Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
Mpumalanga DX and TX various sites - Emalahleni - Mpumalanga - 1055
Organization Type
GOVERNMENT
Published
30 Jul 2026
OCDS Reference
ocds-9t57fa-164000
ESKOM is establishing a 24-month enabling agreement with pre-qualified scrap dealers for the disposal of scrap kva transformers and mini subs on an "as and when" required basis in the mpumalanga operating unit (MP highveld). Bidders must be pre-qualified scrap dealers and must submit their tender electronically via the ESKOM tender bulletin site or in paper form by 14 august 2026 at 10:00 sast. The most consequential requirement is that bidders must be pre-qualified scrap dealers, as the entire tender is restricted to this group.
Pre-qualification: Bidders must be pre-qualified scrap dealers to be eligible to bid.
Submission deadline: Tenders must be submitted by 14 August 2026 at 10:00 SAST, either electronically via the Eskom Tender Bulletin site or in paper form (original plus one copy) to the tender box.
Mandatory returnables: All mandatory tender returnables must be submitted by the closing date and time; failure to do so results in disqualification.
B-BBEE: Proof of B-BBEE level (certificate/CSD number/CSD report) must be provided at closing if it is a pre-qualification criterion; otherwise, it is scored for PPPFA points.
CIDB registration: If stipulated in the Tender Data, bidders must be registered with the CIDB at closing or be capable of registration within 21 working days; proof of registration is mandatory at closing.
SHEQ compliance: Bidders must provide proof of safety, health, environmental and quality (SHEQ) systems, policies and capabilities in place at closing, with all associated costs reflected in the tender.
No 100% sub-contracting: Tenders based on 100% sub-contracting are ineligible and will be disqualified.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 14 August 2026 - 10:00
Venue
https://teams.microsoft.com/meet/327998321464798?p=amT2pNTwDs3zcdLyhl
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Proposal
Mpumalanga DX and TX various sites - Emalahleni - Mpumalanga - 1055
AI Document Analysis Stages
Description
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf30 Jul
2026
Tender Published
Tender was published
14 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training.pdf
E-tendering Help Manual for supplier - 27 January 2025.pdf
Contractor Health and Safety Requirements.pdf
ANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdf
Eskom seeks to establish a 24-month enabling agreement with pre-qualified scrap dealers for the disposal of scrap KVA transformers and mini subs on an as-and-when required basis for the Mpumalanga OU (MP Highveld). The tender includes mandatory compliance with Eskom's Occupational Health and Safety (OHS) requirements, as detailed in the acknowledgement form.
E-Tenderers E-Tendering Training Acknowledgement Form (1).pdf
Eskom is establishing a 24-month enabling agreement for the disposal of scrap KVA transformers and mini subs on an as-and-when required basis, limited to pre-qualified scrap dealers in the Mpumalanga OU (MP Highveld) region.
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf
Eskom seeks to establish a 24-month enabling agreement for the disposal of scrap KVA transformers and mini subs on an as-and-when-required basis in the Mpumalanga OU (MP Highveld), with pre-qualified scrap dealers. Bidders must comply with Eskom's standard conditions of tender, including submission requirements and evaluation criteria.
Eskom life-saving rules.pdf
Eskom is establishing a 24-month enabling agreement for the disposal of scrap KVA transformers and mini subs on an 'as and when' required basis, with pre-qualified scrap dealers, for the Mpumalanga Operating Unit (MP Highveld).
Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga.pdf
Eskom is establishing a 24-month enabling agreement for the disposal of scrap KVA transformers and mini-subs (5 kVA to 1000 kVA) on an as-and-when basis at the Mpumalanga OU (MP Highveld). Pre-qualified scrap dealers will purchase, collect, and remove the scrap units, with pricing determined through a reverse e-auction.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 725 000
Range
Based on Municipal avg. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The tender is for the establishment of an enabling agreement for the Mpumalanga Operating Unit (MP Highveld) with pre-qualified scrap dealers for the disposal of scrap KVA transformers and mini subs, on an "as and when" required basis, for a period of twenty-four (24) months. Bidders must be pre-qualified scrap dealers.
Important Dates
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Closing date and time: 14 August 2026 at 10:00 (SAST). Site visit and/or clarification meeting: attendance is compulsory if stipulated as such in the Tender Data; failure to attend results in disqualification. Details of the meeting are stated in the Tender Data (not provided in the source). Clarification queries must be submitted in writing to the Eskom Representative, allowing reasonable time for response before closing. Addenda and responses to clarifications are published on the Eskom Tender Bulletin and NT e-Tender Portal; tenderers must check regularly.
Contact Information
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)All communication must be directed to the Eskom Representative only, in writing, in English. No other Eskom official may be contacted. The Eskom Representative is identified in the Invitation to Tender (not provided in the source). Submission address and tender box location are specified in the Tender Data (not provided in the source).
Submission Guidelines
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Submission channel: paper tenders must be delivered to the tender box at the address in the Tender Data, with the original plus one complete hard copy, each in separate packages marked "ORIGINAL" and "COPY". E-tendering must be uploaded and finalised on the Eskom Tender Bulletin site by closing time; no tender box deposit is allowed for e-tendering. Late tenders are never accepted; proof of posting or courier delivery is not proof of delivery. The outer package must be sealed, marked "Confidential", and show the tender number, tenderer's name, physical address, email and contact telephone number. The original must be signed by a duly authorised signatory; the Acknowledgement Form must be completed and submitted. Mandatory returnables must be submitted by closing date and time; documents required for contract award (e.g. SDL&I Undertaking, designated material thresholds) must be provided by contract award. Tenders must be in English, written in ink, with no alterations except corrections initialled by all signatories; correction fluid is not permitted. Tenders must remain valid for the validity period stated in the Tender Data and may be extended on request. Agents must submit an authenticated copy of their authority to act. Tenders based on 100% sub-contracting are ineligible and will be disqualified. Failure to submit the original or the copy results in disqualification. Tenders will be opened in the presence of tenderers' representatives (paper) or downloaded electronically (e-tendering); prices may be announced if stated in the Tender Data. Eskom may reject tenders for collusion, bid rigging, or fraudulent activity, and will report B-BBEE fraud or fronting to the B-BBEE Commission, with suspension from State-Owned Company business for up to 10 years.
Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Evaluation stages: basic compliance, mandatory returnables, pre-qualification criteria, functionality (if applicable), then price and specific goals. Eskom will not measure a criterion twice (no double dipping). Functionality: if a criterion, bidders must meet the minimum threshold stated in the Tender Data to proceed. Price evaluation: factors such as CPA, FOREX, commodity exposure, unconditional discounts, technical adjustment, PV and forecasted invoicing rates are considered. B-BBEE: scored from the CSD report or certificate/affidavit; if B-BBEE level is a pre-qualification criterion, proof must be provided at closing or the tender is disqualified. For PPPFA point allocation, if no B-BBEE certificate/affidavit is provided or it is fraudulent/expired, the tenderer scores zero but is not disqualified if otherwise responsive. Specific Goals: scored with reference to supporting documentation; failure to meet or submit proof by closing results in zero points for Specific Goals within the 90/10 or 80/20 allocation. Ranking: price score plus Specific Goals score, ranked highest to lowest. Objective criteria under Section 2(1)(f) of the PPPFA may be applied only if stipulated in the Invitation to Tender; functionality and B-BBEE elements cannot be used as objective criteria. Reverse e-auction may be used if indicated; if used, tenders must not contain prices. Financial analysis: Eskom will assess the financial risk of the tenderer; if risk is too high and no mitigating factors exist, the tenderer will not be considered for award. Arithmetical errors: amounts in words prevail over figures; Eskom will correct errors and the tenderer must accept corrections or the tender is rejected.
Technical Specifications
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Scope: establishment of an enabling agreement for the Mpumalanga Operating Unit (MP Highveld) with pre-qualified scrap dealers for the disposal of scrap KVA transformers and mini subs, on an "as and when" required basis, for a period of twenty-four (24) months. The tender is for disposal services; bidders must be pre-qualified scrap dealers. No further technical specifications are provided in the source document.
Quality Management
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfBidders must provide proof to Eskom's satisfaction that safety, health, environmental and quality (SHEQ) systems, policies and capabilities are in place at closing date and time for tender submission and/or contract award. All costs and personnel associated with SHEQ must be reflected in the tender. No specific quality certifications or standards are stated in the source document.
Pricing Schedule
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfPricing must be in South African Rand, fixed for the duration of the contract, and include all duties, taxes (including VAT) and levies applicable 14 days prior to closing. Rates and prices are not subject to adjustment except as provided in the Invitation to Tender. Exchange rate and base date as stipulated in the Invitation to Tender apply. Bidders must complete the pricing schedule or bill of quantities as provided; omissions or arithmetical errors may be corrected by Eskom, with amounts in words prevailing. If a bill of quantities or pricing schedule applies, line-item totals prevail over unit rates in case of multiplication errors, and the total of prices prevails in case of addition errors. Bidders may be required to provide a breakdown of rates during clarification, but prices cannot change except for correction of arithmetical errors. No specific pricing format (e.g. schedule of rates vs bill of quantities) is stated in the source.
Financial Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Pricing: rates and prices must be in South African Rand, fixed for the duration of the contract, and include all duties, taxes (including VAT) and levies applicable 14 days prior to closing. Prices are not subject to adjustment except as provided in the Invitation to Tender. Exchange rate and base date as stipulated in the Invitation to Tender apply. Insurance: Eskom's insurance may not cover the full extent required; bidders should seek qualified advice. Security for performance: if required, bidders must name at least two financial institutions they are likely to approach; Eskom may reject unsuitable institutions. Financial analysis: Eskom will assess financial risk; bidders may be required to provide financial statements. No specific turnover or financial capacity thresholds are stated in the source.
Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Eligibility: bidders must comply with eligibility criteria in the Tender Data and must not be under any restriction from doing business with Eskom or State-Owned Companies. Bidders must be pre-qualified scrap dealers. CSD registration: bidders must be registered on the Central Supplier Database and have valid tax compliance. B-BBEE: proof of B-BBEE level (certificate/CSD number/CSD report) must be provided at closing if it is a pre-qualification criterion; otherwise it is scored for PPPFA points. CIDB: if stipulated in the Tender Data, bidders must be registered with the CIDB at closing or be capable of registration within 21 working days; proof of registration is mandatory at closing, or proof of application at closing with actual proof by contract award. SHEQ: bidders must provide proof of safety, health, environmental and quality systems, policies and capabilities in place at closing; all SHEQ costs must be reflected in the tender. SDL&I Undertaking: must be completed and submitted by contract award. Designated materials and thresholds: information must be submitted by contract award. Compliance with relevant legislation: National Treasury Instruction Notes, CIDB Regulations, dtic local content requirements, PPPFA Regulations, Amended B-BBEE Codes, COIDA, OHS Act, and Eskom SHEQ requirements. Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) apply to certain contracts as per CIDB standards. Fraud or misrepresentation: any falsified information, certificate, affidavit or document may lead to disqualification and reporting to the B-BBEE Commission.
Health & Safety
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfBidders must comply with relevant legislation including the OHS Act and Eskom's requirements for Safety, Health, Environment and Quality (SHEQ). Proof of SHEQ systems, policies and capabilities must be provided to Eskom's satisfaction at closing date and time for tender submission and/or contract award. All SHEQ costs and personnel must be reflected in the tender. No specific safety plan format or HSE certifications are stated in the source.
Contractual Terms
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfEskom may accept or reject any variation, deviation or alternative tender, and may cancel the tender at any time before contract conclusion with written reasons on request. Eskom may enter into mandated negotiations with selected tenderers. Eskom disclaims liability for losses or damages arising from participation in the tender process. Tender validity: bidders must hold tenders valid for the validity period and extend on request; failure to extend results in exclusion. Confidentiality: all matters arising in connection with the procurement must be treated as confidential; documents may only be used for preparing and submitting the tender. Site visit/clarification meeting: attendance is compulsory if stipulated; failure results in disqualification. Clarification queries must be in writing to the Eskom Representative. Insurance: Eskom's insurance may not cover full requirements; bidders should seek advice. Pricing: rates and prices fixed for contract duration, in ZAR, including all duties and taxes. Alterations to tender documents are not permitted except to correct errors, initialled by all signatories. Alternative tenders only if a main tender is submitted and permitted. Clarification and correction of prices: mandatory returnables cannot be submitted after closing; arithmetical errors are corrected with tenderer's concurrence. Proof of authority: agents must submit authenticated authority. Compliance with legislation and SHEQ requirements is mandatory. Security for performance: if required, name at least two financial institutions. Contract award: Eskom will notify successful tenderer before expiry of validity; contract documents will be revised to include addenda, returnables, and agreed changes; both parties sign the Form of Agreement.
Section
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfEvaluation follows stages: basic compliance, mandatory returnables, pre-qualification criteria, functionality (if applicable), then price and specific goals. Eskom will not measure a criterion twice. Functionality requires meeting a minimum threshold stated in the Tender Data. Price evaluation considers CPA, FOREX, commodity exposure, unconditional discounts, technical adjustment, PV and forecasted invoicing rates. B-BBEE is scored from CSD report or certificate/affidavit; if a pre-qualification criterion, proof must be at closing or the tender is disqualified. For PPPFA points, missing or fraudulent B-BBEE proof results in zero points but not disqualification if otherwise responsive. Specific Goals are scored with supporting documentation; failure results in zero points within the 90/10 or 80/20 allocation. Ranking is by price plus Specific Goals. Objective criteria under Section 2(1)(f) may apply only if stipulated; functionality and B-BBEE cannot be used as objective criteria. Reverse e-auction may be used if indicated; if used, tenders must not contain prices. Financial analysis assesses risk; high risk without mitigating factors leads to exclusion. Arithmetical errors are corrected; amounts in words prevail.
Description
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga.pdfThe scope of work will include the purchase, collection, and removal of SCRAP KVA
TRANSFORMERS AND MINI-SUBS for twenty-four (24) MONTHS CONTRACT PERIOD on “as
and when” required basis contract within Eskom at the MPUMALANGA OU (MP HIGHVELD) OU.
6.1 The contract will be valid for twenty-four (24) months duration, although this is contractual
and fixed there will be work instruction / task orders issued per site per batch that will be
required to be actioned and completed by the successful tenderer within 7 working days from
the date of task order issue. Each batch / work instruction / task order is a standalone task
order.
6.2 The successful tenderer will be required to pay upfront for the allocated batch and collect all
units within 7 working days from the issue date of the approved work instruction / task order.
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 45
File name: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 23
Identifier
Invitation to Tender
Effective Date 21 February 2025
Review Date February 2030
6.3 The successful tenderer is expected to pay in full the units indicated on each batch submitted
by Eskom Disposal Officer (and will not re-batch the quantities on the work instruction / task
order).
6.4 The successful tenderer is required to have sufficient capacity and resources to service this
contract at any given point from any given site within the contractual term as quantities of the
units is not known upfront and is dependent on Eskom’s operations.
6.5 The successful tenderer is accountable to clean the site once the collections is completed
and ensure the area is cleaned should there be an oil spill.
6.6 The contract is for a combination of aluminium and copper core units which must be
purchased by the successful tenderer according to Eskom’s list.
6.7 It is Eskom normal business to issue out a collection request which ranges from 15 to 150
transformers at a time and the successful tenderer will be expected to pay and collect without
re-batching or making part payment.
6.8 The contractor failing to comply with the contractual obligations will be issued with a Non-
Conformance Report (NCR)
6.9 The successful tenderer must submit a safe disposal certificate in their company’s letter head.
6.10 The successful tenderer will be required to nominate three (3) company representatives who
will be given access to Eskom Sites for the duration of the agreement term.
6.11 Please submit your tender only if you will be able to comply with the above conditions.
The purchaser will be responsible for the safe collection, handling, removal, loading and transportation
of the SCRAP UNITS / material and to clean the site, qualified labour and suitable certified plant,
machinery, equipment, and transport for this purpose.
The goods on sale will be identified by an Eskom representative.
Item QTY DESCRIPTION PRICE OFFERED
No. (INCLUSIVE VAT)
1 “as and scrap kva successful tenderers will be
When transformers and contracted - e- auction will determine
Available” mini-subs from 5 prices
Kva to 1000 kva
Annexure a
Authorisation form
Indicate the status of the tenderer by ticking the appropriate box below.
A b c d e f
Company close partnership joint sole trust
Corporation venture proprietor
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 45
File name: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 23
Identifier
Invitation to Tender
Effective Date 21 February 2025
Review Date February 2030
The tenderer must complete the appropriate certificate set out below for its category of organisation.
If the tenderer is a company, close corporation, joint venture, or trust the tenderer must attach a
certified copy the document that is proof of the contents of the certificate (resolution of the board of
directors of a company, members’ resolution of a close corporation, power of attorney in the case of
a joint venture, or resolution of the board of trustees of a trust).
Note further that, in addition to completing the relevant certificate for category of organisation, the
authorised representative of the tenderer is also required to complete and sign the table at the end of
this Authorisation Form.
A. Certificate for company
I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the
board of directors of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby
confirm that by resolution of the board taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is
authorised to submit this tender on behalf of the company, and to sign all documents in connection
with this tender and any contract that may result from it on behalf of the company. A certified copy of
the resolution of the board is annexed to this Form.
Signed: Date:
Name: Position:
B. Certificate for close corporation
I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as member of _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by majority vote of the
members taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting
in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender
on behalf of the close corporation, and to sign all documents in connection with this tender and any
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 45
File name: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 23
Identifier
Invitation to Tender
Effective Date 21 February 2025
Review Date February 2030
contract that may result from it on behalf of the close corporation. A certified copy of the members’
resolution is annexed to this Form.
Signed: Date:
Name: Position:
C. Certificate for partnership
We, the undersigned, being the key partners in the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, acting in his/her
capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, to submit this tender on behalf of the partnership,
and to sign all documents in connection with the tender and any contract that may result from it on
behalf of the partnership.
Name Address Signature Date
NOTE: This certificate is required to be completed and signed by the full number of Partners
necessary to commit the Partnership. Attach additional pages if more space is required.
D. Certificate for Joint Venture
We, the undersigned, are submitting this tender offer in Joint Venture and hereby authorise Mr/Ms _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, an authorised signatory of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ , being the lead member in the Joint Venture, to sign all documents in connection
with the tender and any contract that may result from it on behalf of all the members in the Joint
Venture.
This authorisation is evidenced by the attached power of attorney signed by the legally authorised
signatories of all the members in the Joint Venture.
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 45
File name: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 23
Identifier
Invitation to Tender
Effective Date 21 February 2025
Review Date February 2030
We attach to this Form a certified copy of the Joint Venture Agreement which incorporates a statement
that all members in the Joint Venture are liable jointly and severally for the execution of the contract,
a term that indicates which member will be the lead member, and terms that indicate the ratios
according to which work and payment will be divided amongst the members.
Name of JV member Address Authorised signature,
name and capacity
Lead member
Member
Member
Member
NOTE: This certificate is required to be completed and signed by all members of the joint
venture. Attach additional pages if more space is required.
E. Certificate for sole proprietor
I, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that I am the sole proprietor of the
business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Signed: Date:
Name: Position:
(Sole Proprietor)
F. Certificate for trust
I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the
board of trustees of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm
that by resolution of the board of trustees taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 45
File name: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 23
Identifier
Invitation to Tender
Effective Date 21 February 2025
Review Date February 2030
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_, is authorised to submit this tender on behalf of the trust and to sign all documents in connection
with this tender and any contract that may result from it on behalf of the trust. A certified copy of the
resolution of the board of trustees is annexed to this Form.
Signed: Date:
Name: Position:
NOTE: The table below must also be fully completed by all tenderers in addition to the
certificate that was selected and completed above.
Name of tenderer:
Full names of authorised signatory:
Designation and capacity:
Signature of authorised signatory
Date of signature:
Annexure b
Acknowledgement form
We are in receipt of the Invitation to Tender from Eskom Holdings SOC Ltd and the
following addenda issued by Eskom:
We confirm that the documentation received by us is: (Indicate by ticking the box)
Correct as stated in the Invitation to Tender Content List, and that each document is
complete.
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 45
File name: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 23
Identifier
Invitation to Tender
Effective Date 21 February 2025
Review Date February 2030
Or: Incorrect or incomplete for the following reasons:
Cataloguing Acknowledgement:
Please select the relevant statement by ticking the appropriate box below:
Tender
Invitation to Tender in a previous contract/order [insert previous contract/order
number] __________
stated hereunder:
Manufacturer (OEM), is or is not [delete whichever is not applicable] in the position
to supply cataloguing information for items. We attach the letter from the OEM
confirming its position.
Invitation to Tender No: ____________________
Name of Tenderer: ___________ _ _
Country of registration: _______________________________________
Full names of contact person: __________________________________
Contact details:
Tel (landline):
Cell phone:
e-mail address:
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 45
File name: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 23
Identifier
Invitation to Tender
Effective Date 21 February 2025
Review Date February 2030
Name of tenderer:
Full names of authorised signatory:
Important Dates
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga.pdf (TENDER)Closing date: 14 August 2026 at 10h00. Non-compulsory clarification meeting: 12 August 2026 at 10h00 via Microsoft Teams. Tender validity period: 12 weeks (90 days). Clarification queries must be submitted 3 working days before the tender deadline.
Contact Information
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga.pdf (TENDER)Eskom Representative: Ntsako Machebe, Tel: 013 693 2872, Email: [email protected]. Fraud and corruption hotline: 0800 11 2722 or [email protected].
Submission Guidelines
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga.pdf (TENDER)Submission is electronic only via the Eskom E-tendering site; no hard copies accepted. Upload documents under the Technical, Commercial, Financial, and Other folders. PDF and Excel formats only; maximum 50MB per file and 900MB per submission. No zip or compressed files. If resubmitting, the latest version supersedes all previous submissions. Confirm the submission status shows as complete. Late tenders are not accepted. Mandatory returnables (disqualifiable if missing): Annexure A Authorisation Form, Annexure B Acknowledgement Form, Annexure C Tenderer's Particulars, Annexure D Integrity Pact Declaration, Annexure E Safety Requirements, Annexure F Environmental Requirements, Annexure H SBD 1, Annexure J SBD 4, and the E-auction training acknowledgement form. Required at closing (non-disqualifiable, 5 working days to remedy): Annexure I SBD 6.1, B-BBEE affidavit or verification certificate, tax clearance certificate (if not on CSD), CSD registration proof, Second-Hand Goods certificate from SAPS, CIPC registration documents, and COIDA certificate. Contractual requirements (assessed after ranking): proof of CSD registration, completed ITT document, and SHEQ requirements if applicable.
Evaluation Criteria
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga.pdf (TENDER)Evaluation follows the 80/20 preferential point system. Specific goals are scored out of 20 points in accordance with the PPPFA. Bidders failing to submit evidence for a specific goal will receive 0 points for that goal but will not be disqualified. Pricing and specific goals scores are added together for ranking. Contractual requirements are not evaluation criteria and are assessed after ranking. Eligibility criteria include: no restriction from doing business with Eskom or State-Owned Companies; no nationality from sanctioned countries; no multiple tenders (except for E-tendering size limit); no conflict of interest; tender signed by authorised person; not restricted by National Treasury; not on Tender Defaulters list; and no 100% subcontracting.
Technical Specifications
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga.pdf (TENDER)The scope of work includes the purchase, collection, and removal of scrap KVA transformers and mini-subs (5 kVA to 1000 kVA) on an 'as and when' required basis for a 24-month contract period within the Mpumalanga OU (MP Highveld). The successful tenderer must pay upfront for each allocated batch and collect all units within 7 working days from the issue date of the approved work instruction or task order. Collection requests typically range from 15 to 150 transformers at a time. The tenderer must have sufficient capacity and resources to service the contract at any given site. The successful tenderer is responsible for cleaning the site after collection and rehabilitating any oil spills. The contract covers both aluminium and copper core units. The successful tenderer must submit a safe disposal certificate on company letterhead and nominate three company representatives for site access. The successful tenderer is responsible for safe collection, handling, removal, loading, and transportation of the scrap units, including providing qualified labour and suitable certified plant, machinery, equipment, and transport. The goods on sale will be identified by an Eskom representative.
Quality Management
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga.pdfa. Eskom will not be responsible for any damages or losses suffered during the removal of the
equipment incurred while working on this project arising from theft, damage, or personal injury.
b. You will be required to adhere to the condition as laid out by the Eskom site agent with regards to
site access etc.
c. Littering is always prohibited. Facilities will have to be made available on site during dismantling
operations for the collection of disposal waste material. No rubble whatsoever is to be left on site.
d. Additional precautions must be taken when using cutting equipment. Portable firefighting
equipment must be available on site during all stages of the work programme.
e. The SCRAP UNITS is sold with unknown quantity of oil but any oil remaining in the equipment
shall become the property of successful tenderer and the tenderer will be responsible for any oil
spillage.
f. The successful tenderer will be required to be obtain an Eskom permit, prior to commencement
of work. After completion of the work, it is imperative that you notify the Eskom site agent, so that
the job can be signed off.
g. All work must comply with the OHSA Act no . All Safety requirements and
documentation shall be available on the site
h. Any oil spills caused during the work programme will need to be rehabilitated by the successful
tenderer.
i. This is an open tender.
j. A bidder who has an existing or expired contract with Eskom and has defaulted in terms of that
contract will be disqualified and not be awarded a new contract
k. A bidder who has an open non-conformance that has not been closed, will be disqualified, and
not awarded a new contract.
l. No accommodation will be allowed on site.
Pricing Schedule
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga.pdfE” auction pricing subs from 5
Platform to be used kva to 1000
Goal, it will not be disqualified. However, it will be awarded 0 points
for that Specific Goal.
3.19 Ranking of tenders Tenderers will be ranked by applying the preferential point scoring for
the 80/20 system. Eskom will add the score from Pricing and Specific
Financial Requirements
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga.pdf (TENDER)Pricing will be conducted via a reverse e-auction. The rand rate per item will be determined after evaluation and via the e-auction pricing tool. The successful tenderer must pay upfront for each allocated batch and collect all units within 7 working days. No part payment or re-batching of quantities is allowed. Eskom reserves the right to negotiate with preferred bidders if tendered prices are not market-related.
Compliance Requirements
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga.pdf (TENDER)Mandatory: Proof of CSD registration. Additional requirements: Second-Hand Goods certificate from SAPS/License (for scrap dealers and recyclers), CIPC registration documents, COIDA certificate of good standing, and tax clearance certificate (if not on CSD). B-BBEE affidavit or verification certificate required for points claim. SHEQ requirements may apply. Bidders must not have defaulted on existing or expired Eskom contracts and must have no open non-conformances. All work must comply with the OHSA Act.
Health & Safety
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga.pdfNumber Description Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form Annexure D Y
(refer to www.eskom.co.za for the Supplier Integrity
Pact that suppliers are required to download and read)
1.1.5 Safety Requirements Annexure E
Y
1.1.6 Environmental Requirements Annexure F
Y
1.1.7 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.8 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.9 *SBD 4 – Bidders Disclosure Annexure J Y
1.1.10 Technical Evaluation Criteria Annexure K Y
1.1.11 Section 37 (2) Agreement Annexure L Y
1.1.10 E-auction training acknowledgement form (Attached Y
Separately)
1.1.11 Reverse e-auction process (Attached Separately) Y
1.1.12 Scope of Work
1.1.13 Pricing Schedule/BOQ (if not contained in Contract)
applicable:
Annexure A Authorisation Form √
Annexure B Acknowledgement Form √
Annexure C Tenderers Particulars √
Annexure D Integrity Pact Declaration form √
Annexure E Health and Safety Requirements √
Annexure F Environmental Requirements √
Annexure H SBD 1- to be completed and submitted by all √
(applicable for all tenderers.
suppliers including
foreign suppliers)
Annexure I SBD 6.1- Preference Points Claim Form in terms of
PPPFA 2022 regulations
Annexure J SBD 4 – Bidders Disclosure √
Reverse e-auction E-auction training acknowledgement form (Attached √
training Separately)
acknowledgement
form (if applicable)
Additional Letter of intent to form a JV/consortium or Valid joint √
Safety COIDA - Original certificate of good standing or proof √
of application issued by the Compensation Fund
(COID) or a licensed compensation insurer (South
African tenderers only)
Environmental Environmental Environmental Policy √
Effective Date 21 February 2025
Review Date February 2030
6.3 The successful tenderer is expected to pay in full the units indicated on each batch submitted
by Eskom Disposal Officer (and will not re-batch the quantities on the work instruction / task
order).
6.4 The successful tenderer is required to have sufficient capacity and resources to service this
contract at any given point from any given site within the contractual term as quantities of the
units is not known upfront and is dependent on Eskom’s operations.
6.5 The successful tenderer is accountable to clean the site once the collections is completed
and ensure the area is cleaned should there be an oil spill.
6.6 The contract is for a combination of aluminium and copper core units which must be
purchased by the successful tenderer according to Eskom’s list.
6.7 It is Eskom normal business to issue out a collection request which ranges from 15 to 150
transformers at a time and the successful tenderer will be expected to pay and collect without
re-batching or making part payment.
6.8 The contractor failing to comply with the contractual obligations will be issued with a Non-
Conformance Report (NCR)
6.9 The successful tenderer must submit a safe disposal certificate in their company’s letter head.
6.10 The successful tenderer will be required to nominate three (3) company representatives who
will be given access to Eskom Sites for the duration of the agreement term.
6.11 Please submit your tender only if you will be able to comply with the above conditions.
information furnished herein is true and correct, that it is understood that the tenderer's tender may
be rejected, and that Eskom will act against the tenderer should any aspect of this declaration prove
to be false, and
information furnished herein is true and correct that it is understood that the JV's tender may be
rejected, and that Eskom will act against the JV should any aspect of this declaration prove to be
false; and
Effective Date 21 February 2025
Review Date February 2030
Annexure e: safety requirement
the next review date,
Requirements or ISO 45001/OHSAS
18001
and other requirements form signed and
submitted by the tenderer?
certificates:
4.1 First aider Training
4.2 Fire Fighting Training
4.3 Valid certificate of Crane Operator
4.4 Risk assessment training
5.1 Frist aider
5.2 fire fighter
5.3 crane operator
5.4 Risk assessor
Environmental
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga.pdfof communicating it with the
employees (project team). The
policy should demonstrate your
organization (top
management)’s commitment to
protection of the environment
which is not only intended to
prevent adverse environmental
impacts through prevention of
pollution, but to protect the
natural environment from harm
and degradation arising from
the organisation’s activities,
products and services. The
policy must also demonstrate
commitment to compliance with
legal and other requirements,
prevent pollution and
continually improve
environmental performance.
either adverse or beneficial,
that result wholly or partially
from environmental aspects are
called environmental impacts.
occur at local, regional and
global scales, and also can be
direct, indirect or cumulative by
nature. The relationship
between environmental aspects
and environmental impacts is
one of cause and effect.
Scope of work
Contractual Terms
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga.pdfThe contract is for a 24-month period. Work instructions or task orders will be issued per site per batch, each standing alone. The successful tenderer must pay upfront for each batch and collect within 7 working days. Non-compliance may result in a Non-Conformance Report (NCR). Bidders with existing or expired Eskom contracts who have defaulted, or who have open non-conformances, will be disqualified. Eskom will not be responsible for damages or losses during removal of equipment. The successful tenderer must obtain an Eskom permit before work commences and notify the Eskom site agent upon completion for sign-off. All work must comply with the OHSA Act. Any oil spills must be rehabilitated by the successful tenderer. No accommodation is allowed on site.
Section
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at Mpumalanga.pdf1.1.8 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.10 Technical Evaluation Criteria Annexure K Y
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 points in accordance with the
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
the 80/20 system. Eskom will add the score from Pricing and Specific
Contractual Requirements are not evaluation criteria. They will
be assessed after the evaluation and ranking of the tenders.
Description
Source: Eskom life-saving rules.pdfThe document is Eskom's Life-Saving Rules standard (240-62196227, Rev 6), not the tender specification. It applies to all Eskom employees, agents, consultants, and contractors at all Eskom sites. It enforces zero tolerance for behaviours that could cause serious injury or fatality. The five rules are: 1) OPEN, ISOLATE, TEST, EARTH, BOND, AND/OR INSULATE BEFORE TOUCH - no work on electrical networks without proper training, permits, risk assessments, and PPE. 2) HOOK UP AT HEIGHTS - no work at height without medical fitness, risk assessment, training, and fall arrest systems. 3) BUCKLE UP - mandatory seatbelt use in all vehicles. 4) BE SOBER - no working under the influence of alcohol or drugs. 5) ENSURE THAT YOU HAVE A PERMIT TO WORK - no work without the required permit. Violations result in disciplinary action, and contractors must remove and discipline employees who violate these rules.
Contact Information
Source: Eskom life-saving rules.pdf (unknown){"name":null,"email":null,"phone":null,"department":"....................................................................... 5","address":null}
Evaluation Criteria
Source: Eskom life-saving rules.pdf (unknown)Bidders must be pre-qualified scrap dealers. Compliance with Eskom's Life-Saving Rules is mandatory; violations will result in disciplinary action and potential suspension of contractor activities.
Technical Specifications
Source: Eskom life-saving rules.pdf (unknown)Eskom and its subsidiaries will conduct business with respect and care for people to ensure that no
operating condition or urgency of service endangers the life of anyone or causes injury or damage
to the environment. Eskom is committed to preventing all work-related injuries. In fulfilling this
commitment to protect people, the environment and property, management will provide and
maintain a safe and healthy work environment, in accordance with industry standards and in
compliance with legislative requirements.
At-risk behaviour leads to incidents. Life-saving Rules are safety rules that have been created to
enforce zero tolerance for serious at-risk behaviours. These rules have been determined in terms
of the consequences of the behaviours they describe, that is, if a particular set of behaviours or
actions has a very high probability of causing disabilities or fatalities when performed.
The Eskom Life-saving Rules complement our existing safety best practices and are safety rules to
be followed at all locations.
The Life-saving Rules apply to all Eskom employees, agents, consultants, and contractors. Visitors
to Eskom should also respect and adhere to these rules as applicable and could be instructed to
leave the Eskom premises with immediate effect should they refuse to do so.
2.1 Scope
This standard shall apply at all Eskom sites with the intention to promote a safe working
environment for all Eskom employees, agents, consultants, and contractors. Visitors to Eskom
should also respect and adhere to these rules, as applicable.
2.1.1 Purpose
This standard clarifies the five most prominent causes of serious injuries and fatalities within
Eskom, and Eskom’s intention to enforce “ZERO TOLERANCE” with respect to non-adherence to
these rules, due to the potential consequences of serious injury or fatality at the workplace.
2.1.2 Applicability
This standard shall apply throughout Eskom Holdings SOC Limited, its divisions, subsidiaries, and
entities wherein Eskom has a controlling interest and/or Eskom contractors, unless specifically
exempted by Sustainability Systems, where the business transacted may be of a completely
different nature to the core business of Eskom.
2.1.3 Effective date
This document will be effective from the date of authorisation.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems
[2] 32-37: Substance Abuse Procedure
[3] 32-95: Environmental, Occupational Health and Safety Incident Management Procedure
[4] 32-136 Contractor Health and Safety Requirements
[5] 32-345 Eskom Vehicle Safety Specification
[6] 32-407 Behavioural Safety Observations
[7] 32-418: Working at Heights Standard
[8] 32-477 Safety, Health and Environment Training and Development Procedure
[9] 32-520 Occupational Health and Safety Risk Assessment Procedure
[10] 32-524 Developing a SHE Specification
[11] 36-681: Plant Safety Regulations
[12] 32-726 SHE requirements for Eskom Commercial Process
[13] 32-727: Safety, Health, Environment and Quality Policy
[14] 32-848: Operating Regulations for High Voltage Systems
[15] 32-1112: Disciplinary Code
[16] 32-1113: Disciplinary Procedure
[17] 240-44175132 Eskom Personal Protective Equipment Specification
[18] 240-62946386: Vehicle and Driver Safety Management Procedure
[19] 240-43848327: Right to Refuse Employees’ Right of Refusal to Work in an Unsafe Situation
Procedure
[20] 240-84733329: Medical Surveillance Procedure
[21] 240-100979499 Personal Protective Equipment for Working at Heights Specification
2.2.2 Informative
[22] National Road Traffic Act
[23] Occupational Health and Safety Act
[24] 34-104 Earthing Standard
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
2.3 Definitions
2.3.1 Contractor: Any person (juristic/individual) formally contracted (directly or indirectly) by
Eskom and who performs work; supplies a service, product, equipment or material for the
purposes of advancing Eskom’s business and other interests. This includes consultants,
and third party contractors i.e. vendors, suppliers, agents, joint ventures, fixed term
contractors, principal contractors and subcontractors.
2.3.2 Life-saving Rule: Rules that, if not adhered to, have the potential to cause serious harm to
people. The consequences of a person knowingly and wilfully violating this rule will result in
a disciplinary process in accordance with the Eskom Disciplinary Code and Procedure.
2.3.3 Visitors: Any person who visits an Eskom site/office during working hours to attend a
meeting or for any reason whatsoever. This could include a minor.
2.3.4 Work at height: Means any work performed above a stable work surface or where a
person puts himself/herself in a position where he/she exposes himself/herself to a fall from
or into. Work at height is, as a result, work in any place (except a staircase in a permanent
workplace ), including a place at, above or below ground level, where a person could be
injured if he/she fell from that place. Access and egress that present a risk of fall can also
be classified as work at height.
2.3.5 Zero Tolerance: The standard that provides for the imposition of severe consequences for
a proscribed offence or behaviour without making exceptions for the extenuating
circumstances.
2.4 Abbreviations
Abbreviation Explanation
OHS Occupational Health and Safety
ORHVS Operational Regulations for High Voltage Systems
PPE Personal Protective Equipment
PSR Plant Safety Regulations
PTW Permit to Work
SHEQ Safety, health, environment and quality
2.5 Roles and Responsibilities
2.5.1 Sustainability Systems Department
The sustainability Systems Department shall:
a) Compile and review the Life-saving Rules for Occupational Health and Safety;
b) Develop awareness material;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
c) Ensure that the rules are communicated throughout the business;
d) Ensure compliance is monitored; and
e) Ensure that violations and sanctions are consolidated and communicated by Sustainability
Systems to the organisation.
2.5.2 All Groups/Divisions/Operating Units/Business Units
The management at Group/Divisional/Operating Unit/Business Unit level shall be responsible for:
a) Implementing the Eskom Life-saving Rules in their Groups/Divisions/Operating
Units/Business Units.
b) Communicating to all their employees, contractors, contractor employees and visitors the
importance of compliance with the Eskom Life-saving Rules and the consequences of non-
compliance therewith. This includes communicating Life-saving Rules to all new
employees and new contractors.
c) Ensuring that the awareness material is made available, distributed and displayed at all
units.
d) Ensuring all employees sign confirmation that the rules have been discussed with them,
that they understand the rules and the consequences of violating these rules, and retain
copies thereof.
e) Investigating any violation of a Life-saving rule and initiate the disciplinary process within
five (5) working days.
f) Ensuring consistency in the application of appropriate sanctions on employees, contractors
and contractor employees.
2.5.3 All employees (Eskom and contractors)
a) Always observe and adhere to the Life-saving Rules.
b) Avoid taking shortcuts when executing tasks. Always do the right thing even when no-one
is watching.
c) Only perform work that you are authorised to do.
d) All employees to exercise the right to refuse to perform work in an unsafe situation, or when
required to ignore a Life-saving rule.
2.6 Process for Monitoring
Groups/Divisions/Operating Units/Business units are responsible for ensuring the understanding
of, and compliance with, Life-saving Rules. Line management shall monitor compliance and report
on analysis and trending through performance reporting. The amendments to the revised standard
shall be implemented with immediate effect and may be audited after a period of six (6) months
from date of implementation.
2.7 Related/Supporting Documents
[1] 240-62196227 - Life-saving Rules – revision 5 (superseded).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
[2] 240–63942960 - Life-saving Rule Acknowledgement Form Document Content.
Life-saving Rules are safety rules that, if not adhered to, have the potential to cause serious harm
to people. The consequences of a person knowingly and wilfully violating these rules will result in a
disciplinary process in accordance with the Eskom Disciplinary Code and Procedure.
The objective of this standard is to clarify Eskom’s intention to enforce “ZERO TOLERANCE” with
respect to behaviour resulting in serious risk to an individual at the workplace.
It must be noted that the content of this standard does not detract from the requirements for safe
behaviour for all other work-related activities or other safety requirements, but emphasises the
importance thereof.
3.1 Eskom Life-Saving Rules
3.1.1 Rule 1: open, isolate, test, earth, bond, and/or insulate before
Touch
With the aim to ensure a safe electrical work environment, no person may work/operate on, around
or near any electrical network, line or apparatus, electrically connected to the power system and/or
electrically charged and/or not electrically charged unless:
a) He/she is trained and authorised as competent for the task to be done;
b) There is a valid permit to work, where required;
c) A pre-task risk assessment to identify all risks and hazards has been conducted prior to any
work commencing;
d) He/she follows the requirements on OPEN, ISOLATE, TEST, EARTH, BOND and/or
INSULATE BEFORE TOUCH, correctly based on applicable/related standards, procedures
and outcome of risk assessment fit for the type of work or task to be performed;
e) The authorised person (team leader) has certified and physically shown all team members that
the apparatus is safe to work on;
f) He/she makes the specific electrical environment safe prior to performing the work; and
g) All the appropriate PPE (including face shield and insulated gloves for low voltage work) are
worn.
3.1.2 Rule 2: hook up at heights
Working at height is a significant part of work in Eskom Holdings and is regarded as a high-risk
activity, and as a result all precautions must be taken to prevent incidents while working at height.
Wherever reasonably practicable, preference must be given to the performance of work at ground
level as opposed to work in an elevated position. Where work in an elevated position is necessary,
the requirements in this document shall apply.
No person may work at height where there is a risk of falling unless:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
a) He/she is medically fit to work at height;
b) A pre-task risk assessment to identify all risks and hazards has been conducted prior to
commencing any work of this nature;
c) He/she is appropriately trained as determined by the risk assessment;
d) He/she is appropriately secured during ascending and descending; and
e) He/she is using an Eskom approved fall arrest system where applicable.
3.1.3 Rule 3: buckle up
Where required, the proper wearing of seat belts for any driver, operator and passenger is
mandatory in all vehicles/equipment when driving and/or travelling for Eskom business purposes.
The driver is obligated to ensure that he/she as well as all passengers are properly seated and
wearing their seatbelts at all times while being transported in the vehicle, as per Eskom
specifications.
Note: This rule is applicable on any road or parking lot, irrespective of the speed, and when the
vehicle moves in a forward or backward direction.
3.1.4 Rule 4: be sober
No person who is under the influence or who appears to be under the influence of intoxicating
liquor or drugs will be permitted to enter, or remain on an Eskom site or conduct Eskom business
or drive/operate a vehicle/equipment for Eskom business purposes.
This includes any level of alcohol or the presence of any drugs, controlled substances, and/or
illegal substances in the body that impairs or could impair mental and physical functioning,
irrespective of when the substance was used.
3.1.5 Rule 5: ensure that you have a permit to work
Where an authorisation limitation exists, no person shall work without the required Permit to Work
(PTW), which is governed by for example the:
a) Plant Safety Regulations; or
b) Operating Regulations for High Voltage Systems (ORHVS); or
c) Any other activity where a permit is required.
No plant is to be returned to service without the cancellation of all permits on that plant in
accordance with procedure, unless permission is granted for a particular plant to be returned to
service with permits still open, like in the case of redundant systems.
NOTE: In the case of live work, a “live work declaration form” is to be completed by the authorised
person, who is the person responsible for the safe execution of work according to relevant
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
standards and procedures. Outline the key principles or rules to support the implementation of the
standard statement.
3.2 Consequences of violating a Life-Saving Rule
In terms of general health and safety in Eskom, if any of the Life-saving Rules are violated, it will
be treated as a serious misconduct, and result in a disciplinary process in accordance with the
Eskom Disciplinary Code and Procedure.
It must be highlighted that Eskom takes a ZERO TOLERANCE stance to violation of these rules.
Depending on the circumstances, Eskom reserves the right, where a contractor
manager/supervisor allows the violation of a Life-saving Rule, to suspend the contractor’s activities
while determining an appropriate sanction.
In the light of a contractor employee allegedly violating a Life-saving Rule, the contractor shall
immediately remove the employee from site and initiate the disciplinary process. The contractor
shall investigate any violation of a Life-saving Rule and initiate the disciplinary process within five
(5) working days of the violation. The contractor shall after the disciplinary process furnish Eskom
with a copy of the sanction.
This document has been seen and approved by:
Name Designation
Thava Govender Group Executive – Generation and (Acting) Risk and Sustainability
Divisions
Kerseri Pather General Manager – Sustainability Systems
Jace Naidoo Senior Manager – Sustainability Systems – OHS
Alex Stramrood Senior Manager – Sustainability Systems – OHS
Risk and Sustainability Members of the Risk and Sustainability Management Committee
Management Committee
HR Policies and Procedures Members of the HR Policies and Procedures Committee
Committee
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
Date Rev. Compiler Remarks
January 2017 6 A Stramrood Substituted the words “Disciplinary
hearing” with Disciplinary process.
Updated the Purpose and
Applicability to specify that this
Standard is applicable to
contractors. Updated Normative
and Informative References.
Updated Definition section by
removing Agent and Consultant as
these have been incorporated into
the definition of Contractor.
Updated the definition of Work at
Height and Zero Tolerance.
Reviewed and updated the Roles
and Responsibilities section and
Process for Monitoring. Added
permit requirement to Rule 1,
updated Rule 2 - Removed the
words “psychologically fit to work”
as this is no longer a requirement
in terms of the Construction
Regulations, 2014 and updated
Rule 3 – Removed the words “(for
example transporting people on
the back of trucks in a cabin)”
Updated Consequences of
violating a Life-saving Rule with
regard to contractors.
October 2015 5 A Stramrood Revision date needed to be
extended. Content still valid and
same.
May 2012 4 S Govender Amended Section 3.6
Consequences of Violating a Life-
saving Rule to align with EXCO
decision.
March 2013 3 S Govender Changed Cardinal Rules to Life-
saving Rules, and amended
content to ensure better
understanding of the intent and
requirements.
September 2010 2 K Terblanche Content of Rev 1 was incorporated
into the new Policy template.
Content was revised and updated.
December 2008 1 K Terblanche Annexure 1: Acknowledgement of
Eskom Life-saving Rules of this
document was removed. The
references made to Annexure 1 in
paragraphs 3.5.2 and 3.8 were
also removed.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
Date Rev. Compiler Remarks
August 2008 0 K Terblanche The document with reference
number 32-421 was developed
and approved.
The following people were involved in the development of this document:
Alex Stramrood
Kerseri Pather
Loraine Smit
Marc Lebea
Mike Townsend
Nosipho Noveve
Sheryl Isaacs
Sivi Govender
SN Middel
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Compliance Requirements
Source: Eskom life-saving rules.pdf (unknown)No specific requirements found
Contact Information
Source: E-Tenderers E-Tendering Training Acknowledgement Form (1).pdf (unknown){"name":"__________________________________________________________","email":null,"phone":null,"department":null,"address":null}
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form (1).pdf (unknown)Submission is via the E-Tendering Solution. The E-Tenderers' E-Tendering Training Acknowledgement Form is a mandatory returnable; it must be fully completed and submitted to Eskom within the prescribed period. Failure to do so renders the bidder non-responsive and disqualified.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form (1).pdf (unknown)Bidders must be pre-qualified scrap dealers. The E-Tendering Training Acknowledgement Form is mandatory; non-submission or incomplete submission leads to disqualification.
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form (1).pdf (unknown)Bidders must be pre-qualified scrap dealers. The E-Tendering Training Acknowledgement Form must be completed and submitted.
Description
Source: ANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdfThe tender is for the disposal of scrap KVA transformers and mini subs on an 'as and when' required basis for a period of twenty-four (24) months, limited to the Mpumalanga OU (MP Highveld).
Submission Guidelines
Source: ANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdf (unknown)Returnable documents: the completed and signed Annexure B Acknowledgement Form for Eskom OHS legal and other requirements (Eskom Identifier 240-43921804 Rev 5). The form must be signed by an authorised person (CEO/Director/Managing Director) and witnessed by two witnesses. No other submission instructions are stated in the provided document.
Evaluation Criteria
Source: ANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdf (unknown)Bidders must be pre-qualified scrap dealers. They must complete and sign the Acknowledgement Form for Eskom OHS legal and other requirements (Annexure B), confirming understanding of and compliance with the listed OHS documents. No other eligibility criteria are stated in the provided document.
Technical Specifications
Source: ANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdf (unknown)The tender is for the disposal of scrap KVA transformers and mini subs on an 'as and when' required basis for a period of twenty-four (24) months. The scope is limited to the Mpumalanga OU (MP Highveld). No further technical specifications are stated in the provided document.
Compliance Requirements
Source: ANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdf (unknown)The supplier/contractor/tenderer must comply with the following OHS documents when working at/rendering a service to Eskom: Eskom contractor Health and Safety requirements standards 32-136, OHS specification/requirements provided, the Occupational Health and Safety Act, and the Compensation for Occupational Diseases and Illnesses Act. After contract award, the supplier is responsible for aligning company processes with Eskom's OHS requirements. Penalties will be enforced on the main supplier for non-conformance to Eskom and/or statutory OHS requirements. All employees (contractors/suppliers) must undergo relevant Eskom induction. The main contractor must demonstrate the process and selection criteria for appointing contractors/suppliers, notify Eskom prior to appointment, ensure adequate resources and competencies, manage contractors/suppliers to comply with legal and Eskom requirements, monitor through audits and assessments, provide grounds for termination, and deal with non-conformances directly. Eskom reserves the right to verify compliance and may request testimonials/references.
Contractual Terms
Source: ANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdfThe main contractor/supplier must: demonstrate to Eskom the process and selection criteria applied when appointing contractors and suppliers; provide notification to Eskom prior to the appointment of contractors or suppliers for the commencement of work; ensure that contractors/suppliers have adequate resources and competencies; be accountable for the management of its contractors/suppliers to ensure compliance with applicable legal and Eskom requirements; monitor contractors/suppliers through audits and assessments regarding OHS compliance during execution; provide grounds for termination of work done by contractors/suppliers; deal with all non-conformances/non-compliance by contractors/suppliers (all tiers) directly with the main contractor/supplier in terms of performance and penalty processes. Eskom reserves the right to verify compliance and may instruct the contractor to provide copies of testimonials/references and contact details of clients (including Eskom) for whom the company has done previous work of a similar nature.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Mpumalanga DX and TX various sites - Emalahleni - Mpumalanga - 1055
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
8
Last checked
14 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
Everything South African general contractors need to know about the complete guide to csd and bbbee compliance for general sector suppliers in south africa — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Disposals: General. Unlock full pricing strategies, bid frequency, and historical win rates.