Awarded Tender: Appointment of panel of contractors on CIDB grading 4 to render infrastructure maintenance and capital infrastructure projects required for limpopo department of education for a period of 36 months
Contract Awarded
This tender has been awarded to PERFECT ZONES CONSTRUCTION AND PROJECTS for N/A.
Awarded
Award Information
Award Value
N/A
Winning Supplier
PERFECT ZONES CONSTRUCTION AND PROJECTS
Type: EME
Construction
Construction
Appointment of panel of contractors on CIDB grading 4 to render infrastructure maintenance and capital infrastructure projects required for limpopo department of education for a period of 36 months
Appointment of panel of contractors on CIDB grading 4 to render infrastructure maintenance and capital infrastructure projects required for limpopo department of education for a period of 36 months
What the tender required and what the award supports
Source material and existing AI analysis appear first. Supplier conclusions remain qualified by the evidence Tenders-SA holds.
Summary
The limpopo department of education is appointing a panel of CIDB grading 4 contractors to deliver infrastructure maintenance and capital infrastructure projects over a 36βmonth period. This tender is open to qualified construction firms and requires submission of all prescribed returnable documents before the closing date.
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards β PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement β so nothing critical is missed before you start your bid response.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: Bid Document B14-2025-26.pdf. You donβt need to refresh β this page will pick up the updated review automatically.
DocumentBid Document B14-2025-26.pdfCompliance review in progress
Award analysis coverage
0 of 1 source documents fully reviewed. Unstated details are identified only after complete source review.
technical scope
3 sourced criteria
financial capacity
Source analysis requires completion or review
pricing
Source analysis requires completion or review
compliance returnables
5 sourced criteria
evaluation
Source analysis requires completion or review
experience
Source analysis requires completion or review
personnel
Source analysis requires completion or review
equipment capacity
Source analysis requires completion or review
delivery contract
Source analysis requires completion or review
equity registrations
1 sourced criteria
What the buyer was looking for
1Inferred operational need
Provide infrastructure maintenance and capital project services for the Department of Education.
Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Source: AI key requirements Β· requirements
Known supplier evidence
The linked award records PERFECT ZONES CONSTRUCTION AND PROJECTS as appointed for this tender.
Qualified inference
An award confirms appointment. It does not prove why a supplier was selected, that every qualification remains current, or that delivery was completed successfully.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Document read
Compliance review
Bid-ready summary
Submission Guidelines
Source: Bid Document B14-2025-26.pdf
Returnable Documents: (as stated in the tender). No further details provided in the extracted text.
Ensure all required returnable documents are completed and submitted as per the tender instructions.
Submit before the closing date indicated in the tender record.
Inference only
The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
2Inferred operational need
Contract duration is 36 months.
Threshold: 36 months
Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Source: AI key requirements Β· requirements
Known supplier evidence
The linked award records PERFECT ZONES CONSTRUCTION AND PROJECTS as appointed for this tender.
Qualified inference
Inference only
The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
3Inferred operational need
Adhere to any additional specifications outlined in the tender documentation.
Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Source: AI key requirements Β· requirements
Known supplier evidence
The linked award records PERFECT ZONES CONSTRUCTION AND PROJECTS as appointed for this tender.
Qualified inference
Inference only
The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
4Mandatory requirement
Submit all required returnable documents in accordance with tender instructions.
Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
No source document identifier is stored for this item.
Source: AI key requirements Β· requirements
Known supplier evidence
The linked award records PERFECT ZONES CONSTRUCTION AND PROJECTS as appointed for this tender.
Qualified inference
Inference only
The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
5Mandatory requirement
Submission must be received before 23 January 2026.
Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
No source document identifier is stored for this item.
Source: AI key requirements Β· requirements
Known supplier evidence
The linked award records PERFECT ZONES CONSTRUCTION AND PROJECTS as appointed for this tender.
Qualified inference
Inference only
The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
6Inferred operational need
Returnable Documents: (as stated in the tender). No further details provided in the extracted text.
Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
The linked award records PERFECT ZONES CONSTRUCTION AND PROJECTS as appointed for this tender.
Qualified inference
Inference only
The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
9Mandatory requirement
Must be a CIDB Grading 4 contractor.
Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
No source document identifier is stored for this item.
Source: AI key requirements Β· requirements
Known supplier evidence
The linked award records PERFECT ZONES CONSTRUCTION AND PROJECTS as appointed for this tender.
Qualified inference
Inference only
The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
APPOINTMENT OF A SERVICE PROVIDER TO ASSIST THE DEPARTMENT OF LAND REFORM AND RURAL DEVELOPMENT WITH CONVEYANCING SERVICES FOR PORTION OF PORTION 4 (R/E) OF THE FARM WEENEN NUMBER 40 REGISTRATION DIVISION KS, MEASURING 18 , 2970 HECTARES SITUATED IN MOGALAKWENA LOCAL MUNICIPALITY WITHIN WATERBERG DISTRICT MUNICIPALITYPSSCLP-5/2/1/1 2025-2026 83