Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Arnot Power Station - Arnot Power Station - RIETKUIL - 1087
Organization Type
GOVERNMENT
Published
20 May 2026
OCDS Reference
ocds-9t57fa-156619
This tender is for the installation of a reserve feed water tank (rfwt) balance main flow meter at eskom's arnot power station, with a contract duration of 3 years. IT is open to suppliers capable of machinery and equipment installation, with mandatory e-tendering training compliance required.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Request for Bid(Open-Tender)
Arnot Power Station - Arnot Power Station - RIETKUIL - 1087
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Good Manufacturing Practice (GMP), SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc, Annexure K- eTendering Training Acknowledgement Form - 27 January 2025.pdf, C0 ECC3 Contract cover page (2).pdf and 13 more. You don’t need to refresh — this page will pick up the updated review automatically.
20 May
2026
Tender Published
Tender was published
05 Jun
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc
The tender is for the provision of a Reserve Feed Water Tank (RFWT) Balance Main Flow Meter Installation Project at Arnot Power Station for a period of 3 years. The document primarily includes a PAYE (Pay As You Earn) Questionnaire for Service Contracts to Eskom Group of Companies, which is used to determine the tax classification of contractors (e.g., Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor) based on South African tax legislation for the 2025/2026 tax year.
RFWT Balance Main Flow Meter BOM 10 02 2026.xlsx
C2 ECC3 Pricing Data Option A (1).pdf
Eskom tender for a 3-year project to install reserve feed water tank balance main flow meters at Arnot Power Station (North West). The contract uses NEC3 ECC3 Option A (lump sum) with payment tied to completed activities. The activity schedule includes preliminaries, human resources, equipment, and commissioning.
C1 1 ECC3 Offer Acceptance (2).pdf
Eskom Holdings SOC Ltd. is inviting tenders for the provision and installation of Reserve Feed Water Tank (RFWT) Balance Main Flow Meters at Arnot Power Station in the North West Province. The contract duration is 3 years, and the tender closes on 05 June 2026 at 10:00 UTC.
Supplier Evaluation Pack Template for 01 March 2025 to 29 February 2026.xls
Tenderer - SDLI Strategy The provision of RFWT Balance Main Flow Meter Installation Project.pdf
Eskom is inviting tenders for the provision and installation of a Reserve Feed Water Tank (RFWT) Balance Main Flow Meter at Arnot Power Station in the North West Province. The project duration is 36 months, with a focus on B-BBEE compliance, local procurement, job creation, skills development, and subcontracting obligations. The tender closes on 05 June 2026 at 10:00 UTC.
Standard-for-Uniformity-August-2019.pdf
This is the Construction Industry Development Board (CIDB) Standard for Uniformity in Engineering and Construction Works Contracts (August 2019). It establishes standardized requirements, procedures, and documentation for public sector construction procurement in South Africa. The document referenced is a framework standard, not the specific tender document for the Eskom RFWT flow meter project. The standard outlines how tenders must be solicited, evaluated, and awarded, including rules for functionality assessment, procurement procedures, and mandatory use of the CIDB contractor register.
C1 2b ECC3 Data by Contractor (1).pdf
Eskom seeks a contractor to install reserve feed water tank (RFWT) balance main flow meters at Arnot Power Station in North West province under a 3-year contract using the NEC3 Engineering and Construction Contract. The tender requires detailed contractor data, including company details, fee percentages, key personnel, completion date, risk register, and financial breakdowns.
Annexure G - Tax Compliance Questionnaire (Manadatory for foreign suppliers to complete) -.pdf
The tender is for the provision and installation of a Reserve Feed Water Tank (RFWT) balance main flow meter at Eskom's Arnot Power Station in the North West Province, with a project duration of 3 years. The document includes a tax compliance questionnaire for foreign suppliers to determine their tax obligations in South Africa.
C0 ECC3 Contract cover page (2).pdf
Eskom is tendering for a 3-year project to install Reserve Feed Water Tank (RFWT) Balance Main Flow Meters at Arnot Power Station in North West province, using the NEC3 Engineering & Construction Contract framework.
C1 2a ECC3 Data by Employer (4).pdf
Eskom Holdings SOC Ltd is inviting tenders for the provision, installation, and maintenance of Reserve Feed Water Tank (RFWT) Balance Main Flow Meters at Arnot Power Station in the North West Province. The contract duration is 3 years, with sectional completion deadlines for Units 1-6. The project follows the NEC3 Engineering and Construction Contract (ECC3) framework with specific clauses for pricing, dispute resolution, inflation adjustments, sectional completion, delay damages, and liability limitations. The tender includes detailed contract data, risk management, health/safety/environmental compliance, and ethical conduct requirements.
Annexure L- E-tendering Help Manual for supplier.pdf
The tender is for the provision of a Reserve Feed Water Tank (RFWT) balance main flow meter installation project at Arnot Power Station, issued by Eskom in the North West Province. The project duration is 3 years, and submissions must be made via Eskom's eTendering system by the closing date of June 5, 2026, at 10:00 UTC.
Tender Advert Template RFWT Flow Meters.pdf
Eskom Holdings SOC Ltd invites tenders for the provision of a Reserve Feed Water Tank (RFWT) Balance Main Flow Meter Installation Project at Arnot Power Station, North West Province, for a 3-year period. The tender closes on 05 June 2026 at 10:00 UTC, with a clarification meeting scheduled for 25 May 2026 via Microsoft Teams.
C3 1_2 _RFWT Balance Main Flow Meter Installation Project Scope of Work_ 11 05 2026 001.pdf
Eskom seeks a contractor to design, supply, install, integrate, test, and commission an Ultrasonic Flow Measurement System (UFMS) at Arnot Power Station. The project involves installing ten clamp-on flowmeters (six at unit RFWT outlets and four at central RFWT outlets) to monitor demineralized water flow for improved water accounting and loss reduction. The system must be fully integrated into the existing ABB DCS, with a 3-year contract period.
RFWT Balance Main Flow Meter Installation Project_ Tech Evaluation Strategy 13 04 2026 B..pdf
Eskom seeks a contractor for a 3-year project to install Ultrasonic Flow Measurement Systems (UFMS) at Arnot Power Station to monitor demineralized water usage from Central Reserve Feed Water Tanks to individual unit tanks, aiming to reduce water losses and comply with water accounting standards.
Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - 30 October 2025 Conny.pdf
Eskom invites tenders for a 3-year project to install Reserve Feed Water Tank balance main flow meters at Arnot Power Station. The contract uses NEC3 Engineering and Construction Contract terms, requires a minimum CIDB grading of 6EP, and includes significant local content, B-BBEE, and subcontracting obligations. Submission is electronic via Eskom's e-tendering portal by 05 June 2026, 10:00.
Annexure K- eTendering Training Acknowledgement Form - 27 January 2025.pdf
The tender is for the provision and installation of a Reserve Feed Water Tank (RFWT) balance main flow meter at Arnot Power Station, with a contract duration of 3 years. It is issued by ESKOM in the North West Province, and the closing date is June 5, 2026. The document provided is an E-Tendering Training Acknowledgement Form, which is a mandatory requirement for participation in the tender process.
Code-of-Conduct.pdf
The tender is for the provision, installation, and maintenance of a Reserve Feed Water Tank (RFWT) balance main flow meter at Eskom's Arnot Power Station in the North West Province. The project spans 3 years and is governed by the Construction Industry Development Board (CIDB) Code of Conduct, emphasizing ethical standards, transparency, and compliance with South African construction procurement regulations.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 411 400
Range
Based on 19 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Contact Information
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.docSubmit completed PAYE Questionnaire and signed affidavits to your Eskom contractor representative. Copy Group Tax via email: [email protected].
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.docEvaluation is based on a PAYE Questionnaire to classify the contractor for tax purposes. Key criteria:
Compliance Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.docContractor must complete the PAYE Questionnaire to determine tax classification (Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor). Required actions:
Submission Guidelines
Source: Annexure K- eTendering Training Acknowledgement Form - 27 January 2025.pdfMandatory returnable: Fully completed E-Tendering Training Acknowledgement Form (Annexure K). Must be submitted to Eskom within the prescribed period. Failure to submit or incomplete submission will disqualify the tenderer from the procurement process.
Evaluation Criteria
Source: Annexure K- eTendering Training Acknowledgement Form - 27 January 2025.pdfEvaluation based on: 1) Proof of self-training completion on ESKOM's E-Tendering system (via Noddy Guide, video, or clarification meeting). 2) Full and accurate completion of the E-Tendering Training Acknowledgement Form. 3) Compliance with ESKOM's copyright and document reproduction policies. Note: Technical qualifications for flow meter installation are implied by project scope but not explicitly stated in this document.
Evaluation Criteria
Source: C0 ECC3 Contract cover page (2).pdfContractor must have: valid company registration (Reg No.), ability to provide proforma guarantees, and capacity to execute a 3-year engineering installation project at a power station. Technical qualifications may be detailed in Part C3 (Scope of Work).
Technical Specifications
Source: C0 ECC3 Contract cover page (2).pdfScope: Provision of Reserve Feed Water Tank (RFWT) Balance Main Flow Meter Installation Project at Arnot Power Station. Contract Type: NEC3 Engineering & Construction Contract. Duration: 3 years. Refer to Part C3 for detailed scope of work.
Contact Information
Source: Code-of-Conduct.pdfCIDB Contact: Blocks N&R, SABS Campus, 2 Dr. Lategan Rd, Groenkloof, Pretoria, South Africa. PO Box 2107, Brooklyn Square, 0075. Tel: +27 12 482 7200 / +27 86 100 cidb. Anonymous Fraud Line: 080 011 2432. Email: [email protected]. Website: www.cidb.org.za
Evaluation Criteria
Source: Code-of-Conduct.pdfMandatory: Must be a natural or juristic person or partnership (local or international). No history of CIDB sanctions (e.g., deregistration for misconduct). Must demonstrate experience in flow meter installation/maintenance for power stations or similar infrastructure. Must comply with B-BBEE requirements (if applicable). Must prove financial and technical capacity to execute the project. Preferred: Prior work with Eskom or similar utilities. Certifications in quality management (ISO), OHS, or environmental standards. Local presence or partnerships in North West Province.
Compliance Requirements
Source: Code-of-Conduct.pdfMust comply with the CIDB Code of Conduct for Construction Procurement. Must adhere to principles: equitable, honest, and transparent behavior; timely and integrity-driven discharge of duties; compliance with all applicable legislation and procurement document requirements; avoidance of conflicts of interest; no malicious injury to another party's reputation. Must not engage in corruption, collusion, or fronting. Must uphold occupational health, safety, and environmental standards.
Contact Information
Source: C1 2b ECC3 Data by Contractor (1).pdfSubmission Guidelines
Source: C1 2b ECC3 Data by Contractor (1).pdfEvaluation Criteria
Source: C1 2b ECC3 Data by Contractor (1).pdfTechnical Specifications
Source: C1 2b ECC3 Data by Contractor (1).pdfFinancial Requirements
Source: C1 2b ECC3 Data by Contractor (1).pdfContact Information
Source: C1 1 ECC3 Offer Acceptance (2).pdfSubmission Guidelines
Source: C1 1 ECC3 Offer Acceptance (2).pdfEvaluation Criteria
Source: C1 1 ECC3 Offer Acceptance (2).pdfTechnical Specifications
Source: C1 1 ECC3 Offer Acceptance (2).pdfFinancial Requirements
Source: C1 1 ECC3 Offer Acceptance (2).pdfCompliance Requirements
Source: C1 1 ECC3 Offer Acceptance (2).pdfSubmission Guidelines
Source: RFWT Balance Main Flow Meter Installation Project_ Tech Evaluation Strategy 13 04 2026 B..pdfEvaluation Criteria
Source: RFWT Balance Main Flow Meter Installation Project_ Tech Evaluation Strategy 13 04 2026 B..pdfTechnical Specifications
Source: RFWT Balance Main Flow Meter Installation Project_ Tech Evaluation Strategy 13 04 2026 B..pdfCompliance Requirements
Source: RFWT Balance Main Flow Meter Installation Project_ Tech Evaluation Strategy 13 04 2026 B..pdfEvaluation Criteria
Source: Annexure G - Tax Compliance Questionnaire (Manadatory for foreign suppliers to complete) -.pdfOpen to local and foreign suppliers. Foreign suppliers must have no local footprint in RSA (no residency, branch, permanent establishment, income source, or tax liability) to be exempt from tax clearance requirements. Must adhere to Eskom's document control policies and copyright restrictions.
Compliance Requirements
Source: Annexure G - Tax Compliance Questionnaire (Manadatory for foreign suppliers to complete) -.pdfTax compliance questionnaire mandatory for foreign suppliers. Exemptions apply if the supplier has no local footprint in RSA: no residency, branch, permanent establishment, income source, or tax liability. Exemptions include: no requirement to submit a South African tax clearance certificate; no requirement to register on the National Treasury's Central Supplier Database (CSD). To qualify for exemption, complete the questionnaire by answering 'Yes' or 'No' to the five listed questions. If all answers are 'No', no SARS tax clearance certificate or pin code is required. The completed questionnaire must be signed by an authorised company representative, dated, and include company name, registration number, telephone, fax, and/or email address.
Important Dates
Source: Annexure L- E-tendering Help Manual for supplier.pdfContact Information
Source: Annexure L- E-tendering Help Manual for supplier.pdfSubmission Guidelines
Source: Annexure L- E-tendering Help Manual for supplier.pdfEvaluation Criteria
Source: Annexure L- E-tendering Help Manual for supplier.pdfCompliance Requirements
Source: Annexure L- E-tendering Help Manual for supplier.pdfImportant Dates
Source: C1 2a ECC3 Data by Employer (4).pdfContact Information
Source: C1 2a ECC3 Data by Employer (4).pdfEvaluation Criteria
Source: C1 2a ECC3 Data by Employer (4).pdfEvaluation is based on compliance, technical capacity, financial stability, and legal adherence. Key points:
Technical Specifications
Source: C1 2a ECC3 Data by Employer (4).pdfFinancial Requirements
Source: C1 2a ECC3 Data by Employer (4).pdfCompliance Requirements
Source: C1 2a ECC3 Data by Employer (4).pdfSubmission Guidelines
Source: C3 1_2 _RFWT Balance Main Flow Meter Installation Project Scope of Work_ 11 05 2026 001.pdfSubmit the following before work commences: - Detailed design package for Employer review and acceptance. - Vendor Document Submission Schedule (VDSS) for Employer approval. - All documentation listed in the VDSS must be submitted and accepted by the Project Manager before installation begins. Works are only accepted when: - All flowmeters pass Site Acceptance Testing (SAT) with accuracy within specified limits. - All signals are visible, correctly scaled, and logged in the ABB DCS historian. - All VDSS documentation is submitted and accepted. No submission address, deadline, or method is specified in this document.
Evaluation Criteria
Source: C3 1_2 _RFWT Balance Main Flow Meter Installation Project Scope of Work_ 11 05 2026 001.pdfEvaluation will assess: - Demonstrated capability in instrumentation projects, particularly ultrasonic flow measurement systems. - Proven experience with ABB DCS integration (P13, P14, and Melody platforms). - Ability to engage ABB or an authorised ABB sales channel partner for DCS configuration, logic modifications, HMI development, and historian logging if the Contractor is not the OEM. - Compliance with power industry standards (SANS, IEC, ISO, Eskom standards). - Provision of Certificates of Compliance (CoC) for all new electrical installations. - Technical and financial capacity to execute a 3-year project. - Quality management systems (e.g., ISO 9001) and adherence to SHEQ requirements.
Technical Specifications
Source: C3 1_2 _RFWT Balance Main Flow Meter Installation Project Scope of Work_ 11 05 2026 001.pdfProvide a fully integrated Ultrasonic Flow Measurement System (UFMS) at Arnot Power Station. Key requirements: - Install ten clamp-on ultrasonic flowmeters: six at Unit Reserve Feed Water Tank (RFWT) outlets (one per unit, Units 1-6) and four at Central RFWT outlets (two at North CRFWT, two at South CRFWT). - Flowmeters must measure forward and reverse flow for demineralised water, with accuracy within <1% deviation. - Full integration into existing ABB DCS (P13/P14 for Units 1-6, Melody for WTP). Contractor must engage ABB or an authorised ABB partner for all DCS configuration, totalisation logic, HMI graphics, alarm settings, and historian logging (PGIM). - Power supply: Flowmeters powered from existing 380V UPS in EDS 123/456 via 220V AC. Contractor must design, supply, and install: field distribution boards, ±200m of 600/1000V armoured cable per unit, and all terminations per specified KKS codes. - Cabling and signals: Use UVG02 cable for 4-20mA signals routed to designated C&I junction boxes and marshalling racks. Ensure proper labelling, termination, and EMC compliance (IEC 61326, SANS 61000-5-2). - Standards compliance: All works must adhere to SANS 10142-1, IEC 61511, IEC 61207, ISO 5167, ISO 9001, and Eskom standards (e.g., 240-10520080, 240-56356396). Equipment must be IP67-rated or higher and suitable for plant conditions (temperature, humidity, vibration, dust, corrosive atmospheres). - Documentation: Submit detailed design, operating/maintenance philosophies, as-built drawings, P&IDs, instrument data sheets, calibration certificates, signal lists, configuration backups, alarm setpoints, and training records. - Testing: Conduct Factory Acceptance Testing (FAT), Site Acceptance Testing (SAT), and a 72-hour commissioning test. - Additional: Provide critical spares list, maintenance philosophy, and training for Employer personnel. Ensure KKS labelling for all instruments and cables.
Compliance Requirements
Source: C3 1_2 _RFWT Balance Main Flow Meter Installation Project Scope of Work_ 11 05 2026 001.pdfNo explicit CSD, tax, B-BBEE, CIDB, or CIPC requirements are stated. Mandatory compliance includes: - Occupational Health and Safety Act, 1993, and Construction Regulations. - Eskom SHEQ requirements (32-727) and site-specific SHE files. - Certificates of Compliance (CoC) for all new electrical installations per SANS 10142-1. - Adherence to all referenced SANS, IEC, ISO, and Eskom standards (e.g., 240-56356396 for earthing, 240-56227443 for cables).
Evaluation Criteria
Source: C2 ECC3 Pricing Data Option A (1).pdfTechnical Specifications
Source: C2 ECC3 Pricing Data Option A (1).pdfFinancial Requirements
Source: C2 ECC3 Pricing Data Option A (1).pdfImportant Dates
Source: Tender Advert Template RFWT Flow Meters.pdfContact Information
Source: Tender Advert Template RFWT Flow Meters.pdfSubmission Guidelines
Source: Tender Advert Template RFWT Flow Meters.pdfEvaluation Criteria
Source: Tender Advert Template RFWT Flow Meters.pdfTechnical Specifications
Source: Tender Advert Template RFWT Flow Meters.pdfCompliance Requirements
Source: Tender Advert Template RFWT Flow Meters.pdfImportant Dates
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - 30 October 2025 Conny.pdfClosing date: 05 June 2026 at 10h00. Non-compulsory clarification meeting and site visit: 25 May 2026 at 09h00 via Microsoft Teams (link: https://teams.microsoft.com/meet/393491208360353?p=wrw1htmFeFtOuMAREN). Confirm attendance with Eskom Representative (Constance Ndhlovu) including attendee names, positions, and contact details. Clarification queries deadline: 5 working days before tender closing (31 May 2026). Tender validity period: 12 weeks from closing date.
Contact Information
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - 30 October 2025 Conny.pdfEskom Representative: Constance Ndhlovu. Tel: +27 13 297 9684. Email: [email protected]. Fraud/corruption reporting: 0800 11 2722 or [email protected]. Submission via Eskom E-Tendering site only.
Submission Guidelines
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - 30 October 2025 Conny.pdfSubmit electronically via Eskom E-Tendering site by 05 June 2026 at 10h00. Requirements: Files in PDF format (price list also in Excel). Upload size per document: 500MB; total submission: 4GB max. No ZIP files or hard copies accepted. Latest submission overrides previous versions. Ensure submission status shows as 'complete'. Mandatory returnables at closing: Annexure A (Authorisation Form), B (Acknowledgement Form), C (Tenderer’s Particulars), D (Integrity Declaration), E (CPA for Local Goods/Services), F (CPA for Imported Goods/Services if applicable), G1-G4 (SBD 6.2 Local Content Declarations), H (SBD 1), I (SBD 6.1 Preference Points Claim), J (SBD 4 Bidders Disclosure), E-tendering Help Manual acknowledgement, Tax Evaluation Questionnaire, and CIDB proof of grading (6EP or higher). For joint ventures: Submit JV agreement, profit-sharing ratios, and single designated bank account details. Non-submission of disqualifiable returnables by deadline results in disqualification. Resubmissions allowed; only the latest version is considered.
Evaluation Criteria
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - 30 October 2025 Conny.pdfEligibility: Must have CIDB grading of 6EP or higher. Ineligible if: on international sanctions lists, restricted by National Treasury, on Eskom’s defaulter list, or subcontract 100% of work. Conflict of interest disqualifies. Joint ventures must submit JV agreement with joint and several liability. Foreign suppliers with no SA footprint must complete SBD1 but need no tax clearance. Functionality evaluation (80% threshold required): Technical Experience (10%), Technical Compliance (20%), Design & Engineering Capability (30%), QA/Testing/Commissioning (10%), Training & Documentation (10%), Project Execution Plan (15%), List of Exclusions (5%). Price evaluation: 80 points. Scoring includes VAT, arithmetical corrections, excludes contingencies, and considers Net Present Value, price adjustments, and risk. Preference points (20 points): B-BBEE status levels (1=20, 2=18, 3=14, 4=12, 5=8, 6=6, 7=4, 8=2, non-compliant=0). Submit valid B-BBEE certificate (SANAS-accredited), sworn affidavit (no e-signatures), or CIPS affidavit, plus proof of ownership/shareholding (CIPC), certified ID copies, and disability proof (if applicable). Failure to submit B-BBEE proof scores 0 for preference points but does not disqualify. Final ranking: 80/20 system (price + preference points).
Technical Specifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - 30 October 2025 Conny.pdfScope: Provision of Reserve Feed Water Tank (RFWT) Balance Main Flow Meter Installation Project at Arnot Power Station for 3 years. Technical requirements: Non-invasive clamp-on ultrasonic flowmeters (IP67+), supporting forward and reverse flow measurement. No pipe cutting or intrusive modifications allowed. Must ensure minimal disruption, pipeline integrity, and bidirectional flow measurement. For ABB DCS integration: Submit ABB OEM Letter, Sales Channel Partner Letter, or Letter of Intent (LOI) from ABB. Verifiable ABB support required for system integrity, OEM compliance, and access to resources (hardware, software, technical support). Quality requirements: ISO 9001-compliant QMS (documented evidence required). Submit QMS manual, quality policy, objectives, and documented information for control of nonconforming outputs, corrective action, internal audits, and externally provided processes. Quality Control Plan (QCP)/Inspection and Test Plan (ITP) required per scope of works. Safety/Health/Environment (SHE) requirements: Baseline SHE risk assessment, competency proof (training, qualifications), valid COIDA certificate, SHE policy, SHE plan, and costing for SHE. Environmental compliance: Adherence to National Environmental Management Act, Eskom’s SHEQ Policy, Emergency Preparedness Procedure, Waste Management Procedure, and station Environmental Management System (ISO 14001:2015).
Financial Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - 30 October 2025 Conny.pdfPricing: Submit completed pricing schedule in PDF and Excel. Prices must be inclusive of VAT, corrected for arithmetical errors, and exclude contingencies. Evaluation considers Net Present Value, price adjustment factors, exchange rate fluctuations, and risk. Unconditional discounts counted; conditional discounts implemented at payment. Payment terms: Contracts ≤ R50M: 30 days from receipt of undisputed invoice. Contracts > R50M: 60 days from receipt of undisputed invoice. Financial viability: Submit latest approved annual financial statements (no drafts) including director’s report, auditor’s report, financial position, comprehensive income, equity changes, cash flows, and notes. For unincorporated JVs/SPVs, each partner must submit financials. Public Interest Score (if applicable) and ITA34C for current/previous years required for non-audited South African entities. No security (bonds/guarantees) required for this tender.
Compliance Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - 30 October 2025 Conny.pdfMandatory: Valid CSD registration (CSD number/report). CIDB grading: Minimum 6EP for main contractor. Joint ventures: All members must be CIDB-registered; lead partner must have 5EP or higher (or one level below with required recognition). Combined grading must meet or exceed 5EP. Tax compliance: Certified tax clearance certificate required for local tenderers (unless SARS PIN provided) and foreign tenderers with SA footprint. Foreign suppliers with no SA footprint: SBD1 form only. Employment Equity: South African tenderers must provide proof of compliance (EE report submission to Department of Labour). B-BBEE: Submit valid certificate (SANAS-accredited), sworn affidavit (no e-signatures), or CIPS affidavit. Proof of ownership/shareholding (CIPC), certified ID copies of shareholders, and disability proof (if applicable). Consolidated certificate required for JVs/trusts. Subcontracting: Minimum 10% of contract value to EME/QSE (51% black-owned in rural/underdeveloped areas/townships). Submit subcontracting agreement or intent letters with subcontractor registration documents (CK, B-BBEE certificate/affidavit). Skills Development: Submit proposals for skills development of unemployed candidates (aligned with Government Gazette 43937). Tenderers cover full cost; Eskom provides no financial contribution. SDL&I: Submit job creation/retainment proposals (type and number of jobs). Environmental: Compliance with EMS (ISO 14001:2015) and applicable legislation.
Submission Guidelines
Source: Standard-for-Uniformity-August-2019.pdfSubmit all returnable documents as listed in the tender documentation. Use only the issued tender forms. Follow sealing, addressing, delivery, opening, and assessment requirements as specified in the Tender Data. Telegraphic, telephonic, telex, facsimile, e-mail, and late tenders will not be accepted.
Evaluation Criteria
Source: Standard-for-Uniformity-August-2019.pdfEligibility and evaluation are based on: 1. CIDB registration: Tenderer (or each joint venture member) must be registered with the CIDB. 2. Grading: Tenderer must have a contractor grading designation equal to or higher than the required level for the class of construction work. For joint ventures: (a) all members must be CIDB-registered, (b) the lead partner must meet the required grading (or be not lower than one level below with required recognition status), and (c) the combined grading must meet the requirement. 3. Potentially Emerging Enterprises (50%+ black-owned, managed, and controlled) may qualify one grade lower if part of a targeted development programme. 4. Functionality criteria (if applicable for complex/specialist works) must be met as specified in the Tender Data. 5. Tenders scoring below the minimum qualifying functionality threshold are disqualified. 6. Acceptable tenders are further evaluated on price and B-BBEE preference points.
Technical Specifications
Source: Standard-for-Uniformity-August-2019.pdfScope: Provision of a reserve feed water tank (RFWT) balance main flow meter installation project at Arnot Power Station for 3 years. Requirements: 1. Scope must be performance-based, aligned with national/international standards where applicable. 2. Specifications, plans, and drawings must not create trade barriers. 3. Proprietary references (e.g., trademarks, patents) must include the phrase 'or equivalent'.
Financial Requirements
Source: Standard-for-Uniformity-August-2019.pdfPayment terms: 1. Retention monies deducted shall not exceed 10% of any payment due. If guarantees are provided, total retention held shall not exceed 5% of the contract price. 2. Guarantees (if required) may include: (a) bank or insurance guarantees, (b) cash deposits, (c) payment reductions against certificates, or (d) combinations of the above. 3. Fixed guarantees: maximum 10% of contract price. Variable guarantees: maximum 12.5% of contract price.
Compliance Requirements
Source: Standard-for-Uniformity-August-2019.pdfMandatory compliance: 1. CIDB registration is required for all tenderers (or joint venture members). 2. Tenderer must hold a CIDB contractor grading designation equal to or higher than the required level for the class of construction work. For joint ventures: (a) all members must be CIDB-registered, (b) the lead partner must meet the required grading (or be not lower than one level below with required recognition status), and (c) the combined grading must meet the requirement. 3. B-BBEE status contributes to preference points under the Preferential Procurement Regulations, 2017. 4. Potentially Emerging Enterprises (50%+ black-owned, managed, and controlled) may qualify under targeted development programmes if they meet specified criteria (e.g., one grade lower than required).
Important Dates
Source: Tenderer - SDLI Strategy The provision of RFWT Balance Main Flow Meter Installation Project.pdfSDL&I Implementation Schedule due: 28 days after contract award. Quarterly SDL&I compliance reports required.
Contact Information
Source: Tenderer - SDLI Strategy The provision of RFWT Balance Main Flow Meter Installation Project.pdfBuyer: Constance Ndhlovu. Department: Arnot Power Station.
Submission Guidelines
Source: Tenderer - SDLI Strategy The provision of RFWT Balance Main Flow Meter Installation Project.pdfRequired returnables: Subcontracting agreement signed by both parties with subcontractors’ company registration documents (CK and B-BBEE certificate or sworn affidavit) OR copies of sub-contracting contracts/letters of intent to subcontract, signed by both tenderer and subcontractor(s).
Evaluation Criteria
Source: Tenderer - SDLI Strategy The provision of RFWT Balance Main Flow Meter Installation Project.pdfScoring: 10/20 points for B-BBEE status (90/10 or 80/20 system). Points are added to price score; highest total wins. Non-compliance with documentation for preference points results in 0 points for specific goals but no disqualification. Criteria: Valid B-BBEE certificate (SANAS-accredited) or sworn affidavit (no electronic signatures). EMEs (≤R10M revenue) and QSEs (≤R50M, 51%+ Black-owned) may use sworn affidavits; others require valid B-BBEE certificates. Additional evaluation: Local procurement content (100% target), subcontracting (10% minimum to EME/QSEs 51%+ Black-owned in rural/underdeveloped areas), job creation/retenance proposals, skills development plan for unemployed candidates (aligned with Eskom’s scarce/critical skills).
Technical Specifications
Source: Tenderer - SDLI Strategy The provision of RFWT Balance Main Flow Meter Installation Project.pdfScope: Provision of Reserve Feed Water Tank (RFWT) Balance Main Flow Meter Installation Project at Arnot Power Station. Duration: 36 months.
Financial Requirements
Source: Tenderer - SDLI Strategy The provision of RFWT Balance Main Flow Meter Installation Project.pdfPenalties: 1.5% of invoice amount or contract value for failure to meet SDL&I obligations. Retention: 1.5% of every invoice (excluding VAT) held as security until SDL&I obligations are fulfilled and compliance report is approved. Payment terms: Retained amounts released upon submission of SDL&I progress reports, fulfilment of obligations, and approved compliance report.
Compliance Requirements
Source: Tenderer - SDLI Strategy The provision of RFWT Balance Main Flow Meter Installation Project.pdfB-BBEE: Valid certificate (SANAS-accredited) or sworn affidavit (no electronic signatures). Required documents: Proof of ownership/shareholding (CIPC), certified ID copies of shareholders, proof of disability (if applicable), consolidated B-BBEE certificate for trusts/consortia/JVs. EMEs (≤R10M revenue) and QSEs (≤R50M, 51%+ Black-owned) may use sworn affidavits; others require valid B-BBEE certificates. SDL&I obligations: B-BBEE improvement/retention plan (due within 30 days of contract signing), 100% local procurement content target, job creation/retenance proposals, skills development (unemployed candidates, aligned with Eskom’s scarce/critical skills), subcontracting (minimum 10% of contract value to EME/QSEs 51%+ Black-owned in rural/underdeveloped areas). Sworn affidavits must meet validity criteria (e.g., signed in presence of Commissioner of Oath, no self-commissioning).
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Arnot Power Station - Arnot Power Station - RIETKUIL - 1087
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
18
Last checked
12 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Get deep intelligence on Repair and installation of machinery and equipment. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
A strategic guide for medical equipment suppliers, maintenance companies, and healthcare technology providers bidding for tenders across South Africa's nine provincial health departments. Covers SAHPRA registration, OEM authorisation, service level agreements, and technical evaluation criteria.
A comprehensive guide to securing medical equipment maintenance tenders in South African public hospitals. Learn about SLA management, OEM certifications, and clinical engineering requirements.
Guide to sports tenders in South Africa. Covers SRSA-funded facility maintenance, sports equipment supply, surfacing contracts, and tournament management opportunities.
How security installation companies, technology integrators, and electronic security providers can win government tenders for CCTV, access control, alarm monitoring, and integrated electronic security systems in South Africa.
💡 Want more tendering tips and strategies?
Explore Our Blog