Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Eskom National Transmission Company of South AfricaLocation
Gauteng
Closing Date
08 Dec 2026
Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
Simmerpan NTCSA - Germiston - Germiston - 2001
Organization Type
GOVERNMENT
Published
30 Oct 2026
OCDS Reference
ocds-9t57fa-176464
ESKOM national transmission company of south africa requires the rehabilitation of a sinkhole and implementation of stormwater management measures at the apollo croydon 127kv r21 central grid in gauteng, for a contract period of eighteen (18) months. This annexure governs contract price adjustment and payment of foreign commitments; bidders must note that cpa applies only from year two for contracts exceeding 12 months, and any foreign-currency pricing requires prior ntcsa approval and direct importer status.
Contract price adjustment (CPA): For this 18-month contract, CPA applies only from year two; the first year is fixed. Bidders must submit a CPA formula aligned with NTCSA's proposed breakdown or an alternative acceptable to NTCSA, with a minimum 15% fixed portion and each formula totalling 100%.
Fixed pricing: If no CPA formula is submitted, prices are deemed fixed and firm for the entire contract duration.
Foreign currency pricing: Bidders pricing imported goods/services in foreign currency must be the direct importers and must confirm with the procurement practitioner before tender close that the currency is acceptable to NTCSA.
Payment method selection: Bidders must select a payment method for foreign commitments (1A, 1B, 2, or 3) and comply with its conditions; Payment Method 2 requires NTCSA approval before tender close and a written indemnity against forward cover, and is not available for services.
Exchange rate: The exchange rate for any foreign-currency pricing must be the SARB rate at 12H00 on the tender advertisement date, with proof of the rate submitted.
Documentation: Payment for imported goods/services requires commercial invoice, SAD 500, Bill of Entry, customs release, transport documents, and evidence of importation; failure to provide a commercial invoice results in the contract being concluded in rands.
Closing date: Bids close on 8 December 2026 at 12H00 (as implied by the exchange rate reference).
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tenderβs issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Tuesday, 08 December 2026 - 10:00
Venue
https://teams.microsoft.com/meet/380417745819515?p=xCr6XgGSn4n3RDSUKZ
Categories
Request for Proposal
Simmerpan NTCSA - Germiston - Germiston - 2001
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
30 Oct
2026
Tender Published
Tender was published
08 Dec
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Contractor proforma.pdf
Provision for the rehabilitation of a sinkhole affecting the Apollo Croydon 127kV R21 line, including stormwater management at the Central Grid, over an 18-month period. Eskom National Transmission Company of South Africa requires a contractor to deliver environmental compliance and construction services in Gauteng.
1.0_NTCSA_ITT_Annexure B_Acknowledgement Form.pdf
Rehabilitation of sinkholes in Cluster A and implementation of stormwater management measures on the 127kV R21 line between Apollo and Croydon substations, within Eskom's Central Grid, over an eighteen-month period. The work is procured by the National Transmission Company South Africa (NTCSA) SOC Ltd.
LES 1770 - Apollo Croydon 1 275kV T17 R21 Sinkhole Repair Scope of Work_Signed AS DD TS.pdf
Eskom National Transmission Company of South Africa requires rehabilitation of a sinkhole affecting the Apollo Croydon 127kV R21 line, along with stormwater management implementations at the Central Grid, for a period of eighteen months.
Apollo Croydon 1 275kV Sinkholes Repair Environmental Requirements.xls
Eskom Transmission requires the rehabilitation of a sinkhole affecting the Apollo Croydon 127kV R21 line, including stormwater management works at the Central Grid, over an eighteen-month period. The work is part of a cluster A rehabilitation programme and includes environmental management obligations.
NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.docx
Rehabilitation of sinkhole-affected infrastructure at Apollo Croydon 127kV R21, covering Cluster A, together with stormwater management implementations at Central Grid. The work is required by Eskom National Transmission Company of South Africa (NTCSA) in Gauteng over a period of eighteen (18) months.
1.0_NTCSA_ITT_Annexure G3_Imports Declaration-Supporting schedule to Annex C (annex D).pdf
ESKOMN~2.XLS
1.0_NTCSA_ITT_Annexure G2_Local content Declaration-Summary Schedule (annex C).pdf
100C49~1.PDF
NTCSA_E-tendering Help Manual for supplier.docx
Eskom National Transmission Company of South Africa requires rehabilitation of sinkholes in Cluster A and implementation of stormwater management at the Central Grid, specifically for the Apollo Croydon 127kV R21 line, over an eighteen-month period. The work is located in Gauteng province.
1.0_NTCSA_ITT_Annexure C_Tenderer_s Particulars Form.pdf
Eskom National Transmission Company of South Africa requires the rehabilitation of a sinkhole affecting the Apollo Croydon 127kV R21 line, including stormwater management implementations at Central Grid, over an eighteen-month period. The work involves Cluster A and is located in Gauteng.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
Eskom National Transmission Company of South Africa requires the rehabilitation of sinkholes in Cluster A and the implementation of stormwater management at the Central Grid, specifically for the Apollo Croydon 127kV R21 line, over an eighteen-month period. The work is located in Gauteng and involves quality control planning and inspection interventions.
1.0_NTCSA_ITT_Annexure H_SBD1_Invitation to Bid.pdf
Eskom National Transmission Company of South Africa requires the rehabilitation of a sinkhole affecting the Apollo Croydon 127kV R21 line, including stormwater management implementations at Central Grid, over an eighteen-month period. The work is located in Gauteng and is procured through a formal bidding process.
LES 1786 Technical Evaluation Criteria Strategy_Signed AS DD TS.pdf
Eskom National Transmission Company of South Africa requires a contractor for the sinkhole rehabilitation of Cluster A and stormwater management implementations along the Apollo Croydon 1 275kV powerline servitude near the R21 roadway, for a period of eighteen months. The work involves rehabilitating sinkholes affecting transmission and distribution structures and implementing stormwater management measures, following a Dolomite Stability Investigation that classified the area as D3 and D4 dolomite land.
SDLI Strategy -ApolloCroydon Sinkhole and Stormwater Rehabilitation (002).pdf
Eskom National Transmission Company of South Africa requires a contractor for the rehabilitation of a sinkhole affecting the Apollo/Croydon 127kV R21 line (Cluster A) and for stormwater management implementations at the Central Grid, with a contract period of eighteen (18) months. The work includes local production and content requirements for designated sectors, mandatory subcontracting provisions, and SDL&I obligations covering transformation, local procurement, job creation, and skills development.
NTCSA Annexure A SBD 4 .pdf
Eskom National Transmission Company of South Africa requires the rehabilitation of a sinkhole affecting the Apollo Croydon 127kV R21 line, including stormwater management implementations at Central Grid, for a period of 18 months. The work is located in Gauteng province.
1.0_NTCSA_ITT_Annexure D_Integrity Declaration Form.pdf
Eskom National Transmission Company of South Africa requires rehabilitation of a sinkhole affecting the Apollo Croydon 127kV R21 line, including stormwater management implementations at Central Grid, with services to be delivered over an eighteen-month period.
240-105658000 Supplier Quality Management Specification (3).pdf
Eskom National Transmission Company of South Africa requires a contractor for the rehabilitation of a sinkhole affecting the Apollo Croydon 127kV R21 line, including stormwater management works at the Central Grid, over an eighteen-month period. The contract falls under Eskom's Supplier Quality Management specification, which mandates a quality management system conforming to ISO 9001 and the submission of a Contract Quality Plan and Quality Control Plan/Inspection and Test Plan.
240-68~1.PDF
Eskom National Transmission Company of South Africa requires rehabilitation of a sinkhole on the Apollo-Croydon 127kV powerline and implementation of stormwater management measures at the Central Grid, for a contract period of eighteen (18) months. The work falls under the quality requirements of Eskom specification 240-105658000 and ISO 9001, with the tenderer required to accept and sign the quality declaration form.
1.0_NTCSA_ITT_Annexure E_CPA for Local Goods or Services .pdf
Eskom National Transmission Company of South Africa requires rehabilitation of a sinkhole affecting the Apollo Croydon 127kV R21 line, including stormwater management implementations at the Central Grid, over an eighteen-month period. The contract is subject to contract price adjustment (CPA) provisions for local goods and services, with pricing to be submitted in accordance with the tender's CPA requirements.
1.0_NTCSA_ITT_Annexure G1_SBD 6.2_Declaration Certificate for local production.pdf
Eskom National Transmission Company of South Africa requires the rehabilitation of sinkholes in Cluster A and the implementation of stormwater management measures at the Central Grid, specifically for the Apollo Croydon 127kV R21 line, over an eighteen-month period. The work is located in Gauteng and is subject to local production and content requirements.
1.0_NTCSA_ITT_Annexure I_SBD 6.1_Standard_Bidding_Document.pdf
Eskom National Transmission Company of South Africa seeks a contractor for the rehabilitation of a sinkhole affecting the Apollo Croydon 127kV R21 line, specifically Cluster A, and for the implementation of stormwater management measures at the Central Grid. The contract runs for eighteen (18) months.
1.01_NTCSA Invitation_to_Tender_(ITT)_E3745NTCSACG.pdf
Eskom National Transmission Company South Africa SOC Ltd requires a contractor for the rehabilitation of a sinkhole affecting the Apollo Croydon 127kV R21 line, including stormwater management implementations at Central Grid, for a period of eighteen (18) months. The contract will be awarded to a single supplier under the NEC3 Engineering and Construction Contract.
240-12~1.PDF
Eskom National Transmission Company of South Africa requires the rehabilitation of a sinkhole on the ApolloβCroydon 275kV powerline, including stormwater management implementation at the Central Grid, for a period of eighteen months. The work is in Gauteng and is subject to strict quality management and quality control requirements.
NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdf
Eskom National Transmission Company of South Africa requires the rehabilitation of a sinkhole affecting the Apollo Croydon 127kV R21 line, including stormwater management works at the Central Grid, over an eighteen-month period. The tender is evaluated as a high-risk OHS contract, requiring bidders to submit a comprehensive Occupational Health and Safety (OHS) tender pack.
1.0_NTCSA_ITT_Annexure A_Authorisation Form.pdf
Eskom National Transmission Company of South Africa requires rehabilitation of a sinkhole affecting the Apollo Croydon 127kV R21 line, including stormwater management works at the Central Grid, under an 18-month contract. The tender is open to companies, close corporations, partnerships, joint ventures, and sole proprietors, each of which must complete the relevant authorisation certificate.
Eskom NTCSA CPA - Proposal -Appollo Croydon 1 275kv R21 Sinkholes Rehabilitation REV 00.pdf
Eskom National Transmission Company of South Africa requires a contractor for the rehabilitation of sinkholes and implementation of stormwater management measures on the Apollo Croydon 127 kV R21 line, Cluster A, at the Central Grid, over an eighteen-month period. The contract includes provisions for price adjustments based on specified indices for plant, labour, security guarding, preliminaries, and measured works.
CONTRACTOR SECURITY REQUIREMENTS.pdf
Eskom National Transmission Company of South Africa is procuring sinkhole rehabilitation and stormwater management works on the Apollo Croydon 127kV R21 line, specifically for Cluster A at Central Grid, over an eighteen-month period. The scope includes rehabilitation of sinkholes and implementation of stormwater management measures, with a strong emphasis on site security compliance.
240-109253698 CQP Template 2021.docx
Eskom National Transmission Company of South Africa requires a contractor for the sinkhole rehabilitation of Cluster A and stormwater management implementations at the Apollo Croydon 127kV R21 site within the Central Grid, over an eighteen (18) month period. The appointed supplier must provide a Contract Quality Plan compliant with SANS 466:2005 / ISO 10005:2005.
1.0_NTCSA_ITT_Annexure F_CPA (IG) Requirement for Foreign Goods and Services.pdf
Eskom National Transmission Company of South Africa requires the rehabilitation of a sinkhole on the Apollo Croydon 127kV R21 line, including stormwater management implementations at Central Grid, over an eighteen-month period. The contract is subject to contract price adjustment (CPA) provisions for foreign goods and services, with specific requirements for pricing, payment methods, and documentation.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
RΒ 2Β 524Β 137
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
This specification defines Eskom's minimum quality requirements for all suppliers and sub-suppliers, forming part of all RFI/RFQ/RFP and contracts. It applies to the development, implementation, maintenance and continual improvement of a quality management system based on ISO 9001, and to the selection, evaluation, monitoring, assessment and auditing of suppliers. It covers pre-contract award quality requirements, quality plans, contract quality plans, quality control plans, capability assessments, post-award monitoring, and standard conditions including rights of access and preservation.
Important Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Specification effective from the date of authorisation (17 October 2021).
No tender-specific closing, briefing, or clarification dates are stated in this specification.
Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No delivery or submission address, enquiries contacts, or telephone/email are provided in this specification.
Department: Supply Chain Management.
Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Returnable forms (as selected in the List of Tender Returnables, ref 240-12248652):
All completed and signed forms must be returned with the bid. Eskom reserves the right to perform capability and capacity assessments prior to award.
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality assessment and Form A are used to select applicable supplier quality requirements. Categories 1β4 set the level of quality documentation required, with Category 1 being the highest (requiring a valid ISO 9001 certificate).
No point scoring, minimum qualifying score, or price/functionality split is stated in the provided specification.
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The specification applies to all Eskom suppliers and sub-suppliers for RFIs, RFQs and RFPs.
Bidders must develop, implement, maintain and continually improve a quality management system based on ISO 9001.
Key requirements include:
Methodology
Source: 240-105658000 Supplier Quality Management Specification (3).pdfQCP/ITPs must provide a clear description of equipment and locations, identification of quality verification stages, reference documents, acceptance criteria, certifying evidence, and intervention points (witness/hold/document review).
Preservation programme requirements include: developing a preservation work plan, evaluating storage sites, tracking compliance, and maintaining records.
Method statement templates are provided by Eskom (240-126469599) for documentation.
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdfQuality audits must be carried out by personnel who are trained, accredited and experienced, and in accordance with documented procedures.
Quality Management
Source: 240-105658000 Supplier Quality Management Specification (3).pdfA formal QMS conforming to ISO 9001 is required, covering documented information, quality policy, objectives, control of documented information, internal audit procedures, control of nonconforming outputs, and corrective action.
For Category 1, submit a valid ISO 9001 certificate. For Categories 2β3, objective evidence of a developed, implemented and maintained QMS. For Category 4, submit a quality method statement and approved quality documentation.
Quality plans and QCPs/ITPs must be submitted, reviewed and accepted by Eskom. Work cannot proceed past hold points without Eskom authorisation.
Quality kick-off meeting may be held at contract start; 14 days' advance notice for coordination meetings.
Eskom has the right to:
Pricing Schedule
Source: 240-105658000 Supplier Quality Management Specification (3).pdfNo pricing schedule information is provided in this specification.
Financial Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No pricing format, bid security, bonds, guarantees, retention, payment terms or financial capacity thresholds are stated in this specification.
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality management system requirements:
Forms and templates referenced: 240-68099512 (Form A), 240-109253698 (CQP template), 240-109253302 (QCP/ITP template), 240-126469599 (Method Statement template).
B-BBEE minimum level stated as 1 in the extractor, but this is not verified in the specification text provided.
Health & Safety
Source: 240-105658000 Supplier Quality Management Specification (3).pdfNo specific health and safety requirements are stated in this specification, but reference is made to Eskom's SHEQ Policy (32-727) and quality audits must be performed by trained, accredited and experienced personnel.
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdfPreservation obligations are contractual. Bidders must:
Section
Source: 240-105658000 Supplier Quality Management Specification (3).pdfNo additional evaluation criteria are stated. The specification only requires completion of Form A and submission of quality documentation per the selected category.
Contact Information
Source: 1.0_NTCSA_ITT_Annexure C_Tenderer_s Particulars Form.pdf (unknown)No contacts or addresses are stated in this document.
Submission Guidelines
Source: 1.0_NTCSA_ITT_Annexure C_Tenderer_s Particulars Form.pdf (unknown)Returnable documents:
Submission method and address are not stated in this document.
Evaluation Criteria
Source: 1.0_NTCSA_ITT_Annexure C_Tenderer_s Particulars Form.pdf (unknown)Evaluation criteria are not stated in this document. Registration on the National Treasury's Central Supplier Database (CSD) is mandatory prior to award. Bidders must be tax compliant, either by providing a SARS e-filing PIN or a valid tax compliance certificate (for foreign suppliers).
Compliance Requirements
Source: 1.0_NTCSA_ITT_Annexure C_Tenderer_s Particulars Form.pdf (unknown)Mandatory compliance:
Submission Guidelines
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.docx (unknown)Returnable documents:
Evaluation Criteria
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.docx (unknown)Submission of the fully completed E-Tenderers' E-Tendering Training Acknowledgement Form is a mandatory precondition. Bidders who fail to submit it within the prescribed period are non-responsive and disqualified. No further evaluation details are stated in the document.
Submission Guidelines
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Returnable documents: The tender pack includes a Quality Control Plan / Inspection and Test Plan (QCP/ITP) template that must be completed and submitted. No other returnable forms are identified in the source.
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)The scope is the rehabilitation of sinkholes on the Apollo Croydon 127kV R21 line, Cluster A, and the implementation of stormwater management at Central Grid, for a period of 18 months. The QCP/ITP must cover all work activities, specifying inspection and test methods (e.g., visual, NDT, liquid/dye penetrant, magnetic particle, eddy current), acceptance criteria, and intervention points (hold, witness, document review, surveillance, verification).
Financial Requirements
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Estimated value is R21 million.
Important Dates
Source: LES 1770 - Apollo Croydon 1 275kV T17 R21 Sinkhole Repair Scope of Work_Signed AS DD TS.pdf (unknown)Dates noted in the document cover: 26/11/2024, 26/11/2024, and 06/12/2024. These appear to relate to internal document dates; the closing date is captured in the tender record as 08 December 2026 at 08:00. No briefing or site visit dates are stated.
Submission Guidelines
Source: LES 1770 - Apollo Croydon 1 275kV T17 R21 Sinkhole Repair Scope of Work_Signed AS DD TS.pdf (unknown)Returnable Documents: No specific returnable forms are identified in the available text. The extraction contains insufficient detail to list mandatory documents. Enquiries and submission details are not provided in the extracted text.
Technical Specifications
Source: LES 1770 - Apollo Croydon 1 275kV T17 R21 Sinkhole Repair Scope of Work_Signed AS DD TS.pdf (unknown)The scope covers sinkhole rehabilitation of Cluster A and stormwater management implementations at Croydon Central Grid, associated with the Apollo Croydon 127kV R21 line. The contract period is eighteen (18) months.
Compliance Requirements
Source: LES 1770 - Apollo Croydon 1 275kV T17 R21 Sinkhole Repair Scope of Work_Signed AS DD TS.pdf (unknown)Insufficient searchable text to determine compliance requirements. No CSD, tax, B-BBEE, or CIDB thresholds are stated.
Description
Source: 1.0_NTCSA_ITT_Annexure G1_SBD 6.2_Declaration Certificate for local production.pdfThe tender is for the rehabilitation of a sinkhole on the Apollo Croydon 127kV R21 line (Cluster A) and implementation of stormwater management at Central Grid. The contract period is 18 months. The bid is subject to local production and content requirements as a designated sector, with thresholds to be specified in the bid document (not given in the provided extract).
Important Dates
Source: 1.0_NTCSA_ITT_Annexure G1_SBD 6.2_Declaration Certificate for local production.pdf (TENDER)Submission Guidelines
Source: 1.0_NTCSA_ITT_Annexure G1_SBD 6.2_Declaration Certificate for local production.pdf (TENDER)Returnable documents:
Submission requirements:
Disqualification risks:
Evaluation Criteria
Source: 1.0_NTCSA_ITT_Annexure G1_SBD 6.2_Declaration Certificate for local production.pdf (TENDER)Technical Specifications
Source: 1.0_NTCSA_ITT_Annexure G1_SBD 6.2_Declaration Certificate for local production.pdf (TENDER)Pricing Schedule
Source: 1.0_NTCSA_ITT_Annexure G1_SBD 6.2_Declaration Certificate for local production.pdfThe bid price excluding VAT (y) and imported content (x) must be stated. Local content percentage is calculated using SATS 1286:2011 formula. Declarations C, D and E must be completed; Annex C must be submitted with the bid, while D and E must be retained for verification for at least 5 years. The successful bidder must update these declarations with actual values throughout the contract.
Financial Requirements
Source: 1.0_NTCSA_ITT_Annexure G1_SBD 6.2_Declaration Certificate for local production.pdf (TENDER)Compliance Requirements
Source: 1.0_NTCSA_ITT_Annexure G1_SBD 6.2_Declaration Certificate for local production.pdf (TENDER)Contractual Terms
Source: 1.0_NTCSA_ITT_Annexure G1_SBD 6.2_Declaration Certificate for local production.pdfLocal content must be calculated using the formula in SATS 1286:2011. Exchange rates for imported content are based on SARB rates at 12:00 on the date of advertisement. Bids may be disqualified if the declaration certificate and Annex C are not submitted by the deadline. Sub-contracting must not reduce the local content below the stipulated minimum threshold.
Section
Source: 1.0_NTCSA_ITT_Annexure G1_SBD 6.2_Declaration Certificate for local production.pdfAwarding is dependent on the accuracy of local content information provided. Incorrect or unverifiable data may result in remedies under Regulation 9.1 of the Preferential Procurement Regulations, 2022.
Description
Source: LES 1786 Technical Evaluation Criteria Strategy_Signed AS DD TS.pdfThe NTCSA Central Transmission Grid requires sinkhole rehabilitation and stormwater management work on the Apollo Croydon 1 275kV transmission line servitude (perpendicular to the R21 roadway). Sinkholes were identified in October 2021; the area was classified as D3/D4 Dolomite Land in 2022. A partial structure failure occurred in April 2024, highlighting urgency. The permanent solution involves rehabilitating Cluster A sinkholes and implementing stormwater management for the servitude area. The contractor is responsible for all specialisations, materials, equipment, and resources needed to execute the works as defined in LES 1770.
Submission Guidelines
Source: LES 1786 Technical Evaluation Criteria Strategy_Signed AS DD TS.pdf (unknown)Mandatory technical returnables (Appendix A):
Returnables must be signed and submitted by the closing time. Failure to submit any mandatory returnable may disqualify the bid.
Evaluation Criteria
Source: LES 1786 Technical Evaluation Criteria Strategy_Signed AS DD TS.pdf (unknown)Two-stage technical evaluation:
Stage 1 β Mandatory criteria (gatekeepers, pass/fail):
Stage 2 β Qualitative criteria (weighted, scored 0-5):
Weighted sub-criteria:
Scoring scale:
Unacceptable technical risks:
Technical Specifications
Source: LES 1786 Technical Evaluation Criteria Strategy_Signed AS DD TS.pdf (unknown)Scope of Works is defined in LES 1770 (referenced document).
The successful contractor provides all specialisations, materials, equipment, and resources to execute:
Background context:
Methodology
Source: LES 1786 Technical Evaluation Criteria Strategy_Signed AS DD TS.pdfThe technical proposal (criterion 1.1.1) must include:
Scoring for methodology:
Experience & Qualifications
Source: LES 1786 Technical Evaluation Criteria Strategy_Signed AS DD TS.pdfCompany experience (criterion 1.1.2):
Key personnel qualifications:
Quality Management
Source: LES 1786 Technical Evaluation Criteria Strategy_Signed AS DD TS.pdfQuality management is referenced as ISO 9001 (normative reference). The successful contractor must operate a quality management system aligned with ISO 9001. Safety, health, environmental, and quality evaluation are not part of this engineering scope, but the contractor remains responsible for quality compliance.
Compliance Requirements
Source: LES 1786 Technical Evaluation Criteria Strategy_Signed AS DD TS.pdf (unknown)No specific compliance requirements stated in the document, beyond technical mandatory criteria.
Technical compliance requirements (mandatory):
Section
Source: LES 1786 Technical Evaluation Criteria Strategy_Signed AS DD TS.pdfSee standard evaluationCriteria section for full details. Key additional points:
Submission Guidelines
Source: 1.0_NTCSA_ITT_Annexure I_SBD 6.1_Standard_Bidding_Document.pdf (TENDER)Returnable document
Evaluation Criteria
Source: 1.0_NTCSA_ITT_Annexure I_SBD 6.1_Standard_Bidding_Document.pdf (TENDER)Preference points
Technical Specifications
Source: 1.0_NTCSA_ITT_Annexure I_SBD 6.1_Standard_Bidding_Document.pdf (TENDER)Rehabilitation of the ApolloβCroydon 127 kV R21 sinkhole (Cluster A) and implementation of stormwater management at Central Grid, over an 18-month contract period.
Compliance Requirements
Source: 1.0_NTCSA_ITT_Annexure I_SBD 6.1_Standard_Bidding_Document.pdf (TENDER)SBD 6.1 (Preference Points Claim Form): must be completed and signed, with supporting proof for every specific goal claimed; unsupported claims earn no preference points.
Section
Source: 1.0_NTCSA_ITT_Annexure I_SBD 6.1_Standard_Bidding_Document.pdfPreference points
Description
Source: SDLI Strategy -ApolloCroydon Sinkhole and Stormwater Rehabilitation (002).pdfThe project covers rehabilitation of a sinkhole on the Apollo/Croydon 127kV line (R21) and stormwater management implementations at the Central Grid. The contract period is 18 months. The work is construction-related; CIDB grading 6CE or higher is a condition for award. No mandatory subcontracting is required.
Contact Information
Source: SDLI Strategy -ApolloCroydon Sinkhole and Stormwater Rehabilitation (002).pdf (TENDER)Submission Guidelines
Source: SDLI Strategy -ApolloCroydon Sinkhole and Stormwater Rehabilitation (002).pdf (TENDER)Mandatory returnables:
Note: Objective criteria (local content and CIDB grading) are conditions for contract award. Failure to meet them may lead to the second-ranked tenderer being recommended for award.
Evaluation Criteria
Source: SDLI Strategy -ApolloCroydon Sinkhole and Stormwater Rehabilitation (002).pdf (TENDER)Preference point system applicable under PPPFA. Scoring split (80/20 or 90/10) not stated in this document.
Objective criteria (conditions for award):
B-BBEE preference points claimed via B-BBEE certificate or sworn affidavit (type depends on annual revenue).
Technical Specifications
Source: SDLI Strategy -ApolloCroydon Sinkhole and Stormwater Rehabilitation (002).pdf (TENDER)Scope: Apollo/Croydon sinkhole and stormwater rehabilitation at Central Grid, including stormwater management implementations.
Project duration: 18 months.
No mandatory subcontracting or NIPP requirements.
SDL&I objectives (not scoring, but contractual obligations):
Methodology
Source: SDLI Strategy -ApolloCroydon Sinkhole and Stormwater Rehabilitation (002).pdfFor skills development, tenderers must propose training initiatives (on-job training for civil technician and SHEQ). Skills development targets exclude Eskom employees and registered learners; tenderers bear full cost. Eskom makes no financial contribution. Tenderers may approach SETAs for grants and SARS for tax rebates. Penalty: 2.5% of invoice for failure to meet SDL&I obligations. NTCSA retains 2.5% of every invoice as SDL&I performance security. Reporting: quarterly SDL&I reports using Data Collection Template; NTCSA reviews within 30 days; corrective measures if obligations not met; SDL&I Implementation Schedule to be completed and returned within 28 days after contract award.
Pricing Schedule
Source: SDLI Strategy -ApolloCroydon Sinkhole and Stormwater Rehabilitation (002).pdfLocal procurement content is value added in South Africa; tender response must be separated into components as per the Price Schedule. NTCSA target for local procurement content is 100%.
Financial Requirements
Source: SDLI Strategy -ApolloCroydon Sinkhole and Stormwater Rehabilitation (002).pdf (TENDER)SDL&I performance security: NTCSA retains 2.5% of every invoice (excluding VAT) as security for SDL&I obligations. Retained amounts released after receipt of SDL&I progress reports, fulfilment of obligations, and approved compliance report.
Penalty: 2.5% of invoice amount for failure to meet SDL&I obligations.
Local procurement content calculation: total spending minus imported component; tender response must be separated into components as per the Price Schedule.
Compliance Requirements
Source: SDLI Strategy -ApolloCroydon Sinkhole and Stormwater Rehabilitation (002).pdf (TENDER)CSD registration required (as per market research section).
B-bbee:
CIDB grading: 6CE or higher.
Local content: cement concrete and steel at 100% (designated sectors).
Sworn affidavit validity requirements:
Health & Safety
Source: SDLI Strategy -ApolloCroydon Sinkhole and Stormwater Rehabilitation (002).pdfThe document does not specify health and safety requirements beyond the inclusion of on-job training for SHEQ as part of skills development commitments.
Section
Source: SDLI Strategy -ApolloCroydon Sinkhole and Stormwater Rehabilitation (002).pdfUnder the preference point system, bidders are allocated points based on specific goals (B-BBEE). NTCSA also requests B-BBEE improvement/retention plans. The B-BBEE affidavit requirements depend on annual revenue: EME (β€R10m) may submit sworn affidavit; QSE (β€R50m) must comply with all elements of QSE scorecard unless 51% black-owned, in which case a sworn affidavit is acceptable; above R50m a valid certificate is required.
Important Dates
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_E3745NTCSACG.pdf (TENDER)Closing date and time: 08 December 2026 at 10:00 SAST
Clarification meeting (non-compulsory? stated as 'Clarification meeting'): 16 November 2026 at 10:00 via Microsoft Teams (link provided)
Site visit (non-compulsory): 20 November 2026, gathering at 09:00, site visit starts at 10:00, venue: Sterkfontein Bricks (Pty) Ltd (Google Maps link provided)
Clarification queries deadline: 10 working days before tender submission deadline (approximately 23 November 2026)
Contact Information
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_E3745NTCSACG.pdf (TENDER)NTCSA Representative:
Name: Mahlatse Mochitelo
Telephone: 011 629 5024
Email: [email protected]
Procurement Manager:
Name: Busi Mtungwa
Submission: via NTCSA Etendering site (Eskom E-Tendering) β no physical address.
Site visit venue: Sterkfontein Bricks (Pty) Ltd (map link provided).
Submission Guidelines
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_E3745NTCSACG.pdf (TENDER)Submission method: electronic only, via the NTCSA Etendering site (Eskom E-Tendering page).
Returnable forms (must be completed and signed where required; items marked
Joint Venture (JV) additional documents:
Other returnables:
Disqualification risks:
Evaluation Criteria
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_E3745NTCSACG.pdf (TENDER)Evaluation stages:
Technical Specifications
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_E3745NTCSACG.pdf (TENDER)Scope: Provision for Apollo Croydon 127kV R21 sinkhole rehabilitation of Cluster A and stormwater management implementations at Central Grid, for a period of eighteen (18) months.
Experience & Qualifications
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_E3745NTCSACG.pdfNo explicit experience or key personnel qualifications were stated in the available text beyond referencing the technical evaluation strategy LES 1786. Additional documents such as CVs, ECSA/SACPCMP registrations may be required as per scope.
Quality Management
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_E3745NTCSACG.pdfQuality requirements per scope: Supplier Quality Management Specification 240-105658000, Quality Control Plan or Inspection Test Plan (CQP template).
Pricing Schedule
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_E3745NTCSACG.pdfPricing must be submitted via Bill of Quantities (BOQ) filled in full. The BOQ is an annexure (1.1.28). Prices are evaluated inclusive of VAT and corrected for arithmetic errors. Price scored out of 80 points (80/20 system).
Financial Requirements
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_E3745NTCSACG.pdf (TENDER)Pricing format: Bill of Quantities (BOQ) / Pricing Schedule must be completed in full; submitted in PDF and Excel.
Compliance Requirements
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_E3745NTCSACG.pdf (TENDER)CSD registration: proof required for local tenderers and foreign tenderers with a local footprint.
Tax clearance: SARS PIN or certified tax clearance certificate required; foreign suppliers with no SA footprint complete SBD 1 only.
CIDB grading: 5CE or higher required; proof by closing date or within 21 working days if permitted.
B-BBEE: Valid B-BBEE certificate (from SANAS accredited agency or sworn affidavit/CIPC affidavit) and supporting documents (ownership proof, ID copies, disability proof) required to claim preference points.
Employment Equity: designated employers must provide proof of compliance including EEA report submission.
COIDA: original certificate of good standing or proof of application (SA tenderers).
Local content: designated sectors require 100% local content for Steel-Concrete and Steel-Steel; SBD 6.2 and local content declarations mandatory.
Restricted suppliers: must not be on National Treasury restricted list, Tender Defaulters list, or flagged as per SIU/Zondo report.
No conflict of interest; no subcontracting 100% of scope.
Professional registrations (ECSA/SACPCMP) may be required as per scope.
The bidder must not be under any restriction to do business with NTCSA or State-Owned Companies.
Health & Safety
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_E3745NTCSACG.pdfSafety requirements: Acknowledgement of Eskom SHE Rules (Annexure B), OHS plan aligned with scope, Baseline OHS Risk Assessment (BRA) with methodology, valid COIDA Letter of Good Standing, OHS policy signed by CEO complying with OHS Act Section 7.
Environmental
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_E3745NTCSACG.pdfEnvironmental Management tender returnables are required as per scope. Specific details not provided in the available text.
Contractual Terms
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_E3745NTCSACG.pdfContract type: NEC3 Engineering Construction Contract.
Section
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_E3745NTCSACG.pdfGiven the technical evaluation, the weighting for Civil Engineering is 100% with a minimum qualifying score of 70%. Reference is made to technical evaluation strategy LES 1786.
Description
Source: 240-12~1.PDFProject involves sinkhole rehabilitation and stormwater management at the ApolloβCroydon powerline (referenced as 127kV and 275kV in the document), Central Grid.
Contract period: 18 months.
Category 2 quality requirements apply, meaning quality deliverables will be evaluated.
Evaluation Criteria
Source: 240-12~1.PDF (TENDER)Quality management system (QMS) compliance is evaluated on a pass/fail basis across several categories, each scoring 1 for compliance and 0 otherwise.
Category A β ISO 9001 certification or documented QMS:
Option 1 (accredited certification, max 4): valid ISO 9001 certificate by an accredited and authorised body with recognised international accreditation, scoped to the product/service, and within validity.
Option 2 (documented QMS, max 7): QMS manual with scope, quality policy and objectives approved by top management, documented control of information (Clause 7.5), control of nonconforming outputs (Clause 8.7), nonconformity and corrective action (Clause 10.2), and internal audit (Clause 9.2).
Category B β Evidence of QMS in operation (max 4): organisation chart and responsibility matrix including quality function, control of externally provided processes/products/services (Clause 8.4), latest internal audit report, and management review meeting records.
Category C (1): draft Contract/Project Quality Plan specific to the scope, following ISO 10005.
Category D (1): draft example of an Inspection and Test Plan (ITP) or Quality Control Plan (QCP) from similar/previous work.
Category E (2): Form A completed and signed; any additional requirements per scope/specification.
Total possible score across all categories: 19.
No minimum qualifying score is stated.
Technical Specifications
Source: 240-12~1.PDF (TENDER)Scope: rehabilitation of a sinkhole and stormwater management implementation along the ApolloβCroydon 127kV (also referenced as 275kV) powerline, Central Grid. Contract period: 18 months.
Work involves sinkhole rehabilitation and stormwater management as part of the overall project described in the tender.
Compliance Requirements
Source: 240-12~1.PDF (TENDER)Quality management system requirements are mandatory compliance items: bidders must meet Category A (either accredited ISO 9001 certification or documented QMS per options), provide evidence of QMS operation, and submit the draft Contract/Project Quality Plan, ITP/QCP, and completed Form A.
No other compliance requirements (e.g., CSD, tax clearance, B-BBEE, CIDB) are stated in the provided document.
Section
Source: 240-12~1.PDFQuality deliverables are scored per category:
Category A (Option 1 β 4 points) or Option 2 β 7 points.
Category B β 4 points.
Category C β 1 point.
Category D β 1 point.
Category E β 2 points.
Total 19 points.
Points are awarded for each sub-item met (1 each). No weighting or threshold beyond passing all mandatory items is stated.
Submission Guidelines
Source: NTCSA Annexure A SBD 4 .pdf (TENDER)Returnable forms: SBD 4 (Bidder's Disclosure) β declares whether any director or shareholder is employed by an organ of state, whether a relationship exists with anyone employed by the procuring institution, and lists all CSD-registered companies linked to directors. The declaration must be signed and dated; false disclosure disqualifies the bid.
Evaluation Criteria
Source: NTCSA Annexure A SBD 4 .pdf (TENDER)Disqualification grounds:
Compliance Requirements
Source: NTCSA Annexure A SBD 4 .pdf (TENDER)Bidders must complete and submit the SBD 4 declaration. No other compliance requirements are stated in the document.
Section
Source: NTCSA Annexure A SBD 4 .pdfBidders must not have colluded with competitors or disclosed their bid terms to competitors before bid opening. Suspected collusive practices are referred to the Competition Commission and may lead to penalties or exclusion from state business for up to 10 years.
Contact Information
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdf (unknown)No contact details are provided in the source document.
Submission Guidelines
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdf (unknown)Returnable documents for the OHS evaluation (each must be signed and submitted):
Failure to submit any mandatory returnable may disqualify the bid.
Evaluation Criteria
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdf (unknown)The OHS tender evaluation is marked as high risk.
The bidder must achieve a positive recommendation (Recommended) on all OHS returnables.
No price/functionality split or minimum score is stated in this OHS annexure; the evaluation here is pass/fail on the listed returnables.
Bidders must comply with every listed OHS returnable.
Technical Specifications
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdf (unknown)The scope of work is the provision of sinkhole rehabilitation and stormwater management implementations at the Central Grid (Apollo Croydon 127kV R21).
Contract period: eighteen (18) months.
The OHS assessment must consider the scope of work, associated risks, the OHS plan and its applicability.
OHS competency requirements are to be listed by the bidder (CVs and certificates).
Experience & Qualifications
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdfBidders must provide CVs and qualifications/certificates demonstrating OHS competency relevant to the scope of work, risks, and the OHS plan. The list of required competencies should be tailored to the specific project.
Compliance Requirements
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdf (unknown)The following compliance items are required as part of the OHS evaluation:
No B-BBEE, CIDB or other compliance thresholds are stated in this OHS annexure.
Health & Safety
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdfRequired OHS returnables:
Section
Source: NTCSA - Annexure T 1 OHS Tender Evaluation Template (High risk).pdfThe OHS evaluation is conducted using the NTCSA Annexure T1 OHS Tender Evaluation Template (High risk). Recommended/Not Recommended is determined on all listed returnables.
Description
Source: Contractor proforma.pdfThe document is an Environmental Requirements Proforma (identifier 240-110600836 Rev 2) tied to the Apollo Croydon 127 kV R21 sinkhole rehabilitation of Cluster A and stormwater management implementations at the Central Grid, with a contract period of eighteen (18) months. The contractor must sign the proforma to accept environmental obligations.
Health & Safety
Source: Contractor proforma.pdfAt project completion, the contractor must hand over to the Eskom Project Manager the following site documentation and registers:
Environmental
Source: Contractor proforma.pdfThe contractor must comply with the project Environmental Management Plan/Programme and any Environmental Authorisation, and with Eskom's Environmental Requirements for Organizations (document 240-18100134). The contractor must also adhere to all applicable environmental legal requirements and Eskom environmental standards, policies and procedures.
Environmental management obligations include:
The contractor must submit the following registers and records to Eskom's Project Manager on completion of the project:
Submission Guidelines
Source: 1.0_NTCSA_ITT_Annexure D_Integrity Declaration Form.pdf (RFP)Returnable form: completed, signed Integrity Declaration Form, submitted by the stipulated deadline. The form covers conflict-of-interest declarations, fair tendering practices, restricted-supplier status, and shareholding disclosures.
Evaluation Criteria
Source: 1.0_NTCSA_ITT_Annexure D_Integrity Declaration Form.pdf (RFP)Disqualifying conditions:
Compliance Requirements
Source: 1.0_NTCSA_ITT_Annexure D_Integrity Declaration Form.pdf (RFP)Integrity Declaration Form obligations:
Section
Source: 1.0_NTCSA_ITT_Annexure D_Integrity Declaration Form.pdfAdditional disqualification condition: any relationship that gives a tenderer access to information about or influence over another tenderer's proposal, or influence over NTCSA's decisions, must be declared.
Description
Source: 1.0_NTCSA_ITT_Annexure B_Acknowledgement Form.pdfThis document is a standard NTCSA acknowledgement form (Annexure B), not the full tender specification. It confirms receipt of the tender pack and commits the bidder to provide cataloguing information for the items tendered, unless the bidder is a distributor, importer or agent whose OEM supplies that information.
Submission Guidelines
Source: 1.0_NTCSA_ITT_Annexure B_Acknowledgement Form.pdf (RFP)Returnable documents:
Evaluation Criteria
Source: 1.0_NTCSA_ITT_Annexure B_Acknowledgement Form.pdf (RFP)No evaluation criteria are stated in the provided document. The document is an acknowledgement form only.
Compliance Requirements
Source: 1.0_NTCSA_ITT_Annexure B_Acknowledgement Form.pdf (RFP)No specific pre-qualification requirements (such as CSD registration, tax clearance, B-BBEE level or CIDB grading) are stated in the provided document. The only obligation is to complete and submit the Acknowledgement Form with the stated cataloguing election.
Submission Guidelines
Source: 1.0_NTCSA_ITT_Annexure A_Authorisation Form.pdf (unknown)Returnable documents:
Compliance Requirements
Source: 1.0_NTCSA_ITT_Annexure A_Authorisation Form.pdf (unknown)Eligibility and corporate structure requirements:
No other eligibility criteria (e.g. CSD, tax clearance, B-BBEE, CIDB) are stated in this document.
Description
Source: Eskom NTCSA CPA - Proposal -Appollo Croydon 1 275kv R21 Sinkholes Rehabilitation REV 00.pdfThe work involves sinkhole rehabilitation and stormwater management implementation at the Central Grid for Apollo Croydon 1 275 kV R21. The scope is covered under the attached Bill of Quantities (BOQ), with specific items referenced in the price adjustment tables.
Evaluation Criteria
Source: Eskom NTCSA CPA - Proposal -Appollo Croydon 1 275kv R21 Sinkholes Rehabilitation REV 00.pdf (unknown)No specific evaluation criteria are stated in the provided document. Bidders must be able to perform the described civil and stormwater works and comply with the price adjustment mechanisms. The document does not mention CSD registration, tax clearance, B-BBEE requirements, CIDB grading, or other standard pre-qualifications.
Technical Specifications
Source: Eskom NTCSA CPA - Proposal -Appollo Croydon 1 275kv R21 Sinkholes Rehabilitation REV 00.pdf (unknown)The scope involves sinkhole rehabilitation and stormwater management implementation at the Central Grid for Apollo Croydon 1 275 kV R21. The works are covered under the Bill of Quantities (BOQ). Specific items are referenced in the price adjustment tables, including plant and equipment (BOQ items 1.2.2 a, b, c) and labour (BOQ items 1.2.1 a, b, c, d and 1.2.2 f, g). The document does not provide detailed technical specifications beyond the reference to the attached Excel BOQ.
Financial Requirements
Source: Eskom NTCSA CPA - Proposal -Appollo Croydon 1 275kv R21 Sinkholes Rehabilitation REV 00.pdf (unknown)Bidders must either accept Eskom NTCSAβs CPA proposal or submit an alternative CPA proposal for consideration. Any alternative proposal is subject to negotiation and agreement as part of the contract award process. If a bidder neither accepts the CPA proposal nor submits an alternative, the rates shall be deemed fixed for the entire duration of the scope of work.
Price adjustment mechanisms are provided for various components:
Reference is made to the attached Excel Bill of Quantities (BOQ).
Compliance Requirements
Source: Eskom NTCSA CPA - Proposal -Appollo Croydon 1 275kv R21 Sinkholes Rehabilitation REV 00.pdf (unknown)No specific compliance requirements are stated in the provided document.
Description
Source: Apollo Croydon 1 275kV Sinkholes Repair Environmental Requirements.xlsThe procurement concerns the rehabilitation of sinkholes and implementation of stormwater management measures at the Apollo Croydon 127kV R21 Central Grid, for a period of eighteen months. The document provided is the environmental compliance returnable portion of the tender.
Contact Information
Source: Apollo Croydon 1 275kV Sinkholes Repair Environmental Requirements.xls (unknown)Enquiries may be directed to: Geoffrey Small (not specified as contact; appears in document metadata) β no contact details given.
Submission Guidelines
Source: Apollo Croydon 1 275kV Sinkholes Repair Environmental Requirements.xls (unknown)Returnable documents: The completed and signed EM Tender Returnables form (reference 240-154832228) must be submitted as part of the bid. The form documents environmental compliance evidence; failure to submit or complete it may affect evaluation.
Submission channel: Not stated in the document.
Submission address: Not stated.
Closing time: 08:00 on the closing date.
Evaluation Criteria
Source: Apollo Croydon 1 275kV Sinkholes Repair Environmental Requirements.xls (unknown)Weighted environmental evaluation: The bidder's environmental submission is scored across sections A to E using a Yes=1, No=0, N/A system.
Minimum qualifying score: 80% weighted average in the environmental evaluation, otherwise the tender is not considered.
Sections scored:
Each section requires objective documented evidence (e.g., method statements, plans, registers).
Scores from each section are aggregated to a total percentage.
Technical Specifications
Source: Apollo Croydon 1 275kV Sinkholes Repair Environmental Requirements.xls (unknown)Scope: Sinkhole rehabilitation and stormwater management at the Apollo Croydon 127kV R21 Central Grid, specifically Tower 17 sinkhole repair, over an 18-month period.
Environmental scope deliverables (minimum requirements):
Compliance Requirements
Source: Apollo Croydon 1 275kV Sinkholes Repair Environmental Requirements.xls (unknown)Environmental compliance (mandatory, evaluated):
No CSD, tax clearance, B-BBEE, CIDB or other standard compliance requirements stated in the document.
Pricing Schedule
Source: 1.0_NTCSA_ITT_Annexure E_CPA for Local Goods or Services .pdfCPA conditions govern the pricing schedule.
Financial Requirements
Source: 1.0_NTCSA_ITT_Annexure E_CPA for Local Goods or Services .pdf (unknown)CPA (Contract Price Adjustment) rules apply to this tender.
Description
Source: 240-109253698 CQP Template 2021.docxThe tender is for the provision of Apollo Croydon 127kV R21 sinkhole rehabilitation of Cluster A and stormwater management implementations at Central Grid, for a period of 18 months. The Contract Quality Plan template assists the supplier to identify and plan for meeting the client's contract expectations and requirements for quality management.
Submission Guidelines
Source: 240-109253698 CQP Template 2021.docx (unknown)Complete and sign the Contract Quality Plan (CQP) template, including supplier/contract name and Eskom enquiry/contract number. The CQP must be compiled by a representative of the tenderer at Rev 0 during tender evaluation and approved by the owner of the organisation.
Returnable forms and documents:
Disqualification risks: Incomplete or unsigned CQP, or failure to mark applicable scope of work categories.
Evaluation Criteria
Source: 240-109253698 CQP Template 2021.docx (unknown)No specific scoring criteria are stated in the document. The CQP is subject to review and acceptance by Eskom during tender evaluation (Rev 0). The tenderer must indicate which scope categories apply: design, manufacturing, supply and delivery/transportation, construction/installation/maintenance, commissioning, professional services, or other.
Technical Specifications
Source: 240-109253698 CQP Template 2021.docx (unknown)The tender is for the provision of Apollo Croydon 127kV R21 sinkhole rehabilitation of Cluster A and stormwater management implementations at Central Grid, for a period of 18 months.
Scope categories (tenderer must mark which apply):
The CQP template requires the supplier to:
Compliance Requirements
Source: 240-109253698 CQP Template 2021.docx (unknown)The CQP must be compiled in line with the guidelines for quality plans: SANS 466:2005 Edition 1 / ISO 10005:2005 Edition 2.
Description
Source: 240-68~1.PDFThe tender is for rehabilitation of a sinkhole and storm water management implementation at the Central Grid, specifically along the Apollo β Croydon 275kV powerline. Contract period is eighteen (18) months. Referenced as E3745NTCSACG / contract No. 240-68; description includes 'Apollo-Croydon 275kV powerline sinkhole - Rehabilitation and storm water management'.
Contact Information
Source: 240-68~1.PDF (unknown)Eskom Quality Representative: Siyabulela Nciweni, Officer Quality Management, dated 20 August 2026
Evaluation Criteria
Source: 240-68~1.PDF (unknown)Bidders must complete and sign Form A (Tender & Contract Quality Requirements) to accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001. The form requires indicating with an X the applicable clauses from the specification and ISO 9001 standard.
Applicable quality category: Category 2 (pre-contract award quality requirements).
Technical Specifications
Source: 240-68~1.PDF (unknown)The tender involves rehabilitation of a sinkhole and storm water management implementation at the Central Grid for the Apollo β Croydon 275kV powerline (reference E3745NTCSACG, contract No. 240-68). The contract period is eighteen (18) months.
Quality requirements apply per specification 240-105658000 (Category 2) and ISO 9001. Bidders must accept and commit to Eskom's post-award quality conditions including:
Methodology
Source: 240-68~1.PDFMethodology is not detailed in the extracted text. The document only references ISO 9001 clauses (Context of Organisation, Leadership, Planning, Support, Operation, Performance Evaluation, Improvement) and quality principles (Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, Relationship Management) that bidders must acknowledge.
Quality Management
Source: 240-68~1.PDFQuality management requirements per specification 240-105658000 and ISO 9001 apply. Bidders must accept Eskom's post-award conditions including Eskom Rights of Access, Rights to Information, Preservation, Quality Audits, Management of Nonconformities, and Special Processes. Bidders must confirm acceptance by signing Form A.
Compliance Requirements
Source: 240-68~1.PDF (unknown)Bidders must complete and sign Form A (Tender & Contract Quality Requirements) to indicate acceptance of Eskom Supplier Quality Requirements and ISO 9001. No other eligibility criteria (CSD, tax, B-BBEE, CIDB) are specified in this document.
Section
Source: 240-68~1.PDFBidders must complete and sign Form A (Tender & Contract Quality Requirements) to accept Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001. Applicable pre-contract quality category is Category 2. Post-award conditions include Contract Execution, Supplier Quality Performance Monitoring, Eskom Rights of Access and Information, Preservation, Quality Audits, and Management of Nonconformities.
Description
Source: NTCSA_E-tendering Help Manual for supplier.docxThe document is the NTCSA eTendering System Suppliers Help Manual, dated 28 August 2023. It explains how suppliers submit bids electronically through the eTendering platform, replacing manual office submissions. Suppliers must register, receive an OTP, upload documents by category, and finalise submissions. The manual provides instructions on registration, password reset, and using the system.
Contact Information
Source: NTCSA_E-tendering Help Manual for supplier.docx (unknown)For system problems, contact the buyer responsible for the published tender. No specific contact details are provided in the document.
Submission Guidelines
Source: NTCSA_E-tendering Help Manual for supplier.docx (unknown)Submission method: online via the eTendering system at https://eTendering.eskom.co.za. Bidders must first register on the system. A CSD number is required for registration. After login, select the tender reference number, then create a new submission and upload documents under the correct category (technical, commercial, finance, etc.). Each file must not exceed 50MB; the total uploaded files must not exceed 900MB. Finalise the submission by clicking 'Finalize Submission' and then 'Finalise and Close Submission'. A confirmation email with the submission ID will be sent; keep this for enquiries.
Evaluation Criteria
Source: NTCSA_E-tendering Help Manual for supplier.docx (unknown)Bidders must have a CSD number to access the eTendering system. No other eligibility criteria are stated in the document.
Compliance Requirements
Source: NTCSA_E-tendering Help Manual for supplier.docx (unknown)CSD registration is required to access the eTendering system. No other compliance requirements are stated.
Description
Source: CONTRACTOR SECURITY REQUIREMENTS.pdfThe document is a contractor security requirements checklist for work on Eskom Central Grid sites, substations or servitudes. It outlines pre-commencement documentation, access control, asset protection, incident reporting and security personnel certification requirements.
Compliance Requirements
Source: CONTRACTOR SECURITY REQUIREMENTS.pdf (unknown)Security contractor requirements:
Contractor obligations:
Description
Source: 1.0_NTCSA_ITT_Annexure F_CPA (IG) Requirement for Foreign Goods and Services.pdfThis annexure sets out NTCSA's requirements for contract price adjustment (CPA) and payment of foreign commitments in tenders involving foreign goods and services. It does not describe the technical scope of the main tender.
Important Dates
Source: 1.0_NTCSA_ITT_Annexure F_CPA (IG) Requirement for Foreign Goods and Services.pdf (unknown)Closing time: 12H00 (implied from exchange rate date reference; actual closing date as per tender listing: 8 December 2026)
Evaluation Criteria
Source: 1.0_NTCSA_ITT_Annexure F_CPA (IG) Requirement for Foreign Goods and Services.pdf (unknown)Bidders must verify with the procurement practitioner before tender close that any foreign currency used is acceptable to NTCSA.
Technical Specifications
Source: 1.0_NTCSA_ITT_Annexure F_CPA (IG) Requirement for Foreign Goods and Services.pdf (unknown)The document is Annexure F (Contract Price Adjustment requirements for Foreign Goods and Services) for NTCSA. It does not describe the technical scope of the sinkhole rehabilitation or stormwater management work. Technical details are not provided in this annexure.
Methodology
Source: 1.0_NTCSA_ITT_Annexure F_CPA (IG) Requirement for Foreign Goods and Services.pdfFor service-related payments involving foreign specialists, two engagement models apply:
Pricing Schedule
Source: 1.0_NTCSA_ITT_Annexure F_CPA (IG) Requirement for Foreign Goods and Services.pdfPricing must be submitted in a manner that allows CPA calculation. If pricing is in foreign currency, the foreign currency and amounts must be clearly indicated in the pricing schedule or covering letter. The exchange rate must be the SARB rate at 12H00 on the date of advertisement, and proof of that rate must be submitted. For imported goods/services, the bidder must be the direct importer and provide proof of importation at time of payment.
Financial Requirements
Source: 1.0_NTCSA_ITT_Annexure F_CPA (IG) Requirement for Foreign Goods and Services.pdf (unknown)Contract Price Adjustment (CPA)
Payment Methods for Foreign Commitments
Compliance Requirements
Source: 1.0_NTCSA_ITT_Annexure F_CPA (IG) Requirement for Foreign Goods and Services.pdf (unknown)No specific compliance requirements (CSD, tax, B-BBEE, CIDB) are stated in this annexure.
Description
Source: 1.0_NTCSA_ITT_Annexure H_SBD1_Invitation to Bid.pdfThis document is the SBD 1 Invitation to Bid. It contains standard bidding terms and conditions, not the technical scope of the tender. The actual scope (sinkhole rehabilitation and stormwater management at Central Grid) is indicated only in the tender record title and description.
Contact Information
Source: 1.0_NTCSA_ITT_Annexure H_SBD1_Invitation to Bid.pdf (TENDER)Enquiries
Submission address
Submission Guidelines
Source: 1.0_NTCSA_ITT_Annexure H_SBD1_Invitation to Bid.pdf (TENDER)Submission
Returnable forms
Evaluation Criteria
Source: 1.0_NTCSA_ITT_Annexure H_SBD1_Invitation to Bid.pdf (TENDER)Evaluation
Technical Specifications
Source: 1.0_NTCSA_ITT_Annexure H_SBD1_Invitation to Bid.pdf (TENDER)Scope
Compliance Requirements
Source: 1.0_NTCSA_ITT_Annexure H_SBD1_Invitation to Bid.pdf (TENDER)Compliance requirements
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Lake Street, Germiston, Johanessburg, 1401, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
30
Last checked
31 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
011-629-5553[email protected]www.eskom.co.za/Pages/Landing.aspxLake Street, Germiston, Johanessburg, 1401, South Africa
Key Personnel
Learn how to submit a winning bid with these related articles
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb vs nhbrc: understanding dual registration requirements for residential projects in gauteng β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
π‘ Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.