Submissions closed on 29 January 2026. The information below is archived for reference.
Our AI analyzes thousands of tenders and finds the ones YOUR company can actually win
AI Match Scoring
Get a compatibility score for every new tender
Instant Notifications
Get alerted when 85%+ matches appear
Gap Analysis
See exactly what you need to qualify
B-BBEE Matching
Tenders matched to your certification level
Province Targeting
Only see tenders in your regions
Document Readiness
Know if you have required docs before using AI assistance
Organization
Fetakgomo Tubatse Local Municipality
Province
National
Closed
29 January 2026
Categories
Don't worry! Here are similar opportunities still open for submission
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: RE-ADV~2.PDF. You don’t need to refresh — this page will pick up the updated review automatically.
Important Dates
Source: RE-ADV~2.PDFClosing date: 29 January 2026, 12:00 hrs. No other dates (briefings, site visits, clarification deadlines) are mentioned in the document.
Contact Information
Source: RE-ADV~2.PDFContact: [email protected], Phone: 013 231 1000 (Fetakgomo Tubatse Local Municipality). No additional contact name, department or physical address provided.
Submission Guidelines
Source: RE-ADV~2.PDFProvide all returnable documents listed under Administrative Compliance. Required items include: company registration (CK) for each partner, signed and initialed tender document pages, tax compliance confirmation (CSD report will be generated), completed Form of Offer (figures and words), all MBD forms fully completed and signed, authority letter for signatory, JV agreement (lead partner ≥51% share), CIDB Grade 8CE registration proof, municipal rates/taxes clearance (no arrears >90 days) with supporting letters/lease agreements or sworn affidavits as applicable, certified ID copies of directors/shareholders, and BOQ filled in black ink with all amendments initialed. All certifications must be dated within 6 months of the closing date. Failure to submit any of these items will result in automatic disqualification.
Evaluation Criteria
Source: RE-ADV~2.PDFThree‑phase evaluation:
1. Administrative Compliance – bids screened for completeness; any deviation leads to disqualification.
2. Functionality – technical scoring out of 100 points. Minimum 70 points required to proceed. Scoring breakdown:
Bidders scoring <70 are disqualified.
3. Pricing & Specific Goals – 90/10 point system. Price (90 pts) based on firm BOQ rates; Preference points (10 pts) awarded for local content (RSA address on CK). Only firm prices accepted; separate schedules required for different delivery points.
Technical Specifications
Source: RE-ADV~2.PDFScope: Supply labour, materials and plant for construction of roads and stormwater network and ancillary works at Mashifane Park (Phase 2 & 3). Works include barricading, trench excavation, pipe laying, backfilling, manhole and kerb construction, road layers, stabilization, asphalt paving, pavers, markings, sidewalks, speed‑humps, signage, and service sleeves. Contractor must manage and supervise SMME subcontractors (≈30 % of works) and provide guarantees, quality control and OHS compliance as per the tender document.
Financial Requirements
Source: RE-ADV~2.PDFPricing must be submitted as firm prices in the BOQ; non‑firm prices will be rejected. Separate pricing schedules required for each delivery point if applicable. Financial guarantee letter of intent required (values as per functionality scoring). No explicit bond or guarantee amount beyond the guarantee letter is stated.
Compliance Requirements
Source: RE-ADV~2.PDFB‑BBEE minimum level: 6. Must provide CSD tax compliance report, CIDB Grade 8CE registration, and CIPC company registration. Professional registrations required for key personnel (ECSA, PMP, SACPCMP). Local content considered for preference points (RSA address on CK).
Government tenders in the Construction sector represent significant opportunities for South African businesses. The South African government regularly procures goods and services through the eTender portal, making it essential for businesses to stay informed about new opportunities.
Get weekly tender digests and industry insights delivered to your inbox.
Subscribe for Free