This tender has been awarded to ISIPHO SETHU PROJECTS for RÂ 1Â 634Â 754.
Issuing Organization
Ethekwini Metropolitan Municipality
Location
KwaZulu-Natal
Award Date
12 August 2024
ISIPHO SETHU PROJECTS
Award Date
12 August 2024
Status
Active / AwardedScoring
eTenders ID
36783
GOVERNMENT
Get a full report on (ISIPHO SETHU PROJECTS) including tender win history, total contract values, and bidding patterns.
Appointment of a Service Provider for the Supply and Delivery of 1x Plaque and 1x Signage to Emtshezi Secondary School
Request for a Service Provider to Supply and Fit Urinal Flusher, Bottle Traps and Toilet Seats for Trade & Investment Kwazulu-natal.
Pest Control Services and Treatment at Phoenix, Inanda and Kwamashu
Supply and Delivery of Catering Services for the Dtic Foreign Economic Representative at Trade & Investment Kwazulu-natal
Supply and delivery of stationery for 36 months
Learn how to submit a winning bid with these related articles
Gauteng’s 2026 infrastructure pipeline exceeds R65 billion, yet 42% of General-category bids fail at compliance screening. With National Treasury’s April 2026 Preferential Procurement Policy Framework Act (PPPFA) amendments now in force, every supplier engaged in provincial construction, maintenance, and facilities-management work must recalibrate their documentation matrix. Misinterpreting the revised 80/20 and 90/10 preference point thresholds, or submitting outdated BBBEE affidavits, triggers automatic disqualification—costing contractors both tender costs and opportunity value in the country’s most competitive procurement marketplace.
CIDB grading is no longer a “nice-to-have” in Gauteng—every tender from the Department of Infrastructure, City of Johannesburg, Ekurhuleni and Tshwane explicitly calls for the CIDB grade on page 1 of the SBD 1 form. In 2026 the provincial audit units run automated checks against the CIDB iEnabler database; if the grade on your submission does not match the CIDB record, the bid is culled before technical evaluation even opens. One keystroke error—an “8” instead of a “7”—and your envelope is shredded. That is why this guide exists.
Compulsory briefing sessions have become the single most lethal filter in Gauteng’s 2026 procurement cycle. With National Treasury’s 2025 directive requiring organs of state to verify physical attendance through digital attendance certificates, non-attendance now triggers an immediate disqualification—no exceptions, no late submissions, no “technical oversight” appeals. For General contractors bidding in Gauteng’s R12.8 billion infrastructure pipeline this year, understanding the exact legal requirements is not a formality; it is the difference between compliant submission and automatic exclusion.
From AI matching to competitive intelligence — here's how every part of Tenders-SA works together to give South African businesses a real edge in procurement.
đź’ˇ Want more tendering tips and strategies?
Explore Our BlogThe Supply, Maintenance and Support of the Existing Electronic Fare Collection System on Month-to-month Basis for a Maximum Period of Twelve (12) Months: Section 36 (1)(a)(ii)
Provision of Taxi Transportation for Mms Staff on Events Ending Late – 36 Months: Section 36
Contract for the Operation and Management of the Oceanarium and Marine Life Facility at Durban Marine Theme Park T/a Ushaka Marine World
Replacement of a Broken Cremator at Tongaat Crematorium: Section 36
Architectural Capital Framework Panel: New Buildng4.s – New Kwamashu Auto Hub-ward 104 -amendment to the Contract Number Referred Back to Bec (csa-3147a