The services sector education and training authority (services seta) seeks to appoint a service provider to design and implement a fit-for-purpose, ai-enabled project management support framework. This framework aims to transform services seta’s project management function from a fragmented, compliance-driven role into a strategic, digitally enabled delivery engine, ensuring measurable socio-economic impact, financial discipline, and real-time monitoring.
Key Requirements
Submit four (4) bid proposals: one original, one electronic (USB), one copy, and a zipped email (max 100MB) to [email protected] by 15 July 2026, 11:00 AM. Late submissions are disqualified.
Mandatory compliance: CSD registration, tax compliance (SARS PIN/TCS certificate), B-BBEE status proof, company registration certificate, and proof of registration with a recognised Project Management Professional Body.
Complete all SBD forms (1, 3.3, 4, 6.1, 7.2) and provide five (5) written testimonials for similar work executed within the last five years.
Propose a 9-month phased implementation plan covering initiation, diagnostics, framework design, system/financial models, SOPs/templates, validation, and handover.
Include AI-enabled solutions for project tracking, predictive analytics, and digital twin models, aligned with NDP, PFMA, and Batho Pele principles.
Pricing must follow the provided schedule (20% Initiation, 35% Framework Design, 20% Tools, 20% Systems/Financial Models, 5% Handover) with 15% VAT and remain valid for 120 working days.
Evaluation follows the 80/20 preference point system, with mandatory thresholds for functionality (80/100) and presentation (16/20).
Professional Services & Consulting Industry Profile
Regulatory Bodies
SAGCSAICA
Tenders in this industry often require registration with these bodies.
Typical Documents
5 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
DocumentPROC-T687-BID-DOCUMENT- DEVELOPMENT OF A PROJECT MANAGEMENT SUPPORT FRAMEWORK.pdfReview complete
Description
Important Dates
10 Jun
2026
PUBLICATION
Tender Published
Tender was published
15 Jul
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
PROC-T687-BID-DOCUMENT- DEVELOPMENT OF A PROJECT MANAGEMENT SUPPORT FRAMEWORK.pdf
The Services Sector Education and Training Authority (Services SETA) invites bids for the appointment of a service provider to develop a Project Management Support Framework. The project aims to transform the Project Management function into a strategic, AI-enabled capability that enhances governance, financial stewardship, real-time monitoring, and decision-making. The framework must support integrated governance, financial modeling, digital systems, and performance management to improve delivery outcomes and stakeholder confidence. The contract duration is 9 months, with a budget estimated between R1,000,000 and R50,000,000.
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Source: PROC-T687-BID-DOCUMENT- DEVELOPMENT OF A PROJECT MANAGEMENT SUPPORT FRAMEWORK.pdf
Services SETA seeks to appoint a service provider to develop a Project Management Support Framework.
Goal: Transform the project management function from a fragmented, compliance-driven role into a digitally enabled, intelligence-led strategic delivery engine.
Framework must institutionalise project management, deliver measurable socio-economic impact, ensure financial discipline, enable real-time monitoring, and strengthen alignment with strategic plans (APP, SSP, SLA).
Important Dates
Source: PROC-T687-BID-DOCUMENT- DEVELOPMENT OF A PROJECT MANAGEMENT SUPPORT FRAMEWORK.pdf (TENDER)
Source: PROC-T687-BID-DOCUMENT- DEVELOPMENT OF A PROJECT MANAGEMENT SUPPORT FRAMEWORK.pdf (TENDER)
Submit four (4) bid proposals: one (1) original, one (1) electronic version on USB, one (1) copy, and email a zipped file (max 100MB) to [email protected].
Use official bid forms (do not re-type).
Documents must be properly bound, punched, numbered, and separated per the checklist schedule.
Submit to the bid box at Services SETA Head Office, 15 Sherborne Road, Parktown, Johannesburg 2193 during office hours (Mon-Thu 8am-4pm, Fri 8am-3pm).
Late submissions will not be accepted.
Mandatory returnables: CSD registration, completed SBD forms (1, 3.3, 4, 6.1, 7.2), company registration certificate, proof of registration with a recognised Project Management Professional Body, B-BBEE status proof, tax compliance proof, capability references, company experience, methodology, qualifications, identity documents, bank details, and pricing schedule.
Returnable Documents
Source: PROC-T687-BID-DOCUMENT- DEVELOPMENT OF A PROJECT MANAGEMENT SUPPORT FRAMEWORK.pdf (TENDER)
VERY IMPORTANT: THE CONTENTS OF THE BID/ TENDER DOCUMENT MUST BE AS checklist schedule below. : YES or NO Schedule 1 The potential bidder must be registered with National Treasury Central Supplier Database (CSD) Schedule 2 Bid document must be signed and duly completed, together with all declaration of interest/standard bidding documents (SBD’s 1, 3.3, 4, 6.1 and 7.2) Schedule 3 Provide and attach a copy of Company Registration Certificate Schedule 4 Provide and attach entity’s proof of registration with a recognised Project Management
Evaluation Criteria
Source: PROC-T687-BID-DOCUMENT- DEVELOPMENT OF A PROJECT MANAGEMENT SUPPORT FRAMEWORK.pdf (TENDER)
Evaluation follows the 80/20 preference point system (bid value estimated between R1M and R50M).
Criterion 1: Qualification/Gatekeeper Requirements – Mandatory. Failure to meet all disqualifies the bidder.
Criterion 4: Price (80 points) and Specific Goals (20 points). Highest combined score wins.
Specific Goals (B-BBEE): Black People Ownership (8), Woman Ownership (6), Youth Ownership (5), Disability Ownership (1).
Disqualification risks: Late submission, incomplete/unsigned documents, functionality or presentation below thresholds, non-compliance with PRECCA, tax, or B-BBEE, false declarations, or collusive bidding.
Technical Specifications
Source: PROC-T687-BID-DOCUMENT- DEVELOPMENT OF A PROJECT MANAGEMENT SUPPORT FRAMEWORK.pdf (TENDER)
Objective: Develop a fit-for-purpose, AI-enabled Project Management Support Framework to transform Services SETA’s project management function into a strategic, digitally enabled delivery engine.
Strategic Objectives: Achieve PM maturity level 3 by end FY2027, level 4 in FY2028, and level 5 in FY2029; enable data-driven decision-making; embed governance and accountability.
Alignment: NDP, Skills Development Act, PFMA, King IV/V, Batho Pele, SETA Strategic Plan.
Innovation: Encouraged to propose AI-enabled tracking, predictive analytics, automation, and digital twin models.
Skills Transfer: Structured knowledge transfer, training materials, internal capability building, and long-term sustainability required.
Methodology
Source: PROC-T687-BID-DOCUMENT- DEVELOPMENT OF A PROJECT MANAGEMENT SUPPORT FRAMEWORK.pdf
Bid proposal must detail the methodology and project approach, covering all seven phases.
Innovation encouraged: Propose AI-enabled project tracking, predictive analytics, automation of reporting processes, and digital twin models for simulation.
Quality Management
Source: PROC-T687-BID-DOCUMENT- DEVELOPMENT OF A PROJECT MANAGEMENT SUPPORT FRAMEWORK.pdf (TENDER)
Bidder must ensure skills transfer and sustainability through structured knowledge transfer, training materials, internal capability building, and enabling long-term sustainability.
Pricing Schedule
Source: PROC-T687-BID-DOCUMENT- DEVELOPMENT OF A PROJECT MANAGEMENT SUPPORT FRAMEWORK.pdf
Use the provided pricing schedule (SBD 3.3) with percentage allocations for deliverables: Initiation & Diagnostics (20%), Framework Design (35%), Optimum Structure & Tools (20%), System & Financial Models (20%), Finalisation & Handover (5%).
Clearly state total bid price inclusive of all taxes and levies (VAT, PAYE, income tax, UIF, skills development levies).
Indicate if rates are firm for the full contract period; if not, provide adjustment basis (e.g., CPI).
Bidders may compile their own pricing schedule but must align with the terms of reference.
Financial Requirements
Source: PROC-T687-BID-DOCUMENT- DEVELOPMENT OF A PROJECT MANAGEMENT SUPPORT FRAMEWORK.pdf (TENDER)
Use the provided pricing schedule (SBD 3.3) with percentage allocations: Initiation & Diagnostics (20%), Framework Design (35%), Optimum Structure & Tools (20%), System & Financial Models (20%), Finalisation & Handover (5%). VAT is 15%.
Bid offer must be valid for 120 working days from the closing date.
Provide total bid price inclusive of all applicable taxes (VAT, PAYE, income tax, UIF, skills development levies).
Indicate if rates are firm for the full contract period; if not, detail adjustment basis (e.g., CPI).
Clearly state contract renewal and termination steps.
Bidders may compile their own pricing schedule but must cover all costs per the terms of reference.
Payment terms: Purchaser undertakes to pay within 30 days after receipt of an invoice.
Compliance Requirements
Source: PROC-T687-BID-DOCUMENT- DEVELOPMENT OF A PROJECT MANAGEMENT SUPPORT FRAMEWORK.pdf (TENDER)
Mandatory: Registration on the National Treasury Central Supplier Database (CSD) with active status.
Mandatory: Tax compliance on CSD prior to award; submit SARS PIN or TCS certificate/CSD number.
Mandatory: Valid B-BBEE Status Level Verification Certificate. Non-compliance results in zero points for Specific Goals but not disqualification.
Mandatory: Certified copy of Company Registration Certificate.
Mandatory: Proof of registration with a recognised Project Management Professional Body.
Mandatory: Complete and sign all required SBD forms (1, 3.3, 4, 6.1, 7.2).
Disclose any state employment, conflicts of interest, and comply with PRECCA (Prevention and Combating of Corrupt Activities Act).
Foreign suppliers: Must answer questionnaire on residency, branch, permanent establishment, income source, and tax liability in RSA.
No bids accepted from persons in the service of the state or companies with directors/members in state service.
Contract forms (SBD 7.2) must be completed in duplicate by both service provider and purchaser.
Fraudulent claims for preference points may lead to disqualification, cost recovery, contract cancellation, restriction from state business, and criminal prosecution.
B-BBEE Requirements
Source: PROC-T687-BID-DOCUMENT- DEVELOPMENT OF A PROJECT MANAGEMENT SUPPORT FRAMEWORK.pdf (TENDER)
Submit proof of B-BBEE Status Level of Contributor.
Non-compliant contributors score zero points for Specific Goals but are not disqualified.
Preference points under the 80/20 system: Black People Ownership (8), Woman Ownership (6), Youth Ownership (5), Disability Ownership (1).
Contractual Terms
Source: PROC-T687-BID-DOCUMENT- DEVELOPMENT OF A PROJECT MANAGEMENT SUPPORT FRAMEWORK.pdf
Contract form (SBD 7.2) must be completed in duplicate by both service provider and purchaser.
Successful bidder must sign a written contract.
Contract includes: bidding documents, tax compliance proof, pricing schedule, proposal, preference claim form, disclosure form, special conditions, and General Conditions of Contract.
Payment terms: Purchaser undertakes to pay within 30 days after receipt of an invoice.
PRECCA compliance: Bidder must declare no endorsement under Section 28. If endorsed, SETA may cancel the contract and claim damages.
Fraudulent preference point claims may result in disqualification, cost recovery, contract cancellation, restriction from state business (up to 10 years), and criminal prosecution.
Requirements
Source: PROC-T687-BID-DOCUMENT- DEVELOPMENT OF A PROJECT MANAGEMENT SUPPORT FRAMEWORK.pdf (TENDER)
Foreign suppliers must complete a questionnaire on residency, branch, permanent establishment, income source, and tax liability in RSA.
Bidders must ensure tax compliance and submit SARS PIN or TCS certificate.
No bids accepted from persons in the service of the state or companies with directors/members in state service.
All SBD forms (1, 3.3, 4, 6.1, 7.2) must be completed and signed.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Prondeza Building, 152 Nelson Mandela Dr, Westdene, Bloemfontein, 9301, South Africa
Document-Backed
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
10 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Get deep intelligence on Activities of head offices; management consultancy activities. Unlock full pricing strategies, bid frequency, and historical win rates.