Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
1 Evkom Road, - Brackenfell - Western Cape - 7550
Organization Type
GOVERNMENT
Published
28 Aug 2026
OCDS Reference
ocds-9t57fa-167264
ESKOM is establishing a 24-month enabling agreement with pre-qualified scrap dealers for the disposal of scrap kva transformers and mini subs in the western cape. Bidders must submit comprehensive environmental documentation as per annexure c1, achieving a 100% pass mark on all environmental evaluation criteria. The tender requires strict adherence to eskom's sheq policy and she requirements, with NO tolerance for missing or non-compliant documents.
Bidders must achieve a 100% pass mark on all environmental evaluation criteria in Annexure C1; any criterion scored 0 results in an unacceptable rating.
Bidders must submit an Environmental Policy signed by the CEO/Director, dated and version controlled, expressing commitments to environmental protection, compliance, continual improvement, and pollution reduction.
Bidders must provide a Company Organogram showing environmental responsible persons (e.g., Environmental Officer, Environmental Representative, Company Director, Herbicide Applicator).
Bidders must submit an Environmental Aspects & Impacts Register with a rating methodology (low, medium, high) covering activities such as changing pole-mounted transformers, excavation, compacting, storage of oil-containing equipment, herbicide application, and transporting hazardous goods.
Bidders must submit a project/site-specific Environmental Management Programme (EMP) addressing significant aspects and impacts, SWOT risks, and site-specific risks (e.g., protected areas, indigenous tree removal permits, wetlands).
Bidders must submit a Waste Management Plan (WMP) covering waste streams (e.g., batteries, wires, cables), pollution prevention, waste minimization (reuse, recycle, reduce), and records of waste quantities disposed.
Bidders must submit an Environmental Emergency Preparedness & Response Plan, a Communication Strategy/Plan, an Environmental Incident Register, environmental training records, and signed Environmental Appointment Letters.
Bidders must sign and date Annexure B of the Eskom Contract Environmental Management Plan and submit it with the tender enquiry.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Thursday, 17 September 2026 - 10:00
Venue
MSTEAMS
Tender documents to be submitted to etendering only
Categories
Request for Bid(Open-Tender)
1 Evkom Road, - Brackenfell - Western Cape - 7550
AI Document Analysis Stages
Description
Source: SHE Spec - KVA Transformer and mini sub Disposal_.pdf (unknown)28 Aug
2026
Tender Published
Tender was published
17 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
SHE Spec - KVA Transformer and mini sub Disposal_.pdf
Eskom is establishing a 24-month enabling agreement for the Western Cape Operating Unit with pre-qualified scrap dealers for the disposal of scrap KVA transformers and mini substations on an 'as and when' required basis. The work will be conducted at the Brackenfell RDC (Brackenfell Complex) and is governed by a detailed SHE Specification (Document 056-4515009 Rev 1) that sets out mandatory safety, health, environmental, and legal compliance requirements for contractors.
Annexure A.1 Acknowledgement Form - E-auctioning Training.docx
Eskom invites pre-qualified scrap dealers to establish an enabling agreement for the disposal of scrap KVA transformers and mini-substations in the Western Cape Operating Unit on an 'as and when' required basis over a 24-month period. The process includes a mandatory reverse e-auction for which bidders must confirm training completion.
Environmental Requirements Template.pdf
Eskom seeks to establish an enabling agreement with pre-qualified scrap dealers for the disposal of scrap KVA transformers and mini subs in the Western Cape operating unit, on an "as and when" required basis for 24 months. Bidders must submit a complete set of environmental management documents as per Annexure C1, with a 100% pass mark on all environmental criteria.
User Guide e-auction.pdf
Eskom is establishing a 24-month enabling agreement with pre-qualified scrap dealers in the Western Cape for the disposal of scrap KVA transformers and mini substations on an 'as and when' required basis. The disposal process will be conducted through the Eskom eAuction platform, where registered bidders participate in online auctions.
Annexure A.2 Definition of E-auctioning.doc
Eskom is establishing a 24-month enabling agreement for its Western Cape Operating Unit with pre-qualified scrap dealers for the disposal of scrap KVA transformers and mini substations on an 'as and when' required basis. The process will utilise e-auctioning for price determination after responsive tenderers are identified.
Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf
Eskom Holdings SOC Ltd invites pre-qualified scrap dealers to tender for an enabling agreement to dispose of scrap KVA transformers (5 KVA to 1000 KVA) and mini-substations on an 'as and when' basis over a 24-month period for the Western Cape Operating Unit. Pricing will be determined via a reverse e-auction after technical evaluation.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 2 062 500
Range
Based on Municipal avg. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This is a SHE specification for the disposal of KVA transformers and mini substations.
It sets minimum safety, health, environmental and quality requirements for the contract.
The contractor must develop a SHE plan meeting these requirements and all applicable legislation.
Eskom does not assume the contractor's legal responsibilities; the contractor remains accountable for health and safety of its employees and appointed contractors.
The specification is not all-encompassing; additional Eskom or legislative requirements must be addressed.
Important Dates
Source: SHE Spec - KVA Transformer and mini sub Disposal_.pdf (unknown){"closingDate":"20 February 2016","briefingSession":"{"date":null,"time":null,"venue":"ed work","is_compulsory":false}"}
Contact Information
Source: SHE Spec - KVA Transformer and mini sub Disposal_.pdf (unknown)Eskom Health and Safety Manager: Patiswa Rilityane
Eskom Safety Officer: Mnikelo Mkam
Evaluation Criteria
Source: SHE Spec - KVA Transformer and mini sub Disposal_.pdf (unknown)Bidders must be pre-qualified scrap dealers on Eskom's panel for the Western Cape Operating Unit. The contractor must be registered with the Compensation Fund (COID) and hold a valid Letter of Good Standing. Appointed safety officers must be registered with SACPCMP. The contractor must have the necessary competencies and resources to perform the work safely, including trained personnel, compliant equipment, and a substance abuse programme aligned with the OHS Act and Eskom Procedure 32-37. No work may commence without the presence of the appointed project manager or supervisor. The contractor must not employ child labour and must comply with Section 37(2) of the OHS Act via a signed agreement.
Technical Specifications
Source: SHE Spec - KVA Transformer and mini sub Disposal_.pdf (unknown)Disposal of scrap KVA transformers and mini substations on an as-and-when-required basis for a 24-month period.
Project address: Brackenfell RDC (Brackenfell Complex), Eskom Road, Brackenfell.
Contractor must develop and implement a SHE plan meeting Eskom and legislative requirements.
Contractor remains accountable for health and safety of its employees and appointed contractors.
Compliance with Eskom Life-saving Rules, substance abuse testing, risk assessments, safe work procedures, and method statements required.
Contractor must provide SHE training, inductions, toolbox talks, and maintain a SHE file.
Statutory appointments and Section 37(2) agreement required.
Construction professional registration and notification of construction work apply if construction work is conducted.
Quality Management
Source: SHE Spec - KVA Transformer and mini sub Disposal_.pdf (unknown)Quality and safety non-conformances must be reported to the Department of Employment and Labour (Inspection and Enforcement Services – Provincial office) in the first instance, and thereafter to the Eskom project manager.
Relevant inspection reports must be submitted.
Breathalyser and drug testing may be conducted on entry to or while on any Eskom work site.
Compliance Requirements
Source: SHE Spec - KVA Transformer and mini sub Disposal_.pdf (unknown)Comply with Occupational Health and Safety Act, Basic Conditions of Employment Act, National Environmental Management Act, and National Road Traffic Act.
Register with COID (Compensation for Occupational Injuries and Diseases).
Adhere to Eskom SHEQ Policy and related procedures.
No child labour; hazardous work by children prohibited.
Health & Safety
Source: SHE Spec - KVA Transformer and mini sub Disposal_.pdf (unknown)Contractor must comply with the SHE specification, which includes:
Environmental
Source: SHE Spec - KVA Transformer and mini sub Disposal_.pdf (unknown)Contractor must comply with environmental legislation, local authority/municipal by-laws, and Eskom environmental requirements.
An Environmental Management Plan may be required to ensure positive impacts are enhanced and negative impacts limited during the project lifecycle.
Duty of care to the environment: prevent pollution or degradation, and minimise/rectify any harm.
Description
Source: User Guide e-auction.pdf (RFP)The Eskom eAuction platform facilitates competitive online bidding for products and services. It supports open auctions (public), standard auctions (Eskom selling), and reverse auctions (Eskom buying). Auctions typically run from 1 to 10 days. Bidders must maintain a B-BBEE rating as awards consider price and B-BBEE. The platform requires individual user accounts and a unique company security code for registration.
Important Dates
Source: User Guide e-auction.pdf (RFP)Closing date: 2026-09-17 at 10:00 (from tender record). No briefing or site visit dates are stated in the document.
Contact Information
Source: User Guide e-auction.pdf (RFP)No contact names, emails, or phone numbers are provided in the document. The eAuction portal is https://eauction.eskom.co.za. Procurement officer contact is not specified.
Submission Guidelines
Source: User Guide e-auction.pdf (RFP)Bidding is conducted exclusively through the Eskom eAuction platform at https://eauction.eskom.co.za. Bidders must be registered on the platform with a valid Company Security Code and individual user accounts. Bids are submitted online; the auction closes at the stated end time, but bids made near the end extend the auction by a set increment. No paper submissions are mentioned. Returnable forms: none specified in the provided document.
Evaluation Criteria
Source: User Guide e-auction.pdf (RFP)Award is based on a point system considering both price and B-BBEE rating. Final award is subject to Eskom review after the auction closes. Bidders must be pre-qualified scrap dealers for the Western Cape Operating Unit. No minimum qualifying score or 80/20 vs 90/10 split is stated in the document.
Technical Specifications
Source: User Guide e-auction.pdf (RFP)The tender is for the disposal of scrap KVA transformers and mini subs on an 'as and when' required basis for 24 months. Bidding is via Eskom eAuction, which supports standard auctions (Eskom selling) and reverse auctions (Eskom buying). For this disposal, it is a standard auction: bids must be higher than the previous bid. The system enforces a minimum bid increment. No quantities, weights, or specific asset details are provided in the document.
Pricing Schedule
Source: User Guide e-auction.pdf (RFP)Bidding is online via the Eskom eAuction system. In a standard auction (Eskom selling), each bid must be higher than the previous bid. The system displays the next acceptable bid based on the current winning bid plus a fixed increment; lower bids are rejected. Bids are financially binding. No detailed pricing schedule or bill of quantities is provided in the document.
Financial Requirements
Source: User Guide e-auction.pdf (RFP)Bids are financially binding commitments. Starting bids are at Eskom's reserve value. No bonds, guarantees, or payment terms are stated in the document.
Compliance Requirements
Source: User Guide e-auction.pdf (RFP)Bidders must be pre-qualified scrap dealers for the Western Cape Operating Unit. Must maintain a valid B-BBEE rating, as it influences award. Must have a valid Company Security Code issued by Eskom and be registered on the eAuction platform. No CSD, tax clearance, or CIDB requirements are stated in the document.
Requirements
Source: User Guide e-auction.pdf (RFP)Each user must have their own login credentials; sharing is prohibited. Registration requires a company security code sent to the primary user. Passwords must be at least 8 characters, include letters, numbers, special characters, and at least one capital and one lowercase letter. The company code links all users of the same company. All bids are logged with user, date, and time for audit. Users should log out after use to prevent unauthorized bids.
Description
Source: Annexure A.2 Definition of E-auctioning.doc (unknown)The tender is for the establishment of an enabling agreement for the Western Cape Operating Unit with pre-qualified scrap dealers for the disposal of scrap KVA transformers and mini subs on an 'as and when' required basis for a period of twenty-four (24) months.
Submission Guidelines
Source: Annexure A.2 Definition of E-auctioning.doc (unknown)Returnable documents: SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination), and Authority to Sign/Board Resolution. All must be completed, signed, and submitted with the bid.
Evaluation Criteria
Source: Annexure A.2 Definition of E-auctioning.doc (unknown)Bidders must be pre-qualified scrap dealers. Evaluation follows the PPPFA preference point system (80/20 or 90/10). Responsive tenderers may be invited to participate in an e-auction, which is an electronic negotiation on price only. Eskom reserves the right to award to a supplier who may not be the highest scoring or highest-ranked supplier, in accordance with Section 2(1)(f) of the PPPFA.
Technical Specifications
Source: Annexure A.2 Definition of E-auctioning.doc (unknown)The tender covers the disposal of scrap KVA transformers and mini subs on an 'as and when' required basis for a period of twenty-four (24) months. E-auctioning is an electronic negotiation process on price only, used to achieve the most competitive prices for clearly-specified items. E-auction will only be considered once responsive tenderers have been identified. Tenderers will be trained on the e-auction system and will receive registration details to participate.
Compliance Requirements
Source: Annexure A.2 Definition of E-auctioning.doc (unknown)Bidders must be pre-qualified scrap dealers. Must be registered on the Central Supplier Database (CSD) and have a valid tax compliance status (SARS tax pin). Must comply with B-BBEE requirements under the PPPFA 80/20 or 90/10 system.
Description
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Establishment of Enabling Agreement for Western Cape OU with pre-qualified scrap dealers for the Disposal of Scrap KVA Transformers and Mini subs on 'as and when' required for period of twenty-four (24)-months. Tender number E3432DXWCOU. Issue date 27 August 2026. Closing date and time 17 September 2026 at 10h00. Tender validity period 90 days.
Important Dates
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Closing date: 17 September 2026 at 10h00. Non-compulsory clarification meeting: 10 September 2026 at 10h00 via Teams; tenderers must confirm intention to attend with the Eskom Representative. Tender validity period: 90 days.
Briefing Session
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Non-compulsory clarification meeting: Date 10 September 2026, Time 10h00, Teams meeting link provided. Tenderers must confirm intention to attend with the Eskom Representative. If mandatory, non-attendance leads to disqualification.
Contact Information
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Eskom Representative: Cassiem du Toit, Tel: 021 980 3912, E-mail: [email protected]. Fraud hotline: 0800 11 2722, [email protected].
Submission Guidelines
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Submit the completed tender with all mandatory returnable documents by the closing date and time. Mandatory returnables at closing (disqualifiable): Annexure A Authorisation Form, Annexure B Acknowledgement Form, Annexure C Tenderer's Particulars, Annexure D Integrity Pact Declaration, Annexure E Health and Safety Requirements, Annexure F Environmental Requirements, Annexure H SBD 1, Annexure J SBD 4. Also required at closing: E-auction training acknowledgement form (non-disqualifiable) and Annexure I SBD 6.1 (for evaluation). Additional documents for JVs: letter of intent, JV agreement with joint and several liability, single business entity confirmation, single designated bank account. Bidders with existing/expired contracts who defaulted or have open non-conformances will be disqualified. No accommodation on site.
Returnable Documents
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Mandatory returnables at tender closing (disqualifiable): Annexure A Authorisation Form, Annexure B Acknowledgement Form, Annexure C Tenderer's Particulars, Annexure D Integrity Pact Declaration form, Annexure E Health and Safety Requirements, Annexure F Environmental Requirements, Annexure H SBD 1, Annexure J SBD 4. Returnables required at closing (non-disqualifiable): E-auction training acknowledgement form. Returnables required at closing for evaluation: Annexure I SBD 6.1. Additional documents for JV: letter of intent, JV agreement, confirmation of single business entity, single designated bank account. B-BBEE Affidavit/Verification Certificate, Tax Clearance Certificate, CSD registration, Second-Hand Goods Certificate, CIPC registration documents, COIDA certificate. Mandatory contractual requirements: Proof of CSD registration, completed ITT document.
Evaluation Criteria
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Evaluation uses the 80/20 preferential point system. Pricing and Specific Goals are scored; Specific Goals are scored out of 20 points. Failure to submit evidence for a Specific Goal results in 0 points for that goal but not disqualification. Contractual Requirements are not evaluation criteria and are assessed after evaluation and ranking. Prices are evaluated via e-Auction; a reverse e-auction determines final price for batches.
Technical Specifications
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Scope: Purchase, collection, and removal of scrap KVA transformers and mini-subs (5 KVA to 1000 KVA) on an 'as and when' required basis within Eskom Western Cape OU. Contract period: 24 months. Work instructions/task orders issued per site per batch; must be completed within 7 working days. Successful tenderer must pay upfront for each batch and collect all units within 7 working days. Collection requests range from 15 to 150 transformers; no re-batching or part payment. Must have sufficient capacity and resources. Must clean site after collection and rehabilitate any oil spills. Must submit a safe disposal certificate on company letterhead. Must nominate three company representatives for site access. Non-compliance results in a Non-Conformance Report (NCR).
Methodology
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Scope of work: Purchase, collection, and removal of scrap KVA transformers and mini-subs for 24-month contract period on 'as and when' required basis within Eskom at Western Cape OU. Work instructions/task orders issued per site per batch, to be completed within 7 working days. Successful tenderer must pay upfront for allocated batch and collect all units within 7 working days. Must have sufficient capacity and resources. Must clean site after collection and handle oil spills. Contract for combination of aluminium and copper core units. Collection requests range from 15 to 150 transformers; must pay and collect without re-batching. Non-compliance leads to Non-Conformance Report. Must submit safe disposal certificate. Must nominate three company representatives for site access.
Quality Management
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)All work must comply with the OHSA Act. All safety requirements and documentation must be available on site. Oil spills caused during work must be rehabilitated by the successful tenderer. Open tender. Bidders with existing/expired contracts who defaulted or have open non-conformances will be disqualified. No accommodation on site.
Pricing Schedule
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Pricing conducted via e-Auction. Rand rate per item determined after evaluation via e-Auction pricing tool. Items: Scrap KVA transformers and mini-subs from 5 KVA to 1000 KVA, 'as and when available'. Prices inclusive of VAT.
Financial Requirements
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Pricing conducted via e-Auction; rand rate per item determined after evaluation via e-Auction pricing tool. Prices inclusive of VAT. Successful tenderer must pay upfront for allocated batches. Eskom reserves the right to negotiate with preferred bidders if prices are not market related. Main contractors discouraged from subcontracting with subsidiaries; must declare if doing so.
Compliance Requirements
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Mandatory: Proof of CSD registration, completed ITT document. Additional: SHEQ requirements. Required documents: COIDA certificate (original or proof of application) for South African tenderers; Environmental Policy; Environmental Impact and Aspect Register; B-BBEE Affidavit (DTI template) or Verification Certificate from accredited agency; Tax Clearance Certificate (if not on CSD or no SARS PIN); Second-Hand Goods Act certificate from SAPS (for scrap dealers/recyclers); CIPC registration documents. Joint ventures must provide JV agreement with joint and several liability, single bank account, and lead member designation. Tenderers restricted by National Treasury, on Tender Defaulters list, or with unresolved non-conformances or defaults on previous Eskom contracts are ineligible. Subcontracting 100% of scope is not permitted.
Health & Safety
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Safety requirements: All work must comply with OHSA Act. All safety requirements and documentation shall be available on site. Portable firefighting equipment must be available during all stages of work. Additional precautions when using cutting equipment.
Environmental
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Environmental requirements: Littering prohibited; facilities for collection of disposal waste material; no rubble left on site; oil spills must be rehabilitated by successful tenderer. Contractor must submit Environmental Policy and Environmental Impact and Aspect Register.
Contractual Terms
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Contractual requirements: Mandatory - Proof of CSD registration, completed ITT document. Additional - SHEQ requirements. Contractual requirements assessed after evaluation and ranking; failure to meet may result in non-responsiveness. Conditions of contract will be the Other Contractual Conditions. Eskom reserves right to negotiate with preferred bidders if prices not market related. Main contractors discouraged from subcontracting with subsidiaries; must declare if doing so.
Special Conditions
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Notes: Eskom not responsible for damages/losses during removal; adhere to Eskom site agent conditions; littering prohibited; precautions with cutting equipment and portable firefighting equipment; scrap units sold with unknown quantity of oil, oil becomes property of successful tenderer who is responsible for spillage; successful tenderer must obtain Eskom permit before commencement and notify site agent after completion; all work must comply with OHSA; oil spills must be rehabilitated; open tender; bidders with existing/expired contracts who defaulted or have open non-conformances will be disqualified; no accommodation on site.
Requirements
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Eligibility criteria: Tenderers must not be under any restriction to do business with Eskom or State-Owned Companies. Ineligible if: nationality of a country on international sanctions list; submitting more than one tender (except where E-Tendering size limit applies); JV/consortium agreement does not state joint and several liability; conflict of interest; tenders signed by non-authorized persons; restricted by National Treasury; on Tender Defaulters list; sub-contracting 100% of Scope of Work.
Section
Source: Invitation to Tender (ITT)-KVA transformers and Mini subs at WCOU.pdf (TENDER)Prices evaluated via e-Auction. Specific goals scored out of 20 points in accordance with PPPFA. Ranking by 80/20 system, adding pricing and specific goals scores. Reverse e-auction used to determine final price for batches.
Description
Source: Annexure A.1 Acknowledgement Form - E-auctioning Training.docx (unknown)The tender is for the establishment of an enabling agreement for the Western Cape Operating Unit with pre-qualified scrap dealers for the disposal of scrap KVA transformers and mini subs on an 'as and when' required basis for a period of twenty-four (24) months.
Submission Guidelines
Source: Annexure A.1 Acknowledgement Form - E-auctioning Training.docx (unknown)Returnable documents: the E-auction training Acknowledgment Form (Annexure A.1) must be completed, signed, and submitted with the bid. The form confirms attendance at the e-auction training or completion of self-training via the e-auction video. Bids must be submitted by the closing date and time; late submissions are disqualified.
Evaluation Criteria
Source: Annexure A.1 Acknowledgement Form - E-auctioning Training.docx (unknown)Only pre-qualified scrap dealers registered with Eskom are eligible. Bidders must complete e-auction training (either by attending the clarification meeting or by self-training via the uploaded video) and sign the acknowledgment form. Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax compliance status (SARS tax pin).
Technical Specifications
Source: Annexure A.1 Acknowledgement Form - E-auctioning Training.docx (unknown)The tender is for the disposal of scrap KVA transformers and mini subs on an 'as and when' required basis for the Western Cape Operating Unit. The enabling agreement will be for a period of twenty-four (24) months.
Compliance Requirements
Source: Annexure A.1 Acknowledgement Form - E-auctioning Training.docx (unknown)Must be a pre-qualified scrap dealer with Eskom. Must be registered on the Central Supplier Database (CSD). Must have a valid tax compliance status (SARS tax pin). Must complete e-auction training and submit the signed acknowledgment form.
Description
Source: Environmental Requirements Template.pdfThe document is the Environmental Requirements Template (Annexure C1) used by Eskom to assess whether suppliers submitted the required environmental documentation as specified in the enquiry. It references Eskom SHEQ Policy (32-727) and SHE Requirements for Eskom Commercial Processes (32-726).
Contact Information
Source: Environmental Requirements Template.pdf (unknown){"name":null,"email":null,"phone":null,"department":"ies, Threats/Risks (SWOT)","address":"nvironmental Performance,"}
Submission Guidelines
Source: Environmental Requirements Template.pdf (unknown)Returnable documents: all environmental documentation listed in Annexure C1 must be submitted with the tender. Each document is scored 0 or 1; a score of 0 on any requirement makes the bid unacceptable. The pass mark is 100% of all requirements.
Evaluation Criteria
Source: Environmental Requirements Template.pdf (unknown)Bidders must achieve a pass mark of 100% on all environmental evaluation criteria in Annexure C1. Each criterion is scored 0 (document not submitted or does not satisfy minimum requirements) or 1 (document submitted and content satisfies minimum requirements). A score of 0 on any requirement results in an unacceptable rating. Bidders must read ISO 14001:2015 for detailed environmental management system requirements.
Technical Specifications
Source: Environmental Requirements Template.pdf (unknown)The tender requires submission of environmental documentation as specified in the enquiry. Reference documents include Eskom SHEQ Policy (32-727) and SHE Requirements for Eskom Commercial Processes (32-726). The following environmental documents must be provided:
Compliance Requirements
Source: Environmental Requirements Template.pdf (unknown)Bidders must comply with Eskom SHEQ Policy (32-727) and SHE Requirements for Eskom Commercial Processes (32-726). Environmental documentation must be submitted as per Annexure C1. The pass mark is 100% of all environmental requirements.
Health & Safety
Source: Environmental Requirements Template.pdfThe Environmental Emergency Preparedness & Response Plan must list possible environmental emergencies such as chemical spillages, air pollution incidents, and encounters with bees and snakes.
Environmental
Source: Environmental Requirements Template.pdfAdditional environmental requirements may include relevant training in auditing, environmental law, and ISO 14001.
Section
Source: Environmental Requirements Template.pdfThe tender submission score sheet indicates the criteria, weighting, and weighting per discipline in multidisciplinary packages, authorised by the relevant senior manager. The approved score sheet is issued with the enquiry for technical evaluation. Each criterion is scored 0 or 1; the pass mark is 100% of all requirements.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
1 Evkom Road, - Brackenfell - Western Cape - 7550
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
6
Last checked
28 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
Everything South African general contractors need to know about the complete guide to csd and bbbee compliance for general sector suppliers in south africa — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Disposals: General. Unlock full pricing strategies, bid frequency, and historical win rates.