Tender Type
Request for Bid(Open-Tender)
Delivery Location
Impala Street - Pullens hope - Hendrina - 1096
Organization Type
GOVERNMENT
Published
16 Jul 2026
OCDS Reference
ocds-9t57fa-162536
This tender, issued by ESKOM, seeks a sanas-accredited supplier to conduct parallel and correlation tests (including dust monitor correlation, gas monitor qal2 verification, and biannual isokinetic sampling) at hendrina power station’s north and south stacks over a 5-year period. The work includes mandatory spot checks and compliance with ESKOM and south african emission standards.
Date & Time
Tuesday, 04 August 2026 - 10:00
Venue
MS TEAMS
Categories
Request for Bid(Open-Tender)
Impala Street - Pullens hope - Hendrina - 1096
16 Jul
2026
Tender Published
Tender was published
04 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Median Estimate
R 1 059 840
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
How small cleaning and hygiene services companies use Joint Ventures to win government cleaning contracts by pooling resources and meeting B-BBEE targets.
Win government insurance, banking, actuarial, and financial consulting contracts. FSCA licensing requirements and tender strategies.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
💡 Want more tendering tips and strategies?
Explore Our BlogAI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Contact Information
Source: TSC NEC-correlation test 1.pdf (unknown){"name":null,"email":"[email protected]","phone":"017 749 5416","department":null,"address":"n the conditions of contract identified"}
Submission Guidelines
Source: TSC NEC-correlation test 1.pdf (unknown)Returnable Documents: C1.1 Form of Offer and Acceptance [●], C1.1 Form of Offer & Acceptance, By the representative of the tenderer, deemed to be duly authorised, signing this part of this Form of Offer, This Offer may be accepted by the Employer by signing the Acceptance part of this Form of Offer and
Evaluation Criteria
Source: TSC NEC-correlation test 1.pdf (unknown)The Contractor to comply with all the Employer’s Quality requirements and policies. On commencement of the
works, the QIP will be signed by the Employer. It shall show all hold points and witness points for all critical
Technical Specifications
Source: TSC NEC-correlation test 1.pdf (unknown)Provision to perform parallel and correlation test at
Hendrina Power Station for a period of sixty (60)
months.
Contents: No of
pages
Part C1 Agreements & Contract Data [●]
Part C2 Pricing Data [●]
Part C3 Scope of Work
Experience & Qualifications
Source: TSC NEC-correlation test 1.pdf2 Name:
Job
3 Available from Engineering Contract Strategies Tel 011 803 3008 Fax 011 803 3009
Part c2: pricing data c2 tsc3 cover
ESKOM holdings soc ltd contract NO. _________
Conducting palallel and correlation test
Responsibilities:
CV's (and further key person's data including
CVs) are in .
A Priced contract with price list
11.2(12) The price list is in Part 2 pricing data
11.2(19) The tendered total of the Prices is R
Part c2: pricing data c2 tsc3 cover
ESKOM holdings soc ltd contract NO. _________
Conducting palallel and correlation test
Part 2: pricing data
TSC3 Option A
Document Title No of
reference pages
C2.1 Pricing assumptions: Option A 2
C2.2 The price list [●]
Part c2: pricing data c2 tsc3 cover
ESKOM holdings soc ltd contract NO. _________
Conducting palallel and correlation test
C2.1 Pricing assumptions: Option A
The conditions of contract
How work is priced and assessed for payment
Clause 11 in NEC3 Term Service Contract, June 2005 (TSC3) core clauses and Option A states:
Identified and 11
defined terms 11.2 (12) The Price List is the price list unless later changed in accordance with this
contract.
(17) The Price for Services Provided to Date is the total of
completed and
calculated by multiplying the quantity which the Contractor has completed
by the rate.
(19) The Prices are the amounts stated in the Price column of the Price List.
Where a quantity is stated for an item in the Price List, the Price is calculated
by multiplying the quantity by the rate.
This confirms that Option A is a priced contract where the Prices are derived from a list of items of service
which can be priced as lump sums or as expected quantities of service multiplied by a rate or a mix of both.
Function of the Price List
Clause 54.1 in Option A states: “Information in the Price List is not Service Information”. This confirms that
instructions to do work or how it is to be done are not included in the Price List but in the Service Information.
This is further confirmed by Clause 20.1 which states, “The Contractor Provides the Service in accordance
with the Service Information”. Hence the Contractor does not Provide the Service in accordance with the
Price List. The Price List is only a pricing document.
Link to the Contractor’s plan
Clause 21.4 states “The Contractor provides information which shows how each item description on the
Price List relates to the operations on each plan which he submits for acceptance”. Hence when compiling
the price list, the tendering contractor needs to develop his first clause 21.2 plan in such a way that
operations shown on it can be priced in the price list and result in a satisfactory cash flow in terms of clause
11.2(17).
Part c2: pricing data c2.1 TSC3/A pricing assumptions
ESKOM holdings soc ltd contract NO. _________
Conducting palallel and correlation test
Preparing the price list
It will be assumed that the tendering contractor has read Pages 14, 15 and 73 of the TSC3 Guidance
Notes before preparing the price list. Items in the price list may have been inserted by the Employer and
the tendering contractor should insert any additional items which he considers necessary. Whichever
party provides the items in the price list the total of the Prices is assumed to be fully inclusive of everything
necessary to Provide the Service as described at the time of entering into this contract.
1 As the Contractor has an obligation to correct Defects (core clause 42.1) and there is no
compensation event for this unless the Defect was due to an Employer’s risk, the lump sum Prices and
rates must also include for the correction of Defects.
2 If the Contractor has decided not to identify a particular item in the price list at the time of tender the
cost to the Contractor of doing the work must be included in, or spread across, the other Prices and rates
in the price list in order to fulfil the obligation to complete the service for the tendered total of the Prices.
3 There is no adjustment to lump sum prices in the price list if the amount, or quantity, of work within that
lump sum item of service later turns out to be different to that which the Contractor estimated at time of
tender. The only basis for a change to the Prices is as a result of a compensation event. See Clause 60.1.
4 Hence the Prices and rates tendered by the Contractor in the price list are inclusive of everything
necessary and incidental to Providing the Service in accordance with the Service Information, as it was at
the time of tender, as well as correct any Defects not caused by an Employer’s risk.
5 The Contractor does not have to allow in his Prices and rates for matters that may arise as a result of
a compensation event. It should be noted that the list of compensation events includes those arising as a
result of an Employer's risk event listed in core clause 80.1.
Format of the price list
Entries in the first four columns in the price list in section C2.2 are made either by the Employer or the
tendering contractor.
If the Contractor is to be paid an amount for the item which is not adjusted if the quantity of work in the item
changes, the tendering contractor enters the amount in the Price column only, the Unit, Expected Quantity
and Rate columns being left blank.
If the Contractor is to be paid an amount for an item of work which is the rate for the work multiplied by the
quantity completed, the tendering contractor enters the rate which is then multiplied by the Expected
Quantity to produce the Price, which is also entered.
If the Contractor is to be paid a Price for an item proportional to the length of time for which a service is
provided, a unit of time is stated in the Unit column and the expected length of time (as a quantity of the
stated units of time) is stated in the Expected Quantity column.
Part c2: pricing data c2.1 TSC3/A pricing assumptions
ESKOM holdings soc limited contract number _____________
Conducting palallel and correlation test
C2.2 the price list
The Price List is as follows:
Total
tem Activity Description Quantity UoM Rate Frequency
amount
Full statutory correlation tests – North
& South stack
1.1 8 Days 2
tests
1.2 8 Days 2
tests
22 Bi-annual Isokinetic sampling
2.1 sampling of pollutants (particulate 8 Days 2
matters, O2, CO2, SO2 and Nox)
2.2 sampling of pollutants (particulate Days
8 2
matters, O2, CO2, SO2 and Nox)
3 Spot checks
3.1 Days 2
QAL2 test at 100%MCR 2
3.2 Days 2
QAL2 test at 100%MCR 2
4 Preliminary and general expenses
4.1
4.2
4.3 1 No 2
PPE, safety file)
4.4
4.5
2000
4.6
Total Excl VAT
Part c3: scope of work 1 c3 tsc3 cover page
ESKOM holdings soc limited contract number _____________
Conducting palallel and correlation test
Part 3: scope of work
Document Title No of
reference pages
This cover
C3.1 Employer’s Service Information
C3.2 Contractor’s Service Information
Total number of pages
Part c3: scope of work 2 c3 tsc3 cover page
C3.1: Employer’s service information
Contents
Part 3: Scope of Work 2
C3.1: Employer’s service
Information.....................................................................................................................................27
1 Description of the service................................................................................................27
1.1 Executive overview .......................................................................................................................... 27
1.2 Employer’s requirements for the service ......................................................................................... 27
1.3 Interpretation and terminology ......................................................................................................... 31
2 Management strategy and start up.
2.1 The Contractor’s plan for the service ............................................................................................... 28
2.2 Management meetings .................................................................................................................... 28
2.3 Contractor’s management, supervision and key people ................................................................. 29
2.5 Documentation control ..................................................................................................................... 29
2.6 Invoicing and payment ..................................................................................................................... 29
2.7 Contract change management ........................................................................................................ 30
2.8 Records of Defined Cost to be kept by the Contractor .................................................................... 30
2.9 Insurance provided by the Employer ............................................................................................... 30
2.10 Training workshops and technology transfer ................................................................................... 30
2.11 Design and supply of Equipment ..................................................................................................... 30
2.12 Things provided at the end of the service period for the Employer’s use ....................................... 30
2.12.1 Equipment....................................................................................................................30
2.12.2 Information and other things..............................................................................................30
2.13 Management of work done by Task Order........................................................................30
3 Health and safety, the environment and quality assurance......................................................31
3.1 Health and safety risk management ................................................................................................ 31
3.2 Environmental constraints and management .................................................................................. 32
3.3 Quality assurance requirements ...................................................................................................... 33
4 Procurement.................................................................................................................33
4.1 People.......................................................................................................................38
4.1.1 Minimum requirements of people employed.......................................................................34
4.2 Plant and Materials
4.3.1 Specification......................................................................................................34
4.3.2 Correction of defects............................................................................................34
4.3.3 Plant & Materials provided “free issue” by the Employer..............................................34
5 Working on the Affected Property......................................................................................34
5.1 Employer’s site entry and security control, permits, and site regulations..................................34
5.2 People restrictions, hours of work, conduct and records......................................................35
5.3 Health and safety facilities on the Affected Property ....................................................................... 35
5.4 Environmental controls, fauna & flora .............................................................................................. 35
5.5 Cooperating with and obtaining acceptance of Others .................................................................... 35
5.6 Records of Contractor’s Equipment ................................................................................................. 35
5.7 Equipment provided by the Employer .............................................................................................. 35
5.8 Site services and facilities ................................................................................................................ 35
5.8.1 Provided by the Employer.....................................................................................35
5.8.2 Provided by the Contractor......................................................................... 35
5.9 Control of noise, dust, water and waste .......................................................................................... 35
6 List of drawings
.................................................................................................................................
6.1 Drawings issued by the Employer ................................................................................................... 36
ESKOM holdings soc limited contract number _________
Conducting palallel and correlation test
1 Description of the service
1.1 Executive overview
The Employer intends to comply with Environmental regulations in terms of the particulate emissions and the
required correlation tests. In order to comply the Employer will carry out the following particulate emission
monitor full correlation and correlation spot checks on both the north and south smoke stacks.
The Employer intends to achieve this by acquiring the services of the tests.
1.2 Employer’s requirements for the service
Scope: North and South Stacks
Activity Responsible
person
commence
The supplier must conduct: Contractor
NB. All tests will be conducted by SANAS accredited labs or labs accredited by
similar foreign authorities.
Contractor
unless more frequent checks are required by the power station’s AEL.
monitoring systems must be audited by a SANAS accredited laboratory at least
once every two (2) years. While the SANAS accreditation process is still being
developed, this requirement will be satisfied by the bi-annual correlation tests
and spot checks conducted by independent consultants.
provider must be used to perform the correlation tests and spot checks.
two years.
Contract tsc3 cover pages
ESKOM holdings soc limited contract number _________
Conducting palallel and correlation test
readings and is done as and when required. Estimating two spot checks per
year.
measured values obtained from the AMS still meet the required uncertainty
criteria – as demonstrated in the previous QAL2 test. It also determines
whether the calibration function obtained during the previous QAL2 test is still
valid. The validity of the measured values obtained with the AMS is checked by
means of a series of functional tests as well as by the performance of a limited
number of parallel measurements using an appropriate SRM.
least once every two years.
readings and is done as and when required. Estimating two spot checks per
year.
November 2013. This is a requirement as per Hendrina Power Station AEL No:
17/AEL/MP312/11/16.
to be conducted once every two years.
done as and when required. The Spot check comprises isokinetic traverses that
will compare measured emission to that predicted by the correlation. The Spot
check will be done at normal operating conditions, most experienced. If these
points fall outside the 95% confidence bands, then a full correlation is required
as a continuation of the Spot check tests or as soon as practically possible after
the Spot check tests.
per year.
Contract tsc3 cover pages
ESKOM holdings soc limited contract number _________
Conducting palallel and correlation test
1.3 Interpretation and terminology
The following abbreviations are used in this Service Information:
Eng. Generation Engineering
kPa Kilo Pascal
m meter
m/s Meters per second
m2 Square meter
mg/Nm3 Milligrams per standard cubic meter (at 0 oC, 101.3 KPa, normalised to 1%
O2, Dry)
oC Degrees Celsius
Am3/s Actual cubic meter per seconds
CFD Computation Fluid Dynamics
dtex Decitex
CEMS Continuous Emission Monitoring System
g/m2 Gram per square meter
AMS Automated Measuring System
g/Sm3 Grams per standard cubic meter (at 0 oC and 101.3 KPa)
Contract tsc3 cover pages
ESKOM holdings soc limited contract number _________
Conducting palallel and correlation test
2 Management strategy and start up.
2.1 The Contractor’s plan for the service
2.1.1 The Contractor submits a program for acceptance by the Service Manager prior to commencing with
the work. The program will be updated on a weekly basis.
2.2.2 The program is in Microsoft Excel or MS Project and shall include the following:
2.2.3 The Contractor’s program activities must fit in with the interface activities of other contractors, and must
be indicated. These interfaces must include activities such as scaffolding, lagging, electrical and
instrumentation work.
2.2.4 Activities will only be recorded as complete when the quality inspection plan for the activity is returned
to the employer’s representative with all the relevant signatures, including that of the quality controller.
2.2.5 The frequency of updating is listed on the task order. More regular updating may be required on the
critical path activities.
2.2 Management meetings
Regular meetings of a general nature may be convened and chaired by the Supply Manager as follows:
Title and purpose Approximate time & interval Location Attendance by:
Risk register and As and when required Service Manager’s Employer, Contractor,
compensation events office / MS Teams Supervisor,
Site (Kick Off) meeting First working day after Service Manager’s Employer’s Service
official contract is placed office / MS Teams Team, Contractor
Early Warning Meetings As required Service Manager’s Engineer, Contractor,
office / MS Teams Supervisor and Service
Manager
Overall contract site Last week of the month Service Manager’s Employer, Contractor,
meeting office / MS Teams Supervisor,
Weekly work progress Mondays and Wednesdays Quality boardroom Employer, Contractor,
and plant risks meeting Supervisor,
Meetings of a specialist nature may be convened as specified elsewhere in this Service Information or if not
so specified by persons and at times and locations to suit the Parties, the nature and the progress of the
service. Records of these meetings shall be submitted to the Service Manager by the person convening the
meeting within five days of the meeting.
All meetings shall be recorded using minutes or a register prepared and circulated by the person who
convened the meeting. Such minutes or register shall not be used for the purpose of confirming actions or
instructions under the contract as these shall be done separately by the person identified in the conditions of
contract to carry out such actions or instructions.
Contract tsc3 cover pages
ESKOM holdings soc limited contract number _________
Conducting palallel and correlation test
2.3 Contractor’s management, supervision and key people
The Contractor ensures that qualified personnel are used onsite. The Contractor provides a site supervisor
or project manager to supervise, monitor, control and coordinate all activities during the execution of the
project.
2.4 Provision of bonds and guarantees
N/a
2.5 Documentation control
At the site (Kick Off) meeting to be held, the documentation is identified with an alpha numeric, which
indicates source, recipient, communication number, etc.
All contractual communications are in the form of properly compiled letters or forms attached to e-mails and
as a message in the e-mail itself.
The routing of all written communications will be between the Employer and the Contractor only, any
agreements between the Contractor and any other person representing the employer which has not been
routed via the Service Manager is null and void.
Any instructions written or verbal resulting in any changes to the duration, quality, cost of the service may
only be received from the Service Manager
2.6 Invoicing and payment
Within one week of receiving an assessment from the Service Manager in terms of core clause 51.1, the
Contractor provides the Employer with a tax invoice showing the amount due for payment equal to that
stated in the Service Manager’s payment certificate.
The Contractor shall address the tax invoice to:
Eskom Holdings SOC Limited
Hendrina Power Station
Accounts Payable
PO Box X 1003
Pullenshope
1096
and include on each invoice the following information:
Name and address of the Contractor and the Service Manager;
The contract number and title;
Contractor’s VAT registration number;
The Employer’s VAT registration number 4740101508;
Description of service provided for each item invoiced based on the Price List;
Total amount invoiced excluding VAT, the VAT and the invoiced amount including VAT;
(add other as required)
Payments are done within 30 days after receipt of tax invoice.
2.7 Contract change management
For any changes on the contract standard, NEC forms must be used.
Contract tsc3 cover pages
Qualifications:
Experience:
2 Name:
Job
3 Available from Engineering Contract Strategies Tel 011 803 3008 Fax 011 803 3009
Part c2: pricing data c2 tsc3 cover
ESKOM holdings soc ltd contract NO. _________
Qualifications:
Experience:
CV's (and further key person's data including
CVs) are in .
done as and when required. The Spot check comprises isokinetic traverses that
will compare measured emission to that predicted by the correlation. The Spot
check will be done at normal operating conditions, most experienced. If these
points fall outside the 95% confidence bands, then a full correlation is required
as a continuation of the Spot check tests or as soon as practically possible after
the Spot check tests.
per year.
Contract tsc3 cover pages
ESKOM holdings soc limited contract number _________
Quality Management
Source: TSC NEC-correlation test 1.pdf30.1 The starting date is. TBC
30.1 The service period is Sixty months
4 Testing and defects Defect date is 52 weeks after completion of
each Task Order. The defect correction is 24
hours or any other period agreed between the
parties.
tem Activity Description Quantity UoM Rate Frequency
amount
Full statutory correlation tests – North
& South stack
1.1 8 Days 2
tests
1.2 8 Days 2
tests
3.1 Days 2
QAL2 test at 100%MCR 2
3.2 Days 2
QAL2 test at 100%MCR 2
The supplier must conduct: Contractor
Dust Monitor Correlation Test (Isokinetic Sampling)
Gas Monitor Parallel Verification Test (QAL2)
Biannual Isokinetic Sampling
Spot Checks - as and when required.
Spot checks – a spot check will be conducted on each monitor to confirm the
readings and is done as and when required. Estimating two spot checks per
year.
measured values obtained from the AMS still meet the required uncertainty
criteria – as demonstrated in the previous QAL2 test. It also determines
whether the calibration function obtained during the previous QAL2 test is still
valid. The validity of the measured values obtained with the AMS is checked by
means of a series of functional tests as well as by the performance of a limited
number of parallel measurements using an appropriate SRM.
least once every two years.
readings and is done as and when required. Estimating two spot checks per
year.
2.1 The Contractor’s plan for the service
2.1.1 The Contractor submits a program for acceptance by the Service Manager prior to commencing with
the work. The program will be updated on a weekly basis.
2.2.2 The program is in Microsoft Excel or MS Project and shall include the following:
2.2.3 The Contractor’s program activities must fit in with the interface activities of other contractors, and must
be indicated. These interfaces must include activities such as scaffolding, lagging, electrical and
instrumentation work.
2.2.4 Activities will only be recorded as complete when the quality inspection plan for the activity is returned
to the employer’s representative with all the relevant signatures, including that of the quality controller.
2.2.5 The frequency of updating is listed on the task order. More regular updating may be required on the
critical path activities.
2.2 Management meetings
Financial Requirements
Source: TSC NEC-correlation test 1.pdf (unknown)Payment Terms: payment certificate from the Service Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
Employer's procedures stated in the Service Information, showing the amount due for payment
equal to that stated in the payment certificate.
Z8.2 If the Contractor does not provide a tax invoice in the form and
Compliance Requirements
Source: TSC NEC-correlation test 1.pdf (unknown)C1.1 Form of Offer and Acceptance [●]
C1.1 Form of Offer & Acceptance
By the representative of the tenderer, deemed to be duly authorised, signing this part of this Form of Offer
B-BBEE Details: tly
and severally liable to the Employer for the performance of this contract.
Z2.2 Unless already notified to the Employer, the persons or organisations notify the Service
Manager within two weeks of the Contract Date of the key person who has the authority to bind
the Contractor on their behalf.
Z2.3 The Contractor does not substantially alter the composition of the joint venture, consortium or
other unincorporated grouping of two or more persons without the consent of the Employer
having been given to the Contractor in writing.
Z3 Change of Broad Based Black Economic Empowerment (B-BBEE) status
Z3.1 Where a change in the Contractor’s legal status, ownership or any other change to his business
composition or business dealings results in a change to the Contractor’s B-BBEE status, the
Contractor notifies the Employer within seven days of the change.
Z3.2 The Contractor is required to submit an updated verification certificate and necessary
supporting documentation confirming the change in his B-BBEE status to the Service Manager
within thirty days of the notification or as otherwise instructed by the Service Manager.
Z3.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the Contract Date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Works.
Part c2: pricing data c2 tsc3 cover
ESKOM holdings soc ltd contract NO. _________
Conducting palallel and correlation test
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
constitute a reason for termination. If the Employer terminates in terms of this clause, the
procedures on termination are P1, P2 and P4 as stated in clause 92, and the amount due is A1
and A3 as st
Health & Safety
Source: TSC NEC-correlation test 1.pdfsignature of Date
witness
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and
Z6 Waiver and estoppel: Add to core clause 12.3:
Z6.1 Any extension, concession, waiver or relaxation of any action stated in this contract by the
not give rise to an estoppel unless the Parties agree otherwise and confirm such agreement in
writing.
Z7 Health, safety and the environment: Add to core clause 27.4
Z7.1 The Contractor undertakes to take all reasonable precautions to maintain the health and safety
of persons in and about the execution of the service. Without limitation the Contractor:
provided for under the Construction Regulations 2003 (promulgated under the Occupational
Health & Safety Act ) (“the Construction Regulations”) for the Affected Property;
proper compliance with the Construction Regulations, all applicable health & safety laws
and regulations and the health and safety rules, guidelines and procedures provided for in
this contract and generally for the proper maintenance of health & safety in and about the
execution of the service; and
adhered to and monitored. In case of Safety violations, the work shall be stopped and Defect Notifications
Issued. 0% tolerance on safety issues, ignorance will lead to termination of contract
statement however other clauses may also use the same data
selected. Click on the form field once and type in the data. Otherwise complete by hand and in ink.
4.1
4.2
4.3 1 No 2
PPE, safety file)
4.4
4.5
2000
4.6
Environmental
Source: TSC NEC-correlation test 1.pdfguidelines and procedures otherwise provided for under this contract and ensures that his
Subcontractors, employees and others under the Contractor’s direction and control,
likewise observe and comply with the foregoing.
Z7.2 The Contractor, in and about the execution of the service, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided
for under this contract and ensures that his Subcontractors, employees and others under the
Contractor’s direction and control, likewise observe and comply with the foregoing.
Z8 Provision of a Tax Invoice and interest. Add to core clause 51
Z8.1 Within one week of receiving a payment certificate from the Service Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
2.1 The Contractor’s plan for the service ............................................................................................... 28
2.2 Management meetings .................................................................................................................... 28
2.3 Contractor’s management, supervision and key people ................................................................. 29
2.5 Documentation control ..................................................................................................................... 29
2.6 Invoicing and payment ..................................................................................................................... 29
2.7 Contract change management ........................................................................................................ 30
2.8 Records of Defined Cost to be kept by the Contractor .................................................................... 30
2.9 Insurance provided by the Employer ............................................................................................... 30
2.10 Training workshops and technology transfer ................................................................................... 30
2.11 Design and supply of Equipment ..................................................................................................... 30
2.12 Things provided at the end of the service period for the Employer’s use ....................................... 30
2.12.1 Equipment....................................................................................................................30
2.12.2 Information and other things..............................................................................................30
2.13 Management of work done by Task Order........................................................................30
3 Health and safety, the environment and quality assurance......................................................31
3.1 Health and safety risk management ................................................................................................ 31
3.2 Environmental constraints and management .................................................................................. 32
3.3 Quality assurance requirements ...................................................................................................... 33
4 Procurement.................................................................................................................33
4.1 People.......................................................................................................................38
4.1.1 Minimum requirements of people employed.......................................................................34
4.2 Plant and Materials
4.3.1 Specification......................................................................................................34
4.3.2 Correction of defects............................................................................................34
4.3.3 Plant & Materials provided “free issue” by the Employer..............................................34
5 Working on the Affected Property......................................................................................34
5.1 Employer’s site entry and security control, permits, and site regulations..................................34
5.2 People restrictions, hours of work, conduct and records......................................................35
5.3 Health and safety facilities on the Affected Property ....................................................................... 35
5.4 Environmental controls, fauna & flora .............................................................................................. 35
5.5 Cooperating with and obtaining acceptance of Others .................................................................... 35
5.6 Records of Contractor’s Equipment ................................................................................................. 35
5.7 Equipment provided by the Employer .............................................................................................. 35
5.8 Site services and facilities ................................................................................................................ 35
5.8.1 Provided by the Employer.....................................................................................35
5.8.2 Provided by the Contractor......................................................................... 35
5.9 Control of noise, dust, water and waste .......................................................................................... 35
unless more frequent checks are required by the power station’s AEL.
monitoring systems must be audited by a SANAS accredited laboratory at least
once every two (2) years. While the SANAS accreditation process is still being
developed, this requirement will be satisfied by the bi-annual correlation tests
and spot checks conducted by independent consultants.
provider must be used to perform the correlation tests and spot checks.
two years.
Contract tsc3 cover pages
ESKOM holdings soc limited contract number _________
Contractual Terms
Source: TSC NEC-correlation test 1.pdfPart c1: agreements & contract data
Contents: No of
pages
C1.1 Form of Offer and Acceptance [●]
[to be inserted from Returnable Documents at award
stage]
C1.2a Contract Data provided by the Employer [●]
C1.2b Contract Data provided by the Contractor [●]
[to be inserted from Returnable Documents at award
stage]
C1.3 Proforma Guarantees [●]
Part c2: pricing data c2 tsc3 cover
ESKOM holdings soc ltd contract NO. _________
of Deviations (if any), contact the Employer’s agent (whose details are given in the Contract Data) to arrange
the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to be
provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this
agreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shall
constitute a repudiation of this agreement.
clauses and the clauses for main Option:
A: Priced contract with price list
dispute resolution Option W1: Dispute resolution procedure
and secondary Options
X1: Price adjustment for inflation
X2 Changes in the law
X17 Low Service Damage
X18: Limitation of liability
X19: Task Order
X20 : Key performance indicators
Z: Additional conditions of contract
of the NEC3 Term Service Contract (June
2005)2
10.1 The Employer is (name): Eskom Holdings SOC Limited (Reg No:
2002/015527/06), a juristic person incorporated
in terms of the company laws of the Republic of
11.2(14) The following matters will be included in -As agreed by sites
the Risk Register
11.2(15) The Service Information is in Part 3: Scope of Work and all documents and
drawings to which it makes reference.
12.2 The law of the contract is the law of the Republic of South Africa
13.1 The language of this contract is English
13.3 The period for reply is 1 week
2 The Contractor’s main the Contractor’s liability for defects due to his
responsibilities workmanship that are not listed on the defect
certificate is limited to: See overall limitation of
liability in Option Z
21.1 The Contractor submits a first plan for
acceptance within Within 4 hours or any other period agreed
between the parties
50.1 The assessment interval is Withing 21 days after preliminary correlation
curve is issued
51.1 The currency of this contract is the South African Rand
51.2 The period within which payments are
made is 30 days from the day of receiving the invoice
51.4 The interest rate is The publicly quoted prime rate of interest
(calculated on a 365 day year) charged by from
time to time standard bank of south Africa
limited as certified, in the event of any dispute,
by any manager of such bank, whose
appointment it shall not be necessary to prove
for amounts due in Rands
6 Compensation events (If the optional statement for this section is not
used, no data will be required for this section)
83.1 The Employer provides these insurances as stated for “Format TSC3” available on
from the Insurance Table http://www.eskom.co.za/live/content.php?Item_ID=
9248
(See Annexure A for basic guidance).
83.1 The Employer provides these additional as stated for “Format TSC3” available on
insurances http://www.eskom.co.za/live/content.php?Item_ID=
9248
(See Annexure A for basic guidance)
83.1 The minimum amount of cover for the amount of the deductibles relevant to the
insurance against loss and damage event described in the “Format TSC3”
caused by the Contractor to the insurance policy available on
Employer’s property is http://www.eskom.co.za/live/content.php?Item_ID=
9248
83.1 The minimum amount of cover for loss of the amount of the deductibles relevant to the
or damage to Plant and Materials provided event described in the “Format TSC3”
by the Employer is: insurance policy available on
http://www.eskom.co.za/live/content.php?Item_ID=
9248
83.1 The minimum amount of cover for
insurance in respect of loss of or damage
to property (except the Employer’s
property, Plant and Materials and
Equipment) and liability for bodily injury to
or death of a person (not an employee of
the Contractor) arising from or in
connection with the Contractor’s Providing whatever the Contractor deems necessary in
the Service for any one event is: addition to that provided by the Employer.
83.1 The minimum limit of indemnity for As prescribed by the Compensation for
insurance in respect of death of or bodily Occupational Injuries and Diseases Act No. 130
injury to employees of the Contractor of 1993 and the Contractor’s common law
arising out of and in the course of their liability for people falling outside the scope of
employment in connection with this the Act with a limit of Indemnity of not less than
contract for any one event is: R500 000 (Five hundred thousand Rands)..
20.5 The Contractor prepares forecasts of the Based on urgency, impact and criticality of the
final total of the Prices for the whole of the task and/or as stated in each Task Order or
service at intervals no longer than agreed between parties
Four (4) weeks from issue of each task
11 Data for Option W1
W1.1 The Adjudicator is (Name) All disputes shall in the first instance be
directed at the Service manager and the
settle the dispute it would be referred to senior
management of each organisation. Should they
fail to reach an agreement, it will be referred to
the person/s selected from the Eskom panel of
dispute to him.
W1.2(3) The Adjudicator nominating body is: the Chairman of the Joint Civils Division of the
prices caused by the change in law (if applicable)
and grants the Contractor a reasonable extension
of time if required.
X17 Low Service damages
X17.1 The service level table is in Annexure A table
X18 Limitation of liability
X18.1 The Contractor’s liability to the Employer
for indirect or consequential loss is limited
to R0.0 (zero Rand)
X18.2 For any one event, the Contractor’s the amount of the deductibles relevant to the
liability to the Employer for loss of or event described in the “Format TSC3”
damage to the Employer’s property is insurance policy available on
limited to http://www.eskom.co.za/live/content.php?Item_ID=
9248
X18.3 The Contractor’s liability for Defects due to The greater of
his design of an item of Equipment is limited
to
and
from the Employer’s insurance (other than
the resulting physical damage to the
Employer’s property which is not excluded)
plus the applicable deductibles in the
Employer’s assets and works / maintenance
policies available on
http://www.eskom.co.za/live/content.php?Item_
Id=9248
X18.4 The Contractor’s total liability to the The total of the Prices other than for the
in connection with this contract, other than
the excluded matters, is limited to The Contractor’s total liability for the additional
excluded matters is not limited.
for which the Contractor is liable under this
contract for
specification,
outside the Affected Property,
the Employer’s property, Plant and
Materials),
right.
X18.5 The end of liability date is 12 months after the end of the service period.
Part c2: pricing data c2 tsc3 cover
ESKOM holdings soc ltd contract NO. _________
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
constitute a reason for termination. If the Employer terminates in terms of this clause, the
procedures on termination are P1, P2 and P4 as stated in clause 92, and the amount due is A1
and A3 as stated in clause 93.
Z4 Ethics
Z4.1 Any offer, payment, consideration, or benefit of any kind made by the Contractor, which
constitutes or could be construed either directly or indirectly as an illegal or corrupt practice, as
an inducement or reward for the award or in execution of this contract constitutes grounds for
terminating the Contractor’s obligation to Provide the Service or taking any other action as
appropriate against the Contractor (including civil or criminal action).
Z4.2 The Employer may terminate the Contractor’s obligation to Provide the Service if the Contractor
(or any member of the Contractor where the Contractor constitutes a joint venture, consortium
or other unincorporated grouping of two or more persons or organisations) is found guilty by a
competent court, administrative or regulatory body of participating in illegal or corrupt practices.
otherwise, whether in connection with any procurement process or contract with the Employer
or other people or organisations and including in circumstances where the Contractor or any
such member is removed from the an approved vendor data base of the Employer as a
consequence of such practice.
Z4.3 Notwithstanding the provisions of core clause 90.2, the procedures on termination in terms of
this clause are P1, P2 and P4 as stated in the core clause 92 and the amount due is A1 and A3
as stated in core clause 93.
Z5 Confidentiality
Z5.1 The Contractor does not disclose or make any information arising from or in connection with
this contract available to Others. This undertaking does not, however, apply to information
which at the time of disclosure or thereafter, without default on the part of the Contractor, enters
the public domain or to information which was already in the possession of the Contractor at the
time of disclosure (evidenced by written records in existence at that time). Should the
Contractor disclose information to Others in terms of clause 25.1, the Contractor ensures that
the provisions of this clause are complied with by the recipient.
Z5.2 If the Contractor is uncertain about whether any such information is confidential, it is to be
regarded as such until notified otherwise by the Service Manager.
Z5.3 In the event that the Contractor is, at any time, required by law to disclose any such information
which is required to be kept confidential, the Contractor, to the extent permitted by law prior to
disclosure, notifies the Employer so that an appropriate protection order and/or any other action
can be taken if possible, prior to any disclosure. In the event that such protective order is not,
or cannot, be obtained, then the Contractor may disclose that portion of the information which it
is required to be disclosed by law and uses reasonable efforts to obtain assurances that
confidential treatment will be afforded to the information so disclosed.
Z5.4 The taking of images (whether photographs, video footage or otherwise) of the Affected
equal to that stated in the payment certificate.
Z8.2 If the Contractor does not provide a tax invoice in the form and by the time required by this
contract, the time by when the Employer is to make a payment is extended by a period equal in
time to the delayed submission of the correct tax invoice. Interest due by the Employer in terms
of core clause 51.2 is then calculated from the delayed date by when payment is to be made.
Z8.3 The Contractor (if registered in South Africa in terms of the companies Act) is required to
comply with the requirements of the Value Added Tax Act, no (as amended) and to
include the Employer’s VAT number 4740101508 on each invoice he submits for payment.
Z9 Employer’s limitation of liability
Z9.1 The Employer’s liability to the Contractor for the Contractor’s indirect or consequential loss is
limited to R0.00 (zero Rand)
Z9.2 The Contractor’s entitlement under the indemnity in 82.1 is provided for in 60.1(12) and the
Employer’s liability under the indemnity is limited to compensation as provided for in core
clause 63 and X19 Task order applies to this contract.
Part c2: pricing data c2 tsc3 cover
ESKOM holdings soc ltd contract NO. _________
Termination: Add to core clause 91.1, at the second main bullet point, fourth sub-bullet
Z10
point, after the words "against it":
Z10.1 or had a business rescue order granted against it.
Z11 Define cost. Delete clause 11.2 (5) and replace by:
The Contractor to comply with all the Employer’s Environmental requirements and policies. On completion of
the works, the QIP will be signed by the Employer. For non-compliance, Early Warnings shall be issued with
follow-up meetings and in case of continuance, Defect Notifications shall be issued.
Please Note: If the Contractor fails to comply after two Defect Notifications have been issued, the Employer is in the position to consider
termination of the contract
Annexure B: Insurance provided by the Employer
provided by the Employer. Details of the insurance itself are available from the internet web link given below.
well as a continuous maintenance or operational service activity. If an event occurs which causes loss
or damage, a claim could be made either against the Employer’s “works” type policy which may be in
place for the Employer’s portion of the Affected Property concerned or against the Employer’s assets
policy which may be in place for the Employer’s portion of the Affected Property concerned, or both.
the insurance provided by the Employer. This can be provided from his own resources on a ‘self
insured’ basis or obtained by him from his own insurers. In order to assess the extent of this cover,
Part c2: pricing data c2 tsc3 cover
ESKOM holdings soc ltd contract NO. _________
on the internet web link listed below and may not be the cover required by the tendering contractor or as
intended by each of the listed insurances in the left hand column of the Insurance Table in clause 83.2.
In terms of clause 83.1 “the Contractor provides the insurances stated in the Insurance Table except any
insurance which the Employer is to provide”. Hence the Contractor provides insurance which the
insures for the difference between what the Insurance Table requires and what the Employer provides.
or project manager to supervise, monitor, control and coordinate all activities during the execution of the
project.
2.4 Provision of bonds and guarantees
N/a
2.5 Documentation control
At the site (Kick Off) meeting to be held, the documentation is identified with an alpha numeric, which
indicates source, recipient, communication number, etc.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
TSC NEC-correlation test 1.pdf
Invitation to tender (ITT) CORRELLATION OF TEST.pdf
SAFETY REQUIREMENTS not signed 2.pdf
Eskom is seeking a service provider to perform parallel and correlation tests at Hendrina Power Station for a 5-year period. The tender emphasizes strict Occupational Health and Safety (OHS) compliance, including mandatory safety documentation, risk assessments, and adherence to Eskom's OHS legal requirements.
QUALITY_List of Tender Returnables_Cat 2_ Rev 7 not Signed.pdf
Eskom is seeking a supplier to perform parallel and correlation tests at Hendrina Power Station for a 5-year period. The tender emphasizes strict Quality Management System (QMS) compliance, either through ISO 9001 certification (Option 1) or documented evidence of an ISO 9001-compliant QMS (Option 2). Applicants must demonstrate operational QMS, submit a Contract Quality Plan (CQP), Quality Control Plan (QCP), and meet additional user-defined requirements like completing Form A.
TENDER TECHNICAL EVALUATION STRATEGY FOR Correlation not signed.pdf
Eskom is seeking a service provider to conduct parallel and correlation tests (including Dust Monitor Correlation Tests, Gas Monitor Parallel Verification Tests, Biannual Isokinetic Sampling, and Spot Checks) at Hendrina Power Station for a 5-year period. The tender emphasizes compliance with SANAS accreditation, STSA membership, and adherence to Eskom and international standards (e.g., ISO 9001, ISO 17025).
SDLI 2 Strategy for provision of correlation test at Hendrina Power station for a period of 5years not signed.pdf
Eskom is seeking a service provider to perform parallel and correlation tests at Hendrina Power Station for a 5-year period. The tender evaluates bids based on price (90/80 points) and B-BBEE status (10/20 points), with additional non-scored but contractual SDL&I (Socio-Economic Development & Localization and Industrialization) obligations. Compliance with B-BBEE, local content, skills development, and reporting is mandatory.
QUALITY 240-68099512 Form A_Cat 2_ Rev 9.pdf
Eskom is seeking a service provider to perform parallel and correlation tests at Hendrina Power Station for a 5-year period. The tender emphasizes compliance with Eskom's Quality Requirements (240-105658000) and ISO 9001 standards, including pre- and post-contract quality assessments, supplier performance monitoring, and adherence to specific clauses like Eskom's rights of access, information, preservation, and quality audits.
Supplier Declaration of Interest Template -.pdf
Eskom is seeking a supplier to perform parallel and correlation tests at Hendrina Power Station for a 5-year period. The tender requires strict conflict-of-interest declarations and compliance with Eskom's ethical and procurement policies.
Quality Control Plan TEMPLATE not Signed.pdf
Eskom is seeking a service provider to perform parallel and correlation tests at Hendrina Power Station for a 5-year period. The tender includes a Quality Control Plan (QCP) template outlining inspection, approval, and compliance processes.
SCOPE OF WORK FOR CONDUCTING QAL2 AND CORELLATION TEST not signed.pdf
Eskom is seeking a service provider to conduct parallel (QAL2) and correlation tests (PM) on the North and South stacks at Hendrina Power Station over a 5-year period. The tests must comply with the Air Emissions License (AEL no. 17/4/AEL/MP312/11/16) and relevant ISO standards. The scope includes dust monitor correlation tests, gas monitor parallel verification tests, biannual isokinetic sampling, and spot checks as required. All tests must be performed by SANAS-accredited labs or equivalent foreign authorities.
QUALITY 240-109253698 CQP Template 2021 not signed.pdf
The tender is for the provision of parallel and correlation testing services at Eskom's Hendrina Power Station over a 5-year period. The document outlines a Contract Quality Plan (CQP) template that suppliers must complete to demonstrate their ability to meet Eskom's quality management, technical, and operational requirements. The CQP aligns with SANS 466:2005 / ISO 10005:2005 standards and covers scope of work, quality control, sub-supplier management, documentation, and compliance processes.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
ONeill Moshobane
Phone
021-980-3370
[email protected]
Address
Impala Street - Pullens hope - Hendrina - 1096
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
12
Last checked
16 Jul 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubImportant Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER){"closingTime":"2.2","briefingSession":"{"date":null,"time":null,"venue":"tend a site visit and/or clarification meeting that is stipulated as being","is_compulsory":true}"}
Briefing Session
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Site visit and / or clarification meeting 2.15 Tenderers must attend a site visit and/or clarification meeting that is stipulated as being compulsory in order to familiarise themselves with the proposed work, services, supply, location or similar. Failure to attend a clarification meeting or site visit that is identified as compulsory will result in disqualification from participation. Details of the meeting(s) are stated in the Tender Data. Tenderers are entitled to ask questions for clarity in the course of a site visit or clarification meeting.
Contact Information
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":"g time 2.2 Ensure that Eskom has received the complete original tender and one (1) complete hard"}
Returnable Documents
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tender closing time 2.2 Ensure that Eskom has received the complete original tender and one (1) complete hard copy of the original tender at the address and in the tender box or e-mail address specified in the Tender Data by no later than the closing date and time for tender submission. Proof of posting or of courier delivery does not equate to proof of delivery. Eskom will not accept a tender submitted by e-mail unless stated otherwise in the Tender Data. For E-tendering the tenderer must upload and finalize the tender via Eskom Tender bulletin site on the Eskom E- tendering page by no later than the closing date and time for tender submission. It remains the sole responsibility of the tenderer to ensure that the documents (PDF/Excel) are submitted and accessible for downloading/evaluation without any challenges as well as they are not corrupt or unreadable. It is the tenderer’s responsibility to ensure that their tenders documents are submitted/uploaded, and the submission is finalised before the closing date and time. For E-tendering tenderers are not permitted to deposit a tender into the Eskom tender box only electronic submission via the Eskom Tender bulletin site on the Eskom E- tendering page will be accepted.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)are submitted and accessible for downloading/evaluation without any challenges as well as
It must be noted that Eskom will not measure a criterion twice in the different evaluation
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
further evaluation.
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
the evaluation Price.
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Specific Goals tenderer fails to meet Specific Goals and/or to submit the required proof/supporting
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Reverse e-Auction 3.21 Reverse e-auction is an electronic system that utilises the 90/10 and 80/20 Price and
Preference point systems, and which is intended to achieve competitive pricing. Eskom
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfof a tenderer.
Cost of tendering 2.6 Accept that Eskom will not compensate the tenderer for any costs incurred in the preparation
and submission of a tender, including the costs of any testing necessary to demonstrate that
aspects of the tender satisfy the evaluation criteria, or the negotiation of any contract.
Submitting a tender 2.7 Check the Invitation to Tender documents on receipt and notify the Eskom representative of
any discrepancy or omitted documents. The Acknowledgement Form must be completed
and submitted with the tender and must clearly state if the tender is for the whole or part of
the works, services or supply identified in the specification and/or works information by
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfreasonable time for tenderers to make consequential adjustments to their tenders before
the closing date and time for submission.
In writing’ means hand-written, typed, type-written, printed or electronically made, and that
results in a permanent record.
Insurance 2.17 The extent (if any) of insurance provided by Eskom may not be for the full cover required in
the conditions of contract. The tenderer is advised to seek qualified advice regarding
insurance.
Pricing the tender 2.18 Include in the rates, prices, and the tendered total of the Prices all duties, taxes (including
VAT), and other levies payable by the tenderer if successful. Such duties, taxes and levies
are those applicable 14 (fourteen) days prior to the closing date and time for tender
submission.
2.19 Provide rates and Prices that are fixed for the duration of the contract and are not subject to
contract price adjustment except as provided for in the Invitation to Tender.
2.20 State the rates and Prices in South African Rand unless instructed otherwise in the Invitation
to Tender. The selected conditions of contract may provide for part payment in other
currencies. Therefore, submit Rates/Prices in Rands in accordance with the exchange rate
and base date as stipulated in the Invitation to tender.
Alterations to 2.21 May not make any alterations or additions to the tender documents, other than for purposes
documents of complying with instructions issued by the Eskom Representative or if necessary to correct
errors made by the tenderer. All such alterations shall be initialed by all signatories to the
tender. Corrections may not be made using correction fluid, correction tape or the like.
Alternative tenders 2.22 Submit alternative tenders only if a main tender is also submitted, and only if the submission
of alternative tenders is permitted by the Invitation to Tender. Accept that an alternative
tender may be based only on the criteria stated in the Tender Data.
Clarification and 2.23 Provide clarification and documents as may be required by the Eskom Representative
correction of Prices during the evaluation of tenders. However, documents identified as mandatory tender
after tender returnables that are required to be submitted at the closing date and time for tender
submission submission will not be requested and may not be submitted after the closing date and time.
phases, as this is regarded as ‘double dipping’.
Designated 3.12 Tenderers are also required to submit information on designated material and
materials and thresholds no later than contract award. If this information is not completed and
thresholds submitted as indicated in the Invitation to Tender, your tender will not be considered for
contract award
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
requirements will be required meet the minimum threshold stated in the Tender Data to proceed to
further evaluation.
Financial analysis 3.14 Eskom has to determine the risk of doing business with a supplier who may pose a
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
financial statements, Eskom will attempt to identify mitigating factors or requirements for
the tenderer to meet, if such factors/requirements exist in the tender’s context. However,
should suitable mitigating factors not exist in the tender’s context or should mitigating
factors exist but be insufficient or if the risk is considered to be too high or should the
tenderer not agree with the mitigating factors, the tenderer will not be considered for
award.
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
such as CPA, FOREX, commodity exposure, unconditional discounts, technical
adjustment, PV and forecasted rates of invoicing are taken into account when determining
the evaluation Price.
Arithmetical errors 3.16 Check responsive tenders for arithmetical errors. If there is a discrepancy between an
amount in figures and the amount in words, the amount in words shall prevail.
Check the highest-ranked tenders for the following errors or omissions: -
(a) the misplacement of the decimal point in any unit rate; or
(b) omissions in completing the pricing schedule or bill of quantities, or
(c) arithmetical errors in line-item totals that are the result of the incorrect multiplication
of a unit rate and a quantity in a bill of quantities or schedule of prices; or
(d) arithmetical errors that are the result of the incorrect addition of the prices.
will request the tenderer to either confirm the prices as tendered or to accept the
corrected prices.
Where the tenderer elects to confirm the prices as tendered; Eskom will correct the error
as follows: -
(a) If a bill of quantities or pricing schedule applies and there is an error in the line-item
total that is the result of an error in multiplying the unit rate and the quantity, the line-
item total shall prevail, and the rate shall be corrected.
(b) Where there is a misplacement of the decimal point in the unit rate, the line-item total
as quoted shall prevail, and the unit rate shall be corrected.
(c) Where there is an error in the total of the prices that is the result either of other
corrections required by the checking process or in the tenderer’s addition of prices,
the total of the prices shall prevail, and the tenderer shall be asked to revise the
selected item prices (and their rates if a bill of quantities applies) to result in the
tendered total of the prices.
documentation by closing date and time of tender submission, the tenderer will not be
disqualified if otherwise evaluated as acceptable in all other criteria; however, the tenderer
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
together and rank the suppliers from the highest to the lowest.
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
accordance with Section 2(1) (f) of the Preferential Procurement Policy Framework Act,
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)CSD report or as per certificate/affidavit provided
CSD number/CSD report) must be provided at the closing date and time for
CSD number or B-BBEE certificate/affidavit will need to be
B-BBEE Details: kom Representative and
Agreement to sign the contract documents.
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Environment and closing date and time for tender submission stipulated in the Invitation to Tender and/or
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdftenderers that Eskom has identified. A sole source and a single source are regarded as a
tenderer that meets the requirements stated in the Eskom Procurement and Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated in the Invitation to
Tender; the tender will be disqualified. However, in the event that, at the closing date and
time for tender submission, only proof of application for registration on CIDB is available,
then this must be submitted by the closing date and time for tender submission, while the
actual proof of CIDB registration (printout from CIDB database) must be submitted by
contract award
Contract Skills 2.29 If the tenderer is awarded a contract, it, as Contractor, shall achieve in the performance of
Development Goal the contract the Contract Skills Development Goals (CSDG) established in the CIDB
(CSDG) Standard for Developing Skills through Infrastructure Contract (published in GN 1779,
Government Gazette No. April 2023)
that has a duration of 12 months or more, and to:
a contract of R5 million or more, in the case of a professional service or service contract
or an order issued in terms of such a contract; or
a CIDB grading designation of grade 7 or higher, in case of an engineering and
construction works, or design and build contract or an order issued in terms of such a
contract.
Contract 2.30 The Contractor shall achieve in the performance of the contract the Contract Participation
Participation Goals Goals (CPG) relating to the engagement of targeted enterprises as established in the CIDB
(CPG) standard for indirect targeting for enterprise development through Construction works
contracts (published in Government Gazette No. February 2013).
enterprises as established in the aforesaid standard applies to:
construction works contracts in the General Building (GB) and to Civil Engineering (CE)
classes of construction works;
construction works contracts of an estimated minimum project duration of 6 months; and
construction works contracts in which at least 25% of the main contract could reasonably
be expected to be subcontracted out in one or more of the following CIDB classes of
construction works:
Civil Engineering (CE)
Electrical Engineering Work (EB)
) General Building Works (GB)
) Mechanical Engineering (ME)
2.31 Eskom may disqualify a tender if it is found that the tenderer has misrepresented or
falsified any information, certificate, affidavit or document. Eskom will report any fraud
in relation to a tenderer’s B-BBEE certificate/affidavit, or evidence of ‘fronting’ as
defined in the B-BBEE Act , as amended, to the B-BBEE Commission. The
tenderer will be suspended from business with any State-Owned Company for up to 10
years and may even be sentenced to jail.
2.32 Tenderers are also required to complete fully and submit the SDL&I Undertaking
(annexure to the Invitation to Tender) by no later than contract award. If the SDL&I
Respond 3.1 Respond to a request for clarification that Eskom receives before the closing date for
clarification clarification or queries. Eskom’s responses will be published to all tenderers in the same
manner the Invitation to Tender documents were issued. It is the tenderers’ responsibility
to check the Eskom Tender Bulletin and NT e-Tender Portal regularly for updated
responses to clarifications.
Issue Addenda 3.2 If necessary and prior to the closing date and time for tender submission, amend, amplify, or
add to the Invitation to Tender documents by way of Addenda published in the same
platform that the Invitation to Tender was issued. It is the tenderers’ responsibility to
check the Eskom Tender Bulletin and NT e-Tender Portal regularly for Addenda.
electronically. The Eskom Representative will publish the names of all tenderers received
on the Eskom Tender Bulletin and NT e-Tender Portal.
Tender Prices 3.5 Eskom will announce the names of the tenderers. Prices may be announced if so, stated
in the Tender Data.
Non-disclosure 3.6 Unless required by law, Eskom will not disclose information relating to the evaluation and
comparison of tenders and recommendations for the award of a contract to tenderers or to
any other person not officially concerned with the tender process until after the tender
award.
Grounds for 3.7 Reject a tender if Eskom establishes that there is proof that the tenderer influenced the
rejection processing of tenders or the awarding of the contract, the existence of collusion and/or bid
rigging, and/or that the tenderer has participated in any fraudulent/illegal activity in
connection with the Invitation to Tender.
Clarification of a 3.8 Obtain clarification from a tenderer in respect of any matter in the tender that may not be
tender clear or that could give rise to ambiguity in a contract arising from this tender if the matter
were not to be clarified. A document that the Invitation to Tender identifies as a mandatory
tender returnable that is required to be submitted at the closing date and time for tender
submission will not be requested, but Eskom may seek clarity on it.
may utilise reverse e-auction in certain Enquiries. Where reverse e-auction will be utilised,
this will be indicated in the respective Invitation to Tender and the reverse e-auction
supporting documents will be issued in the Invitation to Tender. Tenderers will be required
to submit a complete tender that does not contain Prices. If a tenderer has included prices
in its tender, the prices will not be considered.
Acceptance of 3.22 Notify Eskom's acceptance to the successful tender before the expiry of the validity period
tender or agreed additional validity period. Inform the successful and unsuccessful tenderers only
once approval has been granted by the Eskom Adjudication Authority. For open tenders,
this notification must be published on the Eskom Tender Bulletin and NT e-Tender Portal
Prepare contract 3.23 Revise the contract documents issued by Eskom in the Invitation to Tender documents to
documents take account of:
Addenda issued during the tender period;
inclusion of returnables stipulated in the Invitation to Tender;
inclusion of changes agreed in contract negotiations; and
Other revisions or documents agreed to between Eskom and the successful
tenderer during negotiations,
Sign Form of 3.24 Arrange for authorised signatories of both parties to complete and sign the original and one
Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfincluding the Eskom Representative shall not be liable for any losses, claims or damages of
whatsoever nature or howsoever arising that may be sustained by a tenderer or any other
person as a result of its participation in the tender or from any amendment, termination or
suspension of the process set out in the Invitation to Tender or from its exclusion from
participating in the tender process at any point.
Eskom’s right to 1.7 Eskom reserves the right to enter into mandated negotiations with any, one or more selected
negotiate tenderer(s) in accordance with Eskom’s approved procurement policies and procedures.
240-62044728 Rev 12 Eskom Standard Identifier
Conditions of Tender Effective Date 01 February 2025
Review Date January 2030
Disclaimer 1.8 While Eskom takes all reasonable measures to ensure that all information contained in the
regarding accuracy tender documents is correct and complete, Eskom does not, however, make any
of tender representations or warranties, express or implied, as to the accuracy or completeness of
documents such information and Eskom expressly disclaims any, and all liability for such
representations, warranties or statements.
Tenderer’s 2. The tenderer shall comply with the following obligations when submitting a tender and shall:
Tender validity 2.12 Hold the tender(s) valid for acceptance by Eskom at any time within the validity period after
the closing date and time for tender submission. Extend the validity period for a specified
additional period if Eskom requests the tenderer to do so. A tenderer that agrees to extend
the validity of its tender will not be required or permitted to modify its tender. A tenderer that
does not agree to extend the validity of its tender will be excluded from further
consideration. Tenderers will be requested to extend the validity of their tenders until a
contract(s) have been concluded with one or more tenderers. A request that a tenderer
extend the validity of its tender is not a representation that the tender is an acceptable
tender or that Eskom will seek to negotiate or conclude a contract with the tenderer. If the
validity of tenders expires before contracts have been concluded, the procurement process
is deemed to have concluded without an award.
Confidentiality and 2. 13 Treat as confidential all matters that arise in connection with the procurement. Use and copy
copyright of the documents provided by Eskom only for the purpose of preparing and submitting a tender
documents in response to this Invitation to Tender.
Standardised 2.14 Obtain and familiarise themselves with, if required for the purposes of submitting a tender,
specifications and the latest revision of standardised specifications and/or other documents that have been
other publications incorporated by reference into the Invitation to Tender documents by reference.
Site visit and / or 2.15 Tenderers must attend a site visit and/or clarification meeting that is stipulated as being
clarification compulsory in order to familiarise themselves with the proposed work, services, supply,
meeting location or similar. Failure to attend a clarification meeting or site visit that is identified as
compulsory will result in disqualification from participation.
Details of the meeting(s) are stated in the Tender Data. Tenderers are entitled to ask
correction of errors as required above.
Evaluation of 3.17 Score the B-BBEE level as stated on the CSD report or as per certificate/affidavit provided.
B-BBEE If the B-BBEE level is a pre-qualification criterion; then the proof of the B-BBEE level
(certificate/CSD number/CSD report) must be provided at the closing date and time for
tender submission; or the tender will be disqualified. If sub-contracting to designated groups
pre-qualification criteria are utilized (selected/mandatory) in terms of the PPPFA
Regulation, then Eskom will apply the PPPFA requirements for sub-contractors’ B-BBEE
status and the sub-contractors’ CSD number or B-BBEE certificate/affidavit will need to be
provided at the closing date and time for tender submission. Should the
information/documents provided indicate that the level is in dispute (fraudulent/ expired)
then the tender will be disqualified.
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
provided at Tender closing date and time for tender submission, or the
information/documents provided are fraudulent or have expired; then the tenderer will not
be disqualified (if otherwise deemed to be responsive and acceptable in all other aspects)
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Eligibility 2.1 Submit a tender only if the tenderer (whether a single company or an incorporated or unincorporated joint venture or consortium) complies with the eligibility criteria stated in the Tender Data and the tenderer, or any of its principals, is not under any restriction to do business with Eskom or State-Owned Companies. Tenderers that Eskom finds to be ineligible will be disqualified. Tenderers are not permitted to sub-contract 100% of the scope of work (SOW). Any tender that is based on 100% sub-contracting will be deemed ineligible and will be disqualified.
Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom Representative only, in writing, and in a format that can be read, copied and recorded. ‘In writing’ means hand-written, typed, type-written, printed or electronically made, and that results in a permanent record. Communication shall be in the English language. Eskom takes no responsibility for non-receipt of communications from or by a tenderer.
Important Dates
Source: Supplier Declaration of Interest Template -.pdf (unknown)Effective Date: 01 February 2015
Review Date: November 2026
Submission Guidelines
Source: Supplier Declaration of Interest Template -.pdf (unknown)Submit the completed Supplier Declaration of Interest form as a returnable with your enquiry, tender, or attendance at a negotiation. Key points:
Returnable Documents
Source: Supplier Declaration of Interest Template -.pdf (unknown)The Supplier Declaration of Interest form must be submitted as a returnable with your enquiry, tender, or attendance at a negotiation.
Evaluation Criteria
Source: Supplier Declaration of Interest Template -.pdf (unknown)General
Open to all suppliers, but those with conflicts of interest (e.g., ties to Eskom employees/directors) must fully disclose them.
Ethical Standards
Suppliers must not have engaged in or benefit from unethical practices (e.g., undisclosed conflicts, business courtesies).
Legal Standing
Suppliers must be legally registered entities (company registration number required).
Exclusions
Eskom employees/directors or their associates/family members involved in procurement are prohibited from financially benefiting from the tender.
Compliance Requirements
Source: Supplier Declaration of Interest Template -.pdf (unknown)Mandatory compliance requirements for all bidders:
Special Conditions
Source: Supplier Declaration of Interest Template -.pdf (unknown)Special conditions for all bidders:
Requirements
Source: Supplier Declaration of Interest Template -.pdf (unknown)Mandatory disclosure requirements for bidders:
Description
Source: QUALITY 240-68099512 Form A_Cat 2_ Rev 9.pdfPre-Contract Award Quality Requirements apply. Only Category 2 (clause 3.5.-105658000) is selected as applicable. Site assessment applicability must be indicated. Main Supplier and Sub-supplier Capability and Capacity Assessment may be required.
Submission Guidelines
Source: QUALITY 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)Complete and sign Form A (240-68099512 Rev 9) to acknowledge acceptance of Eskom Supplier Quality Requirements per 240-105658000 Specification and ISO 9001 Standard. Select only one applicable category (Category 2 marked as applicable in this document). Indicate if site assessment is required.
Evaluation Criteria
Source: QUALITY 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)Capability Assessment
Main supplier and sub-supplier capability and capacity assessment may be required (refer to clause 3-105658000).
Quality Management System
Must have a certified ISO 9001 Quality Management System (all clauses 4–10 applicable).
Site Assessment
Site assessment may be applicable (as indicated in the pre-contract section).
Compliance
Must comply with all Eskom-specific quality clauses, including rights of access, audits, and nonconformity management.
Technical Specifications
Source: QUALITY 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)Pre-Contract Award Quality Requirements apply. Category 2 (refer to clause 3.5.-105658000) is selected as the applicable category. Post-Contract Award requirements include: Contract Execution, Supplier Quality Performance Monitoring Phase, Eskom Rights of Access, Eskom Rights to Information, Preservation, Quality Audits, and Management of Nonconformities and Nonconforming Outputs. Special Processes (clause 3.8.-105658000) are applicable.
Methodology
Source: QUALITY 240-68099512 Form A_Cat 2_ Rev 9.pdfMethodology must align with ISO 9001 principles: Customer Focus, Leadership, Engagement of People, Process Approach, Improvement, Evidence-Based Decision Making, and Relationship Management. All clauses (4-10) of ISO 9001 are applicable.
Quality Management
Source: QUALITY 240-68099512 Form A_Cat 2_ Rev 9.pdfPost-Contract Award requirements: Contract Execution and Supplier Quality Performance Monitoring Phase are applicable.
Compliance Requirements
Source: QUALITY 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)Compliance with ISO 9001 Standard is mandatory. Tenderer must accept Eskom Supplier Quality Requirements as per 240-105658000 Specification. Main Supplier and Sub-supplier Capability and Capacity Assessment may be required (not explicitly marked as applicable in this document).
Section
Source: QUALITY 240-68099512 Form A_Cat 2_ Rev 9.pdfEvaluation includes compliance with ISO 9001 Standard clauses (4-10) and principles (1-7). Post-contract criteria: Contract Execution, Supplier Quality Performance Monitoring Phase, Quality Audits, and Management of Nonconformities. Performance Evaluations and Evidence-Based Decision Making are required.
Description
Source: QUALITY 240-109253698 CQP Template 2021 not signed.pdfScope of work: Perform parallel and correlation tests at Hendrina Power Station for 5 years. Categories may include Design, Manufacturing, Supply and Delivery/Transportation, Construction/Installation/Maintenance, Commissioning, Professional Services, or Other. Full description to be aligned with NEC or Fidic document standards.
Contact Information
Source: QUALITY 240-109253698 CQP Template 2021 not signed.pdf (unknown)Communication channels: E-mails, Minutes of Meetings, Fixed Contract Meetings, Weekly Progress Meetings & reporting. All documentation must be submitted per the contract agreement.
Returnable Documents
Source: QUALITY 240-109253698 CQP Template 2021 not signed.pdf (unknown)Records Control: Records must be identified, completed, retained, and disposed of systematically. Use a retrievable filing system with indexing and cross-referencing. Do not attach procedures.
Evaluation Criteria
Source: QUALITY 240-109253698 CQP Template 2021 not signed.pdf (unknown)Technical Capability
Proven experience in performing parallel and correlation tests in power stations or similar industrial environments.
Quality Certifications
Certification or compliance with **ISO 9001** (Quality Management) and alignment with **ISO 10005:2005/SANS 466:2005** for quality plans.
Financial And Operational
Financial stability and operational capacity to execute the scope over 5 years, including resource allocation for QA/QC, sub-supplier management, and documentation.
Legal Compliance
Registration and compliance with South African legal and regulatory requirements (e.g., company registration, tax clearance, B-BBEE status if applicable).
Health And Safety
Compliance with **Eskom’s safety standards** and occupational health/safety regulations (e.g., OHSA).
Past Performance
Demonstrated track record of successful project delivery for Eskom or similar clients, with references or case studies.
Technical Specifications
Source: QUALITY 240-109253698 CQP Template 2021 not signed.pdf (unknown)Scope of work includes parallel and correlation testing at Hendrina Power Station for 5 years. Activities may include: Design, Manufacturing, Supply and Delivery/Transportation, Construction/Installation/Maintenance, Commissioning, Professional Services, or Other. Full description to be provided as per NEC or Fidic document. Special controls may be required for processes like welding, NDT/NDE. Quality control activities (e.g., Quality Control Checklists) must ensure deliverables meet quality expectations.
Methodology
Source: QUALITY 240-109253698 CQP Template 2021 not signed.pdfMethodology requirements: Submit Method Statements, Safe Working Procedures, PQRs (Procedure Qualification Records), and Repair Procedures. Maintain updated registers for PQRs, Method Statements, and Repair Procedures. Track non-conformances (NCs), defects, and punch items with analysis. Provide monthly inspection analysis reports and databook status registers (milestone-based).
Quality Management
Source: QUALITY 240-109253698 CQP Template 2021 not signed.pdfDatabook Management: If applicable, submit databooks for review and acceptance. Include a list of purchase orders for quality-critical items.
Health & Safety
Source: QUALITY 240-109253698 CQP Template 2021 not signed.pdfMethod statements must detail how work is carried out safely, including risks identified in assessments and control measures. Ensures proper planning and resourcing for health and safety compliance.
Contractual Terms
Source: QUALITY 240-109253698 CQP Template 2021 not signed.pdfPost-delivery activities: Warranty period and conditions, customer satisfaction measurement, technical support, defect correction period, and retention funds. Must consider statutory, regulatory, and scope of work requirements.
Section
Source: QUALITY 240-109253698 CQP Template 2021 not signed.pdf (unknown)Supplier Representative: Provide details and contacts for communication. Use E-mails, Minutes of Meetings, Fixed Contract Meetings, and Weekly Progress Meetings for quality-related issues. All documentation must be submitted as per the contract agreement.
Submission Guidelines
Source: SAFETY REQUIREMENTS not signed 2.pdf (unknown)Submit the following returnable documents as part of your bid:
Returnable Documents
Source: SAFETY REQUIREMENTS not signed 2.pdf (unknown)Returnable documents required:
Evaluation Criteria
Source: SAFETY REQUIREMENTS not signed 2.pdf (unknown)Legal
Valid COIDA (Compensation for Occupational Injuries and Diseases Act) or equivalent compliance.
Policy
Submission of a CEO-signed OHS policy compliant with OHS Act Section 7.
Competency
Demonstrated OHS competency relevant to the scope of work, risks, and OHS plan.
Documentation
Provision of all mandatory and supporting OHS documentation as listed in the checklist.
Technical Specifications
Source: SAFETY REQUIREMENTS not signed 2.pdf (unknown)Technical and safety requirements include:
Compliance Requirements
Source: SAFETY REQUIREMENTS not signed 2.pdf (unknown)Mandatory compliance requirements:
Section
Source: SAFETY REQUIREMENTS not signed 2.pdfEvaluation criteria are detailed in Annexure X of the tender document.
Evaluation Criteria
Source: SCOPE OF WORK FOR CONDUCTING QAL2 AND CORELLATION TEST not signed.pdf (unknown)Mandatory
Preferred
Technical Specifications
Source: SCOPE OF WORK FOR CONDUCTING QAL2 AND CORELLATION TEST not signed.pdf (unknown)Scope: Conduct parallel (QAL2) and correlation tests on Hendrina Power Station’s North and South stacks, as per Air Emissions License (AEL) no. 17/4/AEL/MP312/11/16. Work is executed as and when required by the station.
Required Tests:
Standards and References:
Requirements:
Compliance Requirements
Source: SCOPE OF WORK FOR CONDUCTING QAL2 AND CORELLATION TEST not signed.pdf (unknown)Compliance with the following is required:
Health & Safety
Source: SCOPE OF WORK FOR CONDUCTING QAL2 AND CORELLATION TEST not signed.pdfContractor must:
Environmental
Source: SCOPE OF WORK FOR CONDUCTING QAL2 AND CORELLATION TEST not signed.pdfEnvironmental compliance requirements:
Section
Source: SCOPE OF WORK FOR CONDUCTING QAL2 AND CORELLATION TEST not signed.pdfEvaluation will follow Eskom’s Tender Technical Evaluation Procedure (Reference: 240-48929482). Compliance with ISO 9001 Quality Management Systems and the South African Air Quality Act is mandatory. Returnable documents submitted by the tenderer will be evaluated in support of the bid.
Description
Source: Quality Control Plan TEMPLATE not Signed.pdfContract/Order No., Work Order/QCP No., and Job/Task Description required. Scope: Parallel and correlation testing at Hendrina Power Station over 5 years.
Evaluation Criteria
Source: Quality Control Plan TEMPLATE not Signed.pdf (unknown)General
Technical
Technical Specifications
Source: Quality Control Plan TEMPLATE not Signed.pdf (unknown)Scope: Perform parallel and correlation tests at Hendrina Power Station for a 5-year period. Quality Control Plan (QCP) required, including:
Submission Guidelines
Source: QUALITY_List of Tender Returnables_Cat 2_ Rev 7 not Signed.pdf (TENDER)Submit the following returnable documents as part of your bid: Form A (completed and signed).
Returnable Documents
Source: QUALITY_List of Tender Returnables_Cat 2_ Rev 7 not Signed.pdf (TENDER)Submit Form A (completed and signed) as part of the tender returnables.
Evaluation Criteria
Source: QUALITY_List of Tender Returnables_Cat 2_ Rev 7 not Signed.pdf (TENDER)Must comply with either ISO 9001 certification (Option 1) or documented QMS (Option 2).
Must submit all required returnable documents (QMS evidence, CQP, QCP, audit reports, etc.).
Must align with Eskom’s Supplier Quality Management (Revision 7) and tender specifications (240-105658000).
Must demonstrate capability to perform parallel and correlation tests at a power station.
Technical Specifications
Source: QUALITY_List of Tender Returnables_Cat 2_ Rev 7 not Signed.pdf (TENDER)Technical specifications require compliance with ISO 9001:2015 for Quality Management Systems. Key deliverables include:
Compliance Requirements
Source: QUALITY_List of Tender Returnables_Cat 2_ Rev 7 not Signed.pdf (TENDER)Compliance requirements include:
Requirements
Source: QUALITY_List of Tender Returnables_Cat 2_ Rev 7 not Signed.pdf (TENDER)Additional requirements may apply as per the scope of work or specification. Ensure all customer-specific requirements are addressed.
Section
Source: QUALITY_List of Tender Returnables_Cat 2_ Rev 7 not Signed.pdfEvaluation is based on Quality Management System (QMS) compliance and operational evidence. Scoring breakdown:
Description
Source: Invitation to tender (ITT) CORRELLATION OF TEST.pdf (TENDER)Provision to perform parallel and correlation test at Hendrina Power Station for a period of 5 years.
Important Dates
Source: Invitation to tender (ITT) CORRELLATION OF TEST.pdf (TENDER){"closingDate":"07 April 2026","closingTime":"10h00","briefingSession":"{"date":null,"time":"10h00","venue":"ion meeting: Non-Compulsory clarification meeting will be held as follows","is_compulsory":true}"}
Briefing Session
Source: Invitation to tender (ITT) CORRELLATION OF TEST.pdf (TENDER)Clarification meeting: Non-Compulsory clarification meeting will be held as follows: Date: 2026/07/21 Time: 10h00 – 12h00 (Suppliers are advised to attend clarification on MS team, kindly forward an email) NB: Interested bidders are urged to come in their own PPE (Safety boots, Hard hat, ear plugs, reflectors and goggles) no entry will be permitted to suppliers without full PPE
Contact Information
Source: Invitation to tender (ITT) CORRELLATION OF TEST.pdf (TENDER){"name":"MS TEAM","email":"[email protected]","phone":null,"department":null,"address":"ed to suppliers without"}
Returnable Documents
Source: Invitation to tender (ITT) CORRELLATION OF TEST.pdf (TENDER)The tenderer must submit the returnable set out hereunder as part of its tender at the stipulated deadline. NOTE THE FOLLOWING: -
Evaluation Criteria
Source: Invitation to tender (ITT) CORRELLATION OF TEST.pdf (TENDER)1.1.9 *SBD 6.1 Preference Points Claim Annexure I Y
Form in terms of PPPFA 2022
1.1.11 Tax Evaluation questionnaire to Y
3.13 Functionality Refer to the below technical evaluation criteria.
3.15 Evaluation of Prices will be evaluated as follows
evaluation parameters relating to uncertainty and risk, where applicable.
Prices will be scored out of 80 points
3.18 Evaluation of Specific goals will be scored out of 20 points in accordance with the PPPFA.
Specific Goals
If a tenderer fails to submit evidence of its points claim for a Specific Goal, it will not be
disqualified. However, it will be awarded 0 points for that Specific Goal.
3.19 Ranking of Tenderers will be ranked by applying the preferential point scoring for the 80/20 system.
tenders Eskom will add the score fro
tenders Eskom will add the score from Pricing and Specific Goals together and rank the suppliers
B-BBEE Status Level of Contributor Number of points (80/20 system)
Contractual Requirements are not evaluation criteria. They will be assessed after the
evaluation and ranking of the tenders. Proof that the tenderer recommended for
(Tender quality requirements- Ref 240
Draft Contract Quality Plan specific to the
QCP /Checklist/ ITP (Quality Control Plans) as
Technical Specifications
Source: Invitation to tender (ITT) CORRELLATION OF TEST.pdf (TENDER)Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form Annexure D Y
(Suppliers are required to
download and read the Supplier
Integrity Pact. It is accessible on
the Eskom Tender Bulletin via
Eskom Supplier Integrity Pact
(eskom.co.za) link)
1.1.5 *CPA Requirements for Local Annexure E Y
Goods/Services
1.1.6 *CPA(IG) for Foreign Annexure F Y
Goods/Services (if applicable)
1.1.7 SBD 6.2 Declaration Certificate for Annexure G1 Y
Local Production and Local Content
(only applicable if designated
materials are included and then
Tenderers will be required to
complete and submit Annexures
G1 to G4 as evidence of
compliance with this
requirement). Annexure G2 Y
Annexure C Local Content Annexure G3 Y
Declaration- Summary Schedule
Annexure D Imported Content Annexure G4 Y
Declaration – Supporting Schedule
to Annexure C
Annexure E Local Content
Declaration- Supporting Schedule
to Annexure C
1.1.8 *SBD 1 Invitation to Bid must be Annexure H Y
filled out by all tenderers and
submitted with the tender at tender
submission deadli
Experience & Qualifications
Source: Invitation to tender (ITT) CORRELLATION OF TEST.pdf (TENDER)Functionality/Technical See Technical Criteria below √ 1 GATE KEEPERS - Yes or NO MANDATORY 1.1 SANAS Accreditation The service provider is SANAS, accredited for Emissions testing and Ambient air monitoring. The service provider is to GATE provide proof of SANAS accreditation according to the requirements in the MES 1.2 Member of Stack The service provider is a KEEPERS Testers South Africa member of Stack Testers (STSA) South Africa (STSA). The service provider is to provide proof of valid membership to STSA (a sub-committee of the National Laboratory Association - South Africa NLA-SA). Pass/Fail CAL TH COMPLIANCE TO ESKOM REQUIREMENTS FUNCTI TECHNI CORRELATION PARALLEL TEST - CRITERIA s GUIDELINE NOTES SU DELIVERABLE L 2 COMPANY EXPERIENCE 50 2.1 Traceable experience The bidder shall More than 7 similar 25 demonstrate experience in projects completed conducting correlation and within the last 5 years, parallel testing of CEMS on scores 5 points. combustion plants. 3–6 projects completed, scores 4 Supporting Documents points;
Quality Management
Source: Invitation to tender (ITT) CORRELLATION OF TEST.pdfEffective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* disqualifiable) Contract
to Tender Returnable Returnable Returnable
OHS Act section 7
Quality √
Requirements ISO 9001
is not certified but complies with ISO 9001
(Tender quality requirements- Ref 240-
Requirements (Ref 240-105658000 and 240-
109253698).
scope of work as described in the tender
documents (Ref ISO 10005)
Requirements (Ref 240-105658000 or 240-
QCP /Checklist/ ITP (Quality Control Plans) as
per Scope of Works (Ref ISO 10005)
Requirements & miscellaneous (Ref 240-
2 company experience 50
2.1 Traceable experience The bidder shall More than 7 similar 25
demonstrate experience in projects completed
conducting correlation and within the last 5 years,
parallel testing of CEMS on scores 5 points.
combustion plants. 3–6 projects
completed, scores 4
Supporting Documents points;
certificates 0 Project score, Scores
orders/contracts
Pricing Schedule
Source: Invitation to tender (ITT) CORRELLATION OF TEST.pdf (TENDER)Pricing schedule Completed pricing schedule (if not already submitted in the NEC or other Contract). For e-tendering price schedule needs to be submitted in PDF and a copy in excel format. The upload size per document is 500 megabytes and total submission is restricted to 4 gigabytes.
Financial Requirements
Source: Invitation to tender (ITT) CORRELLATION OF TEST.pdf (TENDER)Payment Terms: payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed
Health & Safety
Source: Invitation to tender (ITT) CORRELLATION OF TEST.pdf (TENDER)Safety 1. Annexure B Is the acknowledgement of Eskom's OHS legal and other requirements form signed and submitted by the tenderer? 2. OHS plan (Must address the project /scope of work OHS risk(s) and aligned with the health and safety specification or requirements) 3. Baseline OHS Risk Assessment (BRA) Identification, assessment and management of OHS risks related to the scope of work. The methodology used for the risk assessment must be provided together with the BRA 4. Valid Letter of Good Standing (COIDA or equivalent) 5. OHS policy signed by CEO The submitted policy document must comply to OHS Act section 7
Contractual Terms
Source: Invitation to tender (ITT) CORRELLATION OF TEST.pdftenderer shall be found to have the nationality of a country if the tenderer is a national
or is constituted, incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also apply to the
determination of the nationality of proposed subcontractors or suppliers for any part of
the Contract including related services.
guarantee is a requirement, the tenderer must select a minimum of two (2) financial
institutions that it is likely to approach from the list provided of Eskom-approved financial
institutions.
3.4 Tender Opening Tenders will not be opened.
W1: Dispute resolution procedure
A: Priced contract with price list
X1: Price adjustment for inflation
X2: Changes in the law
X17: Low Service Damage
X18: Limitation of liability
X19: Task Order
Z: Additional conditions of contract
2.28 CIDB CIDB Requirements are not applicable
Requirements
(where
applicable for
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
suppliers within 60 days of receipt of undisputed invoices.
Requirements
Source: Invitation to tender (ITT) CORRELLATION OF TEST.pdf (TENDER)Tenderers (whether a single company or an incorporated or unincorporated joint venture or consortium) must meet the eligibility criteria stated in the Tender Data. The tenderer, or any of its principals, must not be under any restriction to do business with Eskom or State-Owned Companies. Tenderers are ineligible to submit a tender if: 1. Tenderers have the nationality of a country on any international sanctions list. A tenderer shall be found to have the nationality of a country if the tenderer is a national or is constituted, incorporated, or registered and operates in conformity with the provisions of the laws of that country. This criterion shall also apply to the determination of the nationality of proposed subcontractors or suppliers for any part of the Contract including related services. 2. Tenderers submit more than one tender either individually or as a partner in a joint venture (JV) or consortium, except on an E-Tendering system where there is a limit size (The upload size per document is 500 megabytes and total submission is restricted to 4 gigabytes). 3. Tenders submitted by a joint venture or consortium where the JV/consortium agreement does not explicitly state that the parties of the JV or consortium shall be jointly and severally liable for the execution of the Contract in accordance with the Contract terms. 4. A Tenderer must not have a conflict of interest. All Tenderers found to have a conflict of interest shall be disqualified. Prima facie evidence that a tenderer has a conflict of interest with one or more parties in this tender] process is: (a) they have a controlling partner or majority shareholder in common; or (b) they have a relationship with each other, directly or through common third parties, that puts them in a position to have access to information about or influence on the tender of another tenderer, or to influence the decisions of the Employer regarding this bidding process; 5. Tenders signed by non-authorised persons. 6. Any tenderer that is restricted by National Treasury. 7. Any tenderer on the Tender Defaulters list. 8. Any tenderer and/or its director/s that is restricted by Eskom. 9. A tenderer that sub-contracts 100% of the Scope of Work
Section
Source: Invitation to tender (ITT) CORRELLATION OF TEST.pdf (TENDER)The Eskom Representative is: Name: Oneill Moshobane Tel: (013) 296 3476 E-mail: [email protected]
Description
Source: TENDER TECHNICAL EVALUATION STRATEGY FOR Correlation not signed.pdfScope: Provision of parallel and correlation testing services at Hendrina Power Station (North and South Stacks) for 5 years.
Key activities:
Requirements:
Evaluation Criteria
Source: TENDER TECHNICAL EVALUATION STRATEGY FOR Correlation not signed.pdf (unknown)Mandatory
Qualitative
Technical Specifications
Source: TENDER TECHNICAL EVALUATION STRATEGY FOR Correlation not signed.pdf (unknown)Scope: Conduct testing at Hendrina Power Station (North and South Stacks) for a period of 5 years.
Mandatory requirements:
Services to be performed:
All tests must be conducted by SANAS-accredited labs or labs accredited by equivalent foreign authorities.
Dust Monitor Correlation Test (PM):
Gas Monitor Parallel Verification Test (QAL2):
Biannual Isokinetic Sampling:
Standards and references:
Methodology
Source: TENDER TECHNICAL EVALUATION STRATEGY FOR Correlation not signed.pdfMethodology requirements:
Steps involved in executing testing of both dust and gas monitors simultaneously.
Resources required (personnel and equipment).
Equipment list capable of measuring large diameter stacks (e.g., 12m).
Experience & Qualifications
Source: TENDER TECHNICAL EVALUATION STRATEGY FOR Correlation not signed.pdfBidder experience and qualifications:
5 years: 20 points.
2-5 years: 10 points.
<1 year: 0 points.
Submit company profile with reference lists of relevant jobs completed.
Minimum 3 orders/contracts for Stack Testing (Isokinetic Sampling and QAL2).
Eskom-approved: 5 points.
Content satisfies Eskom requirements: 4 points.
Provided with insufficient content: 2 points.
No procedure: 0 points.
10 points each for certification (max 20 points).
5 points each for compliance with proof.
0 points for no certification or proof.
Quality Management
Source: TENDER TECHNICAL EVALUATION STRATEGY FOR Correlation not signed.pdfQuality standards and requirements:
Compliance Requirements
Source: TENDER TECHNICAL EVALUATION STRATEGY FOR Correlation not signed.pdf (unknown)Mandatory compliance (gatekeepers - failure disqualifies tender):
Additional compliance:
Environmental
Source: TENDER TECHNICAL EVALUATION STRATEGY FOR Correlation not signed.pdfEnvironmental compliance:
Section
Source: TENDER TECHNICAL EVALUATION STRATEGY FOR Correlation not signed.pdfTechnical evaluation threshold: Minimum 70% weighted score required. Gatekeeper criteria (mandatory, pass/fail):
Qualitative criteria (scoring):
Traceable experience in Stack Emission Testing in South Africa: >5 years = 20 points, 2-5 years = 10 points, <1 year = 0 points. Submit company profile with reference lists.
Similar work experience: Eskom-approved = 5 points, satisfies Eskom requirements = 4 points, insufficient content = 2 points, no procedure = 0 points. Minimum 3 orders/contracts required.
Method Statement: Full compliance with Eskom Standard 240-56242363 = 20 points, partial = 10 points, none = 0 points. Must include steps, resources, and equipment list (capable of 12m diameter stacks).
Data Pack: Fully signed-off data pack = 20 points, partial = 10 points, none = 0 points.
Scoring methodology:
Decision basis: Technically suitable if total technical score ≥70% AND gatekeeper score = 2.
Description
Source: SDLI 2 Strategy for provision of correlation test at Hendrina Power station for a period of 5years not signed.pdfProvision of correlation tests at Hendrina Power Station for 5 years.
Submission Guidelines
Source: SDLI 2 Strategy for provision of correlation test at Hendrina Power station for a period of 5years not signed.pdf (TENDER)Submit the following returnable documents to claim preference points:
SDL&I Implementation Schedule must be completed and returned to the SDL&I representative within 28 days of contract award.
Quarterly SDL&I reports must be submitted to Eskom using the Data Collection Template. Corrective measures are mandatory if obligations are unmet; retention clauses may be invoked otherwise.
Returnable Documents
Source: SDLI 2 Strategy for provision of correlation test at Hendrina Power station for a period of 5years not signed.pdf (TENDER)Required documents for preference points:
Evaluation Criteria
Source: SDLI 2 Strategy for provision of correlation test at Hendrina Power station for a period of 5years not signed.pdf (TENDER)B-BBEE
Valid B-BBEE status (Level 1-8 or EME/QSE affidavit). Non-compliant tenderers score 0 for specific goals but are not disqualified (unless B-BBEE is a condition for award).
Local Content
100% local procurement (if applicable).
CIDB
Compulsory training (if applicable) must meet Eskom’s CSDG targets.
Legal
Must comply with all South African laws and Eskom’s contractual terms.
Financial
No explicit financial thresholds, but B-BBEE status depends on annual revenue (EME: ≤R10M, QSE: ≤R50M).
Technical Specifications
Source: SDLI 2 Strategy for provision of correlation test at Hendrina Power station for a period of 5years not signed.pdf (TENDER)Scope: Provision of parallel and correlation tests at Hendrina Power Station for 5 years.
No designated sector or CIDB compulsory training requirements apply to this tender. Failure to meet CIDB Construction Skills Development Goal (CSDG) mandatory percentages (if applicable) will render the tender non-responsive.
Methodology
Source: SDLI 2 Strategy for provision of correlation test at Hendrina Power station for a period of 5years not signed.pdfSkills development targets must address Eskom’s core, scarce, and critical skills (per Government Gazette 43937). Candidates must be sourced from all South African provinces, with demographic representation. Tenderers bear full cost; Eskom provides no financial contribution. SETA-accredited training providers may be engaged. Excludes Eskom employees and registered learners.
Pricing Schedule
Source: SDLI 2 Strategy for provision of correlation test at Hendrina Power station for a period of 5years not signed.pdfTender response must separate local and imported components per the Price Schedule. Local procurement content = total spending minus imported component. Eskom target: 100% local content.
Financial Requirements
Source: SDLI 2 Strategy for provision of correlation test at Hendrina Power station for a period of 5years not signed.pdf (TENDER)Pricing must be separated into local and imported components as per the Price Schedule in the tender documents. Local procurement content is calculated as total spending minus the imported component. Eskom targets 100% local procurement content.
Compliance Requirements
Source: SDLI 2 Strategy for provision of correlation test at Hendrina Power station for a period of 5years not signed.pdf (TENDER)Mandatory compliance requirements:
Sworn Affidavit Validity Requirements:
B-BBEE Improvement/Retention Plan:
Local Content:
B-BBEE Requirements
Source: SDLI 2 Strategy for provision of correlation test at Hendrina Power station for a period of 5years not signed.pdf (TENDER)Local Procurement Content: Value added in South Africa by South African resources. Must be separated in pricing per the Price Schedule.
Special Conditions
Source: SDLI 2 Strategy for provision of correlation test at Hendrina Power station for a period of 5years not signed.pdf (TENDER)Reporting and Monitoring:
Requirements
Source: SDLI 2 Strategy for provision of correlation test at Hendrina Power station for a period of 5years not signed.pdf (TENDER)Sworn Affidavit Validity Requirements:
Section
Source: SDLI 2 Strategy for provision of correlation test at Hendrina Power station for a period of 5years not signed.pdfTenderers failing to provide B-BBEE documentation: