Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
1 Jones Road - Kempton Park - Kempton Park -
Organization Type
GOVERNMENT
Published
23 Sept 2026
OCDS Reference
ocds-9t57fa-171316
Airports company south africa (acsa) is inviting tenders for the refurbishment of staff restrooms at or tambo international airport, under a contract period of 12 months. The successful bidder will be required to complete the contract document and insurance forms, and must attend a compulsory briefing session. Bids must be submitted in a sealed envelope marked 'original' and 'copy', with the original and one copy, plus a USB flash drive, and must be deposited in tender box a at acsa's north wing, 3rd floor offices by 4 november 2026 at 12h00. The most consequential consideration is that bidders must provide at least three reference letters on client letterhead, as these will be verified, and must comply with the 80/20 preference point system, requiring valid b-bbee certification or sworn affidavit.
Compulsory briefing: Attend the compulsory briefing session on the specified dates (exact date not stated in the provided text) — failure to attend will result in disqualification.
Closing time: Submit bids by 4 November 2026 at 12h00 (South African Time) into Tender Box A at ACSA Offices, North Wing, 3rd Floor, OR Tambo International Airport. Late bids will not be accepted.
Bid format: Provide 1 original and 1 copy, each sealed separately and clearly marked 'ORIGINAL' and 'COPY', plus an electronic copy on USB flash drive. Envelopes must show the tenderer's name, contact details, tender reference number, and description, and include the return address.
Reference letters: Provide at least three (3) reference letters on client letterhead, showing bidder name, scope of works, project value, and client name, with contactable references. These will be verified — non-compliance may render the bid non-responsive.
Preference points: Bidders must claim preference points under the 80/20 system. Provide a valid B-BBEE certificate from a SANAS accredited agency, or a sworn affidavit, or a consolidated B-BBEE certificate for joint ventures. Also provide a CSD registration report.
Tax compliance: Provide a valid Tax Compliance Status (TCS) pin or CSD number. If not registered for TCS, complete the relevant declaration in the bid document.
Sign and complete: Complete and sign all returnable documents, including SBD 1, Form of Offer and Acceptance (C1.1), and the contract document (Appendix 1). Bids must be submitted on official forms only — do not re-type or alter them.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 04 November 2026 - 12:00
Venue
O.R. Tambo International Airport Media Room
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
1 Jones Road - Kempton Park - Kempton Park -
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Description
Source: APPENDIX 2B- LANDSIDE INSURANCE REQUIREMENTS.pdf23 Sept
2026
Tender Published
Tender was published
04 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
APPENDIX 2B- LANDSIDE INSURANCE REQUIREMENTS.pdf
Refurbishment of staff restrooms at OR Tambo International Airport over a 12-month period, procured by the Airports Company of South Africa. The contract includes construction works and associated insurance obligations, with the employer arranging principal-controlled insurance and the contractor required to maintain additional cover.
APPENDIX 1- CONTRACT DOCUMENT.pdf
Airports Company South Africa requires the refurbishment of staff restrooms at OR Tambo International Airport over a 12-month period, under an NEC3 Engineering and Construction Contract (Option A: Priced contract with activity schedule). The works cover multiple locations across the airport, including terminal buildings, fire stations, and offices, and include design stages, demolition, construction, and material supply.
ORTIA81792026RFP- Final published.pdf
Refurbishment of staff restrooms over a 12-month period at OR Tambo International Airport, procured by the Airports Company South Africa. The contract covers building, plumbing, electrical, HVAC and related works, with a compulsory briefing and site visit, and evaluation based on functionality, price and preference points.
APPENDIX 2A- AIRSIDE INSURANCE REQUIREMENTS.pdf
Refurbishment of staff restrooms at OR Tambo International Airport over a 12-month period, procured by the Airports Company of South Africa. The contract includes construction works with associated insurance obligations, with a defects liability period and compliance with airside construction insurance clauses.
APPENDIX 3- SAFETY & ENVIRONMENTAL REQUIREMENTS.pdf
Refurbishment of staff restrooms over a 12-month period at OR Tambo International Airport, for the Airports Company of South Africa. The work is subject to strict environmental terms and conditions, including waste management, pollution prevention, and compliance with ACSA's environmental policy.
To download these documents and access AI-powered analysis, visit the main tender page.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 198 375
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This appendix specifies insurance requirements for landside construction contracts. It applies to contracts with a value not exceeding R150 million, a construction period not exceeding 36 months, and a defects liability period not exceeding 24 months.
Contact Information
Source: APPENDIX 2B- LANDSIDE INSURANCE REQUIREMENTS.pdf (unknown)Claims notification contacts:
Contact: Nokulunga Masiza
Telephone: +27 (0)11 723 1400
Mobile: +27 (0)79 512 0532
Email: [email protected]
Contact: Buhle Mnguni
Telephone: +27 (0)11 723 1400
Mobile: +27 (0)74 535 9075
Email: [email protected]
Technical Specifications
Source: APPENDIX 2B- LANDSIDE INSURANCE REQUIREMENTS.pdf (unknown)This document is an appendix covering insurance requirements for landside construction contracts. It applies where the awarded contract value does not exceed R150 million, the construction period does not exceed 36 months, and the defects liability period does not exceed 24 months. The employer (ACSA) arranges principal controlled insurance, and the contractor must maintain additional insurances as specified.
Financial Requirements
Source: APPENDIX 2B- LANDSIDE INSURANCE REQUIREMENTS.pdf (unknown)Deductibles payable by the contractor:
Contractor must maintain insurances with minimum limits:
Contractor must not include premiums for employer-arranged insurance in its pricing, except for supplementary cover it deems necessary.
Compliance Requirements
Source: APPENDIX 2B- LANDSIDE INSURANCE REQUIREMENTS.pdf (unknown)Contractor must comply with all terms and conditions of employer-arranged policies and is deemed aware of all conditions, limits, exclusions and deductibles. Contractor must produce its insurance policies to the employer within 28 days of contract commencement. If the contractor fails to effect or maintain required insurances, the employer may do so and deduct premiums from amounts due to the contractor.
Contractual Terms
Source: APPENDIX 2B- LANDSIDE INSURANCE REQUIREMENTS.pdfSub-contractors: The contractor must ensure all potential and appointed sub-contractors are aware of the insurance clauses and enforce compliance through sub-contract agreements.
Important Dates
Source: APPENDIX 1- CONTRACT DOCUMENT.pdf (RFP)Closing date: 4 November 2026 at 12:00 (from tender record).
Contact Information
Source: APPENDIX 1- CONTRACT DOCUMENT.pdf (RFP)Project Manager:
Employer:
Submission Guidelines
Source: APPENDIX 1- CONTRACT DOCUMENT.pdf (RFP)Returnable documents:
Evaluation Criteria
Source: APPENDIX 1- CONTRACT DOCUMENT.pdf (RFP)The contract is a NEC3 Engineering and Construction Contract (ECC3), Option A (Priced contract with activity schedule).
Technical Specifications
Source: APPENDIX 1- CONTRACT DOCUMENT.pdf (RFP)Refurbishment of staff restrooms at OR Tambo International Airport for a period of 12 months.
Financial Requirements
Source: APPENDIX 1- CONTRACT DOCUMENT.pdf (RFP)Pricing format: NEC3 Option A – Priced contract with activity schedule.
Compliance Requirements
Source: APPENDIX 1- CONTRACT DOCUMENT.pdf (RFP)CIDB registration: The tenderer's CIDB registration number must be provided.
Description
Source: APPENDIX 2A- AIRSIDE INSURANCE REQUIREMENTS.pdfThis appendix sets out the insurance requirements for airside construction contracts at ACSA, applicable where the contract value does not exceed R150 million, the construction period does not exceed 36 months, and the defects liability period does not exceed 24 months.
Evaluation Criteria
Source: APPENDIX 2A- AIRSIDE INSURANCE REQUIREMENTS.pdf (unknown)The contractor must be able to comply with the insurance requirements, including effecting and maintaining the specified insurances. The contractor must familiarise itself with employer-arranged policies and accept the deductibles. The contractor must provide insurance policies within 28 days of contract commencement. The contractor must ensure subcontractors are aware of and comply with insurance clauses. No specific eligibility criteria such as CSD registration, tax clearance, B-BBEE level, or CIDB grading are stated in the provided document.
Technical Specifications
Source: APPENDIX 2A- AIRSIDE INSURANCE REQUIREMENTS.pdf (unknown)The document is an appendix covering insurance requirements for airside construction contracts. It applies where the awarded contract value does not exceed R150 million, the construction period does not exceed 36 months, and the defects liability period does not exceed 24 months. The employer (ACSA) effects Principal Controlled Insurance (PCI) in joint names of employer, contractor, and subcontractors, covering:
The contractor must familiarise itself with these policies and comply with their terms. The contractor must also effect its own insurances, including construction plant and equipment, employer's liability (minimum R20,000,000), motor vehicle liability (minimum R5,000,000), buy-down cover for employer deductibles if unacceptable, excess public/aviation/PI liability, marine cargo (if applicable), and other customary insurances. Policies must be provided within 28 days of contract commencement.
Financial Requirements
Source: APPENDIX 2A- AIRSIDE INSURANCE REQUIREMENTS.pdf (unknown)Deductibles payable by the contractor under employer-arranged policies:
Contractor must not include premiums for employer-arranged insurance in its pricing, except for supplementary insurance it chooses to buy. If the contractor fails to effect required insurances, the employer may do so and deduct premiums from amounts due to the contractor.
Compliance Requirements
Source: APPENDIX 2A- AIRSIDE INSURANCE REQUIREMENTS.pdf (unknown)No specific compliance requirements (such as CSD registration, tax clearance, B-BBEE level, or CIDB grading) are stated in the provided document.
Contractual Terms
Source: APPENDIX 2A- AIRSIDE INSURANCE REQUIREMENTS.pdfThe employer effects Principal Controlled Insurance (PCI) covering Contract Works, Public Liability (R100m), Removal of Lateral Support Liability (R50m), SASRIA Contract Works (R500m aggregate), Aviation Liability (R2bn), and Design & Construct Professional Indemnity (R25m aggregate, shared across ACSA contracts). The contractor must comply with policy terms, bear deductibles (e.g., R150k contract works, R75k public liability, R300k aviation, R5m/R10m PI), and follow claims procedures including immediate notification to specified ACSA contacts, preserving damage, and cooperating with insurers. The contractor must also effect its own insurances: construction plant, employer's liability (min R20m), motor vehicle liability (min R5m), buy-down cover for employer deductibles, excess public/aviation/PI liability, marine cargo (if applicable), and other customary insurances. Policies must be provided within 28 days of contract commencement; if the contractor fails to insure, the employer may insure and deduct premiums. Sub-contractors must be made aware and comply.
Important Dates
Source: ORTIA81792026RFP- Final published.pdf (RFP)Closing date: 4 November 2026 at 12:00 PM (South African Time).
Compulsory briefing session: 7 October 2026 at 10:00 AM, at the OR Tambo International Airport Media Room, Ground Floor of Domestic Terminal B (next to the post office).
Compulsory site inspection: directly after the briefing session on 7 October 2026.
Closing date for enquiries: 14 October 2026.
Employer's response to clarification requests: by 19 October 2026.
Public opening of tenders: 4 November 2026 at 12:30 PM.
Contact Information
Source: ORTIA81792026RFP- Final published.pdf (RFP)Bidding procedure and technical enquiries:
Employer's Agent: Alicia Sekoati (email as above). All communication during the tender period must be directed to ACSA's Supply Chain Department, not to the Principal Agent.
Submission address (Tender Box A):
Airports Company South Africa SOC Limited Offices
North Wing, 3rd Floor
OR Tambo International Airport
Submission Guidelines
Source: ORTIA81792026RFP- Final published.pdf (RFP)Submission method: physical delivery only. Bids must be deposited into Tender Box A at the ACSA offices, North Wing, 3rd Floor, OR Tambo International Airport, before the closing time. Late bids will not be accepted and will be returned unopened. Telephonic, telegraphic, telex, facsimile, or e-mailed tenders are not accepted.
Format: Submit 1 original and 1 copy, each sealed separately and clearly marked "ORIGINAL" and "COPY". Each package must show the bidder's name, contact details, tender reference number (ORTIA8179/2026/RFP), and tender description. Also submit an electronic copy on a USB flash drive. All documents must be completed in non-erasable ink on the official forms provided; do not re-type or alter them.
Returnable documents (complete, sign, and return with the bid):
Disqualification risks:
Evaluation Criteria
Source: ORTIA81792026RFP- Final published.pdf (RFP)Evaluation is in stages:
Stage 1 – Responsiveness: compliance with tender conditions, proper completion and signing, and responsiveness to requirements.
Stage 2 – Mandatory Administration Criteria (pass/fail):
Stage 3 – Functionality (minimum threshold: 80 out of 100 points):
Stage 4 – Price and Preference (90/10 split, for bids above R50 million):
Bidders who fail to meet the minimum functionality threshold of 80/100 will not proceed to price and preference evaluation.
Technical Specifications
Source: ORTIA81792026RFP- Final published.pdf (RFP)Scope: Refurbishment of staff restrooms at OR Tambo International Airport for a period of 12 months.
Key personnel roles required (with CVs and qualifications):
Company experience: minimum 2 reference letters for building or building refurbishment projects, each with a minimum value of R9,000,000 (excl. VAT). Reference letters must be on client letterhead with contactable references, showing bidder name, scope, project value, and client name. Purchase orders and appointment/award letters are not accepted. Reference letters will be verified.
Pricing: Fixed prices, not subject to adjustment for the full contract duration. Rates and prices must be in Rand, excluding VAT (VAT shown separately).
Financial Requirements
Source: ORTIA81792026RFP- Final published.pdf (RFP)Pricing: Fixed prices for the full contract duration; no contract price adjustments or foreign fluctuations. Rates and prices in Rand, excluding VAT (VAT shown separately).
Bid security: Not specified in the provided text.
Bonds/guarantees: Not specified in the provided text, but the tenderer must submit any required securities, bonds, guarantees, policies, and certificates of insurance before contract formation if requested.
Insurance: The employer may provide some insurance, but the tenderer is advised to seek qualified advice; full cover may not be provided.
Company experience threshold: Minimum 2 reference letters for projects each with a minimum value of R9,000,000 (excl. VAT).
Compliance Requirements
Source: ORTIA81792026RFP- Final published.pdf (RFP)Mandatory eligibility:
Tax compliance:
B-bbee:
Other:
Description
Source: APPENDIX 3- SAFETY & ENVIRONMENTAL REQUIREMENTS.pdfEnvironmental Terms and Conditions to Commence Work for ACSA service and maintenance contractors.
Evaluation Criteria
Source: APPENDIX 3- SAFETY & ENVIRONMENTAL REQUIREMENTS.pdf (unknown)Contractors must agree to the Environmental Terms and Conditions and acknowledge ACSA's right to impose penalties for non-compliance. The signed agreement is required. No other eligibility criteria are stated in the provided document.
Technical Specifications
Source: APPENDIX 3- SAFETY & ENVIRONMENTAL REQUIREMENTS.pdf (unknown)Environmental Terms and Conditions to Commence Work (EMS 048) apply to all ACSA service and maintenance contractors. ACSA will audit contractor activities, products and services on an ad hoc basis to ensure compliance. Any pollution clean-up costs are borne by the contractor.
Compliance Requirements
Source: APPENDIX 3- SAFETY & ENVIRONMENTAL REQUIREMENTS.pdf (unknown)No specific compliance requirements found in the provided document.
Health & Safety
Source: APPENDIX 3- SAFETY & ENVIRONMENTAL REQUIREMENTS.pdfContractor must comply with applicable noise regulations. Waste separated as general or hazardous, disposed of at permitted landfill sites if recycling not feasible. No dumping, burying or burning of waste. Maintain a tidy, litter-free work area. Keep on file waste company name, disposal site, monthly quantity reports (general, hazardous, recycled), Waste Manifest Documents, Certificates of Safe Disposal, and copy of waste permit. All hazardous chemical substances (HCS) labelled, stored and handled per Material Safety Data Sheets (MSDS); MSDS stored with HCS. Spillages cleaned up immediately and disposed of as hazardous waste; reported to ACSA immediately. Contractors informed on handling and storage of hazardous substances. Comply with all relevant legislation on transport, storage, use and disposal of hazardous substances.
Contractual Terms
Source: APPENDIX 3- SAFETY & ENVIRONMENTAL REQUIREMENTS.pdf (unknown)Penalties: ACSA may impose penalties for infringements of these requirements or legislation. The contractor will be advised in writing of the nature of the infringement and the penalty amount. The contractor must take steps (e.g. training/remediation) to prevent recurrence and advise ACSA accordingly. Penalties do not replace any legal proceedings that the Council, authorities, land owners or the public may institute. Penalties range from R200 to R20,000 depending on severity, decided by ACSA's Airport Environmental Management Representative in consultation with the Airport Manager or designate, and are final. In addition, the contractor must make good any damage caused by the infringement at their own expense.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
1 Jones Road - Kempton Park - Kempton Park -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
5
Last checked
01 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Comprehensive guide to Institute of IT Professionals South Africa membership. Certification levels, requirements for ICT professionals, and how IITPSA membership enhances credibility for SITA and government IT tenders.
Definitive guide to Health Professions Council of South Africa registration for healthcare professionals bidding on government tenders. Covers the 12 professional boards, step-by-step registration, CPD requirements, foreign qualification evaluation, provincial health department tender opportunities, and how AI Tender Matching on Tenders-SA.org helps you find HPCSA-requiring contracts.
A strategic guide to getting listed on government consultancy, legal, and engineering panels. Learn why panels are the gateway to steady public sector work.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.