Tender Application Workspace for
Review the deadline, returnables and available preparation tools for this tender.
View public tender detailsProvince
Eastern Cape
Closing Date
10 November 2026 at 10:00
Estimated Value
Value not specified
AI Summary
Unlock the AI-generated summary for this tender
Already subscribed or have a bundle? Sign in
Quick Summary
- Eskom
- Eastern Cape
- Closes 10 November 2026 at 10:00 (17 days left)
AI-Analyzed Compliance Requirements
Sign in or upgrade to see 4110 deduplicated compliance points across 13 categories — submission and returnable-document rules, technical and financial requirements, B-BBEE / local-content obligations, and evaluation criteria, consolidated from every tender document.
Unlock with a subscription or Action Pack →Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
24
Last checked
25 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Supply and delivery of cages and clips on as and when required basis for a period of 3years at Arnot Power station
Increase your winning chances
Most bidders are rejected due to compliance gaps. Use our Readiness Engine to verify your status for this specific Other service activities.
Check My ReadinessImportant Dates & Timeline
2 key dates
Tender Closing Date
10 November 2026 at 10:00
17
Days Left
Tender Published
23 October 2026
Tender was published
Tender Closing Date
10 November 2026 at 10:00
Final deadline for submission
Eskom
As the backbone of South Africa's national grid, Eskom issues high-stakes tenders for power generation, transmission, distribution, plant maintenance, and critical infrastructure rehabilitation. However, the sheer volume of engineering-intensive RFQs—combined with strict safety protocols, technical specifications, and compliance schedules—makes manual bid preparation a high-risk gamble. Tenders SA transforms this page into your power-sector command centre. Our AI Tender Matching engine surfaces Eskom opportunities aligned with your engineering, manufacturing, or logistics capacity. Our document analysis instantly decodes dense technical specs, compulsory site briefings, and functionality criteria. Use procurement intelligence to assess project viability against your operational bandwidth, while compliance gap analysis flags missing electrical certifications or safety files before they derail you. Finally, our application assistance helps you compile a meticulous, submission-ready response that meets Eskom's rigorous procurement standards.
Operating Provinces
Key Personnel
AI Document Analysis Stages
- Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
- Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
- Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
- Document read
- Compliance review
- Bid-ready summary
AI Document Analysis
Unlock the full AI-extracted sections, compliance review, and bid-ready summaries from this tender's documents
Already subscribed or have a bundle? Sign in
BEE_Affidavit-EME-Gen.pdf - 08 Sept 2020.pdf
Supplier Declaration of Interest.pdf
E-Tenderers E-Tendering Training Acknowledgement Form.pdf
5. Eskom Standard Conditions of Tender.pdf
E-Tendering Help Manual for supplier.pdf
20. New contractor Health and Safety Requirements 32-136.pdf
Invitation to tender supply and delivery of FFP cages.pdf
20. Eskom life-saving rules.pdf
20. Annexure B.pdf
Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx
5. Eskom Standard Conditions of Tender.pdf
3. Eskom Vehicle Safety Spec 32-345.pdf
NEC3 Supply Contract for FFP Cages and Clips.pdf
Annexure G - Tax Compliance Questionnaire for Foreign Suppliers (Manadatory for foreign suppliers to complete) - April 2024.docx
240-68099512 Form A_Cat 2_ Rev 9.docx
Local Content Annex C, D, E supplier to complete and send back at tender closing date - Copy.xls
She spec.pdf
FFP cage supply SOW rev 1..pdf
Baseline Risk assessment.pdf
3. Eskom Waste Management Standard 32-245 - Copy.pdf
BEE_Affidavit-QSE-Gen.pdf - 08 Sept 2020.pdf
Integrity Pact Declaration Form_ANNEXURE A.pdf
TEC and data sheet - FFP Cages 11.pdf
240-12248652_List of Tender Returnables_Cat 2_ Rev 7.xlsx
Share this tender
Supply and delivery of cages and clips on as and when required basis for a period of 3years at Arnot Power station
Eskom tender in Eastern Cape. Closing 11/10/2026. Supply and delivery of cages and clips on as and when required basis for a period of 3years at Arnot Power station...
Smart Assistant
Check if your company qualifies for this tender before you apply.
How it Works
Organization
Eskom
Contact Person
Nicky Deane
Phone
021-941-5762
[email protected]
Address
Arnot Power Station - rietkuil - middelburg - 1097
10 November 2026 at 10:00
Location
Eastern Cape
Closing Date
10 November 2026 at 10:00
Organization
Eskom
Are you a news editor or niche publisher? Embed this tender data directly on your site for free.
Get Embed CodeAI-generated Document Analysis for Tender by Eskom. 12 business days remain.