Issuing Organization
Department of Rural Development & Land ReformLocation
Mpumalanga
Closed On
26 Feb 2026
Status: Closed — No Longer Accepting Submissions
This tender closed on 26 February 2026. Submissions are no longer accepted. The tender lifecycle continues — check the awards section for updates.
Tender Type
Request for Bid(Open-Tender)
Delivery Location
17 van rensburg street,sonheuwel mbombela - mbombela - mbombela - 1201
Organization Type
GOVERNMENT
Published
03 Feb 2026
The department of rural development & land reform is seeking a qualified service provider to review and update the land use schemes of dr js moroka, thembisile hani, victor khanye, emalahleni and emakhazeni local municipalities in mpumalanga, ensuring compliance with spluma, municipal by‑laws and spatial development frameworks. The contract is open to firms or consortia and bids must be submitted by 26 february 2026.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: Bid document LUS Final (1).pdf. You don’t need to refresh — this page will pick up the updated review automatically.
Categories
Request for Bid(Open-Tender)
17 van rensburg street,sonheuwel mbombela - mbombela - mbombela - 1201
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Bid document LUS Final (1).pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Date & Time
Thursday, 26 February 2026 - 11:00
Venue
null
This briefing session took place during the tender period.
2.1 For decades, the Land Use Management System in South Africa had limited the ability
Category: technical
of municipalities to effectively address matters relating to land development planning,
Category: technical
development management, and the regularisation of land use activities.
Category: technical
2.2 Historically, municipalities regulated land use through Town Planning Schemes
Category: technical
developed in terms of provincial ordinances. However, these schemes were not “wall-
Category: technical
to-wall” and, in many cases, did not cover all areas within a municipality’s jurisdiction.
Category: technical
As a result, large portions of land remained unaudited, leading to municipalities losing
Category: technical
oversight and control over land use within their areas of jurisdiction.
Category: technical
of 30
Category: technical
2.3 This gap was addressed through the introduction of SPLUMA. In terms of Chapter 5,
Category: technical
Section 24(1), municipalities were required—after public consultation—to adopt and
MandatoryCategory: technical
approve a single Land Use Scheme for their entire area of jurisdiction within five years
Category: technical
of the Act’s commencement in 2015. This meant that all municipalities were expected to
Category: technical
have adopted a Land Use Scheme by 2020. This deadline was later extended by 12
Category: technical
months, as per Government Gazette Notice No. 43598.
Category: technical
2.4 A Land Use Scheme must give effect to, and be consistent with, the Municipal Spatial
MandatoryCategory: technical
Development Framework (SDF) and guide the use and development of land within the
Category: technical
municipal area. It must do so in a manner that promotes:
MandatoryCategory: technical
(i) Economic growth.
Category: technical
(ii) Social inclusion.
Category: technical
(iii) Efficient land development; and
Category: technical
(iv) Minimum impact on public health, the environment and natural resources.
Category: technical
2.5 SPLUMA uses the term Land Use Scheme instead of older terms such as Town Planning
Category: technical
Scheme or Zoning Scheme, in order to establish a single, standardised term for the
Category: technical
document described in Chapter 5, which regulates and manages land use.
Category: technical
2.6 Section 27. (1) of SPLUMA provides that a municipality may review its land use scheme
Category: technical
in order to achieve consistency with the municipal spatial development framework and
Category: technical
must do so at least every five years.
MandatoryCategory: technical
2.7 The Land Use Schemes of the subject municipalities were promulgated in 2020. In
Category: technical
accordance with the provisions of SPLUMA, the municipalities are therefore required to
MandatoryCategory: technical
conduct review of their Land Use Schemes as the prescribed five-year period has
Category: technical
lapsed.
Category: technical
3. PURPOSE AND OBJECTIVE OF THE PROJECT
Category: technical
3.1 The main objective of the project is to assist the five municipalities – Dr JS Moroka,
Category: technical
Thembisile Hani, Victor Khanye, Emalahleni and Emakhazeni to review their Land Use
Category: technical
Schemes in line with the provisions of SPLUMA and the By-Laws of the respective
Category: technical
of 30
Category: technical
municipalities. The review of the Land Use Schemes (LUSs) must take cognisance of
MandatoryCategory: technical
the following:
Category: technical
• Consistency with the municipal SDFs.
Category: technical
• Must cater for both rural and urban areas as well as formal and informal areas
MandatoryCategory: technical
found within the administrative boundaries of the Municipality.
Category: technical
• Promote a planning system that will better respond to the current challenges and
Category: technical
pro-actively put in place mechanisms that will respond to future development and
Category: technical
growth requirements.
Category: technical
• Must balance policy objectives with decision making.
MandatoryCategory: technical
• Provide clarity and reasons on what may or may not occur on specific parcels
Category: technical
of land.
Category: technical
• Promote certainty for land use and the management thereof to create investor
Category: technical
confidence.
Category: technical
• Promote amenity, efficient land use practices and reserve land for essential
Category: technical
services.
Category: technical
• Resolve conflicts between different land uses and to control negative
Category: technical
externalities.
Category: technical
• Enable the mix of convenient land uses, efficient movement processes and
Category: technical
promote economic development.
Category: technical
• Protect natural, cultural and religious resources, unique areas, ecosystem
Category: technical
services, areas of archaeological and historical significance, and land with
Category: technical
agricultural potential.
Category: technical
• Ensure public involvement in land management decision-making processes.
Category: technical
• Provide for sound local regulation and enforcement procedures.
Category: technical
• Recognize indigenous and local spatial knowledge, land use practices and land
Category: technical
allocation processes.
Category: technical
• Ensure the collaborative designation of areas for future land uses; and
Category: technical
• Ensure that the scheme is developed in a collaborative manner aiming at social
Category: technical
justice and the equitable regulation of contested spaces.
Category: technical
of 30
Category: technical
4. CHARACTERISTICS OF THE LAND USE SCHEME
Category: technical
4.1 The reviewed LUS must be simplified, in accordance with SPLUMA and must contain
MandatoryCategory: technical
provisions for special development zones linked with economic growth, environmental
Category: technical
management, built environment and other related special cases that may arise.
Category: technical
4.2 The LUS clauses and maps should also be reviewed. The reviewed LUS should be able
Category: technical
to achieve amongst others, the following:
Category: technical
• Bridge the gap between old order land uses and currently approved land uses.
Category: technical
• Resolve conflict between different land uses.
Category: technical
• Promote economic, social and environmental land use sustainability.
Category: technical
• Protect amenities of adjacent land uses.
Category: technical
• Conserve natural and agricultural resources.
Category: technical
• Protect and promote buildings and areas with heritage significance.
Category: technical
• Protect cultural resources and promote culture diversities.
Category: technical
• Protect both the formal and the informal economy.
Category: technical
• Cater for both formal and informal residential settlements.
Category: technical
5. SCOPE OF THE PROJECT
Category: technical
5.1 The scope of the project comprises reviewing the Land Use Schemes of:
Category: technical
5.1.1 Dr JS Moroka Local Municipality
Category: technical
5.1.2 Thembisile Hani Local Municipality
Category: technical
5.1.3 Victor Khanye Local Municipality
Category: technical
5.1.4 Emalahleni Local Municipality and
Category: technical
5.1.5 Emakhazeni Local Municipality
Category: technical
5.2 The project will be guided by the Land Use Scheme Guidelines (2017), the provisions
Category: technical
of the SPLUM By-Laws of Dr JS Moroka, Thembisile Hani, Victor Khanye,
Category: technical
Emalahleni and Emakhazeni Local Municipality and SPLUMA. The reviewed LUSs
Category: technical
should contain amongst others at least the following:
Category: technical
of 30
Category: technical
(i) Reflection of the development principles highlighted in SPLUMA.
Category: technical
(ii) Suitable categories of land use zoning and regulations for the entire municipal
Category: technical
area.
Category: technical
(iii) Cognizance of any environmental management instrument adopted by relevant
Category: technical
environmental management authority and must comply with environmental
MandatoryCategory: technical
legislation.
Category: technical
(iv) Reviewal of the provisions that permit land use management and regulation in
Category: technical
areas under traditional leadership, rural areas, informal settlements, slums
Category: technical
and areas not previously subject to a Land Use Scheme.
Category: technical
(v) Provisions to promote the inclusion of affordable housing in residential land
Category: technical
development.
Category: technical
(vi) Land use and development incentives to promote the effective
Category: technical
implementation of the SDF and other development policies.
Category: technical
(vii) Systems to manage and regulate both formalities and informalities found with a
Category: technical
municipal area.
Category: technical
(viii) Consistency with the relevant Municipal Spatial Development Framework; and
Category: technical
(ix) Processes relating to Land Use Scheme enforcement.
Category: technical
5.3 The review of each municipality’s Land Use Scheme should focus primarily on the
Category: technical
specific areas outline below:
Category: technical
5.3.1 Dr JS Moroka Local Municipality – the LUS review shall focus mainly on the following
Category: technical
areas:
Category: technical
5.3.1.1 Legislative compliance – review alignment with SPLUMA and Municipal SPLUM By-
Category: technical
Law; alignment with the SDF.
Category: technical
5.3.1.2 Assess current development trends, existing land use patterns and spatial form, density
Category: technical
patterns and settlement trends, growth pressures and investment hotspots,
Category: technical
environmental constraints.
Category: technical
5.3.1.3 Review and update definitions and terminology
Category: technical
5.3.1.4 Review and adjust land use and zoning categories to ensure relevance and
Category: technical
compatibility. Further consider introducing new zoning and land use categories or
Category: technical
joining others.
Category: technical
5.3.1.5 Define a process of rectifying errors on the Land Use Scheme
Category: technical
of 30
Category: technical
5.3.1.6 Formulate specific development regulations for certain land use categories and specific
Category: technical
areas.
Category: technical
5.3.1.7 Update development policies, e.g. inclusion of newly developed development policies.
Category: technical
5.3.1.8 Provide for differentiated application procedures for various forms of land tenure
Category: technical
arrangements, considering the specific context of the municipality.
Category: technical
5.3.1.9 Ensure that the scheme is aligned with municipal spatial policies, e.g. the SDF.
Category: technical
5.3.1.10 Provide overlay zones, particularly to regulate development on agricultural land and
Category: technical
protected areas.
Category: technical
5.3.1.11 Provide a GIS compatible scheme that would be accessible through the municipal GIS
Category: technical
system.
Category: technical
5.3.1.12 Provide a mechanism/tool for the monitoring and tracking of land use changes.
Category: technical
5.3.1.13 Provide for transitional arrangements
Category: technical
5.3.2 Thembisile Hani Local Municipality – the LUS review shall mainly focus on the
Category: technical
following areas:
Category: technical
5.3.2.1 Review and update definitions and terminology
Category: technical
5.3.2.2 Review and adjust land use and zoning categories to ensure relevance and
Category: technical
compatibility
Category: technical
5.3.2.3 Review legislative and policy context in line with changes in policy context, e.g.
Category: technical
SPLUMA Certificates court ruling
Category: technical
5.3.2.4 Formulate specific development regulations for certain land use categories and specific
Category: technical
areas.
Category: technical
5.3.2.5 Policies, guidelines and simplified requirements for small scale businesses and informal
Category: technical
trade as well as township economy.
Category: technical
5.3.2.6 Provide differentiated land use management schemes for urban, rural and informal
Category: technical
areas.
Category: technical
5.3.2.7 Align LUS with the SDF and SPLUM By-Law.
Category: technical
5.3.2.8 Formulate development guidelines and regulations for specific land uses, e.g. taverns,
Category: technical
carwash, spaza shops, etc.
Category: technical
5.3.2.9 Updating spatial data and scheme maps.
Category: technical
5.3.2.10 Land use survey to be conducted.
Category: technical
5.3.2.11 Review of Existing Zoning and Scheme Clauses
Category: technical
5.3.2.12 Review zoning categories and subcategories
Category: technical
of 30
Category: technical
5.3.2.13 Review development controls (height, coverage, FAR, building lines, parking
Category: technical
standards).
Category: technical
5.3.3 Emakhazeni Local Municipality – the LUS review shall focus mainly on the following
Category: technical
areas
Category: technical
5.3.3.1 Review and update the land use definitions and terminology sections
Category: technical
5.3.3.2 Development regulation – including the introduction of new development controls and
Category: technical
measures, e.g. defining area sizes for density use on each zone.
Category: technical
5.3.3.3 Zoning and Land Use Categories – revision of zoning and land use under each zone,
Category: technical
including addition of more land uses and ensuring alignment and compatibility, with due
Category: technical
consideration of development intensities. Further make revisions on development
Category: technical
controls in line with the spatial objectives of the municipality as depicted in the SDF and
Category: technical
the context of the municipality. i.e. proposed additions and subtractions of uses under
Category: technical
different zoning categories.
Category: technical
5.3.3.4 Land use survey (desktop) and zoning scheme maps – a thorough revision is required
MandatoryCategory: technical
to correct existing errors and ensure that maps are based on proclaimed zonings and
Category: technical
other approvals. It is suggested that the actual zonings of properties be thoroughly
Category: technical
investigated and correctly indicated on the proposed reviewed Scheme Map.
Category: technical
5.3.3.5 Review scheme maps to reflect historic zoning approvals and to rectify incorrectly
Category: technical
depicted zoning categories.
Category: technical
5.3.3.6 Review overlay zones to align with new legislation, policies and frameworks and depict
Category: technical
SDF directives while maintaining factual zoning rights depiction on scheme maps. The
Category: technical
current Scheme Map appears to reflect and focus more on the desired land use patterns
Category: technical
derived from the SDF. It is suggested that this be reviewed so that the SDF directives
Category: technical
are rather captured as Overlay zones, than being included in the Use Zones on the
Category: technical
maps. This will ensure that the actual zoning map remains a real indication of actual
Category: technical
zoning rights.
Category: technical
5.3.3.7 Provide provisions depicted on relevant policy and legislation.
Category: technical
5.3.3.8 Provide differentiated land use management schemes for urban, rural and informal
Category: technical
areas with due consideration to the different conditions defining the various localities.
Category: technical
5.3.3.9 Compliance, enforcement and transitional arrangements – to address properties with
Category: technical
existing right and ongoing applications.
Category: technical
5.3.3.10 Sections that are already contained in the By-law, such as the Law Enforcement
Category: technical
of 30
Category: technical
Procedures in Chapters 13 and 14, should not be duplicated in the Scheme provisions.
Category: technical
5.3.3.11 Formulate a standard draft Amendment Scheme Map and Schedule (Annexure).
Category: technical
5.3.4 Victor Khanye Local Municipality – the LUS review shall focus mainly on the following
Category: technical
areas:
Category: technical
5.3.4.1 Revise land use definitions and terminology sections
Category: technical
5.3.4.2 Revise spatial data and scheme maps to rectify inconsistencies
Category: technical
5.3.4.3 Revise zoning categories and introduce overlay zones
Category: technical
5.3.4.4 Align regulatory framework and LUS provisions with recent legislative and policy
Category: technical
changes
Category: technical
5.3.4.5 Align the scheme with the latest SDF and rectify conflicts
Category: technical
5.3.4.6 Make provision for emerging issues – e.g. renewable energy sector
Category: technical
5.3.4.7 Revise scheme to strictly delineate and differentiate between certain land use
Category: technical
categories
Category: technical
5.3.4.8 Introduce zoning categories/ overlay zones to support informal settlement upgrading.
Category: technical
5.3.4.9 Agricultural and peri-urban land-use classification – introduce overlay conditions in the
Category: technical
scheme that link rezoning/development to service capacity and to map out constraints’
Category: technical
zones” e.g. dolomite risk areas.
Category: technical
5.3.5 Emalahleni Local Municipality – the LUS review shall focus on the following
Category: technical
areas:
Category: technical
5.3.5.1 Review land use definitions and terminology sections
Category: technical
5.3.5.2 Update spatial data and scheme maps – including update zoning and cadastral data
Category: technical
5.3.5.3 Review zoning categories to incorporate changes that have occurred over time
Category: technical
5.3.5.4 Provide differentiated land use management schemes for urban, rural and informal
Category: technical
areas.
Category: technical
5.3.5.5 Revise the regulatory framework of the scheme, e.g. to make provision for addressing
Category: technical
small and low intensity undertaken from residential properties, e.g. spaza shops.
Category: technical
5.3.5.6 Policies and guidelines – develop a guiding policy for small scale businesses and
Category: technical
provide for provisions for townships/informal/rural settlements
Category: technical
5.3.5.7 Align scheme with the SDF
Category: technical
of 30
Category: technical
5.4 The review of each Land Use Scheme must align with the provisions of Chapter 3 of
MandatoryCategory: technical
SPLUMA and the respective Municipal By-Laws.
Category: technical
5.5 The successful bidder may be required to undertake additional reviews beyond those
MandatoryCategory: technical
specified, as identified by the Project Management Committee, Project Steering
Category: technical
Committee, or arising from issues or areas highlighted during the public consultation
Category: technical
process.
Category: technical
6. PROJECT OUTCOMES
Category: technical
6.1 Each reviewed Land Use Scheme must include, amongst others, the following:
MandatoryCategory: technical
(i) Scheme Regulations (Scheme Clauses)
Category: technical
(ii) Scheme Maps
Category: technical
(iii) Zones
Category: technical
(iv) Scheme Controls
Category: technical
(v) Design and Layout Requirements
Category: technical
(vi) General Administrative powers of the LUS
Category: technical
(vii) Legal effect of LUS
Category: technical
(viii) Strategy to address illegal land uses
Category: technical
7. CRITICAL MILESTONES
Category: technical
7.1 The following Six (6) critical milestones/ phases should be used to review the five Land
Category: technical
Use Schemes.
Category: technical
7.1.1 Phase 1: Inception: This phase will involve the preparation of a Project Plan in
Category: technical
alignment with these Terms of Reference, clearly outlining all project phases, activities,
Category: technical
and deliverables. A Project Steering Committee (PSC) must be established by identifying
MandatoryCategory: technical
and confirming participation from all key stakeholders. The PSC will be responsible for
Category: technical
reviewing and approving the inception report and subsequent phase reports throughout
Category: technical
the project. The Inception Report and project plan must include but should not be limited
MandatoryCategory: technical
to:
Category: technical
of 30
Category: technical
• Project objectives and scope.
Category: technical
• Detailed work breakdown structure.
Category: technical
• Deliverables and timelines.
Category: technical
• Roles and responsibilities of project team members.
Category: technical
• Stakeholder engagement plan.
Category: technical
• Risk assessment and mitigation measures; and
Category: technical
• Reporting and approval process.
Category: technical
• Possible dates for Project Management Committee (PMC) and PSC
Category: technical
meetings.
Category: technical
7.1.2 Phase 2: Data Collection and Research Analysis: This phase involves the systematic
Category: technical
collection, verification, and analysis of all relevant data to inform the review of the Land
Category: technical
Use Schemes. The key data sources and components that must be addressed include
MandatoryCategory: technical
the following:
Category: technical
• Desktop Land Use Survey and Verification – including the identification of
Category: technical
existing land uses, non-conforming uses, and any deviations from the current
Category: technical
LUSs.
Category: technical
• Cadastral and Jurisdictional Boundaries – confirmation and mapping of municipal
Category: technical
boundaries and cadastral data.
Category: technical
• Municipal Planning Documents – review of the respective Integrated
Category: technical
Development Plans (IDPs) and the Spatial Development Frameworks (SDFs) to
Category: technical
ensure alignment.
Category: technical
• Aerial Photography – utilisation of up-to-date aerial imagery to verify and map
Category: technical
land uses and physical features.
Category: technical
• Land Ownership Verification – assessment of ownership records to inform land
Category: technical
management and planning decisions.
Category: technical
• Land Tenure – identification of different forms of land tenure and their spatial
Category: technical
distribution.
Category: technical
• Settlement Patterns – mapping and classification of defined urban areas, rural
Category: technical
settlements, and other settlement types.
Category: technical
• Physical Environment – analysis of geology, soil characteristics, topography, and
Category: technical
slope, to determine development suitability.
Category: technical
of 30
Category: technical
• Existing LUS Review – evaluation of the current Land Use Scheme’s provisions,
Category: technical
implementation, and enforcement.
Category: technical
• Environmentally Sensitive Areas – identification of ecologically important or
Category: technical
protected areas requiring special planning consideration.
Category: technical
• Engineering Services and Infrastructure – assessment of existing service levels,
Category: technical
current demand, available capacity, and associated operational costs.
Category: technical
7.1.3 Phase 3: Draft Land Use Scheme and Supporting Documents: The purpose of this
Category: technical
phase is to plan, conceptualise, and prepare the draft Land Use Schemes. The draft
Category: technical
LUSs should integrate the findings from Phase 2. Proposals contained in the SDFs
Category: technical
should be translated into broad land use proposals that will inform and give effect to the
Category: technical
Land Use Schemes. Additionally, existing general and land use definitions should be
Category: technical
reviewed to ensure consistency and relevance.
Category: technical
7.1.4 Phase 4: Consultation and Amendments: Once the draft Land Use Schemes have
Category: technical
been completed, public participation must be conducted. This consultation should
MandatoryCategory: technical
involve all relevant stakeholders, including Traditional Councils (if relevant) and affected
Category: technical
communities. Feedback received during this process should be carefully considered and
Category: technical
incorporated into the LUSs through the necessary amendments.
Category: technical
7.1.5 Phase 5: Adoption and Application Procedures: this phase includes preparing and
Category: technical
submitting the final draft Land Use Schemes, including all clauses, maps, and supporting
Category: technical
documents, to the PSC for review and approval. once adopted, the LUSs will be
Category: technical
submitted to the respective Municipal Councils for final adoption. Following adoption by
Category: technical
the Councils, the LUSs will be formally promulgated and implemented.
Category: technical
7.1.6 Phase 6: Close Out Process: Final Land Use Schemes, data and supporting material
Category: technical
should be handed over to the client. A close-out report must be prepared and submitted
MandatoryCategory: technical
to the client.
Category: technical
7.2 All milestones outlined in Section 7.1 must be executed individually, separately, and
MandatoryCategory: technical
simultaneously for each of the five municipalities, ensuring consistent quality and
Category: technical
compliance across all areas.
Category: technical
of 30
Category: technical
No specific requirements found
MandatoryCategory: compliance
03 Feb
2026
Tender Published
Tender was published
26 Feb
2026
Closing Date
Tender closing date
Pending
Awaiting Award of Contract
This tender has not yet been awarded. The contracting authority is expected to publish the award notice in due course.
26 Feb
2026
Submissions Closed
No further submissions were accepted after this date.
Organization
Department of Rural Development & Land ReformContact Person
Alpheus Nkuna
Phone
012-312-8364
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: Bid document LUS Final (1).pdfContact Information
Source: Bid document LUS Final (1).pdfTechnical enquiries:
Bid‑related enquiries:
Bid submission address (Bid Box):
6th Floor, 17 Van Rensburg Street, Block E, Bateleur Building, Nelspruit, 1200 (Provincial Shared Services Centre).
Submission Guidelines
Source: Bid document LUS Final (1).pdfEvaluation Criteria
Source: Bid document LUS Final (1).pdf– Historically Disadvantaged Individual (HDI) ownership (up to 8 points)
– Female ownership (up to 5 points)
– Disability (up to 2 points)
– Youth (≤ 35 years) (up to 2 points)
– Locality within Mpumalanga (up to 3 points)
Technical Specifications
Source: Bid document LUS Final (1).pdfScope:
Deliverables:
Key requirements:
Financial Requirements
Source: Bid document LUS Final (1).pdfCompliance Requirements
Source: Bid document LUS Final (1).pdfSets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
17 van rensburg street,sonheuwel mbombela - mbombela - mbombela - 1201
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
05 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 1 288 488
Range
Based on 6 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Other service activities. Unlock full pricing strategies, bid frequency, and historical win rates.