This tender has been awarded to AFAT PROJECTS for R 5 714 286.
Issuing Organization
ESKOM
Location
Limpopo
Award Date
14 August 2024
AFAT PROJECTS
Award Date
14 August 2024
Status
Active / AwardedScoring
eTenders ID
48296
GOVERNMENT
Get a full report on AFAT PROJECTS including tender win history, total contract values, and bidding patterns.
Construction of Community Residential Units (top Structure) and Installation of Engineering Services at Hostel in Greater Tzaneen Municipality Within Mopani District Municipality.
Appointment of a Service Provider to Provide Web Development, Support, and Maintenance Services for the Lnw Website for the Period of 15 Months
Provision of Project Quality Assurance (pqa) Services for the Implementation of Sap S/4hana Private Cloud Edition
Letter to Extend Validity of Enquiry E1609ntcsamwpr - to All Suppliers Who Participated on Enqury for Supply, Delivery and Installation of Cable Trench Covers at Hermes Ss.
Calibration of Test Equipment for Electrical Maintenance Department at Medupi Power Station for a period of 5 years.
Learn how to submit a winning bid with these related articles
Local development is the heart of 2026 procurement. Explore the roadmap for securing township renewal and rural infrastructure contracts.
From AI matching to competitive intelligence — here's how every part of Tenders-SA works together to give South African businesses a real edge in procurement.
Inside the North West's February 2026 procurement cycle. Analysis of the surge in institutional security contracts, administrative supply chain consolidation, and the province's strategic investment in community healthcare support.
Using 'Find and Replace' is a dangerous game. We explain why generic proposals get rejected and how to customize your bid efficiently.
💡 Want more tendering tips and strategies?
Explore Our BlogThe provision of dry cleaning and laundry services at Eskom Transmission, Simmerpan, Victoria Lake Inn on, as and when required basis.
Onsite Machining and line boring at Drakensberg Pumped Storage Scheme for a period of 5 years
The Supply and Delivery of Fluorescent Sulphur Dioxide (so2), Chemiluminescence Nitrogen Oxide (nox) and Ozone (o3) Analyser for Research, Testing & Development Rt&d.
Supply and Delivery of 7x Fine Particulate Dust Samplers/monitors Capable of Both Measuring Pm2.5 and Pm10 Simultaneously for Air Quality Monitoring Network for a Period of Six (6) Months
Tender Validity Extension - The panel appointment of thirty-seven (37) consultants for the provision of Environmental Management Services (EMS) within Central East Cluster (Kwa-Zulu Natal and Free State Operating Units), on an “as and when” required basis for a period of five (5) years.
The Establishment of an Enabling Agreement with a maximum Panel of 30 Contractors for the Provision of Supervision, Labour, Equipment, Material (except the “Big Five” material: Meters, Poles/Cross Arms, Transformers, Cable & Conductor), Transport (as it will be required and authorised) for Electrification of Low Value New Household and Infills Connections (Below R3 000 000,00 per project) for a period of two (2) years and a further six (6) months for the close out of projects, for the Distribution Division in the KwaZulu-Natal Operating Unit, Central East Cluster on an as and when required.
An enabling agreement to establish a panel of 60 Contractors to execute Minor works Project on an “As and When required basis, for a period of 36 months in the KZN Operating Unit, Central East Cluster.
Establishment of an Enabling Agreement for Class 3&4 Wood Pole Replacement Under Dead Work Conditions for 11-33 Kv at Fsou, Bloemfontein Zone and Bethlehem Zone, Centraleast Cluster on an as and When Required Basis. Eskom Will Enter Into a 5 Panel Contract.
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
The provision of MV and LV Electrification infrastructure and connections (households and infills) within the LimLanga Cluster – Limpopo over a period of 48 months.