Skip to main content
    Replace Stolen Earthing Copper Bar with Aluminium Conductor at Lethabo Power Station for a period of 12 months. Compulsory Clarification meeting scheduled 27 July 2023 at 14h00. Site visit scheduled 24 August 2023 @ 09h00. Closing date extended to 18 September 2023 @ 10h00. (Awarded) | Contract Award