The tender requires pricing in a detailed Bill of Quantities format.
- Pricing must be broken down by item, unit, quantity, and rate across multiple schedules for Civil, Electrical, Wet, and Fire services.
- The BOQ includes provisional sums for items like safeguarding excavations, control tests, relocation of services, training, and community liaison.
- Dayworks rates are required for various labour categories (unskilled, semi-skilled, artisan, etc.) and plant hire (excavators, TLBs, trucks, generators).
- All rates must include overheads, charges, and profit on provisional sums.
- The contractor must provide a detailed pricing schedule covering all supplied and installed items.
The tender requires a detailed priced Bill of Quantities. Bidders must provide rates for hundreds of line items across four main sections:
- Civil Works: Includes scheduled fixed-charge items (site facilities), time-related items (monthly costs for facilities and supervision), provisional sums, dayworks for labour and plant, and specific construction items (site clearance, pipe trenches, steel tanks, pump station, chambers, pipelines, concrete repairs, fencing).
- Electrical Works: Includes supply and installation rates for cables, trenching, internal installation (sockets, distribution boards, light fittings), and commissioning.
- Wet Services: Includes supply and installation rates for water piping, valves, pumps, and controls.
- Fire Services: Includes supply and installation rates for fire hydrants, signage, piping, and hose reels.
All pricing must be broken down by unit, quantity, and rate, with separate columns for supply and install costs where applicable.
[Source: Annexure-C-BOQ.pdf]
Section 1: civil works
Schedule 1: general
NO (Rand)
SANS
Schedule 1: general
1.01 8.3.1 Contractual Requirements Sum 1
8.3.2 Establishment of Facilities on the Site:
8.3.2.1 Facilities for Engineer (SANS 1200 AB)
Psa
1.02 Engineers Office Sum 1
8.3.2.1(a)
Psa
1.03 Communication costs (cellular phone) Sum 1
8.3.2.1(b)
Psa
1.04 Nameboards (1 No.) Sum 1
8.3.2.1 c)
1.12 Sum 1
8.3.2.2(g) communications
1.13 8.3.2.2(h) Dealing with water (Sub-clause 5.5) Sum 1
1.14 8.3.2.2(i) Access (Sub-clause 5.8) Sum 1
1.15 8.3.2.2.(j) Plant. Sum 1
1.16 8.3.3 Other fixed-charge obligations Sum 1
1.17 8.3.4 Removal of Site establishment Sum 1
Psa
1.18 Issuing of notices to consumers Sum 1
8.3.5.1
Section 1: civil works
Schedule 1: general
1.24 8.4.2 Month 3
duration of Construction:
1.35 Month 3
8.4.2.2.(g) communications
1.36 8.4.2.2(h) Dealing with water (Sub-clause 5.5) Month 3
Section 1: civil works
Schedule 1: general
1.37 8.4.2.2(i) Access (Sub-clause 5.8) Month 3
1.38 8.4.3 Supervision for the Duration of Construction Month 3
1.40 8.4.5 Other Time-related Obligations Month 3
1.4.1 8.4.5.3 Community liaison Officer (CLO) Month 3
Section 1: civil works
Schedule 2: general - dayworks & provisional sums
a) Safeguarding of excavations as required by the Prov
2.01 0 r50 000,00 r50 000,00
a)(i). Overheads, charges and profit on item 2.01
2.02 % 50 000
above
b)Additional Control tests by independent Prov
2.03 1 r50 000,00 r50 000,00
laboratory Sum
b)(i) Overheads, charges and profit on item 2.03
2.04 % 50 000
above
c) Relocation of existing services (water mains, Prov
2.05 0 r100 000,00 r100 000,00
electricity cables/poles, etc.) by Services utility Sum
c)(i) Overheads, charges and profit on item 2.05
2.06 % 100 000
above
d) Additional surveys and underground service
Prov
2.07 detection by nominated specialist as ordered by 1 R50 000,00 R50 000,00
d)(i) Overheads, charges and profit on item 2.07
2.08 % 50 000
above
Prov
2.09 e) Provision for training of targeted labourers 1 R50 000,00 R50 000,00
Sum
e)(i) Overheads, charges and profit on item 2.09
2.10 % 50 000
above
f)Safeguarding of excavations as required by the Prov
2.11 1 r50 000,00 r50 000,00
f)(i) Overhead, charges and profit on item 2.11
2.12 % 50 000
above
g) Appoint a Community Liaison Officer from the Prov
2.13 1 r50 000,00 r50 000,00
community for the duration of the contract Sum
2.14 g)(i) Overheads, charges and profit on item 2.13 % 50 000
h)Tri-gonometrical survey beacons, bench marks
2.15 and plot boundary pegs, -locate and record and 0 R50 000,00 R50 000,00
2.16 h)(i)Contractors mark-up on Item 2.15 above % 50 000
Section 1: civil works
Schedule 2: general - dayworks & provisional sums
i)Tri-gonometrical survey beacons and plot
boundary pegs, -protect and re-establish located
2.17 under item 2.15, above, as ordered, by a 1 R50 000,00 R50 000,00
2.18 i)(i)Contractors mark-up on Item 2.17 above % 50 000
2.19 j)Provisional sum for cost of material 1 R50 000,00 R50 000,00
Sum
2.20 j)i)Contractors mark-up on Item 2.19 above % 50 000
8.7 Dayworks
2.21 Unskilled Labour hours 322
2.22 Semi-skilled Labour hours 38
2.23 Construction-hand hours 32
2.24 Carpenter hours 38
2.25 Driver (LDV, machines, trucks, etc.) hours 32
2.26 Artisan hours 38
2.27 Foreman hours 50
2.28 Gangers and section leaders hours 26
2.29 Bricklayer or plasterer hours 32
2.30 Welder hours 16
8.7 Plant
item will be charged that will cover all relevant
costs of plant hire, including operating crew
2.31 Lowbed transport of plant to and from site km 500
2.32 Excavator (medium), between 93kW & 200kW hours 26
2.33 Tractor loader backhoe (TLB) hours 26
2.34 Front end wheel loaders (2 cub or larger) hours 26
Section 1: civil works
Schedule 2: general - dayworks & provisional sums
2.35 Generator 5Kw hours 26
2.36 Trucks (6 cub or larger) hours 26
2.37 Tip trucks (10 Cub or larger) hours 26
2.38 Water pump 100mm diameter hours 32
2.39 Plate compactor hours 26
2.40 Light delivery vehicles (1ton or equivalent) km 32
2.41 Sewer pump 100mm diameter hours 32
8.8 Temporary works
2.42 8.8.1 Contractors Access Road to Works Sum 1
8.8.4 Existing Services
Supply (or hire) and use of specialist equipment
2,43 8.8.4(a) for the detection of a particular service (electrical) Sum 1
on request of the Employerβs Agent
2,44 8.8.4(b) Day 1
item 1.89 above
2,45 8.8.4(c) m3 300
expose service
Psa8.8.7
services (as instructed by Employerβs agent):
(a) Split PVC pipes sleeves, for diameter:
2,46 (i) 200 mm Γ m 100
2,47 (ii) 250 mm Γ m 100
2,48 PSA8.8.8 Survey of existing services Sum 1
2,49 PSA8.8.9 Sum 1
owners regarding shutdowns & connections
2,5 PSA8.8.10 Provision of record/as-build drawings Sum 1
Section 1: civil works
Schedule 3: site clearance
NO (Rand)
- SANS schedule 3 : site clearance
1200 c
3.1 Clear site
3.1.1 8.2.1 Clear and grub Site m2 87
3.1.2 Manholes No 5
3.1.3 Concrete structures m3 10
Section 1: civil works
Schedule 4: pipe trenches
NO (Rand)
- Schedule 4: pipe trenches
4,1 SANS pipe trenches
1200 db
4,2 8.3.1 Site clearance
4.2.1 8.3.1 a) Site clearance m2 2 116
4.2 8.3.2 Excavation
8.3.2 a) Excavate in all materials for trenches,
backfill, compact, and dispose of surplus/
unsuitable material, for pipes: 100 mm
diam. to 700 mm for total trench depth:
4.2.1 Exceeding 0,0 m but not exceeding 1,0 m m 895,0
8.3.2 b) Extra-over items 8.3.1 to 8.3.4 included for
(provisional):
4.2.2 Intermediate excavation m3 125,3
4.2.3 Hard rock excavation m3 10,0
4.2.5 8.3.2 c) Excavate and dispose of unsuitable m3 10,0
material from trench bottom (Provisional)
4,3 sabs bedding (pipes)
within 0,4 km (Sub-clause 3.4.1)
4.3.1 8.2.1 a) Selected granular material m3 140,8
4.3.2 8.2.1 b) Selected fill material m3 1 196,2
Section 1: civil works
Schedule 5: structural steelworks
NO (Rand)
5, SANS schedule 5: structural
5.1.1 Pipe anchors No, 400
Structural steelwork : abeco
5.1.2 1 x Intake Steel Tank : 24kl rectangular Tank 1
Sum
( Incl.supply and assemble of the steel
5.1.3 2 x Circular 12kl Circular steel tanks( Incl. Sum 2
Section 1: civil works
Schedule 6: pump station
NO (Rand)
6 schedule 6: pump station
Pump station ( as per dwg NO : nt-20236,1
1159-112-001)
backfill or dispose as ordered, from
6.1.1 a) Necessary excavations m3 16
6,2 concrete
1200G
8.2.1 Rough ( below ground):
6.2.1 (a) To outside of walls m2 10
6.2.2 (c) To sides of pipe supports m2 4
8.2.2 Horizontal:
6.2.3 (c) To roof slab including 1/2 round drip on outside m2 4
6.2.4 (e) To ground floor slab m2 12
8.2.4 Box out holes and form voids:
Small, circular of diameter up to and including 0,35
6.2.5
m:
Over 0 m deep up to 0,5m deep No. 2
6.3 Scheduled reinforcement items
6.3.1 8.1.2.3a) Mild steel bars
All sizes t 1
6.3.2 8.1.2.3a) High-tensile steel bars
All sizes t 1
Strength concrete 15 MPa/19mm
6.3.3 8.4.2 (a) Blinding layer in 50 mm thickness m2 30
Strength concrete 20 MPa/8mm
6.3.4 PA 8.2.3 a) Screed to Floor Slab m3 1
6.3.5 PA 8.2.3 b) Screed to Roof Slab m3 1
Strength concrete 35 Mpa/19 mm
6.3.6 8.4.3 (b) In floor slabs m3 9
6.3.7 8.4.3 (c) In concrete surround m3 1
6.3.8 8.4.3 (d) In roof slab m3 12
Section 1: civil works
Schedule 6: pump station
8.4.4 Steel-floated finish
6.3.10 (a) To top of floor slab m2 9
6.3.11 (b) To top of roof slab m2 12
6.3.12 (c) To top of plinth m2 8
8.2.3 Joints
(b) 2 Layers of malthoid or hard board between walls
6.3.13 m 14
and roof slab & Floor slab
6.3.14 Pump cost Sum 2
Section 1: civil works
Schedule 6: pump station
Section 1: civil works
Schedule 7: chambers
NO (Rand)
7.1 Schedule 7: chambers
7.1.1 Prov.
500mmx 500mm x 500mm Rocla Grid Inlet 1 R 30 000,00 30 000,00
Sum
7.1.2 Construct and complete 1 Inlet Chamber
including Pipe fittings, valves and connection to 1 R 50 000,00 50 000,00
7.1.3 Construct and complete 1 x Scour Chambers
including Pipe fittings, valves and connection to 1 R 50 000,00 50 000,00
7.1.4 Construct and complete 5 x Air Valve Chambers
including Pipe fittings, valves and connection to 1 R 50 000,00 250 000,00
7.1.5 Prov.
Refurbishment of the Existing chamber 1 R 50 000,00 50 000,00
Sum
7.1.6 Construct and complete Level Control Chamber
including Pipe fittings, valves and connection to 1 R 50 000,00 50 000,00
Total Carried Forward To Summary R 480 000,00
Section 1: civil works
Schedule 8: medium pressure pipelines
8 schedule 8: medium pressure pipelines
SANS
8,1 medium pressure pipelines
1200 l
Supply, handle and lay PE 100 Class PN 16 HDPE
pipe above Ground
8,1,1 8.2.1 110mm dia m 985
8,1,2 125mm dia m 895
above ground
8,1,3 125mm dia m 238
8,2 pipe fittings
8,2,1 or flanged fittings on site for HDPE Pipes Class 1 R 50 000,00 R 50 000,00
m
Pe100 pn16
8,3 connection to existing water network
8,3,1 1 r 50 000,00 r 50 000,00
steel tanks Sum
Section 1: civil works
Schedule 9: concrete remedial works
No (Rand)
9 schedule 9: concrete remedial
SANS concrete (structural)
9,1 Refurbishment of the two existing Reinforced Prov.
1 r 100 000,00 r 100 000,00
9,2 Refurbishment of the broad crest weir wall Prov. 1 R 50 000,00 R 50 000,00
across the river 25m in length Sum
Total Carried Forward R 150 000,00
of 33
Section 1: civil works
Schedule 9: concrete remedial works
No (Rand)
- Schedule 13: fencing
13,1 pa 8.2 Supply and erect new steel see
13.1. PA 8.2.2 New 2.4m high Concrete Palisade fence m 140,0
2 complete as shown in the drawing NT06-22-
1121-601-PS- 005
13,3 pa 8.4 Supply and erect new security
13.3. PA 8.4.1 New 2.4m high, 4m wide steel palisade No. 1,0
1 security gate (Double Leaf Type) complete
as shown in the drawing NT06-22-1121-601-
13.3. PA 8.4.2 New 2.4m high, 4m wide steel palisade No.
2 security gate (Sliding Type) complete as
shown in the drawing NT06-22-1121-601-PS-
Section 1: civil works
(Rand)
1 schedule 1: general
2 schedule 2: general - dayworks & provisional sums
3 schedule 3: site clearance
4 schedule 4: pipe trenches
5 schedule 5: structural steel
6 schedule 6: pump station
7 schedule 7: chambers
8 schedule 8: medium pressure pipes
9 schedule 9: concrete repairs
10 schedule 9: fencing
Section 2: electrical works
Schedule 1: cables and accessories
Schedule 1: cables and accessories
1.2.1 35 mm2, 4-core No. 2
1.2.2 10 mm2, 4-core No. 2
1.2.3 16mm2, 4-core No. 2
Section 2: electrical works
Schedule 2: trenching and excavations
Schedule 2: trenching and excavations
2,1 trenching for low voltage cables
of
2.1.1 Soil_dig,backfill,compact hand pickable m3 180
2.1.2 lose rocks /soil_dig,backfill,compact m3 45
2.1.3 soft soil m3 120
2.1.4 Danger Barriers for Trenches (500m long & 75mm wide) m 500
2.1.5 a) In solid rock (material which requires drilling) m3 86,4
b) In solid rock ( material which requires blasting) m3 86,4
Section 2: electrical works
Schedule 3: internal electrical installation
Schedule 3: internal electrical installation
Complete electrical installation: internal small power and
lighting
3,1 switched socket outlets
position for casting into concrete or screed, for building
in or chased into concrete or brickwork and for surface
mounted in ceiling voids included dending threading,
jointing, short lengths, draw boxes, and saddles etc. as
specified: couplings, bends, tees,
3.1.1 16 Amp single switched socket outlet complete with No. 7
cover plate for
installation in a 100 mm x 100 mm drawbox, etc.
3.1.2 Isolator three phase No. 6
100 mm x 100 mm draw box flush mounted complete
3.1.3 chased into brickwork No. 7
3,2 distribution boards
equipment to be provided in the electrical \distribution
board where applicable
DB-A No. 1
DB-B No. 1
DB-C No. 1
3,3 light fittings
position for casting into concrete or screed, for building
in or chased into concrete or brickwork and for surface
mounted in ceiling voids included bending threading,
short lengths, draw boxes, couplings, bends, tees and
saddles etc. as specified:
voids or roof trusses including all fixing brackets,
supports, connectors, connections complete with lamps
Section 2: electrical works
Schedule 3: internal electrical installation
3.3.1 Vapourline 36W No. 10
Bulkhead Round black NW 20WLED complete with its
3.3.2 holder and cover No. 16
3.3.3 accessories No. 4
Photo cell/ Day night switch with controller No. 3
20 mm diameter steel galvanized conduit complete
installed with all bends, fixing saddles, adaptors, chased
3.3.4 into walls, act. as specified. m 200
25 mm diameter Steel Galvanized conduit complete
installed with all bends, fixing saddles, adaptors, chased
3.3.5 into walls, act. as specified.
m 200
100 mm x 50 mm draw box surface mounted complete
3.3.6 installed into Brickwork m 10
3,4 earthing and bonding
3.4.2 be tested and Sum 1
upgrade complete as required, etc.
Section 2: electrical works
Schedule 4: commissioning of installation
Schedule 4: commissioning of installation
4,1 complete installation. Sum 1
4,2 for examination as specified. Sum 1
terms of the SANS specifications for each completed
4,3 distribution board. Sum 1
Allow for the provision of a complete set (3 Copies) of
marked-up record "as-built" drawings of the final layout
4,4 of the electrical services. Sum 1
Section 2: electrical works
ITEM DESCRIPTION Amount (Rand)
1 schedule 1: cables and accessories
2 schedule 2: trenching and excavations
3 schedule 3: internal electrical installation
4 schedule 4: commissioning of installation
Section 3: wet services
Schedule 1: preliminaries and general
1 Site Establishment Sum 1
2 Workshop Drawings No 3
The Contractor shall make provision for 4 x
copies of O & M Manuals in accordance with No 3
the detail in the Standard specification.
The Contractor shall make provision for 1 full
day's training of the Clients Staff, on the Sum 1
operation of the installation.
detailed set of As Fitted Layout drawings of
No 3
the entire installation, as the project
progresses.
commission and pressure test the installation
Sum 1
during construction
8 entire installation. 11 x Standard Maintenance Sum 1
visits and 1 x Major service is required
throughout the 12 months.
Section 3: wet services
Schedule 2: domestic hot and cold water pipe installation
1,1 Galvanised Pipe: (Surface Mounted )
Water piping in accordance with SANS 460 installed
complete with short lengths, cutting, plain couplings,
capillary solder and jointing strictly in accordance with
the Manufacturer's instructions, support brackets etc.
10252 regulations.
1.1.1 dia 100 m 20
1.1.2 dia 50 m 20
1,2 Bends:
accordance with SANS 1067 - 2 complete with
hangers, brackets, soldering , etc.
1.2.1 dia 42 No 5
1.2.2 dia 35 No 5
1,3 Tees:
accordance with SANS - 10252 complete with
hangers, brackets, soldering , etc.
1.3.1 dia 50-50-50 No 2
1.3.2 dia 35-35-35 No 2
1,4 Reducers
accordance with SANS - 2 complete with hangers,
brackets, soldering , etc.
1.4.1 100-76 No 2
1.4.2 76-50 No 2
Section 3: wet services
Schedule 2: domestic hot and cold water pipe installation
piping, etc., all strictly in accordance with
1056 - 3
2,1 dia 100 No 5
2,2 dia 50 No 5
piping, etc., all strictly in accordance with
3,1 dia 50-50-50 No 2
3,2 dia 35 No 2
etc., all strictly in accordance with Manufacturer's
instructions.
4,1 dia 100 No 2
4,2 dia 50 No 2
Pump specification @ min 100 l/min @ 15 m No 2
installation within the confines of the pump house
with cable runs not exceeding 6 m between pump &
panels supplied. 2 Tier Autostart arrangement c/w
pressure switches and gauges. Includes pump house
pipe work and tank to pump complete with valves and
trim.
requirement complete with all necessary accessories No 2
Section 3: wet services
1 schedule 1: preliminaries and general
2 schedule 2: domestic hot and cold water pipe
Section 4: fire services
Schedule 1: preliminaries and general
1 Site Establishment Sum 1
2 Workshop Drawings No 3
The Contractor shall make provision for 4 x copies of O & M
Manuals in accordance with the detail in the Standard No 3
specification.
The Contractor shall make provision for 1 full day's training of
the Clients Staff, on the operation of the installation. Sum 1
Fitted Layout drawings of the entire installation, as the project No 3
progresses.
Sum 1
pressure test the installation during construction
9,1 Submission of shop drawings Sum 1
Non-return valve (size to be confirmed with
10 CIVIL CONTRACTOR - ALLOWED FOR DIAMETER 100 No 1
mm)
ANGLED FIRE HYDRANTS WITH 65 mm DIAMETER
Instantaneous couplings to SANS 10400 and
12 SANS 10252. PIPE TO CONNECT TO UNDERGROUND No 1
Pipework (by civil engineer). Item to include
Section 4: fire services
Schedule 2: entire site
1,1 65 mm Pillar Type Fire Hydrant No. 2
1,2 F13 Signage 190mm x 190mm No. 2
1,3 F30 Signage 290mm x 290mm No. 2
1,4 100mm piping Underground Class 12 uPVC No. 150
1,5 50mm piping Underground Class 12 uPVC No. 900
1,7 30 m Fire Hose Reel No. 2