Contract scope: construction of the bulk water pipeline forming Phase 2 of infrastructure upgrades at Mdala Nature Reserve.
Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records MADALA LANDPAVING AND BUILDING CONSTRUCTION as appointed for this tender. Recorded contract value: 8900085.86 ZAR.
Qualified inference