Skip to main content
    Contracting Of the Mechanical/Electrical Servicing, Ad Hoc Repair and Refurbishment Function: Wastewater Pump Stations (WWWPS) Wastewater Treatment Works (WWTW) / Miscellaneous Plant: 36 Month Duration – Central Area (Awarded) | Contract Award