ESKOM requires a contractor to provide coating and lining services for condensers, coolers, associated large bore pipework, water boxes and tube sheets at kriel power station for a period of 5 years on an as-and-when-required basis. The work involves in-situ application of solvent-free epoxy coatings in water-immersed environments. Bidders must meet strict technical gatekeeper criteria, including verifiable references for three similar projects since 2021, and achieve a minimum 70% functionality score to be considered for award.
Quick Summary
- Eskom
- National
- Closes 17 November 2026 at 10:00 (2 days left)
AI-Analyzed Compliance Requirements
624 pointsPoint-by-point requirements consolidated and deduplicated from 13 analyzed documents.
Submission Requirements
64- Submission method and format are not explicitly stated in the extracted document.
- The NEC3 Term Service Contract (TSC3) Form of Offer and Acceptance requires the tenderer to sign and submit the Offer, which the Employer accepts by signing and returning a copy including any Schedule of Deviations.
- The tenderer must contact the Employer's agent within two weeks of receiving the completed agreement to arrange delivery of securities, bonds, guarantees, proof of insurance and other documentation.
- Returnable forms (to be completed, signed and submitted):
- Form of Offer and Acceptance (C1.1): signed offer committing to all obligations and liabilities of the Contractor under the contract.
- Schedule of Deviations: any deviations from tender documents agreed during offer and acceptance.
- Contract Data Part two (C1.2): data to be completed by the tenderer/contractor.
- Price List (C2.2): priced items of service under Option A.
- Contractor's plan: to be submitted for acceptance within the period stated in the service agreement.
- Contract Quality Plan and Quality Control Plan: to be submitted within 30 days after contract award.
- B-BBEE documentation: verification certificate or affidavit as applicable.
- Proof of insurance cover for deductibles under Employer's insurance policies.
- Failure to submit signed returnable forms.
- Any deviation not recorded in the Schedule of Deviations.
- Prohibited Action (coercive, collusive, corrupt, fraudulent or obstructive conduct) by the Contractor or any Committing Party.
- Submission method: e-tendering via the Eskom Tender Bulletin site on the Eskom E-tendering page. Paper submissions are not accepted for e-tendering.
- Closing: 30 October 2026 at 10:00 SAST (GMT+2). The E-tendering system will not allow finalisation or submission after this time.
- Packaging for e-tendering: upload documents into the relevant folders — Technical, Commercial and Financial — as indicated on the e-tendering page.
- Number of copies: one complete original tender plus one complete hard copy if paper submission is stipulated; for e-tendering, upload PDF/Excel documents that are accessible and not corrupt.
- Language: English only. Written tenders must be completed in ink (not pencil) if paper-based; electronic submissions must result in a permanent record.
+ 44 more requirements in the full document analysis
Evaluation Criteria
99- The document does not specify an explicit evaluation methodology, scoring split, or minimum qualifying score.
- The NEC3 TSC3 Option A is a priced contract where the Prices are derived from a list of items of service priced as lump sums or as expected quantities multiplied by rates.
- B-BBEE status monitoring applies throughout the contract:
- The Contractor must notify the Employer within 7 days of any change in legal status, ownership or business composition that affects B-BBEE status.
- An updated verification certificate and supporting documentation must be submitted within 30 days of notification.
- If B-BBEE status has decreased since the starting date, the Employer may re-negotiate the contract or terminate the Contractor's obligation to provide the service.
- Failure to notify of a B-BBEE status change may result in termination under NEC3 TSC penalty/termination clauses.
- No explicit preference point system (80/20 or 90/10) is stated in the extracted text.
- The CQP template implies bidders must demonstrate a compliant Quality Management System per SANS 466:2005 / ISO 10005:2005, qualified QA/QC personnel, and effective sub-supplier management.
- Evaluation method: Two-phase technical evaluation.
- Phase 1 – Desktop: Mandatory gatekeepers (pass/fail) followed by qualitative criteria scoring.
- Phase 2 – Workshop/site visit: For bidders passing Phase 1 with ≥70% qualitative score.
- Scoring: Weighted scorecard with scores 5 (100%), 4 (80%), 2 (40%), 0 (0%).
- Minimum technical threshold: 70% weighted final score.
- Method statement per GE/MAT/26/007 (surface preparation, coating application, curing, testing) – weight 45%.
- List of deviations from Eskom SOW/standards – weight 10%.
- Minimum qualitative score: 70%.
- Availability and knowledge of standards (GE/MAT/26/006, 007, 008, 009, ISO 8501-1, ISO 8502-6, ISO 8502-3) – weight 20%.
- Equipment inspection (blasting pots, airless spray pumps, calibrated measuring equipment) – weight 40%.
- Practical demonstration of surface preparation and coating on 0.5 m² plate with 30 m air hoses – weight 40%.
+ 79 more requirements in the full document analysis
Technical Requirements
183- Scope: Coating and lining for Kriel Condensers, Coolers, associated large bore pipework, waterboxes and tubesheets
- Location: Kriel Power Station
- Duration: 5 years, on an as-and-when-required basis
- Outages: 15 outages over the contract period; outages may be postponed, brought forward or deferred with timely notification to the Contractor
- Repair, replacement, component re-instatement and machining of components/fittings
- Refurbishment off-site and on-site
- Boiler and Turbine plant scope
- Mean atmospheric pressure: 847 millibars
- Electricity: 220/400 V
- Instrument air: 750 kPa
- Process water: 6 bar
- Work is instructed via signed Task Orders issued by the Service Manager
- Task Orders include: detailed work description, priced list of items, starting and completion dates
- No work commences without a signed detailed Task Order agreed by both Service Manager and Contractor
- No Task Orders issued after the end of the service period
- Level 4 programme when Task Order is provided
- Link between Price List items and operations on each plan
- Information showing how each Price List item relates to plan operations
- Detailed feedback report required daily during outages
- Accurate progress status and constraint communication with mitigation action plans
+ 163 more requirements in the full document analysis
Methodology
6- Required work process for tubesheets, waterboxes and piping:
- Detailed visual inspection to identify and mark up corrosion protection defects
- Inspection report documenting findings
- Surface preparation of repair areas
- Project schedule submission to contract manager
- Methodology – Phase 2 Site Visit: Bidders passing Phase 1 with ≥70% qualitative score undergo site visit at their works. Evaluation:
Experience & Qualifications
2- Employer may verify references.
- Unsatisfactory or unverifiable projects do not count.
Quality Management
16- Submission to: Kriel Engineering
- Joint plant inspection with Kriel Engineer to confirm final scope
- Close-out documentation (within 14 days of completion):
- Product datasheets
- Batch numbers
- GE/MAT/26/006 to /26/009 and /26/039: Kriel Power Station specific corrosion protection specifications
- Quality Management – Acceptable/Unacceptable Risks & Exceptions:
- Extensive knowledge of standards and quality control shown during site visit even if not all standards physically available.
- Minor deviations from scope not affecting overall corrosion protection quality.
- Minor omissions in returnables that can be resolved during formal method statement and QCP approvals.
- Plagiarised employer specification submitted as method statement.
- Acceptable technical exceptions/conditions: None listed.
- Unacceptable technical exceptions/conditions:
- Significant deviations from specification without informing client.
- Evidence of QMS in operation: organisation chart and responsibility matrix (must include quality function), control of externally provided processes (clause 8.4).
- Mandatory technical evaluation (gatekeeper) criteria for quality:
Pricing
7- Pricing basis: all duties, taxes (including VAT) and levies included in rates, prices and tendered total; applicable rates are those 14 days before closing.
- Alterations: only for compliance with Eskom Representative instructions or to correct errors; all alterations initialed by all signatories.
- No correction fluid or tape.
- Alternative tenders: only with main tender and if permitted by Invitation to Tender; based only on criteria in Tender Data.
- Clarification after submission: required if requested during evaluation, but mandatory returnables cannot be submitted after closing.
- Price breakdown clarifications cannot change prices or substance except for arithmetical error correction.
- Eskom notifies errors and requests confirmation or acceptance of corrections.
Financial Requirements
61- Contract type: NEC3 Term Service Contract (TSC3) Option A — priced contract with lump sums and/or rates multiplied by quantities
- Lump sum items: fixed amount, no adjustment for quantity changes; only changed by compensation event
- Rate-based items: rate multiplied by completed quantity
- Time-proportional items: unit of time stated with expected duration
- Tax invoice due within one week of receiving payment certificate from Service Manager
- Invoice must equal amount stated in Service Manager's payment certificate
- Invoices hand-delivered to Kriel Finance Department (Accounts Payable)
- Electronic invoices not accepted; original or certified-original invoices only
- Contractor and Service Manager name and address
- Contract number and title
- Contractor VAT registration number
- Employer VAT registration number: 4740101508
- Description of service per Price List item
- Amounts excluding VAT, VAT, and total including VAT
- Service Entry and Goods Receipt Note number on invoice
- Eskom Purchase Order number on invoice
- Bank account details on invoice
- Eskom correct name: "Eskom Holdings SOC Limited"
- Both parties agree service completed before invoicing
- Assessment/payment certificate completed and signed by both parties
+ 41 more requirements in the full document analysis
Compliance & Regulatory
132- CSD registration: Required (implied by standard government procurement; not explicitly stated in extracted text)
- Tax compliance: Valid tax compliance status required; VAT registration number must appear on invoices
- Decreased B-BBEE status may trigger re-negotiation or termination
- EMEs (revenue ≤ R10 million): qualifying sworn affidavit may be submitted
- QSEs (revenue ≤ R50 million): applicable certificate or qualifying affidavit
- Revenue above R50 million: valid B-BBEE certificate required
- Affidavit must contain required ownership and revenue information
- Deponent and Commissioner of Oaths must sign on same date
- Commissioner of Oaths must be independent of bidder
- CIDB grading: Not explicitly stated in extracted document
- CIPC registration: Not explicitly stated
- Professional registrations: Not explicitly stated
- Local content: Not explicitly stated in extracted document
- Contract Quality Plan (CQP) and Quality Control Plan (QCP) per QM-58 and Supplier Contract Quality Requirement Specification (QM58)
- Submitted for approval within 30 days after contract award
- No work commences until written approval obtained
- Final signed-off documents submitted within 1 week after completion
- ITPs and welding procedures required
- Material certificates required
- Adherence to Eskom welding rule book
+ 112 more requirements in the full document analysis
Health & Safety
8- Contractor responsible for OSH Act compliance
- Environmental health and safety requirements:
- Health & Safety / Site Visit Evaluation (Phase 2):
- Evaluation of equipment function, safety aspects, operator skills.
- Post-blast measurements: cleanliness, profile, dust, salt.
- Post-coat: wet film thickness – weight 40%.
- Scoring: 0 (deficient/non-responsive), 40 (non-compliant/unacceptable risks), 80 (compliant with acceptable risks), 100 (compliant).
- Compliance with OHS Act and Eskom SHEQ requirements mandatory.
Environmental
3- Environmental requirements for the contractor:
- Environmental Aspects and Impacts Register: Identify aspects related to scope of work; register aspects and impacts (cause and effect).
- Required submissions: Environmental Policy, Environmental Aspects and Impacts Register, and EMP.
Contractual Terms
25- Tender validity: tenderers must hold tenders valid for acceptance within the validity period after closing, and extend if requested until contract(s) concluded.
- Refusal to extend excludes tenderer from further consideration.
- Extension does not represent that the tender is acceptable or that Eskom will negotiate.
- Confidentiality: all procurement matters treated as confidential;
- Eskom documents used only for tender preparation and submission.
- Negotiation: Eskom reserves right to enter mandated negotiations with selected tenderer(s).
- Disclaimer: Eskom does not warrant accuracy or completeness of tender document information and disclaims liability.
- Cancellation: Eskom may cancel tender before contract conclusion with written reasons; may abandon, perform alternatively, or re-issue.
- No liability for losses from participation, amendment, termination, suspension or exclusion.
- Contract formation: successful tenderer must notify acceptance before validity expiry; contract documents revised for addenda, returnables, negotiated changes and agreed revisions.
- Signatories: both parties must sign original and one copy of Form of Agreement.
- Contract type: NEC Term Service Contract.
- Main option A: Priced contract with price list.
- Dispute resolution: W1.
- Secondary options: X1 price adjustment for inflation, X2 changes in law, X17 low service damages, X18 limitation of liability, X19 task order, Z additional conditions.
- B-BBEE improvement/retention plan required within 30 days of contract signature.
- Payment terms: 30 days for contracts below R50m (incl. VAT); 60 days for above R50m.
- No performance security required.
- CIDB CSDG and CPG not applicable.
- Subcontracting with subsidiary companies discouraged; must be declared if done.
+ 5 more requirements in the full document analysis
Other Requirements
6- Method statement and QCP to Kriel Engineering for approval
- Requirements – Mandatory Gatekeepers: Pass/fail criteria assessed via questionnaire (YES/NO).
- Any NO eliminates bidder.
- Gatekeepers are minimum critical parameters for successful execution.
- Specific mandatory criterion: verifiable reference list of 3 projects since 2021 involving submersed internal coatings of industrial components in comparable water-immersed environments (vessel, tank, pipeline ≥800 NB, in-situ).
- References must be verifiable with client contact details.
Evaluation criteria
12- Evaluation Criteria (detailed): Two-phase technical evaluation.
- Qualitative criteria: two method statements (GE/MAT/26/007 and GE/MAT/26/008) each 45%, deviations list 10%.
- Site visit criteria: standards knowledge 20%, equipment inspection 40%, practical demonstration 40%.
- Functionality: if applicable, tenderers scored against functionality criteria with minimum threshold to proceed to further evaluation.
- Specific Goals: scored from supporting documentation; missing proof by closing scores zero in 90/10 or 80/20 allocation without disqualification.
- Section D (Draft ITP/QCP): 1 point
- Total: 13 points. No minimum qualifying score or overall evaluation split provided.
- Functionality/technical evaluation threshold: minimum 70% (scored on 100% weight).
- Detailed technical scoring weights: equipment inspection 40%, workshop demonstration 40%, familiarity with standards 20%.
- Specific goals (B-BBEE) points per 80/20 system, maximum 20 points.
- Price points: 80 points.
- Ranking: highest combined score wins, subject to objective criteria (local content 100%).
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
13
Last checked
16 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Provide Coating and Lining for Kriel Condensers, Coolers, associated large bore pipework, water boxes and tube sheets for a period of 5 years on an as and when required
Increase your winning chances
Most bidders are rejected due to compliance gaps. Use our Readiness Engine to verify your status for this specific Services: General.
Check My ReadinessImportant Dates & Timeline
2 key dates
Tender Closing Date
17 November 2026 at 10:00
2
Days Left
Tender Published
2 October 2026
Tender was published
Tender Closing Date
17 November 2026 at 10:00
Final deadline for submission
Eskom
As the backbone of South Africa's national grid, Eskom issues high-stakes tenders for power generation, transmission, distribution, plant maintenance, and critical infrastructure rehabilitation. However, the sheer volume of engineering-intensive RFQs—combined with strict safety protocols, technical specifications, and compliance schedules—makes manual bid preparation a high-risk gamble. Tenders SA transforms this page into your power-sector command centre. Our AI Tender Matching engine surfaces Eskom opportunities aligned with your engineering, manufacturing, or logistics capacity. Our document analysis instantly decodes dense technical specs, compulsory site briefings, and functionality criteria. Use procurement intelligence to assess project viability against your operational bandwidth, while compliance gap analysis flags missing electrical certifications or safety files before they derail you. Finally, our application assistance helps you compile a meticulous, submission-ready response that meets Eskom's rigorous procurement standards.
Operating Provinces
Key Personnel
AI Document Analysis Stages
- Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
- Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
- Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
- Document read
- Compliance review
- Bid-ready summary
NEC3 TSC - EPOXY COATING.docx
72% Medium ConfidenceScope of Work for Coating and Rubber Lining.pdf
55% Low ConfidenceEnvironmental Requirement Form - Epoxy.pdf
35% Low Confidence240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
35% Low Confidence240-109253698 CQP Template 2021.docx
35% Low ConfidenceAnnexure B.docx
55% Low ConfidenceKriel PS Condenser Coating and Rubber.pdf
75% Medium ConfidenceEskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf
55% Low Confidence240-12248652_List of Tender Returnables_Cat 3_ Rev 7_Coating & lining.pdf
75% Medium ConfidenceInvitation to Tender (ITT) Epoxy.pdf
95% High Confidence240-77471651.docx Annexure C1 High risk.docx
45% Low Confidence240-68099512 Form A_Cat 3_ Rev 9_Coating and Lining.docx
45% Low ConfidenceSDL&I Strategy template for Provide Epoxy Coating and Lining.pdf
72% Medium ConfidenceAI Analysis Summary
Recommended Actions
NEC3 TSC - EPOXY COATING.docx
Annexure B.docx
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf
Kriel PS Condenser Coating and Rubber.pdf
240-77471651.docx Annexure C1 High risk.docx
SDL&I Strategy template for Provide Epoxy Coating and Lining.pdf
Environmental Requirement Form - Epoxy.pdf
240-12248652_List of Tender Returnables_Cat 3_ Rev 7_Coating & lining.pdf
240-109253698 CQP Template 2021.docx
Scope of Work for Coating and Rubber Lining.pdf
240-68099512 Form A_Cat 3_ Rev 9_Coating and Lining.docx
Invitation to Tender (ITT) Epoxy.pdf
Share this tender
Provide Coating and Lining for Kriel Condensers, Coolers, associated large bore pipework, water boxes and tube sheets for a period of 5 years on an as and when required
Eskom tender in National. Closing 11/17/2026. Provide Coating and Lining for Kriel Condensers, Coolers, associated large bore pipework, water boxes and tube sheets for a period of 5 years on an as...
Smart Assistant
Check if your company qualifies for this tender before you apply.
How it Works
Organization
Eskom
Contact Person
Dieketseng Molise
Phone
017-612-9156
[email protected]
Address
VAALPAN ROAD - KRIEL - KRIEL - 2271
17 November 2026 at 10:00
Location
National
Closing Date
17 November 2026 at 10:00
Organization
Eskom
Urgent: Closing Soon
This tender closes in less than 3 days
Upcoming Deadlines
Some requirements have upcoming deadlines
Are you a news editor or niche publisher? Embed this tender data directly on your site for free.
Get Embed CodeAI-generated Document Analysis for Tender by Eskom. 1 business days remain.