Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
02 Maxwell Drive - Suninghill - Gauteng -
Organization Type
GOVERNMENT
Published
09 Jun 2026
OCDS Reference
ocds-9t57fa-158485
This tender invites bids for the supply, delivery, offloading, transport, and storage of stationery for ESKOM in gauteng over a 36-month period. IT is open to suppliers who can demonstrate compliance with e-tendering training and submission requirements.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Tuesday, 30 June 2026 - 11:00
Venue
MS Teams
Categories
Request for Bid(Open-Tender)
02 Maxwell Drive - Suninghill - Gauteng -
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: 240-126469599_Method Statement template -rev 3 final (001).docx. You don’t need to refresh — this page will pick up the updated review automatically.
09 Jun
2026
Tender Published
Tender was published
30 Jun
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
E-tendering Help Manual for supplier - 27 January 2025.docx
Eskom is inviting tenders for the supply, delivery, offloading, transport, and storage of stationery over a 36-month period in Gauteng. Submissions must be made electronically via the eTendering system.
Eskom Supplier Integrity Pact - 02 June 2023.pdf
This is Eskom's Supplier Integrity Pact, a mandatory ethical compliance document for all suppliers participating in procurement processes. It establishes a binding agreement between Eskom and its suppliers to prevent corruption, fraud, and unfair practices throughout the tendering and contract execution phases. The pact outlines specific obligations for both parties and requires suppliers to submit a signed Integrity Declaration Form.
Eskom General Conditions of Purchase - 31 May 2024.pdf
Eskom is inviting tenders for the supply, delivery, offloading, transport, and in-store packing of stationery over a 36-month period in Gauteng. The contract is governed by Eskom's General Conditions of Purchase, which outline terms related to pricing, delivery, compliance, risk, ownership, and ethical standards.
240-68099512 Form A Cat 4 Rev 9.docx
This tender, issued by ESKOM in Gauteng, involves the supply, delivery, offloading, transport, and in-store packing of stationery for a 36-month period. The tender emphasizes compliance with Eskom Supplier Quality Requirements (Specification 240-105658000) and ISO 9001 standards. Key focus areas include pre-contract quality requirements, post-contract execution, performance monitoring, and adherence to standard conditions like Eskom's rights of access, information, and quality audits.
SDL&I Strategy Setting for Bidders.pdf
Eskom is inviting tenders for the supply, delivery, offloading, transport, and in-store packing of stationery over a 36-month period in Gauteng. The tender includes preferential scoring based on B-BBEE status (20 points) and price (80 points), with additional Socio-Economic Development and Localisation (SDL&I) obligations that are contractual but non-scoring. Compliance with B-BBEE, local procurement, skills development, and job creation targets is mandatory, with penalties for non-compliance.
Affidavit-QSE-Sample.pdf
Eskom is inviting tenders for the supply, delivery, offloading, transport, and in-store packing of stationery over a 36-month period in Gauteng. The tender emphasizes B-BBEE compliance, requiring applicants to declare their Black Ownership, Black Female Ownership, and Black Designated Group Ownership percentages via a sworn affidavit.
Supplier Quality Management_Cat 4_List of Returnables Rev 7.xlsx
This tender, issued by ESKOM in Gauteng, is for the supply, delivery, offloading, transport, and storage of stationery over a 36-month period. The closing date is June 30, 2026. The tender emphasizes compliance with ISO 9001:2015 Quality Management System (QMS) standards and requires detailed documentation to prove adherence to quality, operational, and contractual requirements.
Non-Disclosure Agreement (NDA) Vendors Template -.docx
This tender is for the supply, delivery, offloading, transport, and in-store packing of stationery for Eskom Holdings SOC LTD over a 36-month period in Gauteng, South Africa. The document provided is a Confidentiality Agreement (NDA) template outlining the terms for handling confidential information between Eskom and potential suppliers/tenderers.
240-105658000 Supplier Quality Management Specification (3).pdf
Eskom is inviting tenders for the supply, delivery, offloading, transport, and storage of stationery over a 36-month period in Gauteng. The tender emphasizes strict Supplier Quality Management (SQM) requirements, including compliance with ISO 9001 standards, documented Quality Management Systems (QMS), and adherence to Eskom's quality specifications (240-105658000/QM 58). Suppliers must demonstrate capability in quality control, audits, and performance monitoring, with mandatory submission of quality plans, inspection/test plans, and other tender returnables as per the specified category (1–4).
Supply Contract Stationery Distribution rev (003).pdf
Eskom Holdings SOC Ltd is inviting tenders for the supply, delivery, offloading, transport, and in-store packing of stationery for a 36-month period. The contract is governed by the NEC3 Supply Contract (SC3) with specific clauses, pricing, and scope detailed in the document. The tender closes on June 30, 2026, and requires compliance with Eskom's procurement, legal, and operational standards, including B-BBEE, health and safety, and ethical conduct requirements.
Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Eskom is inviting tenders for the supply, delivery, offloading, transport, and in-store packing of stationery for a 36-month period in Gauteng. The tender process is open, competitive, and governed by strict submission, eligibility, and compliance rules. The closing date is 30 June 2026, and submissions must adhere to Eskom’s Standard Conditions of Tender (Rev 12).
240-126469599_Method Statement template -rev 3 final (001).docx
Eskom is seeking a supplier for the provision, delivery, offloading, transport, and in-store packing of stationery over a 36-month period in Gauteng. The tender emphasizes compliance with NEC (New Engineering Contract) documentation, quality management, risk mitigation, and customer-focused service delivery.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx
Eskom is inviting tenders for the supply, delivery, offloading, transport, and in-store packing of stationery over a 36-month period in Gauteng. The tender requires mandatory e-tendering training acknowledgment.
Affidavit-EME-Gen new.pdf
Tender for the supply, delivery, offloading, transport, and storage of stationery for Eskom in Gauteng over a 36-month period. The tender includes B-BBEE (Broad-Based Black Economic Empowerment) compliance requirements, with a focus on Black Ownership, Black Female Ownership, and Black Designated Group Ownership percentages. Applicants must submit a sworn affidavit confirming their B-BBEE status and financial revenue (≤ R10M).
Invitation to Tender (ITT) Stationery.pdf
Eskom Holdings SOC Ltd invites tenders for the supply, delivery, offloading, transport, and in-store packing of stationery for a 36-month period. The tender (E3019DXMWP) closes on 30 June 2026 at 10:00 AM (UTC). Submissions must be electronic via Eskom’s e-tendering portal, with mandatory documents including authorization forms, B-BBEE certificates, tax compliance, and COIDA certificates. Evaluation follows an 80/20 pricing-preference points system under PPPFA 2022 regulations.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 1 320 932
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: 240-105658000 Supplier Quality Management Specification (3).pdfTitle: Supplier Quality Management: Document Identifier: 240-105658000
Alternative Reference QM 58
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Quality Management
Revision: 3
Total Pages: 28
Next Review Date: October 2024
Disclosure Controlled Disclosure
Classification:
Compiled by Supported by Functional Authorized by
Responsibility
SA Sambo P Dondashe L Meyer K Pather
Chief Advisor Middle Manager Acting Senior General Manager
Quality Quality Manager Quality Risk and
Management Management Management Sustainability
Date: 15/10/2021 Date: 15/10/2021 Date: 15/10/2021 Date: 17 October 2021
EDC TN Formatted 15.10.2021
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Content
. Introduction ............................................................................................................................... 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ........................................................................................................... 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References ................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative............................................................................................................. 3
2.3 Definitions ........................................................................................................................ 4
2.4 Abbreviations ................................................................................................................... 5
2.5 Roles and Responsibilities ............................................................................................... 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................... 7
3.2 Quality Plan ...................................................................................................................... 8
3.3 Contract Quality Plan........................................................................................................ 8
3.4 Quality Control Plan ....................................................................................................... 10
3.5 Pre-Contract Award: Quality Requirement ...................................................................... 13
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................... 16
3.7 Post-Contract Award ...................................................................................................... 17
3.7.1 Contract Execution .............................................................................................. 17
3.7.2 Supplier Quality Performance Monitoring Phase ................................................. 18
3.7.3 Supplier Quality Audit .......................................................................................... 18
3.8 Standard Conditions ....................................................................................................... 19
3.8.1 Rights of Access .................................................................................................. 19
3.8.2 Eskom Rights to Information ................................................................................ 20
3.8.3 Preservation ........................................................................................................ 21
3.8.4 Quality Audits Related Conditions ....................................................................... 25
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by
Eskom ................................................................................................................. 25
3.8.6 Special Processes ............................................................................................... 26
Acceptance ............................................................................................................................. 27
Revisions ................................................................................................................................ 27
Development Team ................................................................................................................ 27
Acknowledgements ................................................................................................................ 28
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
vendor registration, management, monitoring, assessment and auditing of suppliers. Eskom’s
position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The priority is to encourage suppliers to continually improve
their QMS and enhance service delivery by implementing and conforming to the standard.
2.1 Scope
2.1.1 Purpose
The purpose of this specification is to outline the requirements according to which suppliers shall
develop,
implement,
maintain, and
continually improve
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
2.1.2 Applicability
This specification shall apply throughout Eskom Holdings Limited divisions, its subsidiaries,
suppliers, and sub-suppliers and shall form part of all Eskom requests for information (RFI)/ requests
for quotation (RFQ)/ requests for proposal (RFP), including contracts for the procurement of products
and services.
2.1.3 Effective date
Date of authorisation of the specification
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
2.2.2 Informative
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
Success
[7] 32-1033: Eskom’s Procurement and Supply Chain Management Policy
[8] 32-1034: Eskom’s Procurement and Supply Chain Management Procedure
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
[12] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Activities
[13] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
Purpose of a CQP is to outline how the results defined in the specifications will be achieved.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
Eskom representative or Eskom inspection agency, whichever is applicable.
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
Requirements are generally specified in the purchase order and/or contract documentation,
but may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus-bars, CT’s, VT’s and transformers).
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use.
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
A supplier may be a natural or legal person and includes any employee acting within the
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
2.4 Abbreviations
Abbreviation Explanation
AIA Approved Inspection Authority
CA Corrective Action
CQP Contract Quality Plan
FIDIC Federation Internationale Des Ingenieurs- Conseils
FMECA Failure Mode, Effects and Criticality Analysis
HAZOP Hazard and Operability Study
ISO International Organisation for Standardisation
ITP Inspection and Test Plan
NC Nonconformity
NDT Non Destructive Testing
PMI Positive Material Identification
QCP Quality Control Plan
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Abbreviation Explanation
QMS Quality Management System
PQP Project Quality Plan
RFI Request for Information
RFQ Request for Quotation
RFP Request for Proposal
SHEQ Safety, Health, Environment, and Quality
SETA Skills Education Training Authorities
WPS Welding procedure specifications
WQR Welder’s Qualification Record
2.5 Roles and Responsibilities
Eskom Quality representative/ professional will select applicable requirements for existing and
potential Eskom suppliers using Form A (Tender and Contract Quality Requirements for Supplier
Quality Management: Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001
Standard).
The existing and/ or potential suppliers must complete, sign and return Form A with the other
returnable as listed in the List of Tender Returnable document (240-12248652). Other roles and
responsibilities for this standard are defined within the text of this specification.
2.6 Process for Monitoring
The application of this specification throughout Eskom shall be audited as per the management
system audit schedule.
2.7 Related/Supporting Documents
The documents superseded by this specification: all divisional and business unit supplier quality
requirements standards and/or specifications.
Forms and templates:
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The quality assessment criteria and Form A of this specification will be selected and completed by
an Eskom Quality representative/ professional who will identify the applicable supplier quality
requirements to be met.
Form A of this specification must also be completed and signed by the supplier responding to an
Eskom invitation to tender, in order to acknowledge and accept Eskom Supplier Quality requirements
as per this specification and ISO 9001 Standard or any additional quality requirements specific to
the scope of work.
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) and in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001 and may include a quality manual, quality plans, work procedures, work
instructions, method statements, work flow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub-supplier’s scope of responsibility includes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.6 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-supplier’s scope of
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.1.7 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.8 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
Verification of the QMS
Audits and surveillances
Regular assessment of the CQPs and reviews of QCPs.
NC and Defect Management
Inspection and test plans
Risk management
3.2 Quality Plan
The information in this section constitutes the minimum requirements for a quality plan.
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables , as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained contract
quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract quality plan (CQP) and/ or quality control plan (QCP)/ inspection and test
plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
supplier’s quality system in order to demonstrate its ability towards both controlling and
meeting specified Eskom requirements.
Note 1: Contract Quality Plan should address the quality assurance elements related to the scope
of work and/ or technical specification.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-supplier’s scope of work.
The supplier shall, where applicable, based on scope of work criticality, ensure that procurement
documents clearly and unambiguously require sub-supplier submission of a sub-supplier CQP for
supplier and Eskom review.
The main supplier shall ensure that sub-supplier CQPs are developed and implemented in
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans. In
addition to the elements specified in ISO 10005, the supplier’s and/ or sub-suppliers’ CQPs shall
include the following (as applicable):
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding: management of the welder’s qualification record
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture. The personnel carrying out special processes (for
example, NDE, welding, coating, heat treatment, etc.) where the results cannot be fully
verified by subsequent inspection and test shall be suitably qualified and, where applicable,
registered with statutory bodies as legally required, that is, as radiographic workers to conduct
radiography. The requirements for the qualification shall be specified, and personnel records
shall be maintained in accordance with the Project Quality Personnel Qualification
Specification and, where applicable, legal requirements.
3.3.6 The personnel required to perform special processes shall be certified competent through a
certificate of competency in accordance with the company’s internal training management
and competency control procedures or an external certification body (for example, NDT)
through an accredited service provider as per Skills Education Training Authorities (SETA)
requirements.
3.3.7 All personnel who perform activities that affect quality shall have their training needs identified
and documented. The required training shall be implemented in accordance with the
company’s training management and competency control procedures. All the training
certificates shall meet the SETA requirements in terms of having the unit standard completed
and the accreditation number of the service providers.
3.3.8 Instructions and requirements for equipment and materials storage, preservation, and
maintenance, including identification of materials required for preservation and maintenance,
are to be provided sufficiently prior to receipt (prior to shipment or earlier) to ensure that
appropriate resources are available at the time of delivery.
3.3.9 Specific quality monitoring and verification activities are to be undertaken on the supplier’s
sub-suppliers by Eskom or it agent.
3.3.10 The CQP information need to include, but not limited to:
Spells out the aspects of the QMS to be applied within a specific Eskom project, and the
methods to be utilised to ensure quality.
Outline the resources, the communication channels, applicable documents and records to be
generated.
Management Authority and Responsibility from both supplier and client need to outline in the
Cqp.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
List of documents and records that will be used and submitted during the execution of the
project.
Communications channels should include contact person and contact details
Monitoring & measurement procedures for activities need to be indicated.
3.3.11 The main supplier and sub-supplier CQPs shall comply with the Eskom Quality Requirements
Specifications and shall be submitted prior to the initial scope of work kick-off or initial pre-
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.12 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.4 Quality Control Plan
The supplier shall develop and implement processes and procedures that efficiently and effectively
monitor, verify and document the quality of the scope of work for deliverables.
The main supplier shall ensure that sub-supplier QCPs/ ITPs are prepared at a level of detail
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
supplier’s QCP/ ITP that clearly and unambiguously identifies the quality verifications to be
performed and special attention to controls related to critical products and services.
3.4.2 QCP/ ITP shall be reviewed and accepted by Eskom, its inspection authority or agency, and
they shall allow for the insertion of Eskom specific requirements, including hold and witness
points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
authority or agency’s agreement prior to the commencement of work involving an activity
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
Qcp/ itp.
3.4.6 All applicable codes, standards, and relevant acceptance criteria documents are available at
the work location, and Eskom representatives on site shall have on-going access to this
information. Workplace documentation shall be available in English and in any workforce-
appropriate language.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub-supplier’s involvement. A separate QCP/ ITP shall be required for each sub-
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
be reviewed at Eskom’s discretion based on its assessment of the supplier’s performance or
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
Eskom contract number and title
The supplier’s order number
Identification of the area of works/contract
Description of the work, with components, item number, and activity date
QCP/ITP unique number
A list of the sequence of operations, including inspection and tests
The identification of the specification, drawing number, or procedure for each operation,
with reference to the relevant criticality risk rating
The acceptance criteria, with reference to the technical specification, in-house, national, or
international standard, with the relevant clause number for each operation
The inspection and test activities that the supplier has nominated for its intervention points
Provision for the inclusion of intervention points nominated by Eskom and/or its authority/
agency
Provision for intervention point acceptance by date and signature for all parties having
intervention in the plan
Inspection and test records to be generated by the supplier for each operation and an
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Specifications, including, but not limited to, the following requirements:
Clear and unambiguous description of the equipment and location(s) at which each activity
will take place, including facility location(s)
Identification of quality verification activity and stage
The details of reference documents, procedures, or method statements to be utilised in
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Definition of acceptance criteria
Listing of certifying or verifying documents generated to provide evidence of compliance
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
Identification of main supplier and sub-supplier (where applicable) third-party/approved
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
Qualification requirements for quality control inspectors, including any third-party/AIA
inspectors
Listing of all proposed test procedures
Acceptance criteria for each inspection or test in alignment with specified tolerances
A section for signed acceptance of the QC/ITP by the supplier, sub-supplier (where
applicable), and Eskom prior to commencement of work
Inspection or testing intervention points, including, but not limited to, factory acceptance test
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
The supplier shall arrange coordination meetings with Eskom prior to placement of orders
for items or equipment to ensure that all technical and commercial requirements are clear
and understood. Fourteen days’ advance notice of meetings shall be given to Eskom.
Supplier inspection personnel, including inspection agency personnel, shall be competent
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
Specification.
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
Requirements for inspection checklists and inspection assignments, with lists of items to be
inspected
An inspection and testing report format, report content, schedule for report processing and
distribution, and report retention requirements
Inspection and test report results response tracking (log) and resolution of nonconformity in
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
Associated Failure Mode, Effects and Criticality Analysis (FMECA) reports relating to the
equipment and sub-systems (if applicable)
Hazard and Operability Study (HAZOP) report, as applicable
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-supplier’s
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
AIA to be attended by the supplier’s and sub-supplier’s representatives, including their quality
representatives who will be involved in the works, and records are to be kept.
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
supplier’s or sub-supplier’s premises and on site where the work is being performed. The
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
3.5 Pre-Contract Award: Quality Requirement
3.5.1 Main Supplier and Sub-supplier Categories
Eskom supplier quality requirements for all existing and potential suppliers and sub-suppliers are
classified into four categories (category 1, 2, 3 and 4). Suppliers must prepare and submit quality
documentation as per the tender selected category (indicated in Form A) using the list of tender
returnables document.
NOTE: Only one (1) category must be applicable per procurement process e.g. [Eskom requests for
information (RFI)/ requests for quotation (RFQ)/ requests for proposal (RFP), including contracts for
the procurement of products and services].
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The following are the minimum returnable documentation for Categories 1 to 4:
3.5.2 Category 1: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a valid copy of ISO 9001 or any applicable certificate of a QMS (the
latest applicable revision). The QMS should drive the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal and external
audit reports. The audit reports must include, if applicable, nonconformity identified, and the
resulting remedial actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit a draft, or an example of an inspection and test
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
3.5.3 Category 2: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed, implemented and maintained QMS
that complies with ISO 9001 or any applicable standard of quality management system (the latest
applicable revision). The following documents (approved/ signed copies) shall be submitted:
Quality Management System manual or a documented information that have defines and
describes the QMS and its scope
Quality Policy, aligned with the supplier’s strategic direction (documented information)
Quality Objectives (documented information)
Control of documented information (both maintain and retain documented information )
Internal audit procedure (documented information)
Control of nonconforming outputs (documented information)
Nonconformity and Corrective action procedure (documented information)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal audit reports. The
audit reports must include, if applicable, nonconformity identified, and the resulting remedial
actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example of inspection and test plan (ITP) or
quality control plan (QCP) on similar or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
document (240-12248652).
3.5.4 Category 3: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed QMS that complies with ISO 9001
(or the latest applicable revision). The following documented information (approved/ signed
copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information )
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example inspection and test plan (ITP) or
quality control plan (QCP).
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
NB: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.5.5 Category 4: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a quality method statement based on ISO 9001 and specific to the
scope of work.
The quality method statement should address all the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit a signed/ approved quality policy (aligned with the supplier’s strategic
direction). (documented information)
The supplier shall submit a copy of quality objectives. (documented information)
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of the documented information for roles, responsibilities and
authorities, specific to the project/ scope of work/ technical requirements. Examples of relevant
documented information are; organization charts, job descriptions, work instructions, duty
statements, manuals, procedures.
Note: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment
Supplier capability and capacity assessments shall be performed prior to contract award on potential
suppliers participating in Eskom Holdings procurement process to:
provide products and services with high risk to operational sustainability
work on critical plant and equipment
supply of critical plant items or components
provide special processes
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
All sub-suppliers used by the main supplier/ contractor, performing work on Eskom critical plant
equipment, supplying commodities and providing specialised services shall be subjected to the
capability and capacity assessment.
Critical plant includes the following:
Generation Level 1 & 2 plant
Transmission and Distribution Power Plant & Control Plant
Mega Projects
All potential quality risks identified will be included in the assessment report provided for the tender
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted.
3.7 Post-Contract Award
3.7.1 Contract Execution
The supplier shall submit the following documents within 30 days or as per stated timeline after the
contract date, prior to the commencement of work, for acceptance by Eskom:
The supplier shall complete a QCP before contract award. This shall be reviewed and
signed off by Eskom within 30 days or as per stated timeline after contract award.
The supplier shall complete a quality control plan and ITP(s) for review and acceptance by
Eskom prior to the commencement of any work, inclusive of subcontracted work, within 30
days or as per stated timeline after contract award.
The sub-supplier QCP/ ITP shall be submitted for review and comment by the supplier and
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
The equipment lists and an indication of pressurised components and systems.
Note: These plans are to be compiled in line with Eskom’s requirements and will have to be
discussed with, and approved by, Eskom prior to any work commencing.
Correspondence shall be directed to the project manager, and periodic quality review
meetings shall be convened by Eskom with the supplier.
The mandatory quality review meetings are to be convened by the nominated project quality
manager or his/her representative for the contract.
Monthly quality performance and management reports are to be prepared by the supplier
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.2 Supplier Quality Performance Monitoring Phase
During the contract execution phase, suppliers shall be monitored by Eskom for performance on
quality-related aspects.
The outcomes of such monitoring will enable Eskom to take any appropriate actions pertaining to
the supplier.
The monitoring shall be carried out periodically by Eskom or at predetermined intervals during the
execution of a contract using agreed key performance indicators. The monitored key performance
areas include the following:
CQP and QCP /ITP
Delivery
Design
Cost
Management system
Subsequent key performance indicators associated with these areas will include the following:
Nonconformity monitoring
Audit and assessment evaluation scoring
Management system compliance and accreditation
Achievement of delivery targets as per contractual agreements
Process improvements
Correction and corrective action response and closure
3.7.3 Supplier Quality Audit
3.7.3.1 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.2 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers
3.7.3.3 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.4 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.3.5 Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with procedures documented in the
Cqp.
3.7.3.6 The supplier shall submit, for Eskom review, documented processes for conducting project
scope of work quality audits and related quality performance reviews. Supplier quality audits
and related quality performance review processes shall be designed to address evaluation
of progress towards completion of project functional area deliverables as well as final
deliverable quality.
3.7.3.7 The supplier shall provide a schedule of anticipated quality audits covering all functional
areas and related quality performance reviews at the time of first post-contract award CQP
submission.
3.8 Standard Conditions
3.8.1 Rights of Access
Eskom:
3.8.1.1 shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
3.8.1.2 reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
3.8.1.3 reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
The supplier:
3.8.1.4 shall support Eskom’s effort to monitor, verify, and/or witness any activities associated with
the work at any time;
3.8.1.5 shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
3.8.1.6 shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
3.8.1.7 shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
3.8.1.8 shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
Eskom’s suppliers to assist with the product and/or service delivery to Eskom; and
3.8.1.9 shall ensure that the above requirements flow down to sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.2 Eskom Rights to Information
3.8.2.1 To expect that the works will be conducted in accordance with the contract between the
parties.
3.8.2.2 To have access to the supplier’s information as determined by applicable legislation.
3.8.2.3 Eskom reserves the right to oversee the supplier’s audit programmes by participating in
selected audits as an observer and by assessing the supplier during key work stages.
Eskom will coordinate with the supplier to develop an oversight schedule aligned with the
supplier’s audit schedule.
3.8.2.4 To obtain access to any audit reports of audits performed by the supplier reflected in the
audit programme.
3.8.2.5 To conduct independent quality audits during all phases of the contract, and the supplier
shall provide all resources to support these activities.
3.8.2.6 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.2.7 To participate in, and/or lead, investigations related to incidents involving its products.
3.8.2.8 To require from suppliers to be responsible for the cost of re-inspections.
3.8.2.9 To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
3.8.2.10 Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
3.8.2.11 Reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as
well as any documentation, materials, or equipment associated with the work, at any time or
project work location.
3.8.2.12 Shall carry out assessments and audits on all new suppliers and sub-suppliers.
3.8.2.13 Reserves the right to appoint resident quality inspectors who can be based at the supplier’s
or sub-supplier’s premises and on site where the work is being performed.
3.8.2.14 Reserves the right to select intervention points within all developed supplier QCPs/ ITPs
for Eskom oversight of selected functions and to perform surveillance or audits of the work.
3.8.2.15 Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.2.16 Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3 Preservation
The supplier shall develop and implement a comprehensive preservation programme consisting of
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
3.8.3.1 Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
3.8.3.2 Development and implementation of preservation programme training appropriate to work
need.
3.8.3.3 Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not
limited to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-supplier’s testing facilities, processing plant, and any other processes
deemed important towards effective and efficient quality control.
3.8.3.4 Eskom seeks cooperation between the supplier’s designers and those of Eskom’s service
provider in ensuring seamless installation of the device and other associated installations.
Moreover, there is also a need to integrate data flows and systems between Eskom and the
supplier. Further details are included in the Eskom specifications and works information.
3.8.3.5 Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
3.8.3.6 Review and tracking of compliance with sub-supplier provided preservation requirements
and recommendations.
3.8.3.7 Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
3.8.3.8 Preservation work plan development and plan execution performance evaluation of all
parties engaged for provision of material transportation, handling, or storage services.
3.8.3.9 Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
3.8.3.10 Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
3.8.3.11 The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term “physical assets” should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.12 Where the project responsibility for equipment and materials management has been
formally delegated, the supplier’s preservation programme shall ensure clear and
unambiguous communication of pre-operation preservation of goods quality requirements
to sub-suppliers.
3.8.3.13 The supplier’s preservation programme shall clearly and unambiguously document
processes and procedures for efficient and effective monitoring of compliance with
programme requirements.
3.8.3.14 Compliance monitoring shall commence with ensuring comprehensive consideration of
preservation requirements in the engineering instruction and subsequent inclusion of said
instruction in procurement documentation and shall be applicable until such time as
equipment or materials have been incorporated in an operating or operational system or
structure.
3.8.3.15 Compliance evaluation frequency shall anticipate transfer of tactical-level responsibility for
management of preservation responsibilities between project functional areas, for example,
procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to
construction, etc., and shall, in similar fashion, anticipate transfer of support for tactical-level
responsibility between various subcontracted service providers.
3.8.3.16 Supplier engineering shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project procurement, logistics, construction management,
quality, security, and other project functional areas, as required, for efficient and effective
implementation of preservation requirements. This shall take the form of a preservation
programme applicable to all systems, system components, equipment, materials, customer-
supplied materials, and other goods procured or managed under the scope of work.
3.8.3.17 The supplier’s preservation management programme shall clearly and unambiguously
address temporary, long-term, and in-transit preservation requirements, including, but not
limited to:
requirements for protection against, or insulation from, atmospheric conditions,
sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, or
other physical environment conditions;
detailed procedures for application, use, monitoring, and maintenance of coatings,
coverings, fasteners, lines, and other components for internal and external weather
proofing;
requirements for electrical grounding or isolation;
requirements for internal or external environment creation, for example, inert gas
charging, heating, cooling, etc., inclusive of gas storage, electric power supply, etc.;
detailed procedures for initial set-up, charging, activation, and maintenance of
internal atmosphere generation, regeneration, monitoring, and relieving systems, for
example, inert gas management systems;
requirements for protection against, or insulation from, vibration or long-period
cyclical motion in transit, for example, wave-generated movement during sea
transport;
internal and external structural integrity protection, for example, internal and external
bracing, padding, framing, chocking, etc.;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
support structure requirements, for example, stools, pads, or other devices,
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
provision for physical separation and/or barriers to prevent airborne or direct
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
provision for, and final disposition of, temporary and longer-term storage or transit
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
provision of requirements for temporary work platforms or other support structures
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
requirements for protection against, or insulation from, contact with other objects, for
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
clear physical delineation of temporary and longer-term storage areas supplemented
by hard and soft barriers, as required, to maintain a protective perimeter;
documented agreements with storage facility and transportation provider
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain
preservation status.
3.8.3.18 The supplier’s preservation management programme scope shall encompass
management of preservation requirements, from initial transfer of ownership or management
responsibility to project scope of responsibility, through any period of temporary or longer-
term storage and through any period of transit, including transit for final delivery at point of
active use or installation.
3.8.3.19 The supplier’s preservation management programme shall clearly and unambiguously
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.20 The supplier’s preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components,
mechanical and rotating equipment, piping and fittings, instrumentation, flange faces,
gaskets, coatings, insulation, and other materials. Special precautions include, but are not
limited to, supplier-specified maintenance procedures related to engines, electric motors,
pumps, compressors, etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
3.8.3.21 The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
3.8.3.22 Where sub-supplier expertise is utilised in determination of the preservation protocol,
supplier procurement processes shall ensure clear and unambiguous documentation of sub-
supplier input into preservation management programme requirements.
3.8.3.23 Supplier procurement shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements.
3.8.3.24 The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
3.8.3.25 The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation
management programme execution.
3.8.3.26 The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
3.8.3.27 The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.4 Quality Audits Related Conditions
3.8.4.1 The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
3.8.4.2 The supplier’s quality audit and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
3.8.4.3 Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the supplier to develop an oversight schedule aligned with the supplier’s
audit schedule.
3.8.4.4 Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
3.8.4.5 Eskom reserves the right to conduct independent quality audits, scheduled and
unscheduled, during all phases of the contract. The supplier shall provide all resources to
support these activities.
3.8.4.6 Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
the products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.4.7 The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
3.8.4.8 The assessments and audits shall be carried out on all new suppliers and their sub-
suppliers.
3.8.4.9 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.4.10 Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by Eskom
3.8.5.1 Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
3.8.5.2 A formal response shall be prepared in respect of the defined criteria and submitted to
Eskom for its review, evaluation, and acceptance, within a maximum of 14 calendar days
from the date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
3.8.5.3 Eskom may, at its discretion, request a response sooner and, in any case, before the
supplier proceeding with any pending/further intervention or corrective action, as may be
required by Eskom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.5.4 Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
3.8.5.5 The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
any action to rescind/withdraw the supplier’s qualification status.
3.8.5.6 Nonconforming outputs identified by Eskom shall be documented via a NC Report and
issued to the suppliers via the contract communication protocol. The suppliers shall
investigate the matter and respond in writing to Eskom of disposition within the stated
contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
3.8.5.7 Eskom shall identify repeat deficiencies as systematic failures of the supplier’s QMS and
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
Cause Analysis. In such cases, QMS rectification and/ or update measures shall be taken
immediately.
3.8.5.8 Should the Supplier fail to respond and rectify nonconforming products within stipulated
contractual conditions. The Project Manager should apply contractual remedies in
accordance with Fidic/ NEC contract.
3.8.5.9 Repeated Nonconformities; if there are any identified repeat nonconformities from the same
supplier within a period of 6 months or less. This must then be escalated to the management
review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not resolved, then
the matter must be escalated to the supplier review committee for recommendation.
3.8.6 Special Processes
The following requirements shall be applicable as well as additional requirements as specified in the
scope of work for the provision of the following special process services:
3.8.6.1 The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
3.8.6.2 This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
3.8.6.3 All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
3.8.6.4 Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
3.8.6.5 Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.6.6 The supplier shall ensure that all operators are suitably qualified for these processes in
accordance with the procedures, processes and/ or applicable standards/ codes.
3.8.6.7 The records of qualification of procedures, processes and operators shall be maintained by
the supplier in accordance with the applicable procedure or code and these made available
to Eskom at all times.
This document has been seen and accepted by:
Name Designation
Kerseri Pather General Manager: Risk and Sustainability
Lenock Meyer Acting Senior Manager: Quality Management
Pamela Dondashe Middle Manager: Quality Assurance
Mandla Mkhwanazi Middle Manager: SHEQ Procurement and Supply Chain Management
Suzette Manthe Senior Advisor: Quality Performance and Planning
Lorna Ndlela Middle Manager: Eskom Document and Records Management
Date Rev. Compiler Remarks
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
The following people were involved in the development of this document:
Andrew Else
Bongi Tshabalala
Feziwe Mogamisi
Lesego Garegae
Patrick Thwane
Xolani Zuma
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Eskom Operational Quality Forum Members
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Important Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Closing date: 30 June 2026 at 11:00 AM.
Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Department: Supply Chain Management. Note: No specific names, emails, phones, or addresses provided in the document.
Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Submit all returnable documents as specified in the List of Tender Returnables (240-12248652) for the selected category (1-4). Ensure Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001) is completed, signed, and returned with other required documents.
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)General: Must be a registered supplier on Eskom’s database. Must demonstrate financial and technical capability to fulfill the 36-month contract. Must comply with South African laws and Eskom’s SHEQ Policy. Must adhere to PPPFA for B-BBEE compliance. Quality-Specific: Must have a valid ISO 9001 certification unless exempted by the tender category. Must submit all tender returnables as per the List of Tender Returnables (240-12248652) for the selected category. Must pass Eskom’s supplier capability and capacity assessment for high-risk/critical supplies. Must allow Eskom unrestricted access to facilities, records, and sub-suppliers for audits/inspections.
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Scope: Supply, delivery, offload, transport, and storage of stationery for a 36-month period. Quality Management: Suppliers must develop, implement, maintain, and continually improve a Quality Management System (QMS) based on ISO 9001. The QMS must conform to Eskom’s quality requirements and be adhered to throughout the contract duration. Suppliers must submit a Contract Quality Plan (CQP) and/or Quality Control Plan (QCP)/Inspection and Test Plan (ITP) as specified in the tender. Sub-suppliers must also comply with these quality requirements if involved in design, manufacturing, testing, or other critical activities.
Methodology
Source: 240-105658000 Supplier Quality Management Specification (3).pdfSuppliers must provide a clear and unambiguous methodology for delivering the scope of work. This includes: Detailed description of equipment, locations, and facility addresses. Identification of quality verification activities and stages. Reference to applicable documents, procedures, or method statements, including specific sections and pages. Definition of acceptance criteria. Listing of certifying or verifying documents to provide evidence of compliance. Identification of inspection and testing intervention points, including witness and hold points. Suppliers must use Eskom’s templates for Contract Quality Plans (CQPs) and Quality Control Plans (QCPs)/Inspection and Test Plans (ITPs) if they do not have their own.
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdfSuppliers must demonstrate experience and qualifications relevant to the scope of work. Quality audits and performance reviews must be conducted by trained, accredited, and experienced personnel. Suppliers must submit documented evidence of their QMS, including internal and external audit reports, management review records, and corrective action reports. Sub-suppliers must also meet these experience and qualification requirements if involved in critical activities.
Quality Management
Source: 240-105658000 Supplier Quality Management Specification (3).pdfSuppliers must develop, implement, maintain, and continually improve a Quality Management System (QMS) based on ISO 9001. The QMS must conform to Eskom’s quality requirements and be adhered to throughout the contract. Suppliers must submit a Contract Quality Plan (CQP) and/or Quality Control Plan (QCP)/Inspection and Test Plan (ITP) as specified. QCPs/ITPs must be reviewed and accepted by Eskom before work commences. Suppliers must ensure sub-suppliers also comply with these quality requirements. Eskom reserves the right to perform audits, inspections, and assessments at any time. Suppliers must allow Eskom access to all quality-related information and facilities. Nonconformities must be addressed promptly, with root cause analysis and corrective actions documented and submitted to Eskom.
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Must comply with South African laws, including the Preferential Procurement Policy Framework Act (PPPFA) for B-BBEE. Must adhere to Eskom’s SHEQ Policy (32-727). Must have a valid ISO 9001 certification unless exempted by the tender category. Must submit all required tender returnables as per the List of Tender Returnables (240-12248652). Must allow Eskom unrestricted access for audits and inspections. Sub-suppliers must also meet these compliance requirements if involved in critical activities.
Health & Safety
Source: 240-105658000 Supplier Quality Management Specification (3).pdfSuppliers must comply with Eskom’s Safety, Health, Environment, and Quality (SHEQ) Policy (32-727). All activities must adhere to applicable health and safety regulations. Suppliers must ensure that personnel are suitably qualified and trained for their roles, particularly for special processes. Workplace documentation must be available in English and any other workforce-appropriate language. Suppliers must provide a safe working environment and ensure that all operations meet Eskom’s SHEQ standards.
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdfEskom Rights of Access: Eskom shall have electronic and hard-copy access to all quality plans, procedures, documentation, and records. Eskom reserves the right to review, inspect, and audit any part of the supplier’s QMS, documentation, materials, or equipment at any time or location. Eskom may carry out assessments and audits on all new suppliers and sub-suppliers. Supplier Obligations: Support Eskom’s monitoring, verification, and witnessing of activities. Cooperate with Eskom requests for documentation, records, and inspections at no extra cost. Ensure sub-suppliers provide Eskom access to all work procedures, records, and supporting documentation. Allow Eskom to assess, audit, approve, or reject any sub-suppliers. Ensure these requirements flow down to sub-suppliers. Preservation: Supplier must develop and implement a preservation program for materials, including protection against environmental conditions, proper storage, and maintenance of quality until delivery. Eskom may appoint resident quality inspectors at the supplier’s or sub-supplier’s premises at no cost to Eskom. Nonconformities: Supplier must investigate and respond to nonconformity reports within 14 calendar days. Eskom may withhold payment for outstanding nonconformities. Repeated nonconformities may lead to escalation and potential rescinding of supplier qualification status. Special Processes: All special processes (e.g., welding, non-destructive testing) must be pre-qualified, and operators must be certified. Records of qualifications must be maintained and available to Eskom.
Section
Source: 240-105658000 Supplier Quality Management Specification (3).pdfSupplier Quality Management: Specification Unique Identifier: 240-105658000
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
implementation, and maintenance of a quality management system (QMS) that conforms to the
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
inspection, hold points, surveillances, witnesses, reviews and verifications.
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
Title: Supplier Quality Management: Document Identifier: 240-105658000
Functional Area: Quality Management
Quality Quality Manager Quality Risk and
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Mandatory returnable: E-Tenderers E-Tendering Training Acknowledgement Form must be fully completed and submitted to Eskom within the prescribed period. Failure to submit this form or incomplete submission will disqualify the tenderer from the procurement process.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Mandatory: Completion of e-tendering training and submission of the acknowledgment form. Disqualification: Non-submission or incomplete submission of the form renders the tenderer non-responsive. Technical: Ability to operate the E-Tendering Solution.
Description
Source: Supply Contract Stationery Distribution rev (003).pdfContact Information
Source: Supply Contract Stationery Distribution rev (003).pdf (unknown)Submission Guidelines
Source: Supply Contract Stationery Distribution rev (003).pdf (unknown)Evaluation Criteria
Source: Supply Contract Stationery Distribution rev (003).pdf (unknown)Technical Specifications
Source: Supply Contract Stationery Distribution rev (003).pdf (unknown)Methodology
Source: Supply Contract Stationery Distribution rev (003).pdf (unknown)Quality Management
Source: Supply Contract Stationery Distribution rev (003).pdfPricing Schedule
Source: Supply Contract Stationery Distribution rev (003).pdfFinancial Requirements
Source: Supply Contract Stationery Distribution rev (003).pdf (unknown)Compliance Requirements
Source: Supply Contract Stationery Distribution rev (003).pdf (unknown)Health & Safety
Source: Supply Contract Stationery Distribution rev (003).pdfEnvironmental
Source: Supply Contract Stationery Distribution rev (003).pdfContractual Terms
Source: Supply Contract Stationery Distribution rev (003).pdfSpecial Conditions
Source: Supply Contract Stationery Distribution rev (003).pdf (unknown)Section
Source: Supply Contract Stationery Distribution rev (003).pdfDescription
Source: E-tendering Help Manual for supplier - 27 January 2025.docxThe tender requires the supply, delivery, offload, transport or carry, and pack in store of stationery for a 36-month contract period. All bids must be submitted electronically via Eskom’s eTendering system, which replaces physical submissions at Eskom tender offices.
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)For system-related issues or difficulties with the eTendering, Tender Bulletin, or OpenText systems, contact the buyer responsible for the published tender. No direct contact details (email/phone) are provided in the document.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Submission must be done electronically via Eskom’s eTendering system (https://eTendering.eskom.co.za). Steps: 1) Register on the portal with valid details (a CSD number is mandatory for access). 2) Verify your email and the OTP sent to your registered cellphone/email. 3) Log in, select the tender reference number (E3019DXMWP), and review the tender details. 4) Click 'Create New Submission' and upload all required documents under the correct categories (e.g., Technical, Commercial, Finance). 5) Assign clear file names and select the appropriate file type for each upload. 6) Individual files must not exceed 50MB; the total submission size must not exceed 900MB. 7) Verify all documents are uploaded before clicking 'Finalize Submission'. 8) Confirm the submission via the pop-up message and save the confirmation email (including the submission ID) for future reference. Physical submissions are not accepted.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Evaluation is based on the ability to: 1) Successfully register and verify access to the eTendering system (CSD number required). 2) Correctly categorize and upload all required documents (Technical, Commercial, Finance, etc.). 3) Adhere to file size limits (50MB per file, 900MB total). 4) Use the web-based system effectively (compatible with most browsers; Microsoft Edge is recommended). Non-compliance with submission rules may result in disqualification.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Scope: Supply, delivery, offload, transport or carry, and pack in store of stationery for a period of 36 months. All submissions and document uploads must be completed via Eskom’s eTendering system, a web-based platform replacing manual/physical submissions at Eskom tender offices.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Mandatory: Suppliers must have a valid CSD (Central Supplier Database) number to access the eTendering system. No additional compliance requirements (e.g., B-BBEE, CIDB, tax clearance) are explicitly stated in the provided document.
Contact Information
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Fraud/corruption reporting: [email protected] or 0800 11 2722.
Submission Guidelines
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Submit the following returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Evaluation is based on the following criteria:
Technical Specifications
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Scope: Supply, delivery, offload, transport, and packing in store of stationery for a 36-month period.
Requirements:
Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfQuality control and rejection:
Pricing Schedule
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfPricing structure:
Financial Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Pricing and payment:
Compliance Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Statutory and legal compliance:
Contract terms:
Contractual Terms
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfContract basis:
Risk and ownership:
Termination and breach:
Indemnity and warranty:
Assignment and subcontracting:
Ethics and governance:
Evaluation Criteria
Source: Affidavit-QSE-Sample.pdf (unknown)Evaluation is based on B-BBEE compliance and financial capacity. Key points: All legal entity types (CC, (Pty) Ltd, Sole Proprietor, etc.) are eligible. Annual total revenue must be between R10,000,000 and R50,000,000. Must meet B-BBEE requirements as per the Amended Codes of Good Practice. Must declare Black Ownership, Black Female Ownership, and Black Designated Group Ownership percentages.
Compliance Requirements
Source: Affidavit-QSE-Sample.pdf (unknown)B-BBEE Requirements: Minimum B-BBEE Level: One (1). Bidders must submit a sworn affidavit confirming B-BBEE status as a Qualifying Small Enterprise (QSE). Affidavit must declare: Percentage of Black Ownership (as per Amended Code Series 100 of the B-BBEE Act). Percentage of Black Female Ownership. Percentage of Black Designated Group Ownership (with breakdown for Black Youth, Black Disabled, Black Unemployed, Black People in Rural Areas, Black Military Veterans). Annual Total Revenue for the latest financial year-end must be between R10,000,000.00 and R50,000,000.00. B-BBEE Contributor Level (e.g., 100% Black Owned = Level One with 135% procurement recognition; At Least 51% Black Owned = Level Two with 125% procurement recognition). Affidavit validity: 12 months from the date signed by the Commissioner of Oaths. Definitions: 'Black People': Africans, Coloureds, and Indians who are South African citizens by birth, descent, or naturalisation (before or after 27 April 1994, with conditions). 'Black Designated Groups': Unemployed Black people, Black youth, Black people with disabilities, Black people in rural/underdeveloped areas, Black military veterans.
Submission Guidelines
Source: 240-126469599_Method Statement template -rev 3 final (001).docx (unknown)Returnable Documents: Not specified in the provided document. Suppliers must refer to the official tender record (Eskom) for submission details, including deadline, format, and delivery address.
Evaluation Criteria
Source: 240-126469599_Method Statement template -rev 3 final (001).docx (unknown)General: Must be a registered legal entity in South Africa. Compliance with Eskom’s procurement policies and B-BBEE requirements (if applicable). Proven track record in stationery supply and logistics for large organizations. Financial stability to fulfill a 36-month contract. Technical: Ability to meet delivery timelines and quality standards for stationery. Capacity to handle transport, offloading, and in-store packing as per Eskom’s specifications. Adherence to NEC contract terms and Works Information details. Certifications (e.g., ISO 9001) may be advantageous. Documentation: Valid tax clearance certificate. Company CIPC registration documents. Method Statement as per tender template. Health and Safety (H&S) compliance documentation (e.g., COIDA, OHS Act).
Technical Specifications
Source: 240-126469599_Method Statement template -rev 3 final (001).docx (unknown)Scope of Work: Supply, delivery, offload, transport, and storage of stationery for 36 months. Method Statement Requirements: Title must match tender/RFQ title. Include supplier representative details (full name, designation, contact number, date). Outline scope of work as per Works Information of the NEC document. Define 2-3 SMART objectives (Specific, Measurable, Achievable, Realistic, Time-bound) for the scope. Organizational Requirements: Clearly communicate mission, vision, values, and policies. Identify and communicate customer needs via meetings, websites, telephone, email, or other means. Implement feedback mechanisms (email, phone, surveys, meetings) for complaints, concerns, and service/product issues. Competency and Training: Specify skills, competencies, and training required for delivery. List any accreditation or industry requirements for products/services. Infrastructure and Compliance: Detail infrastructure, tools, equipment, and PPE required. Describe measures to protect client property (materials, tools, premises, IP, personal data). Limit access to intellectual property or confidential data post-contract. Identify statutory/regulatory requirements and mitigation measures. Risk Management: List risks associated with delivery and actions to mitigate them. Address non-conformances or substandard work during execution. Explain processes for improving efficiency and effectiveness. Data and Analysis: Describe data collection and analysis methods for customer satisfaction, product conformity, and external provider performance. Outline resolution processes for rework or scrapping. Supplier Management: If outsourcing, provide supplier selection criteria, evaluation, and performance monitoring processes.
Description
Source: SDL&I Strategy Setting for Bidders.pdfSupply, delivery, offload, transport, and pack in store of stationery for a period of 36 months.
Important Dates
Source: SDL&I Strategy Setting for Bidders.pdf (unknown)Contract duration: 36 months. SDL&I Implementation Schedule must be submitted within 28 days of contract award. B-BBEE improvement or retention plan must be submitted within 30 days of signing the contract. Quarterly SDL&I reports must be submitted to Eskom.
Submission Guidelines
Source: SDL&I Strategy Setting for Bidders.pdf (unknown)Submit the following returnable documents to claim preference points: Valid B-BBEE certificate (SANAS-accredited) or sworn affidavit (no electronic signatures), proof of ownership/shareholding (CIPC documentation), certified ID copies of shareholders, proof of disability (if applicable), and consolidated B-BBEE certificate for trusts/consortia/joint ventures. Failure to provide these documents will not disqualify the bidder but will result in scoring only out of 80 for price and 0 out of 20 for specific goals. Objective criteria, if included, must align with PPPFA clause 2(1)(f) and clearly state consequences (e.g., non-compliance may lead to the second-ranked tenderer being recommended). Quarterly SDL&I progress reports must be submitted to Eskom. Retention of 2.5% of invoice value (excluding VAT) applies until SDL&I obligations are fulfilled, including submission of approved compliance reports.
Evaluation Criteria
Source: SDL&I Strategy Setting for Bidders.pdf (unknown)Scoring uses an 80/20 system: 80 points for price and 20 points for B-BBEE status. Points for B-BBEE are allocated as follows: Level 1 (20), Level 2 (18), Level 3 (14), Level 4 (12), Level 5 (8), Level 6 (6), Level 7 (4), Level 8 (2), Non-compliant (0). The contract is awarded to the tenderer with the highest total points. Objective criteria, if included, must align with PPPFA and may lead to disqualification if not met. SDL&I commitments are contractual but do not form part of scoring. Failure to meet SDL&I obligations may result in penalties (2.5% of invoice/contract value) or retention of payments.
Technical Specifications
Source: SDL&I Strategy Setting for Bidders.pdf (unknown)Scope: Supply, delivery, offload, transport, and packing in store of stationery for a period of 36 months. Local procurement content must be 100% (value added in South Africa by South African resources). Tender responses must separate local and imported components as per the Price Schedule. Skills development: Obligation to skill one candidate for every R500,000 spent cumulatively, with implementation required one month after the threshold is reached. Jobs: Create and retain jobs locally (Gauteng-Johannesburg), including warehouse assistants, picker-packers, delivery support staff, contract administrators, inventory controllers, and drivers.
Methodology
Source: SDL&I Strategy Setting for Bidders.pdfSkills development must involve the tenderer’s supply network and may include SETA-accredited training providers. Tenderers are responsible for the full cost of skills development, with no financial contribution from Eskom. Tenderers are advised to access SETA grants, subsidies, and SARS tax rebates for skills development initiatives. SDL&I penalties of 2.5% of invoice or contract value apply for non-compliance. Eskom retains 2.5% of every invoice (excluding VAT) as security for SDL&I obligations.
Pricing Schedule
Source: SDL&I Strategy Setting for Bidders.pdfTender responses must separate local and imported components as per the Price Schedule. Local procurement content is total spending minus the imported component.
Financial Requirements
Source: SDL&I Strategy Setting for Bidders.pdf (unknown)Pricing must be submitted as per the Price Schedule included in the tender documents. Local procurement content is calculated as total spending minus the imported component. Eskom retains 2.5% of every invoice (excluding VAT) as security for SDL&I obligations. Penalties of 2.5% of invoice or contract value apply for failure to meet SDL&I obligations. Procurement from designated groups (Black Owned: 4%, Black Women Owned: 3%, Black Youth Owned: 2%, Black Persons with Disability: 1%) must be detailed in the tender response.
Compliance Requirements
Source: SDL&I Strategy Setting for Bidders.pdf (unknown)Valid B-BBEE certificate or sworn affidavit is mandatory for contract award. EMEs (≤ R10M annual revenue) and QSEs (≤ R50M, 51% Black-owned) may submit sworn affidavits; others require SANAS-accredited certificates. Proof of ownership/shareholding (CIPC documentation), certified ID copies of shareholders, and proof of disability (if applicable) are required. Sworn affidavits must meet validity criteria: deponent details, enterprise registration, ownership percentages, revenue, financial year-end, B-BBEE status level, empowering supplier status, and Commissioner of Oath signatures (no electronic signatures, no conflict of interest). B-BBEE improvement plans must be submitted within 30 days of contract signing. Non-compliance with B-BBEE targets (Levels 4–8 or non-compliant) requires migration to higher levels within specified timelines.
B-BBEE Requirements
Source: SDL&I Strategy Setting for Bidders.pdf (unknown)B-BBEE points allocation (80/20 system): Level 1 (20), Level 2 (18), Level 3 (14), Level 4 (12), Level 5 (8), Level 6 (6), Level 7 (4), Level 8 (2), Non-compliant (0). Valid B-BBEE certificate or sworn affidavit is required for contract award. EMEs (≤ R10M revenue) and QSEs (≤ R50M, 51% Black-owned) may submit sworn affidavits; others require SANAS certificates. B-BBEE improvement or retention plans must be submitted within 30 days of contract signing. Non-compliant tenderers must migrate to higher B-BBEE levels within specified timelines.
Special Conditions
Source: SDL&I Strategy Setting for Bidders.pdf (unknown)Objective criteria must align with PPPFA clause 2(1)(f) and clearly state consequences (e.g., non-compliance may lead to the second-ranked tenderer being recommended). SDL&I obligations are contractual. Eskom retains 2.5% of invoice value until SDL&I obligations are fulfilled, including submission of approved compliance reports. Quarterly SDL&I reports must be submitted, and corrective measures must be implemented if obligations are not met.
Section
Source: SDL&I Strategy Setting for Bidders.pdfA maximum of 20 points may be awarded for B-BBEE status under the 80/20 system. Points are added to the price score, and the total is rounded to two decimal places. The contract is awarded to the tenderer with the highest total points. Failure to provide B-BBEE documentation results in scoring only out of 80 for price and 0 out of 20 for specific goals.
Returnable Documents
Source: Affidavit-EME-Gen new.pdf (unknown)Affidavit Validity:
Evaluation Criteria
Source: Affidavit-EME-Gen new.pdf (unknown)Evaluation is based on B-BBEE compliance for Exempted Micro Enterprises (EMEs):
Compliance Requirements
Source: Affidavit-EME-Gen new.pdf (unknown)B-BBEE Compliance:
Requirements
Source: Affidavit-EME-Gen new.pdf (unknown)Financial Threshold:
Description
Source: Supplier Quality Management_Cat 4_List of Returnables Rev 7.xlsxThe tender involves the supply, delivery, offloading, transport, and storage of stationery for a 36-month period. Bidders must select the applicable category (e.g., Category 4) in the provided template by entering '1' in the relevant block (Column D) on the 'Cover' tab. Only one category may be selected to avoid errors.
Submission Guidelines
Source: Supplier Quality Management_Cat 4_List of Returnables Rev 7.xlsx (unknown)Submit the following returnable documents as part of your bid: Form A, ISO 9001:2015 certificate (or equivalent QMS documentation such as a QMS Manual, Quality Policy, and Quality Objectives), internal and external management system audit reports (including Nonconformity, Correction, and/or Corrective Action Reports), Draft Contract Quality Plan (CQP) and Inspection and Test Plan (ITP) as per Scope of Works (Reference: ISO 10005), and documented information for defined roles, responsibilities, and authorities. Save the completed template in PDF format, sign, and preferably lock the sheet before submission. Select only one category in the template (e.g., Category 4) by entering '1' in the relevant block (Column D) on the 'Cover' tab to avoid errors.
Evaluation Criteria
Source: Supplier Quality Management_Cat 4_List of Returnables Rev 7.xlsx (unknown)Evaluation is based on compliance with ISO 9001:2015 or equivalent QMS standards, with the following weighted sections: Section A (Quality Management System Requirements, 25%), Section B (Evidence of QMS in operation, 25%), Section C (Contract Quality Plan Requirements, 20%), Section D (Quality Control Plan Requirements, 20%), and Section E (User-defined additional requirements, 10%). Points are awarded for: valid ISO 9001:2015 certification (Option 1) or evidence of QMS in operation (Option 2), including QMS Manual, Quality Policy, Quality Objectives, audit reports, and documented roles and responsibilities. Suppliers must also submit a Draft CQP, ITP, and completed Form A.
Technical Specifications
Source: Supplier Quality Management_Cat 4_List of Returnables Rev 7.xlsx (unknown)The tender requires the supply, delivery, offloading, transport, and storage of stationery for a period of 36 months. Bidders must select the applicable category (e.g., Category 4) in the provided template by entering '1' in the relevant block (Column D) on the 'Cover' tab. Only one category may be selected at a time to avoid errors.
Compliance Requirements
Source: Supplier Quality Management_Cat 4_List of Returnables Rev 7.xlsx (unknown)Compliance with ISO 9001:2015 Quality Management System standards is mandatory. Bidders must provide evidence of either: Option 1 - Valid ISO 9001:2015 certification (with defined product/service scope, authorized certification body, recognized international accreditation, and valid expiry date), OR Option 2 - Evidence of QMS in operation, including a QMS Manual or document defining the QMS and its scope, Quality Policy and Objectives approved by top management, and documented information for roles, responsibilities, and authorities. Additional requirements include internal and/or external management system audit reports (not older than 12 months) with Nonconformity, Correction, and Corrective Action Reports.
Description
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdfThis document is the Eskom Supplier Integrity Pact, applicable to Eskom Holdings SOC Ltd and all its subsidiaries. It governs ethical behaviour for suppliers, requiring adherence to principles of fairness, transparency, equity, cost-effectiveness, and competitiveness. Suppliers must read, sign, and submit the Integrity Declaration Form for all Eskom procurement processes. The pact prohibits dishonesty, fraud, corruption, and anti-competitive practices (e.g., under-pricing, collusion, bid rigging).
Important Dates
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Closing date for Integrity Declaration Form submissions: 27 June 2023.
Contact Information
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Report ethical concerns to:
Submission Guidelines
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Bidders must:
Returnable Documents
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Required returnable documents:
Evaluation Criteria
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Eligibility to participate in tenders is contingent upon acceptance and compliance with the Eskom Supplier Integrity Pact.
Compliance Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Bidders must:
Contractual Terms
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdfContractual terms:
Special Conditions
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Special conditions:
Description
Source: 240-68099512 Form A Cat 4 Rev 9.docxTenderer must complete and sign the form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard.
Contact Information
Source: 240-68099512 Form A Cat 4 Rev 9.docx (unknown)Eskom’s Quality Representative: Sipho A Sambo, Middle Manager SQM (Acting), Signature Date: 2026/05/28.
Submission Guidelines
Source: 240-68099512 Form A Cat 4 Rev 9.docx (unknown)Returnable Documents: Tenderer must complete and sign the form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard.
Evaluation Criteria
Source: 240-68099512 Form A Cat 4 Rev 9.docx (unknown)General: Must be a registered supplier capable of meeting Eskom’s quality and logistical requirements. Must demonstrate compliance with ISO 9001 standards. Specific: Must fall under Category 4 as per Clause 3.5.5 of 240-105658000. Must agree to Eskom’s rights of access, information, and audit conditions.
Technical Specifications
Source: 240-68099512 Form A Cat 4 Rev 9.docx (unknown)Tenderer must acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard. Applicable clauses: Category 4 (Clause 3.5.5 of 240-105658000), Contract Execution (Clause 3.7.1), Supplier Quality Performance Monitoring Phase (Clause 3.7.2), Eskom Rights of Access (Clause 3.8.1), Eskom Rights to Information (Clause 3.8.2), Preservation (Clause 3.8.3), Quality Audits Related Conditions (Clause 3.8.4), Management of Nonconformities and Nonconforming Outputs (Clause 3.8.5), Special Processes (Clause 3.8.6). ISO 9001 principles applied: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, Relationship Management.
Compliance Requirements
Source: 240-68099512 Form A Cat 4 Rev 9.docx (unknown)Compliance with Eskom Supplier Quality Requirements (240-105658000 Specification) and ISO 9001 Standard is mandatory. Tenderer must sign the form to confirm acceptance.
Contact Information
Source: Non-Disclosure Agreement (NDA) Vendors Template -.docx (unknown)Eskom Holdings SOC Ltd. Physical address: Megawatt Park, Maxwell Drive, Sunninghill, Sandton. Postal address: P.O. Box 1091, Johannesburg, 2000, South Africa. Telephone: +27 (no specific number provided).
Evaluation Criteria
Source: Non-Disclosure Agreement (NDA) Vendors Template -.docx (unknown)General: Must be a legally registered company (local or international). Must have the authority to enter into binding agreements. Must demonstrate the capacity to supply, deliver, and manage stationery logistics for a large organization like Eskom. Compliance: Must agree to the terms of the Confidentiality Agreement (NDA). Must not have conflicts of interest or legal restrictions preventing compliance with the NDA. Technical: No explicit technical specifications are provided in the NDA, but suppliers must likely meet Eskom’s operational and quality standards for stationery supply and logistics.
Important Dates
Source: Invitation to Tender (ITT) Stationery.pdf (TENDER)Closing date: 30 June 2026 at 10:00. Non-compulsory clarification meeting: 24 June 2026 at 11:00 via Microsoft Teams (Join: https://teams.microsoft.com/meet/329369889361332?p=1UwUCupV4dYemimgNe, Meeting ID: 329 369 889 361 332, Passcode: va67XS3m). Clarification queries deadline: 5 working days before closing date (25 June 2026). Tender validity period: 120 days from closing date.
Contact Information
Source: Invitation to Tender (ITT) Stationery.pdf (TENDER)Eskom Representative: Tsepiso Moloi, Tel: +27 71 941 5891, Email: [email protected]. Submission address: Eskom E-tendering site (https://etendering.eskom.co.za). Fraud/corruption reporting: 0800 11 2722 or [email protected].
Submission Guidelines
Source: Invitation to Tender (ITT) Stationery.pdf (TENDER)Submit tender electronically via Eskom E-tendering site (https://etendering.eskom.co.za) by 30 June 2026 at 10:00. No late tenders accepted. Upload all documents in PDF format (max 500MB per file, total submission max 4GB). Price list must be submitted in both PDF and Excel. No zipped files or hard copies allowed. Latest submission version overrides previous ones; ensure submission status shows as 'complete'. Mandatory returnables at closing (disqualifiable if missing/incomplete): Authorisation Form (Annexure A), Acknowledgement Form (Annexure B), Tenderer’s Particulars (Annexure C), Integrity Declaration Form (Annexure D), CPA for Local Goods/Services (Annexure E, if applicable), SBD 6.2 Declaration Certificate (Annexures G1-G4, if applicable), SBD 1 (Annexure H), SBD 6.1 Preference Points Claim Form (Annexure I), SBD 4 – Bidders Disclosure (Annexure J). Non-disqualifiable returnables may be requested within 5 working days if incomplete or missing. Failure to submit mandatory documents by deadlines results in disqualification.
Evaluation Criteria
Source: Invitation to Tender (ITT) Stationery.pdf (TENDER)Eligibility criteria: Must not be on international sanctions lists or Eskom/State-Owned Companies restriction lists. No conflict of interest (e.g., shared majority shareholders, access to competitor information). Tenders must be signed by authorized persons only. Must not be on Tender Defaulters List or restricted by National Treasury. Cannot subcontract 100% of the scope of work. Joint ventures/consortiums: JV agreement must explicitly state joint and several liability, must operate as a single business entity (incorporated) for the contract duration, and must have a designated single bank account for the JV. Evaluation: 80/20 preference point system. Price (80 points): inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for acceptable variations, and evaluated on Net Present Value. Unconditional discounts considered for evaluation; conditional discounts applied at payment. Specific Goals (20 points): B-BBEE status level (Level 1: 20, Level 2: 18, Level 3: 14, Level 4: 12, Level 5: 8, Level 6: 6, Level 7: 4, Level 8: 2, Non-compliant: 0). Valid B-BBEE certificate or sworn affidavit (no electronic signatures) required to claim points. Failure to submit evidence scores 0 for Specific Goals but does not disqualify. Tie-breaker: higher Specific Goals score, then functionality (if applicable), then drawing of lots. Functionality requirements not applicable.
Methodology
Source: Invitation to Tender (ITT) Stationery.pdfMethodology requirements: Submit QM 58 Method Statement Template and List of Tender Returnables Documentation. Methodology must align with QM 58 and ISO 9001 standards.
Quality Management
Source: Invitation to Tender (ITT) Stationery.pdfQuality standards: Must comply with QM 58 (Supplier Quality Management Specification) and ISO 9001. Submit FORM A (Tender & Contract Quality Requirements for QM 58 and ISO 9001), QM 58 Method Statement Template, and List of Tender Returnables Documentation. Quality requirements are not evaluation criteria but must be met prior to contract award. Failure to meet quality requirements may result in disqualification.
Pricing Schedule
Source: Invitation to Tender (ITT) Stationery.pdfPricing schedule must be completed and submitted in PDF and Excel formats. Include line item for cataloguing if required. Pricing evaluated inclusive of VAT, corrected for errors, excluding contingencies, and adjusted for acceptable variations. Unconditional discounts considered for evaluation; conditional discounts applied at payment. Pricing schedule attached to NEC contract.
Financial Requirements
Source: Invitation to Tender (ITT) Stationery.pdf (TENDER)Pricing schedule must be completed and submitted in PDF and Excel formats. Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, and adjusted for acceptable variations. Unconditional discounts considered for evaluation; conditional discounts applied at payment. Payment terms: 30 days for contracts ≤ R50M (incl. VAT), 60 days for contracts > R50M (incl. VAT). Performance security (bond or demand guarantee) may be required; select minimum 2 Eskom-approved financial institutions. Cataloguing costs, if required, must be quoted separately in the pricing schedule.
Compliance Requirements
Source: Invitation to Tender (ITT) Stationery.pdf (TENDER)Mandatory contractual requirements: Proof of valid CSD registration (CSD number/report), COIDA certificate of good standing or proof of application (South African tenderers only), valid B-BBEE certificate or sworn affidavit (electronic signatures not accepted), tax compliance (SARS e-filing PIN or tax clearance certificate). For designated employers: proof of Employment Equity Act compliance, including submission of EE report to Department of Labour. Foreign tenderers with SA footprint: tax clearance certificate; foreign suppliers with no SA footprint: complete SBD1 (no tax compliance proof required). Joint ventures: submit JV agreement, confirmation of single business entity operation, and designated bank account details. Subcontracting with subsidiaries must be declared. CIDB grading not applicable. Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) not applicable.
Health & Safety
Source: Invitation to Tender (ITT) Stationery.pdfSafety compliance: Original COIDA certificate of good standing or proof of application issued by the Compensation Fund (COID) or a licensed compensation insurer (South African tenderers only). Mandatory for contract award.
Contractual Terms
Source: Invitation to Tender (ITT) Stationery.pdfContract terms: NEC3 Supply Contract with conditions X1 (Price adjustment for inflation), X2 (Changes in the law), X7 (Delay damages). Tender validity: 120 days from closing date. No public tender opening; tenders downloaded electronically. Prices not read out. Eskom may negotiate with preferred bidders if prices are not market-related. Payment terms: 30 days for contracts ≤ R50M (incl. VAT), 60 days for contracts > R50M (incl. VAT). Performance security (bond or demand guarantee) may be required; select minimum 2 Eskom-approved financial institutions. Subcontracting with subsidiaries must be declared.
Section
Source: Invitation to Tender (ITT) Stationery.pdfEvaluation based on 80/20 preference point system. Price (80 points): inclusive of VAT, corrected for errors, excluding contingencies, adjusted for variations, and evaluated on Net Present Value. Unconditional discounts considered; conditional discounts applied at payment. Specific Goals (20 points): B-BBEE status level (Level 1: 20, Level 2: 18, Level 3: 14, Level 4: 12, Level 5: 8, Level 6: 6, Level 7: 4, Level 8: 2, Non-compliant: 0). Valid B-BBEE certificate or sworn affidavit required to claim points. Failure to submit evidence scores 0 for Specific Goals but does not disqualify. Tie-breaker: higher Specific Goals score, then functionality (if applicable), then drawing of lots. Functionality requirements not applicable.
Description
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfSupply, delivery, offload, transport, and in-store packing of stationery for a 36-month period. Tenderers must adhere to Eskom’s standardised specifications and any additional requirements in the Tender Data. Compulsory site visits/clarification meetings (if applicable) are detailed in the Tender Data.
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Closing date and time: Strictly adhered to (SAST, GMT+2). Check Eskom Tender Bulletin and NT e-Tender Portal regularly for addenda, extensions, or changes. Compulsory site visits/clarification meetings: Details in Tender Data; failure to attend results in disqualification. E-tendering system locks submissions at deadline.
Contact Information
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)All communications must be directed to the Eskom Representative identified in the Invitation to Tender, in writing (permanent record). Clarification requests must be submitted in writing to the Eskom Representative; responses are published on the tender advertisement platforms. No other Eskom officials may be contacted for tender queries.
Submission Guidelines
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Submit the complete original tender and one (1) complete hard copy (or electronic copy if required) by the closing date and time. For e-tendering, upload and finalize via the Eskom Tender Bulletin site. No email submissions unless specified in Tender Data. Late submissions are rejected. Ensure documents are accessible, uncorrupted, and marked as "ORIGINAL", "COPY", or "ELECTRONIC COPY" with Eskom’s address, tender number, and your contact details. Seal packages as "Confidential". Sign the tender (electronic or paper). Mandatory returnables must be submitted by the deadline. Failure to submit original + copy or upload documents (e-tendering) results in disqualification. Eskom is not liable for delays, network issues, or incorrect submissions. Eskom employees cannot submit tenders on your behalf.
Returnable Documents
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Mandatory returnables must be submitted by the closing date and time. This includes: original tender + one hard copy (or electronic copy if required), signed and marked as "ORIGINAL" and "COPY". All forms, data, and schedules must be fully completed. Certificates/documents (e.g., B-BBEE, CIDB, SHEQ) must be valid, current, and original (where stipulated) for the entire tender validity period. For e-tendering, upload documents to the Eskom Tender Bulletin site in the correct folders (Technical, Commercial, Financial). Failure to submit mandatory returnables results in disqualification.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Evaluation follows PPPFA (90/10 or 80/20 Price-Preference system). Pricing is scored per Tender Data criteria (e.g., CPA, FOREX, discounts, technical adjustments). Functionality (if applicable) requires meeting minimum thresholds to proceed. B-BBEE level is scored via CSD report/certificate; if a pre-qualification criterion, proof must be submitted by closing time or the tender is disqualified. Specific Goals (e.g., local content, skills development) are scored with supporting documentation; failure to submit results in zero points for that section. Arithmetical errors are corrected per Eskom’s rules (e.g., line-item totals prevail over unit rates). Reverse e-auction may apply (no prices in tender if used). Objective Criteria (if any) must be stated in the Invitation to Tender. Double-dipping of criteria is prohibited. Tenders are ranked by combined Price + Specific Goals scores.
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Scope: Supply, delivery, offload, transport, and in-store packing of stationery for 36 months. Tenderers must comply with Eskom’s standardised specifications (latest revisions) and any additional requirements in the Tender Data. For compulsory site visits, details are provided in the Tender Data. Cataloguing may be required post-award; include a line item for cataloguing in the Pricing Schedule if applicable. All materials must meet Eskom’s labelling specifications.
Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfTenderers must ensure all submitted documents are complete, accurate, and accessible for evaluation. The Acknowledgement Form must be submitted with the tender, stating whether it covers the whole or part of the scope. Standardised specifications (latest revisions) must be followed. Cataloguing may be required post-award; include a line item in the Pricing Schedule if applicable. All materials must meet Eskom’s labelling specifications.
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfPricing must include all duties, taxes (VAT), and levies applicable 14 days prior to closing. Rates/prices must be fixed for the contract duration (no adjustments unless specified). Submit prices in ZAR unless otherwise instructed; exchange rates must align with Tender Data. Alternative tenders are only accepted if a main tender is submitted and permitted. Arithmetical errors are corrected per Eskom’s rules (e.g., line-item totals prevail over unit rates). Clarifications on pricing may be requested during evaluation but cannot alter the tender’s substance. Cataloguing costs (if required) must be quoted as a line item; Eskom will pay for cataloguing.
Financial Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Pricing must include all duties, taxes (VAT), and levies applicable 14 days prior to closing. Rates/prices must be fixed for the contract duration (no adjustments unless specified). Submit prices in South African Rand (ZAR) unless otherwise instructed; exchange rates must align with Tender Data stipulations. Alternative tenders are only accepted if a main tender is submitted and permitted by the Invitation to Tender. Arithmetical errors are corrected per Eskom’s rules (e.g., line-item totals prevail). Clarifications on pricing may be requested during evaluation but cannot alter the tender’s substance. Security for performance (if required): Provide names of at least two financial institutions for obtaining bonds/guarantees; Eskom may reject unsuitable institutions. Insurance: Eskom’s cover may not be sufficient; tenderers must seek independent advice.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Eligibility: No restrictions on doing business with Eskom/State-Owned Companies. Joint ventures/consortia must collectively comply. 100% subcontracting of SOW is prohibited. Mandatory compliance: Submit all mandatory returnables (original + copy, signed, correctly marked) by deadline. CIDB registration: Required if stipulated in Tender Data; proof must be submitted by closing time (or proof of application + registration by contract award). B-BBEE: Valid certificate/CSD report required if a pre-qualification criterion; fraudulent/expired documents result in disqualification. For PPPFA scoring, missing/expired B-BBEE documents score zero. SHEQ: Proof of Safety, Health, Environment, and Quality systems/policies required by closing time. SDL&I Undertaking: Must be completed and submitted by contract award. Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) apply if contract duration/meets thresholds (e.g., R5M+, CIDB Grade 7+). Compliance with legislation: PPPFA, CIDB Regulations, OHS Act, COIDA, dtic local content, National Treasury Instructions, and any other stipulated regulations.
B-BBEE Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)B-BBEE certificate/CSD report must be submitted if a pre-qualification criterion; fraudulent/expired documents result in disqualification. For PPPFA scoring, missing/expired documents score zero. Sub-contractors’ B-BBEE status must comply with PPPFA Regulations if applicable. Eskom reports fronting or fraud to the B-BBEE Commission, which may result in suspension from State-Owned Company business for up to 10 years or legal consequences.
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfCompliance with OHS Act and Eskom’s SHEQ requirements is mandatory. Tenderers must provide proof of Safety, Health, Environment, and Quality (SHEQ) systems, policies, and capabilities by the closing date. All SHEQ costs and personnel must be included in the tender pricing. Failure to meet SHEQ requirements may result in disqualification.
Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfTender validity: Must remain valid for acceptance within the stated period; extensions may be requested but cannot modify the tender. Confidentiality: All procurement matters must be treated as confidential; documents may only be used for tender preparation. Eskom’s rights: May accept/reject tenders, cancel the process, or negotiate with selected tenderers. No liability for losses/damages arising from tender participation or process changes. Contract signing: Successful tenderers must sign the final contract documents. Security for performance: Provide names of at least two financial institutions for bonds/guarantees; Eskom may reject unsuitable institutions. Addenda: Published on the same platform as the Invitation to Tender; tenderers must check regularly for updates.
Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Eligibility: No restrictions on doing business with Eskom/State-Owned Companies. Joint ventures/consortia must collectively comply. 100% subcontracting of SOW is prohibited. Time references: All deadlines use South African Standard Time (SAST, GMT+2). Extensions: If Eskom extends the closing date, all Standard Conditions of Tender still apply. Late submissions: Not accepted under any circumstances (including e-tendering uploads not finalized by deadline). Eskom is not liable for courier/postal delays, network issues, or incorrect submissions. SDL&I Undertaking: Must be completed and submitted by contract award. Designated materials: Information must be submitted by contract award or the tender will not be considered.
Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfScoring uses PPPFA’s 90/10 or 80/20 Price-Preference system. Price evaluation includes factors like CPA, FOREX, commodity exposure, discounts, and technical adjustments. Functionality (if applicable) requires meeting minimum thresholds. B-BBEE level is scored via CSD report/certificate; missing/expired documents score zero under PPPFA. Specific Goals (e.g., local content) are scored with supporting documentation; failure to submit results in zero points. Reverse e-auction may apply (no prices in tender if used). Objective Criteria must be stated in the Invitation to Tender. Double-dipping of criteria is prohibited.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
02 Maxwell Drive - Suninghill - Gauteng -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
15
Last checked
09 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: Stationery/Printing. Unlock full pricing strategies, bid frequency, and historical win rates.