Issuing Organization
South African Nuclear Energy Corporation LimitedLocation
North West
Closing Date
23 Jun 2026
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
1 TAU DR - Broederstroom - Hartbeespoort - 0216
Organization Type
GOVERNMENT
Published
09 Jun 2026
OCDS Reference
ocds-9t57fa-158556
This request for quotation (RFQ) by the south african nuclear energy corporation (necsa) seeks suppliers to modify and install lagging on the furnace off-gas extraction ducting for furnace 1 and furnace 2 at the area 26 smelter project. The work includes reducing existing lagging thickness, installing modified lagging, and fitting protective covers, with all materials provided on-site.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Tuesday, 23 June 2026 - 17:00
Venue
null
Categories
Request for Quotation
1 TAU DR - Broederstroom - Hartbeespoort - 0216
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Good Manufacturing Practice (GMP), SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
09 Jun
2026
Tender Published
Tender was published
23 Jun
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf
The South African Nuclear Energy Corporation (Necsa) is requesting quotations for the collection, modification, and installation of lagging on the furnace off-gas extraction ducting for Furnace 1 and Furnace 2 as part of the Area 26 Smelter Project. The work includes reducing existing 50 mm lagging to 25 mm, installing the modified lagging, and fitting protective galvanized covers. The RFQ closes on 23 June 2026, and submissions must comply with Necsa’s procurement policies, including B-BBEE requirements and technical specifications.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
South African Nuclear Energy Corporation LimitedContact Person
Catherine Matima
Phone
012-305-3027
Secure NECSA tenders with AI Matching & Recommendations, nuclear-science intelligence, compliance analysis, and structured support for research and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 158 400
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Scope: Collect, modify, and install lagging on the two furnace off-gas extraction ducting for Furnace 1 and Furnace 2 (Area 26 Smelter Project). Necsa is a state-owned company (SOC) registered under the Companies Act (Reg. No. 2000/003735/06), operating through subsidiaries NTP Radioisotopes SOC Ltd and Pelchem SOC Ltd. Necsa complies with ISO 14001, OHSAS 18001, RD 0034, ISO 9001, and ISO 17025 standards.
Important Dates
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf (RFQ)Closing date: 23 June 2026 at 17:00. Quotation validity: 90 days from closing date. Site briefing: Not compulsory but can be arranged if additional information is needed.
Contact Information
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf (RFQ)Contact person: Catherine Matima. Email: [email protected]. All queries must be submitted in writing to this email.
Submission Guidelines
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf (RFQ)Submit quotation via email to [email protected] on or before 23 June 2026 at 17:00. Quotation validity: 90 days from closing date. Incomplete quotations may be disqualified. Do not deliver goods/services without an official Necsa Purchase Order. Direct all queries in writing to the provided contact; approaching other Necsa employees may result in disqualification.
Evaluation Criteria
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf (RFQ)Evaluation occurs in two phases: Phase 1 (Functionality/Technical) and Phase 2 (Price and B-BBEE). Phase 1: Technical, Performance, Quality, and Risk criteria are assessed out of 100 points. Only bids scoring above the threshold and >= the highest bidder's functionality score progress. Phase 2: 80/20 point system (80 for price, 20 for B-BBEE status level). B-BBEE points: Level 1 = 20, Level 2 = 18, Level 3 = 14, Level 4 = 12, Level 5 = 8, Level 6 = 6, Level 7 = 4, Level 8 = 2, Non-compliant = 0. Failure to submit B-BBEE proof forfeits preference points.
Technical Specifications
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf (RFQ)Scope of work: Lagging Modification: Reduce existing 50 mm thick lagging material to 25 mm thickness (material available on-site for reuse). Lagging Installation: Install modified 25 mm lagging on furnace off-gas extraction ducting for Furnace 1 and Furnace 2, following standard practices. Protective Cover Installation: Fit and secure galvanised covers/sleeves over ducting for mechanical protection and weatherproofing. Materials: All lagging materials and galvanised covers/sleeves are provided on-site.
Quality Management
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdfNecsa’s quality management system aligns with ISO 9001, ISO 17025, ISO 14001, OHSAS 18001, and RD 0034 (Quality and Safety Management for Nuclear Installations). Top management commits to regulatory compliance.
Financial Requirements
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf (RFQ)Pricing must include all applicable taxes. Prices must be fixed and firm. Include additional costs: freight, insurance until acceptance, duty (where applicable), and disbursements. Payment terms follow Necsa’s General Conditions of Purchase. Pre-payment is not allowed. Incomplete pricing may result in disqualification.
Compliance Requirements
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf (RFQ)Required documents: Tax Clearance Certificate (SARS-issued tax PIN). Declaration of Interest (SBD 4). B-BBEE Certificate or Affidavit (if EME). Letter of Good Standing (COID). CIDB 1ME grading. Any other requested certifications. Compliance with Necsa’s OHSAS 18001 and RD 0034 standards is mandatory. A safety file is required. Orders above R30,000 are evaluated under PPPFA 80/20 system.
Health & Safety
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdfA safety file is required. Compliance with Necsa’s OHSAS 18001 and RD 0034 standards is mandatory.
Section
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdfTwo-phase evaluation: Phase 1 (Functionality/Technical) assesses Technical, Performance, Quality, and Risk criteria out of 100 points. Only bids scoring above the threshold and >= the highest bidder’s functionality score progress. Phase 2 uses the PPPFA 80/20 system: 80 points for price, 20 for B-BBEE status level. B-BBEE points: Level 1 = 20, Level 2 = 18, Level 3 = 14, Level 4 = 12, Level 5 = 8, Level 6 = 6, Level 7 = 4, Level 8 = 2, Non-compliant = 0.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
1 TAU DR - Broederstroom - Hartbeespoort - 0216
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
09 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Other manufacturing. Unlock full pricing strategies, bid frequency, and historical win rates.