Contract duration of 20 weeks from commencement to practical completion; 5% of construction value set aside for local SMME material procurement and at least 25% of work subcontracted to local SMMEs.
Threshold: at least 25% of work subcontracted to local SMMEs
Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for SHWEME AND SHWENZA TRADING ENTERPRISE.