Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Passenger Rail Agency of South Africa (PRASA)Location
Gauteng
Closed On
18 Feb 2026
Status: Closed — No Longer Accepting Submissions
This tender closed on 18 February 2026. Submissions are no longer accepted. The tender lifecycle continues — check the awards section for updates.
Tender Type
RFQ
Delivery Location
78 Simmonds street - Braamfontein - Johannesburg - 2001
Organization Type
GOVERNMENT
Published
03 Feb 2026
The passenger rail agency of south africa (PRASA) is seeking a service provider to supply and deliver concrete and wooden sleepers together with fist and e‑clip fastenings for the metrorail gauteng network on an as‑and‑when‑required basis over a 12‑month period. The contract is for a fixed ZAR price, includes transport to designated depots, and requires compliance with extensive technical, quality and safety standards.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: SCOPE OF WORK FOR SUPPLY AND DELIVERY OF SLEEPERS AND FASTERNINGS .pdf. You don’t need to refresh — this page will pick up the updated review automatically.
Categories
RFQ
78 Simmonds street - Braamfontein - Johannesburg - 2001
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
SCOPE OF WORK FOR SUPPLY AND DELIVERY OF SLEEPERS AND FASTERNINGS .pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Date & Time
Wednesday, 18 February 2026 - 10:00
Venue
null
This briefing session took place during the tender period.
The works is for the supply and delivery of sleepers and fastenings in the Metrorail
Category: technical
Gauteng region on an as and when required basis for a period of 12 months
MandatoryCategory: technical
The Gauteng Region is a network of commuter rail services in Gauteng province in
Category: technical
South Africa, servicing the Johannesburg and Tshwane metro areas. It is operated by
Category: technical
Metrorail, a division of the Passenger Rail Agency of South Africa (PRASA).
Category: technical
Metrorail routes spread out across the province from three main hubs: Park Station in
Category: technical
Johannesburg, Germiston Station on the East Rand, and Pretoria Station. Routes
Category: technical
service central Johannesburg, the East Rand, Soweto, the Vaal Triangle, the West
Category: technical
Rand, central Pretoria, and suburbs to the north, east and west of Pretoria.
Category: technical
2. BACKGROUND INFORMATION
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
BID SPECIFICATION - APPOINTMENT OF A SERVICE PROVIDER FOR
Category: technical
THE SUPPLY AND DELIVERY OF SLEEPERS AND FASTENINGS IN THE
Category: technical
METRORAIL GAUTENG REGION ON AN AS AND WHEN REQUIRED
MandatoryCategory: technical
BASIS FOR A PERIOD OF 12 MONTHS
Category: technical
2.1 STATUS QUO
Category: technical
Most of the Perway components has reached their life cycle and Perway is facing a
Category: technical
backlog in replacing these components due to budget constraints. The current on-track
Category: technical
screener project has exposed several areas that requires these material as most of old
Category: technical
components gave in during screening project as they have served their life cycle. The
Category: technical
situation is now encroaching on the safety space whereby if this is not attended to, it will
Category: technical
pose a high risk in train operations.
Category: technical
2.2 PROBLEM STATEMENT
Category: technical
Sleepers and Fastenings form an integral part of the Perway track structure, the main
Category: technical
functions include to provide safe passage of trains used to transport passengers/
Category: technical
goods. Rail to sleeper fastenings – use e clips and fist springs, these fastenings or
Category: technical
springs offer a constant clamping force to fasten rail to concrete sleepers.
Category: technical
In some areas sleepers and fastenings gave in during screening and tamping process
Category: technical
due to age and this is impacting on the handing back of site to the operator as the
Category: technical
areas are declared unsafe until replacement takes place.
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
BID SPECIFICATION - APPOINTMENT OF A SERVICE PROVIDER FOR
Category: technical
THE SUPPLY AND DELIVERY OF SLEEPERS AND FASTENINGS IN THE
Category: technical
METRORAIL GAUTENG REGION ON AN AS AND WHEN REQUIRED
MandatoryCategory: technical
BASIS FOR A PERIOD OF 12 MONTHS
Category: technical
2.3 PICTORIALS
Category: technical
Fig 2.1: Replacement of damaged Perway components during screening project
Category: technical
3. OBJECTIVES OF THE PROPOSED PROJECT
Category: technical
3.1 DESIRED OUTCOMES FOR CARRYING OUT THE PROPOSED PROJECT
Category: technical
3.1.1. The project aims to restore the Perway infrastructure to enable the safe operation of the
Category: technical
train service. The strategy will be to appoint a contractor/s for the supply and delivery
Category: technical
of sleepers and fastenings. Sections which are critical will be addressed first and the
Category: technical
rest will be delivered according to priority.
Category: technical
3.2 PROJECT BENEFITS TO PRASA
Category: technical
3.2.1. The Project will assist the organisation to keep the lines open and safe. This will therefore
Category: technical
assist PRASA in achieving its primary mandate of providing a reliable rail transport
Category: technical
service to Gauteng commuters and enable the business to collect fare revenue.
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
BID SPECIFICATION - APPOINTMENT OF A SERVICE PROVIDER FOR
Category: technical
THE SUPPLY AND DELIVERY OF SLEEPERS AND FASTENINGS IN THE
Category: technical
METRORAIL GAUTENG REGION ON AN AS AND WHEN REQUIRED
MandatoryCategory: technical
BASIS FOR A PERIOD OF 12 MONTHS
Category: technical
3.3 CURRENT MECHANISMS IN PLACE TO ADDRESS THE PROBLEM
Category: technical
3.3.1. Old, scavenged sleepers and fastenings are utilised in some areas to enable the region
Category: technical
to run the passenger service however this is not ideal as it poses a risk
Category: technical
4. SCOPE OF WORK AND AREAS OF FOCUS
Category: technical
4.1 SCOPE OF THE DESIRED SOLUTION
Category: technical
The Supply and delivery of:
Category: technical
4.1.1. F4, FY, P2, PY concrete sleepers
Category: technical
4.1.2. Wooden sleepers on turnouts
Category: technical
4.1.3. Fist and e Clip fastenings.
Category: technical
4.2 DETAILS ON THE PREFERRED SOLUTION
Category: technical
4.2.1. The preferred solution in addressing the challenge at hand is by appointing a service
Category: technical
provider to supply material for the rehabilitation of Perway system.
Category: technical
4.3 AREA TARGETED BY THIS PROJECT
Category: technical
4.3.1. The supply will cover the delivery of the required material to the below stated depots and
MandatoryCategory: technical
sites. The scope of supply for Perway material is to cover the designated locations:
Category: technical
4.3.1.1. Rebecca material store, Rebecca Street, Pretoria.
Category: technical
4.3.1.2. Metrorail Gauteng region along the railway lines where material need to be
Category: technical
replaced.
Category: technical
4.4 EXTENT AND COVERAGE OF THE PROPOSED PROJECT
Category: technical
4.4.1. The project will cover Metrorail Gauteng Region.
Category: technical
4.5 OTHER RELATED PROJECTS
Category: technical
4.5.1. National supply, delivery and handover of 48kg/m and 57 kg/m rails
Category: technical
4.5.2. National supply of Turnouts
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
BID SPECIFICATION - APPOINTMENT OF A SERVICE PROVIDER FOR
Category: technical
THE SUPPLY AND DELIVERY OF SLEEPERS AND FASTENINGS IN THE
Category: technical
METRORAIL GAUTENG REGION ON AN AS AND WHEN REQUIRED
MandatoryCategory: technical
BASIS FOR A PERIOD OF 12 MONTHS
Category: technical
5. SPECIFICATION OF THE WORK OR PRODUCTS OR SERVICES REQUIRED
MandatoryCategory: technical
5.1 SLEEPERS AND FASTENINGS
Category: technical
5.1.1 TECHNICAL SPECIFICATION
Category: technical
5.1.1.1 Sleepers to comply with specifications referred to in the schedule of prices.
Category: technical
Specification PWM 2/5 and drawings E3303 sheet 1 and 2, E3318 sheet 1 and 2 are
Category: technical
attached to this document. Anti-theft (A/T) fastening system to comply with
Category: technical
specifications referred to in the schedule of prices.
Category: technical
5.1.1.2 The sleepers and fastening system consist of the following components:
Category: technical
Qty. per
Category: technical
Item No. Item Images Item Description
Category: technical
sleeper
Category: technical
e2005 Anti-theft Clip 4
Category: technical
e2006 Anti-sabotage
Category: technical
M00067398 4
Category: technical
Clip
Category: technical
Sleeve for Anti
Category: technical
M00056144 4
Category: technical
sabotage clip
Category: technical
M00033574 T6 insulator 4
Category: technical
A11/A17 4
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
BID SPECIFICATION - APPOINTMENT OF A SERVICE PROVIDER FOR
Category: technical
THE SUPPLY AND DELIVERY OF SLEEPERS AND FASTENINGS IN THE
Category: technical
METRORAIL GAUTENG REGION ON AN AS AND WHEN REQUIRED
MandatoryCategory: technical
BASIS FOR A PERIOD OF 12 MONTHS
Category: technical
M00020976 P2 HDPE Pad 2
Category: technical
M00015385 F4 Concrete Sleeper 1
Category: technical
M00023208 F4 Fist clip 2
Category: technical
M00075570 Fist Pin 2
Category: technical
Base Plate
Category: technical
M00032610 2
Category: technical
E
Category: technical
1 per 100
Category: technical
M00041882 Extraction Tool
Category: technical
sleepers
Category: technical
Figure 5: Sleepers and fastening system, material item numbers are for internal purpose.
Category: technical
5.1.2 SHAPE AND SIZE OF SLEEPER AND FASTENINGS
Category: technical
5.1.2.1 The sleeper and fastenings shall be of the shape and configuration as indicated on
Category: technical
the below table and indicated on PWM2/5 drawings:
Category: technical
5.1.2.2 The Fist rail fastening system comprises of a spring steel clip, rail pad and insulated
Category: technical
retaining pin.
Category: technical
Table 1: “Fist” clip Fastening system
Category: technical
Sleeper Rail kg/m Fastening components
Category: technical
F4 SAR 48 Clip spring E – Base plate Fist Pin
Category: technical
SAR 57 Clip spring E – Base plate Fist Pin
Category: technical
FY UIC60 Clip spring E – Base plate Fist Pin
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
BID SPECIFICATION - APPOINTMENT OF A SERVICE PROVIDER FOR
Category: technical
THE SUPPLY AND DELIVERY OF SLEEPERS AND FASTENINGS IN THE
Category: technical
METRORAIL GAUTENG REGION ON AN AS AND WHEN REQUIRED
MandatoryCategory: technical
BASIS FOR A PERIOD OF 12 MONTHS
Category: technical
Table 2: “e”- type clip fastening gauge plate combination for different gauges
Category: technical
Sleeper Rail kg/m Outer Inner Gauge Inner Outer
Category: technical
PY UIC 60 UIC60/06/09 UIC60/06/09 1066 UIC60/06/09 UIC60/06/09
Category: technical
SAR 57 T14 T11 1065 T11 T14
Category: technical
SAR 48 T23 T17 1067 T17 T23
Category: technical
P2 SAR 57 T6 T6 1064 T6 T6
Category: technical
SAR 48 T17 T11 1064 T11 T17
Category: technical
SAR 57 A11 A17 1064 A11 A17
Category: technical
SAR 48 A11 A17 1064 A11 A17
Category: technical
Figure 6: Sleepers and fastening system combination
Category: technical
5.1.3 ACCEPTANCE TESTS
Category: technical
5.1.3.1 Factory acceptance test certificate to be submitted, strength defects or other defects
Category: technical
with classifications on bending tests and concrete quality tests as described in PWM
Category: technical
2/5 shall be measured with respect to specification.
Category: technical
5.2 PRICES
Category: technical
Prices quoted must be in South African currency and fixed for the duration of the
MandatoryCategory: technical
contract inclusive of transport to the point of delivery at PRASA Gauteng Region
Category: technical
Rebecca material store and Metrorail Gauteng region sites inclusive of loading and
Category: technical
offloading.
Category: technical
5.3 DISTRIBUTION
Category: technical
Prices tendered shall be the ex-works, loaded onto road trucks and Rail wagons.
Category: technical
Transport cost will be borne by the supplier.
Category: technical
5.4 NEGOTIATION
Category: technical
PRASA reserves the right to negotiate prices and commercial aspects after the closing
Category: technical
date of the tender.
Category: technical
5.5 INCREASE OR DECREASE IN COSTS
Category: technical
5.5.1 This is an as and when required basis contract, and no contract price adjustment will
MandatoryCategory: technical
be applied to allow for all increases or decreases in production costs of a product,
Category: technical
from any cause whatsoever, which may occur after the closing date of the
Category: technical
submission of tenders and before the date of completion.
Category: technical
5.5.2 Price shall be firm for the duration of contract.
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
BID SPECIFICATION - APPOINTMENT OF A SERVICE PROVIDER FOR
Category: technical
THE SUPPLY AND DELIVERY OF SLEEPERS AND FASTENINGS IN THE
Category: technical
METRORAIL GAUTENG REGION ON AN AS AND WHEN REQUIRED
MandatoryCategory: technical
BASIS FOR A PERIOD OF 12 MONTHS
Category: technical
5.6 EXCHANGE RATE
Category: technical
The contract price payable to the Contractor will not be adjusted for increases and
Category: technical
decreases in costs of imported materials, machines and spare parts, due to fluctuations in
Category: technical
foreign currency exchange rates after the conclusion of the Contract and for the duration
Category: technical
thereof.
Category: technical
5.7 PLACING OF ORDERS AND DELIVERY OF GOODS
Category: technical
5.7.1 The Parties shall meet monthly for the purposes of-
Category: technical
5.7.1.1 Planning
Category: technical
5.7.1.2 Placing of orders and delivery of goods.
Category: technical
5.7.1.3 Amending, revising, updating and finalising the twelve-month forward delivery
Category: technical
schedule.
Category: technical
5.7.1.4 To re-plan previous plans where there have been mismatches or discrepancies.
Category: technical
5.7.2 The Supplier shall, on a monthly basis, furnish the Project Manager with a written
Category: technical
report on the production of the Goods to be supplied.
Category: technical
5.7.3 PRASA will provide the Supplier, in advance, over the duration of the contract period,
Category: technical
with a written document regarding requested deliveries for each product, taking the
Category: technical
necessary lead-time into consideration. Such document must be accepted and signed
MandatoryCategory: technical
by the Supplier who thereby binds himself or herself to the delivery times therein
Category: technical
stated.
Category: technical
5.7.4 Orders for each month will be placed at one instance. Any extraordinary factors
Category: technical
surrounding the required goods, lead time, expected delivery date, price in relation to
MandatoryCategory: technical
forward cover influences, place of delivery and production capacity, which may
Category: technical
influence price or performance are to be brought to the attention of the Project
Category: technical
Manager immediately upon receipt of an order by the Supplier.
Category: technical
5.7.5 Orders shall be placed as follows:
Category: technical
5.7.5.1 Orders will be placed at the Supplier.
Category: technical
5.7.5.2 The Supplier will check the required goods, based on projections, the lead times,
MandatoryCategory: technical
expected delivery date and place of delivery and adjust, if necessary and notify the
Category: technical
Project Manager of the adjustment.
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
BID SPECIFICATION - APPOINTMENT OF A SERVICE PROVIDER FOR
Category: technical
THE SUPPLY AND DELIVERY OF SLEEPERS AND FASTENINGS IN THE
Category: technical
METRORAIL GAUTENG REGION ON AN AS AND WHEN REQUIRED
MandatoryCategory: technical
BASIS FOR A PERIOD OF 12 MONTHS
Category: technical
5.7.5.3 The Supplier shall confirm the order with the Project Manager.
Category: technical
5.7.5.4 The Supplier shall issue an order confirmation, to be handed to the Project Manager,
Category: technical
which order confirmation shall be fixed.
Category: technical
5.8 DISPATCHING OF MATERIAL
Category: technical
The Supplier shall do all necessary to acquire transportation for the goods, in the form of
Category: technical
"road or rail transport”, in order to dispatch such goods to the various places of delivery.
Category: technical
Transport of the material will be to the supplier’s account. Transportation rates to be
Category: technical
included on the tender.
Category: technical
5.9 ACCEPTANCE OF GOODS
Category: technical
5.9.1 Final acceptance of goods is the Project Manager's responsibility (with support from the
Category: technical
relevant technical expert) and shall be in the form of a Quality Assurance Final Release
Category: technical
Certificate to be issued by the Supplier to the Project Manager on presentation of the
Category: technical
goods.
Category: technical
5.9.2 The Project Manager shall inform the Supplier in writing within a reasonable period from
Category: technical
date of receipt of the goods if the goods are found to be defective or not strictly in
Category: technical
accordance with specifications.
Category: technical
5.9.3 The Supplier shall upon handing over the goods to a cartage agent to transport the goods
Category: technical
to the PRASA’s sites or transport the good themselves (based on the applicable
Category: technical
incoterms), issue a certificate confirming that quantities correspond to the accompanying
Category: technical
waybills.
Category: technical
5.10 QUALITY ASSURANCE
Category: technical
5.10.1 The manufacturer/supplier shall be ISO9001 accredited and shall make available its
Category: technical
quality plan for the manufacture of all components. These quality plans will be audited
Category: technical
by PRASA/Metrorail every six months.
Category: technical
5.10.2 The Supplier shall keep quality assurance records for a period of at least 36 (thirty-six)
Category: technical
months from the date of final delivery of the goods in a safe place. These records must
MandatoryCategory: technical
be made available to the Project Manager for inspection on his or her request.
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
BID SPECIFICATION - APPOINTMENT OF A SERVICE PROVIDER FOR
Category: technical
THE SUPPLY AND DELIVERY OF SLEEPERS AND FASTENINGS IN THE
Category: technical
METRORAIL GAUTENG REGION ON AN AS AND WHEN REQUIRED
MandatoryCategory: technical
BASIS FOR A PERIOD OF 12 MONTHS
Category: technical
5.11 SUPPLIER'S WARRANTY FOR GOODS
Category: technical
5.11.1 The Supplier hereby warrants that the Goods he or she shall provide to the PRASA in
Category: technical
terms of this Agreement are suitable for the purpose for which they are intended, the
Category: technical
prices are fair, and market related and that they shall adhere to the delivery times as
Category: technical
stipulated in the specifications.
Category: technical
5.11.2 If within 18 (eighteen) months after delivery of the goods, or 12 (twelve) months after
Category: technical
being placed into service, whichever expires first, any defects, whether patent or latent,
Category: technical
are found in the goods due to improper workmanship or defective material, excluding
Category: technical
fair wear and tear, rough handling or improper use, such defects will be rectified by the
Category: technical
Supplier at no extra cost, upon receiving written notification from the Project Manager of
Category: technical
such defects within a reasonable time.
Category: technical
5.12 PERFORMANCE LEVELS
Category: technical
5.12.1 The Supplier shall perform strictly in accordance with the levels required by this
MandatoryCategory: technical
Agreement and any other specifications emanating there from and accept the penalties
Category: technical
which will be instituted for non - performance.
Category: technical
5.12.2 When goods are delivered late, early delivered, on time but not in accordance with
Category: technical
specification it will be regarded as non-performance. Delivery is deemed to be early if it
Category: technical
arrives at the destination more than 4 (four) weeks prior to the expected delivery date,
Category: technical
and it is considered late if it arrives at the destination after the delivery date stipulated in
Category: technical
the order.
Category: technical
5.12.3 Should there be non-performance, the Supplier shall inform the Project manager
Category: technical
immediately of such an event, stating the reasons and remedial action the Supplier
Category: technical
intends taking.
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
BID SPECIFICATION - APPOINTMENT OF A SERVICE PROVIDER FOR
Category: technical
THE SUPPLY AND DELIVERY OF SLEEPERS AND FASTENINGS IN THE
Category: technical
METRORAIL GAUTENG REGION ON AN AS AND WHEN REQUIRED
MandatoryCategory: technical
BASIS FOR A PERIOD OF 12 MONTHS
Category: technical
5.13 OTHER SPECIFIC PERFORMANCE REQUIREMENTS
Category: technical
5.13.1 The Supplier shall, provide the Goods in the quantity, on or before the due date
Category: technical
determined in accordance with the technical specification, tender specification and
Category: technical
written Purchase order issued by PRASA,
Category: technical
5.13.2 All Goods shall be packaged in accordance with the provisions of the technical
Category: technical
specification. Where no provisions are made in the technical specification for
Category: technical
packaging, the Goods shall be properly packed for long term storage suitable to
Category: technical
protect the contents against damage through rough handling and over storage in
Category: technical
transit or whilst in store.
Category: technical
5.13.3 Unless otherwise stated, all containers (including packing cases, boxes, pallets, tins
Category: technical
drums and wrappings) supplied by the Supplier shall be considered as non-returnable,
Category: technical
and their cost having been included in the price of the Goods.
Category: technical
5.13.4 The Supplier shall clearly mark the outside of each consignment or package with the
Category: technical
Supplier's name and full details of the destination in accordance with the PRASA’s order
Category: technical
and include a packing note stating the contents thereof.
Category: technical
5.13.5 On despatch of each consignment, send to PRASA at the address for delivery of the
Category: technical
Goods, an advice note specifying the means of transport, weight, number or volume as
Category: technical
appropriate, the point and date of despatch.
Category: technical
5.13.6 Send to PRASA a detailed priced invoice as soon as is reasonably practical after
Category: technical
despatch of the Goods, and state on all communications in the relevant order number
Category: technical
and code number (if any).
Category: technical
5.13.7 Goods shall be delivered on working days, between working hours of 08:00 am to 15:00
Category: technical
pm to Rebecca material store, Rebecca Street, Pretoria via road; between Pretoria and
Category: technical
Mabopane via rail.
Category: technical
5.13.8 Should the Supplier have reason to suspect delays in delivery, the Supplier shall advise
Category: technical
the Project Manager upon receipt of the purchase order (PO) in writing of any anticipated
Category: technical
delays citing reasons therefore and put forward a new anticipated delivery date. PRASA
Category: technical
may then extend the delivery date if and as it seems fit. Unless and until the Supplier
Category: technical
receives a notification of the new, extended delivery date, there shall be no extension to
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
BID SPECIFICATION - APPOINTMENT OF A SERVICE PROVIDER FOR
Category: technical
THE SUPPLY AND DELIVERY OF SLEEPERS AND FASTENINGS IN THE
Category: technical
METRORAIL GAUTENG REGION ON AN AS AND WHEN REQUIRED
MandatoryCategory: technical
BASIS FOR A PERIOD OF 12 MONTHS
Category: technical
delivery dates. Should delivery delays lead to cost implications, the supplier will be held
Category: technical
liable for the cost incurred.
Category: technical
5.13.9 All Goods supplied shall comply with the requirements of the Scope of Work or shall
Category: technical
conform in all respects to the technical and tender specification in Annexure 3,
Category: technical
respectively.
Category: technical
5.13.10. All Goods supplied shall be the subject of the Project Manager’s inspection and test
Category: technical
at all times before, during or after manufacturing. The Supplier shall furnish without extra
Category: technical
charge all reasonable facilities and assistance for the safe and convenient inspection or
Category: technical
test required by appointed inspectors. Such inspections may be carried out on the
MandatoryCategory: technical
Supplier’s premises or at another place as deemed appropriate by inspectors.
Category: technical
5.13.10 If the Supplier fails to supply Goods, materials, workmanship or services in accordance
Category: technical
with the provisions of the Contract, the Project Manager may reject any part of the Goods
Category: technical
by giving written notice to the Supplier specifying the reason for rejection and whether
Category: technical
replacement Goods are required and within what time.
MandatoryCategory: technical
5.13.11 The Supplier warrants that the goods will remain free from defects for a period of three
Category: technical
years (unless otherwise stated in the Contract Data) from acceptance of the Goods by
Category: technical
the Project Manager.
Category: technical
5.14 BOND AND GUARANTEES
Category: technical
5.14.1 Surety in the amount equal to either five percent or five percent of the contract price, as
Category: technical
elected by the Contractor, shall be provided by the Contractor for the due and faithful
Category: technical
performance by him in terms of the Contract. Such security shall be in the form of:
Category: technical
5.14.2 Government or approved Municipal stocks in negotiable form, or
Category: technical
5.14.3 A deed of suretyship furnished by an approved bank, insurance or guarantee
Category: technical
corporation in such form as may be prescribed by PRASA, provided however that the
Category: technical
Project Manager may, upon written application by the Contractor, return to the
Category: technical
Contractor the whole or part of such security held by PRASA.
Category: technical
5.14.4 All work done shall be guaranteed for a period of 12 month after the successful
Category: technical
handover.
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
BID SPECIFICATION - APPOINTMENT OF A SERVICE PROVIDER FOR
Category: technical
THE SUPPLY AND DELIVERY OF SLEEPERS AND FASTENINGS IN THE
Category: technical
METRORAIL GAUTENG REGION ON AN AS AND WHEN REQUIRED
MandatoryCategory: technical
BASIS FOR A PERIOD OF 12 MONTHS
Category: technical
5.14.5 All completion certificates will be given in writing after all contract obligations are met
Category: technical
and approved by PRASA Project Manager.
Category: technical
5.14.6 Formal completion certificate will be given in writing after all contract obligations are met
Category: technical
and approved by PRASA Project Manager.
Category: technical
5.14.7 Corrective action to be taken by the Contractor during the guarantee period at his/her
Category: technical
own cost and expense.
Category: technical
5.14.8 Project Manager will, where practicable be entitled to take corrective action of its own
Category: technical
should the Contractor not be able to give immediate attention at the time a fault occurs
Category: technical
and recover from the contractor any costs and expenses reasonably incurred by it in
Category: technical
doing so as per penalty clauses.
Category: technical
5.15 PAYMENT CERTIFICATE
Category: technical
5.15.1 On or after the assessment date, the Project Manager and the Supplier will together
Category: technical
assess the quantities of the progress on each item in the Bill of Quantities and complete
Category: technical
the Progress Assessment Detail form, where after the Progress Assessment Certificate
Category: technical
will be issued.
Category: technical
5.15.2 The Supplier shall then submit a VAT invoice and attach the above Progress Certificate
Category: technical
for payment by the Employer.
Category: technical
5.15.3 Supplier to provide the Employer with the necessary details regarding banking details to
Category: technical
enable the Employer to make electronic payments.
Category: technical
5.16 PRICING OF THE WORKS
Category: technical
5.16.1 The contractor is required to provide firm prices/ rates for material and labor for the
MandatoryCategory: technical
duration of the contract.
Category: technical
5.16.2 The contractor shall make provisions for the costs (direct or otherwise) associated with
Category: technical
works on, over or adjacent to railway lines. The Contractor is advised to study the
Category: technical
requirements of the SPK 7/2 and ensure that all works can be completed in accordance
Category: technical
with these requirements.
Category: technical
5.17 PENALTIES
Category: technical
5.17.1 If the Contractor fails to complete the Services within the time a stipulated in this Contract
Category: technical
for completion of Services or a part or portion of Services, the Contractor shall be liable
Category: technical
to the Employer for an amount calculated at 0.05% of the Contract Price per delayed
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
BID SPECIFICATION - APPOINTMENT OF A SERVICE PROVIDER FOR
Category: technical
THE SUPPLY AND DELIVERY OF SLEEPERS AND FASTENINGS IN THE
Category: technical
METRORAIL GAUTENG REGION ON AN AS AND WHEN REQUIRED
MandatoryCategory: technical
BASIS FOR A PERIOD OF 12 MONTHS
Category: technical
Day per order, which shall be paid for every day which shall elapse between the time for
Category: technical
due completion and completion of the relevant Services. However, the total amount due
Category: technical
under this sub-clause shall not exceed the maximum of 10% of the Contract Price.
Category: technical
5.17.2 The imposition of such penalty shall not relieve the Contractor from its obligation to
Category: technical
complete Services or from any of the obligations and liabilities under the Contract,
Category: technical
5.17.3 PRASA may set off or deduct from the fees due to the Contractor any penalty amounts
Category: technical
due and owing by the Contractor in terms of clause 5.17.1
Category: technical
6. TECHNICAL SPECIFICATIONS RELATED TO THE PROJECT
Category: technical
The documents forming the contract are to be taken as complimentary to each other. In case of
Category: technical
any discrepancy or inconsistency between contract documents, the order of precedence will be:
Category: technical
SANS 3000-1 to 2, Railway Safety Management
Category: technical
SABS 1200NB Railway Sidings (Track work)
Category: technical
EN13674-1 Specification for new Railway Rails or the latest equivalent standard
Category: technical
UIC 860-0, UIC UIC Codes or the latest equivalent standard
Category: technical
8610-1
Category: technical
EN13848 Railway applications – Track geometry quality standard
Category: technical
EN 13481- Part 1 Performance requirements for fastening systems
Category: technical
EN 13146 Test methods for fastening systems
Category: technical
EN 10089 Hot rolled steels for quenched and tempered springs
Category: technical
EN ISO 6506-1 Brinell hardness test method for rails
Category: technical
CCE 1/57/2 Specification for concrete sleepers to standard dimensions 1065mm
Category: technical
gauge track
Category: technical
PWM 2/5 Specification for prestressed concrete sleepers used on 1065mm
Category: technical
gauge Railway track
Category: technical
E3303 sheet 1 P2 Concrete sleepers drawing
Category: technical
E3303 sheet 2 F4 Concrete sleepers drawing
Category: technical
E3318 sheet 1 PY Concrete sleepers drawing
Category: technical
E3318 sheet 2 FY Concrete sleepers drawing
Category: technical
Z1153 Sheets 1 & 2 Drawing for normal rolling and straightness tolerances laid down in
Category: technical
the EN13674 Specification for new railway rails
Category: technical
ASTM American (USA) standards
Category: technical
SABS 1083:2013 Ballast specification (latest revision for Railway lines)
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
BID SPECIFICATION - APPOINTMENT OF A SERVICE PROVIDER FOR
Category: technical
THE SUPPLY AND DELIVERY OF SLEEPERS AND FASTENINGS IN THE
Category: technical
METRORAIL GAUTENG REGION ON AN AS AND WHEN REQUIRED
MandatoryCategory: technical
BASIS FOR A PERIOD OF 12 MONTHS
Category: technical
S406 (1998) Transnet specification for supply of ballast stone
Category: technical
EN13674 Specification for new Railway Rails
Category: technical
CP1/1 Exothermic welding portions packaging specification
Category: technical
SABS 1431 Grade 300wa for weldable structural steel
Category: technical
E10 General Specifications for Railway Track work (1996)
Category: technical
Track Manual Manual for Track Maintenance (2000)
Category: technical
Track Manual Manual for Track Welding (2007)
Category: technical
7. CIDB REQUIRENTS
Category: technical
9.1. Is this a CIDB related Project? (Yes / No)
Category: technical
9.1.1. No
Category: technical
9.2. If YES, what is the applicable Class of Work & Grade?
Category: technical
9.2.1. Class of Work: ______N/A___________
Category: technical
9.2.2. Minimum Grade: _____N/A__________
Category: technical
8. PROJECT SPECIFIC TERMS AND CONDITIONS
Category: technical
8.1 INCREASE OR DECREASE IN COSTS
Category: technical
8.1.1 This is as and when required basis contract, and no contract price adjustment will be
MandatoryCategory: technical
applied to allow for all increases or decreases in production costs of a product, from
Category: technical
any cause whatsoever, which may occur after the closing date of the submission of
Category: technical
tenders and before the date of completion.
Category: technical
8.1.2 Price shall be firm for the duration of contract.
Category: technical
8.2 EXCHANGE RATE
Category: technical
The contract price payable to the Contractor will not be adjusted for increases and
Category: technical
decreases in costs of imported materials, machines and spare parts, due to fluctuations
Category: technical
in foreign currency exchange rates after the conclusion of the Contract and for the
Category: technical
duration thereof.
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
BID SPECIFICATION - APPOINTMENT OF A SERVICE PROVIDER FOR
Category: technical
THE SUPPLY AND DELIVERY OF SLEEPERS AND FASTENINGS IN THE
Category: technical
METRORAIL GAUTENG REGION ON AN AS AND WHEN REQUIRED
MandatoryCategory: technical
BASIS FOR A PERIOD OF 12 MONTHS
Category: technical
8.3 ACCEPTANCE OF GOODS
Category: technical
8.3.1 Final acceptance of goods is the Project Manager's responsibility (with support from the
Category: technical
relevant technical expert) and shall be in the form of a Quality Assurance Final Release
Category: technical
Certificate to be issued by the Supplier to the Project Manager on presentation of the
Category: technical
goods.
Category: technical
8.3.2 The Project Manager shall inform the Supplier in writing within a reasonable period from
Category: technical
date of receipt of the goods if the goods are found to be defective or not strictly in
Category: technical
accordance with specifications.
Category: technical
8.3.3 The Supplier shall upon handing over the goods to a cartage agent to transport the goods
Category: technical
to the PRASA’s sites or transport the good themselves (based on the applicable
Category: technical
incoterms), issue a certificate confirming that quantities correspond to the accompanying
Category: technical
waybills.
Category: technical
8.4 QUALITY ASSURANCE
Category: technical
8.4.1 The manufacturer/supplier shall be ISO9001 accredited and shall make available its
Category: technical
quality plan for the manufacture of all components. These quality plans will be audited
Category: technical
by PRASA/Metrorail every six months.
Category: technical
8.4.2 The Supplier shall keep quality assurance records for a period of at least 36 (thirty-six)
Category: technical
months from the date of final delivery of the goods in a safe place. These records must
MandatoryCategory: technical
be made available to the Project Manager for inspection on his or her request.
Category: technical
8.5 SUPPLIER'S WARRANTY FOR GOODS
Category: technical
8.5.1 The Supplier hereby warrants that the Goods he or she shall provide to the PRASA in
Category: technical
terms of this Agreement are suitable for the purpose for which they are intended, the
Category: technical
prices are fair and market related and that it shall adhere to the delivery times as
Category: technical
stipulated in the specifications.
Category: technical
8.5.2 If within 18 (eighteen) months after delivery of the goods, or 12 (twelve) months after being
Category: technical
placed into service, whichever expires first, any defects, whether patent or latent, are
Category: technical
found in the goods due to improper workmanship or defective material, excluding fair
Category: technical
wear and tear, rough handling or improper use, such defects will be rectified by the
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
BID SPECIFICATION - APPOINTMENT OF A SERVICE PROVIDER FOR
Category: technical
THE SUPPLY AND DELIVERY OF SLEEPERS AND FASTENINGS IN THE
Category: technical
METRORAIL GAUTENG REGION ON AN AS AND WHEN REQUIRED
MandatoryCategory: technical
BASIS FOR A PERIOD OF 12 MONTHS
Category: technical
Supplier at no extra cost, upon receiving written notification from the Project Manager of
Category: technical
such defects within a reasonable time.
Category: technical
8.6 PERFORMANCE LEVELS
Category: technical
8.6.1 The Supplier shall perform strictly in accordance with the levels required by this
MandatoryCategory: technical
Agreement and any other specifications emanating there from and accept the penalties
Category: technical
which will be instituted for non - performance.
Category: technical
8.6.2 When goods are delivered late, early delivered, on time but not in accordance with
Category: technical
specification it will be regarded as non-performance. Delivery is deemed to be early if it
Category: technical
arrives at the destination more than 4 (four) weeks prior to the expected delivery date,
Category: technical
and it is considered late if it arrives at the destination after the delivery date stipulated in
Category: technical
the order.
Category: technical
8.6.3 Should there be non-performance, the Supplier shall inform the Project manager
Category: technical
immediately of such an event, stating the reasons and remedial action the Supplier
Category: technical
intends taking.
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
BID SPECIFICATION - APPOINTMENT OF A SERVICE PROVIDER FOR
Category: technical
THE SUPPLY AND DELIVERY OF SLEEPERS AND FASTENINGS IN THE
Category: technical
METRORAIL GAUTENG REGION ON AN AS AND WHEN REQUIRED
MandatoryCategory: technical
BASIS FOR A PERIOD OF 12 MONTHS
Category: technical
10 PROJECT SECIFIC SAFETY RELATED REGULATIONS
Category: technical
12.1. The contractor shall comply with requirements of safety legislations and regulations
Category: technical
in all respects.
Category: technical
12.2. It is the requirement of this contract that the contractor should provide PRASA with
Category: technical
a detailed safety plan prior to being issued with a site access certificate, in accordance
Category: technical
with the latest version of the Occupational Safety Act, 1993 (Act No: ) and
Category: technical
the SPK7, PRASA SHE Specification and National Environmental Management Act
Category: technical
Category: technical
12.3. All drivers shall be in possession of valid driver’s licenses and Public Drivers
Category: technical
Permits (PDP) where applicable. Crane operators will be required to have a valid
MandatoryCategory: technical
Crane Operator’s certificate. All vehicles shall be road worthy.
Category: technical
12.4. The contractor shall be responsible for all protective clothing and equipment for his
Category: technical
or her employees.
Category: technical
12.5. All work shall at all times comply with the SPK7/2 Specification attached hereto.
Category: technical
12.6. Normal protection measures in accordance with the Protection Manual shall apply.
Category: technical
12.7. An effective safety procedure to be followed by all personnel on any work site in the
Category: technical
case of approaching rail traffic shall be compiled by the Contractor and implemented
Category: technical
before any work commences. This procedure shall be updated whenever the need arises,
Category: technical
and any changes shall be communicated to all employees on a works site before work
Category: technical
proceeds.
Category: technical
of 20
Category: technical
Confidential – Specification / Scope Submission (Ver.1 2020)
Category: technical
No specific requirements found
MandatoryCategory: compliance
03 Feb
2026
Tender Published
Tender was published
18 Feb
2026
Closing Date
Tender closing date
Pending
Awaiting Award of Contract
This tender has not yet been awarded. The contracting authority is expected to publish the award notice in due course.
18 Feb
2026
Submissions Closed
No further submissions were accepted after this date.
Organization
Passenger Rail Agency of South Africa (PRASA)Secure PRASA tenders with AI Matching & Recommendations, rail-infrastructure intelligence, compliance analysis, and bid support for rolling stock and station upgrades.
Contact Person
KHUTHADZO TSHIKHUDO
Phone
043-700-2331
Secure PRASA tenders with AI Matching & Recommendations, rail-infrastructure intelligence, compliance analysis, and bid support for rolling stock and station upgrades.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 963 844
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: SCOPE OF WORK FOR SUPPLY AND DELIVERY OF SLEEPERS AND FASTERNINGS .pdfSubmission Guidelines
Source: SCOPE OF WORK FOR SUPPLY AND DELIVERY OF SLEEPERS AND FASTERNINGS .pdfEvaluation Criteria
Source: SCOPE OF WORK FOR SUPPLY AND DELIVERY OF SLEEPERS AND FASTERNINGS .pdfTechnical Specifications
Source: SCOPE OF WORK FOR SUPPLY AND DELIVERY OF SLEEPERS AND FASTERNINGS .pdfFinancial Requirements
Source: SCOPE OF WORK FOR SUPPLY AND DELIVERY OF SLEEPERS AND FASTERNINGS .pdfCompliance Requirements
Source: SCOPE OF WORK FOR SUPPLY AND DELIVERY OF SLEEPERS AND FASTERNINGS .pdfSets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
78 Simmonds street - Braamfontein - Johannesburg - 2001
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
05 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.