Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Eskom Holdings SOC Ltd, Duvha Power Station - WITBANK - WITBANK - 1035
Organization Type
GOVERNMENT
Published
21 May 2026
OCDS Reference
ocds-9t57fa-156722
This tender involves the replacement of diesel generators at eskom's duvha power station in the north west province. IT is an open bid request targeting suppliers capable of providing compliant and efficient generator replacement solutions for a critical power infrastructure site.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Categories
Request for Bid(Open-Tender)
Eskom Holdings SOC Ltd, Duvha Power Station - WITBANK - WITBANK - 1035
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: Low Risk OHS Specification.pdf, SAS0012 Project Specific Risk.pdf, TENDER~1.PDF and 18 more. You don’t need to refresh — this page will pick up the updated review automatically.
21 May
2026
Tender Published
Tender was published
22 Jun
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annex-c_Local content Declaration-Summary Schedule.pdf
ANNEX-~3.PDF
etendering-user-verification-1.mp4
OCCUPA~1.PDF
The tender is for the replacement of diesel generators at Eskom's Duvha Power Station in the North West Province. The document provided is a Section 37(2) Agreement under the Occupational Health and Safety (OHS) Act, outlining the compliance requirements for contractors/suppliers undertaking the project.
How-to-locate-the-etendering-site-1.mp4
ESKOM'~1.PDF
Annexure B .pdf
The tender is for the replacement of diesel generators at Eskom's Duvha Power Station in the North West Province. It includes the supply and delivery of Economizer Elements & Bends and Boiler Tubing for stock over four years on an as-needed basis. The tender emphasizes strict compliance with Eskom’s Occupational Health and Safety (OHS) legal requirements, policies, and procedures, with penalties for non-compliance.
TENDER~1.PDF
ESKOM is seeking tenders for the replacement of diesel generators at Duvha Power Station in the North West Province. The scope includes design, supply, installation, integration, and commissioning of diesel generators and associated systems (electrical, control & instrumentation, low-pressure services, and civils/structures). The tender closes on 22 June 2026.
32-345_Eskom_Vehicle_Safety_Specification-Exp 12-2028.pdf
The tender is for the replacement of diesel generators at Eskom's Duvha Power Station in the North West Province. The associated document provided is Eskom's Vehicle Safety Specification (Revision 6), which outlines safety standards for all vehicles used in Eskom operations, including contractors. While the tender title focuses on diesel generators, the document details vehicle safety compliance, which may be indirectly relevant to logistics or service vehicles involved in the generator replacement project.
etendering-create-submission-1.mp4
Drawing.zip
How-to-register-on-etendering-1.mp4
DUVHAP~2.PDF
EMPLOY~1.PDF
The tender pertains to the replacement of diesel generators at Eskom's Duvha Power Station in the North West Province. The provided document, however, is a procedural guideline titled 'Employees’ Right of Refusal to Work in an Unsafe Situation Procedure,' which outlines Eskom’s health and safety protocols, including the right of employees to refuse unsafe work and the steps for reporting and resolving unsafe conditions. This document is not the tender specification but provides context on Eskom’s safety and compliance expectations, which may be relevant for applicants.
ANNEX-~2.PDF
ENVP0005_Rev8_WASTE MANAGEMENT (ENVIRONMENTAL) (003).pdf
This document is not a tender solicitation but Eskom's internal Waste Management Work Instruction (ENVP0005) for Duvha Power Station. It details comprehensive procedures for handling, storing, transporting, and disposing of both general and hazardous waste streams generated at the station, in compliance with national regulations and Eskom standards.
Low Risk OHS Specification.pdf
The tender is for the replacement of diesel generators at Eskom's Duvha Power Station in the North West Province. The document outlines extensive Occupational Health and Safety (OHS) requirements, legal compliance, and procedural guidelines for contractors. The scope includes supply, refurbishment, and testing of boiler tubing and pump components, with strict adherence to Eskom’s SHEQ policies, risk assessments, and life-saving rules. The closing date is June 22, 2026.
E-TEND~1.PDF
This tender, issued by ESKOM, pertains to the replacement of diesel generators at Duvha Power Station in the North West Province. The closing date for submissions is June 22, 2026. A key preliminary requirement is the completion and submission of an E-Tendering Training Acknowledgement Form, confirming the tenderer's ability to use the E-Tendering Solution.
SAS0012 Project Specific Risk.pdf
This tender document is a Project Specific Risk Assessment form for Eskom's Duvha Power Station in North West province, focusing on vehicle-related safety hazards during site operations. The document outlines six specific vehicle accident risks with their causes, priority ratings, likelihood, and consequences. It includes a risk matrix and consequence criteria for health and safety impacts. The tender title references replacement of diesel generators, but the provided document content is specifically a safety risk assessment form.
Eskom life-saving rules-Extended review date.pdf
The tender is for the replacement of diesel generators at Eskom's Duvha Power Station in the North West Province. The document provided outlines Eskom's Life-Saving Rules, which are critical safety protocols that must be adhered to by all employees, contractors, and visitors. These rules are non-negotiable and violations result in severe disciplinary actions, including potential removal from site and legal consequences. The tender likely requires strict compliance with these safety standards, among other technical and procedural requirements.
32-95 -Expires March 2027.pdf
The document provided is not the tender document itself, but Eskom's internal 'Occupational Health and Safety Incident Management Procedure' (Revision 9). It details the standardized process for managing OHS incidents across Eskom, including identification, emergency response, notification, investigation, and corrective actions. The actual tender for 'The replacement of diesel generators at Duvha Power Station' is not included in the provided text.
Invitation to Tender (ITT) (Diesel Generator) 20260520.pdf
Eskom Holdings SOC Ltd invites tenders for the replacement of diesel generators at Duvha Power Station. The tender (E1397GXMPDUVR) is open, with submissions due by 22 June 2026 at 10:00 AM UTC. The project requires compliance with Eskom’s Standard Conditions of Tender, CIDB grading (6ME or higher), and adherence to technical, financial, and contractual requirements. Evaluation follows a two-stage technical assessment (mandatory and qualitative) with a 70% threshold, followed by price and specific goals scoring (90/10 or 80/20 PPPFA system).
NEC for Duvha PS Diesel Generator Replacement .pdf
Eskom seeks a contractor to replace five diesel generators (1MW each) at Duvha Power Station in North West province using the NEC3 Engineering & Construction Contract (Option A: Priced contract with activity schedule). The contract duration is 24 months from award, with a closing date of June 22, 2026.
Gx Division Contractor Criminal check.final (005).pdf
Eskom is seeking tenders for the replacement of diesel generators at Duvha Power Station in the North West Province. The tender emphasizes strict security and compliance requirements, including mandatory criminal background checks for all contractor employees accessing the site, as the power station is a National Key Point (NKP). The tender closes on 22 June 2026.
ACKNOW~1.PDF
This document is Annexure B of Eskom's tender for replacing diesel generators at Duvha Power Station, focusing on Occupational Health and Safety (OHS) compliance requirements. It outlines mandatory OHS documents, responsibilities, and management protocols for contractors and suppliers.
32-726 -rev3-Exp March 2025.pdf
This document is Eskom's standard procedure (32-726, Rev. 3) for managing Occupational Health and Safety (OHS) throughout the contractor procurement and management lifecycle. It outlines a six-phase model, from project initiation to post-contract review, mandating OHS integration at every stage. The tender for replacing diesel generators at Duvha Power Station will be governed by these strict OHS compliance rules.
SAS001~2.PDF
This document is Eskom's Safety, Health and Environmental Specification (SAS0012, Rev 10) for contractors working at Duvha Power Station. It is a mandatory set of rules and procedures, not the tender itself, but forms a critical part of the tender and contract requirements. It defines the SHE (Safety, Health, Environment) standards, roles, responsibilities, and compliance protocols that all contractors must follow while performing work, such as the replacement of diesel generators.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 1 724 971
Range
Based on 23 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Contact Information
Source: Low Risk OHS Specification.pdfEskom Contract’s Manager: George Klopper. Eskom’s OHS Manager: S.Matsebe. Eskom OHS Officer: Ephraim Ngoato. Address: Duvha Power Station.
Evaluation Criteria
Source: Low Risk OHS Specification.pdfMandatory: Valid COID registration and Letter of Good Standing; Compliance with South African OHS legislation and Eskom’s SHEQ standards; Proven technical capability to refurbish boiler components and diesel generators; Ability to provide statutory appointments (e.g., OHS officers, competent supervisors); No history of child labor or non-compliance with hazardous work regulations. Preferred: Prior experience working with Eskom or in power station environments; Certification to ISO 45001 (Occupational Health and Safety Management); Established medical surveillance and incident management programs.
Technical Specifications
Source: Low Risk OHS Specification.pdfScope of Work: Collect the damaged pump; Strip the pump; Identify internal/external damage; Refurbish the pump based on identified scope; Record clearances; Assemble the pump; Test the assembled pump; Deliver the pump back to Duvha Power Station. Note: Awarded contractor is the 'Main contractor'; subcontractors are 'Appointed contractors'. Contractors must retain a copy of the scope of work.
Compliance Requirements
Source: Low Risk OHS Specification.pdfLegal Compliance: Section 37(2) OHS Act agreement must be signed between Eskom and the Main contractor at safety file submission. Main contractor must compile Section 37(2) agreements with all Appointed contractors. Originals retained by contractors; copies retained by Eskom project manager. Legislative Compliance: Constitution of South Africa (Section 24 Bill of Rights), Occupational Health and Safety Act 1993 and Regulations, National Environmental Management Act 1998, Environment Conservation Act 1989, National Water Act 1998, National Road Traffic Act, Compensation for Occupational Injuries and Diseases Act, SANS Standards. COID: Main contractor and Appointed contractors must be registered with the Compensation Commissioner and possess a valid Letter of Good Standing (LoG). LoG must remain valid throughout the contract and be filed in the contractor’s OHS files. Statutory Appointments: Main contractor and Appointed contractors must appoint competent workers compliant with OHS Act criteria. Eskom Life-Saving Rules: Must be obeyed by all contractors and employees on Eskom premises. Rules include: Isolate and test before touch (plant >1000V), hook up at heights, buckle up, be sober, permit to work, wear correct PPE, report all injuries before end of shift. Substance Abuse: Zero tolerance for alcohol/drugs. Contractors must follow Eskom Procedure 32-37 and include life-saving rules in induction. Ad hoc alcohol testing at site entrance. Contractors may develop their own testing manuals. Test results must be confidential and filed in employee records. SHEQ Policy: Main contractor and Appointed contractors must compile and sign a SHEQ policy (aligned with OHS responsibilities) by the CE or appointed assistant. Policy must be displayed prominently and filed in OHS files. OHS Plan: Contractors must develop an OHS plan meeting Eskom and legislative requirements. Plan must address hazards, safe work procedures, and risk mitigation. Risk Assessments: Mandatory per Section 8(2)(d) of OHS Act. Must identify hazards, evaluate risks, and implement control measures. Assessments must be reviewed periodically and updated for new processes. Safe Work Procedures: Required for all activities, aligned with risk assessments. Must detail tasks, risks, equipment, control measures, PPE, and training. Medical Assessments: Main contractors must ensure employees and Appointed contractor employees undergo entry, periodic, and exit medical examinations. Medical fitness certificates must be renewed annually. Occupational Health Program: Contractors must develop a program to identify and control health risks. PPE: Contractors must provide and maintain risk-based PPE for all employees and visitors. PPE must comply with SANS standards. Incident Reporting: All incidents must be reported and investigated within 48 hours by competent investigators, aligned with Eskom Procedure 32-95. Non-compliance may result in disciplinary action. Emergency Management: Contractors must develop and align their emergency response plan with Eskom’s. Periodic drills must be conducted and recorded. Environmental Compliance: Contractors must develop and maintain an Environmental Management Plan (EMP) compliant with ISO 14001. Must include impact summaries, mitigation measures, monitoring programs, and employee training. Waste disposal must comply with Duvha Power Station and National Environmental Management Act requirements. OHS Files: Contractors must maintain OHS files on-site, including all relevant documentation. Files must be available for audit and inspection. Work Stoppage: Any person may stop work if unsafe acts/conditions pose imminent threats. Non-conformance reports must be raised and documented. Hours of Work: Must comply with Basic Conditions of Employment Act. Overtime and night work require risk assessment reviews and approvals. Child Labour: Prohibited per Constitution and Basic Conditions of Employment Act. Contractors must ensure no child labour is used.
Important Dates
Source: SAS0012 Project Specific Risk.pdfClosing date: 3 June 2020
Evaluation Criteria
Source: SAS0012 Project Specific Risk.pdfContractor must demonstrate capability to manage identified vehicle safety risks. Must have experience with power station environments. Must comply with Eskom safety standards and risk management procedures. Understanding of occupational health and safety requirements, particularly regarding vehicle operations in industrial settings, is required.
Submission Guidelines
Source: TENDER~1.PDFSubmit the following returnable documents as part of your tender: ISO 9001 Certificate, ISO 3834 Part 2 Certificate (if applicable), ECSA registration certificates for Electrical, Mechanical, and Civil Engineers/Technologists (Pr. Eng/Pr. Eng Tech), CVs reflecting relevant experience (including civil/structural consulting works), and certified copies of qualifications (certification must be within 6 months of submission date). Failure to meet any Mandatory Technical Evaluation Criteria will result in automatic disqualification.
Evaluation Criteria
Source: TENDER~1.PDFEvaluation consists of two stages: Mandatory Technical Evaluation Criteria (gatekeepers) and Qualitative Technical Evaluation Criteria. Mandatory Criteria: Assessed on a Yes/No basis. Failure to meet any criterion results in automatic disqualification. Qualitative Criteria: Weighted scoring (0, 2, 4, or 5 points per criterion) with a minimum threshold of 70% to proceed. Key Performance Areas (KPA) and weights: 40% for five project experience in diesel generator replacement or similar work (last 5 years), 10% for Method Statement (Electrical, C&I, Mechanical, Civil), 10% for Project-based Team Organogram, 20% for Proposed Staff Allocation (CVs & qualifications), 10% for proof of HVAC installation experience (last 5 years), 10% for Civil Construction experience (last 15 years). Scoring: 5 = Fully compliant, 4 = Compliant with acceptable qualifications, 2 = Non-compliant, 0 = Totally deficient or non-responsive.
Technical Specifications
Source: TENDER~1.PDFScope: Design, supply, installation, integration, and commissioning of diesel generators at Duvha Power Station. Disciplines and boundaries: Electrical: Diesel generator room (engines, alternators, control panels, starting/protection systems, circuit breakers, power cabling up to 380V Diesel Generator Board). Control & Instrumentation (C&I): From existing controllers to unit control room (junction boxes, field instrumentation, control cabling, interfaces from Engine Operating Device for monitoring alarms, status, and operational parameters). Low Pressure Services (LPS): Diesel generator room (fuel oil supply, cooling, HVAC, fire protection; repair/replace as required). Civils & Structures: Generator room and external installations (water cooling towers, diesel storage tanks; structural assessments and load verification for new equipment).
Compliance Requirements
Source: TENDER~1.PDFMandatory certifications: ISO 9001 Certification, ISO 3834 Part 2 Certification (if applicable). Professional registrations: 1x ECSA Registered Electrical Engineer/Technologist (Pr. Eng/Pr. Eng Tech), 1x ECSA Registered Mechanical Engineer/Technologist (Pr. Eng/Pr. Eng Tech), 1x ECSA Registered Civil Engineer/Technologist (Pr. Eng/Pr. Eng Tech). Submit certified copies of qualifications and ECSA certificates (certification must be within 6 months of submission date). Additional compliance: CVs reflecting civil/structural consulting experience, proof of HVAC installation experience (client references or completion certificates within the last 5 years), and tenderer/sub-contractor Civil Construction experience (completion certificates for similar works within the last 15 years).
Submission Guidelines
Source: ESKOM'~1.PDFCompliance Requirements
Source: ESKOM'~1.PDFSubmission Guidelines
Source: ANNEX-~3.PDFReturnable Documents: Not specified in the provided text.
Submission Guidelines
Source: Annex-c_Local content Declaration-Summary Schedule.pdfReturnable Documents: The specific returnable documents required are not detailed in the provided text.
Compliance Requirements
Source: Annex-c_Local content Declaration-Summary Schedule.pdfInsufficient searchable text - AI extraction recommended.
Evaluation Criteria
Source: Eskom life-saving rules-Extended review date.pdfGeneral Requirements:
Safety Requirements:
Technical Requirements:
Legal Requirements:
Technical Specifications
Source: Eskom life-saving rules-Extended review date.pdfScope: Replacement of diesel generators at Duvha Power Station, governed by Eskom’s Life-Saving Rules framework.
Key Technical and Safety Requirements:
Electrical Work:
Work at Height:
Vehicle Safety:
Substance Policy:
Permit to Work (PTW):
Applicability:
Compliance Requirements
Source: Eskom life-saving rules-Extended review date.pdfMandatory Compliance:
Contractor Obligations:
Disciplinary Consequences:
Contact Information
Source: 32-345_Eskom_Vehicle_Safety_Specification-Exp 12-2028.pdfAuthorized personnel listed in the document:
Note: No direct submission contacts, emails, phones, or addresses for tender queries are provided.
Evaluation Criteria
Source: 32-345_Eskom_Vehicle_Safety_Specification-Exp 12-2028.pdfGeneral requirements:
Vehicle-specific requirements:
Documentation requirements:
Technical Specifications
Source: 32-345_Eskom_Vehicle_Safety_Specification-Exp 12-2028.pdfScope:
Minimum safety specifications for all vehicle types:
Additional requirements for Eskom-owned vehicles:
Heavy commercial vehicles (GVM ≥ 3,500 kg):
Minibuses:
Midi-buses and buses:
Construction vehicles/equipment:
Modifications:
Standards referenced:
Compliance Requirements
Source: 32-345_Eskom_Vehicle_Safety_Specification-Exp 12-2028.pdfLegislative compliance:
Standards compliance:
Eskom-specific compliance:
Note: No tender-specific compliance requirements (e.g., CSD, tax, B-BBEE, CIDB, CIPC, local content) are explicitly stated in the document.
Evaluation Criteria
Source: 32-95 -Expires March 2027.pdfBidder must demonstrate capability to comply with Eskom's Occupational Health and Safety (OHS) Incident Management Procedure (Document 32-95). This includes: - Trained personnel familiar with Eskom's incident classification, reporting, and investigation processes. - Systems and processes aligned with SAP EH&S for recording and managing OHS incidents. - Compliance with Eskom's internal processes, statutory appointments, and roles/responsibilities as outlined in the procedure. - Ability to adhere to Eskom's incident prioritisation, corrective action management, and communication protocols.
Technical Specifications
Source: 32-95 -Expires March 2027.pdfNote: This document (32-95) is Eskom's internal OHS Incident Management Procedure and NOT the tender specification for 'The replacement of diesel generators at Duvha Power Station'. For actual technical requirements, refer to the correct tender documents. This procedure covers: - Incident identification, emergency response, and reporting. - Classification and recording of incidents (e.g., first-aid, medical, lost-time injuries, fatalities). - Investigation, corrective actions, and close-out processes. - Roles, responsibilities, and compliance with statutory and Eskom-specific OHS standards.
Submission Guidelines
Source: E-TEND~1.PDFMandatory returnable: Submit the fully completed E-Tendering Training Acknowledgement Form (Template ID: 240-9722574 Rev 1) to Eskom within the prescribed period. Failure to submit or incomplete submission will disqualify the tenderer. Required fields: business name/JV, contact person, landline, cellphone, email, tenderer’s name, authorized signature, designation, and date. Self-training via the E-Tendering Noddy Guide, video, or clarification meeting is mandatory before submission.
Evaluation Criteria
Source: E-TEND~1.PDFDisqualification criteria: Non-submission or incomplete submission of the acknowledgement form. Mandatory requirement: Tenderer must confirm self-training proficiency for the E-Tendering Solution. Compliance: Adherence to ESKOM's document control and copyright policies is required.
Submission Guidelines
Source: ANNEX-~2.PDFCompliance Requirements
Source: ANNEX-~2.PDFEvaluation Criteria
Source: EMPLOY~1.PDFScoring likely includes: Legal compliance (valid registrations, OHSA, ISO 9001). Prior experience in generator replacement or power station upgrades. Strong health and safety track record with no major incidents. Demonstrated financial capacity to execute the project. Preference for local content or partnerships in North West Province.
Important Dates
Source: NEC for Duvha PS Diesel Generator Replacement .pdfContract start date: 01 October 2026. Completion date: 30 September 2028 (24 months). Key milestones: Submit method statement within 3 weeks after contract award. Submit QCP for approval within 4 weeks after contract award. Submit programme for approval within 2 weeks after contract award. Submit safety file within 2 weeks after project kick-off meeting. Submit detailed design for approval within 3 months after contract award. Access to site: Immediately after safety file approval and inductions. Defects date: 52 weeks after completion of each diesel generator unit. Defect correction period: 2 working days for planning, up to 2 weeks or as agreed based on defect complexity.
Contact Information
Source: NEC for Duvha PS Diesel Generator Replacement .pdfProject Manager: Takalani Mudonde, Address: P O BOX 2199, Witbank, 1035, Tel: +27 13 680 3127, Email: [email protected]. Supervisor: Mighty Diale, Address: P O BOX 2199, Witbank, 1035, Tel: 013 690 0813, Email: [email protected].
Submission Guidelines
Source: NEC for Duvha PS Diesel Generator Replacement .pdfSubmit the following returnable documents with your bid: Signed Form of Offer and Acceptance (C1.1) by a duly authorised representative. Alternative tenders require a separate form. Record all deviations from tender documents in the Schedule of Deviations. Provide required securities, bonds, guarantees, and proof of insurance within two weeks of contract award. Failure to do so may result in repudiation of the agreement. Submit a tax invoice within one week of receiving a payment certificate; delays will extend payment deadlines.
Evaluation Criteria
Source: NEC for Duvha PS Diesel Generator Replacement .pdfEvaluation is based on compliance with legal and technical requirements. Key factors: Contractor must be legally registered (CIDB registration required, with CIDB number provided in the offer). Joint ventures must accept joint and several liability; composition changes require Eskom’s written consent. B-BBEE status must be maintained; notify Eskom within 7 days of any change and submit an updated verification certificate within 30 days. Failure to notify may lead to termination. Contractor must provide required guarantees, bonds, and insurance certificates. No cession, delegation, or assignment of rights/obligations without Eskom’s written consent.
Technical Specifications
Source: NEC for Duvha PS Diesel Generator Replacement .pdfScope: Replacement of diesel generators at Duvha Power Station (Units 1-6). Deliverables: Design and supply of 5 x 1MW diesel generator sets, including: Engine base mounting on existing platforms. Synchronous generators. Piping for fuel (connection to existing diesel storage tank), cooling water, air starting (if applicable), and exhaust systems. Lubricating systems. Control panels (alarm, metering, synchronizing, engine management, excitation, governor, interlocking). Generator protection (rotor, engine, low voltage switchgear). Upgrade room ventilation system to conform to Eskom’s HVAC standard (240-102547991). Decommissioning, stripping, and removal of existing generators. Provide detailed 'As-Required' and 'As-Built' drawings. Compliance: Works must conform to NEC3 ECC3 standards, Eskom’s technical specifications, and South African regulations (Construction Regulations 2014, OHSA). Site: Duvha Power Station Diesel Generator Room, Units 1-6. Risks: High noise exposure, slip/trip/fall, falling objects, electric shock, permit-to-work, COVID-19, community unrest, labour strikes, unavailability of key design documentation.
Financial Requirements
Source: NEC for Duvha PS Diesel Generator Replacement .pdfPricing: Lump-sum prices for each activity in the Activity Schedule (NEC3 ECC3 Option A). Only completed activities are paid; no partial payments. Payment terms: Monthly assessments on the 25th of each month, with payments made within 4 weeks. Tax invoice must be submitted within 1 week of receiving a payment certificate; delays extend payment deadlines. VAT at 15% applies. Currency: South African Rand (ZAR). Interest rate: Prime rate + 0% for ZAR amounts; LIBOR for foreign currencies. Price adjustment: Escalation applies in the second year, linked to SEIFSA indices (Mechanical Engineering Materials 20%, Electrical Engineering Materials 20%, Transport 5%, Labour 40%, Fixed Non-adjustable 15%). Retention: 10% of contract value. Delay damages: R20,000/day per milestone, capped at 10% of section value. Bonds/guarantees: Required as per Contract Data (e.g., performance bonds, advance payment guarantees).
Compliance Requirements
Source: NEC for Duvha PS Diesel Generator Replacement .pdfMandatory compliance: CIDB registration (tenderer must provide CIDB number in the offer). B-BBEE: Contractor must notify Eskom within 7 days of any change in B-BBEE status and submit an updated verification certificate within 30 days. Failure to notify may result in termination. Joint ventures: All parties are jointly and severally liable; composition changes require Eskom’s written consent. Insurance: Contractor must provide certificates for works, plant, materials, equipment, liability (property/body injury), and environmental risks as per Insurance Table A. Health & Safety: Compliance with Construction Regulations 2014 (OHSA) and Eskom’s health/safety rules. Asbestos: Compliance with Eskom’s Asbestos Standard (32-303) and South African regulations (OEL limits, monitoring). Nuclear liability: Eskom indemnifies Contractor for nuclear damage unless caused by Contractor’s unlawful intent. Ethics: Prohibited actions (corruption, fraud, collusion, coercion, obstruction) may lead to termination. Confidentiality: Contractor must not disclose contract-related information without Eskom’s consent. VAT: Include Eskom’s VAT number (4740101508) on all invoices.
Important Dates
Source: Gx Division Contractor Criminal check.final (005).pdfClosing date: 22 June 2026 at 10:00. Briefing session: Not specified in the document.
Contact Information
Source: Gx Division Contractor Criminal check.final (005).pdfContact: Rhulani Mathebula (Group Executive: Generation Division, Acting). Phone: 011 800 5228.
Submission Guidelines
Source: Gx Division Contractor Criminal check.final (005).pdfSubmit the following returnable documents: A clear criminal record certificate (not older than 30 days) from a reputable screening company or SAPS Criminal Record Centre (CRC) for all company management and employees. If subcontractors are appointed, the same applies to their staff. Include a copy of each employee’s ID or passport. Proof of verification must be submitted to the Eskom Security team before site access is granted. Non-compliance with criminal record screening requirements may result in contract termination.
Evaluation Criteria
Source: Gx Division Contractor Criminal check.final (005).pdfOpen to contractors capable of replacing diesel generators at a power station. Security compliance: All employees accessing the site must have a clear criminal record (exceptions: minor traffic offenses). Employees with risk ratings above Level III are ineligible. Must commit to periodic re-screening (6-12 months based on risk level). Legal compliance: Must comply with MISS, National Key Point Act, and other cited legislation.
Technical Specifications
Source: Gx Division Contractor Criminal check.final (005).pdfScope: Replacement of diesel generators at Duvha Power Station. All contractors and their employees must undergo criminal background screening before site access is granted. Screening is mandatory due to the facility's designation as a National Key Point under the National Key Point Act. Access to sensitive information or critical plant areas is determined by the Scope of Work. Contractors must implement all security measures required for safe performance of the work.
Compliance Requirements
Source: Gx Division Contractor Criminal check.final (005).pdfMandatory compliance: Criminal record screening for all contractor employees (including subcontractors) via SAPS CRC or an accredited supplier linked to SAPS AFIS. Certificates must be no older than 30 days. Exemptions: Offences under the National Road Traffic Act or paid admission-of-guilt fines do not disqualify access. Additional checks: Security Manager will verify certificates with SAPS and cross-reference against HR and site databases. Employees with a risk rating above Level III are deemed unsuitable. Re-screening required every 12 months for low-risk employees (Risk Rating 5, 4) and every 6 months for medium-to-high-risk employees (Risk Rating 3). Relevant legislation: Minimum Information Security Standards (MISS), National Key Point Act, National Strategic Intelligence Act, Protection of Critical Infrastructure Act.
Important Dates
Source: Invitation to Tender (ITT) (Diesel Generator) 20260520.pdfClosing date and time: 22 June 2026 at 10:00. Non-compulsory clarification meeting: 04 June 2026 at 13:30 via Microsoft Teams (Join: https://teams.microsoft.com/meet/362099295058515?p=vYFXhusV3bZ32t7jze, Meeting ID: 362 099 295 058 515, Passcode: Ca93i5gY, Dial-in: +27 21 834 0825,,840640403#). Clarification queries deadline: 10 working days before closing (12 June 2026). Tender validity period: 12 weeks from closing date.
Contact Information
Source: Invitation to Tender (ITT) (Diesel Generator) 20260520.pdfEskom Representative: Sibongile Masilela, Tel: +27 13 690 0212, Email: [email protected]. Fraud/corruption reporting: 0800 11 2722 or [email protected]. Submission portal: Eskom E-Tendering site (https://tenderbulletin.eskom.co.za).
Submission Guidelines
Source: Invitation to Tender (ITT) (Diesel Generator) 20260520.pdfSubmit electronically via Eskom E-Tendering site (https://tenderbulletin.eskom.co.za) by 22 June 2026 at 10:00. No hard copies, zipped files, or late submissions accepted. All documents must be in PDF format (max 500MB per file, total submission max 4GB). Resubmissions overwrite previous versions—ensure final submission is marked as 'complete'. Required returnables at closing (disqualifiable if missing/incomplete): Annexure A (Authorisation Form), Annexure B (Acknowledgement Form), Annexure C (Tenderer’s Particulars), Annexure D (Integrity Declaration Form), Annexure E (CPA for Local Goods/Services), Annexure F (CPA for Foreign Goods/Services, if applicable), Annexure G1-G4 (Local Content Declarations, if applicable), Annexure H (SBD 1), Annexure I (SBD 6.1 Preference Points Claim Form), Annexure J (SBD 4 – Bidders Disclosure), E-tendering Help Manual acknowledgement form, and completed pricing schedule. For JVs: signed JV agreement, single designated bank account confirmation, and written confirmation of operating as a single business entity.
Evaluation Criteria
Source: Invitation to Tender (ITT) (Diesel Generator) 20260520.pdfEvaluation follows a multi-stage process: 1) Basic Compliance: Must meet eligibility criteria (no sanctions, no tender defaulters, no conflicts of interest, authorised signatories, single submission per tenderer, subcontracting <100% of scope), submit complete tender (commercial, financial, technical), mandatory returnables, valid CSD registration, and CIDB 6ME or higher. 2) Functionality: Two-stage technical evaluation. Stage 1: Mandatory 'gatekeeper' criteria (Yes/No assessment; failure disqualifies). Stage 2: Qualitative weighted criteria with a minimum 70% threshold to proceed. 3) Price Evaluation: Scored out of 90/80 points (inclusive of VAT, corrected for errors, excluding contingencies). Unconditional discounts considered; conditional discounts applied at payment. 4) Specific Goals: Scored out of 10/20 points per PPPFA (failure to submit evidence = 0 points for that goal). Final ranking combines price and specific goals scores (90/10 or 80/20 system).
Technical Specifications
Source: Invitation to Tender (ITT) (Diesel Generator) 20260520.pdfScope: Replacement of diesel generators at Duvha Power Station. Mandatory documents: Scope of Work (Annexure 1.1.18), NEC3 Engineering and Construction Contract (Annexure 1.1.19), and Pricing Schedule/BOQ (Annexure 1.1.20, PDF format). Technical evaluation: Stage 1 (Mandatory 'must meet' criteria—failure disqualifies) and Stage 2 (Qualitative weighted criteria—minimum 70% threshold required). Refer to the attached 'Tender Technical Evaluation Strategy for Duvha Power Station – Diesel Generators Replacement' for detailed technical requirements, weightings, and scoring methodology.
Financial Requirements
Source: Invitation to Tender (ITT) (Diesel Generator) 20260520.pdfPricing: Submit in PDF format (inclusive of VAT, excluding contingencies). Payment terms: 30 days for contracts ≤ R50M (VAT incl.), 60 days for contracts > R50M (VAT incl.). Performance bonds/demand guarantees may be required from Eskom-approved financial institutions. Financial statements: Latest approved annual statements (audited/reviewed/compiled) for the tendering company, including director’s report, auditor’s/reviewer’s report, statement of financial position, comprehensive income, changes in equity, cash flows, and notes. Unconditional discounts are considered for evaluation; conditional discounts applied at payment. For JVs/SPVs: Each partner must submit financial statements.
Compliance Requirements
Source: Invitation to Tender (ITT) (Diesel Generator) 20260520.pdfMandatory: Valid CSD registration (number/report), CIDB grading 6ME or higher (proof required at closing or within 21 working days for main contractor/JV/subcontractor). Tax compliance: Valid tax clearance certificate (local tenderers) or SBD1 form (foreign tenderers with no SA footprint). B-BBEE: Proof of status (certificate, sworn affidavit, or other prescribed evidence). Employment Equity: Proof of compliance (SA tenderers only). COIDA: Certificate of good standing (SA tenderers only). JV requirements: Signed JV agreement, profit-sharing ratios, single designated bank account, and confirmation of operating as a single business entity. Subcontracting with subsidiaries must be declared. No tender defaulters, restricted entities, or conflicts of interest allowed.
Important Dates
Source: OCCUPA~1.PDFClosing Date: 11 December 2024 at 10:00.
Submission Guidelines
Source: OCCUPA~1.PDFReturnable Documents: Submit a signed Section 37(2) Agreement (Occupational Health and Safety Act compliance). This is mandatory for the bid to be considered.
Evaluation Criteria
Source: OCCUPA~1.PDFLegal: Must be a registered legal entity (contractor/supplier) with authority to enter into binding agreements. Must acknowledge in writing that they are an employer with OHS duties under the Act. Technical: Capability to perform work in compliance with Eskom’s SHE standards and OHS Act requirements. Experience in diesel generator replacement is implied. Administrative: Submission of a fully executed Section 37(2) Agreement as part of the tender process. Compliance with Eskom’s document control policies (e.g., using authorized versions).
Technical Specifications
Source: OCCUPA~1.PDFScope: Replacement of diesel generators at Duvha Power Station. Compliance: Strict adherence to Occupational Health and Safety Act, 1993. SHE (Safety, Health, and Environment) specifications provided for the project must be followed.
Compliance Requirements
Source: OCCUPA~1.PDFOccupational Health and Safety Act, 1993 compliance required. Signed Section 37(2) Agreement mandatory for contractor/supplier and employees. Contractor must ensure all work and machinery/plant used comply with the Act.
Submission Guidelines
Source: 32-726 -rev3-Exp March 2025.pdfEvaluation Criteria
Source: 32-726 -rev3-Exp March 2025.pdfTechnical Specifications
Source: 32-726 -rev3-Exp March 2025.pdfCompliance Requirements
Source: 32-726 -rev3-Exp March 2025.pdfContact Information
Source: SAS001~2.PDFSubmission Guidelines
Source: SAS001~2.PDFEvaluation Criteria
Source: SAS001~2.PDFTechnical Specifications
Source: SAS001~2.PDFKey Technical and Safety Requirements:
Compliance Requirements
Source: SAS001~2.PDFSubmission Guidelines
Source: ACKNOW~1.PDFRequired returnable: Signed OHS Acknowledgement Form (Annexure B). Must be completed by the authorised person (CEO/Director/Managing Director) with two witnesses. Submit as part of the bid package.
Evaluation Criteria
Source: ACKNOW~1.PDFBidder must demonstrate: capability to comply with Eskom’s OHS legal and procedural requirements; clear processes for selecting and managing subcontractors/suppliers; evidence of adequate resources and competencies; and references/testimonials from previous similar work (including Eskom projects). Non-compliance may result in penalties or disqualification.
Technical Specifications
Source: ACKNOW~1.PDFMain contractor/supplier responsibilities: demonstrate selection criteria for appointing subcontractors/suppliers; notify Eskom prior to subcontractor/supplier appointment; ensure subcontractors/suppliers have adequate resources and competencies; manage subcontractors/suppliers to comply with legal and Eskom OHS requirements; conduct OHS audits/assessments during work execution; provide grounds for termination of subcontractor/supplier work.
Compliance Requirements
Source: ACKNOW~1.PDFMandatory compliance with: SHE specifications/requirements; Contract and Contractor OHS Management (32-726); Eskom Vehicle Safety Specification (32-345); Eskom’s SHEQ Policy (32-727); Eskom’s Life Saving Rules (240-62196227); Occupational Health and Safety Incident Management Procedure (32-95); Occupational Health and Safety Act; Compensation for Occupational Diseases and Illnesses Act. Post-award: align company processes to Eskom’s OHS requirements. Penalties apply for non-conformance. All employees (including subcontractors/suppliers) must undergo Eskom induction. Eskom may verify compliance and request testimonials/references for similar past work.
Submission Guidelines
Source: Annexure B .pdfRequired returnable: Annexure B (Acknowledgement Form for Eskom OHS legal and other requirements) must be completed, signed, and submitted with the bid. Ensure the following are provided: company/supplier name, name of authorised person (CEO/Director/Managing Director), signature, date, and signatures of two witnesses.
Evaluation Criteria
Source: Annexure B .pdfGeneral: Must be a registered legal entity (company/supplier). Must have verifiable experience in similar projects (references/testimonials required). Must demonstrate capacity to meet Eskom’s OHS and technical standards. OHS: Must have OHS management systems aligned with Eskom’s requirements. Must commit to penalties for non-compliance (applies to main supplier and all tiers of subcontractors). Technical: Must demonstrate capability to supply and deliver Economizer Elements & Bends (Two sizes) of Boiler Tubing for stock items. Must have ability to manage stock and deliver on-demand over a 4-year period.
Technical Specifications
Source: Annexure B .pdfScope: Supply and delivery of Economizer Elements & Bends (Two sizes) of Boiler Tubing for stock items on an as-when-required basis over four years. Compliance: Must adhere to Eskom contractor Health and Safety requirements (Standard 32-136). Must comply with provided OHS specifications/requirements. Must comply with the Occupational Health and Safety Act and the Compensation for Occupational Injuries and Diseases Act. Must follow Eskom procedures: Substance Abuse Procedure (32-37), OHS Incident Management Procedure (32-95), Life Saving Rules (240-62196227), and Vehicle and Driver Safety requirements (240-62946386). Post-award: Must fully align company processes to Eskom’s OHS policies, procedures, and standards. All employees (contractors/suppliers) must undergo relevant Eskom induction.
Compliance Requirements
Source: Annexure B .pdfOHS Compliance: Must comply with Eskom’s OHS legal and other requirements as detailed in Annexure B. Penalties will be enforced on the main supplier for non-conformance to Eskom and/or Statutory OHS requirements. Contractor/Supplier Management: Must demonstrate process and selection criteria for appointing contractors/suppliers. Must notify Eskom prior to appointing contractors/suppliers for work commencement. Must ensure contractors/suppliers have adequate resources and competencies. Must be accountable for managing contractors/suppliers to ensure compliance with legal and Eskom requirements. Must monitor contractors/suppliers through audits and assessments for OHS compliance during work execution. Must provide grounds for termination of work done by contractors/suppliers. Must deal directly with non-conformances by contractors/suppliers in terms of performance and penalty processes. Verification: Eskom reserves the right to verify compliance and may request copies of testimonials/references and contact details of previous clients (including Eskom) for similar work. Required Documentation: Signed acknowledgement form (Annexure B) confirming understanding and acceptance of OHS requirements.
Evaluation Criteria
Source: ENVP0005_Rev8_WASTE MANAGEMENT (ENVIRONMENTAL) (003).pdfFor external waste contractors referenced in the document:
Technical Specifications
Source: ENVP0005_Rev8_WASTE MANAGEMENT (ENVIRONMENTAL) (003).pdfScope: Internal Eskom work instruction (ENVP0005) for waste management at Duvha Power Station.
Compliance Requirements
Source: ENVP0005_Rev8_WASTE MANAGEMENT (ENVIRONMENTAL) (003).pdfFor contractors working at Duvha Power Station:
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Eskom Holdings SOC Ltd, Duvha Power Station - WITBANK - WITBANK - 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
27
Last checked
12 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.