This tender from ntcsa (ESKOM) invites bids for the refurbishment of ptm&c labs in the engineering building at the simmerpan complex in germiston. IT is open to contractors with a minimum CIDB grading of 5gb or higher, and requires attendance at a compulsory site meeting on 25 june 2026. Bidders must submit their proposals electronically via the ESKOM e-tendering site by 13 july 2026 at 10:00.
Key Requirements
Compulsory site meeting on 25 June 2026 at 10:00 at the Simmerpan Complex – failure to attend will result in disqualification.
Minimum CIDB grading of 5GB or above is required; proof must be submitted at tender closing.
Tenders must be submitted electronically via the Eskom E-tendering site by 13 July 2026 at 10:00; no hard copies accepted.
A functionality threshold of 70% applies, based on criteria including construction programme, method statements, subcontractor list, plant and machinery, relevant projects, and key personnel CVs.
B-BBEE status level will be scored out of 20 points under the 80/20 PPPFA system; a valid certificate or sworn affidavit is required.
Mandatory returnable documents (e.g., Authorisation Form, Integrity Declaration, SBD forms) must be fully completed and submitted by the closing deadline to avoid disqualification.
Tender validity period is 90 days from the closing date.
Corner of Power and Refinery Road - Germiston - Johannesburg -
Construction & Civil Engineering Industry Profile
Critical Requirements
CIDB Contractor Grading
Regulatory Bodies
ECSASACPCMPCIDBSAIA
Tenders in this industry often require registration with these bodies.
CIDB Registration
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Typical Documents
10 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
CIDB Registration Certificate
NHBRC Registration (if applicable)
Health & Safety Plan
Insurance Certificates
Previous Project Completion Certificates
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
Review in progress · 8 of 49 documents being finalised
AI Document Analysis Stages
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: Annexure G3-Imported Content Declaration.pdf, Drawings-Simco25P02-SE-D69 Telecoms RAMP.pdf, Drawings-Simco25P02-SE-D70-Simmerpan PTMC Lab Stormwater Drainage-.pdf and 5 more. You don’t need to refresh — this page will pick up the updated review automatically.
DocumentSHEQ Specification.pdfReview complete
Important Dates
12 Jun
2026
PUBLICATION
Tender Published
Tender was published
13 Jul
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
11 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
The tender is for the refurbishment of PTM&C (Protection, Testing, Measurement & Control) labs in the Engineering Building at Eskom’s Simmerpan Complex in the Northern Cape. The project requires suppliers to adhere to Eskom’s Supplier Quality Management Specification (240-105658000/QM 58), which mandates compliance with ISO 9001 standards for Quality Management Systems (QMS). The tender emphasizes rigorous quality control, documentation, and performance monitoring throughout the project lifecycle, including pre-contract, execution, and post-contract phases. Suppliers must submit detailed quality plans, control plans, and evidence of QMS compliance, with categorization into four levels of quality requirements (Category 1-4).
Eskom tender for the refurbishment of PTM&C labs in the engineering building at the Simmerpan Complex, Northern Cape. The tender emphasizes strict quality management requirements aligned with ISO 9001 and Eskom's internal quality specification 240-105658000.
The tender involves the refurbishment of PTM&C Labs (Telecoms, Legacy, and Phase 6 Labs) within the Engineering Building at Eskom's Simmerpan Complex in the Northern Cape. The scope includes structural modifications, access flooring, stair construction, roofing, partitioning, electrical installations, and safety compliance upgrades. The project requires demolition of existing structures (e.g., ramps, doors), installation of new access flooring (250mm and 380mm FFL), stainless steel balustrades, drywall partitioning, and specialized installations like control panels. Finishes include plastering, painting, and Chromadeck Klip Lock roofing. Compliance with engineer's specifications and architectural approvals is mandatory.
This document is an E-Tendering Training Acknowledgement Form for a tender titled 'The refurbishments of ptm&c labs - ESKOM'. It is not the main tender specification but a mandatory administrative form confirming the bidder's competence in using Eskom's e-tendering system.
Tender for refurbishment of PTM&C labs (Telecoms, Legacy, and Phase 6) in the Engineering Building at Simmerpan Complex, focusing on fire protection and safety signage compliance.
Environmental Requirements for Contractors and Suppliers.pdf
The tender is for the refurbishment of PTM&C (Protection, Testing, Metering, and Control) labs in the Engineering Building at Eskom’s Simmerpan Complex in the Northern Cape. The document outlines Eskom’s environmental requirements for contractors/suppliers, emphasizing compliance with environmental management systems (EMS), legal obligations, and sustainable practices. The tender process follows a six-phase contractor management model, including design, tender evaluation, supplier registration, site mobilization, contract execution, and post-contract review. Environmental compliance is strictly monitored, and non-adherence may lead to work stoppages or contract termination.
Tender for electrical refurbishment of PTM&C labs at Eskom's Simmerpan Complex in Northern Cape, involving distribution board installation, circuit wiring, and electrical system upgrades for laboratory facilities.
Refurbishment tender for PTM&C labs in the engineering building at Simmerpan Complex for ESKOM in Northern Cape. The tender involves renovation work on specialized laboratory facilities.
Tender for refurbishment of PTM&C labs at Eskom's Simmerpan Complex in Northern Cape, focusing on electrical and lighting system upgrades in storage areas and labs. The project involves replacing existing luminaires with LED fixtures, rewiring electrical systems, and ensuring compliance with South African electrical standards.
This tender document is a schematic diagram for electrical refurbishments of PTM&C labs at Eskom's Simmerpan Complex in the Northern Cape. It details electrical circuit layouts, distribution boards, and equipment specifications for various lab systems including AHUs, fans, AC units, and plug panels.
Eskom tender for refurbishment of PTM&C labs at Simmerpan Complex in Northern Cape. Requires ISO 9001-aligned quality management system with specific documented evidence. Closing date: July 13, 2026.
This document is a single-page electrical schematic drawing for the refurbishment of PTM&C labs at Eskom's Simmerpan Complex in the Northern Cape. It details the electrical distribution board layout, circuit specifications, and equipment connections for laboratory power systems.
Eskom tender for refurbishment of PTM&C labs at Simmerpan Complex in Northern Cape. The project includes alterations, building works, electrical upgrades, fire protection, and furniture installation, with a total budget of R690,000 inclusive of VAT. The scope covers demolition, structural work, HVAC, plumbing, and comprehensive SHEQ compliance.
Tender for refurbishment of PTM&C labs at Eskom's Simmerpan Complex in Northern Cape, involving detailed drywall construction, light steel framing, insulation installation, and finishes for telecoms training and legacy lab spaces.
Eskom tender for refurbishment of PTM&C labs at Simmerpan Complex in Northern Cape, with total budget of R690,000 (incl. VAT). Scope includes building works (R100k), electrical (R300k provisional), fire protection (R50k provisional), furniture (R150k provisional), plus alterations, plumbing, HVAC, and comprehensive SHEQ requirements. Closing date: July 13, 2026.
Tender for Phase 2 refurbishment of PTM&C (Protection, Telemetry, Metering & Control) labs within the Engineering Building at the Simmerpan Complex in the Northern Cape. The project involves comprehensive architectural, civil, and HVAC/electrical upgrades to training and testing facilities for Protection & Control (Phase 6 and Legacy), Telecoms, and Metering equipment. The work must comply with NTCSA standards, National Building Regulations, and Eskom's SHEQ policies.
Eskom tender for the refurbishment of PTM&C (Phase 6 Lab, Legacy Lab, and Telecomms Lab) HVAC systems at the Simmerpan Complex in the Northern Cape Province. The project involves removing existing air conditioning units, extractors, and old chiller equipment, and installing a new VRF (Variable Refrigerant Flow) system with associated air handling units, pressurisation fans, and extraction fans. The works include ducting, trunking, cabling, and drain pipe installations across multiple laboratory spaces in the engineering building.
This document is a user manual for Eskom's eTendering system, not the tender specification for 'The refurbishments of ptm&c labs'. It details the process for suppliers to register and submit tender documents electronically. The actual tender details (scope, technical specs) are not included.
Tender for refurbishment of PTM&C labs at Simmerpan Complex for ESKOM/NTCSA. Focus on compliance with B-BBEE, local content, and SDL&I objectives. Contract includes mandatory improvement plans and quarterly reporting.
Eskom (NTCSA) tender for refurbishment of PTM&C labs at Simmerpan Complex in Northern Cape. Focuses on contractor eligibility, B-BBEE compliance, local content requirements, and SDL&I (Supplier Development, Localisation & Industrialisation) objectives. Contract award includes mandatory post-award improvement plans and quarterly reporting.
NTCSA SOC Ltd (formerly ESKOM) is inviting tenders for the refurbishment of PTM&C Labs in the Engineering Building at Simmerpan Complex, Northern Cape. This is a NEC3 Engineering & Construction Contract (ECC3) Option B - Priced Contract with Bill of Quantities. The contract duration is 9 months, with a defects liability period of 52 weeks after completion. The tender closes on July 13, 2026 at 10:00 AM.
This document outlines the standard conditions of tender for the refurbishment of PTM&C labs at Eskom's Simmerpan Complex in the Northern Cape. It details the procedural requirements, obligations of both NTCSA (the tendering authority) and tenderers, and the evaluation framework. The tender closes on July 13, 2026.
The tender is for the refurbishment of PTM&C labs (Telecoms, Legacy, and Phase 6) in the Engineering Building at Eskom's Simmerpan Complex, Northern Cape. The scope includes the supply and installation of a Bergvik raised access flooring system with specific technical and structural requirements, as well as associated works like drywall, fire protection, and finishes.
This is an Invitation to Tender from National Transmission Company South Africa SOC Ltd (NTCSA) for the refurbishments of PTM&C Labs in the Engineering Building at Simmerpan Complex in Germiston. The tender (E2886NTCSAMWPRER) closes on 13 July 2026 at 10h00. A compulsory site meeting is scheduled for 25 June 2026 at 10h00 at Telecomms Field and Ops Boardroom. The tender uses an 80/20 preference point system with price scoring of 80 points and specific goals (B-BBEE) scoring of 20 points. A minimum CIDB grading of 5GB or above is required. Technical functionality threshold is 70%.
This tender is for the refurbishment of PTM&C (Pressure Testing, Measuring & Control) laboratories in the Engineering Building at Simmerpan Complex, Northern Cape, South Africa. The document provided is Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy (Document Identifier: 32-727, Revision 5), which establishes the compliance framework that all contractors and service providers must adhere to when working on Eskom projects. The policy emphasizes zero harm culture, environmental protection, quality management, and compliance with South African legislation and international ISO standards.
This is an environmental management compliance evaluation document for a tender to refurbish PTM&C labs at Eskom's Simmerpan Complex in the Northern Cape. The document outlines a structured scoring system to assess whether bidders meet specified environmental requirements, with a mandatory threshold of 80% to be considered.
Refurbishment of PTM&C (Protection, Testing, Measurement & Control) laboratories within the Engineering Building at the Simmerpan Complex for ESKOM in the Northern Cape. The tender involves renovation work on specialized electrical testing facilities.
The tender is for the refurbishment of PTM&C (Protection, Testing, Maintenance & Commissioning) labs, storage rooms, and associated areas in the Engineering Building at Eskom's Simmerpan Complex in the Northern Cape. The scope includes flooring, ceiling, wall treatments, fire safety upgrades, furniture supply, and exterior works like gutter replacement and roof repairs. The project aims to modernize and improve the functionality of the labs and storage spaces while adhering to Eskom's corporate identity and technical specifications.
This is a Non-Disclosure Agreement (NDA) for vendors interested in the 'Refurbishments of PTM&C Labs in engineering building at Simmerpan complex' project, issued by the National Transmission Company South Africa SOC Ltd (NTCSA). The document is a pre-qualification confidentiality agreement, not the main tender. It establishes terms for protecting confidential information shared during the tender process.
The tender is for the refurbishment of PTM&C Labs, Legacy Lab, and Telecoms Lab in the Engineering Building at Eskom's Simmerpan Complex in the Northern Cape. The project includes architectural, structural, and infrastructure upgrades, with a strong emphasis on Safety, Health, Environment, and Quality (SHEQ) compliance. The closing date for submissions is **13 July 2026**.
This tender document outlines refurbishment work for PTM&C Labs in the Engineering Building at the Simmerpan Complex for Eskom. The project involves extensive demolition and replacement of existing building elements including cladding, windows, doors, walls, and ramps, with installation of new aluminum shopfronts, timber doors, and structural modifications to accommodate new lab layouts.
This document is an OHS (Occupational Health and Safety) tender evaluation template for the refurbishment of PTM&C labs at Eskom's Simmerpan Complex in the Northern Cape. It outlines mandatory health and safety submission requirements for bidders, focusing on risk management, compliance, and competency.
This is a method statement template from Eskom for a tender titled 'The refurbishments of ptm&c labs - ESKOM' at the Simmerpan Complex in the Northern Cape. The document is a structured template requiring the supplier to detail their approach to delivering the scope of work. It is not the tender itself but a required submission document outlining the supplier's methodology, risk management, resource planning, and quality processes. The closing date is July 13, 2026.
This is an environmental requirements proforma document for contractors bidding on the refurbishment of PTM&C labs at Eskom's Simmerpan Complex in the Northern Cape. The document outlines environmental compliance obligations that contractors must commit to as part of the tender process.
This tender document is an OHS (Occupational Health and Safety) Acknowledgement Form for the refurbishment of PTM&C labs at the Simmerpan Complex in the Northern Cape for Eskom. The document outlines Eskom's OHS legal and compliance requirements that contractors must acknowledge and adhere to.
This tender document outlines the detailed specifications for the refurbishment of PTM&C Labs (Telecoms, Legacy, and Phase 6) in the Engineering Building at the Simmerpan Complex for Eskom/National Transmission Company South Africa. The focus is on the supply and installation of doors, windows, and associated ironmongery, with specific material, finish, and compliance requirements.
This document is Eskom's Contractor and Contractor OHS Management Standard (Document ID: 32-726, Revision 3) that establishes minimum criteria for managing supplier OHS compliance throughout the contract lifecycle. It applies to all Eskom Holdings SOC Ltd operations and outlines a six-phase OHS contractor management model covering project initiation through post-contract review. The standard integrates OHS requirements into procurement and supply chain processes to achieve Zero Harm.
This tender document outlines the refurbishment of PTM&C Labs (Telecoms, Legacy, and Phase 6) within the Engineering Building at the Simmerpan Complex for Eskom. The scope includes detailed drywall construction, light steel framing, insulation, fire-rated boarding, and finishing works, with specific material and installation specifications provided.
This document is Eskom's Occupational Health and Safety Incident Management Procedure (Document 32-95, Revision 9). Note: The tender information references 'refurbishments of ptm&c labs' but the document content is an OHS incident management procedure that would be applicable to any Eskom project, including construction/refurbishment work. This procedure establishes the framework for managing occupational health and safety incidents including near-misses, injuries, occupational diseases, and fatalities. It applies to Eskom employees, contractors, and members of the public affected by Eskom activities.
This tender document outlines the refurbishment of PTM&C Labs (Telecoms, Legacy, and Phase 6) within the Engineering Building at the Simmerpan Complex for Eskom (National Transmission Company South Africa). The project involves demolition, construction, and finishing works including new concrete stairs, ramps, walls, windows, doors, ceilings, and flooring systems.
NTCSA SOC Ltd (formerly ESKOM) seeks contractors for the refurbishment of PTM&C Labs in the Engineering Building at Simmerpan Complex, Northern Cape. This is a NEC3 Engineering and Construction Contract (ECC3) using Option B (Priced Contract with Bill of Quantities) with a 9-month duration. The contract includes comprehensive provisions for health and safety, asbestos management, nuclear liability (Koeberg Nuclear Power Station proximity), B-BBEE compliance, and ethics requirements.
Document mismatch detected. The provided document is Eskom's Occupational Health and Safety Incident Management Procedure (32-95, Rev 9), not the tender for refurbishments of PTM&C labs. This OHS procedure is a supporting document that establishes requirements for managing occupational health and safety incidents across Eskom operations, applicable to employees, contractors, and members of the public. The document covers incident identification, emergency response, notification, classification, investigation, and corrective action management. Effective date: 1 April 2021.
Refurbishment of PTM&C Labs (Telecoms, Legacy, and Phase 6) in the Engineering Building at Simmerpan Complex, including demolition, structural modifications, installation of new windows, doors, ramps, stairs, ceilings, and finishes, with compliance to detailed design drawings and specifications.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Description
Source: SHEQ Specification.pdf
This is a SHE (Safety, Health, Environment) specification document setting out NTCSA AM Real Estate's minimum requirements for the PTM&C Labs refurbishment contract.
The contractor is responsible for developing a SHE Plan and remains legally accountable for their health and safety programme.
The document includes supporting clauses, definitions, abbreviations, and detailed roles and responsibilities for contractors, sub-contractors, and site management.
Quality Management
Source: SHEQ Specification.pdf
Contractor must discuss SHE-related problems with NTCSA AM Real Estate project manager regarding procedure requirements, non-conformances, corrective actions, audits, and inspection schedules.
Must compile relevant inspection reports.
First aid appointees must be trained to Level 2 by a SAQA-approved provider.
Must submit a Covid-19 risk assessment and management plan aligned with Department of Employment and Labour guidelines.
Must comply with Eskom's Substance Abuse Procedure (32-37) and Life-saving Rule 4 (Be Sober).
Alcohol and drug permissible level is 0%. Eskom may conduct ad hoc alcohol testing.
Contractor should conduct their own alcohol testing; records are confidential and filed in employees' personal files.
Health & Safety
Source: SHEQ Specification.pdf
This is a comprehensive SHE specification covering legal compliance, roles, scope of work, and detailed health and safety requirements.
Key requirements include: signing Section 37(2) agreements, submitting safety file package 2 weeks before site establishment, following Eskom Life-saving Rules, conducting risk assessments, maintaining fire equipment and first aid, implementing SHE communication and training, and ensuring compliance with OHS Act regulations.
Specific hazards addressed: working at heights, electrical safety, substance abuse, child labour, PPE, incident investigation, and emergency management.
Contractor must appoint competent supervisors, a health and safety officer, and ensure all personnel are inducted and medically fit.
Environmental
Source: SHEQ Specification.pdf
An Environmental Management Plan (EMP) should be developed to enhance positive impacts and limit negative environmental impacts during the project lifecycle.
The EMP should preferably form part of Eskom's Environmental Management System.
Section
Source: SHEQ Specification.pdf
The contractor is accountable for quality and execution of their health and safety programme.
Quality requirements are referenced but no specific scoring criteria are provided in this SHE specification.
Returnable Documents: The provided document does not explicitly list the required submission forms or certificates. Bidders must consult the full Eskom tender dossier to identify all mandatory returnables.
Disqualification Risks: Ensure all demolition and construction plans align strictly with the provided technical drawings to avoid non-compliance.
Scoring Method: Not explicitly stated in the provided text.
Minimum Thresholds: Not explicitly stated.
Practical Guidance: Based on the nature of the work, bidders should prepare for evaluation based on technical competence in building refurbishment, CIDB grading, and adherence to Eskom's specific safety and construction standards.
No specific technical eligibility criteria are stated. The NDA must be properly executed by an authorized representative of the vendor company. The vendor must have the legal authority to enter into binding agreements.
This document is a Non-Disclosure Agreement (NDA) with the following key compliance obligations:
Effective date: 01 July 2024. Review date: July 2027.
The Receiving Party must not disclose Confidential Information to third parties without prior written consent from NTCSA.
Confidential Information includes technical, commercial, financial, marketing data, technical specifications, and project-related information.
The Receiving Party must protect Confidential Information using the same standard of care as it applies to its own proprietary information, but no less than a reasonable standard.
NTCSA may request the return or destruction of Confidential Information within 7 business days, with written confirmation required.
The agreement is binding for 3 years after termination of the parties' relationship or as specified in a subsequent project agreement.
Breaches must be remedied within 7 business days after written notice; otherwise, NTCSA may pursue legal remedies.
Governing law: Republic of South Africa.
This NDA does not commit either party to a business relationship; a separate definitive agreement is required for the project.
Effective date: 01 July 2024. Review date: July 2027.
The Receiving Party must not disclose Confidential Information to third parties without prior written consent.
Confidential Information includes technical, commercial, financial, marketing data, technical specifications, and project-related information.
The Receiving Party must protect Confidential Information using the same standard of care as its own proprietary information, but no less than a reasonable standard.
NTCSA may request the return or destruction of Confidential Information within 7 business days, with written confirmation required.
The agreement is binding for 3 years after termination of the parties' relationship or as specified in a subsequent project agreement.
Breaches must be remedied within 7 business days after written notice; otherwise, NTCSA may pursue legal remedies.
Governing law: Republic of South Africa.
Addresses for notices are specified in clause 17.
This NDA does not commit either party to a business relationship; a separate definitive agreement is required.
DocumentNTCSA Standard Conditions of Tender.pdfReview complete
Important Dates
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)
Compulsory site visit and/or clarification meeting details are specified in the Tender Data. Failure to attend results in disqualification.
Tenderers may ask questions for clarity during site visits or meetings.
Check the NTCSA Tender Bulletin and NT e-Tender Portal regularly for updates on closing dates, addenda, and clarification responses.
Tender opening occurs at the time and place stated in the Tender Data. Tenderer representatives may attend.
Validity period: Tenders must remain valid for acceptance within the stipulated period. NTCSA may request extensions; refusal excludes further consideration.
Briefing Session
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)
Attend the compulsory site visit and/or clarification meeting as stipulated in the Tender Data. Failure to attend results in disqualification.
Meeting details (date, time, location) are provided in the Tender Data.
Tenderers may ask questions for clarity during the site visit or clarification meeting.
Contact Information
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)
All communications must be in writing, in English, and addressed to the NTCSA Representative only.
Requests for clarification must be submitted in writing to the NTCSA Representative identified in the enquiry document.
NTCSA publishes all clarification requests (without tenderer names) and responses on the NTCSA Tender Bulletin and NT e-Tender Portal.
Tenderers must check these platforms regularly for updates and responses.
Submission Guidelines
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)
Submit a complete original tender in paper form plus one (1) hard copy to the address and tender box specified in the Tender Data by the closing date and time (SAST, determined by Telkom time signal).
Proof of posting or courier delivery is not accepted as proof of delivery. Late tenders are rejected.
Tenders submitted by fax or email are not accepted unless explicitly stated in the Tender Data.
Seal the outer package and mark it "Confidential". Include the NTCSA submission address, Invitation to Tender number, tenderer’s name, physical address, email, and contact number of the authorised signatory.
Submit separate inner packages marked "ORIGINAL" and "COPY". If an electronic copy is required, package it separately and mark "ELECTRONIC COPY".
Tenders must be in English, completed in ink (not pencil), and signed by the duly authorised signatory.
Mandatory tender returnables must be submitted by the deadline. No documents can be submitted after closing.
Failure to submit both the original and a copy in paper form results in disqualification.
Check the NTCSA Tender Bulletin and NT e-Tender Portal regularly for addenda or changes to the submission deadline.
Returnable Documents
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)
Submit the original tender and one hard copy by the closing date and time to the specified address and tender box.
Complete and submit the Acknowledgement Form with the tender.
Return all mandatory tender returnables by the submission deadline. No late submissions are accepted.
Do not make alterations to tender documents except to comply with NTCSA Representative instructions or to correct errors. All alterations must be initialled by all signatories.
If submitting as an agent, include an authenticated copy of the authority to act on behalf of the principal.
Regularly check the NTCSA Tender Bulletin and NT e-Tender Portal for addenda or updates.
Evaluation Criteria
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)
Tenderers must meet eligibility criteria stated in the Tender Data and not be restricted from doing business with NTCSA or State-Owned Companies. Ineligible tenderers will be disqualified.
Basic compliance is checked first: failure to submit an original and a copy in paper form, or missing mandatory returnables, results in disqualification.
Functionality criteria (if applicable) require meeting the minimum threshold stated in the Tender Data to proceed to further evaluation.
Financial analysis may be conducted to assess risk. Tenderers posing unacceptable financial risk may be excluded.
Pricing is evaluated per the criteria in the Tender Data, including factors like CPA, FOREX, commodity increases, discounts, NPV, and invoicing rates.
Arithmetical errors are corrected per NTCSA’s process, with tenderer concurrence required.
Specific Goals (e.g., B-BBEE) are scored based on supporting documentation. Failure to meet these does not disqualify but scores zero for that section.
Tenders are ranked by combining Price and Specific Goals scores (90/10 or 80/20 preference point system).
NTCSA may use reverse e-auction for certain tenders, where prices are submitted separately after initial tender evaluation.
Objective criteria (if stipulated) may allow award to a tenderer not scoring the highest, per PPPFA Act Section 2(1)(f).
Technical Specifications
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)
The tender must clearly state if it is for the whole or part of the works, services, or supply identified in the specification.
Check enquiry documents on receipt and notify the NTCSA Representative of any discrepancies or omitted documents immediately.
Complete and submit the Acknowledgement Form with the tender, specifying the scope (whole or part).
Return all mandatory tender returnables by the submission deadline. Documents must be valid, current, and original if stipulated.
Submit a complete original tender and one copy in paper form. Failure to do so results in disqualification.
Obtain and familiarise yourself with the latest revision of standardised specifications if referenced in the enquiry documents.
Quality Management
Source: NTCSA Standard Conditions of Tender.pdf
Review enquiry documents upon receipt and notify the NTCSA Representative of any discrepancies or omitted documents.
Complete and submit the Acknowledgement Form with the tender, clearly stating if the tender covers the whole or part of the works/services.
Return all mandatory tender returnables by the submission deadline. Ensure all documents are valid, current, and original if stipulated.
Submit a complete original tender and one copy in paper form. Failure to submit both results in disqualification.
Pricing Schedule
Source: NTCSA Standard Conditions of Tender.pdf
Include all duties, taxes (including VAT), and levies applicable 14 days prior to the closing date in the rates and prices.
Provide fixed rates and prices for the contract duration unless price adjustment is explicitly allowed in the Enquiry.
State all prices in South African Rand unless instructed otherwise. Part payments in other currencies may apply per the contract.
If cataloguing is required, include a line item for it in the Pricing Schedule. NTCSA will pay for cataloguing.
Arithmetical errors will be corrected per NTCSA’s process, with tenderer concurrence required. Corrected totals are binding.
Financial Requirements
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)
Include all duties, taxes (including VAT), and levies applicable 14 days prior to the closing date in the rates, prices, and tendered total.
Provide fixed rates and prices for the contract duration unless price adjustment is explicitly provided for in the Enquiry.
State all rates and prices in South African Rand unless instructed otherwise. Part payment in other currencies may be allowed per the contract terms.
If cataloguing is required, include a line item for it in the Pricing Schedule. NTCSA will cover cataloguing costs.
If a performance bond or demand guarantee is required, select at least two financial institutions from NTCSA’s approved list.
Arithmetical errors will be corrected per NTCSA’s process, with tenderer concurrence required. Corrected totals are binding.
Compliance Requirements
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)
Comply with eligibility criteria in the Tender Data and ensure no restrictions exist on doing business with NTCSA or State-Owned Companies.
Comply with all relevant legislation and regulatory instruments, including:
National Treasury instructions
CIDB Regulations for construction works
PPPFA Regulations and Amended B-BBEE Codes
COIDA and OHS Act
NTCSA’s Safety, Health, Environment, and Quality (SHEQ) requirements
Provide proof of valid SHEQ systems, policies, and capabilities by the stipulated deadline. All SHEQ costs and personnel must be included in the tender.
If CIDB grading is stipulated, be registered with the CIDB at tender closing or capable of registration within 21 working days thereafter.
If awarded the contract:
Achieve Contract Skills Development Goals (CSDG) for contracts with a duration of 12+ months or values of R5M+ (professional/services) or CIDB grade 7+ (engineering/construction).
Achieve Contract Participation Goals (CPG) for eligible construction works contracts (General Building or Civil Engineering, 6+ months duration, 25%+ subcontractable).
Misrepresentation or falsification of information (e.g., B-BBEE certificates) leads to disqualification and reporting to the B-BBEE Commission.
If an agent submits the tender, provide an authenticated copy of the authority to act.
Designated materials requirements must be met to avoid disqualification.
B-BBEE Requirements
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)
Comply with the Amended B-BBEE Codes of Good Practice.
If awarded the contract, achieve the Contract Skills Development Goals (CSDG) for eligible contracts:
Contracts with a duration of 12+ months, or
Professional service or service contracts of R5M+ in value, or
Engineering/construction/design-and-build contracts with a CIDB grade 7+.
Achieve Contract Participation Goals (CPG) for eligible construction works contracts:
General Building (GB) or Civil Engineering (CE) classes of construction works,
Minimum project duration of 6 months,
At least 25% of the main contract subcontractable in CIDB classes (CE, EB, GB, ME).
Misrepresentation or falsification of B-BBEE information (e.g., certificates or affidavits) leads to disqualification and reporting to the B-BBEE Commission for potential fronting.
Health & Safety
Source: NTCSA Standard Conditions of Tender.pdf
Comply with the Occupational Health and Safety (OHS) Act and NTCSA’s Safety, Health, Environment, and Quality (SHEQ) requirements.
Provide proof of SHEQ systems, policies, and capabilities by the deadline specified in the Tender Data.
All costs and personnel associated with SHEQ must be included in the tender pricing.
Contractual Terms
Source: NTCSA Standard Conditions of Tender.pdf
NTCSA may accept or reject any variation, deviation, or alternative tender at its discretion.
NTCSA reserves the right to cancel the tender at any time before contract conclusion and will provide written reasons upon request.
NTCSA is not liable for any losses, claims, or damages arising from participation, amendment, termination, suspension, or exclusion from the tender process.
NTCSA may enter into mandated negotiations with selected tenderers per its procurement policies.
Tenders must remain valid for acceptance within the stipulated validity period. NTCSA may request extensions; refusal to extend excludes further consideration.
All procurement matters are confidential. Documents provided by NTCSA may only be used for tender preparation and submission.
NTCSA’s insurance may not cover full contract requirements; tenderers must seek qualified advice on additional coverage.
If security for performance (e.g., performance bond or demand guarantee) is required, select at least two financial institutions from NTCSA’s approved list.
The successful tenderer must review and sign the final contract documents provided by NTCSA.
Requirements
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)
Submit a tender only if eligible and not restricted from doing business with NTCSA or State-Owned Companies.
Obtain and familiarise yourself with standardised specifications if referenced in the enquiry documents.
Alternative tenders are permitted only if a main tender is also submitted and if allowed by the Enquiry. Alternative tenders must be based on criteria stated in the Tender Data.
Comply with all relevant legislation and regulatory instruments, including those specified in the Tender Data.
If CIDB grading is stipulated as a qualification criterion, be registered with the CIDB at tender closing or capable of registration within 21 working days thereafter.
Meet designated materials requirements to avoid disqualification.
Section
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)
Direct all communications to the NTCSA Representative only, in writing and in English.
Submit requests for clarification in writing to the NTCSA Representative identified in the enquiry document.
NTCSA publishes all clarification requests (without tenderer names) and responses on the NTCSA Tender Bulletin and NT e-Tender Portal.
Tenderers must check these platforms regularly for updates and responses.
DocumentAnnexure G3-Imported Content Declaration.pdfCompliance review in progress
Valid CIDB grading for construction work, proven experience with similar laboratory or technical facility projects, compliance with ESKOM procurement policies, financial stability, and valid tax clearance certificate.
Refurbishment of PTM&C labs at Simmerpan Complex, focusing on HVAC and electrical installations. Includes installation of cooling AHU units, trunking, cantilever supports, and specified Mitsubishi equipment (e.g., ACU/AHU units, fans). Involves wall sleeves, cable and pipe routing, and compliance with technical standards like NRS002 for wall louvres.
Submission procedures are not specified in this document. Refer to the main tender invitation (E2886NTCSAMWPRER) for instructions on how and where to submit, required forms, and returnable documents.
Standard Eskom procurement requirements apply. Contractors must be registered and capable of undertaking HVAC installation works. Drawing reference: SIMCO25P02-SE-E64 (Revision 1, dated 02/11/2025, scale 1:100).
Scope: Refurbishment of PTM&C labs in the engineering building at Simmerpan Complex, focusing on HVAC, electrical, and drainage works.
Removal Works:
Phase 6 Lab: Remove 2x under-ceiling indoor units and 2x outdoor units. Remove existing diffusers and return grills in walls.
Telecoms Lab: Remove existing diffusers and return grills in walls. Remove existing extractor fan in the wall of the Telecoms Training Room and make good.
Legacy Lab: Remove existing diffusers and return grills in walls.
Existing Storage: Remove old chiller plant equipment to make way for new VRF system equipment.
Installation Works:
HVAC Units: Install new VRF system equipment, including specified Mitsubishi units (e.g., ACU1 outdoor unit: 101kW cooling / 113kW heating, AHU10 under-ceiling unit: 7.1kW, BC1 controller with 8 branch points).
Trunking: Fabricate from 1mm sheet steel, dimensions 127x76.2mm with clip-on cover. Must be hot-dipped galvanised to SANS 1763. Exposed surfaces on outside walls require beige epoxy-powder coating.
Cable Trays: Install light-duty cable trays in roof void, overall width 50mm, for cables and earth wire.
Drain Pipes: Use Polycop pipe with suitable connectors (e.g., JG Speedfit or Connex) for handling units. Discharge water to apron slab via trunking, fixed on master bats saddles, 2 courses of bricks above slab and 200mm from wall. PVC tape is not acceptable.
Pressurisation and Extraction Fans: Install as per schedule (e.g., Fan 1: pressurisation fan filter unit with washable primary/secondary filters; Fan 4: 220V AC, 0.56m³/s motor with weather louvres).
Outdoor Switch-Disconnector: IP65 enclosure with 2 bottom cable access entries, installed next to outdoor unit.
Electrical and Cabling: Power/control cables and refrigerant pipes in roof space/control room and on outside walls must be installed in trunking with covers.
Wall Sleeves and Louvres: Comply with NRS002 standards for wall louvres. Install 685x685mm sleeves where required.
All airconditioning units must be installed per manufacturer’s instructions.
Equipment Specifications:
Mitsubishi units: AHU10 (7.1kW), AHU3 (14kW), AHU9, AHU8, AHU7, AHU6, AHU5, AHU4, AHU2, AHU1, ACU1, ACU2, Fan 4 (PCA-RP140KAQ), and VRF outdoor unit (PURY-P900YSLM-A).
Fan specifications: Pressurisation fans with 3CR12 body and epoxy matt black finish; extraction fans with powder-coated finish and weather louvres.
Trunking: 1mm sheet steel, hot-dipped galvanised to SANS 1763 for corrosion protection. Exposed surfaces on outside walls must have beige epoxy-powder coating.
Cable Trays: Light-duty, installed in roof void with 50mm width for cables and earth wire.
Drain Pipes: Polycop with approved connectors (JG Speedfit or Connex).
Wall Louvres: Must comply with NRS002 standards.
Note: No specific compliance requirements (e.g., CSD, tax, B-BBEE, CIDB, CIPC) are stated in this document. Refer to the main tender invitation for mandatory compliance conditions.
Unit installations: Specific heights (e.g., h=1350 AFFL, h=2400 AFFL), airflow controls, and cabling/piping layouts for labs (Phase 6, Legacy, Telecoms).
Removal works: Existing diffusers, grills, indoor/outdoor units, and extractor fans to be removed and walls made good.
Equipment schedules: Mitsubishi units (e.g., AHU10 under-ceiling unit 7.1kW, BC1 controller with 8 branch points), fan specifications (e.g., pressurisation and extraction fans with filter units).
Installation standards: Drain pipes to use Polycop with proper connectors; outdoor switch-disconnector to be IP65 enclosure; all airconditioning units installed per manufacturer instructions.
Refurbishment of PTM&C labs (Telecoms, Legacy, and Phase 6) in the Engineering Building at Simmerpan Complex. This is a construction project involving detailed architectural and engineering drawings.
The scope involves refurbishment of PTM&C labs (Telecoms, Legacy, and Phase 6) in the Engineering Building at Simmerpan Complex. Key technical details include:- Refer to detailed construction drawings: SIMCO25P02-SE-D67, SIMCO25P02-SE-D70, SIMCO25P02-SE-E47-05, and others.- Work includes demolition of existing ramps and walkways, construction of new ramps with balustrades, installation of new access flooring at specified heights (250mm and 380mm FFL), and new storm water channels.- Installation of new partitions, doors, windows, and stainless steel balustrades by specialists, requiring architect approval for shop drawings.- Roofing and cladding using new Chromadeck Klip Lock 406 in charcoal grey.- Finishes include plaster and paint (2 coats), facebrick work, and cavity wall insulation.- Fire protection, safety signs, and protection against moving equipment are required.- All work must comply with engineer's design and specifications.
The methodology involves a detailed construction sequence based on engineering drawings. Key points:- Demolition of existing ramps and walkways, followed by construction of new ramps with balustrades on either side.- Installation of new access flooring at specified heights (250mm FFL in Legacy Lab, 380mm FFL elsewhere).- Erection of new partitions, doors, and windows, with specialist installation of stainless steel balustrades requiring architect approval.- Roofing and cladding work using Chromadeck Klip Lock 406.- Finishing work including plaster, paint, brickwork, and insulation.- All work must align with thresholds, levels, and engineer's design specifications as per referenced drawings.
No specific compliance requirements (e.g., B-BBEE, tax) are stated in the provided document. Refer to the main tender documents for full compliance details.Health and safety requirements inferred from the document include:- Installation of fire protection and safety signs.- Protection against moving equipment, with removable handrails at 1000mm FFL.- Compliance with engineer's specifications for safety during construction.
DocumentDrawings-Simco25P02-SE-D70-Simmerpan PTMC Lab Stormwater Drainage-.pdfCompliance review in progress
Likely requires: 1) Registered electrical/construction contractors with relevant experience, 2) Compliance with ESKOM contractor requirements, 3) Experience in laboratory or specialized facility refurbishment, 4) Valid tax clearance and CIDB registration (South African context), 5) Health and safety compliance, 6) Financial capability for project scope.
Contractors must demonstrate: 1. Compliance with South African electrical standards (SANS 10142, NRS002) 2. Experience with electrical installations in industrial/commercial settings 3. Ability to work with Eskom's technical specifications for electrical work 4. Capacity to complete work by specified timeline 5. Proper licensing for electrical work in South Africa
Electrical installation scope for Simmerpan Complex storages (Legacy, Telecoms and Phase 6):
Installation shall comply with SANS 10142, Model Preambles for Trades Section 'S' Electrical Work, and Technical Specification-Electrical Work
Comply with NRS002 standards
Earth and neutral terminals shall be pressure plate type with captive screws
All existing luminaires shall be removed and new installation done as shown on plan
New surface-mounted LED luminaires: 1200x600mm size, 60W LED power, colour temperature 4000K (Lascon LBP-24-60W-LED or equivalent)
Luminaires to be removed: Telecoms Storage (1 unit), Phase 6 Lab Storage (1 unit), Legacy Storage (1 unit)
All wiring for luminaires shall be replaced from DB to luminaires and switch
Re-use existing light switches
Bulkhead luminaires: aluminium die-cast black housing, Lascon Rimini-Dome, 23.4W power, 4000K colour temperature, converted to 21W LED emergency mode with inverter and battery pack for 1 hour
Weatherproof (WP) rated luminaires required where indicated
2x16A 3-pin switched socket-outlets at specified locations
16A 230V light switches as per schedule
Refurbishment of PTM&C labs (electrical component) at Simmerpan Complex Engineering Building. Work includes lighting installation in Legacy, Telecoms, and Phase 6 storage and lab areas. Drawing reference: SIMCO25P02-SE-E64, Revision 5, for construction.
[Source: Drawings-Simco25P02-SE-E64-05.pdf]
Refurbishment of PTM&C labs (electrical component) at Simmerpan Complex Engineering Building. Work includes lighting installation in Legacy, Telecoms, and Phase 6 storage and lab areas. Drawing reference: SIMCO25P02-SE-E64, Revision 5, for construction.
No specific compliance requirements found in the provided document. Bidders should obtain the full tender documentation for mandatory requirements.
Document contains emergency lighting specifications with 1-hour battery backup capability. No explicit OHS plan requirements stated in this drawing. Bidders should refer to full tender documentation for HSE compliance requirements.
Bulkhead luminaire, aluminium die-cast black housing, lascon rimini-dome- ee power 23.4W. Colour temp.4000K, Factory converted to 21W-LED/EMG emergency mode with inverter and battery pack for 1 hour.
National Transmission Company South Africa SOC Ltd (NTCSA) invites tenders for the refurbishment of the PTM&C laboratories located in the Engineering Building at the Simmerpan complex.
Compulsory site meeting – 25 June 2026 at 10:00, Telecomms Field and Ops Boardroom, Ground Floor, Engineering Building, Simmerpan Complex, Germiston. Attendance must be confirmed with the NTCSA Representative (name, position, contact details of each attendee). Non‑attendance results in disqualification.
Mandatory returnables (disqualifiable): Basic Compliance, Authorisation Form (Annexure A), Acknowledgement Form (Annexure B), Tenderer’s particulars (Annexure C), Integrity Declaration (Annexure D), CPA Local Goods (Annexure E), CPA Foreign Goods (Annexure F), SBD 6.2 Local Production & Content certificates (Annexures G1‑G4), SBD 1 Invitation to Bid, Tax Clearance Certificates, Tax Evaluation questionnaire, Preference Points Claim Form (SBD 6.1), Specific Goals evidence, Employment Equity compliance, Bidders Disclosure (Annexure J). Non‑disqualifiable returnables: same set but may be submitted within 5 working days after the deadline (CIDB proof of grading exempt). Returnables required solely for evaluation (score zero if missing): listed in the Returnables schedule. All documents must be uploaded in the appropriate folders before the closing time.
Provide a detailed construction methodology covering all scope items (foundations, cable trenches, earthworks, roads, drainage, building works, steelwork, lighting, electrical installations).
Specify concrete placement method (batching on‑site with mix design, aggregate source, testing; or ready‑mix with supplier details and testing).
CVs of Construction/Project Manager, Site Manager/Agent, Site Supervisor and Electrician – each must show BTech/Diploma qualification and minimum 3 years relevant experience.
Academic certificates must be certified copies not older than 3 months.
Provide a list of at least three comparable previous projects (scope, completion date, client contact, completion certificates).
Evidence required: valid B‑BBEE certificate (SANAS‑accredited) or sworn affidavit (for Exempted Micro Enterprises ≤ R10 m or Qualifying Small Enterprises ≤ R50 m).
Improvement/Retention Plan must be submitted within 30 days of contract signing, outlining milestones for moving up at least one B‑BBEE level per year (as per the level‑specific requirements described).
The contract will be governed by the NEC3 Engineering & Construction Contract (ECC). Tender validity is 90 days; extensions may be granted at NTCSA’s discretion but bidders may not amend their submission. Payment terms: 30 days for contracts ≤ R50 million, 60 days for contracts > R50 million, VAT inclusive. Insurance, deductibles and list of acceptable guarantors are referenced in Annexure 33 and must be supplied by the successful bidder.
Eligibility: bidders must meet all criteria in the Tender Data and must not be on any sanctions, defaulter or flagged‑supplier lists.
Joint ventures must provide a letter of intent, JV agreement confirming joint and several liability, single bank account details and proof of a single legal entity.
All mandatory returnable documents (Annexures A‑J) must be completed and uploaded.
SDL&I obligations: NTCSA will retain 2.5 % of each invoice (excl. VAT) as security; progress reports and compliance certificates must be submitted as required.
Returnable Documents: (No further details provided in extracted text. Refer to full tender documents for submission instructions, address, deadline, and required forms.)
DocumentDrawings-Simco25P02-SE-D67 PTMC LAB RAMPS.pdfCompliance review in progress
The provided document is an engineering drawing (Simco25P02‑SE‑D67) for PTMC Lab Ramps at the Simmerpan Complex.
Approval signatures:
– B. Hajee – 09/01/2026
– A. Mayet – 18/11/2025
No detailed scope of work, deliverables, standards or service levels are described in the drawing; these should be obtained from the complete tender package.
DocumentSDL&I Requirements.pdfReview complete
Description
Source: SDL&I Requirements.pdf
Scope: Refurbishment of the Simmerpan PTM&C Labs in the engineering building at the Simmerpan complex.
Market research indicates current suppliers are listed in a vendor database, and the market must be tested for potential suppliers.
Contact Information
Source: SDL&I Requirements.pdf (TENDER)
Buyer: Thendo Silimela (ESKOM NTCSA).
Returnable Documents
Source: SDL&I Requirements.pdf (TENDER)
Sworn affidavits must include: deponent name and ID, designation, enterprise name and address, black ownership percentages, total revenue and basis (audited/management accounts), financial year-end, B-BBEE status level, empowering supplier status, matching dates for deponent and Commissioner of Oath signatures, and a Commissioner who is not an employee/ex officio of the enterprise.
Evaluation Criteria
Source: SDL&I Requirements.pdf (TENDER)
CIDB grading of 5GB or higher is mandatory for contractors.
B-BBEE status must be maintained throughout the contract period. Bidders with Level 4 or higher must improve their B-BBEE status annually as follows:
Level 4: Must achieve Level 3 by the end of the first year, then improve annually.
Level 5-8 or non-compliant: Must achieve Level 4 by the end of the first year, then improve by at least one level annually thereafter.
SDL&I objectives (e.g., skills development, job creation, procurement spend) do not form part of the scoring but become contractual obligations upon award.
Local content thresholds for designated commodities must be met: wires (100%), steel (100%), cables (90%), cement (100%), office furniture (85%).
B-BBEE documentation requirements vary by annual revenue:
Scope: Refurbishment of the Simmerpan PTM&C Labs in the engineering building at the Simmerpan complex.
Note: The document focuses primarily on SDL&I (Supplier Development and Localisation) requirements. Technical specifications are not detailed in the provided content.
Financial Requirements
Source: SDL&I Requirements.pdf (TENDER)
NTCSA will retain 2.5% of every invoice (excluding VAT) as security for the fulfilment of SDL&I obligations. Retained amounts are released upon:
Submission of SDL&I progress reports.
Fulfilment of all SDL&I obligations.
Approval of a compliance report by the SDL&I Department.
Compliance Requirements
Source: SDL&I Requirements.pdf (TENDER)
B-BBEE: A valid B-BBEE certificate or sworn affidavit is mandatory for contract award. Requirements by turnover:
≤ R50 million: Comply with all QSE scorecard elements (unless ≥51% Black-owned, then sworn affidavit).
R50 million: Valid B-BBEE certificate.
All tenderers must maintain their B-BBEE status throughout the contract and submit a B-BBEE improvement or retention plan within 30 days of signing the contract.
Local Content: Minimum thresholds for designated sectors must be met (e.g., wires 100%, steel 100%, cables 90%, cement 100%, office furniture 85%). SBD 6.2 Declaration Form and Annexures C, D & E are mandatory for contract award.
CIDB: Grade 5GB or higher is required.
Subcontracting: Not mandatory as a condition of award.
Skills Development: Proposals must include training initiatives for Health & Safety Officer (2), Electrician (2), Bricklayer (2), Painter (2).
Job Creation: Proposals must specify the number of jobs to be created and retained in South Africa, prioritising unemployed graduates, TVET college graduates, or matriculates from the local vicinity.
Procurement Spend Targets: Black Owned (4.0%), Black Women Owned (3.0%), Black Youth Owned (2.0%), Black Persons with Disability (1.0%).
Reporting: Quarterly SDL&I compliance reports must be submitted. NTCSA reviews within 30 days and notifies of shortfalls, requiring corrective action.
Implementation Schedule: Must be completed and returned within 28 days after contract award for monitoring.
Sworn Affidavits: Must include deponent name and ID, designation, enterprise name and address, black ownership percentages, total revenue and basis, financial year-end, B-BBEE status level, empowering supplier status, matching dates for deponent and Commissioner of Oath signatures, and a Commissioner who is not an employee/ex officio of the enterprise.
B-BBEE Requirements
Source: SDL&I Requirements.pdf (TENDER)
Procurement Spend Targets: Black Owned (4.0%), Black Women Owned (3.0%), Black Youth Owned (2.0%), Black Persons with Disability (1.0%).
B-BBEE improvement or retention plans must be submitted within 30 days of contract signing. Bidders must maintain or improve their B-BBEE status annually as per specified milestones.
Contractual Terms
Source: SDL&I Requirements.pdf (TENDER)
NTCSA retains 2.5% of every invoice (excluding VAT) as security for SDL&I obligations. Retained amounts are released upon submission of progress reports, fulfilment of obligations, and approval of compliance reports.
Suppliers must submit quarterly SDL&I compliance reports. NTCSA reviews within 30 days and notifies of shortfalls, requiring corrective action.
Suppliers must complete and return an SDL&I Implementation Schedule within 28 days after contract award for monitoring.
Requirements
Source: SDL&I Requirements.pdf (TENDER)
Subcontracting is not mandatory as a condition of award.
Section
Source: SDL&I Requirements.pdf
SDL&I objectives do not form part of the scoring but become contractual obligations upon award.
DocumentAnnexure G4-Local content Declaration supporting Schedule to Annexure C.pdfCompliance review in progress
Returnable Documents: - The document mentions 'Returnable Documents' but provides no further detail. - There is no information on submission method, address, or deadline risks.
The tender involves the refurbishment of PTM&C labs in the Engineering Building at Simmerpan Complex. Work includes drywall partitioning, insulation, structural fixes, and finishing to specified standards.
Closing time: 13 July 2026 at 10:00. Note: Document mentions 'Closing time: 1:25' but this is likely an error; rely on the official tender closing date.
Evaluation will assess: - Demonstrated experience in similar drywall and light steel frame construction projects. - Ability to work within operational Eskom facilities without disrupting operations. - Compliance with Eskom safety standards. - Capability to meet detailed technical specifications, including use of specified brands: Simpson StrongTie/Hilti anchors, Isover insulation, Gypsum Firecheck boards.
Scope: Refurbishment of PTM&C labs in the Engineering Building at Simmerpan Complex. Key requirements: - Install new 90mm light steel frame drywall partitions (galvanized steel Z275, 0.8mm thickness). - Fill cavities with ISOVER 102mm cavity batt insulation. - Use 15mm Gypsum Firecheck boards (tapered edge). - Fix Titen HD anchors M12 x 50mm galvanized bolts at 600mm centers. - Use 25mm jack point screws at 220mm centers. - Pre-drill holes at 600mm centers, blow out dust. - Set drywall steel studs spaced 600mm centers, aligned with spirit level. - Apply jointing plaster (per DW14/96), sand smooth, then apply primer and two coats of paint (Prominent Sheen - White Cloud or match existing). - Install flexible corner beads or aluminium corner trim. - Use timber nogging for fixing support (e.g., for TV screens/chalkboards). - Follow DW1/96 for windows and doors. - Install fire protection and safety signs along vertical brick walls. - Ensure electrical wiring is installed where required.
Install new 90mm light steel frame drywall partitions around existing ducts. - Fill cavities with ISOVER 102mm cavity batt insulation. - Use timber nogging as fixing support for fixtures (e.g., TV screens, chalkboards). - Fix Titen HD anchors M12 x 50mm galvanized bolts at 600mm centers. - Pre-drill holes at 600mm centers and blow out dust. - Set drywall steel studs spaced 600mm centers, ensuring level and square alignment using a spirit level. - Close the frame with 15mm Gypsum Firecheck boards (tapered edge). - Secure boards with 25mm jack point screws at 220mm centers. - Apply Fibatape along board joints, seal with jointing plaster, allow to dry, then sand smooth. - Apply primer and two coats of paint (Prominent Sheen - White Cloud or match existing). - Install flexible corner beads or aluminium corner trim where required.
No explicit compliance certifications (e.g., CIDB, B-BBEE) are stated in the document. However, the following are implied: - Adherence to Eskom safety standards. - Use of specified materials and brands (Simpson StrongTie/Hilti, Isover, Gypsum Firecheck). - Compliance with drywall and steel frame installation specifications (DW14/96, DW1/96).
Health & Safety
Source: Drawings-Simco25P02-SE-D50-05.pdf
Install fire protection and safety signs along vertical brick walls. - Ensure structural security by using specified screws (25mm jack point screws at 220mm centers) and anchors (Titen HD M12 x 50mm galvanized bolts at 600mm centers). - Follow Eskom safety standards during demolition, construction, and installation activities.
DocumentBill of Quantities or Pricing Schedule.xlsxReview complete
Description
Source: Bill of Quantities or Pricing Schedule.xlsx
The project involves refurbishing PTM&C labs in the engineering building at Eskom’s Simmerpan complex. Preliminaries and general items cover the full cost of establishing, commissioning, and removing all site facilities required to start and complete the work as per contract terms.
Evaluation Criteria
Source: Bill of Quantities or Pricing Schedule.xlsx (unknown)
Bidders will be evaluated on their ability to:
Execute labor-intensive methods where specified (no deviations accepted).
Comply with Eskom SHE specifications and the OHS Act, including full PPE, fall protection systems, and SHEQ officer appointment (SACPCMP-registered, full-time on-site).
Use registered pest control companies for soil poisoning (10-year termite guarantee required).
Conduct concrete testing via approved laboratories (SANS 861/863 compliance).
Manage provisional sums for specialist appointments (e.g., balustrades, aluminium doors/windows, UPS, fire detection, furniture).
Adhere to SANS standards for all materials, installations, and manufacturer specifications.
Technical Specifications
Source: Bill of Quantities or Pricing Schedule.xlsx (unknown)
Scope: Refurbishment of PTM&C labs at Eskom’s Simmerpan complex engineering building.
Key deliverables:
Site establishment: Facilities for contractor and engineer (offices, storage, tools, plant), site signage, and removal of establishment on completion.
SHEQ: Supply and enforce use of PPE (safety boots, overalls, gloves, hard hats, ear/eye protection, dust masks, COVID-19 supplies, high-vis vests, induction tags). Provide fall arrest systems, barricading, transport compliance, signage (SANS 1186), safety file, and SHEQ officer (National Diploma + SACPCMP registration). Conduct baseline risk assessments, pre-exit medical screenings, and environmental/waste management plans (including oil spill kits, drip trays, waste bins, hazardous waste disposal).
Alterations: Demolition of block walls, plaster, concrete, brickwork, doors, windows, ceilings, partitions, flooring, and tiling. Protect existing surfaces, remove rubble continuously, control dust (water spraying, dust screens), and erect hoarding with lockable gates. Labour-intensive methods mandatory for marked items.
Electrical: Supply/install LED luminaires, distribution board equipment (circuit breakers, terminal bars, earth leakage units), cabling (BVX, earthing), trunking, and provisional sum for UPS (R300,000).
HVAC: Remove existing units (under-ceiling, outdoor, chillers, fans) and supply/install new pressurisation units, fans, Mitsubishi AC units (13.6kW–14kW), VRF outdoor unit (101kW), BC controller, and commissioning.
Fire protection: Supply/install 9kg dry chemical/CO2 extinguishers, fire escape signs, backing boards, and provisional sum for fire detection system (R50,000).
Furniture: Provisional sum for specialist supply/install of drawer units, tables, chairs, smartboard, and projector (R150,000).
Standards: SABS 1200 series, SANS (e.g., 1186, 861, 863), manufacturer specifications. Site visits strongly advised to assess work extent.
Financial Requirements
Source: Bill of Quantities or Pricing Schedule.xlsx (unknown)
Submit pricing in the provided Bill of Quantities format.
Total price (excl. VAT): R600,000. VAT: R90,000. Total (incl. VAT): R690,000.
Rates for new work must include: material, labour, plant, wastage, transport, and profit.
Refurbishment of PTM&C labs (Telecoms, Legacy, and Phase 6) in the Engineering Building at Simmerpan Complex. Work includes door/window replacements, shopfront installations, and finishing as per detailed design drawings (SIMCO25P02-SE-D50-04). Approved by National Transmission Company South Africa SOC Ltd, checked by S. Sibiya, drawn by MJ. Mathekga. Date: 28/10/2025.
Bidders must demonstrate competence in the following areas to qualify:
Ability to perform rational fenestration design.
Capability to manufacture and install doors, windows, and ironmongery to specified standards (e.g., aluminium frames, Matt Charcoal finish, DORMA hardware).
Capacity to obtain NTCSA approval for submitted designs and shop drawings.
Competence to conduct site visits for confirming door/window positions and sizes.
Use of competent personnel for fenestration calculations.
Scope: Refurbishment of PTM&C labs (Telecoms, Legacy, and Phase 6) in the Engineering Building at Simmerpan Complex.
Key deliverables and specifications:
Doors: Interior/exterior aluminium frame doors (D1, D2, D3, D4 types), sliding and double doors, with Matt Charcoal finish. Includes timber doorframes (86 x 67 HW) for specified sizes.
Windows: Aluminium frame windows with fixed and opening sections, glazing as per schedule.
Shopfronts: SF01-SF04 with solid Meranti hardwood, Meranti edge under face.
Finishes: Sand down, prepare, and apply 1 coat of clear polyurethane varnish, followed by 2 coats after drying. Smooth and glossy finish required.
Safety/Sealing: Exterior door frames must include dust seals (Raven co-extruded PVC sweep seal, 100mm x 6mm and 20mm x 10mm Sondor SBR strip) and weatherguard with RP116 threshold plates.
Design/Approval: Contractor must submit rational design, fenestration calculations, and new glazing shop drawings for NTCSA approval prior to manufacture. Calculations must be performed by competent personnel.
Site Confirmation: Sizes and positions must be confirmed on-site before manufacture. Contractor must conduct site visits.
Materials: Typical specifications are indicative; specialist approval is required for final materials and finishes.
Additional: Door stops for all doors. Fire protection and safety signs referenced.
The project involves refurbishments of PTM&C labs in the engineering building at Simmerpan Complex. Documented information is required for control of externally provided processes, products, and services, including criteria for evaluation, selection, monitoring, and re-evaluation.
Returnable documents must be submitted as specified in the quality requirements. Ensure Form A (E.1) is completed and signed. Use the specified method statement template (Ref 240-126469599) for the quality method statement.
Suppliers must demonstrate ISO 9001 compliance (certification not mandatory but system must comply). Must provide all tender returnables as per effective date 2022/01/26. Must meet Category 4 quality requirements with all deliverables evaluated (indicator=1).
The scope involves refurbishments of PTM&C labs in the engineering building at Simmerpan Complex. Quality management system requirements include documented control of externally provided processes, products, and services, with criteria for evaluation, selection, monitoring, and re-evaluation of external providers.
No specific compliance requirements (e.g., CSD, tax, B-BBEE) are stated in the provided document. Additional requirements (E.2) may apply as per the scope of work or specification.
Section
Source: Quality Returnables_Catergory 4.pdf
Section E score is 2.
DocumentSDL&I Requirements.pdfReview complete
Returnable Documents
Source: SDL&I Requirements.pdf (TENDER)
SBD 6.2 Declaration Form and Annexures C, D, E are mandatory for contract award.
Sworn affidavits (if applicable) must include: deponent details (name, ID, designation), enterprise information (CIPC name, address), black ownership percentages, revenue (audited/management accounts), financial year-end, B-BBEE status level, empowering supplier status, and proper commissioning (signed/stamped by Commissioner of Oath, not an employee/ex-officio of the enterprise).
Evaluation Criteria
Source: SDL&I Requirements.pdf (TENDER)
Objective criteria may be included and must align with PPPFA clause 2(1)(f). If a tenderer fails to meet objective criteria, the second-ranked tenderer may be recommended for award.
Mandatory requirements: CIDB Grade 5GB or higher, valid B-BBEE certificate or sworn affidavit, SBD 6.2 Declaration Form and Annexures C, D, E.
SDL&I objectives (e.g., B-BBEE improvement, skills development, job creation) do not form part of scoring but are contractual obligations if awarded.
Technical Specifications
Source: SDL&I Requirements.pdf (TENDER)
Scope: Refurbishment of PTM&C Labs in the engineering building at Simmerpan Complex.
SDL&I objectives must be submitted but not meeting targets does not disqualify. Commitments become contractual obligations.
Financial Requirements
Source: SDL&I Requirements.pdf (TENDER)
SDL&I penalty: 2.5% of every invoice (excluding VAT) retained as security until all SDL&I obligations are fulfilled.
Quarterly SDL&I reporting required. NTCSA reviews reports within 30 days and notifies if obligations are not met. Corrective measures must be implemented before the next report; otherwise, retention clauses are invoked.
Compliance Requirements
Source: SDL&I Requirements.pdf (TENDER)
B-BBEE: Valid certificate (SANAS-accredited) or sworn affidavit (CIPC or as per B-BBEE Codes) required for contract award. Exempted Micro Enterprises (≤R10M revenue) and Qualifying Small Enterprises (≤R50M revenue, unless ≥51% Black-owned) may submit sworn affidavits. Entities >R50M revenue must submit a valid B-BBEE certificate.
Skills development: Proposals required for Health & Safety Officer (2), Electrician (2), Bricklayer (2), Painter (2). Candidates must be unemployed graduates/TVET/Matriculates, representative of SA demographics, and sourced locally.
Job creation: Proposals required for new and retained jobs in South Africa.
Procurement spend targets: Black Owned 4.0%, Black Women Owned 3.0%, Black Youth Owned 2.0%, Black Persons with Disability 1.0%.
B-BBEE improvement/retention plan: Must be submitted within 30 days of contract signing. Bidders must maintain or improve B-BBEE status during the contract (specific milestones apply based on current level).
SDL&I Implementation Schedule: Must be completed and returned within 28 days of contract award.
Sworn affidavits: Must include deponent details (name, ID, designation), enterprise information (CIPC name, address), black ownership percentages, revenue (audited/management accounts), financial year-end, B-BBEE status level, empowering supplier status, and proper commissioning (signed/stamped by Commissioner of Oath, not an employee/ex-officio of the enterprise).
Contractual Terms
Source: SDL&I Requirements.pdf (TENDER)
SDL&I penalty: 2.5% of every invoice (excluding VAT) retained until all SDL&I obligations are fulfilled.
Quarterly SDL&I reporting required. NTCSA reviews reports within 30 days and notifies if obligations are not met.
Corrective measures must be implemented before the next report; otherwise, retention clauses are invoked.
SDL&I Implementation Schedule must be completed and returned within 28 days of contract award for monitoring.
Requirements
Source: SDL&I Requirements.pdf (TENDER)
Subcontracting is not applicable as a mandatory requirement for this tender.
Install fire protection and safety signs along vertical brick walls.
Follow standard specifications for fire protection and safety as outlined in the document.
Health & Safety
Source: Drawings-Simco25P02-SE-D50-05.pdf
Install fire protection and safety signs along vertical brick walls.
Follow standard specifications for fire protection and safety as per the project requirements.
DocumentScope of work.pdfReview complete
Evaluation Criteria
Source: Scope of work.pdf (unknown)
Eligibility is determined by the ability to comply with all referenced standards (NTCSA, SANS, Eskom SHEQ) and execute the multi-disciplinary work. Key points:
Designs must conform to NTCSA standards.
Contractors must adhere to Eskom’s Safety, Health, and Environmental (SHE) specifications during construction.
Work must meet world-class quality standards as per the document.
Technical Specifications
Source: Scope of work.pdf (unknown)
Scope: Refurbishment of PTM&C Labs in the Engineering Building at Simmerpan Complex (Phase 2).
Architectural Work:
PTM&C (Phase 6) Training Facility: Wall improvements (paint), floor-to-ceiling windows, signage, emergency exits, HMI desks, fire safety (extinguishers, smoke detectors), new aluminium curtain wall and door, steps between labs, galvanised steel barrier for equipment protection.
Legacy Protection Training Facility: Raised computer flooring (per SIMCO25P02-SE-D50-06), door/window replacement, ramps, removal of outdated fixtures, new furniture (chairs, desks, first aid kits), aluminium curtain wall and timber doors, steps, steel barrier.
Telecoms Ground Floor Training Facility: Raised computer flooring, door/window replacement, ramps, plaster and paint, aluminium curtain wall and doors, steel barrier, new storage room, fire escape route.
Telecoms Training Room: Aluminium windows with heat-blocking glazing, smart board, projector, trip hazard mitigation, reinforced walls, desks, chairs, training laptops.
IDEA Training Facility: Paint and carpet, aluminium windows with heat-blocking glazing.
PTM&C Ramps: Modify existing ramp to comply with SANS 10400-S (max slope 1:12). Includes scabbling, dowelling Y10 L-bars, reinforcement mesh, new concrete. New ramp at alternate entrance (per SIMCO25P02-SE-D67).
Telecoms Building Ramp: Demolish existing ramp, construct new ramp (per SIMCO25P02-SE-D69), install 120mm HDPE pipe for stormwater, softboard joint to prevent cracking.
Drainage: Regrade concrete floors, install drainage channel and 150mm PVC pipe to existing manhole (per SIMCO25P02-SE-D70).
HVAC/Lighting:
PTM&C: DB rewiring, underfloor AC/DC cabling, new plugs, cassette-type air-conditioning units, fire safety, access control, Wi-Fi, GPS antenna brackets.
Legacy: Reconfigure panel orientation, raised flooring, new DB/MCBs/plugs/earth leakage, certified air-conditioning, fire systems, access control, PA system, GPS antennas.
Telecoms Ground Floor: AC/DC cable trays, extended cable trenches, new DB/aircons/external lights/UPS, network cabling, Wi-Fi, PA system, signage.
All designs and construction must conform to NTCSA standards.
Health & Safety
Source: Scope of work.pdf
All construction must adhere to Eskom’s Safety, Health, and Environmental (SHE) specifications. Strict safety procedures are mandatory during construction. Compliance with the Occupational Health and Safety Act (OHS Act) is required.
Section
Source: Scope of work.pdf
Eligibility is determined by compliance with NTCSA, SANS, and Eskom SHEQ standards. Contractors must demonstrate ability to execute multi-disciplinary work to world-class quality.
Project involves refurbishment of PTM&C labs electrical systems at Simmerpan Complex. Associated with National Transmission Company South Africa SOC Ltd (Reg No 2021/539129/30). Drawing dates: 04/12/2025 (approval), 02/11/2025 (final design).
Evaluation likely based on: Electrical contractor registration, CIDB grading, compliance with South African electrical regulations (NRS002), and Eskom vendor registration. Work must be approved by National Transmission Company South Africa SOC Ltd.
Electrical installation methodology: Use circuit breakers (TP20A, SP20A, DP20A). Wiring with defined conductor sizes (e.g., 2x2.5 + 2x2.5 E/W for pressurisation). Install trunking and PVC conduit. Set up AHU units, 12 plug panel sets (each 2000W), and control systems. Incorporate rotary on/off switches and speed control units. Comply with electrical legend per NRS002.
DocumentContract and Contractor OHS Management.pdfReview complete
Description
Source: Contract and Contractor OHS Management.pdf
This document sets Eskom's minimum criteria for managing supplier OHS compliance and conformity based on standards, procedures, policies, and legal obligations.
It applies from inception to completion of the contract/transaction.
Scope outlines key responsibilities of procurement professionals, contract/project managers, line management, suppliers, and OHS professionals.
Minimum OHS requirements must be addressed during project initiation, tender enquiry, supplier registration, site access, performance monitoring, contract completion, and work stoppage instances.
Purpose is to guide Eskom employees in OHS-related activities from procurement to contract end, ensuring standardisation.
Applicable throughout Eskom Holdings SOC Ltd, its divisions, subsidiaries, and entities where Eskom has controlling interest.
Normative references include Eskom policies, procedures, and South African legislation such as the Occupational Health and Safety Act, National Environmental Management Acts, and others.
Experience & Qualifications
Source: Contract and Contractor OHS Management.pdf
Competent person definition: A person with required training, knowledge, experience, and where applicable qualification relevant to perform the work/task.
Where qualifications and training are registered under the National Qualifications Framework Act, those are regarded as required.
Must be familiar with the Act and applicable regulations.
Quality Management
Source: Contract and Contractor OHS Management.pdf
Contract custodian must ensure contractor non-conformances on OHS obligations are addressed, recorded, and submitted to Procurement for future reference.
After procurement concludes for national/divisional contracts, handover to site OHS professional where work/service is conducted.
For national/divisional contracts, when supplier mobilises to site, Eskom site manager takes responsibility ensuring supplier works according to approved OHS plan and provides oversight supervision.
Health and safety specification and baseline risk assessment must be made available to appointed additional contractors.
37(2) agreement must be signed by contract custodian and contractor/supplier when signing contract.
Continual OHS performance monitoring: Eskom conducts risk-based inspections, audits, and blitz inspections; construction work contractors audited per legal requirements; non-construction work audit frequency determined by risk.
Contract custodian must ensure monitoring mechanisms (audits, reviews) instituted with OHS professional support to ensure compliance.
Management of contractors: contract custodian ensures principal contractor notified of accountability for employees/contractors/suppliers and their compliance.
Non-conformances dealt with via approved Eskom contractor management processes (e.g., supplier reconsideration review committee).
Post contract review: contract custodian informs supplier about OHSKPIs before work commences; OHS professional assists setting KPIs and prepares OHS component for review.
Health & Safety
Source: Contract and Contractor OHS Management.pdf
This document outlines Eskom's contractor OHS management model across six phases: project initiation, tender phase, supplier registration, site mobilisation, contract execution/monitoring, and post contract review.
Key OHS requirements integrated into procurement and supply chain processes.
Minimum OHS requirements addressed during phases including project initiation, tender enquiry, supplier registration, site access, performance monitoring, contract completion, and work stoppage.
Normative references include Eskom Safety, Health, Environmental and Quality Policy, Procurement Procedure, Life-Saving Rules, Occupational Health and Safety Act, National Environmental Management Acts, and others.
Roles and responsibilities defined for designers, procurement practitioners, contract custodians, line managers, OHS professionals, construction and safety agents, and suppliers.
Designers must incorporate OHS requirements into design, considering risks.
Procurement practitioners ensure OHS professional part of multidisciplinary team, OHS requirements provided before enquiry release, and OHS professional participates in meetings leading to contract award.
Contract custodian ensures contract specifies OHS management, OHS professional part of cross-functional team, project-specific OHS requirements provided, OHS costing included in bill of quantities, OHS file evaluated before work commencement, OHS plan audited for compliance, and 37(2) agreement signed.
OHS professionals ensure relevant OHS procedures part of procurement enquiry, compile scope-specific OHS requirements, audit OHS plans, monitor performance, and determine if work falls under construction regulations.
Construction and safety agent responsibilities aligned to Construction Regulations, including preparing baseline risk assessment, providing health and safety specification to designer, facilitating inclusion in tender documents, ensuring principal contractor registered with compensation fund, and conducting periodic audits.
Supplier must provide valid documentation, comply with OHS legislation and Eskom requirements, be conversant with OHS legal obligations, and meet site-specific OHS requirements before work commencement.
Contractual Terms
Source: Contract and Contractor OHS Management.pdf
Contract awarding: All findings in the OHS tender evaluation report must be addressed with the supplier at negotiation; if contract signed before gaps are closed, they become contract conditions with a timeframe.
Contracts must state no work commences before OHS file approval.
For construction work requiring a permit, allow minimum 30 days for Department of Employment and Labour processing.
National contracts: after signing, supplier must meet OHS professional on site within five working days to discuss site requirements; site allows 5-15 working days for preparation.
Supplier must ensure compliance with each business unit's OHS requirements, even if approved centrally.
OHS 37(2) Agreement (COID) indemnifies Eskom from contractor acts/omissions; contractors are deemed employers responsible for their employees.
Exempted services include manufacturing/supply not delivered to Eskom premises, services not provided at Eskom premises, government entities, independent electricity generators, consumables from retailers without contract, accommodation without contract, professional registration bodies, and non-profit organisations for funding.
Section
Source: Contract and Contractor OHS Management.pdf
OHS functionality evaluation criteria: Safety & Health weighted at 100%, with a minimum threshold of 70% to proceed.
Tender evaluation: OHS professionals will evaluate shortlisted suppliers who have passed mandatory and functionality thresholds.
OHS tender returnables must be clear and explicit; suppliers may be expected to conduct a site visit before tendering.
For OHS as a contractual requirement, each supplier will only be evaluated twice during the tender evaluation stage.
OHS as functionality: technical, procurement, and OHS teams conduct initial tender evaluation against a 70% OHS functionality threshold.
Post-contract review: supplier OHS performance is evaluated after contract completion.
DocumentDrawings-Simco25P02-SE-D68 JB Support concrete.pdfCompliance review in progress
Submission Guidelines
Source: Drawings-Simco25P02-SE-D68 JB Support concrete.pdf (unknown)
Returnable documents list not available in the provided source. The document is a construction drawing (PDF), not the full tender. Bidders must obtain the complete tender document for submission requirements, including forms, deadlines, and disqualification risks.
Evaluation Criteria
Source: Drawings-Simco25P02-SE-D68 JB Support concrete.pdf (unknown)
Contractors must: - Be registered with relevant South African construction bodies. - Have experience with Eskom or similar utility projects. - Demonstrate financial capability. - Meet health and safety requirements. - B-BBEE certification is likely required.
Technical Specifications
Source: Drawings-Simco25P02-SE-D68 JB Support concrete.pdf (unknown)
No technical specifications, scope of work, or deliverables found in the provided document. The file is a construction drawing (Drawings-Simco25P02-SE-D68 JB Support concrete.pdf) with approval signatures: - B. HAJEE (09/01/2026) - A. MAYET (18/11/2025). Bidders must obtain the full tender document for actual technical requirements.
Compliance Requirements
Source: Drawings-Simco25P02-SE-D68 JB Support concrete.pdf (unknown)
Compliance requirements (e.g., CSD, tax clearance, B-BBEE, CIDB, CIPC, professional registrations, local content) are not specified in the provided document. Bidders must obtain the full tender document for details.
The document provided is an E-Tendering Training Acknowledgement Form only — it does not contain the full returnable document list for the tender.
Bidders must complete and submit this acknowledgement form as part of their submission.
The form requires the following fields:
Enquiry number
Business name / Joint Venture name
Contact person details (landline, cellphone, email)
Tenderer's name (acknowledgement statement)
Authorized signature
Designation of signatory
Date of signing
The bidder must confirm they have completed self-training via the e-Tendering Noddy Guide, video, or a clarification meeting.
Practical guidance: This form alone is unlikely to be the complete returnable schedule. Bidders should request the full tender pack from Eskom to identify all required returnables (e.g., CSD report, tax compliance, B-BBEE certificate, CIDB grading, etc.).
Refurbishment of PTM&C Labs (Telecoms, Legacy, and Phase 6) in the Engineering Building at Simmerpan Complex. Scope includes structural modifications, finishes, and installations as per detailed drawings.
Bidders must demonstrate capability in commercial construction and refurbishment projects. Compliance with engineering specifications, as detailed in the drawings (e.g., SIMCO25P02-SE-D67, SIMCOP25P02-SE-E47-02), is required. Likely requires relevant construction industry registration and health and safety compliance.
Fire protection and safety signs are required as part of the finishes schedule. No other specific compliance requirements (e.g., CSD, B-BBEE, CIDB) are stated in the document.
Health & Safety
Source: Drawings-Simco25P02-SE-D50-03.pdf
Fire protection and safety signs are required as part of the finishes schedule. No additional health and safety plans or OHS requirements are detailed in the document.
Refurbishment of PTM&C labs (Phase 6 Lab, Legacy Lab, Telecoms Lab) in the Engineering Building at Simmerpan Complex. Work includes structural, interior, and access modifications as per detailed drawings and schedules.
Evaluation likely includes: Valid CIDB grading for building construction, proof of similar refurbishment project experience, compliance with Eskom vendor registration, valid tax clearance certificate, and B-BBEE certification. Technical capability for structural and laboratory refurbishment work must be demonstrated.
Fire protection and safety signs required (refer to Schedule 07).
Health & Safety
Source: Drawings-Simco25P02-SE-D50-03.pdf
Fire protection and safety signs required as per Schedule 07. Specific safety details must align with referenced drawings and manufacturer specifications.
Returnable documents are required. Submission details (address, format, deadline) are in the main tender documents. Late or incomplete submissions may lead to disqualification.
Scope: refurbishment of PTM&C labs (Telecoms, Legacy, Phase 6) in the Engineering Building at Simmerpan Complex, including telecoms lab, legacy lab, phase 6 lab, telecoms storage rooms, and a training room.
All work must comply with SANS 10400 Part T.
Fire protection: install 9 kg DCP extinguisher, 9 kg CO₂ extinguisher, 25 mm nominal thickness hardwood backing boards with chamfered edges, plug‑and‑screw to wall, hook height 1 m above floor.
Fire doors: 46 mm steel fire door, knob‑cylinder lock operable in a single movement, longest travel distance to an escape door ≤10 m, exit doors ≤30 m.
High‑voltage electrical equipment present; no water reticulation to hose reels allowed.
Refer to drawings SIMCOP25P02‑SE‑D50‑07 (detailed design date 20 Aug 2025).
Must comply with SANS 10400 Part T building regulations.
No water reticulation to hose reels in high‑voltage rooms.
No other compliance requirements (e.g., B‑BBEE, tax) are specified.
Health & Safety
Source: Drawings-Simco25P02-SE-D50-07.pdf
The refurbishment site contains high‑voltage electrical equipment. Hose reels or water reticulation are prohibited in these rooms.
DocumentNEC3 Engineering & Construction Contract(ECC).pdfReview complete
Contact Information
Source: NEC3 Engineering & Construction Contract(ECC).pdf (unknown)
Employer: NTCSA SOC Ltd, registered office at Megawatt Park, Maxwell Drive, Sandton, Johannesburg.
Project Manager and Supervisor details are to be confirmed (TBC).
No submission address, email, or phone contacts are provided in the document.
Submission Guidelines
Source: NEC3 Engineering & Construction Contract(ECC).pdf (unknown)
Submit a completed C1.1 Form of Offer and Acceptance, signed by a duly authorised representative of the tenderer. The Employer may accept the offer by signing the Acceptance part and returning a copy before the period of validity ends. Failure to provide required securities, bonds, guarantees, or proof of insurance within two weeks after agreement may constitute repudiation.
Alternative tenders require a separate copy of the Form of Offer and Acceptance.
Tenderer must include a Schedule of Deviations if applicable, as part of the returnable documents.
Returnable Documents
Source: NEC3 Engineering & Construction Contract(ECC).pdf (unknown)
Completed C1.1 Form of Offer and Acceptance, signed by a duly authorised representative.
Schedule of Deviations (if applicable).
CVs for key persons appended to the tender schedule.
Programme and activity schedule.
Contract Data provided by the Contractor (Part C1.2b), including key persons details, direct fee percentage, subcontracted fee percentage, working areas, completion date, risk register, and pricing data.
Evaluation Criteria
Source: NEC3 Engineering & Construction Contract(ECC).pdf (unknown)
Contractor must be a registered entity under South African company laws.
Joint ventures: all parties are jointly and severally liable.
Contractor must not have had a business rescue order granted against them.
No cession or assignment of rights without written consent from the Employer.
Compliance with South African law, Construction Regulations 2014, and all applicable health, safety, and environmental legislation is mandatory.
B-BBEE status verification certificate is required.
Contractor must notify Employer of any change in B-BBEE status within seven days and submit updated verification within thirty days. Decrease in B-BBEE status may lead to contract re-negotiation or termination.
Prohibited actions (e.g., coercive, collusive, corrupt, fraudulent, or obstructive) may result in termination.
Technical Specifications
Source: NEC3 Engineering & Construction Contract(ECC).pdf (unknown)
Scope: Refurbishment of PTM&C labs in the Engineering Building at Simmerpan Complex.
Contract duration: 9 months.
Works Information is detailed in Part C3: Scope of Work (32 pages), covering architectural, civil, electrical, mechanical, and process control works.
Specific areas include PTM&C Training Facility, Legacy Protection Training Facility, Telecoms Training Facility, Idea Training Facility, and Storeroom.
Contractor must submit CVs for key persons (names, jobs, responsibilities, qualifications, experience) and a programme within two weeks of contract date.
Asbestos management: Employer ensures ambient air conforms to South African asbestos standards (OEL: 0.2 fibres/ml, 4-hour TWA). Contractor may perform parallel measurements at their own expense. Asbestos removal and disposal must be done by a registered asbestos contractor at Employer’s expense, following South African legislation.
Contractor’s personnel may stop work in unsafe asbestos conditions until the area is declared safe.
Contractor must comply with all applicable environmental laws, regulations, and contract procedures.
Experience & Qualifications
Source: NEC3 Engineering & Construction Contract(ECC).pdf
Contractor must provide details of key persons, including names, jobs, responsibilities, qualifications, and experience.
CVs for key persons must be appended to the tender schedule.
Contractor must submit a programme and activity schedule as part of the tender.
Key persons must be notified to the Project Manager within two weeks of the contract date if not already provided.
Quality Management
Source: NEC3 Engineering & Construction Contract(ECC).pdf
Defects must be discovered through reasonable inspection before the defects date.
Works Information includes detailed requirements for subcontracting, plant and materials quality, tests, construction, completion, testing, commissioning, and correction of defects.
Specific standards and workmanship are outlined for building, civil, electrical, mechanical, and process control works.
Contractor must submit a first programme for acceptance within two weeks of the contract date and revised programmes at intervals no longer than specified.
Pricing Schedule
Source: NEC3 Engineering & Construction Contract(ECC).pdf
Pricing based on NEC3 Option B: bill of quantities with quantities and rates or lump sums.
Tender must include offered total prices exclusive and inclusive of VAT.
Bill of quantities uses metric units; items are measured net with no allowance for waste.
Prices must be fully inclusive of all work, risks, overheads, and profit.
Quantities are not final; payment is based on assessed work.
Assessment interval: 25th day of each month.
Payment period: 3 weeks after assessment.
Retention: 10% on each approved payment certificate.
Financial Requirements
Source: NEC3 Engineering & Construction Contract(ECC).pdf (unknown)
Contract uses NEC3 Option B: Priced contract with bill of quantities.
Tender must include offered total prices exclusive and inclusive of VAT.
Payment is based on re-measurement of completed work against the bill of quantities.
Assessment interval: 25th day of each month.
Currency: South African Rand.
Payment period: 3 weeks after assessment.
Interest rate: publicly quoted prime rate from Standard Bank of South Africa.
Retention: 10% on each approved payment certificate.
Delay damages: 0.1% per day up to a maximum of 10% of contract value.
Tax invoices must include Employer’s VAT number 4710303126 and be submitted within one week of receiving a payment certificate. Failure to submit a tax invoice on time delays payment.
Prices must be fully inclusive of all work, risks, overheads, and profit.
Quantities are not final; payment is based on assessed work.
Bill of quantities uses metric units; items are measured net with no allowance for waste.
Compliance Requirements
Source: NEC3 Engineering & Construction Contract(ECC).pdf (unknown)
Tenderer must provide CIDB registration number if applicable.
B-BBEE status must be maintained; any decrease may lead to contract re-negotiation or termination.
Joint ventures are jointly and severally liable.
Confidentiality clauses restrict disclosure of contract information.
Compliance with Construction Regulations 2014, Occupational Health and Safety Act, and Asbestos Regulations is mandatory.
Specific asbestos exposure limits and monitoring procedures are defined.
Contractor must take all reasonable precautions for health and safety and may be appointed as Principal Contractor under Construction Regulations 2014.
Contractor must comply with all applicable environmental laws, regulations, and contract procedures.
Insurance: Contractor must provide certificates for required insurances (e.g., loss of or damage to works, equipment, liability for property damage, bodily injury). Employer provides insurances as per Insurance Table B (e.g., Assets All Risk, Contract Works, Environmental Liability).
Nuclear liability: Employer is solely responsible for nuclear damage liabilities, except in cases of unlawful intent or unauthorised presence by the Contractor.
B-BBEE Requirements
Source: NEC3 Engineering & Construction Contract(ECC).pdf (unknown)
Contractor must provide a valid B-BBEE verification certificate.
Contractor must notify Employer of any change in B-BBEE status within seven days and submit updated verification within thirty days.
Decrease in B-BBEE status may lead to contract re-negotiation or termination.
Failure to notify Employer of a change in B-BBEE status may constitute a reason for termination.
Health & Safety
Source: NEC3 Engineering & Construction Contract(ECC).pdf
Contractor must take all reasonable precautions for health and safety and may be appointed as Principal Contractor under Construction Regulations 2014.
Compliance with Occupational Health and Safety Act and Asbestos Regulations is mandatory.
Specific asbestos exposure limits: OEL of 0.2 fibres/ml (4-hour TWA) and short-term exposure limit of 0.6 fibres/ml (10-minute TWA).
Contractor’s personnel may stop work in unsafe asbestos conditions until the area is declared safe by Compliance Monitoring or an approved asbestos work plan.
Contractor must ensure all subcontractors, employees, and others under their control comply with health and safety laws and regulations.
Environmental
Source: NEC3 Engineering & Construction Contract(ECC).pdf
Contractor must comply with all applicable environmental laws, regulations, and contract procedures.
Asbestos removal and disposal must be done by a registered asbestos contractor at Employer’s expense, following South African legislation.
Employer manages asbestos and asbestos-containing materials (ACM) according to the Employer’s Asbestos Standard 32-303.
Contractor must notify the Employer if asbestos is identified during work; a risk assessment and control measures will be implemented.
Contractually agreed dates may be adjusted if asbestos-related delays occur.
Contractual Terms
Source: NEC3 Engineering & Construction Contract(ECC).pdf
Contract uses NEC3 Engineering and Construction Contract (ECC3) April 2013, with main Option B (Priced contract with bill of quantities) and secondary options including delay damages (X7), retention (X16), and limitation of liability (X18).
Retention: 10% on each approved payment certificate.
Delay damages: 0.1% per day up to 10% of contract value.
Liability limitations: Contractor’s liability for indirect or consequential loss is limited to R0.00. Employer’s liability to the Contractor for indirect or consequential loss is also limited to R0.00.
Additional Z-clauses cover B-BBEE, confidentiality, health and safety, environmental compliance, insurance, nuclear liability, and asbestos management.
Contract comes into effect upon receipt of a fully signed copy by the tenderer, unless objections are raised within five working days.
Contractor must deliver securities, bonds, guarantees, and proof of insurance within two weeks of receiving the signed agreement.
Requirements
Source: NEC3 Engineering & Construction Contract(ECC).pdf (unknown)
Tenderer must provide CIDB registration number if applicable.
Contractor must be a registered entity under South African company laws.
Joint ventures are jointly and severally liable.
Contractor must not cede, delegate, or assign any rights or obligations without written consent from the Employer.
Section
Source: NEC3 Engineering & Construction Contract(ECC).pdf
Quality assurance requirements are referenced but specific criteria are not detailed in the document.
Bidders must comply with the following based on Eskom’s SHEQ Policy:
External service providers (contractors/suppliers) must fulfil all relevant safety, health, environmental, and quality compliance obligations.
Must conform to Eskom’s standards and organisational requirements.
Must establish, develop, and implement management systems conforming to ISO 9001, ISO 14001, or ISO 45001.
Must comply with Eskom’s Life-saving Rules, which apply to all employees, external service providers, and visitors:
Open, isolate, test, earth, create an equipotential zone bond, and/or insulate before touch.
Hook up at heights.
Buckle up.
Be sober.
Permit to work.
Ensure safe live working.
Must align with Eskom’s Zero Harm principles: zero fatalities, zero injuries/ill-health, zero environmental incidents, and zero defects.
Key legal references include the Occupational Health and Safety Act, Compensation for Occupational Injuries and Diseases Act, National Environmental Management Act, and Climate Change Act.
Eskom’s SHEQ Policy sets strict health and safety expectations for contractors/suppliers. Key requirements:
Prevent work-related injuries and ill-health through proactive measures.
Contractors/suppliers are defined as any employer formally contracted by Eskom to perform work or supply services, products, equipment, or materials.
Comply with Eskom’s Life-saving Rules, applicable to all employees, external service providers, and visitors:
Open, isolate, test, earth, create an equipotential zone bond, and/or insulate before touch.
Hook up at heights.
Buckle up.
Be sober.
Permit to work.
Ensure safe live working.
Align with Eskom’s Zero Harm principles: zero fatalities, zero injuries/ill-health, zero environmental incidents, and zero tolerance for unsafe practices.
Key legal references: Occupational Health and Safety Act, Compensation for Occupational Injuries and Diseases Act, and ISO 45001.
External service providers must fulfil all relevant safety and health compliance obligations.
Proactively manage environmental footprint by minimising pollution and degradation, pursuing a low-carbon future, and prioritising energy and water conservation.
Support national government objectives for a low-carbon, climate-resilient future by mainstreaming climate change initiatives.
Achieve 'Zero environmental incidents' as part of the Zero Harm goal.
Key references: National Environmental Management Act, Climate Change Act, ISO 14001, and Eskom’s Environmental Strategy.
Contractors/suppliers must consider their environmental impact and comply with relevant standards.
DocumentNEC3 Engineering & Construction Contract(ECC).pdfReview complete
Description
Source: NEC3 Engineering & Construction Contract(ECC).pdf
Scope: Refurbishment of PTM&C Labs in the Engineering Building at Simmerpan Complex.
Contract documents: Part C1 (Agreements & Contract Data), Part C2 (Pricing Data), Part C3 (Scope of Work), and Part C4 (Site Information).
Contact Information
Source: NEC3 Engineering & Construction Contract(ECC).pdf (unknown)
Source: NEC3 Engineering & Construction Contract(ECC).pdf (unknown)
Submit the completed C1.1 Form of Offer and Acceptance as a returnable document, signed by the tenderer’s authorised representative.
The Employer accepts the offer by signing the Acceptance part and returning a copy to the tenderer.
Within two weeks of receiving the signed agreement, the Contractor must provide all required securities, bonds, guarantees, proof of insurance, and other documentation as specified in the Contract Data.
Failure to provide these within the stipulated timeframe constitutes a repudiation of the agreement.
The Contractor must notify the Employer in writing within five working days of receipt if any terms of the agreement are unacceptable; otherwise, the agreement becomes binding.
Evaluation Criteria
Source: NEC3 Engineering & Construction Contract(ECC).pdf (unknown)
Open tender: all qualified contractors may bid.
Joint ventures/consortia: must notify the Employer of the key person authorised to bind the Contractor within two weeks of the Contract Date. Composition cannot be altered without the Employer’s written consent.
B-BBEE compliance: mandatory. Any change in B-BBEE status must be notified within 7 days, with an updated verification certificate submitted within 30 days. A decrease in status may lead to contract re-negotiation or termination.
Principal Contractor role: the Contractor must have the capacity to accept appointment as Principal Contractor under the Construction Regulations 2014.
No nationality restrictions; South African law applies.
Quality assurance: requirements are detailed in the Works Information (Section 2.5).
Technical Specifications
Source: NEC3 Engineering & Construction Contract(ECC).pdf (unknown)
Scope: Refurbishment of PTM&C Labs in the Engineering Building at Simmerpan Complex. Duration: 9 months.
Works Information: Contained in Part C3 (Scope of Work) and referenced drawings. Includes specifications for building works, civil/structural works, electrical/mechanical works, and process control/IT works.
Key areas: PTM&C Training Facility, Legacy Protection Training Facility, Telecoms Ground Floor Training Facility, Telecoms Training Room, Idea Training Facility, and Storeroom (Phase 6 & Legacy).
Deliverables: As-built drawings, operating manuals, and maintenance schedules.
Contract type: NEC3 Engineering and Construction Contract (ECC3) Option B (Priced contract with bill of quantities).
Experience & Qualifications
Source: NEC3 Engineering & Construction Contract(ECC).pdf
Key personnel: Contractor must provide details of key persons, including names, job titles, responsibilities, qualifications, and experience. CVs must be appended to the tender schedule.
Contract Data Part Two: Contractor must complete this section, including direct fee percentage, subcontractor fee percentage, and working areas.
Pricing details: Contractor must provide rates for equipment, hourly rates for design staff, and percentages for overheads (e.g., people overheads, design overheads).
Programme: Contractor must submit a programme for acceptance within two weeks of the Contract Date.
Quality Management
Source: NEC3 Engineering & Construction Contract(ECC).pdf
Quality requirements: Specified in the Works Information for Plant, Materials, and workmanship.
Procedures: Tests, inspections, commissioning, and defect correction are outlined in the Works Information.
Subcontractor management: Contractor must ensure subcontractors comply with quality standards and document control.
Construction standards: Temporary works, site services, and building standards are specified.
Pricing Schedule
Source: NEC3 Engineering & Construction Contract(ECC).pdf
Pricing basis: NEC3 Option B (Priced contract with bill of quantities).
Bill of Quantities (BOQ): Attached as a separate document. Contains items measured using quantities and rates or stated as lump sums.
Payment: Based on re-measurement of completed work against the BOQ. The BOQ is a pricing document only; specifications are in the Works Information.
General assumptions: Items are measured net; no allowance for waste. Prices must be fully inclusive of all work, risks, overheads, and profit.
Measurement units: Metric units (e.g., m, m², m³, kg, t, h, No.).
Compensation events: Default position is to use Defined Cost and Fee. Rates from the BOQ may be used only if agreed upon by the Contractor and Project Manager.
Financial Requirements
Source: NEC3 Engineering & Construction Contract(ECC).pdf (unknown)
Contract type: NEC3 Option B (re-measurement contract with bill of quantities).
Pricing: Based on rates and lump sums in the Bill of Quantities (BOQ). Prices must be fully inclusive of all work, risks, liabilities, overheads, and profit.
Payment: Monthly assessments, with payments due within 3 weeks of assessment. Currency: South African Rand (ZAR).
Retention: 10% retained on each approved payment certificate.
Delay damages: 0.1% per day of the contract value, capped at 10% of the total contract value.
Tax invoice: Must be submitted within one week of receiving a payment certificate. VAT number (4710303126) must be included on all invoices.
Interest on late payments: Based on the Standard Bank prime rate for ZAR amounts.
BOQ assumptions: Items measured net; no allowance for waste. The BOQ is a pricing document only; specifications are in the Works Information.
Compliance Requirements
Source: NEC3 Engineering & Construction Contract(ECC).pdf (unknown)
B-BBEE: Mandatory compliance. Contractor must notify the Employer of any change in B-BBEE status within 7 days and submit an updated verification certificate within 30 days. Failure to notify may result in termination. A decrease in status may lead to contract re-negotiation or termination.
Joint ventures/consortia: Jointly and severally liable. Must notify the Employer of the key authorised person within two weeks of the Contract Date. Composition cannot be altered without written consent.
Cession/assignment: Contractor may not cede, delegate, or assign rights or obligations without the Employer’s written consent.
Confidentiality: Contractor must not disclose contract-related information without authorisation. Images of the works require prior written consent.
Health, Safety, and Environment (HSE): Contractor must comply with all applicable laws, including the Construction Regulations 2014. May be appointed as Principal Contractor. Must take all reasonable precautions for health and safety.
Asbestos: Employer manages asbestos per its standard. If asbestos is identified, a risk assessment and control measures are required. Removal and disposal must be done by a registered asbestos contractor at the Employer’s expense, following South African legislation. Personnel may stop work in unsafe conditions until the area is declared safe.
Insurance: Contractor must provide insurances as specified in Insurance Table A (e.g., works, equipment, public liability, bodily injury).
Ethics: Prohibited actions (corrupt, fraudulent, coercive, collusive, or obstructive) may lead to termination. Contractor must cooperate fully with any investigation into alleged prohibited actions.
Nuclear liability: Employer (NTCSA SOC Ltd) is the operator of Koeberg Nuclear Power Station and indemnifies the Contractor against nuclear damage liabilities, except in cases of unlawful intent or unauthorised presence.
Tax compliance: Contractor must comply with the Value Added Tax Act and include the Employer’s VAT number (4710303126) on all invoices.
Health & Safety
Source: NEC3 Engineering & Construction Contract(ECC).pdf
Compliance: Contractor must comply with the Construction Regulations 2014 and all applicable health and safety laws. May be appointed as Principal Contractor by the Employer.
Responsibilities: Contractor must take all reasonable precautions to maintain health and safety for all personnel involved in the works.
Asbestos: Exposure limits and monitoring procedures are defined per South African regulations. If asbestos is identified, a risk assessment and control measures are required. Personnel may stop work in unsafe conditions until the area is declared safe.
Insurance: Contractor must ensure all subcontractors, employees, and others under their control comply with HSE requirements.
Environmental
Source: NEC3 Engineering & Construction Contract(ECC).pdf
Compliance: Contractor must comply with all applicable environmental laws, regulations, and contract-specified guidelines.
Asbestos management: Employer manages asbestos per its standard (Employer’s Asbestos Standard 32-303). Removal and disposal must be conducted by a registered asbestos contractor at the Employer’s expense, following South African legislation.
Monitoring: If asbestos is identified, risk assessments and air monitoring are required to declare the area safe. Contract dates may be adjusted for compliance with asbestos regulations.
Contractual Terms
Source: NEC3 Engineering & Construction Contract(ECC).pdf
Contract framework: NEC3 ECC3 (April 2013), main Option B (Priced contract with bill of quantities), dispute resolution Option W1, and secondary Options X2 (Changes in the law), X7 (Delay damages), X16 (Retention), X18 (Limitation of liability), and Z clauses (Additional conditions).
Contract period: 9 months.
Defects: Defects date is 52 weeks after completion; defect correction period is 2 weeks.
Law: Republic of South Africa.
Retention: 10% retained on each approved payment certificate.
Delay damages: 0.1% per day, capped at 10% of the contract value.
Liability: Contractor’s liability for indirect/consequential loss is limited to R0.00. Employer’s liability to the Contractor for indirect/consequential loss is also limited to R0.00.
Termination: Procedures defined for scenarios including B-BBEE status decrease, prohibited actions (e.g., corruption, fraud), or business rescue.
Additional Z clauses: Cover B-BBEE, confidentiality, health/safety/environment, insurance, nuclear liability, asbestos, and ethics.
The primary focus of quality personnel must be to meet customer requirements and exceed expectations.
DocumentBill of Quantities or Pricing Schedule.xlsxReview complete
Description
Source: Bill of Quantities or Pricing Schedule.xlsx
Project: Refurbishment of PTM&C labs in the engineering building at Eskom’s Simmerpan complex, Northern Cape.
Scope: Comprehensive refurbishment covering multiple trades, including alterations, building works, electrical, plumbing, HVAC, fire protection, and furniture installation.
Structure: Detailed in a Bill of Quantities (BOQ) with itemised pricing, provisional sums for specialists, and extensive SHEQ requirements.
Key Focus: Compliance with SABS 1200, SANS, OHS Act, and Eskom specifications. Contractors must demonstrate capacity for multi-trade coordination and adherence to strict safety and quality standards.
Evaluation Criteria
Source: Bill of Quantities or Pricing Schedule.xlsx (unknown)
Contractor must demonstrate capacity to manage multi-trade refurbishment projects, including coordination across building, electrical, plumbing, HVAC, fire protection, and furniture installation.
SHEQ Officer requirement: Full-time on-site appointment with a minimum National Diploma and SACPCMP registration. Costs for SHEQ personnel and activities must be included in pricing.
Use of approved manufacturers and SANS-compliant materials is mandatory. Non-compliance may result in disqualification.
Experience with Eskom specifications and safety standards is required. Prior work with Eskom or similar large-scale industrial clients will be advantageous.
Product guarantees must be provided for all materials and workmanship. Specialist trades (e.g., aluminium, steelwork, UPS, fire detection) require design approval by a professionally registered engineer.
Technical Specifications
Source: Bill of Quantities or Pricing Schedule.xlsx (unknown)
Scope: Refurbishment of PTM&C labs in the engineering building at Eskom’s Simmerpan complex, Northern Cape.
Work is structured in a Bill of Quantities (BOQ) with the following key components:
Preliminaries and General: Site establishment, facilities, and commissioning for project duration.
SHEQ: Mandatory provisions for PPE (e.g., safety boots, hard hats, high-visibility vests), fall arrest systems, barricading, safety signage, SHEQ officer, risk assessments, medical screenings, environmental management plans, and waste management (general and hazardous).
Alterations: Demolition and removal of existing walls, plaster, concrete, brickwork, doors, windows, ceilings, partitions, floor coverings, and tiling. Includes temporary barriers, dust screens, and protection of existing structures.
Building Works: Earthworks, concrete (including formwork, reinforcement, and testing), masonry, carpentry, drywall partitioning, raised access flooring, epoxy flooring, ironmongery, metalwork (handrails, balustrades, aluminium windows/doors), plastering, and paintwork.
Plumbing and Drainage: PVC pipes, drainage channels, and reinforced concrete sumps.
Electrical Works: Supply and installation of LED luminaires, distribution board equipment (MCCBs, earth leakage units), cabling, trunking, and provisional sum for UPS specialist (R300,000).
HVAC: Removal of existing units and installation of new pressurisation fan filter units, fans, Mitsubishi ceiling/under-ceiling units, VRF outdoor units, and controls.
Fire Protection: Supply and installation of 9kg dry chemical powder and CO2 fire extinguishers, signage, backing boards, and provisional sum for fire detection system (R50,000).
Furniture: Provisional sum for specialist supply and installation of drawer units, tables, chairs, smartboard, and projector (R150,000).
Standards: All work must comply with SABS 1200, SANS, OHS Act, and Eskom SHE specifications. Contractors must visit the site, take their own measurements, and account for labour-intensive methods and possible overtime work.
Rates: Must include breakdowns for material, labour, plant, wastage, transport, and profit. No claims will be entertained for overtime or delays in compensation event approvals.
Financial Requirements
Source: Bill of Quantities or Pricing Schedule.xlsx (unknown)
Total estimated value: R600,000 (excluding VAT), R690,000 (including VAT at 15%).
Pricing must be submitted in the provided BOQ format with itemised rates for each trade and activity.
All rates must include a full breakdown: Material, Labour, Plant, Wastage, Transport, and Profit.
Provisional sums are allocated for specialist appointments:
Contractors must account for all costs upfront, including overtime work and potential delays in compensation event approvals (3-month delay possible). No additional claims will be accepted.
Compliance Requirements
Source: Bill of Quantities or Pricing Schedule.xlsx (unknown)
Mandatory adherence to SABS 1200 standards for all construction works.
Compliance with Eskom’s SHE (Safety, Health, Environment) specifications and OHS Act for all safety-related activities.
SANS standards must be followed for safety equipment, signage, and materials (e.g., SANS 1397 for hard hats, SANS 1186 for signage).
Full-time SHEQ Officer on site with a minimum National Diploma and SACPCMP registration is required.
All products and materials must comply with SANS and be from approved manufacturers.
Specialist trades (e.g., aluminium, steelwork, electrical) require design approval by a professionally registered engineer.
Environmental management plans, waste management plans, and risk assessments must be submitted and implemented.
Testing and certification (e.g., COC for electrical work) must be provided by approved laboratories or professionals.
DocumentProcedure 32-95 rev 9.pdfReview complete
Description
Source: Procedure 32-95 rev 9.pdf
This document is Eskom's internal Occupational Health and Safety (OHS) Incident Management Procedure (Document 32-95, Revision 9). Key points:
Purpose: Manage incidents resulting in or with potential for near misses, property damage, injuries, occupational diseases, or fatalities.
Scope: Applies to Eskom Holdings SOC Ltd, its groups, divisions, subsidiaries, and entities under Eskom's control. Also applies to Eskom employees, contractors, and affected members of the public.
Aims: Reduce risk, prevent recurrence, ensure effective incident management, accurate classification/recording, prompt investigation, proactive near-miss reporting, learning from incidents, information sharing, stakeholder reporting, trend analysis, and stakeholder involvement.
Supported by Eskom standards and South African legislation (e.g., OHS Act, COIDA, MHSA).
Evaluation Criteria
Source: Procedure 32-95 rev 9.pdf (unknown)
For construction/refurbishment tenders at Eskom, contractors typically need to demonstrate:
Valid registration with relevant construction/building authorities.
Capability to comply with Eskom's OHS procedures, including incident management as outlined in this document.
Proof of insurance coverage.
References from similar projects.
Note: This document is an internal Eskom OHS procedure and does not specify tender evaluation criteria. It applies to contractors unless explicitly stated otherwise.
Technical Specifications
Source: Procedure 32-95 rev 9.pdf (unknown)
This document is Eskom's internal Occupational Health and Safety (OHS) Incident Management Procedure (Document 32-95, Revision 9). Key points for contractors:
Defines processes for managing OHS incidents: near misses, property damage, injuries, occupational diseases, or fatalities.
Key definitions: accident, fatality, first-aid injury, lost-time injury (LTI), medical injury, OHS incident, near-miss incidents (occupational safety and hygiene), occupational disease, public incident, serious incident.
Full incident management process: identification, emergency response, notification, prioritisation, classification, recording, investigation, corrective actions, close-out, and communication.
Roles and responsibilities for Eskom Responsible Managers and contractors.
Investigation committee compositions vary by incident type (OU/BU, serious, corporate fatalities).
References applicable legislation: OHS Act, COIDA, MHSA, and others.
Environmental
Source: Procedure 32-95 rev 9.pdf
Environmental requirements are explicitly excluded from this revision of the procedure. The document focuses solely on occupational health and safety incident management.
Contractual Terms
Source: Procedure 32-95 rev 9.pdf
Contractual obligations for contractors per this Eskom procedure:
Contractors must investigate incidents as an employer and submit reports to the relevant Eskom Operating Unit/Business Unit (OU/BU).
Eskom may participate in contractor investigations.
For incidents with potential legal liability, the OU/BU must consult Eskom's Legal and Sustainability Systems Departments.
Contractors must comply with legal obligations under contracts and statutes like the OHS Act and Mine Health and Safety Act (MHSA).
Valid CSD (Central Supplier Database) number is mandatory for registration and access.
Section
Source: eTendering_Supplier's User_Guide_v4.4.pdf
Electronic submission via eTendering is the primary requirement noted.
DocumentAnnexure B.pdfReview complete
Description
Source: Annexure B.pdf
This tender involves the appointment of contractors or suppliers to commence work on the refurbishment of PTM&C labs in the engineering building at Simmerpan Complex.
Submission Guidelines
Source: Annexure B.pdf (unknown)
Submit the signed acknowledgement form (Annexure B).
The form must contain:
– Company/Supplier name.
– Name and signature of an authorised person (CEO/Director/Managing Director).
– Signatures of two witnesses.
– Date and location of signing.
Incomplete or unsigned forms will result in disqualification.
Evaluation Criteria
Source: Annexure B.pdf (unknown)
Eligibility is based on:
– Demonstrated ability to fully comply with Eskom’s OHS requirements and related statutory legislation.
– Robust management system for selecting, supervising and auditing subcontractors/suppliers.
– Provision of testimonials or references for similar work, if requested by Eskom.
Technical Specifications
Source: Annexure B.pdf (unknown)
As the main contractor you must:
– Notify Eskom before appointing any subcontractors or suppliers.
– Ensure appointed parties have adequate resources and competencies.
– Manage and monitor them to guarantee compliance with all applicable legal and Eskom requirements.
– Conduct audits and assessments of OHS compliance during execution.
– Provide clear grounds for terminating work performed by subcontractors/suppliers.
– Handle all non‑conformances directly, applying performance and penalty procedures.
Compliance Requirements
Source: Annexure B.pdf (unknown)
Understand and comply with Eskom’s Occupational Health and Safety (OHS) legal and other requirements.
Required documents:
– Eskom Contract and Contractor OHS Management (32‑726).
– OHS specification/requirements (240‑180200068).
– Occupational Health and Safety Act.
– Compensation for Occupational Diseases and Illnesses Act.
– Eskom SHEQ Policy (32‑727).
– OHS Incident Management Procedure (32‑95).
After award, align your company’s processes with Eskom’s OHS policies, procedures and standards.
Penalties will be enforced on the main supplier for non‑conformance with Eskom or statutory OHS requirements.
All employees, including subcontractors and suppliers, must undergo the relevant Eskom induction.
Health & Safety
Source: Annexure B.pdf
Must understand and comply with Eskom’s Occupational Health and Safety (OHS) legal and other requirements.
Required documents:
– Eskom Contract and Contractor OHS Management (32‑726).
– OHS specification/requirements (240‑180200068).
– Occupational Health and Safety Act.
– Compensation for Occupational Diseases and Illnesses Act.
– Eskom SHEQ Policy (32‑727).
– OHS Incident Management Procedure (32‑95).
After contract award, fully align your company’s processes with Eskom’s OHS policies, procedures and standards.
Penalties will be enforced on the main supplier for non‑conformance with Eskom or statutory OHS requirements.
Ensure all employees (contractors/suppliers) undergo the relevant Eskom induction.
Contractual Terms
Source: Annexure B.pdf
As the main contractor/supplier you must:
– Demonstrate to Eskom the process and selection criteria used when appointing contractors and suppliers.
– Notify Eskom prior to appointing any contractors or suppliers for work commencement.
– Ensure contractors/suppliers have adequate resources and competencies.
– Be accountable for managing your contractors/suppliers to ensure they comply with all applicable legal and Eskom requirements during contract execution.
– Monitor contractors/suppliers through audits and assessments regarding OHS compliance during work execution.
– Provide the grounds for termination of work performed by contractors/suppliers.
– Deal directly with all non‑conformances/non‑compliance by your contractors/suppliers (across all tiers) in terms of performance and penalty processes.
– Eskom reserves the right to verify compliance and may instruct you to provide copies of testimonials/references and contact details of clients (including Eskom) for whom you have done previous similar work.
Special Conditions
Source: Annexure B.pdf (unknown)
The acknowledgement form (Annexure B) requires:
– Company/Supplier Name.
– Name of authorised person (CEO/Director/Managing Director).
– Signatures of two witnesses.
– Completion of the signature date and location details.
Refurbishment of PTM&C Labs (Telecoms, Legacy, and Phase 6) in the Engineering Building at Simmerpan Complex. The scope includes demolition, ground storey plans, elevations, sections, windows/door schedules, drywall specifications, access floor specifications, fire protection/safety signs, and finishes schedules.
No submission guidelines found in the provided technical drawings. Bidders must refer to the official Eskom tender notice for formal submission instructions and required returnable documents.
The provided document is a technical drawing and does not specify scoring weights. However, based on technical requirements, the following are critical:
Technical Capability: Demonstrated ability to install Bergvik ISO Floor systems.
Compliance: Adherence to manufacturer-specific installation processes.
Quality: Ability to deliver a rigid, stable installation free of rocking, rattles, or squeaks.
Project Scope: Refurbishment of PTM&C Labs (Telecoms, Legacy, and Phase 6) in the Engineering Building at Simmerpan Complex.
Access Floor System Requirements:
System Type: BERGVIK ISO Floor Raised Floor System.
Panel Specifications: 600x600x38mm wood-core panels with factory-applied high-pressure white laminate.
Load Capacity: Must support a uniformly distributed load of 7.2 KN/m².
Understructure: 80x40mm primary and secondary layer tube steel sections, bolted together at 90 degrees using angle clips and self-tapping screws.
Pedestal Assembly: Steel construction consisting of a base, 80x40mm tube column, and a head cap with head bracket, including height adjustment provisions.
Installation Standards:
Must be performed strictly by a manufacturer's authorized representative.
Must follow the manufacturer's specific installation process.
Must result in a rigid, firm installation free of instability, rocking, rattles, and squeaks.
Manufacturer must provide a detailed, signed warranty.
Additional Requirements:
Supply of a panel lifting device.
Installation must include 40x40 hollow sections on both sides of openings to close the length of the opening.
The access floor system is a modular, self-supporting structure composed of gravity-placed floor panels (not connected to pedestal supports). The lateral strength of the system must remain independent of whether the floor panels are in place or removed. The understructure consists of 80x40mm primary and secondary tube steel sections bolted together perpendicularly with angle clips and self-tapping screws. Pedestals consist of a steel base, 80x40mm tube column, and a head cap with a head bracket and height adjustment provisions.
Installation must be carried out strictly by a manufacturer's authorized representative.
Installation must comply with the manufacturer's specific installation process to ensure stability and performance.
Health & Safety
Source: Drawings-Simco25P02-SE-D50-06.pdf
Installation must be executed strictly according to the manufacturer's installation process to ensure a rigid, firm installation that meets performance requirements and is free of instability, rocking, rattles, and squeaks.
The scope of work involves electrical construction and refurbishment as detailed in drawing SIMCO25P02-SE-E64, Revision 3, Scale: As Shown, Sheet Size: A2L.
The project involves electrical construction and refurbishment work at the Simmerpan Complex (PTM&C Labs) as per drawing SIMCO25P02-SE-E64 (Revision 3).
Technical Requirements:
Voltage: 400/230V AC.
Breaking Capacity: 6KA.
Current Rating (In): 41.69A.
Load/Plug Sets: Installation of 12 plug panel sets (1-1 to 1-12), each rated at 2000W.
Circuit Breakers: Installation of SP20A, DP20A, SP5A, and TP40A breakers.
Wiring/Conductors: Specific conductor sizing required (e.g., 2x2.5mm² + 2.5mm² E/W and 2x2.5mm² + 1x2.5mm² E/W).
Components: Installation of speed control units, rotary on/off switches, surge arrestors (SAL type from 'CBi'), busbars on insulators, and pressurisation fan controls.
Compliance: All work must be in accordance with NRS002 standards.
No specific compliance requirements were identified in the provided technical drawings. Bidders must refer to the full tender document for standard Eskom/National Transmission Company requirements regarding CSD, Tax, B-BBEE, and CIDB.
Health & Safety
Source: Drawings-Simco25P02-SE-E64-03.pdf
No specific health and safety requirements were found in the extracted text. Bidders must consult the full tender documentation for mandatory OHS and HSE compliance protocols.
The project involves refurbishment of PTM&C labs (Telecoms, Legacy, Phase 6) within the Engineering Building at Simmerpan Complex. Work includes supply and installation of furniture, finishes, and building works as per detailed drawings and schedules.
Scope includes refurbishment of PTM&C labs (Telecoms, Legacy, Phase 6) at Simmerpan Complex Engineering Building.\n- Flooring: Remove existing tiles, apply epoxy primer and self-levelling epoxy floor finish (Flowcrete Flowshield 1000, colour light beige). Must be applied by Flowcrete approved applicators.\n- Walls & Ceilings: Prepare and paint with 2 coats white Prominent Sheen acrylic. Seal cracks, remove loose paint. New walls require primer plus 2 coats.\n- Ceilings: Replace stained ceiling tiles in Telecoms storage with new 1200mm x 600mm lay-in tiles. Install Aerolite insulation for thermal efficiency.\n- Furniture: Supply and install furniture per ESKOM corporate identity. Quantities to be verified with Facilities Manager as student numbers may vary.\n - Chairs (Training Room & Student Labs): 24 off.\n - 3-drawer filer unit: 1 off (800 x 600 x 0.7m).\n - Tables for Training Room: 12 off (1000 x 450mm rectangular with PU edging).\n - Tables for Student Labs: 12 off (1200 x 700mm rectangular with PU edging).\n - Interactive Smartboard: 1 off (min 2400mm W x 1200mm H).\n - Projector: 1 off (specifications to be confirmed with Facilities Manager).\n- Storage: Install Linvar Storage Systems wall-mounted shelving (Linspace), 9 single entry bays (1000w x 2200h x 500dp).\n- Fire Safety: Supply and install 4.5kg dry powder fire extinguishers (Tempest or similar) at locations per fire protection plan SIMCO25P02-SE-D50-07.\n- Exterior Works: Replace damaged gutters and downpipes (100x100mm). Install new Chromadeck Klip Lock 406 roof side cladding and eave overhang (colour charcoal grey to match existing). Build new facebrick exterior planter wall with stretcher bond.\n- Roofing: Check roof sheeting and waterproofing. Apply ABE stitch bond polyester membrane and Super Laycryl liquid waterproofing compound as per drawing SIMCO25P02-SE-D50-06.\n- Access Flooring: Install new access flooring per manufacturer's instructions and drawing SIMCO25P02-SE-D50-06.\n- Finishes: Install non-slip porcelain/ceramic floor tiles (colour light grey or beige) on exterior ramps and passageways. Install anti-slip aluminium strips on ramps.\n- General: Remove outdated air vents. Liaise with Facilities Manager for specifications on interactive smartboard, projector, and final furniture quantities.
No specific compliance requirements (like CSD, tax, B-BBEE, CIDB) are stated in the extracted document.\n\n---\n- Fire Safety: Contractor must supply and install 4.5kg dry powder fire extinguishers (Tempest or similar) at specified locations per fire protection plan SIMCO25P02-SE-D50-07.\n- General Safety: Install fire protection and safety signs as required.\n- Note: Quantities and specifications for training laptops and certain safety items to be provided by Facilities Management.
Scope: The contractor must sign a declaration accepting responsibility to comply with all environmental requirements, including adherence to the project Environmental Management Plan/Programme, Eskom’s environmental standards, and applicable legal requirements. Key actions include informing staff of their roles, reporting incidents within 24 hours, implementing best practices, and addressing non-conformances promptly.
Required submission: The contractor must complete, sign, and submit the Environmental Requirements Proforma declaration form. The form must include: full name of the contractor, designation, signature and date, contact number, and signature of the Eskom Project Manager with date.
Eligibility is based on the contractor's willingness and ability to: sign the environmental declaration, comply with all stated environmental requirements, and maintain specified documentation throughout the project. No explicit scoring method or thresholds are provided in the document.
Upon project completion, the contractor must submit the following to the Eskom Project Manager where applicable:
Copy of the approved project-specific Environmental File.
Incident/complaint register.
Herbicide and pesticide register.
Hazardous substance register, including solvents.
Health & Safety
Source: Environmental Requirements Proforma.pdf
Documentation: The contractor must maintain and submit the following registers to the Eskom Project Manager upon project completion:
Incident/complaint register.
Herbicide and pesticide register.
Hazardous substance register, including solvents.
Environmental
Source: Environmental Requirements Proforma.pdf
Incident reporting: The contractor must report all environmental incidents within 24 hours of occurrence.
DocumentEnvironmental Requirements for Contractors and Suppliers.pdfReview complete
Description
Source: Environmental Requirements for Contractors and Suppliers.pdf
This standard outlines Eskom Transmission’s environmental requirements for contractors and suppliers, ensuring sustainable procurement practices and compliance with Zero Harm SHEQ principles.
Suppliers must establish and maintain an Environmental Management System (EMS) for goods, works, or services provided.
The six-phase environmental contractor management model includes: design phase, tender enquiry/evaluation/award, supplier registration, site mobilisation/access, contract execution/monitoring, and post-contract review.
Key roles: Procurement Practitioner, Business Unit Manager, Environmental Practitioner, Contract Custodian, and Supplier/Service Provider.
Appendices provide templates for environmental aspect registers, EMPs, risk assessments, tender returnable forms, and method statements.
Important Dates
Source: Environmental Requirements for Contractors and Suppliers.pdf (unknown)
Tenderers have 7 days to submit outstanding environmental requirements after evaluation if not initially met.
Site visits (if applicable) must be conducted under supervision of the contract custodian and commercial practitioner before tendering.
Clarification meetings include an environmental agenda; records are kept by the commercial team.
All required documentation must be submitted to Transmission within 7 days after contract award.
Environmental file evaluation must be completed before supplier mobilisation; practitioners require at least one week’s notice post-award.
Contact Information
Source: Environmental Requirements for Contractors and Suppliers.pdf (unknown)
All clarifications must be directed to the Eskom Representative (Buyer) listed in the tender document. Direct communication with Environmental Practitioners is not permitted.
General contacts include Procurement and Supply Chain Management (P&SCM) and Transmission Group Business Units. Specific submission addresses and contacts are provided in the tender document.
Submission Guidelines
Source: Environmental Requirements for Contractors and Suppliers.pdf (unknown)
Submit valid and authentic environmental documentation with your tender returnables, including the completed Environmental Acknowledgement Form (Appendix E).
Environmental requirements are contractual; non-compliance will be highlighted for post-award resolution, not immediate disqualification.
If environmental requirements are not met during evaluation, you have 7 days to submit outstanding documents; failure to do so retains your original score.
All clarifications must be directed to the Eskom Representative (Buyer) listed in the tender document. Direct communication with Environmental Practitioners is prohibited.
Submit all required documentation to Transmission for evaluation within 7 days after contract award.
Supplier may be removed from Eskom’s database (no future business) if found guilty of: three major environmental non-conformances in one financial year, two or more contraventions of environmental legislation, violation of Eskom Life-saving Rules, or submission of fraudulent environmental documents. Reinstatement is possible if cleared.
No Transmission employee may directly terminate or suspend a contractor; referrals must go to the Reconsideration of Supplier Status Committee.
Evaluation Criteria
Source: Environmental Requirements for Contractors and Suppliers.pdf (unknown)
Suppliers must be registered on Eskom’s Transmission vendor database unless exempted.
Suppliers must demonstrate compliance with environmental legislation and Eskom’s environmental standards, providing valid, authentic documentation for evaluation.
Environmental requirements are evaluated based on risk level:
High-risk contracts (widespread/permanent ecological damage or major public health hazards): 'all or nothing' approach. Suppliers must score full points or submit outstanding documents within 7 days; failure retains the original score.
Medium-risk contracts (regional/local impacts, remedied within one year): contractual requirements, may allow for negotiations.
Non-compliance is highlighted for post-award resolution; suppliers are not disqualified but must address issues during negotiations or post-contract award.
Environmental practitioners conduct evaluations, compile reports, and assess performance during post-contract reviews.
Exemptions apply to: independent electricity generators/demand response suppliers for rebates, venue/accommodation services without direct Transmission contracts, municipalities, retailers for consumables, and emergency procurements.
Technical Specifications
Source: Environmental Requirements for Contractors and Suppliers.pdf (unknown)
Suppliers must have a documented Environmental Management System (EMS), preferably ISO 14001:2015 compliant.
EMS must cover: site establishment, access control, construction/installation work, manufacturing, storage areas, waste management, hazardous substances handling, site management (water, dust, noise, landowner liaison), rehabilitation, and demobilisation.
Maintain environmental records, including: Environmental Authorisation, project-specific Environmental Management Plan/Programme (EMP/EMPr), Aspects and Impacts register, incident/non-conformance/complaints registers, waste statistics, water use records, hazardous substances registers, Safety Data Sheets (SDS), audit/inspection reports, ECO reports, energy efficiency checklists, and appointed environmental representative letter.
Provide Transmission-specific environmental procedures/method statements.
Conduct supervised site visits before tendering where applicable.
Ensure compliance with environmental legislation and Transmission’s site-specific requirements.
Environmental budgeting must be included in the Bills of Quantities.
Submit required documents to Transmission within 7 days after contract award: completed Environmental Requirements Pro-Forma (Appendix E), EMS documentation, organisation’s EMS records, permits, and corrective actions for non-conformances.
Final environmental inspection and rehabilitation sign-off are required before contract closure. Hand over the environmental file to the asset owner, including certificates of conformance, test certificates, ECO close-out report, final rehabilitation report, and final site close-out audit/inspection report.
Quality Management
Source: Environmental Requirements for Contractors and Suppliers.pdf
Include environmental budgeting in the Bills of Quantities.
Conduct post-contract reviews and document results.
Submit required documents to Transmission within 7 days after contract award: completed Environmental Requirements Pro-Forma (Appendix E), environmental procedures/method statements, EMS documentation, organisation’s EMS records, permits, and corrective actions for non-conformances.
Environmental practitioners conduct inspections and audits during contract execution to monitor compliance.
Final environmental inspection and rehabilitation sign-off are mandatory before contract closure.
Hand over the environmental file to the asset owner upon completion, including: certificates of conformance, test certificates, ECO close-out report, final rehabilitation report, and final site close-out audit/inspection report.
Compliance Requirements
Source: Environmental Requirements for Contractors and Suppliers.pdf (unknown)
B-BBEE minimum level: 2.
Comply with all applicable environmental legislation, including: National Environmental Management Act, Waste Act, Water Act, Air Quality Act, Biodiversity Act, Protected Areas Act, Heritage Resources Act, and Veld and Forest Fire Act.
Adhere to Eskom’s Zero Harm SHEQ culture, ensuring no harm to assets, employees, contractors, the public, or the environment.
Provide valid environmental authorisations, permits, and licenses as required.
Maintain an organisational structure showing SHEQ representatives and lines of authority.
Appoint a qualified environmental representative: National Diploma/degree in Environmental Sciences/Management or equivalent (for low-risk projects, two weeks of environmental training suffices).
Submit all environmental tender returnables as specified.
Ensure subcontractors comply with environmental legal obligations and Eskom/Transmission requirements.
Works or services may be stopped, suspended, or contracts terminated for environmental incidents. Investigations are triggered by: three major non-conformances in one financial year, two or more legislative contraventions, violation of Eskom Life-saving Rules, or submission of fraudulent environmental documents.
Health & Safety
Source: Environmental Requirements for Contractors and Suppliers.pdf
Adhere to Eskom’s Zero Harm SHEQ culture, ensuring no harm to assets, employees, contractors, the public, or the environment.
Include SHE policies and procedures in the tender/enquiry documentation.
Maintain records: incident register, hazardous substances registers, Safety Data Sheets (SDS), and audit reports.
Work may be stopped without financial compensation due to environmental threats, including ad-hoc interventions by Transmission management, environmental practitioners, or government authorities.
Comply with Eskom Life-saving Rules; violations trigger investigations and may lead to contract suspension or termination.
Environmental
Source: Environmental Requirements for Contractors and Suppliers.pdf
This standard sets minimum environmental criteria for Transmission suppliers, service providers, contractors, and subcontractors.
References include ISO 14001, National Environmental Management Act, Waste Act, Water Act, Air Quality Act, Biodiversity Act, Protected Areas Act, Heritage Resources Act, and Veld and Forest Fire Act.
The six-phase environmental contractor management model covers: design, tender enquiry/evaluation/award, supplier registration, site mobilisation/access, contract execution/monitoring, and post-contract review.
Suppliers must conduct due diligence and provide environmental documentation for review.
Environmental risk levels (high, medium, low) determine the evaluation approach and contractual requirements.
Exemptions apply to: independent electricity generators, venue/accommodation services without contracts, municipalities, retailers, and emergency procurements.
Monitoring includes audits, inspections, and record-keeping of natural resource consumption (water, fuel, electricity).
Contractual Terms
Source: Environmental Requirements for Contractors and Suppliers.pdf
Works or services may be stopped, suspended, or contracts terminated due to environmental incidents or non-compliance.
The contract custodian must communicate suspension/termination recommendations to the Reconsideration of Supplier Status Committee via the commercial practitioner.
Investigations are initiated for: three major environmental non-conformances in one financial year, two or more contraventions of environmental legislation, violation of Eskom Life-saving Rules, or submission of fraudulent environmental documents.
Suppliers found guilty may be removed from Eskom’s database, with no future business. Reinstatement is possible if cleared.
No Transmission employee may directly terminate or suspend a contractor; all actions must be referred to the Reconsideration of Supplier Status Committee.
Special Conditions
Source: Environmental Requirements for Contractors and Suppliers.pdf (unknown)
Suppliers may be removed from Eskom’s database, resulting in no future business, if found guilty of: three major environmental non-conformances in one financial year, two or more contraventions of environmental legislation, violation of Eskom Life-saving Rules, or submission of fraudulent environmental documents.
Reinstatement is possible if the supplier is cleared of offences.
No Transmission employee may directly terminate or suspend a contractor; all actions must be referred to the Reconsideration of Supplier Status Committee.
Requirements
Source: Environmental Requirements for Contractors and Suppliers.pdf (unknown)
Environmental requirements are stipulated in Eskom’s Procurement and Supply Chain Management Procedure and relevant instruction notes.
Suppliers must comply with all applicable environmental legislation and Eskom/Transmission-specific requirements.
Environmental documentation, records, and reports must be made available for review by Transmission or its appointed inspection agency upon request.
Section
Source: Environmental Requirements for Contractors and Suppliers.pdf
Environmental requirements are evaluated based on risk classification (high, medium, low).
High-risk contracts: 'all or nothing' scoring; suppliers must either meet all criteria or submit outstanding documents within 7 days. Non-compliance does not disqualify but is flagged for post-award resolution.
Medium/low-risk contracts: requirements are contractual and may allow for negotiations.
Environmental practitioners conduct evaluations, compile reports, and assess performance during post-contract reviews.
Non-compliance is addressed during negotiations or post-contract award, with outstanding requirements included in the contract for resolution within a stipulated timeframe.
DocumentQuality Form A_Catergory 4_.pdfReview complete
Description
Source: Quality Form A_Catergory 4_.pdf
Refurbishment of PTM&C Labs in the Engineering Building at Simmerpan Complex. This is an Eskom tender requiring compliance with Supplier Quality Requirements per specification 240-105658000 and ISO 9001 Standard.
Submission Guidelines
Source: Quality Form A_Catergory 4_.pdf (unknown)
Submit the completed and signed Quality Form A (Template Identifier 240-43921804 Rev 3). Indicate applicable clauses with (X) or non-applicable clauses with (-). Only Category 4 is selected for this tender. The form must acknowledge acceptance of Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001 Standard. No submission address, method, or deadline is specified in this document.
Evaluation Criteria
Source: Quality Form A_Catergory 4_.pdf (unknown)
Pre-contract award quality requirements apply under Category 4 (refer to clause 3.5.-105658000). Tenderers must demonstrate alignment with ISO 9001 quality management principles: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, and Relationship Management. The tenderer must appoint and provide details of a Quality Representative. No specific scoring weights or evaluation stages are provided.
Technical Specifications
Source: Quality Form A_Catergory 4_.pdf (unknown)
Scope: Refurbishment of PTM&C Labs in the Engineering Building at Simmerpan Complex. Quality requirements are governed by Eskom specification 240-105658000 and ISO 9001 Standard. Post-contract award requirements include: Contract Execution, Supplier Quality Performance Monitoring Phase, Eskom Rights of Access, Eskom Rights to Information, Preservation, Quality Audits, Management of Nonconformities, and Special Processes. Main supplier and sub-supplier capability and capacity assessment is mandatory.
Methodology
Source: Quality Form A_Catergory 4_.pdf
Bidders must align with ISO 9001 principles: Customer focus (Clause 4), Leadership (Clause 5), Engagement of people (Clause 6), Process approach (Clause 7), Improvement (Clause 8), Evidence-based decision making (Clause 9), and Relationship Management (Clause 10). Demonstrate these in your approach.
Quality Management
Source: Quality Form A_Catergory 4_.pdf
Pre-contract award quality requirements apply under Category 4 (clause 3.5.-105658000). Post-contract requirements include: Contract Execution, Supplier Quality Performance Monitoring, Eskom Rights of Access/Information, Preservation, Quality Audits, Management of Nonconformities, and Special Processes. ISO 9001 alignment is mandatory. Document Identifier: 240-68099512 Rev 9 (Authorised: January 2022, Review: January 2027).
Compliance Requirements
Source: Quality Form A_Catergory 4_.pdf (unknown)
Compliance with Eskom Supplier Quality Requirements per specification 240-105658000 is mandatory. ISO 9001 Standard compliance is required. The tenderer must complete and sign Quality Form A to acknowledge acceptance of these requirements. No additional compliance requirements (e.g., CSD, tax clearance, B-BBEE, CIDB, CIPC) are specified in this document.
Section
Source: Quality Form A_Catergory 4_.pdf
Pre-contract award quality requirements apply under Category 4 (clause 3.5.-105658000). Tenderers must complete and sign Quality Form A to acknowledge Eskom Supplier Quality Requirements. No specific scoring weights or evaluation stages are detailed.
This document is Eskom’s Supplier Quality Management Specification (Document 240-105658000, Revision 3).
It defines the minimum quality requirements for all existing and potential Eskom suppliers.
Purpose: Outline requirements for suppliers to develop, implement, maintain, and continually improve a Quality Management System (QMS) based on ISO 9001.
Applicability: Applies to Eskom Holdings, its subsidiaries, suppliers, and sub-suppliers, and forms part of all RFI, RFQ, RFP, and procurement contracts.
No specific contact names, emails, phone numbers, or submission addresses are provided in the document. Refer to the main tender listing for contact details.
Complete, sign, and return Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001) with your tender submission.
Submit all returnable documents listed in the List of Tender Returnables document (240-12248652).
Quality documentation requirements vary by category (1, 2, 3, or 4), as indicated in Form A. Failure to submit the correct documentation for the selected category will result in disqualification.
Category-specific requirements:
Category 1: Valid ISO 9001 certificate, latest internal/external audit reports, draft Contract Quality Plan (CQP), and examples of Inspection and Test Plans (ITP) or Quality Control Plans (QCP).
Category 2: Objective evidence of a developed, implemented, and maintained QMS compliant with ISO 9001 (e.g., quality manual, policy, objectives, procedures), plus a draft CQP and example ITP/QCP.
Category 3: Objective evidence of a developed QMS compliant with ISO 9001 (similar to Category 2 but may not require full implementation evidence), plus a draft CQP and example ITP/QCP.
Category 4: Quality method statement based on ISO 9001, signed quality policy, quality objectives, and documented roles and responsibilities specific to the project.
Scope: Refurbishment of PTM&C labs in the Engineering Building at Simmerpan Complex.
Suppliers must develop, implement, maintain, and continually improve a Quality Management System (QMS) based on ISO 9001.
Key technical requirements:
Supplier and sub-supplier QMS must conform to ISO 9001 or equivalent standards.
Quality Plans, Contract Quality Plans (CQP), and Quality Control Plans (QCP)/Inspection and Test Plans (ITP) must be documented, implemented, and maintained.
Pre-contract award quality documentation is categorized into four levels (Category 1–4), with specific returnables per category.
Capability and capacity assessments are required for suppliers working on critical plant, supplying critical components, or providing special processes.
Special processes (e.g., welding, NDT) require certified personnel and documented procedures (WPS, WQR, PQR).
Preservation programmes for materials and equipment must be documented and comply with Eskom’s requirements.
Nonconformities must be managed, with records maintained and escalated if repeated within 6 months.
Standards and references:
ISO 9001, ISO 10005, SANS 10845-1, Eskom’s SHEQ Policy (32-727), and IAEA Safety Standard GS-R-3.1.
Quality Control Plans (QCP)/Inspection and Test Plans (ITP) must include:
Clear descriptions of equipment locations and work areas.
Identification of quality verification stages (e.g., hold points, witness points).
Details of reference documents, procedures, or method statements (including specific sections and pages).
Definition of acceptance criteria aligned with technical specifications or standards.
Listing of certifying or verifying documents generated to provide evidence of compliance.
Identification of intervention points (witness, hold, document review) for Eskom, suppliers, and sub-suppliers, with sign-off provisions.
Suppliers must review and track compliance with Eskom and sub-supplier preservation requirements.
Suppliers must evaluate temporary and long-term material storage sites for consistency with preservation programme expectations.
A preservation work plan must be developed, with performance evaluations for all parties involved in material transportation, handling, or storage.
Oversight of material quality preservation plan preparation and execution is required at all work locations.
A preservation programme records management process must be established, ensuring generation, maintenance, and ready access by Eskom to all preservation records.
Suppliers must deploy a documented programme for identifying preservation requirements for all physical assets (e.g., bulk materials, equipment systems, components).
Suppliers must ensure personnel for special processes (e.g., welding, NDT) are certified competent through internal training or accredited external providers per SETA requirements.
All personnel affecting quality must have identified training needs, with training implemented and certificates meeting SETA unit standard requirements.
Suppliers must provide instructions for equipment and materials storage, preservation, and maintenance prior to delivery.
Contract Quality Plans (CQP) must include project-specific QMS aspects, resources, communication channels, documents, records, management authority, and monitoring procedures.
Quality Control Plans (QCP)/Inspection and Test Plans (ITP) must be detailed, accepted by Eskom, and include Eskom-specific hold and witness points.
Eskom reserves the right to oversee supplier audit programmes, participate in audits, and assess suppliers during key work stages.
A comprehensive preservation programme is required, covering communication of requirements to sub-suppliers, compliance monitoring, and special precautions for critical components (e.g., valves, motors, piping).
Repeated nonconformities from the same supplier within 6 months may be escalated to management review committees.
Records of qualification for special processes and operators must be maintained and made available to Eskom.
Eskom’s Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) is referenced as an informative document.
The IAEA Safety Standard GS-R-3.1 on the application of management systems is also referenced.
Specific health and safety plan requirements are not detailed in this document; refer to the main tender documents for project-specific HSE compliance.
Eskom reserves the right to specify preservation procedures for materials and equipment, with clear documentation required in purchase orders.
Works must be conducted in accordance with the contract terms.
Eskom has rights to access supplier information as per applicable legislation.
If a supplier fails to rectify nonconforming products within stipulated contractual conditions, the Project Manager may apply contractual remedies in accordance with FIDIC/NEC contracts.
This specification applies to all Eskom RFI, RFQ, RFP, and procurement contracts.
An Eskom Quality representative selects applicable supplier quality requirements using Form A.
Procurement documents must explicitly require sub-supplier submission of a Contract Quality Plan (CQP) for review.
Supplier quality requirements are classified into four categories (1–4). Suppliers must prepare and submit documentation as per the tender’s selected category, indicated in Form A.
Only one category applies per procurement process.
Suppliers must submit documented information for roles, responsibilities, and authorities specific to the project/scope of work (e.g., organization charts, job descriptions).
Specific requirements per tender are selected using the List of Tender Returnables document (240-12248652).
Capability and capacity assessments are performed prior to contract award for suppliers:
Providing high-risk products/services.
Working on critical plant (e.g., Generation Level 1 & 2, Transmission/Distribution Power Plant & Control Plant, Mega Projects).
Supplying critical components.
Providing special processes.
All sub-suppliers used for critical plant work, commodities, or specialised services are subject to capability and capacity assessments.
Eskom evaluates suppliers based on their commitment to a QMS conforming to ISO 9001.
Selection criteria include the development, implementation, maintenance, and continual improvement of a QMS.
Evaluation references: ISO 9001, ISO 10005, CIDB 1004 Best Practice Guideline A4, and the Preferential Procurement Policy Framework Act (PPPFA).
Specific quality requirements and returnables are selected by an Eskom Quality representative using Form A and the List of Tender Returnables (240-12248652).
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Prevention and Combating of Corrupt Activities Act (PRECCA)
Act 12 of 2004
high
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Public Procurement Act, 2024 (PPA)
Act 28 of 2024
high
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Promotion of Access to Information Act (PAIA)
Act 2 of 2000
medium
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Promotion of Administrative Justice Act (PAJA)
Act 3 of 2000
medium
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Sector-specific rules
These rules are linked to the work category, industry, or regulated service area.
4
Construction Industry Development Board Act (CIDB Act)
Act 38 of 2000
high
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
National Environmental Management Act (NEMA)
Act 107 of 1998
high
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Occupational Health and Safety Act (OHS Act)
Act 85 of 1993
high
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
National Building Regulations and Building Standards Act
Act 103 of 1977
medium
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Corner of Power and Refinery Road - Germiston - Johannesburg -
Document-Backed
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
49
Last checked
30 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.