Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
VAALPAN ROAD - KRIEL - KRIEL - 2271
Organization Type
GOVERNMENT
Published
02 Oct 2026
OCDS Reference
ocds-9t57fa-172030
ESKOM requires a contractor to provide coating and lining services for condensers, coolers, associated large bore pipework, water boxes and tube sheets at kriel power station for a period of 5 years on an as-and-when-required basis. The work involves in-situ application of solvent-free epoxy coatings in water-immersed environments. Bidders must meet strict technical gatekeeper criteria, including verifiable references for three similar projects since 2021, and achieve a minimum 70% functionality score to be considered for award.
Closing: 30 October 2026 at 10:00, submitted electronically via Eskom E-Tendering site only; no hard copies accepted.
Clarification meeting (non-compulsory): 16 October 2026 at 09:00 on MS Teams; confirm attendance with Dieketseng Molise ([email protected], 017 625 2855).
Mandatory returnables at closing (disqualifiable if missing or unsigned): Annexures A, B, C, D, E, F, G1–G4, H (SBD 1), I (SBD 6.1), J (SBD 4); plus CSD registration and COIDA letter of good standing.
Technical gatekeeper: provide verifiable references for 3 projects since 2021 involving submersed internal solvent-free epoxy coating of industrial components in water-immersed environments (vessel, tank, or ≥800NB pipeline); workshop/controlled-environment work not accepted.
Functionality: minimum 70% threshold on 100% weighted technical evaluation; includes equipment inspection (40%) and practical demonstration of surface prep and coating application on a 0.5 m² plate with 30m air hoses (40%).
Evaluation: 80/20 system – price scored out of 80, B-BBEE specific goals out of 20 (Level 1=20, 2=18, 3=14, 4=12, 5=8, 6=6, 7=4, 8=2); objective criteria require 100% local content.
Contractual requirements (assessed after ranking): latest approved annual financial statements of the tendering company, QMS per ISO 9001:2015, safety and environmental plans, and 2% CSI allocation; failure may render bidder non-responsive.
These opportunities are also free to read in their final 3 days.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
These opportunities are also free to read in their final 3 days.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Friday, 30 October 2026 - 10:00
Venue
MS TEAM
Categories
Request for Bid(Open-Tender)
VAALPAN ROAD - KRIEL - KRIEL - 2271
AI Document Analysis Stages
Description
Source: NEC3 TSC - EPOXY COATING.docx02 Oct
2026
Tender Published
Tender was published
17 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NEC3 TSC - EPOXY COATING.docx
Eskom requires coating and lining services for Kriel Condensers, Coolers, associated large bore pipework, waterboxes and tubesheets at Kriel Power Station over 5 years on an as-and-when required basis, covering 15 outages.
Annexure B.docx
Eskom seeks a contractor to provide coating and lining services for Kriel condensers, coolers, associated large bore pipework, water boxes and tube sheets on an as‑and‑when‑required basis for a five‑year period.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
ESKOM is procuring coating and lining materials for Kriel Condensers, coolers, associated large bore pipework, water boxes, and tube sheets for a five-year period on an as-and-when-required basis.
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf
Eskom requires coating and lining services for condensers, coolers, large bore pipework, water boxes and tube sheets at Kriel Power Station for a five-year period on an as-and-when required basis.
Kriel PS Condenser Coating and Rubber.pdf
Provision of coating and lining services for Kriel Power Station components, including condensers, coolers, large bore pipework, waterboxes, and tubesheets, for a five-year period on an as-and-when-required basis.
240-77471651.docx Annexure C1 High risk.docx
Eskom requires coating and lining services for Kriel condensers, coolers, large bore pipework, water boxes and tube sheets over a 5-year period, awarded on an as-and-when-required basis.
SDL&I Strategy template for Provide Epoxy Coating and Lining.pdf
Supply and coating and lining services for Kriel Power Station condensers, coolers, associated large bore pipework, water boxes and tube sheets over 60 months on an as and when required basis.
Environmental Requirement Form - Epoxy.pdf
ESKOM requires coating and lining services for Kriel Condensers, Coolers, large bore pipework, water boxes and tube sheets over a 5-year period, supplied on an as-and-when-required basis.
240-12248652_List of Tender Returnables_Cat 3_ Rev 7_Coating & lining.pdf
The department requires coating and lining for Kriel condensers, coolers, associated large bore pipework, water boxes and tube sheets for a period of five years on an as‑and‑when basis. This procurement is for ESKOM.
240-109253698 CQP Template 2021.docx
The procurement involves providing coating and lining services for Kriel Condensers, Coolers, associated large bore pipework, water boxes, and tube sheets for ESKOM over a 5-year period on an as-and-when-required basis. The provided document is a Contract Quality Plan template that bidders must complete to demonstrate their quality management capabilities, outlining processes for communication, personnel roles, sub-supplier monitoring, and documentation control in accordance with SANS 466:2005 / ISO 10005:2005.
Scope of Work for Coating and Rubber Lining.pdf
Eskom is procuring coating and lining services for Kriel Power Station’s condensers, coolers, associated large bore pipework, water boxes, tube sheets and demineralised head tanks on an as‑and‑when‑required basis for a five‑year period.
240-68099512 Form A_Cat 3_ Rev 9_Coating and Lining.docx
Coating and lining services for Kriel condensers, coolers, associated large bore pipework, water boxes and tube sheets are required for a 5-year period on an as and when required basis. Eskom requires bidders to accept its Supplier Quality Requirements under 240-105658000 and ISO 9001.
Invitation to Tender (ITT) Epoxy.pdf
Eskom requires a contractor to provide coating and lining services for Kriel Condensers, Coolers, associated large bore pipework, water boxes and tube sheets on an as-and-when-required basis over five years. The contract uses an NEC Term Service Contract with a priced contract and price list, and tenders are evaluated under an 80/20 preferential points system with 100% local content required.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The Employer requires coating and lining services for Kriel Power Station equipment over a 5-year term. The procurement uses the NEC3 Term Service Contract (TSC3) Option A, a priced contract where the Contractor provides service on an as-and-when-required basis via Task Orders issued by the Service Manager. The scope covers repair, replacement, component re-instatement, machining, and refurbishment of Boiler and Turbine plant components, with 15 planned outages over the contract period.
Important Dates
Source: NEC3 TSC - EPOXY COATING.docx (unknown)Closing date: 30 October 2026 at 10:00
Contract period: 5 years, on an as-and-when-required basis
Outages: 15 outages planned over the 5-year period. Outages may be postponed, brought forward or deferred; the Contractor will be informed in time to make arrangements.
Task Order response times (when emergencies arise):
Post-award deadlines:
Contact Information
Source: NEC3 TSC - EPOXY COATING.docx (unknown)Invoice submission:
Insurance and policy information:
Site access permits:
Note: Specific named SCM and technical contacts with telephone numbers are not stated in the extracted document. The Employer's agent details are referenced in the Contract Data but not provided in the extracted text.
Submission Guidelines
Source: NEC3 TSC - EPOXY COATING.docx (unknown)Submission method and format are not explicitly stated in the extracted document. The NEC3 Term Service Contract (TSC3) Form of Offer and Acceptance requires the tenderer to sign and submit the Offer, which the Employer accepts by signing and returning a copy including any Schedule of Deviations. The tenderer must contact the Employer's agent within two weeks of receiving the completed agreement to arrange delivery of securities, bonds, guarantees, proof of insurance and other documentation.
Returnable forms (to be completed, signed and submitted):
Disqualification risks:
Evaluation Criteria
Source: NEC3 TSC - EPOXY COATING.docx (unknown)The document does not specify an explicit evaluation methodology, scoring split, or minimum qualifying score. The NEC3 TSC3 Option A is a priced contract where the Prices are derived from a list of items of service priced as lump sums or as expected quantities multiplied by rates.
B-BBEE status monitoring applies throughout the contract:
No explicit preference point system (80/20 or 90/10) is stated in the extracted text.
Technical Specifications
Source: NEC3 TSC - EPOXY COATING.docx (unknown)Scope: Coating and lining for Kriel Condensers, Coolers, associated large bore pipework, waterboxes and tubesheets
Location: Kriel Power Station
Duration: 5 years, on an as-and-when-required basis
Outages: 15 outages over the contract period; outages may be postponed, brought forward or deferred with timely notification to the Contractor
Work elements:
Site conditions:
Task Order system:
Contractor plan requirements:
Daily reporting:
Management meetings:
Key personnel:
Documentation:
Equipment and materials:
Site access and security:
Eskom Life Saving Rules (mandatory):
Financial Requirements
Source: NEC3 TSC - EPOXY COATING.docx (unknown)Contract type: NEC3 Term Service Contract (TSC3) Option A — priced contract with lump sums and/or rates multiplied by quantities
Pricing mechanism:
Payment terms:
Invoice requirements:
Service-related payment process:
Retention:
Contract Price Adjustment (CPA):
Foreign exchange invoices:
Insurance:
Bonds and guarantees:
Financial records:
Compliance Requirements
Source: NEC3 TSC - EPOXY COATING.docx (unknown)CSD registration: Required (implied by standard government procurement; not explicitly stated in extracted text)
Tax compliance: Valid tax compliance status required; VAT registration number must appear on invoices
B-bbee:
CIDB grading: Not explicitly stated in extracted document
CIPC registration: Not explicitly stated
Professional registrations: Not explicitly stated
Local content: Not explicitly stated in extracted document
Quality certifications:
Health and safety:
Environmental:
Statutory appointments required (where applicable):
Prohibited conduct:
Description
Source: Scope of Work for Coating and Rubber Lining.pdfScope: Coating and lining for corrosion protection at Kriel Power Station, 5-year as-and-when contract
Plant: 6 generating units with condensers for main and boiler feed pump turbines, plus auxiliary coolers
Components: main turbine condensers, BFPT condensers, main and BFPT oil coolers, stator coolers, H2 coolers, auxiliary and primary cooling water strainers, associated cooling water pipework, demineralised head tank
Work: patch repairs to defective tubesheet coatings; full coating or patch repairs on waterboxes and pipework where corrosion protection has failed; removal of existing rubber lining; organic coatings only
Site conditions: 847 millibars atmospheric pressure; 220/400 V electricity; 750 kPa instrument air; 6 bar process water
Quantities and specifications per component listed in technicalSpecifications section
Technical Specifications
Source: Scope of Work for Coating and Rubber Lining.pdf (unknown)Scope: Coating and lining services for corrosion protection at Kriel Power Station, 5-year as-and-when contract
Plant: 6 generating units with main and boiler feed pump turbine condensers, auxiliary coolers
Components covered:
Work types:
Per-unit quantities (estimated areas, one unit):
Waterbox and staybars lining:
Tubesheet coating:
Cooling water strainers:
Demineralised water head tank:
Pipe coating (100 NB – 3000 NB), raw water, 65°C:
Site conditions:
Applicable standards:
Methodology
Source: Scope of Work for Coating and Rubber Lining.pdf (unknown)Required work process for tubesheets, waterboxes and piping:
Per-order process:
Quality Management
Source: Scope of Work for Coating and Rubber Lining.pdfQuality system: ISO 9001 Quality Management Systems required
Pre-approval required:
Submission to: Kriel Engineering
Per-order process:
Close-out documentation (within 14 days of completion):
Applicable standards:
Compliance Requirements
Source: Scope of Work for Coating and Rubber Lining.pdf (unknown)Quality: ISO 9001 Quality Management Systems required
Documentation required before work commences:
Both require approval from Kriel Engineering
Per-order requirements:
Post-completion (within 14 days):
Safety compliance:
Health & Safety
Source: Scope of Work for Coating and Rubber Lining.pdfSafety obligations:
Requirements
Source: Scope of Work for Coating and Rubber Lining.pdf (unknown)Pre-commencement:
Per-order:
Post-completion (14 days):
Important Dates
Source: Environmental Requirement Form - Epoxy.pdf (unknown)Form effective date: 29 January 2025
Form review date: 28 January 2027
Form sign-off date: 18 May 2026
Contact Information
Source: Environmental Requirement Form - Epoxy.pdf (unknown)Contact: Tumelo Lekone
Role: Senior Advisor Environmental Management
Email: not provided
Telephone: not provided
Technical Specifications
Source: Environmental Requirement Form - Epoxy.pdf (unknown)Scope: Coating and lining for Kriel condensers, coolers, associated large bore pipework, water boxes and tube sheets for 5 years on an as-and-when-required basis.
Environmental Policy: Contractor must submit an environmental policy and proof of communication to employees (project team). Policy must demonstrate top management commitment to environmental protection, pollution prevention, legal compliance, and continual improvement.
Environmental Aspects and Impacts Register: Contractor must determine aspects related to scope of work and register aspects and impacts.
Environmental Management Plan (EMP): Contractor must develop an EMP demonstrating how activities with potential environmental impacts will be managed during project lifespan.
Not required: Convey Dangerous Goods by Road certificate, Waste Transporter Certificate, Waste Management License.
Compliance Requirements
Source: Environmental Requirement Form - Epoxy.pdf (unknown)Environmental compliance: Environmental Policy, Environmental Aspects and Impacts Register, Environmental Management Plan must be submitted.
No requirement for dangerous goods conveyance certificate, waste transporter certificate, or waste management license.
Health & Safety
Source: Environmental Requirement Form - Epoxy.pdfEnvironmental health and safety requirements:
Environmental
Source: Environmental Requirement Form - Epoxy.pdfEnvironmental requirements for the contractor:
Important Dates
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Closing: 30 October 2026 at 10:00
Submission method: not stated in the available document text
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Scope: coating and lining services for Kriel power station condensers, coolers, associated large bore pipework, water boxes and tube sheets
Duration: 5 years, as and when required basis
Quality requirements: Quality Control Plan or Inspection Test Plan required, with defined intervention points (Hold Points, Witness Points, Document Review, Surveillance, Verification)
Inspection methods: visual, microscopy, NDT, liquid/dye penetrant, magnetic particle, EDDY current testing
Acceptance criteria: functionality requirements, performance measures, regulatory compliance, chemical testing
Third-party inspection: Approved Inspection Authority (AIA) / Notification Body (NOBO) involvement required for statutory elements
Description
Source: 240-109253698 CQP Template 2021.docxThe document is a Contract Quality Plan (CQP) template based on SANS 466:2005 / ISO 10005:2005. It outlines the structure and content required for a supplier's quality plan, including definitions, scope, communication, organogram, interfacing documents, supplier lists, monitoring, QMS interfaces, item indexes, QCP/ITP requirements, special controls, document submission, records control, non-conformance management, databook management, equipment management, customer property, preservation, traceability, and commissioning activities.
Evaluation Criteria
Source: 240-109253698 CQP Template 2021.docx (unknown)The document does not specify evaluation criteria, scoring split, minimum qualifying score, or preference point system. The CQP template implies bidders must demonstrate a compliant Quality Management System per SANS 466:2005 / ISO 10005:2005, qualified QA/QC personnel, and effective sub-supplier management.
Technical Specifications
Source: 240-109253698 CQP Template 2021.docx (unknown)Scope: Coating and lining for Kriel condensers, coolers, associated large bore pipework, water boxes, and tube sheets for a 5-year period on an as-and-when-required basis.
Quality requirements: Supplier must prepare a Contract Quality Plan (CQP) aligned with SANS 466:2005 / ISO 10005:2005 covering:
Description
Source: Annexure B.docxSupply and application of coating and lining for Kriel Power Station condensers, coolers, large bore pipework, water boxes and tube sheets over a 5-year period on an as-and-when-required basis.
Technical Specifications
Source: Annexure B.docx (unknown)Scope: Coating and lining for Kriel Power Station condensers, coolers, associated large bore pipework, water boxes and tube sheets for a 5-year period on an as-and-when-required basis.
Mandatory SHE compliance:
Penalties and liabilities:
Induction:
Contractor and supplier management:
Acknowledgement:
Description
Source: Kriel PS Condenser Coating and Rubber.pdfDescription (summary): Kriel Power Station 6 units, condensers for main and boiler feed pump turbines. Coating scope: main turbine/BFPT condenser tubesheets (coated), waterboxes (rubber lined), oil cooler tubesheets/waterboxes (coated), stator cooler tubesheets/waterboxes (coated), hydrogen cooler waterboxes (coated), CW strainers (coated). Waterboxes and pipework coated, rubber lined, or combination. Work: repair defective tubesheet coating, full/patch coating on waterboxes and pipework where protection failed, remove rubber lining, apply organic coatings.
Evaluation Criteria
Source: Kriel PS Condenser Coating and Rubber.pdf (unknown)Evaluation method: Two-phase technical evaluation.
Phase 1 – Desktop: Mandatory gatekeepers (pass/fail) followed by qualitative criteria scoring.
Phase 2 – Workshop/site visit: For bidders passing Phase 1 with ≥70% qualitative score.
Scoring: Weighted scorecard with scores 5 (100%), 4 (80%), 2 (40%), 0 (0%).
Minimum technical threshold: 70% weighted final score.
Qualitative criteria (Phase 1):
Minimum qualitative score: 70%.
Site visit criteria (Phase 2):
No price/B-BBEE split disclosed in this document.
Technical Specifications
Source: Kriel PS Condenser Coating and Rubber.pdf (unknown)Scope: Coating and lining for Kriel Power Station condensers, coolers, large bore pipework, water boxes, tube sheets (6 generating units).
Components:
Work: Repair defective tubesheet coating; full coating or patch repairs on waterboxes and cooling water pipework where corrosion protection failed; remove existing rubber lining; apply organic coatings.
Applicable standards: GE/MAT/26/006, GE/MAT/26/007, GE/MAT/26/008, GE/MAT/26/009, ISO 8501-1, ISO 8502-6, ISO 8502-3.
Normative references: Generation Technical Tender Evaluation Procedure (240-168966153), Eskom Procurement Policy (32-1034), Eskom SHEQ Policy (32-727), National Environmental Management Waste Act, Occupational Health and Safety Act.
Operating medium: Clarified cooling water (CCW).
Location: Kriel Power Station only.
Methodology
Source: Kriel PS Condenser Coating and Rubber.pdfMethodology – Phase 2 Site Visit: Bidders passing Phase 1 with ≥70% qualitative score undergo site visit at their works. Evaluation:
Scoring per criterion: 0 (deficient/non-responsive), 40 (non-compliant/unacceptable risks), 80 (compliant with acceptable risks), 100 (compliant).
Experience & Qualifications
Source: Kriel PS Condenser Coating and Rubber.pdfExperience & Qualifications – Mandatory References: Bidder must provide 3 verifiable references for submersed internal coating projects completed since 2021. Comparable environment: water-immersed (vessel, tank, or pipeline ≥800 NB containing water continuously, in-situ work). Each reference must include: project description, component description, product name, operating environment, client name, client engineer/QC representative name, contact number, email, completion date. Employer may verify references. Unsatisfactory or unverifiable projects do not count. Exclusions: work not in comparable environments, unverifiable, pre-2021, workshop/controlled environment, purchase orders only, vague references, non-tank/pipe lining systems.
Quality Management
Source: Kriel PS Condenser Coating and Rubber.pdfQuality Management – Acceptable/Unacceptable Risks & Exceptions:
Acceptable technical risks:
Unacceptable technical risks:
Acceptable technical exceptions/conditions: None listed.
Unacceptable technical exceptions/conditions:
Compliance Requirements
Source: Kriel PS Condenser Coating and Rubber.pdf (unknown)Mandatory technical compliance:
Health & Safety
Source: Kriel PS Condenser Coating and Rubber.pdfHealth & Safety / Site Visit Evaluation (Phase 2):
Scoring: 0 (deficient/non-responsive), 40 (non-compliant/unacceptable risks), 80 (compliant with acceptable risks), 100 (compliant).
Requirements
Source: Kriel PS Condenser Coating and Rubber.pdf (unknown)Requirements – Mandatory Gatekeepers: Pass/fail criteria assessed via questionnaire (YES/NO). Any NO eliminates bidder. Gatekeepers are minimum critical parameters for successful execution. Specific mandatory criterion: verifiable reference list of 3 projects since 2021 involving submersed internal coatings of industrial components in comparable water-immersed environments (vessel, tank, pipeline ≥800 NB, in-situ). References must be verifiable with client contact details. Unacceptable references: non-comparable environments, unverifiable, pre-2021, workshop/controlled environment, purchase orders only, vague, non-tank/pipe lining systems.
Section
Source: Kriel PS Condenser Coating and Rubber.pdfEvaluation Criteria (detailed): Two-phase technical evaluation. Phase 1: Desktop – mandatory gatekeepers (pass/fail) then qualitative scoring. Phase 2: Workshop/site visit for bidders scoring ≥70% in qualitative phase. Qualitative criteria: two method statements (GE/MAT/26/007 and GE/MAT/26/008) each 45%, deviations list 10%. Minimum qualitative score 70%. Site visit criteria: standards knowledge 20%, equipment inspection 40%, practical demonstration 40%. Overall technical threshold 70% weighted final score.
Important Dates
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Closing date and time: 30 October 2026 at 10:00 SAST (GMT+2)
Tender validity period: as stated in Tender Data; tenderers must hold tenders valid for acceptance within this period and extend if requested by Eskom until contract(s) concluded.
Compulsory site visit / clarification meeting: date, time and venue stated in Tender Data. Attendance is mandatory if stipulated; non-attendance results in disqualification.
Addenda: issued prior to closing if necessary. Tenderers must monitor Eskom Tender Bulletin and NT e-Tender Portal regularly.
Clarification requests: must be submitted in writing to the Eskom Representative before closing, allowing reasonable time for response and tender adjustments.
Contact Information
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Enquiries and communications: must be addressed to the Eskom Representative only, in writing, in English. No other Eskom official may be contacted.
Eskom Tender Bulletin: check regularly for addenda, clarification responses and award notifications.
NT e-Tender Portal: check regularly for addenda, clarification responses and award notifications.
Submission address: e-tendering via Eskom Tender Bulletin site on the Eskom E-tendering page (no physical tender box for e-tendering).
Note: specific named contact (name, email, telephone) for this tender is not stated in the extracted document text; refer to the Tender Data in the Invitation to Tender documents.
Submission Guidelines
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Submission method: e-tendering via the Eskom Tender Bulletin site on the Eskom E-tendering page. Paper submissions are not accepted for e-tendering.
Closing: 30 October 2026 at 10:00 SAST (GMT+2). The E-tendering system will not allow finalisation or submission after this time.
Packaging for e-tendering: upload documents into the relevant folders — Technical, Commercial and Financial — as indicated on the e-tendering page.
Number of copies: one complete original tender plus one complete hard copy if paper submission is stipulated; for e-tendering, upload PDF/Excel documents that are accessible and not corrupt.
Language: English only. Written tenders must be completed in ink (not pencil) if paper-based; electronic submissions must result in a permanent record.
Signing: the original tender must be signed. For e-tendering, the electronic tender must be signed. Eskom will hold the named signatory liable.
Late tenders: no late tenders accepted. Proof of posting or courier delivery does not equate to proof of delivery.
Disqualification risks:
Returnable forms:
Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Evaluation framework: PPPFA preference points system (80/20 or 90/10 as stated in Tender Data).
Evaluation stages (in order):
Arithmetical errors: amount in words prevails over figures. Eskom will notify the tenderer of errors and request confirmation or acceptance of corrections. If the tenderer confirms prices as tendered, Eskom corrects errors with line-item total prevailing over rate, and total of prices prevailing over item prices. Refusal to correct errors leads to rejection.
Objective criteria: may be applied under PPPFA section 2(1)(f) only if stipulated in the Invitation to Tender. Functionality and B-BBEE scorecard elements may not be used as Objective Criteria.
Reverse e-auction: may be utilised if indicated in the Invitation to Tender. Tenderers submit a complete tender without prices; any included prices will not be considered.
Minimum qualifying score: functionality minimum threshold as stated in Tender Data (specific value not provided in extracted text).
Technical Specifications
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Scope: coating and lining for Kriel Condensers, Coolers, associated large bore pipework, water boxes and tube sheets.
Duration: 5 years, on an as-and-when-required basis.
Location: Kriel (Eskom power station).
Contract type: services — maintenance/protective coating works on power plant heat-exchange equipment and piping.
Key requirements from standard conditions:
Pricing Schedule
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfPricing basis: all duties, taxes (including VAT) and levies included in rates, prices and tendered total; applicable rates are those 14 days before closing. Fixed rates for contract duration; no contract price adjustment except as provided in Invitation to Tender. Currency: South African Rand unless otherwise instructed; exchange rate and base date as stipulated if part payment in other currencies applies. Alterations: only for compliance with Eskom Representative instructions or to correct errors; all alterations initialed by all signatories. No correction fluid or tape. Alternative tenders: only with main tender and if permitted by Invitation to Tender; based only on criteria in Tender Data. Clarification after submission: required if requested during evaluation, but mandatory returnables cannot be submitted after closing. Price breakdown clarifications cannot change prices or substance except for arithmetical error correction. Arithmetical errors: amount in words prevails. Eskom notifies errors and requests confirmation or acceptance of corrections. If tenderer confirms as tendered: line-item total prevails over rate; total of prices prevails over item prices. Refusal to correct leads to rejection.
Financial Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Pricing format: rates and prices fixed for the contract duration, not subject to contract price adjustment except as provided in the Invitation to Tender.
Currency: South African Rand unless instructed otherwise. Exchange rate and base date as stipulated in Invitation to Tender if part payment in other currencies is provided for.
Taxes and levies: all duties, taxes (including VAT) and other levies payable by the tenderer if successful must be included in rates, prices and tendered total. Applicable rates are those in force 14 days prior to closing.
Insurance: Eskom's insurance cover may not be sufficient; tenderers should seek qualified advice.
Bid security / performance security: if required, tenderer must indicate minimum of two financial institutions likely to be approached. Eskom reserves the right to reject unsuitable institutions.
Financial capacity: Eskom will evaluate financial statements for risk. If risk is too high or mitigating factors insufficient, tenderer will not be considered for award.
Arithmetical errors: correction process may adjust rates and prices; tenderer must accept corrections or face rejection.
Payment terms: as per conditions of contract in Invitation to Tender documents.
Retention: not specified in extracted text.
Cost of tendering: no compensation by Eskom for preparation, submission, testing or negotiation costs.
Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)CSD registration: mandatory. Tenderers must be registered on the National Treasury Central Supplier Database.
Tax status: valid tax clearance (SARS TCS or tax pin) required.
B-BBEE: proof of B-BBEE level required at closing if pre-qualification criterion; for PPPFA scoring, certificate/affidavit/CSD report used. Missing, fraudulent or expired documents score zero for preference points; may disqualify if pre-qualification applies. Fronting or misrepresentation reported to B-BBEE Commission with suspension up to 10 years and potential jail sentence.
CIDB: if stipulated in Tender Data as qualification criterion, registration required at closing or capability to register within 21 working days after closing. Proof of application acceptable at closing; full registration printout required by contract award. Missing proof at closing disqualifies.
CIPC: not explicitly mentioned; ensure company registration documentation is current.
Professional registrations: not specified in extracted text.
Local content: designated material and threshold information must be submitted by contract award if applicable; missing = no award.
Legislative compliance: National Treasury Instruction Notes, CIDB Regulations, dtic local content designations, PPPFA Regulations, Amended B-BBEE Codes, COIDA, OHS Act, Eskom SHEQ requirements, and any other applicable legislation indicated in Invitation to Tender.
SHEQ: proof of safety, health, environmental and quality systems, policies and capabilities required by closing or contract award.
SDL&I Undertaking: must be completed and submitted by contract award; missing = no award.
Contract Skills Development Goals (CSDG): applicable if contract duration ≥12 months and either contract value ≥R5 million (professional/service) or CIDB grade ≥7 (engineering/construction/design-build). Achieve CSDG as per CIDB Standard (GN 1779, Government Gazette April 2023).
Contract Participation Goals (CPG): applicable to construction works contracts in GB or CE classes, duration ≥6 months, with ≥25% of main contract sub-contractable in CE, EB, GB or ME classes. Achieve CPG per CIDB standard (Government Gazette February 2013).
Disqualification grounds: misrepresentation or falsification of any information, certificate, affidavit or document; influence on tender processing or award; collusion/bid rigging; fraudulent/illegal activity; restriction from doing business with Eskom or state-owned companies.
Health & Safety
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfSHEQ requirements: tenderers must provide proof satisfactory to Eskom that safety, health, environmental and quality systems, policies and capabilities are in place by closing or contract award. All SHEQ costs and personnel must be reflected in the tender. Compliance with OHS Act and Eskom SHEQ requirements mandatory. Legislative compliance includes COIDA, OHS Act, and any other applicable legislation in the Invitation to Tender.
Contractual Terms
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfTender validity: tenderers must hold tenders valid for acceptance within the validity period after closing, and extend if requested until contract(s) concluded. Refusal to extend excludes tenderer from further consideration. Extension does not represent that the tender is acceptable or that Eskom will negotiate. Confidentiality: all procurement matters treated as confidential; Eskom documents used only for tender preparation and submission. Negotiation: Eskom reserves right to enter mandated negotiations with selected tenderer(s). Disclaimer: Eskom does not warrant accuracy or completeness of tender document information and disclaims liability. Cancellation: Eskom may cancel tender before contract conclusion with written reasons; may abandon, perform alternatively, or re-issue. No liability for losses from participation, amendment, termination, suspension or exclusion. Contract formation: successful tenderer must notify acceptance before validity expiry; contract documents revised for addenda, returnables, negotiated changes and agreed revisions. Signatories: both parties must sign original and one copy of Form of Agreement.
Section
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfFunctionality: if applicable, tenderers scored against functionality criteria with minimum threshold to proceed to further evaluation. Financial analysis: Eskom assesses financial risk; insufficient mitigating factors or excessive risk excludes tenderer from award. Price evaluation: based on Tender Data criteria including CPA, FOREX, commodity exposure, unconditional discounts, technical adjustment, PV and forecasted invoicing rates. B-BBEE: scored from CSD report or certificate/affidavit; pre-qualification proof required at closing or disqualification; for PPPFA scoring only, missing/expired/fraudulent documents score zero but do not disqualify if otherwise responsive. Specific Goals: scored from supporting documentation; missing proof by closing scores zero in 90/10 or 80/20 allocation without disqualification. Ranking: Price score plus Specific Goals score, highest to lowest. Objective criteria: may apply under PPPFA section 2(1)(f) only if stipulated in Invitation to Tender; functionality and B-BBEE elements excluded. Reverse e-auction: if utilised, tenderers submit complete tender without prices; included prices disregarded.
Description
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7_Coating & lining.pdfScope: Coating and lining for Kriel condensers, coolers, associated large bore pipework, water boxes and tube sheets for 5 years on an as-and-when-required basis. Quality requirements per specification 240-105658000.
Important Dates
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7_Coating & lining.pdf (TENDER)Closing date and time: 30 October 2026 at 10:00
Document issued: 19 May 2026
Contact Information
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7_Coating & lining.pdf (TENDER)Eskom representative: T.M. Mogola
Role: Not specified
Email: Not provided
Telephone: Not provided
Submission address: Not provided
Service delivery address: Not provided
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7_Coating & lining.pdf (TENDER)Quality evaluation scoring (Category 3 quality requirements):
Total quality score: 13 points
No minimum qualifying score, preference point system (80/20 or 90/10), or price/B-BBEE split stated in this document.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7_Coating & lining.pdf (TENDER)Scope: Provide coating and lining for Kriel condensers, coolers, associated large bore pipework, water boxes and tube sheets for a period of 5 years on an as-and-when-required basis.
Quality requirements (ref specification 240-105658000):
Section
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7_Coating & lining.pdfQuality evaluation scoring (Category 3):
Total: 13 points. No minimum qualifying score or overall evaluation split provided.
Description
Source: Invitation to Tender (ITT) Epoxy.pdfEskom invites tenders for the provision of coating and lining services for Kriel power station condensers, coolers, associated large bore pipework, water boxes, and tube sheets. The contract is for a period of 5 years on an as-and-when-required basis. The work is part of an open tender process (single award to a single supplier).
Important Dates
Source: Invitation to Tender (ITT) Epoxy.pdf (RFP)Closing date: 30 October 2026 at 10:00
Tender validity period: 120 days from closing date and time
Clarification meeting (non-compulsory): 16 October 2026 at 09:00, held on MS Teams
Contact Information
Source: Invitation to Tender (ITT) Epoxy.pdf (RFP)Eskom Representative
Procurement Manager (signature block)
Fraud and corruption hotline
Submission Guidelines
Source: Invitation to Tender (ITT) Epoxy.pdf (RFP)Submission
Returnable documents (mandatory, signed where required):
Disqualification risks:
Evaluation Criteria
Source: Invitation to Tender (ITT) Epoxy.pdf (RFP)Evaluation stages:
Objective criteria (may result in award to other than highest scorer):
Contractual requirements are assessed after ranking; failure to meet them may render the bidder non-responsive.
Technical Specifications
Source: Invitation to Tender (ITT) Epoxy.pdf (RFP)Scope of work: Provide coating and lining for Kriel Condensers, Coolers, associated large bore pipework, water boxes, and tube sheets for a period of 5 years on an as-and-when-required basis.
Key requirements:
Quality management (Category 3):
Safety requirements:
Environmental requirements:
CSI (Community Social Investment): 2% of contract value allocated to CSI initiatives.
Quality Management
Source: Invitation to Tender (ITT) Epoxy.pdfQuality requirements (Category 3):
Mandatory technical evaluation (gatekeeper) criteria for quality:
Pricing Schedule
Source: Invitation to Tender (ITT) Epoxy.pdfPricing schedule requirements:
Financial Requirements
Source: Invitation to Tender (ITT) Epoxy.pdf (RFP)Pricing format:
Payment terms (standard Eskom):
Evaluation of price:
Financial capacity:
No performance security stated (not applicable per tender data).
Compliance Requirements
Source: Invitation to Tender (ITT) Epoxy.pdf (RFP)Mandatory eligibility:
B-BBEE requirements:
Tax compliance:
Employment Equity:
Local Content:
CIDB: Not applicable for this contract.
Safety compliance (COIDA):
Quality compliance:
Health & Safety
Source: Invitation to Tender (ITT) Epoxy.pdfOHS requirements (returnables):
Environmental
Source: Invitation to Tender (ITT) Epoxy.pdfEnvironmental requirements:
Contractual Terms
Source: Invitation to Tender (ITT) Epoxy.pdfContract type: NEC Term Service Contract.
Duration: 5 years, as-and-when-required (not stated as fixed volume).
B-BBEE improvement/retention plan required within 30 days of contract signature.
Eskom may negotiate with preferred bidders if prices not market-related.
Payment terms: 30 days for contracts below R50m (incl. VAT); 60 days for above R50m.
No performance security required.
CIDB CSDG and CPG not applicable.
Subcontracting with subsidiary companies discouraged; must be declared if done.
Contract may be awarded to other than highest scorer based on objective criteria (local content 100%).
Section
Source: Invitation to Tender (ITT) Epoxy.pdfAdditional evaluation criteria:
Description
Source: 240-77471651.docx Annexure C1 High risk.docxHigh-risk coating and lining contract for Kriel power station. Scope covers condensers, coolers, large bore pipework, water boxes and tube sheets. Five-year as-and-when-required arrangement. Supplier categorised as high risk per Eskom's supplier risk framework; full OHS tender returnables apply for pre-award evaluation. Reference Annexure A (240-77433139) for SHE requirement explanatory notes.
Important Dates
Source: 240-77471651.docx Annexure C1 High risk.docx (unknown)Closing: 30 October 2026 at 10:00
No briefing dates, site visit dates, or clarification deadlines are stated in the provided extract.
Submission Guidelines
Source: 240-77471651.docx Annexure C1 High risk.docx (unknown)Submission method and address are not stated in the provided document extract. The tender is an open-tender request for bid with a closing date of 30 October 2026.
Returnable documents — OHS tender returnables (mandatory for evaluation prior to contract award):
Note: The document references Annexure A (Supplier Risk Category, ref 240-77433139) for explanatory notes on SHE requirements.
Evaluation Criteria
Source: 240-77471651.docx Annexure C1 High risk.docx (unknown)Evaluation approach: OHS tender returnables are evaluated prior to contract award as pass/fail or scored items.
OHS evaluation items:
Recommendation outcome: each item assessed as Recommended / Not Recommended.
No price/functionality split, minimum qualifying score, or preference point system (80/20 or 90/10) is stated in the extract.
Technical Specifications
Source: 240-77471651.docx Annexure C1 High risk.docx (unknown)Scope: coating and lining services for Kriel power station condensers, coolers, associated large bore pipework, water boxes and tube sheets.
Contract basis: 5-year period, as and when required (ad hoc call-off).
SHE risk category: high risk (per filename reference to Annexure C1 High Risk).
Reference document: Annexure A (ref 240-77433139) contains explanatory notes for SHE requirements applicable to this scope.
Financial Requirements
Source: 240-77471651.docx Annexure C1 High risk.docx (unknown)SHE costing: bidders must submit detailed, activity-based costing for health and safety management; lump-sum submissions are not acceptable. Costing must cover the full scope of work and may be guided by the risk assessment.
No bid security, bonds, guarantees, retention, payment terms, or turnover thresholds are stated in the extract.
Compliance Requirements
Source: 240-77471651.docx Annexure C1 High risk.docx (unknown)Mandatory registrations and certifications:
SHE compliance:
No B-BBEE level, CIDB grade, CIPC, professional-body registration, or local content percentage thresholds are stated in the provided text.
Description
Source: 240-68099512 Form A_Cat 3_ Rev 9_Coating and Lining.docxEskom requires coating and lining services for Kriel Power Station equipment over a 5-year as-and-when-required contract.
Equipment covered
Quality framework
Evaluation Criteria
Source: 240-68099512 Form A_Cat 3_ Rev 9_Coating and Lining.docx (unknown)Quality evaluation
Technical Specifications
Source: 240-68099512 Form A_Cat 3_ Rev 9_Coating and Lining.docx (unknown)Scope
Quality requirements
Compliance Requirements
Source: 240-68099512 Form A_Cat 3_ Rev 9_Coating and Lining.docx (unknown)Quality compliance
Description
Source: SDL&I Strategy template for Provide Epoxy Coating and Lining.pdfSDL&I objectives form part of contractual obligations but do not affect scoring. Tenderers not meeting Eskom's targets are not disqualified. Transformation focus through B-BBEE improvement or retention plans aligned with national transformation imperatives for growth, industrialization, employment and skills development.
Important Dates
Source: SDL&I Strategy template for Provide Epoxy Coating and Lining.pdf (unknown)Closing: 30 October 2026 at 10:00
Contract duration: 60 months from award
B-BBEE Improvement Plan due: within 30 days of contract signature
SDL&I Implementation Schedule due: within 28 days of contract award
Quarterly SDL&I reports: ongoing
Eskom review period: 30 days from report receipt
Contact Information
Source: SDL&I Strategy template for Provide Epoxy Coating and Lining.pdf (unknown)Buyer: Mesuli Hlatshwayo
Business unit: Kriel Power Station
Compiled by: Thomas Chuene, Senior Advisor, Supplier Development, Localisation and Industrialisation
Date of strategy: 18 May 2026
Evaluation Criteria
Source: SDL&I Strategy template for Provide Epoxy Coating and Lining.pdf (unknown)Preference points system: 90/10 or 80/20
B-BBEE points allocation:
Total score: price plus specific goal points, rounded to two decimal places. Contract awarded to highest scoring tenderer.
Minimum consequence for missing B-BBEE documentation: bidder scores only price points (90 or 80) and zero specific goal points. Not disqualified, but cannot claim preference points.
Technical Specifications
Source: SDL&I Strategy template for Provide Epoxy Coating and Lining.pdf (unknown)Scope: coating and lining services for Kriel Power Station
Delivery: on an as-and-when-required basis over 60 months
Local content target: 100% (value added in South Africa by South African resources)
Tender response must separate local and imported components per Price Schedule
Subcontracting requirement:
Job creation and retention:
Pricing Schedule
Source: SDL&I Strategy template for Provide Epoxy Coating and Lining.pdfTender response must separate local and imported components per Price Schedule included with tender documents. Local procurement content equals total spending minus imported component.
Financial Requirements
Source: SDL&I Strategy template for Provide Epoxy Coating and Lining.pdf (unknown)SDL&I penalty: 2% of Contract Value for failure to meet SDL&I obligations
Performance security: 2% of every invoice (excluding VAT) retained for duration of contract as security for SDL&I fulfilment; released only upon full compliance
Pricing format: tender response must separate local and imported components per Price Schedule
Local procurement content calculation: total spending minus imported component
Compliance Requirements
Source: SDL&I Strategy template for Provide Epoxy Coating and Lining.pdf (unknown)B-BBEE evidence required to claim preference points:
B-BBEE certificate vs affidavit thresholds:
B-BBEE Improvement/Retention Plan (contractual obligation):
Sworn affidavit validity requirements:
CIPC registration: proof of enterprise registration required
Local content: 100% target; separate local and imported components in pricing
Subcontracting: 15% to 51% Black-owned EME/QSE, preferably from Kriel/Matla feeder areas
B-BBEE Requirements
Source: SDL&I Strategy template for Provide Epoxy Coating and Lining.pdf (unknown)Subcontracting target: 15% of procurement spend to EME/QSE with minimum 51% Black Ownership. Subcontractors must not be subsidiaries or related entities. Preferred: Kriel/Matla feeder areas.
Contractual Terms
Source: SDL&I Strategy template for Provide Epoxy Coating and Lining.pdf (unknown)Quarterly SDL&I compliance reports required per Data Collection Template. Eskom reviews within 30 days and notifies in writing of non-compliance. Supplier must implement corrective measures before next reporting period or retention clauses invoked. SDL&I Implementation Schedule must be completed and returned to SDL&I representative within 28 days of contract award for monitoring and reporting.
Special Conditions
Source: SDL&I Strategy template for Provide Epoxy Coating and Lining.pdf (unknown)Job creation and retention: tenderer must propose type and number of jobs created and retained in South Africa as direct result of contract award. Preferred: source candidates from Kriel/Matla feeder areas.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
VAALPAN ROAD - KRIEL - KRIEL - 2271
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
13
Last checked
08 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Median Estimate
R 1 465 176
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our Blog