Scope: Supply, delivery, removal of existing UPS systems, and installation, testing, and commissioning of three (3) new UPS systems at the Port of East London. Duration: 6 months.
Key deliverables:
- Procure/supply new UPS systems.
- Remove existing UPS systems.
- Install new UPS systems.
- Test and commission new UPS systems.
- Dispose of waste and restore the site.
Supply, delivery, removal of existing UPS systems, and installation, testing, and commissioning of three (3) new UPS systems at the Port of East London for a period of 6 months.
[Source: 2. Technical Functionality Evaluation Criteria for Supply and Installation of UPS.pdf]
Environmental requirements include:
- Submission of an Environmental Management Plan as part of the SHE Management Plan.
- Disposal of waste and site restoration must be addressed in the method statement.
[Source: 2. Technical Functionality Evaluation Criteria for Supply and Installation of UPS.pdf]
Submit a comprehensive method statement detailing the execution plan for:
- Procurement/supply of UPS systems.
- Installation of new UPS systems.
- Testing of UPS systems.
- Disposal of waste and site restoration.
- Project schedule with milestones and activities.
Minimum 3 of 5 aspects required for scoring. Points increase with the number of aspects covered (20 to 100).
[Source: 2. Technical Functionality Evaluation Criteria for Supply and Installation of UPS.pdf]
Company Experience (30% weight):
- Submit 3+ signed reference letters or practical completion certificates for UPS/similar work.
- Each must include project description and valid client contact details (name, email, address, phone).
- Points: 20 (1 reference), 40 (2), 60 (3), 80 (4), 100 (5+).
Key Personnel Qualification (15% weight):
- Submit copies of electrical artisan/electrician qualifications with trade test certificates.
- Points: 20 (N2), 40 (N3), 60 (N4), 80 (N5), 100 (N6 or higher).
Key Personnel Experience (15% weight):
- Submit CVs for electrical artisans/electricians with UPS/similar work experience.
- Minimum 3 years required.
- Points: 20 (1-2 years), 40 (2-3 years), 60 (3-4 years), 80 (4-5 years), 100 (5+ years).
- Qualifications must match CVs.
[Source: 2. Technical Functionality Evaluation Criteria for Supply and Installation of UPS.pdf]