This tender has been awarded to ADY EM TECHNICAL for R 1.
Issuing Organization
ESKOM
Location
Western Cape
Award Date
22 October 2024
ADY EM TECHNICAL
Award Date
22 October 2024
Status
Active / AwardedScoring
eTenders ID
37074
GOVERNMENT
Get a full report on ADY EM TECHNICAL including tender win history, total contract values, and bidding patterns.
Appointment of a Service Provider for the Assessment and Training of Artisan Recognition of Prior Learning (arpl) Project for Occupational Certificate: Electricians for a Period of 18 Months (closed Bid)
Partitioning of Storeroom
Request for Bids for the Appointment of a Contractor for the Upgrades and Renovations to Various Ablution Facilities at the Kirstenbosch National Botanical Garden: Repairs and Renovations Contract
Supply and Delivery of 5500 Liter Water Tanks with Taps and Fittings for a Period of Three Years
Supply and delivery Hand Tools to iThemba LABS (NRF), Cape Town.
The provision of dry cleaning and laundry services at Eskom Transmission, Simmerpan, Victoria Lake Inn on, as and when required basis.
Onsite Machining and line boring at Drakensberg Pumped Storage Scheme for a period of 5 years
The Supply and Delivery of Fluorescent Sulphur Dioxide (so2), Chemiluminescence Nitrogen Oxide (nox) and Ozone (o3) Analyser for Research, Testing & Development Rt&d.
Supply and Delivery of 7x Fine Particulate Dust Samplers/monitors Capable of Both Measuring Pm2.5 and Pm10 Simultaneously for Air Quality Monitoring Network for a Period of Six (6) Months
Tender Validity Extension - The panel appointment of thirty-seven (37) consultants for the provision of Environmental Management Services (EMS) within Central East Cluster (Kwa-Zulu Natal and Free State Operating Units), on an “as and when” required basis for a period of five (5) years.
Supply, Delivery, Construction and Erection of an 80m Tower at Wapadskloof Substation and 65m Tower at Monsterlus Radio Station within LimLanga Cluster –Limpopo Area for a period of 12 months.
For the Watershed Substation Refurbishment Supply and Installation of 275kv Tubular Busbar, 275kv Tubes Postinsulators, & Tubular Busbar Clamps
The provision of MV and LV Electrification infrastructure and connections (households and infills) within the LimLanga Cluster – Limpopo over a period of 48 months.
The Establishment of an Epc and Line Construction Panels for 132kv, 275kv, 220kv, 400kv, 533kv Dc and 765kv for Transmission Division
The provision of control plant within Limlanga Cluster on an “as and when” required basis for a period of 60 months.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog