Scope: Maintenance of Perway (including Turnouts and Track Welding) for the Umlazi Line (Reunion Station to Umlazi Station) in PRASA KZN Region for 6 months. Work includes: Perway maintenance (sleeper/rail replacement, welding of skid marks/rail defects, general track maintenance), Points Maintenance (fettling, re-gauging, geometry rectification, material replacement), Track Welding (exothermic, arc, grinding). Deliverables: Labour, plant, supervision, and tools/equipment for routine and corrective maintenance. Service levels: Work must comply with PRASA railway standards (E10-1996, Manual for Track Maintenance 2000, SSS1-12, E4E, SPK7/1). Key personnel requirements: 2 Qualified Trackmasters (valid C Green Certificate + Train Working Rules), 4 Flagmen (valid certificates), 1 Track Welder (Thermit/Exothermic Welding certificates), 1 SACPCMP-accredited Construction Health and Safety Officer. Tools/Equipment: Must provide a list of required tools (e.g., augers, rail saws, welding machines, tampers, grinders). Occupations/Work Permits: Maximum duration of 6 hours (08:30–15:30 on weekdays), applied 21 days in advance. Penalties: R10,000 for illegal occupation; R200/minute per train delayed (max R10,000/incident). Insurance: Contractor must provide ALL RISK INSURANCE (contract works, public liability, off-site storage, SASRIA, theft). Local Content: Extensive use of local community labour required. Measurement/Payment: Hourly rates for teams (Perway, Points, Welding), provisional labour rates, standing time (if applicable). No price escalation or contract adjustment allowed.