Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Status: Closed — No Longer Accepting Submissions
This tender closed on 27 February 2026. Submissions are no longer accepted. The tender lifecycle continues — check the awards section for updates.
Tender Type
Request for Bid(Open-Tender)
Delivery Location
175 Lunnon Street,Hillcrest Office Park - Hillcrest Office Park - Pretoria - 0083
Organization Type
GOVERNMENT
Published
04 Feb 2026
The public protector south africa (ppsa) invites bids for the lease of a stand-alone or interconnected office building in bethlehem to serve as its regional office. The contract spans 9 years and 11 months, with an option to extend, and requires a minimum of 250 m² of usable space, 7 parking bays, and full compliance with accessibility, safety, and maintenance standards.
AI Document Analysis Stages
Categories
Request for Bid(Open-Tender)
175 Lunnon Street,Hillcrest Office Park - Hillcrest Office Park - Pretoria - 0083
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
PPSA office accomodation Bethlehem Specification..pdf
Date & Time
Friday, 27 February 2026 - 11:00
Venue
null
This briefing session took place during the tender period.
1 MANDATE OF THE PPSA
Category: technical
1.1 The Public Protector South Africa (PPSA) is a Chapter 9 institution constituted under
Category: technical
Section 182 of the Constitution of the Republic of South Africa, in which the PPSA has
Category: technical
the power to:
Category: technical
04 Feb
2026
Tender Published
Tender was published
27 Feb
2026
Closing Date
Tender closing date
Pending
Median Estimate
R 538 352
Range
Based on 18 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: PPSA office accomodation Bethlehem Specification..pdf. You don’t need to refresh — this page will pick up the updated review automatically.
Important Dates
Source: PPSA office accomodation Bethlehem Specification..pdfContact Information
Source: PPSA office accomodation Bethlehem Specification..pdfTechnical Enquiries:
Procurement Enquiries:
Bid submission address:
Public Protector South Africa
175 Lunnon Street, Hillcrest Office Park
Pretoria, 0083
Submission Guidelines
Source: PPSA office accomodation Bethlehem Specification..pdf– Signed SBD 1 (Invitation to Bid)
– Completed SBD 3.1 (Pricing Schedule)
– Signed SBD 4 (Bidder Disclosure)
– Signed SBD 6.1 (Preference Points Claim Form) and proof for any specific goal claimed
– Proof of registration on the Central Supplier Database (CSD) – attach CSD report or registration number
– Tax Compliance Status (TCS) PIN or printed TCS certificate (or CSD number if no TCS PIN)
– For consortia/joint ventures, each party must submit its own TCS/CSD documentation
– Proof of authority to sign (e.g., company resolution)
Evaluation Criteria
Source: PPSA office accomodation Bethlehem Specification..pdfThe bid is assessed in four phases:
1. Phase 1 – Administrative Compliance (mandatory documents listed above). Failure to submit any required form results in disqualification.
2. Phase 2 – Mandatory Requirements – proof of property ownership, ECOC, PCOC, municipal rates statements, valid insurance, OHS certificate, and other compliance certificates. All must be submitted; otherwise the bidder is excluded from further evaluation.
3. Phase 3 – Functionality
4. Phase 4 – Pricing and Specific Goals – only bidders scoring ≥80 points in Phase 3 are considered. Price accounts for 80 % of the total score; specific‑goal points (up to 20) are added. Highest total wins; ties are broken by specific‑goal points, then by lot.
All evaluations are based on documented evidence; missing proof = zero points.
Technical Specifications
Source: PPSA office accomodation Bethlehem Specification..pdfScope: Lease of office accommodation for the PPSA Bethlehem Regional Office for 9 years 11 months (option to extend).
Deliverables:
Financial Requirements
Source: PPSA office accomodation Bethlehem Specification..pdfCompliance Requirements
Source: PPSA office accomodation Bethlehem Specification..pdfTenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
To download these documents and access AI-powered analysis, visit the main tender page.
1.2 Investigate any conduct in state affairs or in the public administration in any sphere of
Category: technical
government that is alleged or suspected to be improper or that will result in impropriety
Category: technical
or prejudice.
Category: technical
1.3 Report on that conduct; and take appropriate remedial action.
Category: technical
1.4 The PPSA is independent and subject only to the Constitution and the law, always
Category: technical
impartial and must exercise its powers and perform its functions without fear, favor or
MandatoryCategory: technical
prejudice. The PPSA is accountable to the National Assembly and must report on its
MandatoryCategory: technical
activities and performance to the National Assembly at least once a year. The PPSA
Category: technical
has the power as regulated by the national legislation to investigate any conduct in state
Category: technical
affairs, or in the public administration in any sphere of government that is alleged or
Category: technical
suspected to be improper or to result in any impropriety or prejudice.
Category: technical
1.5 The PPSA has national footprint, which is Head Office, nine (09) Provincial Offices, six
Category: technical
(06) Regional Offices and two (2) Satellite Offices with the corporate organogram
Category: technical
consists of the following departments,
Category: technical
a) Executive Authority
Category: technical
b) Investigations branches
Category: technical
c) Stakeholder Management and
Category: technical
d) Corporate services
Category: technical
2 OBJECTIVE
Category: technical
2.1 The PPSA is looking for a new or renovated building to be utilized as corporate office
Category: technical
space for the implementation of its mandate. The facility should be located in Bethlehem
Category: technical
within the CBD and be easily accessible to both internal and external stakeholders.
Category: technical
2.2 The PPSA herein invites suitably qualified and experienced Property
Category: technical
Developers/Owners, Facilities Management or similar to submit bids for the leasing of
Category: technical
their office accommodation facilities/properties for the PPSA Regional Office to run its
Category: technical
day-to-day office operations.
Category: technical
3. OBJECTIVES AND PROBLEM STATEMENT
Category: technical
3.1 The Batho Pele principles sets out standards that government and organs of state
Category: technical
should maintain with regards to service delivery. There are clear implications of this
Category: technical
policy for the design and management of government office buildings, including:
Category: technical
(a) Providing adequate, well designed and clearly marked reception and public service
Category: technical
areas so as to enable the general public to access the required services promptly
MandatoryCategory: technical
and with ease;
Category: technical
(b) Ensuring that PPSA office facilities can be easily used by everyone, including old
Category: technical
people and people with disabilities.
Category: technical
4. STRUCTURAL DIMENSIONS OR REQUIREMENTS
Category: technical
4.1 The scope of this project will include the provision of office accommodation and parking bays for
Category: technical
the PPSA Bethlehem Regional Office needs requirements as outlined on Table 1 below.
Category: technical
REQUIREMENTS SIZE IN SQUARE METRE (SQM)
Category: technical
PUBLIC WAITING AREA / RECEPTION 20
Category: technical
REGIONAL MANAGER 12
Category: technical
INVESTIGATOR X 1 10
Category: technical
ASSISTANT INVESTIGATOR X 1 8
Category: technical
ADMIN ASSISTANT X1 8
Category: technical
INTERN X 1 8
Category: technical
DUPLICATING/BUSINESS CENTRE 4
Category: technical
BOARDROOM 20
Category: technical
COMMITTEE/MEETING ROOMS X 1 12
Category: technical
CONSULTATION ROOMS – INVESTIGATIONS X 1 8
Category: technical
SERVER ROOM + NETWORK ROOM 6
Category: technical
LIBRARY 15
Category: technical
STRONG ROOMS X 1 12
Category: technical
REGISTRY AND USED WITH DUPLICATING
Category: technical
ARCHIVES (OLD RECORDS)
Category: technical
FIRST AID ROOM/ SICK BAYS 10
Category: technical
KITCHEN 12
Category: technical
PAUSE AREA 8
Category: technical
GENERAL STORE (FOR e.g. FURNITURE ETC.) 5
Category: technical
WELLNESS ROOM 10
Category: technical
CLEANERS ROOM 8
Category: technical
CIRCULATION, TECHNICAL SUPPORT, FACILITIES 121
Category: technical
MANAGEMENT AND ABLUTIONS ACC. SANS 10400 (FOR
Category: technical
MALE AND FEMALE, FOR VISITORS AND FOR PEOPLE
Category: technical
WITH DISABILITIES)
Category: technical
TOTAL SQUARE METER = 250
Category: technical
PARKING BAYS 07
Category: technical
SECURED AND/OR UNDERCOVER PARKING 04
Category: technical
SECURED AND LOCKABLE GARAGE FOR OFFICE VEHICLES 01
Category: technical
PARKING FOR DISABLED 01
Category: technical
VISITORS VEHICLES 01
Category: technical
4.2 Provide a stand-alone, single tenanted building or multiple tenanted but interconnected
Category: technical
(multi-storey) office space to ensure an acceptably secure working environment as per
Category: technical
the required m2/ that is visible and prominent from major routes.
MandatoryCategory: technical
4.3 Access for people living with disabilities, (lifts if offices are not on ground floor, Ramps
Category: technical
and Signage)
Category: technical
4.4 The proposed building/s must be easily accessible within reasonable walking distance
MandatoryCategory: technical
from taxi rank or public transport route or rail etc.
Category: technical
4.5 The proposed building should have a professional look and feel and be in a safe, secure
Category: technical
environment that does not present a security risk to PPSA staff members, including
Category: technical
those who may be working after hours.
Category: technical
4.6 Bidders should have the capability to offer a solution in specialized services including
Category: technical
but not limited to space-planning, interior design, architecture services, engineering
Category: technical
(Mechanical, Electrical, Electronic, Acoustics, fire, etc.), Facilities Management and
Category: technical
Lease contract management. All services should be supplied by bona fide service
Category: technical
providers in good standing and may be subject to a vetting process by PPSA.
Category: technical
4.7 For the purposes of tenant installation and/or renovations, the bidders shall submit a
Category: technical
proposal showing the building designs and core installations as well as miscellaneous
Category: technical
installation that are required for the building.
MandatoryCategory: technical
4.8 Any alterations/ refurbishments by the bidder should meet PPSA’s requirements.
Category: technical
5. DURATION OF APPOINTMENT
Category: technical
5.1 The duration of the lease contract will be for a period of 9 years and 11 months with an
Category: technical
option to renew or extend upon expiry of the lease.
Category: technical
6. GUIDELINES FOR RESPONSE
Category: technical
Property Developers/Owners, Facilities Management or similar company should
Category: technical
demonstrate the following:
Category: technical
6.1 Relevant skills, experience in well-established facilities management services i.e.
Category: technical
provision of leasing office accommodation.
Category: technical
6.2 The building to be within the CBD or within 5km radius and easily accessible including
Category: technical
people with disabilities.
Category: technical
6.3 The property should be accessible to public transport (buses, taxis and rail).
Category: technical
The property size should be of a minimum of 250m2 and 07 parking bays (including
Category: technical
secured overnight parking bay for 01 PPSA vehicle).
Category: technical
a) Submit a detailed Project Methodology/Project Plan or Development
Category: technical
Implementation Plan with fixed deliverables and timelines. A detailed explanation
Category: technical
of the methodology and approach that will be followed to conduct and deliver the
Category: technical
required office accommodation for the PPSA. Project Methodology should
MandatoryCategory: technical
demonstrate the ability and capacity to deliver the project within four (04) months
Category: technical
of award by the PPSA.
Category: technical
b) The PPSA will conduct a site inspection to verify the property descriptions, location,
Category: technical
accessibility, main roads.
Category: technical
NB: Skilled and experienced team members to execute the range of activities and tasks
Category: technical
specified in the terms of reference with integrity in a professional manner. This should
Category: technical
include the CVs of the project team (Team Leader) that will service the PPSA account.
Category: technical
Building Building accessibility ramps or elevators for people with disabilities, including Submission of
MandatoryCategory: compliance
wheelchairs access. floor plans or accessibility for
MandatoryCategory: compliance
people with layouts should
MandatoryCategory: compliance
disabilities 5 clearly indicate
MandatoryCategory: compliance
ramps or
MandatoryCategory: compliance
elevators for
MandatoryCategory: compliance
people with
MandatoryCategory: compliance
disabilities
MandatoryCategory: compliance
including
MandatoryCategory: compliance
wheelchairs
MandatoryCategory: compliance
access
MandatoryCategory: compliance
0 points No evidence of access to the building for people with
MandatoryCategory: compliance
disabilities
MandatoryCategory: compliance
5 points Submitted evidence of access for people with disabilities
MandatoryCategory: compliance
Ablution facilities Accessible ablution facilities (Male and female) for people with disabilities, Submission of
MandatoryCategory: compliance
including wheelchairs access floor plans or for people with
MandatoryCategory: compliance
disabilities layouts should
MandatoryCategory: compliance
clearly indicate
MandatoryCategory: compliance
5 ablution facilities
MandatoryCategory: compliance
for people with
MandatoryCategory: compliance
disabilities
MandatoryCategory: compliance
including
MandatoryCategory: compliance
wheelchairs
MandatoryCategory: compliance
access
MandatoryCategory: compliance
0 points No evidence of ablution facilities for people with disabilities
MandatoryCategory: compliance
5 points Submitted of ablution facilities for people with disabilities
MandatoryCategory: compliance
Planned The bidder must submit planned maintenance schedule and clearly specify Bidder to submit
MandatoryCategory: compliance
the responsibilities and liabilities of the Landlord around maintenance maintenance maintenance (10)
MandatoryCategory: compliance
issues (air conditioning units, fire equipment, lifts, electricity, back-up schedule for the
MandatoryCategory: compliance
power, back-up water, plumbing work, day-to-day maintenance of the planned building.
MandatoryCategory: compliance
maintenance for all 0 points No evidence submitted 10
MandatoryCategory: compliance
equipment and
MandatoryCategory: compliance
services for the 10 points Detailed maintenance plan for planned maintenance
MandatoryCategory: compliance
submitted duration of the
MandatoryCategory: compliance
contract.
MandatoryCategory: compliance
Unplanned The bidder must submit the schedule with turnaround times for unplanned Bidder to submit
MandatoryCategory: compliance
maintenance (10) maintenance request for the building (air conditioning units, fire equipment, the maintenance
MandatoryCategory: compliance
schedule for the lifts, electricity, back-up power, back-up water, plumbing work)
MandatoryCategory: compliance
unplanned
MandatoryCategory: compliance
10 maintenance
MandatoryCategory: compliance
5 points Detailed maintenance plan for planned maintenance only
MandatoryCategory: compliance
indicating the internal planned maintenance submitted
MandatoryCategory: compliance
turnaround times
MandatoryCategory: compliance
10 points Detailed maintenance plan for both planned and unplanned for resolving issues
MandatoryCategory: compliance
maintenance submitted
MandatoryCategory: compliance
in the building for
MandatoryCategory: compliance
all equipment and
MandatoryCategory: compliance
services for the
MandatoryCategory: compliance
duration of the
MandatoryCategory: compliance
contract.
MandatoryCategory: compliance
Capacity to Deliver Provide at least 4 (four) duly signed and dated reference letters which confirm that the bidder
MandatoryCategory: compliance
has provided a commercial leasing services, the letters should have contact details of (10)
MandatoryCategory: compliance
referee and not more than 5 (five) years old. The PPSA reserves the right to verify the 10
MandatoryCategory: compliance
authenticity of references provided by the bidder.
MandatoryCategory: compliance
Signed Reference
MandatoryCategory: compliance
0 points No evidence submitted letters
MandatoryCategory: compliance
1 point 1 (one) duly signed reference letter
MandatoryCategory: compliance
5 points 3 (three) duly signed reference letters
MandatoryCategory: compliance
10 points 4 (four) or more duly signed reference letters
MandatoryCategory: compliance
Experience and CV’s to be provided of the team who will be the direct liaison with the PPSA, e.g. the Property
MandatoryCategory: compliance
Manager and Building/Facility Manager. Expertise (10)
MandatoryCategory: compliance
0 points No CV’s provided for the Property Manager and Building /Facility
MandatoryCategory: compliance
CVs indicating Manager – less than 2 years of experience 10
MandatoryCategory: compliance
years of experience
MandatoryCategory: compliance
5 points CVs provided only for the Property Manager or the Building/
MandatoryCategory: compliance
in Property
MandatoryCategory: compliance
Facility Manager – 3 to 4 years of experience
MandatoryCategory: compliance
Management and
MandatoryCategory: compliance
10 points CVs provided for both the Property Manager and Building/ Building /Facility
MandatoryCategory: compliance
Facility Manager - 5 years and above of experience Management field
MandatoryCategory: compliance
IT Infrastructure Availability of High-Speed Fiber Optic to Business Infrastructure at the proposed building Detailed proposal
MandatoryCategory: compliance
(5) 0 points No Fiber Optic or Access to fiber Optic connection more than 100m outside indicating
MandatoryCategory: compliance
High-Speed Fiber 5 the proposed building
MandatoryCategory: compliance
Optic 3 points Access to High-Speed Fiber Optic connection between 50m to 100m outside availability,
MandatoryCategory: compliance
the proposed building and permission granted to install secondary distance and
MandatoryCategory: compliance
microwave link. access to high-
MandatoryCategory: compliance
5 points Access to High-Speed Fiber Optic connection points inside the proposed speed fiber optic
MandatoryCategory: compliance
building and permission granted to install secondary a microwave link. connection
MandatoryCategory: compliance
points.
MandatoryCategory: compliance
Other ICT A bidder to provide confirmation that server room requirements will be provided as specified Submission of
MandatoryCategory: compliance
requirements (5) latest floor plans
MandatoryCategory: compliance
Server-room area • Server room area - 3 x 2 = 6 square meters 5 or layouts
MandatoryCategory: compliance
showcasing
MandatoryCategory: compliance
0 points No evidence submitted or minimum requirements of the above server room
MandatoryCategory: compliance
5 points Compliance with all minimum server room requirements requirements by
MandatoryCategory: compliance
PPSA
MandatoryCategory: compliance
Building Grade: B Bidder to indicate the condition of the proposed building if it is an existing facility set-up or newly Submission of a
MandatoryCategory: compliance
or similar (10) renovated. grading certificate
MandatoryCategory: compliance
0 points Aged dilapidated or damaged building 10 from an
MandatoryCategory: compliance
accredited
MandatoryCategory: compliance
10 points B or any Graded building in good condition or renovated
MandatoryCategory: compliance
organisation.
MandatoryCategory: compliance
TOTAL 100
MandatoryCategory: compliance
FUNCTIONALITY B: SITE VISIT CHECKLIST
MandatoryCategory: compliance
The Due Diligence (site visit) threshold for this bid is 100 points.
MandatoryCategory: compliance
Bids that fail to meet the 80 points threshold will not be considered for Phase 4 Evaluation.
MandatoryCategory: compliance
Bid Evaluation Committee (BEC)
MandatoryCategory: compliance
PointsNo. Definition Points Allocation Comments Allocated
MandatoryCategory: compliance
Proposed Building Location 10
MandatoryCategory: compliance
1.1. The proposed building is located in a radius of 5km from
MandatoryCategory: compliance
CBD
MandatoryCategory: compliance
Comment:
MandatoryCategory: compliance
1.1.1 Within 0m - 5km from Bethlehem CBD 10
MandatoryCategory: compliance
1.1.2 Within 5km - 10km of Bethlehem CBD 5
MandatoryCategory: compliance
1.1.3 > 10km From Bethlehem CBD 0
MandatoryCategory: compliance
Building Grade: B or similar 10
MandatoryCategory: compliance
2.1 B or any Graded building in good condition or renovated 10
MandatoryCategory: compliance
2.2 Aged dilapidated or damaged building 0
MandatoryCategory: compliance
Disability Accessibility 10
MandatoryCategory: compliance
3.1. The proposed office space provides the following facilities for People Living with Disabilities: Bidder to submit OHS compliant certificate with SANS
MandatoryCategory: compliance
10400
MandatoryCategory: compliance
Disability ramp to the main entrance and elevator to access 10
MandatoryCategory: compliance
all areas of the proposed office space.
MandatoryCategory: compliance
Disability ramp to the main entrance and no elevator to 5
MandatoryCategory: compliance
access all areas of the proposed office space
MandatoryCategory: compliance
No ramp, no elevator for people living with disability to access 0
MandatoryCategory: compliance
all areas of the proposed office space
MandatoryCategory: compliance
Electricity Supply 10
MandatoryCategory: compliance
4.1. The proposed office space has a dedicated electricity meter 10
MandatoryCategory: compliance
or prepaid meter registered with local Municipality or accredited
MandatoryCategory: compliance
service provider.
MandatoryCategory: compliance
4.2. The proposed office space has an electrical supply but does not 5
MandatoryCategory: compliance
have a dedicated electricity meter registered with local municipality
MandatoryCategory: compliance
or accredited service provider.
MandatoryCategory: compliance
4.3 The proposed office space has non-compliant electricity meter 0
MandatoryCategory: compliance
registered with local municipality.
MandatoryCategory: compliance
Water Supply 10
MandatoryCategory: compliance
5.1. The proposed office space has a dedicated water account/meter 10
MandatoryCategory: compliance
registered with local Municipality.
MandatoryCategory: compliance
5.2. The proposed office space has a water supply but does not have 5
MandatoryCategory: compliance
a dedicated water account/meter registered with local municipality.
MandatoryCategory: compliance
5.3 The proposed office space has non-compliant water 0
MandatoryCategory: compliance
account/meter registered with local municipality.
MandatoryCategory: compliance
Accessibility to Public Transport 10
MandatoryCategory: compliance
6.1. The proposed office space is accessible to public transport with 10
MandatoryCategory: compliance
a distance of up to 1km.
MandatoryCategory: compliance
6.2. The proposed office space is accessible to public transport with 5
MandatoryCategory: compliance
a distance of more than 1km to 2km.
MandatoryCategory: compliance
6.3. The proposed office space is accessible to public transport of 0
MandatoryCategory: compliance
more than 2km.
MandatoryCategory: compliance
Fire Protection System 10
MandatoryCategory: compliance
7.1. The proposed offices have the following fire protection systems:
MandatoryCategory: compliance
Fire extinguishers and any other fire protection system 10
MandatoryCategory: compliance
Proposed building has got only fire extinguishers 5
MandatoryCategory: compliance
No fire protection systems 0
MandatoryCategory: compliance
Heating, Ventilation and Air-Conditioning (HVAC) 10
MandatoryCategory: compliance
8.1. Proposed offices have an HVAC system including ducting 10
MandatoryCategory: compliance
8.2 Proposed offices have no HVAC system 0
MandatoryCategory: compliance
Parking facility on site 20
MandatoryCategory: compliance
9.1 07 or more onsite parking bays 20
MandatoryCategory: compliance
9.2 Less than 07 parking bays or no parking bays 0
MandatoryCategory: compliance
Total 100
MandatoryCategory: compliance
7.4 Phase 4: Pricing and Specific goals: Only bidders scoring 80 points or more on Functionality evaluation (due diligence) will be evaluated
MandatoryCategory: compliance
for pricing and specific goals.
MandatoryCategory: compliance
Pricing is 80
MandatoryCategory: compliance
Specific goals are 20.
MandatoryCategory: compliance
7.4.1 The points scored for the specific goal will be added to the points scored for
MandatoryCategory: compliance
price and the total will be rounded off to the nearest two decimal places.
MandatoryCategory: compliance
7.4.2 The contract will be awarded to the tender scoring the highest points.
MandatoryCategory: compliance
7.4.4 If two or more tenders score an equal total number of points, the contract will be awarded to the tenderer that scored the highest points
MandatoryCategory: compliance
for specific goals, and if two or more tenderers score equal total points in all respects, the award must be decided by the drawing of lots.
MandatoryCategory: compliance
7.5. PRICE
MandatoryCategory: compliance
7.5.1 To provide detailed financial proposals, refer to pricing schedule below.
MandatoryCategory: compliance
SBD3.1
MandatoryCategory: compliance
DETAILED PRICING SCHEDULE
MandatoryCategory: compliance
7.5.2 ALL-INCLUSIVE COST-TO-COMPANY GROSS RENTAL (VAT INCLUSIVE), WHICH COMPRISES THE FOLLOWING:
MandatoryCategory: compliance
DESCRIPTION YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 11 MONTHS
MandatoryCategory: compliance
COST COST COST COST COST COST COST COST COST INCLUDING COST
MandatoryCategory: compliance
INCLUDING INCLUDING INCLUDING INCLUDING INCLUDING INCLUDING INCLUDING ESCALATIONS INCLUDING
MandatoryCategory: compliance
ESCALATIONS ESCALATIONS ESCALATIONS ESCALATIONS ESCALATIONS ESCALATIONS ESCALATIONS ESCALATIONS
MandatoryCategory: compliance
OFFICE SPACE AND PARKING BAYS
MandatoryCategory: compliance
Rate per m2 R R R R R R R R R R
MandatoryCategory: compliance
Monthly Basic R R R R R R R R R R
MandatoryCategory: compliance
Rental for the full
MandatoryCategory: compliance
area
MandatoryCategory: compliance
Rate per Parking R R R R R R R R R R
MandatoryCategory: compliance
Bay
MandatoryCategory: compliance
Monthly Basic R R R R R R R R R R
MandatoryCategory: compliance
Rental for a l l
MandatoryCategory: compliance
p a r k i n g b a y s
MandatoryCategory: compliance
Monthly Basic R R R R R R R R R R
MandatoryCategory: compliance
Rental for full
MandatoryCategory: compliance
area and parking
MandatoryCategory: compliance
bays (Incl VAT)
MandatoryCategory: compliance
Annual Basic R R R R R R R R R R
MandatoryCategory: compliance
Rental for full
MandatoryCategory: compliance
area and parking
MandatoryCategory: compliance
bays (Incl VAT)
MandatoryCategory: compliance
Office space and Parking Bays Grand Total (Including 15% VAT and escalations): R
MandatoryCategory: compliance
7.6 OPERATION COSTS AND EXPENSES
MandatoryCategory: compliance
Provide a full list of all applicable items that are included in the All-inclusive Operating Costs
MandatoryCategory: compliance
DESCRIPTION of YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 11 MONTHS
MandatoryCategory: compliance
Operating Cost COST INCLUDINGESCALATIONS INCLUDINGESCALATIONS INCLUDINGESCALATIONS INCLUDINGESCALATIONS INCLUDINGESCALATIONS INCLUDINGESCALATIONS INCLUDINGESCALATIONS INCLUDINGESCALATIONS INCLUDINGESCALATIONS
MandatoryCategory: compliance
Provide a full list of all applicable items that are included in the All-inclusive Operating Cost
MandatoryCategory: compliance
Services
MandatoryCategory: compliance
Water consumption R R R R R R R R R R
MandatoryCategory: compliance
Electricity consumption R R R R R R R R R R
MandatoryCategory: compliance
Sanitation R R R R R R R R R R
MandatoryCategory: compliance
Maintenance
MandatoryCategory: compliance
Internal maintenance R R R R R R R R R R
MandatoryCategory: compliance
External R R R R R R R R R R
MandatoryCategory: compliance
Garden (if applicable) R R R R R R R R R R
MandatoryCategory: compliance
Air conditioning R R R R R R R R R R
MandatoryCategory: compliance
Lifts R R R R R R R R R R
MandatoryCategory: compliance
Floor covering normal R R R R R R R R R R
MandatoryCategory: compliance
wear
MandatoryCategory: compliance
Rates and Insurance
MandatoryCategory: compliance
Municipal rates R R R R R R R R R R
MandatoryCategory: compliance
Insurance R R R R R R R R R R
MandatoryCategory: compliance
SASRIA insurance R R R R R R R R R R
MandatoryCategory: compliance
Other Responsibilities
MandatoryCategory: compliance
Contracts costs R R R R R R R R R R
MandatoryCategory: compliance
Stamp duty R R R R R R R R R R
MandatoryCategory: compliance
Fire Fighting equipment R R R R R R R R R R
MandatoryCategory: compliance
Cost of alterations R R R R R R R R R R
MandatoryCategory: compliance
Monthly operating costs & R R R R R R R R R R
MandatoryCategory: compliance
expenses for the full
MandatoryCategory: compliance
area upon which Operating
MandatoryCategory: compliance
costs & expenses are levied
MandatoryCategory: compliance
(Including VAT)
MandatoryCategory: compliance
Annual operating costs & R R R R R R R R R R
MandatoryCategory: compliance
expenses for the full
MandatoryCategory: compliance
area upon which Operating
MandatoryCategory: compliance
costs & expenses are levied
MandatoryCategory: compliance
(Including VAT)
MandatoryCategory: compliance
Annual escalations rate Not %
MandatoryCategory: compliance
(%) applicable
MandatoryCategory: compliance
Operating costs Grand Total (Including 15% VAT and escalations): R
MandatoryCategory: compliance
TENANT INSTALLATION OR TENANT INSTALLATION ALLOWANCE
MandatoryCategory: compliance
Space Planning and interior design inclusive of research, detailing, drawings and revisions R
MandatoryCategory: compliance
allowances
MandatoryCategory: compliance
Tenant installation allowance R
MandatoryCategory: compliance
Total R
MandatoryCategory: compliance
Grand Total for Office space and Parking Bays + Operating costs (Including 15% VAT and escalations): R
MandatoryCategory: compliance
DATE: ..........................................................................................
MandatoryCategory: compliance
CAPACITY UNDER WHICH THIS BID IS SIGNED: .....................................................................
MandatoryCategory: compliance
PART B:
MandatoryCategory: compliance
General conditions of contracts
MandatoryCategory: compliance
8.1 The General Conditions of Contracts (GCC) as set out by the National Treasury will be
MandatoryCategory: compliance
applicable in all instances.
MandatoryCategory: compliance
Other bid requirements
MandatoryCategory: compliance
9.1 The PPSA reserves the right to disqualify any bidder which does not comply with anyone
MandatoryCategory: compliance
or more of the required information as indicated below:
MandatoryCategory: compliance
9.1.1 If the bidder/s submit their bids without all the data and information requested.
MandatoryCategory: compliance
9.1.2 Proposal that did not submit mandatory documents stipulated in the RFP document.
MandatoryCategory: compliance
9.1.3 Proposal that fails to comply with the specification.
MandatoryCategory: compliance
9.1.4 Proposal that contains any information that is found to be incorrect or misleading in any
MandatoryCategory: compliance
way or Bidders who submit information that is fraudulent, factually untrue or inaccurate
MandatoryCategory: compliance
information.
MandatoryCategory: compliance
9.1.5 Bidders who submit incomplete information and documentation according to the
MandatoryCategory: compliance
requirements of this RFP document.
MandatoryCategory: compliance
9.1.6 Bidders who receive information not available to other potential bidders through fraudulent
MandatoryCategory: compliance
means.
MandatoryCategory: compliance
PPSA reserves the right:
MandatoryCategory: compliance
10.1 Not to award or cancel this bid at any time
MandatoryCategory: compliance
10.2 To negotiate with one or more Preferred or Reserved Bidders identified in the evaluation
MandatoryCategory: compliance
process, regarding any terms and conditions, including price without offering the same
MandatoryCategory: compliance
opportunity to any other Bidder who has not been awarded the status of the Preferred or
MandatoryCategory: compliance
Reserved Bidder.
MandatoryCategory: compliance
10.3 To award in part or in full.
MandatoryCategory: compliance
10.4 To award this bid to one or more bidders.
MandatoryCategory: compliance
10.5 To negotiate prices of items that are contracted and should these items be available at a
MandatoryCategory: compliance
competitive price than the contracted price, PPSA will request the current bidder to reduce
MandatoryCategory: compliance
their price to be inline failing which; these will be purchased out of contract.
MandatoryCategory: compliance
10.6 To cancel and/or terminate the bid process at any stage, including after the Closing Date
MandatoryCategory: compliance
and/or after presentations have been made, and/or after bids have been evaluated and/or
MandatoryCategory: compliance
after the Preferred Bidders have been notified of their status as such.
MandatoryCategory: compliance
10.7 To carry out explanatory meetings to verify the nature and quality of the services bidding
MandatoryCategory: compliance
for, whether before or after adjudication of the bid at the bidder’s corporate offices and / or
MandatoryCategory: compliance
at client sites if so required.
MandatoryCategory: compliance
10.8 To award the contract to a Bidder whose bid was not the lowest in price.
MandatoryCategory: compliance
10.9 To award the bid to a Bidder who is not the highest scoring Bidder.
MandatoryCategory: compliance
10.10 To correct any mistakes at any stage of the bid that may have been in the bid documents
MandatoryCategory: compliance
or occurred at any stage of the bid process.
MandatoryCategory: compliance
10.11 The PPSA is entitled to amend any bid conditions, bid validity period, RFP specifications,
MandatoryCategory: compliance
or extend the bid closing date, all before the bid closing date. All bidders, to whom the RFP
MandatoryCategory: compliance
documents have been issued and where the PPSA has record of such bidders, may be
MandatoryCategory: compliance
advised in writing of such amendments in good time and any such changes will also be
MandatoryCategory: compliance
posted on the PPSA’s website under the relevant tender information. All prospective
MandatoryCategory: compliance
bidders should therefore ensure that they visit the website regularly and before they submit
MandatoryCategory: compliance
their bid response to ensure that they are kept updated on any amendments in this regard.
MandatoryCategory: compliance
10.12 The PPSA reserves the right not to accept the lowest priced bid or any bid in part or in
MandatoryCategory: compliance
whole. It normally awards the contract to the bidder who proves to be fully capable of
MandatoryCategory: compliance
handling the contract and whose bid is functionally acceptable and/or financially
MandatoryCategory: compliance
advantageous to the PPSA.
MandatoryCategory: compliance
10.13 The PPSA reserves the right to request all relevant information, agreements, and other
MandatoryCategory: compliance
documents to verify information supplied in the bid response.
MandatoryCategory: compliance
10.14 The bidder hereby gives consent to the PPSA to conduct background checks, including
MandatoryCategory: compliance
FICA verification, on the bidding entity and any of its directors / trustees / shareholders /
MandatoryCategory: compliance
members.
MandatoryCategory: compliance
10.15 No attempt may be made, whether directly or indirectly, to canvass any member of PPSA
MandatoryCategory: compliance
employees before the award of the contract.
MandatoryCategory: compliance
10.16 Any enquiries must be referred to in writing.
MandatoryCategory: compliance
10.17 PPSA reserves the right to monitor the agreement between the bidder and Municipality and
MandatoryCategory: compliance
may cancel the contract if the agreement is not honored.
MandatoryCategory: compliance
Undertakings by the Bidder
MandatoryCategory: compliance
11.1 By submitting a bid in response to the RFB, the bidder will be taken to offer to render all or
MandatoryCategory: compliance
any of the services described in the bid response submitted by it to the PPSA on the terms
MandatoryCategory: compliance
and conditions and in accordance with the specifications stipulated in this RFB document.
MandatoryCategory: compliance
11.2 The bidder shall prepare for a possible presentation should PPSA require such and the
MandatoryCategory: compliance
bidder shall be notified before the actual presentation date. Such a presentation may
MandatoryCategory: compliance
include a practical demonstration of services as called for in this RFB.
MandatoryCategory: compliance
11.3 The bidder agrees that the offer contained in its bid shall remain binding upon him/her and
MandatoryCategory: compliance
receptive for acceptance by the PPSA during the bid validity period indicated in the RFP
MandatoryCategory: compliance
and calculated from the bid closing hour and date such offer, and its acceptance shall be
MandatoryCategory: compliance
subject to the terms and conditions contained in this RFB document read with the bid.
MandatoryCategory: compliance
11.4 The bidder furthermore confirms that he/she has satisfied himself/herself as to the
MandatoryCategory: compliance
correctness and validity of his/her bid response; that the price(s) and rate(s) quoted cover
MandatoryCategory: compliance
all the work/item(s) specified in the bid response documents; and that the price(s) and
MandatoryCategory: compliance
rate(s) cover all his/her obligations under a resulting contract for the services contemplated
MandatoryCategory: compliance
in this RFB; and that he/she accepts that any mistakes regarding price(s) and calculations
MandatoryCategory: compliance
will be at his/her risk.
MandatoryCategory: compliance
11.5 The successful bidder accepts full responsibility for the proper execution and fulfilment of
MandatoryCategory: compliance
all obligations and conditions devolving on him/her under the supply agreement and SLA
MandatoryCategory: compliance
to be concluded with PPSA, as the principal(s) liable for the due fulfilment of such contract.
MandatoryCategory: compliance
11.6 The bidder accepts that all costs incurred in the preparation, presentation and
MandatoryCategory: compliance
demonstration of the solution offered by it shall be for the account of the bidder. All
MandatoryCategory: compliance
supporting documentation and manuals submitted with its bid will become PPSA property
MandatoryCategory: compliance
unless otherwise stated by the bidder/s at the time of submission.
MandatoryCategory: compliance
Contract requirements
MandatoryCategory: compliance
12.1 Contract period
MandatoryCategory: compliance
12.1.1 The start date for the implementation of the project will be confirmed with the successful
MandatoryCategory: compliance
bidder upon contract negotiations. The initiative is based on deliverables. The contract
MandatoryCategory: compliance
period is 09 Years and 11 Months, a subject to review the service provider’s performance.
MandatoryCategory: compliance
12.2 General terms and conditions of contract
MandatoryCategory: compliance
12.2.1 The General Conditions of Contracts (GCC) as set out by the National Treasury will be
MandatoryCategory: compliance
applicable in all instances.
MandatoryCategory: compliance
12.3 Price basis
MandatoryCategory: compliance
12.3.1 Bidders shall consider that PPSA’s total requirements will be allocated to one bidder.
MandatoryCategory: compliance
12.3.2 Bidders shall quote prices in South African Rand and Value Added Tax shall be included.
MandatoryCategory: compliance
12.3.3 For PPSA to be able to facilitate the evaluation of bids and the administration of the contract
MandatoryCategory: compliance
it is required that bidders must provide pricing including escalation for a period of 09 years
MandatoryCategory: compliance
and 11 months.
MandatoryCategory: compliance
12.3.4 Bidders shall quote on the basis indicated in the Pricing Schedule and complete SBD 3.1.
MandatoryCategory: compliance
12.3.5 Prices tendered for must be inclusive of all required deliverables as per specification.
MandatoryCategory: compliance
12.3.6 PPSA requires an all-inclusive and fully transparent cost structure.
MandatoryCategory: compliance
12.3.7 Where figures are referred to in numerals and in words and there is a conflict between the
MandatoryCategory: compliance
two, the words will prevail.
MandatoryCategory: compliance
12.3.8 The successful bidder shall commit to the programme of continuous improvement, which
MandatoryCategory: compliance
will result in cost-efficiencies during the duration of the contract.
MandatoryCategory: compliance
Awaiting Award of Contract
This tender has not yet been awarded. The contracting authority is expected to publish the award notice in due course.
27 Feb
2026
Submissions Closed
No further submissions were accepted after this date.
Organization
Public Protector South AfricaContact Person
kabelo Lekalakala
Phone
012-366-7014
[email protected]
Address
175 Lunnon Street,Hillcrest Office Park - Hillcrest Office Park - Pretoria - 0083
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
05 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Learn how to submit a winning bid with these related articles
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Data conflicts
None detected
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Building. Unlock full pricing strategies, bid frequency, and historical win rates.