Tender Type
Request for Bid(Open-Tender)
Delivery Location
Lower Germiston Road - Rosherville - Germiston - 2020
Organization Type
GOVERNMENT
Published
17 Jul 2026
OCDS Reference
ocds-9t57fa-162691
This tender invites bids for the supply and delivery of a comprehensive range of industrial gaskets, seals, and related products to ESKOM rotek industries in gauteng over a three-year period. The contract is governed by nec3 supply contract terms and requires strict compliance with technical, financial, and b-bbee regulations.
Date & Time
Friday, 07 August 2026 - 10:00
Venue
MS Teams
Categories
Request for Bid(Open-Tender)
Lower Germiston Road - Rosherville - Germiston - 2020
17 Jul
2026
Tender Published
Tender was published
07 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Invitation to Tender- Supply and delivery of Gaskets and Seals .pdf
Median Estimate
R 326 089
Range
Based on 13 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
A meticulous legal compliance guide for South African SMEs and General contractors navigating the 2026 procurement landscape. This case study-driven analysis provides a regulatory intelligence deep dive into the mandatory frameworks of CSD (Central Supplier Database), BBBEE (Broad-Based Black Economic Empowerment), SARS Tax Compliance, CIPC registration, and COIDA. It outlines the precise, actionable steps contractors must take to achieve compliance, highlights common disqualification pitfalls in tender submissions, and explains how integrated tools like Tenders-SA.org can streamline the process. The guide serves as an essential evergreen resource for any business seeking to compete effectively for public sector contracts in the General sector.
💡 Want more tendering tips and strategies?
Explore Our BlogRecommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: 240-10~1.DOC. You don’t need to refresh — this page will pick up the updated review automatically.
Description
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfImportant Dates
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Contact Information
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Submission Guidelines
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Returnable Documents
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Evaluation Criteria
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Eligibility is primarily determined by the ability to meet the specified quality management requirements. Suppliers must have, or demonstrate the capability to implement, a QMS conforming to ISO 9001. Specific eligibility is tied to the tender's selected Quality Category, requiring submission of valid certificates (Category 1) or documented QMS evidence (Categories 2-4). Eskom reserves the right to perform capability and capacity assessments on suppliers of critical items.
Technical Specifications
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Methodology
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfExperience & Qualifications
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfQuality Management
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfCompliance Requirements
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Health & Safety
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfContractual Terms
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfSection
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfThese rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Quality Requirements.docx
ESKOM Gauteng seeks suppliers for the supply and delivery of Gaskets and Seals. The tender emphasizes strict compliance with specific quality management specifications and requires submission of detailed returnable documents using provided templates.
240-10~1.DOC
SOW- Supply and delivery of Gaskets and Seals.pdf
The tender is for the supply and delivery of various types of gaskets, seals, O-rings, valve packings, and related components to Eskom in Gauteng. The items include doughnut seals, conical seals, sheet gaskets, Johnson couplings, O-rings (neoprene, nitrile, PTFE), square rubber seals, PTFE gaskets, and valve packings (graphite and acrylic PTFE) in specified dimensions and materials. The closing date for submissions is August 7, 2026, at 10:00 UTC.
32-136 Contractor Health and Safety Requirements.pdf
240-106084675 Annexure C 3.docx
This tender, issued by ESKOM in Gauteng, calls for the supply and delivery of Gaskets and Seals. It emphasizes strict compliance with Occupational Health and Safety (OHS) requirements, including auditable OHS systems, risk assessments, and valid certifications.
Form A.pdf
Eskom tender for the supply and delivery of gaskets and seals over a 3-year period. The document specifies quality requirements aligned with ISO 9001 and includes pre- and post-contract award quality clauses.
Annexure B- Acknowledgement Form for Eskom SHE Rules and other requirements.pdf
This tender, issued by ESKOM in Gauteng, is for the supply and delivery of gaskets and seals. The closing date is August 7, 2026. The document emphasizes strict compliance with Eskom's Safety, Health, and Environment (SHE) rules, statutory regulations, and contractor management requirements.
NEC-Complete Supply Contract-Supply and delivery of Gaskets and Seals.pdf
Supplier Evaluation Pack Template for 01 March 2025 to 29 February 2026.xls
The tender document appears to be corrupted or improperly formatted, containing mostly unreadable text and Excel VBA macros. However, the header suggests it is a tender for the 'Supply and delivery of Gaskets and Seals' issued by ESKOM in Gauteng, with a closing date of August 7, 2026.
240-12248652 (Rev 7) - List of Tender Returnables.pdf
Eskom is inviting tenders for the supply and delivery of gaskets and seals in Gauteng for a 3-year period. The tender emphasizes strict quality management system (QMS) compliance, with evaluation based on ISO 9001 certification or documented QMS alignment, operational evidence, and quality control plans.
240-126469599 (Rev 2) - Method Statement - Template.docx
The tender is for the supply and delivery of Gaskets and Seals to ESKOM in Gauteng, South Africa. The closing date is August 7, 2026. The document outlines a method statement framework requiring details on scope of work, objectives, customer focus, competencies, infrastructure, leadership, risk management, process improvements, data analysis, and relationship management.
E-tendering Help Manual for supplier.docx
Eskom is inviting tenders for the supply and delivery of Gaskets and Seals in Gauteng. The submission process is conducted electronically via the eTendering system, which requires registration, OTP verification, and document upload under specified categories (e.g., Technical, Commercial, Finance). The closing date is 07 August 2026 at 10:00 UTC.
240-105658000 Supplier QM Spec Rev 3-QM 58.pdf
Eskom tender for supply and delivery of gaskets and seals, governed by comprehensive Supplier Quality Management Specification (QM 58). The tender mandates strict adherence to ISO 9001 quality management systems, detailed quality planning, and supplier performance monitoring. Applicants must comply with one of four quality requirement categories, each with specific documentation deliverables.
Authority to submit a tender (Returnable Schedule) Template.docx
This document is a mandatory returnable schedule for Eskom's tender for supply and delivery of gaskets and seals. It requires the tenderer to formally declare their organizational structure and provide a certificate of authority for the person signing the tender submission, ensuring contractual validity.
E0226TSSERI RR Clarification Meeting LINK.pdf
Eskom is requesting suppliers for the supply and delivery of gaskets and seals, with a clarification meeting scheduled to discuss tender E0226TSSERI RR. The tender closing date is August 7, 2026.
BOQ- Supply and deliver of Gaskets and Seals.xlsx
This tender, issued by ESKOM in Gauteng, South Africa, is for the supply and delivery of a wide range of gaskets, seals, and related components. The tender includes items such as doughnut seals, conical seals, O-rings, PTFE gaskets, valve packings, and various specialized seals for transformers and bushings. The closing date for submissions is August 7, 2026, at 10:00 AM UTC. The document lists 96 distinct items with specifications, material numbers, quantities, and unit prices to be filled in by applicants.
Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdf
Eskom is soliciting tenders for the supply and delivery of gaskets and seals in Gauteng. The tender follows standard Eskom procurement procedures with a closing date of August 7, 2026. The document outlines comprehensive conditions of tender, emphasizing fair, transparent, and competitive processes, along with detailed obligations for both Eskom and tenderers.
Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc
The tender is for the supply and delivery of Gaskets and Seals to Eskom in Gauteng, South Africa. The closing date is 07 August 2026. The document primarily focuses on a PAYE (Pay As You Earn) questionnaire to determine the tax classification of contractors (e.g., Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor) supplying services or labor to Eskom. It includes detailed questions and affidavits to assess compliance with South African tax legislation, particularly the Income Tax Act No. 58 of 1962.
TECHNICAL EVALUATION- Supply and delivery of Gaskets and Seals.pdf
This tender, issued by ESKOM in Gauteng, is for the supply and delivery of various types of gaskets and seals, including doughnut seals, conical seals, sheet gaskets, O-rings, square rubber, PTFE gaskets, valve packing (graphite and acrylic PTFE), and Klingersil C4400 sheet. The closing date is August 7, 2026. The technical evaluation criteria include purchase orders and delivery notes (30%), technical data sheets (40%), company profile (15%), and method statement (15%). A minimum weighted score of 75% is required to pass the technical evaluation.
Eskom Supplier Integrity Pact - 02 June 2023.pdf
This is not the main tender document but the Eskom Supplier Integrity Pact, a mandatory ethical compliance document for all suppliers participating in Eskom procurement processes. It outlines the ethical obligations of both Eskom and its suppliers to prevent fraud, corruption, and unfair practices.
Annexure K- Supply and delivery of Gaskets and Seals.doc
This tender, issued by Eskom Rotek Industries (ERI) in Gauteng, is for the supply and delivery of Gaskets and Seals. The focus is on socio-economic transformation, local industrial development, and compliance with Supplier Development, Localisation, and Industrialisation (SDL&I) targets. The successful supplier must adhere to B-BBEE, skills development, job creation, and socio-economic development commitments.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
Zenie Bota
Phone
021-980-3370
[email protected]
Address
Lower Germiston Road - Rosherville - Germiston - 2020
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
22
Last checked
17 Jul 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubEvaluation Criteria
Source: TECHNICAL EVALUATION- Supply and delivery of Gaskets and Seals.pdf (unknown)Technical Score
Minimum weighted final score of 75% required to pass technical evaluation.
Documentation
All required documents (purchase orders, delivery notes, data sheets, company profile, method statement) must be submitted as per the tender specifications.
Scope Alignment
Services and products offered must align with the scope of work (supply and delivery of specified gaskets and seals).
Past Experience
Preferable to have completed orders for similar items (seals and gaskets) in the past 5 years.
Technical Specifications
Source: TECHNICAL EVALUATION- Supply and delivery of Gaskets and Seals.pdf (unknown)Scope: Supply and delivery of Seals and Gaskets. Required items include:
Technical data sheets must be provided for each item, detailing dimensions, specifications, and relevant technical information.
Section
Source: TECHNICAL EVALUATION- Supply and delivery of Gaskets and Seals.pdfTechnical evaluation is weighted at 100% with a minimum threshold of 75% required to qualify. Criteria and point allocations:
Purchase Orders & Delivery Notes (30%): Points awarded based on the number of completed orders (0, 1, 2, or 4+) for Seals and Gaskets in the past 5 years. Orders must include company name, order number, value, and contact person(s).
Technical Data Sheets (40%): Points awarded based on the number of data sheets submitted (0, ≤5, 6–9, or ≥10). Data sheets must detail dimensions, specifications, and relevant information for all bid items.
Company Profile (15%): Points awarded for clarity, detail, and relevance to the scope of work (0, 7, or 15 points).
Method Statement (15%): Points awarded for completeness and detail in describing procurement, handling, transportation, and storage processes (0, 6, 7, or 15 points).
Submission Guidelines
Source: 240-126469599 (Rev 2) - Method Statement - Template.docx (unknown)Returnable Documents: Not specified in the provided document. Refer to the official tender record for submission details.
Evaluation Criteria
Source: 240-126469599 (Rev 2) - Method Statement - Template.docx (unknown)General
Technical
Financial
Financial stability to fulfill the contract (may require submission of financial statements).
Technical Specifications
Source: 240-126469599 (Rev 2) - Method Statement - Template.docx (unknown)Scope of Work: Supply and delivery of gaskets and seals as per the tender/RFQ title and Works Information of the NEC document.
Method Statement Requirements:
Quality Management:
Infrastructure and Resources:
Organizational Requirements:
Data and Analysis:
Relationship Management:
Compliance Requirements
Source: 240-126469599 (Rev 2) - Method Statement - Template.docx (unknown)No specific compliance requirements found in the provided document.
Description
Source: BOQ- Supply and deliver of Gaskets and Seals.xlsxSupply and delivery of a comprehensive range of gaskets and seals for industrial applications, including:
Evaluation Criteria
Source: BOQ- Supply and deliver of Gaskets and Seals.xlsx (unknown)General
Technical
Financial
Local Content
Technical Specifications
Source: BOQ- Supply and deliver of Gaskets and Seals.xlsx (unknown)Scope: Supply and delivery of gaskets and seals as per the Bill of Quantities (BoQ).
Key Deliverables:
Material Specifications:
Quantities: Specified per item in the BoQ, ranging from 3000 to 5000 units for high-demand items (e.g., O-RING 84.3x5.7, QUATRO RADIATOR O-RING).
Financial Requirements
Source: BOQ- Supply and deliver of Gaskets and Seals.xlsx (unknown)Pricing Structure:
Description
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.docThis document is a Supplier Evaluation Pack for Eskom Holdings SOC Ltd (Registration Number 2002/015527/00) and its subsidiaries. It applies to contractors supplying services or labour to Eskom for the 2025/2026 tax year. The pack determines tax classification and compliance with the Income Tax Act No. 58 of 1962.
Contact Information
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc (unknown)Group Tax Department at Megawatt Park. Email: [email protected]
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc (unknown)Residency
Contractors must declare whether they are residents of the Republic of South Africa as per the Income Tax Act.
Employee Count
Companies, close corporations, or trusts must employ at least 3 full-time employees who are not connected persons to qualify for certain tax exemptions.
Income Test
No more than 80% of the contractor’s income should come from a single client (e.g., Eskom) or associated institutions to avoid PAYE withholding.
Control And Supervision
Contractors must confirm whether their services are performed mainly at Eskom’s premises and/or under Eskom’s control or supervision.
Dominant Impression Test
Contractors must answer questions to determine if their relationship with Eskom is akin to an employer-employee relationship (e.g., payment based on output, control over tools/equipment, exclusivity of services).
Connected Persons
Contractors must declare if any connected persons (e.g., shareholders, members, beneficiaries) will render services to Eskom on their behalf.
Labour Broker Status
Contractors classified as Labour Brokers must provide a valid IRP30 exemption certificate to avoid PAYE withholding.
Compliance Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc (unknown)Bidders must complete the PAYE Questionnaire to determine tax classification (Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor). Required affidavits and declarations must be signed and submitted to confirm compliance with Income Tax Act No. 58 of 1962. Failure to submit signed documents may result in PAYE withholding from payments.
Submission Guidelines
Source: 240-106084675 Annexure C 3.docx (unknown)Submit the following returnable documents: 1. Signed acknowledgement of Eskom's OHS legal and other requirements form (Annexure B). 2. OHS plan addressing project/scope OHS risks, aligned with health and safety specifications. 3. Baseline OHS Risk Assessment (BRA) with methodology, identifying and managing OHS risks. 4. Valid Letter of Good Standing (COIDA or equivalent). 5. OHS policy signed by CEO, compliant with OHS Act Section 7. 6. ISO 45001 certificate or equivalent (if applicable).
Evaluation Criteria
Source: 240-106084675 Annexure C 3.docx (unknown)Mandatory
Preferred
Compliance Requirements
Source: 240-106084675 Annexure C 3.docx (unknown)OHS compliance requirements: 1. Valid Letter of Good Standing (COIDA or equivalent). 2. OHS policy signed by CEO, compliant with OHS Act Section 7. 3. ISO 45001 certification or equivalent (if applicable). 4. Submission of OHS-related returnable documents as specified.
Description
Source: Quality Requirements.docxScope: Supply and delivery of Gaskets and Seals in compliance with the following:
Submission Guidelines
Source: Quality Requirements.docx (unknown)Returnable Documents: Submit all required templates as per the List of Tender Returnable Documents (240-12248652).
Evaluation Criteria
Source: Quality Requirements.docx (unknown)Suppliers must demonstrate capability to meet the specified quality management requirements, including ISO9001 compliance, and must submit all required returnable documents in the prescribed format.
Technical Specifications
Source: Quality Requirements.docx (unknown)Compliance Requirements:
Compliance Requirements
Source: Quality Requirements.docx (unknown)No specific compliance requirements stated beyond quality management specifications.
Evaluation Criteria
Source: 32-136 Contractor Health and Safety Requirements.pdf (unknown)Occupational hygiene is the identification, evaluation and control of those environmental factors,
exposure to its operations, which is in line with its Safety, Health, Environmental and Quality
to achieve specific goals. A project is a temporary endeavour with a defined beginning and end
while honouring the preconceived constraints. The primary constraints are scope, time, quality and
plant) within cost, quality and time.
Technical Specifications
Source: 32-136 Contractor Health and Safety Requirements.pdf (unknown)Eskom is committed to safeguarding its contractors (principal contractors, appointed contractors,
suppliers, vendors, service providers and consultants) and the environment against undesired
exposure to its operations, which is in line with its Safety, Health, Environmental and Quality
Policy. Therefore, as an organisation, processes have to be in place to identify all possible
practical occupational health and safety risks to which contractors are exposed and to take the
appropriate measures that are necessary to prevent any incidents, injuries or environmental
damage resulting from accidental exposure.
The term “contractor requirements” means a comprehensive documented prerequisite of the
imperative safety, health and environmental requirements for a contract or project.
Contractors have the crucial responsibility for executing work safely on a site or project, including
taking measures to ensure contractor health, safety and environment during their activities/services
to prevent any injury to employees and/or other people and members of the public, or damage to
the environment. Each contractor is responsible for ensuring that its employees and the
employees of any appointed contractors comply with all the applicable occupational health and
safety legislative requirements and the policies and procedures of Eskom.
2.1 Scope
The aim of this standard is to standardise the health and safety requirements applicable to the
activities of contractors throughout Eskom Holdings SOC Limited and its subsidiaries, with a view
to achieving a common goal, namely Zero Harm.
This standard sets out the minimum legislative and organisational requirements for contractors.
Each project and situation may contain additional unique activities, challenges, needs and
requirements that must be considered and incorporated, over and above the minimum
requirements already contained in this standard.
This standard may not thoroughly address all the hazards and factors associated with any
specialised activity or operation. In such a situation, contractors shall be responsible for
developing their safety, health and environmental plans/procedures/manuals/work instructions to
adequately address these specialised activities and scope of operation.
2.1.1 Purpose
The purpose of this document is to stipulate essential information on significant safety and health
aspects for the purposes of contractor health and safety conformity and standardisation.
Eskom’s contractors have the fundamental accountability and responsibility for the on-site safety
and health of people, and environmental protection in their activities, services, products and work.
Each contractor is responsible for ensuring that its employees and the employees of all appointed
contractors comply with all the occupational safety, health, and environmental (SHE) statutory
requirements and the policies and procedures of Eskom Holdings SOC Limited.
The contractor’s SHE management system must demonstrate compliance with the level
appropriate to the service provided and with the applicable legal requirements. The contractor and
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
its employees must be able to carry out their work safely, using the correct procedures for the
safety of plant, equipment and substances, by employing safe systems of work, and providing
adequate instruction, training and supervision for all employees.
In addition to the legislative requirements governing health, safety and the environment,
contractors shall comply with all the Eskom Holdings SOC Limited policies, procedures and
standards.
NOTE: this standard (or any project-specific version of it) does not replace legislative requirements.
2.1.2 Applicability
This standard applies to Eskom Holdings SOC Limited, its divisions, subsidiaries, and entities in
which Eskom has a controlling interest.
This standard shall apply to all Eskom and Eskom subsidiary employees carrying out any form of
contract work for or on behalf of Eskom, that is, agents, clients and contractors.
NOTE: the client or agent is responsible for ensuring that the contractors are informed of any
revisions to any of the documents listed, which they are required to adhere to while performing
work for Eskom Holdings SOC Limited.
2.1.3 Effective date
This document will be effective from the date of signature. The implementation of this standard
shall be monitored after a period of six months from the authorisation date.
2.2 Normative/Informative references
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
NOTE: where the date for revision of a document on the Eskom Document Centre website has
passed, the document still remains current, irrespective of having passed its revision date.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems
[2] 32-296: Integrated SHE Organisation, Roles and Responsibilities, and Statutory Appointments
Procedure
[3] 32-727: Safety, Health, Environment, and Quality Policy
[4] 32-726: SHE Requirements for the Eskom Commercial Process
[5] 240-62196227: Life-Saving Rules Standard
[6] 32-245: Waste Management Procedure
[7] 32-477: Safety, Health, and Environment Training and Development
[8] 32-524 Developing Health & Safety Specifications
[9] 32-529: Occupational Health and Safety Risk Management Process
[10] 32-407: Behavioural Safety Observations
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
[11] 32-123: Emergency Planning
[12] 32-124: Eskom Fire Risk Management
[13] 32-108: Firefighting Organisation
[14] 32-37: Substance Abuse Procedure
[15] 32-95: Environmental, Occupational Health and Safety Incident Management Procedure
[16] 32-418: Working at Heights Standard
[17] 32-520: Occupational Health & Safety Risk Assessment Procedure
[18] 32-345: Eskom Vehicle Safety Specification
[19] 32-1112: Eskom Disciplinary Code (Standard)
[20] 32-1113: Eskom Disciplinary Procedure
[21] 32-1034: Eskom Procurement and Supply Chain Management Procedure
[22] 240-62946386: Vehicle and Driver Safety Management Procedure
[23] 240-44175038: Control of Non-Conforming Product or Service Procedure
[24] 240-46569633: Professional and Statutory Registration for Construction Project Managers and
Supervisors with SACPCMP
[25] Project and Construction Management Professions Act, 2000 (Act No. )
[26] National Environmental Management Act, 1998 (Act No. )
[27] National Environmental Management: Waste Act, 2008 (Act No. )
[28] All relevant South African legislation (at national, provincial and municipal level)
[29] Occupational Health and Safety Act, 1993 (Act No. ), and regulations.
2.2.2 Informative
NOTE: the following is a list of documents that can be used as a guide in order to meet legal and Eskom requirements.
[1] 240-84520108: Public Safety Standard
[2] 32-726: SHE Requirements for the Eskom Commercial Process
[3] 32-303: Requirements for the Safe Processing, Storage, Removing and Handling of Asbestoscontaining Materials, Equipment and Articles Procedure
[4] 240-46569633 Professional and Statutory Registration for Construction Project Managers and
Supervisors with SACPCMP
2.3 Definitions
NOTE: where there are no listed Eskom definitions, the definitions listed in the Occupational
Health and Safety Act, 1993 (Act No. ) (OHS Act), or its regulations should be referred
to.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.3.1 Agent: (OHS Act) means any person who acts as a representative for a client.
2.3.2 Baseline risk assessment: means the OHS hazards and risks that are identified and
assessed before the inception of a new project and the commencement of operations. The
baseline risk assessment shall include both routine and non-routine tasks.
2.3.3 Client: means the Eskom representative (Internal – Asset Owner), also referred to as the
contract administrator/custodian or agent or project manager (as defined in the contract).
He/she is the person responsible for ensuring that the works or services are executed in
terms of the contract, as well as for adherence to legislation pertaining to construction
works.
2.3.4 Competent person: means any person having the knowledge, training, experience and
qualifications specific to the work or task being performed, provided that, where appropriate,
qualifications and training are registered in terms of the South African Qualifications
Authority Act, 1995 (Act No. ).
2.3.5 Contractor: means a current or potential supplier, vendor, contractor, consultant or service
provider. A supplier may be a natural or legal person. Definition is per the 32-726 SHE
Requirements for the Eskom Commercial Process.
2.3.6 Contract custodian: means the person defined in a contract as the Eskom representative,
for example the project manager/end-user, that is, the person responsible for managing the
contract and ensuring that the works or services are executed in terms of the contract.
2.3.7 Construction work: means any work in connection with –
a) the construction, erection, alteration, renovation, repair, demolition or dismantling of or addition
to a building or any similar structure;
b) the construction, erection, maintenance, demolition or dismantling of any bridge, dam, canal,
road, railway, runway, sewer or water reticulation system, or any similar civil engineering structure;
or type of work.
2.3.8 Construction vehicle: means a vehicle used as a means of conveyance for transporting
persons or material or both such persons and material, as the case may be, both on and off
the construction site for the purpose of performing construction work.
2.3.9 Consultant: means a person providing professional advice.
2.3.10 Controlled disclosure: controlled disclosure to external parties (either enforced by law or
discretionary).
2.3.11 Design: in relation to any structure, includes drawings, calculations, design details and
specifications.
2.3.12 Designer: means –
a) a competent person who –
i. prepares a design;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
ii. checks and approves a design;
iii arranges for a person at work under his or her control to prepare a design, including an
employee of that person where she or he is the employer; or
iv designs temporary work, including its components;
b) an architect or engineer contributing to, or having overall responsibility for a design;
c) a building services engineer designing details for fixed plant;
d) a surveyor specifying articles or drawing up specifications;
e) a contractor carrying out design work as part of a design and building project; or
f) an interior designer, shop-fitter or landscape architect.
2.3.13 Duty of care to the environment: anyone who causes or has caused or may cause
significant pollution or degradation of the environment must take reasonable measures to
prevent such pollution or degradation from occurring, continuing or recurring. If such harm
to the environment is authorised by law or cannot reasonably be avoided or stopped, such
person must minimise and rectify such pollution or degradation of the environment.
2.3.14 Employee: means, subject to the provisions of subsection (2), any person who is employed
by or works for an employer and who receives or is entitled to receive any remuneration or
who works under the direction or supervision of an employer or any other person.
2.3.15 Employer: means, subject to the provisions of subsection (2), any person who employs or
provides work for any person and remunerates that person or expressly or tacitly
undertakes to remunerate him/her, but excludes a TES (ex labour broker) as defined in
section 1(1) of the Labour Relations Act 1956 (Act No. ).
2.3.16 Environment: means –
a) the land, water, and atmosphere of the earth;
b) micro-organisms and plant and animal life; and
c) any part or combination of (a) and (b) and the interrelationships among and between them,
and the physical, chemical, aesthetic and cultural properties and conditions of the foregoing
that influence human health and well-being.
2.3.17 Eskom requirements: mean the Eskom requirements flowing from directives, policies,
standards, procedures, specifications, work instructions, guidelines or manuals.
2.3.18 Fall protection plan: means a documented plan of all the risks relating to working from an
elevated position, considering the nature of the work undertaken, and setting out the
procedures and methods to be applied in order to eliminate the risk.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.3.19 Hazard: means a source of, or exposure to, danger.
2.3.20 Hazard identification: means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated with the type of
construction work being executed or to be executed.
2.3.21 Health and safety file: means a file or other record in permanent form, containing the
information required as contemplated in these regulations (the Construction Regulations).
2.3.22 Health and safety specification: means a document specification of all health and safety
requirements pertaining to associated works on a construction site, so as to ensure the
health and safety of persons.
2.3.23 Health and safety requirements: mean the comprehensive health and safety
requirements for a contract, project, site and scope of work. This specification is intended
to ensure the health and safety of persons, both workers and the public, and the duty of
care to the environment. The health and safety requirements must be specific to each
contract, project, site and scope of work.
2.3.24 Internal: means an Eskom department that performs work for another Eskom department.
2.3.25 Joint venture: means a strategic alliance between two or more parties to undertake
economic activity together. The parties agree to create a new entity (incorporated or
unincorporated) by each party’s contribution of equity, and they then share in the profits,
losses and control of the enterprise. The venture may be for one specific project only or a
continuing business relationship.
2.3.26 Life-Saving Rules: mean the set of Eskom safety rules that, if not adhered to, have the
potential to cause serious harm to people.
2.3.27 Maintenance: (maintenance management) means the schemes that can be based on a
number of techniques to focus on those parts which deteriorate and need to be maintained,
such as the following:
a) Preventive – planned maintenance which involves replacing parts and consumables or
making necessary adjustments at pre-set intervals, so that no hazards are created by
component deterioration or failure.
b) Condition-based –involves monitoring the condition of critical parts and carrying out
maintenance whenever necessary to prevent hazards which could otherwise occur.
c) Breakdown-based –the maintenance carried out when faults or failures have occurred. This
is acceptable if the failure does not present an immediate hazard and can be corrected
before the risk is increased.
2.3.28 Mandatary: includes an agent, a contractor, or an appointed contractor for work, but
without derogating from his/her status in his/her own right as an employer or user.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.3.29 Medical Certificate of Fitness: (OHS Act) means a certificate valid for one year, issued in
terms of the regulations by an occupational health practitioner who shall be registered with
the Health Professions Council of South Africa.
2.3.30 Medical surveillance: (OHS Act) means a planned programme of periodic examination
(which may include clinical examinations, biological monitoring or medical tests) of
employees by an occupational health practitioner or, in prescribed cases, by an
occupational medicine practitioner.
2.3.31 Method statement: (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards identified in any
risk assessment.
2.3.32 Mine
a) when used as a noun, means –
i. any borehole or excavation, in any tailings on or in the earth, including the portion of the
earth that is under the sea or other water, made for the purpose of searching for or winning
a mineral, whether it is being worked or not; or
ii. any other place where a mineral deposit is being exploited, including the mining area and
all buildings, structures, machinery, mine dumps, access roads or objects situated on or in
that area that are used or intended to be used in connection with searching, winning,
exploiting or processing of a mineral, or for health and safety purposes. But, if two or more
excavations, boreholes or places are being worked in conjunction with one another, they
are deemed to comprise one mine, unless the Chief Inspector of Mines notifies their
employer in writing that those excavations, boreholes or places comprise two or more
mines; or
iii. a works; and
(b) when used as a verb, the making of any excavation or borehole referred to in paragraph (a)(i),
or the exploitation of any mineral deposit in any other manner, for the purpose of winning a
mineral, including prospecting in connection with the winning of a mineral.
2.3.33 Organisation: may be defined as a group of individuals (large of small) which is co-
operating under the direction of executive leadership in the accomplishment of certain
common objects.
2.3.34 Project: means an activity or a group of activities which has a defined start and end date, a
defined scope and a defined sum of money allocated to complete the activities.
2.3.35 Project manager/leader: means the person who has the responsibility for the successful
planning and execution of a project. The project manager must satisfy the certification
requirements set by the South African Council for the Project and Construction
Management Professions. Note: the project manager is the duly authorised Eskom
representative who acts on Eskom’s behalf as the administrating officer for the purposes of
the contract. (The term “project manager” in the context of this procedure should be used in
its broader sense and should not be restricted to the designation of project manager in any
specific work environment.)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.3.36 Risk assessment: (OHS Act) means a programme to determine any risk associated with
any hazard at a construction site in order to identify the steps that have to be taken to
remove, reduce or control such hazard.
2.3.37 Service provider: means any private person or legal entity that provides any service(s) to
Eskom for compensation.
2.3.38 Subsidiary: means an enterprise controlled by another (called the parent) through the
ownership of greater than 50% of its voting stock.
2.3.39 Task: means a segment of work that requires a set of specific and distinct actions for its
completion.
2.3.40 Toolbox talks: where the team leader, after conducting pre-task planning, shares all the
tasks at hand and discusses task allocation, the identified risks and the control measures
with all his/her team members on site before commencing a specific task and documenting
the agreed strategy. (This shall be done to ensure a common understanding of the tasks,
risks and control measures required.)
2.3.41 The Act: (OHS Act) means the Occupational Health and Safety Act, 1993 (Act No. ), as amended, and the regulations made under it.
2.3.42 Visitor: means any person visiting a workplace with the knowledge of, or under the
supervision of, an employer or who is not providing a specific service to Eskom.
2.4 Abbreviations
Abbreviation Explanation
BU Business Unit
CE Chief Executive
COID Act Compensation for Occupational Injuries and Diseases Act, 1993 (Act No. )
HIRA Hazard Identification and Risk Assessment
MHS Act Mine Health and Safety Act, 1996 (Act No. )
NEMA National Environmental Management Act, 1998 (Act No. )
OHS Act Occupational Health and Safety Act, 1993 (Act No. )
OHS Occupational Health and Safety
H&S Health and Safety
ORHVS Operating Regulations for High Voltage Systems
SACPCMP South African Council for the Project and Construction Management Professions
SHE Safety, health, and environment
NRTA National Road Traffic Act, 1996 (Act No. )
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.5 Roles and responsibilities
The Group Chief Executive (GCE) of Eskom, as the employer in terms of the OHS Act and in
general terms, has the overall responsibility and liability for the health and safety of all persons
involved at all Eskom sites. Within the framework of the OHS Act, the GCE may discharge these
duties as far as is reasonably practicable. These duties may be delegated to section 16(2)
appointees and to responsible managers in the various Eskom divisions.
Eskom and its subsidiaries must take all reasonably practicable steps to prevent constructionrelated incidents and harm to any person, including members of the public, and damage to
property and the environment.
The contractor, being an employer in his/her own right, is still required to abide by Eskom’s SHE
requirements, as well as the relevant safety, health and environmental legislation.
The appointed managers are responsible for health, safety and the environment on sites under
their control.
2.5.1 Project management
Project management is the discipline of planning, organising, motivating and controlling resources
to achieve specific goals. A project is a temporary endeavour with a defined beginning and end
(usually time-constrained, and often constrained by funding or deliverables), undertaken to achieve
unique goals and objectives, typically to bring about beneficial change or added value. The
temporary nature of projects contrasts with business as usual (or operations), which are repetitive,
permanent or semi-permanent functional activities to produce products or services. In practice, the
management of these two systems is often quite different, and as such requires the development
of distinct technical skills and management strategies.
The primary challenge of project management is to achieve all of the project goals and objectives
while honouring the preconceived constraints. The primary constraints are scope, time, quality and
budget. The secondary and more ambitious challenge is to optimise the allocation of the necessary
inputs and integrate them to meet pre-defined objectives.
2.5.2 Project managers
Project managers manage the activities and resources allocated to projects in a cohesive, efficient
manner and also administer and execute engineering and technology projects (including control
plant) within cost, quality and time.
Eskom: Project health and safety manager/practitioner
The responsibility of the health and safety manager/practitioner is to provide assurance, as well as
to advise, assist and support the project manager, supervisor and project engineer with managing
the health and safety issues on the project, which include ensuring proper co-ordination among the
various contractors. The health and safety manager/practitioner shall also be responsible for
assisting with the development of site- and project-specific health and safety specifications and for
ensuring that health and safety specifications are issued with the enquiry documents and that the
contractor’s health and safety plans are submitted, evaluated and approved. He/she shall be
responsible for auditing these plans and ensuring they comply with legal requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.5.3 Contractor health and safety officer
Where appointed, a contractor’s health and safety officer shall be competent to perform the
required duties contemplated in the OHS Act and contained in the project requirements.
2.5.4 MHS Act
In terms of the MHS Act, the appointment of a health and safety officer is required for the duration
of the contracted work. The contractor’s health and safety officer shall assist and support the
contractor’s construction manager to ensure that the organisation’s health and safety
responsibilities are fulfilled and that there is compliance with the health and safety specifications
and the health and safety plan.
In determining the number of appointed competent health and safety officers, the nature and scope
of work being performed shall be taken into consideration.
All contractor health and safety officers must liaise closely with Eskom’s OHS departments for the
Divisions/BUs in the area where they are working.
2.5.5 OHS Act
In terms of Construction Regulation 8(5) a contractor must, after consultation with the client and
having considered the size of the project, the degree of danger likely to be encountered or the
accumulation of hazards or risks on the site, appoint in writing a full-time construction health and
safety officer to assist with controlling the health and safety-related matters on the site: provided
that, where the question arises as to whether a construction health and safety officer is necessary,
the inspector makes thedecision.
The appointed safety officer must have the necessary competencies and resources to enable
him/her to carry out his/her tasks efficiently, and must be registered with a statutory body approved
by the Chief Inspector.
The contractor’s health and safety officer shall assist with the control of all safety-related matters at
the sites, and give inputs at the design stage.
In determining the number of appointed competent health and safety officers, the nature and scope
of the work being performed shall be taken into consideration.
All contractor health and safety officers must maintain constant liaison with Eskom’s divisional
health and safety departments and co-operate with the health and safety managers/practitioners
responsible for providing a health and safety service.
2.5.6 Contractors
Eskom, as the client, has duties to the contractor, and the contractor, in turn, has duties to all its
appointed contractors. It must be noted that the contractor remains accountable and responsible
for his/her appointed contractors.
The relationship between the contractor and its appointed contractors shall be governed by the
contractual arrangements entered into between them.
Contractors shall carry out the duties contemplated in sections 8 and 9, and the relevant
regulations and duties listed in regulation 7 of the Construction Regulations of the OHS Act.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
All Eskom contractors have to ensure their compliance with the legislative requirements and any
further requirements contained in the contractual agreements they enter into with Eskom.
Where subsidiaries of Eskom, such as Rotek Industries, serve in the capacity of an Eskom
contractor, they must comply with any further contractual requirements.
Construction supervisors shall be appointed in writing for the duration of the construction project,
with the primary responsibility of supervising the construction work. Where required, contractors
may appoint additional employees as assistant construction supervisors. Persons so appointed
must be competent and have extensive knowledge of the type of work they are required to
supervise.
Assistant construction supervisors have the same responsibilities as construction supervisors.
This appointment does not relieve the construction supervisors of any of their accountabilities
and/or responsibilities.
2.5.7 Employees
Section 14 of the OHS Act has reference; contractor employees are responsible for their own
health and safety, as well as the health and safety of their colleagues while at work. The
client/employer/contract manager cannot be expected to be totally responsible if any of their
employees do not comply with legislative and Eskom health and safety requirements. Employees
will be held jointly responsible where situations so require. In their own interests, contractor
employees must be aware of the responsibilities of their contractor management.
2.5.8 Construction professional registration
The legislation and the SACPCMP’s publications direct that all persons assuming responsibility for
construction project management, construction management and construction health and safety
should be registered as professionals in the appropriate category with the SACPCMP in order to
comply with the legal and statutory requirements in South Africa.
2.5.9 Joint ventures
Where the work is to be managed jointly with a joint venture partner, the requirements imposed on
the contractors shall also apply to the joint venture partner, therefore each contractor shall be
responsible and accountable for its own organisation’s health and safety. All organisations shall be
signatories to the required section 37(2) agreement of the OHS Act.
Where a joint venture operates as separate entities, each partner must fulfil the SHE requirements.
If the joint venture operates as a single entity which has been registered and through mutual
agreement, the single business entity must fulfil all the SHE requirements.
Each company shall be liable for its own contraventions and could, therefore, be prosecuted in its
own right without reference to any of the other companies involved.
2.6 Process for monitoring
This document will be reviewed five-yearly or if required.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.7 Related/Supporting documents
Not applicable.
2.8 Statutory/Non-Statutory appointment
All statutory appointments shall comply with legislative requirements and any Eskom non-statutory
appointments must be made using Eskom Standard 32-296: Integrated SHE Organisation, Roles
and Responsibilities, and Statutory Appointments.
Where BUs require contractors to make additional non-statutory appointments, these are permitted
(in terms of the BU’s Legal Appointments Manual, where compiled). All appointments/copies made
by the contractor shall be included in the health and safety file, and be available to the client/agent.
Where construction work is conducted on sites governed by mining legislation, the appropriate
equivalent appointments and assignments shall be made. Depending on the nature of the
contract, the assignations shall be expanded.
3.1 Material and equipment
Material and equipment used or purchased must conform to the health and safety requirements of
the manufacturer and legislative requirements. Where reclaimed material is authorised to be used,
it shall meet the manufacturer’s safety requirements, as if it were new.
Cognisance of the health and safety factor during work: the health and safety of such
material/equipment shall be factored in, to ensure that it remains safe for use by others at a time
after the completion of the contract. Eskom and/or the designer/agent/client shall determine the
acceptability of workmanship.
3.2 Risk assessments
In terms of section 8(2)(d) of the OHS Act and section 9 of the CR for an employer, it is a legal
requirement to carry out risk assessments to establish what hazards to the health and safety of
persons are attached to any work which is performed, any article or substance which is produced,
processed, used, handled, stored or transported, and any plant or machinery which is used in
his/her business and he/she shall, as far as is reasonably practicable, further establish what
precautionary measures should be taken with respect to such work, article, substance, plant or
machinery in order to protect the health and safety of persons and shall provide the necessary
means to take such precautionary measures.
A risk assessment is defined as an identification of the hazards present in an organisation and an
estimate of the extent of the risks involved, taking into account whatever precautions are already
being taken.
Risk assessment is essentially a three-stage process to –
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
Risk assessments must be kept updated. This means that significant changes to a process or
activity, or any new process, activity or operation, should be subjected to a risk assessment and, if
new hazards come to light during the work process, these should also be subjected to risk
assessments.
Contractors/suppliers conducting high-risk and critical work/tasks/activities must have written safe
work procedures for the work/tasks/activities to be performed. This shall also apply to the
contractor’s contractor.
Risk assessments for long-term processes should be periodically reviewed and updated. Method
statements or written safe work procedures are an effective method for recording information and
keeping a record of the way that jobs or tasks must be performed.
Before work commences, risk assessments must be conducted for every job or task to allow
supervisors and employees to assess any inherent risks which might have been overlooked during
the initial risk assessment or any changes which might have occurred in a period of absence, in
particular if a job or task is extended over a day or halted owing to inclement weather.
3.3 Record keeping
Record keeping is a system where relevant documentation is kept for auditing or inspection
purposes and may be referenced to at any stage during or after a project.
All records pertaining to the project shall be kept in terms of legislative and Eskom requirements.
The SHE files shall be kept for the duration of the project. They shall be open to audit or inspection
by any party who is entitled to audit or inspect the project. SHE files should be handed over by the
contractor to the client or asset owners for archiving on completion of the project.
3.4 Disciplinary process
A disciplinary process is a structured organisational procedure to deal with employees who have
transgressed the organisation’s rules or requirements. This is a method of changing behaviour. It is
essential for an organisation to have such a process.
3.5 Life-Saving Rules
Life-Saving Rules are a set of Eskom safety rules which, if not adhered to, have the potential to
cause serious harm to people.
describe, i.e. if a particular set of behaviours or actions have a very high probability of
causing disabilities or fatalities when performed.
These rules are created to enforce “zero tolerance” of serious at-risk behaviours.
Violation of these rules will be viewed in a serious light and the consequences will be dealt with in
accordance with the respective disciplinary processes.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
The Life-Saving Rules apply to all Eskom employees, agents and contractors. Visitors to Eskom
should also respect and adhere to these rules as applicable and could be instructed to leave the
Eskom premises with immediate effect should they refuse to do so.
3.6 Health and safety behaviour observations
The objective of behaviour safety observations is to assess and address the actual safe and
unsafe behaviour of people in the workplace, as well as the workplace conditions that are caused
by the actions or omissions of employees and contractors.
3.7 Incident investigation
All incidents shall be investigated in terms of OHS Act General Administrative Regulations 8 and 9,
using Eskom Procedure 32-95 as a reference, and where injuries as contemplated in sections 24
and 25 have been sustained, be reported to the Department of Labour.
Contractors shall use the standard General Administrative Regulation Annexure 1 “Recording of an
Incident” form as a minimum for all incident investigation reports.
The objective of incident investigation, not only being a legal requirement, is to establish why and
how the incident occurred; and to find out the real causes of the incident and to decide on the
precautionary measures that are required to address the causes to prevent any recurrences of the
same or similar incidents.
3.8 Training
Appropriate training must be given to employees so that they are competent to perform the tasks
assigned to and expected of them. Training also gives an employee an opportunity to develop
additional skills which will benefit any organisation.
The contractor shall have a training matrix for its organisation.
3.8.1 Induction training
All contractors, their employees and visitors are required to attend formal induction training
courses. Such training shall be conducted by contractor management, construction safety officers
or construction supervisors.
Induction training is an opportunity to inform persons of the organisation’s health and safety
requirements, not only in the organisation’s offices but also at the workplaces.
3.8.2 Site-specific awareness training
Over and above induction training, contractors are required to ensure, before an employee
commences work on the project, that the supervisor in control with responsibility for the employee
has informed the employee of his/her scope of authority for that site/workplace.
3.9 Health and safety representative
The requirements of sections 17 and 18 of the OHS Act shall be complied with. Where contractors
perform operational work, they shall appoint health and safety representatives for each workplace.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
Contractor managers shall permit their appointed health and safety representatives to carry out
their functions as required by legislation and support them in performing these functions.
The client may require a contractor safety representative to be appointed and trained on the basis
of the nature and risk level of work in terms of sections 17 and 18 of the OHS Act.
3.10 Health and safety communication
Communication is a two-way tool to enhance awareness and knowledge with the main aim of
changing behaviour or influencing decision-making. Communication is a process which allows
information to be shared and exchanged, using different methods that sometimes require
feedback.
3.10.1 SHE Committees
Statutory SHE Committees shall be established in terms of sections 19 and 20 and General
Administrative Regulation 5 of the OHS Act and Eskom’s requirements.
SHE Committees are forums for discussing health and safety-related matters, with specifics such
as making recommendations to an employer on health and safety matters, incident investigations
and any other health and safety-related matters as such committees may prescribe.
Project managers shall include safety and health as a standing agenda item for all their project
meetings, and the minutes of these meetings must be available on site at all times.
NOTE: this project meeting does not replace or act as a substitute for the required SHE Committee
meeting.
3.10.2 Toolbox talks
Toolbox talks are short, targeted meetings and/or awareness sessions to inform and/or educate
employees about the hazards and risks they will be exposed to when they perform work. Use
toolbox talks to create awareness among the employees to recognise and avoid unsafe conditions.
Use toolbox talks to teach employees to correct or report health and safety hazards so that
management and other employees can take actions to correct them. Employees will learn to avoid
the potentially hazardous situations discussed during toolbox talks as well as become able to
identify hazards and correct those hazards prior to starting a task/job if there are hazards present.
Toolbox talks are an effective way of fulfilling one’s legal requirements.
3.10.3 General SHE communication
Constant communication with employees creates an interest and feeling of being part of the team.
Various methods could be in the form of, but not limited to –
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
Such methods are learning aids and also send a message or act as a reminder of a SHE topic
without having to hold specific forums or training sessions.
3.11 Contractor’s site facilities
Where required, contractors, unless otherwise specified in the contract or negotiated with Eskom to
use their facilities, must ensure that adequate facilities are provided for their employees on the
site/project.
When such facilities are provided, they must comply with the Facilities Regulations, SANS 10400
standard A to XA and CR 30.
3.12 Public safety
Eskom upholds the rights of members of the public and has an awareness and educational
programme to protect the public against the risks that may arise out of, and in the course of,
Eskom’s activities. Similarly, contractors shall demonstrate the same respect for the public.
Contractors shall include in their SHE plan how they intend controlling or safeguarding any
members of the public against their activities during the project, without damaging Eskom’s name
and reputation.
3.13 Emergency preparedness
Emergency situations threaten, or may cause harm to, the lives of employees and members of the
public, may cause damage to property, infrastructure and equipment as well as degradation to the
environment, and may disrupt production and the rendering of services.
The contractor shall have an emergency preparedness plan that will address all the identified risks
of the organisation so as to achieve a quick response and recovery and return the situation to
normal in the shortest possible time and the most cost-effective way.
3.13.1 Fire safety
Fire safety is an integral part of the general safety and protection of an organisation, its employees
and members of the public from the effects of fire, heat and smoke. As a minimum, this is ensured
by complying with and fulfilling the legislative and policy requirements.
Fire safety requirements are covered in the Construction Regulations and the National Building
Regulations, SANS 10400 (T regulations).
3.13.2 First-aid planning and emergency care
Every person at a workplace should be given appropriate and prompt medical treatment or
assistance.
In the event of an incident and to receive post-incident rehabilitation, organisations are required to
meet the first-aid requirements of General Safety Regulation 3:
“An employer shall take all reasonable steps that are necessary under the circumstances, to
ensure that persons at work receive prompt first aid treatment in the case of injury or emergency.”
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
Eskom has established a contract with Netcare 911 for all its employees, contractors and their
employees for emergency medical assistance while on duty anywhere in South Africa. The
telephone number is 086 1237 566 (0861 2ESKOM).
3.13.3 Emergency escape routes
The SANS 10400 T regulations provide that escape routes have to be incorporated in buildings.
Far too often, when there are fires inside a building, employees die or are injured because they
were unable to evacuate the burning building. This is attributed to there being no escape routes
and/or, if there were such routes in the building, egress was restricted because the routes were
being used as storage areas.
3.14 Occupational health and hygiene
3.14.1 Medicals
Medical surveillance is based on the occupational risk exposure of employees. It is a statutory
requirement in terms of the Occupational Health and Safety Act, 1993 (Act No. ) and is
an essential component of an Occupational Health and Safety programme.
The purpose of medical surveillance is to comply with statutory requirements to determine a
person’s fitness for duty by assessing whether or not the prospective candidate or employee is
physically/mentally/psychologically fit and able to fulfil the inherent requirements of the prospective
or current job without any ill effects or limitations, and to provide a baseline health status against
which future changes can be measured. Job specifications are required for each individual person
so that job-specific fitness can be measured.
The contractor shall have a medical surveillance programme.
3.14.2 Occupational hygiene
Occupational hygiene is the identification, evaluation and control of those environmental factors,
arising in or from the workplace, that may cause illness, injury or discomfort to the employees or
the surrounding communities.
Occupational hygiene stressors include chemical, physical, biological and ergonomic stressors.
Where there is a possibility of occupational hygiene stressors (for example noise, dust,
illumination, heat and cold stressors, ergonomics, vibration (hand, arm and whole body, etc.),
health risk assessments must be carried out to determine whether there is any possible worker
exposure. Records of all these assessments should be documented and kept up to date.
Contractors shall monitor the extent to which their employees are exposed to the occupational
hygiene stressors. These assessments should be performed by a SANAS-accredited and DOLapproved inspection authority.
3.14.3 Protection against thermal conditions
The requirements listed in the OHS Act Environmental Regulations for Workplaces, Regulation 2,
are precise. The human body will only survive if its core temperature does not exceed the
medically accepted limits of the WBGT Index of 30 for heat, and dry bulb (DB) temperature of not
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
less than 6 oC for cold. Any exposure beyond these limits can lead to organ damage/failure and
death.
3.14.4 Asbestos control management
The exposure of employees to asbestos-containing materials is a serious health risk. The
management and disposal of asbestos-containing materials also pose significant environmental
impacts and consequent legal and financial risks. Where the handling of asbestos and/or asbestosrelated products is required, this shall only be carried out in terms of the Asbestos Regulations of
the OHS Act.
3.14.5 Noise
Noise and vibration are both fluctuations in the pressure of air (or other media) which affect the
human body. Vibrations that are detected by the human ear are classified as sound. Noise is an
unwanted sound.
Where the value of the 8-hour rating level is 85 dBA, above which hearing impairment is likely to
result, the contractor shall have an effective hearing conservation programme.
3.15 Auditing
To maintain an organisation’s efficiency and statutory observance, regular audits must be
conducted throughout the organisation.
Internal auditing is an independent, objective assurance and consulting activity designed to add
value and improve an organisation's operations. It helps an organisation accomplish its objectives
by bringing a systematic, disciplined approach to evaluating and improving the effectiveness of risk
management, control and governance processes.
3.16 Inspections
Regular inspections on health and safety matters highlight problem areas and enable action to be
taken before an incident occurs. Safety inspections can be either reactive or proactive.
Reactive inspections are those that occur after the fact, i.e. the incident has already occurred, or is
a response to reports which highlight that something is not according to plan.
The proactive approach endeavours to identify, evaluate and control hazards and risks before they
develop to the stage of causing an incident.
Safety inspections are the common method employed to identify potential hazards before they
manifest, where the work area is inspected for any hazards and these are recorded, and after the
inspection the hazards are assessed and a plan of action is formulated to rectify such hazards.
A surprise inspection tends to have different results from those of an announced inspection.
Leaders wanting to know how others in their organisation perform can drop in without warning, to
see directly what happens. If an inspection is announced in advance, it can give people a chance
to cover up or to fix mistakes. This could lead to distorted and inaccurate findings. This is why a
surprise inspection gives inspectors a better picture of the typical state of the inspected object or
process than an announced inspection.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.17 Transport/Mobile plant equipment
The use of vehicles accounts for a large number of injuries and fatalities due to motor vehicle
accidents in South Africa. Construction sites account for a number of construction-related
accidents involving construction vehicles and mobile equipment.
The National Road Traffic Act regulates vehicle usage, the roadworthiness of vehicles and the
competency of vehicle drivers.
There is a misconception about carrying passengers in the back of vehicles. The Act does not
permit passengers to be transported in the back of light delivery vehicles. Carrying passengers at
the back of trucks is only permitted if such a truck is fitted by the manufacturer or manufacturer’s
appointed fitment centre with a specifically designed crew cab and appropriate seating and seat
belts for each passenger.
Eskom does not approve the conveying of passengers in the back of vehicles designed to carry
equipment/loads (any truck/trailer), irrespective of whether or not crew cabs are fitted and seating
with four-point seat belts has been fitted.
Construction vehicles and mobile equipment, when driven or towed on a public road, fall under the
requirements of the Act.
All construction vehicles and equipment shall meet the legislative requirements pertaining to the
OHS Act Construction Regulation 23, NRTA, the Mine Health and Safety Act and the National
Environmental Act.
3.18 Management of hazardous materials/chemicals
The handling and use of hazardous materials have a major impact on the health and wellbeing of
all persons and the environment. Various requirements for the handling and storage of hazardous
materials and chemicals are listed in the OHS Act.
When purchasing hazardous materials and/or chemicals, buying departments can fulfil the
legislative requirements by ensuring that purchases are made only from suppliers and
manufacturers that comply with the requirements of section 10 (General duties of manufacturers
and others regarding articles and substances for use at work) and section 22 (Sale of certain
articles prohibited) of the OHS Act.
Any hazardous materials and chemicals, including gases, must be stored in compliance with the
legislative requirements, local municipal by-laws and SANS building standards.
3.19 Machinery, tools and equipment
Machinery is considered as any article or a combination of articles assembled, arranged or
connected and which is used or intended to be used for converting any form of energy to perform
work, or which is used, or intended to be used, whether incidental thereto or not, for developing,
receiving, storing, containing, conforming, transmitting, transferring or controlling any form of
energy.
The requirements for the use of machinery are covered in the various regulations of the
Occupational Health and Safety Act.
There are strict requirements regarding the supervision and use of machinery. Since incorrectly
used machinery or using unsafe machinery can cause serious harm and/or damage, it is important
to ensure that all mechanical equipment is safeguarded in order to protect the health and safety of
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
persons who may be exposed to such mechanical equipment, and also to ensure that competent
persons operate the machinery.
3.20 Explosive-powered tools
An explosive-powered tool means a tool that is activated by an explosive cartridge and/or air or
gas charge, and that is used for driving bolts, nails and similar objects for the purpose of providing
fixing.
Because such a tool fastening system operates on an explosive force, it is considered a lethal
operating tool, especially when the manufacturer’s and legal requirements are not adhered to, in
particular when being operated. These types of tools operate like a loaded gun, so they must be
treated with extreme caution and be operated by specially trained employees.
The legal operating requirements for explosive-powered tools are set out in the Construction
Regulations.
3.21 Lifting equipment
Owing to its versatility, lifting equipment is often abused and/or misused. This nearly always results
in damage to and/or the failure of equipment, leading to incidents and serious injuries.
All types of lifting equipment are governed by regulation 18 of the OHS Act: Driven Machinery
Regulations, as follows:
includes all the lifting machine codes as listed in the regulations and the national code of
practice for the training providers of lifting machine operators).
When working in close proximity (with tower cranes) to power lines, the contractor shall apply for a
permit. See the Eskom Plant Safety Regulations and/or Operating Regulations for High-Voltage
Systems and Electrical Machinery Regulations 19(4) and 19(5) of the OHS Act.
3.22 Boilers, pressurised systems and vessels under pressure
The Pressure Equipment Regulations cover various types of equipment, from boilers, fixed-plant
compressors, mobile compressors and pressure vessels, to fire extinguishers and all piping
associated with such equipment.
There are strict requirements in terms of the Pressure Equipment Regulations. A poorly maintained
and/or operated piece of equipment can have catastrophic consequences.
3.23 Working at heights
Where there is a risk that a fall may cause personal injury, measures should be taken to prevent a
fall and injury. Falls occur at any level. The duty is to prevent falls. It is worth noting that there are
almost as many low-fall injuries as high-fall injuries. Where it is reasonably practicable to take
precautions to prevent falls, such precautions should be taken.
In an effort to prevent falls, including falling objects and/or materials, fall protection plans and
rescue plans must be compiled and implemented. The Occupational Health and Safety Act places
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
duties on employers, employees and anyone who controls the way that work at height is
undertaken.
Where possible, efforts should be made to provide a safe working platform for employees before
resorting to the use of a fall arrest system. Where this is not practicable, suitable fall arrest
equipment shall be provided.
All equipment used for working at height must conform to the OHS Act and the relevant SANS
standards.
A working platform can be virtually any surface from which work is carried out, such as a roof, floor,
a platform on a scaffold, a mobile elevated work platform, the treads of a stepladder, climbing
irons, suspended platforms or a boatswain’s chair.
3.23.1 Eskom’s life-saving rule “Hook up at Height”
When working at height, you must take suitable and sufficient measures to prevent, as far as is
reasonably practicable, any person from falling a distance liable to cause personal injury. Where a
fall from any height could result in harm, an effective means of fall prevention has to be put in
place. You are required to take practicable steps to ensure your safety and the safety of others, as
well as not knowingly exposing yourself or others to harm.
3.23.2 Floor and wall openings
Falls through openings in walls, floors, roadways, etc. account for a number of fatalities and
serious injuries where such openings are not protected. Floor and wall openings must be included
in the fall protection plan.
When including fall arrest equipment, note must be taken of the amount of pedestrian and
vehicular traffic and that the nature of equipment specified can prevent its dislodgement or
unauthorised removal, in other words, barricading must be adequate.
3.24 Excavations and tunnelling
3.24.1 Excavations
Almost all construction work involves some form of excavation, for foundations, drains, sewers, etc.
These can vary greatly in depth and may be only a few centimetres deep or very deep and very
dangerous.
A relatively small collapse might involve about a cubic metre of soil, but a cubic metre of soil
weighs over a tonne. A person at the bottom of a trench who is buried under this volume of
material would be unable to breathe, due to the pressure on the chest, and could quickly suffocate
and die.
An excavation may also be a “confined space” in the meaning of the Work in Confined Spaces
Regulations, and additional precautions will have to be taken.
The legislative requirements for making excavations are contained in Construction Regulation 13
of the OHS Act.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.24.2 Tunnelling
Owing to environmental and seismic factors, no ground material can be regarded as stable when
excavating or tunnelling is taking place or work is being done in them. Ground collapse is
extremely hazardous, especially where people are working inside a tunnel, and usually results in
serious injuries and fatalities.
Any contractor performing tunnelling activities shall comply with Construction Regulation 15, which
then refers to the Tunnelling Regulations published under the Mine Health and Safety Act, 1996
(Act No. ), as amended, and regulation 15 of the Construction Regulations.
3.25 Confined spaces
The belief that any confined space is a safe place as far as asphyxiation is concerned, because of
ignorance about the air quality inside such space and the risk factors, is dangerous. Most
asphyxiates are colourless and odourless. Sometimes the odour asphyxiate is considered a
nuisance and temporary. This makes entering into a confined space an extremely high risk. If
testing is not performed, irrespective of the size of the space or the duration of entry, then
employees’ health (in the short or long term) will be at risk.
The requirements listed in General Safety Regulation 5 shall be adhered to.
3.26 Danger of engulfment
No person shall be permitted to work in any situation where there is a danger of material, etc.
being discharged, unless that person is issued with an appropriate safety belt/harness fitted with a
rope, where at least one other person who has been trained in rescue is available and observing.
If there is a possibility of gas or other fumes being emitted from the material in question, adequate
precautions shall be taken regarding air quality.
3.27 Barricading
Falls through openings in walls, floors or excavations, or approaching dangerous equipment and
operations, continue to pose a threat to persons.
Stringent precautions have to be taken to protect persons against any form of injury through
entering unauthorised entrances and/or areas and/or to prevent such persons from approaching
dangerous and/or operating equipment. These precautions are taken by erecting substantial
barriers, fencing or covers to a degree that prevents unauthorised removal.
3.28 Explosives
The handling and use of explosives for any form of construction work are controlled by the
requirements of the Explosives Regulations of the OHS Act, the Mine, Health and Safety Act, 1996
(Act No. ) and the Explosives Act, 1956 (Act No. ).
Requirements for the transporting and storage of explosives must be in accordance with
Explosives Regulation 13(4) of the OHS Act and SANS 100228 Code of Practice for the
Identification and Classification of Dangerous Substances and Goods for Transport (published by
the South African Bureau of Standards).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
Explosives in the wrong hands and used for the wrong purpose can have devastating
consequences.
3.29 Demolition work
The demolition of structures is an extremely hazardous task and can only be performed by
competent persons.
All demolition work must be planned, and all role players must be involved in the planning; this
includes making thorough risk assessments.
If explosives have to be used, the requirements in terms of the Explosives Regulations shall be
adhered to.
Where structures (power lines, poles, lattice towers, etc.) have to be demolished, this shall be done
in terms of Eskom requirements (task manuals).
All demolition work shall be carried out in accordance with Construction Regulation 14 Demolition
Work.
3.30 Permit to work
A permit-to-work system is a formal written system used to control certain types of work which are
potentially hazardous.
A permit-to-work is a document which specifies the work to be done and the precautions to be
taken.
Permits-to-work are an essential part of safe systems of work for many maintenance activities.
They allow work to start only after safe procedures have been defined, and provide a clear record
that all foreseeable hazards have been considered.
A permit is needed when maintenance work can only be carried out if normal safeguards are
dropped or when the work introduces new hazards. Examples are entry into vessels, hot work and
pipeline breaking.
If the type of work requires working with Eskom power systems/networks (low voltage, medium
voltage or high voltage), then the appropriate permits will be required.
3.31 Radiography, ultrasonic or non-destructive testing (NDT)
During the construction phase and maintenance phase, certain equipment and/or materials require
some form of examination to ascertain that the material used is free of any kind of defect or that
welded joints in piping do not leak. Where testing is performed, all actions for that specific type of
testing must be taken in accordance with the relevant requirements.
3.32 Work in close proximity to/on public roads
Working next to or in close proximity to any public road has inherent dangers, not only to the
persons carrying out the work but also to the motorists, where the persons working do not take
care of their own safety and ignore any rules and regulations. It is imperative to comply with all the
requirements of the National Road Traffic Act when work is performed. For additional worker
safety, organisations should enhance the national requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.33 Work stoppage
Section 8(2)(f) and Construction Regulation 5(q) of the OHS Act have clear requirements for not
permitting an employee to work unless adequate precautionary measures are taken and for
stopping any work which is not in accordance with health and safety plans.
Any person may stop any activity where there is an unsafe act or unsafe condition that poses or
may pose an imminent threat to the health and safety of an individual or of creating a risk of
degrading the environment. This includes any unauthorised work or service performed by, or
legally or contractually non-compliant acts or omissions by, any contractor contracted to work at
that site.
Work stoppages which are initiated because of SHE concerns will be handled in terms of the
Eskom standard SHE Requirements for the Eskom Commercial Process (32-726).
Where stoppages are carried out, the required non-conformance report shall be raised.
3.34 Substance abuse
Alcohol and substance abuse poses a significant threat to any business, more so in industrial
incidents and when driving vehicles. Eskom is therefore entitled to take reasonable steps to ensure
that intoxicated persons are identified and prevented from entering Eskom’s premises, or working
on any of Eskom’s equipment.
General Safety Regulation 2A is clear on the legal stance regarding intoxication.
Persons are not permitted to enter or remain on or at a workplace while under the influence of
either or both substances and are not permitted to be under the influence of or consume
intoxicating substances while at/in the workplace. There is a provision regarding the taking of
medication.
The permissible blood level of alcohol and/or drugs is 0%.
3.35 Statistical reporting
There is a legal requirement in terms of the Occupational Health and Safety Act, 1993 (Act No. ) (General Administrative Regulations) that certain serious incidents shall be reported to the
Department of Labour within a specified time.
Measuring performance also allows us to entrench a positive safety culture and benchmark against
world-class systems.
The primary purpose of measuring health and safety performance is to provide information about
the progress and current status of the strategies, processes and activities used by Eskom to
control risks to health and safety.
Suppliers are required to report to the Eskom contract custodians and Eskom SHE staff, the
monthly OHS statistics which shall include the following as a minimum:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
Measurement information sustains the operation and development of the health and safety
management system, and the control of risk, by –
This report will also enable the organisation to reflect on the impact of the implemented
improvement strategies, namely a decrease or an increase in the number of incidents.
3.35.1 From a contractor point of view
There are regulatory requirements in the Construction Regulations which place a strong emphasis
on the relationship between and accountability from the client’s and contractor’s point of view. The
contractor, which is an employer in its own right, does not release Eskom from fundamental
responsibilities; therefore Eskom will have an interest in the contractor’s activities.
“We can't manage what we can't measure.”
“What is measured can be monitored and improved.”
3.36 Housekeeping
Good housekeeping has important functions, which benefit not only the worker but also the
employer:
superfluous material.
of refuse bins, store areas comply with good storage practices and stacking is done in
accordance with accepted stacking practices.
Access to emergency and/or safety equipment will be unimpeded.
Housekeeping means “A Place for Everything and Everything in Its Place”.
A clean and tidy workplace produces a clean and safe worker.
Prompt disposal of waste materials, scrap and rubbish is essential to prevent unnecessary storage.
3.37 Workplace signage and colour coding
The purpose of symbolic safety signs is to convey a message without the use of a specific
language. In this way, instant recognition takes place or the employee can receive a message,
order or warning.
Caution and care have to be taken when positioning mandatory signage. Where these signs
“indicate” a requirement, this means that it shall be done, irrespective of whether the activity is
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
present or the equipment is a requirement. For example, if the sign indicates that hearing
protection is required, which is now no longer needed although the sign is still in place, hearing
protection shall be worn.
All signs and notices shall conform to the requirements of SANS 1186 in terms of standard signs,
safety colours, geometric forms and dimensions.
In terms of identification regarding colour marking, ensure that the colours used match the
appropriate colours of SANS 10140 and 1091.
3.38 Personal protective equipment (PPE)
Personal protective equipment may be described as clothing and/or equipment used in the
workplace to protect the worker from risks and hazards, and includes but is not limited to
equipment and clothing worn on the body as well as equipment used to determine, measure or
indicate danger. The objective of protective clothing is to prevent exposure or injury to any body
parts exposed to operations.
In the interests of the effective protection of the worker, it is essential for the quality and
effectiveness of the items to be of a high standard.
It is imperative to realise that PPE, like any other form of protection, does not eliminate danger. It
simply serves as a screen between the person and the danger lurking in the machine or process.
In most instances, the PPE can only limit to a greater or lesser extent the negative effect of danger
to the human body. Employees must be trained on the limitations of PPE and on how to fit PEE
correctly.
General Safety Regulation 2 of the OHS Act provides for employers to make the workplace safe
and where required to provide appropriate PPE.
3.39 Safety, Health and Environment (SHE) Specification
NOTE: this paragraph is included for information sharing only. The guideline for the compilation of
SHE specifications is contained in the Eskom document 32-524 “Developing a Construction Safety,
Health, and Environmental Specification”.
As a norm, Eskom provides SHE project/service specifications for all types of contracts awarded.
Minimum requirements for SHE specifications must be specific to the task, project and site. The
various project tasks have to be defined, the associated hazards identified, and the associated
risks listed.
SHE specifications provide a basis of requirements for contractors to compile their project-specific
SHE plans.
By drawing up SHE specifications, the client has endeavoured to address the identified critical
factors relating to health and safety issues in order to assist the contractor to provide adequately
for the health and safety of employees on site. Should additional risks be identified later by Eskom
or its agents/clients, these will be included in the contract works information and/or relayed at the
clarification or negotiation meeting.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.40 Safety, Health and Environment (SHE) Plan
A health and safety plan is a documented plan that addresses the hazards identified, and includes
safe work procedures to mitigate, reduce or control the hazards identified. It is specific to each
project undertaken and site where work is done, is compiled by the contractor and appointed
contractor, and must be approved by the client/agent prior to the commencement of any activities
on a project. The contractor and the client/agent must both be signatories to the health and safety
plan once it has been negotiated, agreed upon and accepted. This plan has to be regularly
updated to take account of any changes in project scope and unanticipated conditions.
The health and safety plan must cover all aspects of the health and safety procedures to be
applied by all contractors for the duration of the contract
Where any H&S issues have been omitted in the specification, and the contractor is aware of
these, the omitted issues must be documented in the plan, and the client/agent must be advised of
the omission.
Eskom will evaluate each contractor for its health and safety plan. A health and safety plan will be
accepted and signed by an Eskom SHE functionary, and approved and signed by the contract
custodian. The main contractor is required to evaluate its appointed contractors and proof of
compliance shall be included in the main contractor’s safety file. The contractor shall not be
allowed to commence work on site until the health and safety file has been accepted and
approved.
3.41 Safety, Health and Environment (SHE) File
An SHE file means a file or other record in permanent form, containing the information about the
health and safety management system for the project and the site during the project, and all
information relating to the post-project phase after handover to the client.
All Eskom contractors and their appointed contractors are required to keep a SHE file on every
project worksite. If there is more than one worksite per specific project and scope of work, a file for
a particular site and scope of work shall be kept at that site. Contractors may keep additional files
at their head office as additional records. The SHE file shall be maintained by all the contractors
on their construction sites and shall be available on request for audit and inspection purposes.
The main contractor is responsible for ensuring that its contractor(s) maintain a SHE file and
adhere to the SHE plans at all times during the duration of their appointment. However, this does
not take away the authority from Eskom staff members to regularly inspect and audit their
contractor’s SHE file.
3.42 Hours of work
The Basic Conditions of Employment Act, 1997 (Act No. ), stipulates the permissible
working hours for individuals to perform their duties optimally.
Staff consistently working excessive hours of overtime risk their health and safety and that of their
colleagues due to fatigue.
Fatigue can have deadly consequences, especially in environments where a loss of alertness can
threaten the health and safety of the employee or others.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Compliance Requirements
Source: 32-136 Contractor Health and Safety Requirements.pdf (unknown)Alternative Reference N/A Number: Area of Applicability: Eskom Holdings SOC Ltd Functional Area: Sustainability Systems Revision: 4 Total Pages: 33 Next Review Date: March 2023 Disclosure Controlled Disclosure Classification: SM/EDC/Formatted 08.09.2016 Document Template 32-4 Rev 9 Contractor Health and Safety Requirements Unique Identifier: 32-136 Revision: 4 Page: Contents . Introduction ............................................................................................................................... 4
Supporting Clauses .................................................................................................................. 4 2.1 Scope ............................................................................................................................... 4 2.1.1 Purpose ................................................................................................................. 4 2.1.2 Applicability ........................................................................................................... 5 2.1.3 Effective date ......................................................................................................... 5 2.2 Normative/Informative References ................................................................................... 5 2.2.1 Normative .............................................................................................................. 5 2.2.2 Informative............................................................................................................. 6 2.3 Definitions ........................................................................................................................ 6 2.4 Abbreviations ................................................................................................................. 11 2.5 Roles and Responsibilities ............................................................................................. 12 2.6 Process for Monitoring .................................................................................................... 14 2.7 Related/Supporting Documents ...................................................................................... 15 2.8 Statutory/Non-statutory Appointment .............................................................................. 15
Document Content .................................................................................................................. 15 3.1 Material and Equipment .................................................................................................. 15 3.2 Risk Assessments .......................................................................................................... 15 3.3 Record Keeping .............................................................................................................. 16 3.4 Disciplinary Process ....................................................................................................... 16 3.5 Life-Saving Rules ........................................................................................................... 16 3.6 Health and Safety Behaviour Observations .................................................................... 17 3.7 Incident Investigation ...................................................................................................... 17 3.8 Training .......................................................................................................................... 17 3.9 Health and Safety Representative .................................................................................. 17 3.10 Health and Safety Communication ................................................................................. 18 3.11 Contractor’s Site Facilities .............................................................................................. 19 3.12 Public Safety .................................................................................................................. 19 3.13 Emergency Preparedness .............................................................................................. 19 3.14 Occupational Health and Hygiene .................................................................................. 20 3.15 Auditing .......................................................................................................................... 21 3.16 Inspections ..................................................................................................................... 21 3.17 Transport/Mobile Plant Equipment.................................................................................. 22 3.18 Hazardous Materials/Chemicals Management................................................................ 22 3.19 Machinery, Tools and Equipment ................................................................................... 22 3.20 Explosive-Powered Tools ............................................................................................... 23 3.21 Lifting Equipment ............................................................................................................ 23 3.22 Boilers, Pressurised Systems and Vessels under Pressure ............................................ 23 3.23 Working at Heights ......................................................................................................... 23 CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30. Contractor Health and Safety Requirements Unique Identifier: 32-136 Revision: 4 Page: 3.24 Excavations and Tunnelling ............................................................................................ 24 3.25 Confined Spaces ............................................................................................................ 25 3.26 Danger of Engulfment..................................................................................................... 25 3.27 Barricading ..................................................................................................................... 25 3.28 Explosives ...................................................................................................................... 25 3.29 Demolition Work ............................................................................................................. 26 3.30 Permit to Work................................................................................................................ 26 3.31 Radiography, Ultrasonic or Non-destructive Testing (NDT) ............................................ 26 3.32 Work in Close Proximity to/on Public Roads ................................................................... 26 3.33 Work Stoppage............................................................................................................... 27 3.34 Substance Abuse ........................................................................................................... 27 3.35 Statistical Reporting ....................................................................................................... 27 3.36 Housekeeping ................................................................................................................ 28 3.37 Workplace Signage and Colour Coding .......................................................................... 28 3.38 Personal Protective Equipment (PPE) ............................................................................ 29 3.39 Safety, Health and Environment (SHE) Specification ..................................................... 29 3.40 Safety, Health and Environment (SHE) Plan .................................................................. 30 3.41 Safety, Health and Environment (SHE) File .................................................................... 30 3.42 Hours of Work ................................................................................................................ 30 3.43 SHE Recognition and Reward System ........................................................................... 31 3.44 Environmental Care ........................................................................................................ 31 3.45 Unlawful Orders .............................................................................................................. 31 3.46 Section 37(2) Agreement ................................................................................................ 31 3.47 Security .......................................................................................................................... 32
Acceptance ............................................................................................................................. 32
Revisions ................................................................................................................................ 32
Development Team ................................................................................................................ 33
Acknowledgements ................................................................................................................ 33 CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30. Contractor Health and Safety Requirements Unique Identifier: 32-136 Revision: 4 Page
B-BBEE Details: ll reasonably practicable steps to prevent constructionrelated incidents and harm to any person, including members of the public, and damage to
property and the environment.
The contractor, being an employer in his/her own right, is still required to abide by Eskom’s SHE
requirements, as well as the relevant safety, health and environmental legislation.
The appointed managers are responsible for health, safety and the environment on sites under
their control.
2.5.1 Project management
Project management is the discipline of planning, organising, motivating and controlling resources
to achieve specific goals. A project is a temporary endeavour with a defined beginning and end
(usually time-constrained, and often constrained by funding or deliverables), undertaken to achieve
unique goals and objectives, typically to bring about beneficial change or added value. The
temporary nature of projects contrasts with business as usual (or operations), which are repetitive,
permanent or semi-permanent functional activities to produce products or services. In practice, the
management of these two systems is often quite different, and as such requires the development
of distinct technical skills and management strategies.
The primary challenge of project management is to achieve all of the project goals and objectives
while honouring the preconceived constraints. The primary constraints are scope, time, quality and
budget. The secondary and more ambitious challenge is to optimise the allocation of the necessary
inputs and integrate them to meet pre-defined objectives.
2.5.2 Project managers
Project managers manage the activities and resources allocated to projects in a cohesive, efficient
manner and also administer and execute engineering and technology projects (including control
p
Health & Safety
Source: 32-136 Contractor Health and Safety Requirements.pdfTitle: Contractor Health and Safety Document Identifier: 32-136
Requirements
SM/EDC/Formatted 08.09.2016 Document Template 32-4 Rev 9
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
. Introduction ............................................................................................................................... 4
2.1 Scope ............................................................................................................................... 4
2.1.1 Purpose ................................................................................................................. 4
2.1.2 Applicability ........................................................................................................... 5
2.1.3 Effective date ......................................................................................................... 5
2.2 Normative/Informative References ................................................................................... 5
2.2.1 Normative .............................................................................................................. 5
2.2.2 Informative............................................................................................................. 6
2.3 Definitions ........................................................................................................................ 6
2.4 Abbreviations ................................................................................................................. 11
2.5 Roles and Responsibilities ............................................................................................. 12
2.6 Process for Monitoring .................................................................................................... 14
2.7 Related/Supporting Documents ...................................................................................... 15
2.8 Statutory/Non-statutory Appointment .............................................................................. 15
3.1 Material and Equipment .................................................................................................. 15
3.2 Risk Assessments .......................................................................................................... 15
3.3 Record Keeping .............................................................................................................. 16
3.4 Disciplinary Process ....................................................................................................... 16
3.5 Life-Saving Rules ........................................................................................................... 16
3.6 Health and Safety Behaviour Observations .................................................................... 17
3.7 Incident Investigation ...................................................................................................... 17
3.8 Training .......................................................................................................................... 17
3.9 Health and Safety Representative .................................................................................. 17
3.10 Health and Safety Communication ................................................................................. 18
3.11 Contractor’s Site Facilities .............................................................................................. 19
3.12 Public Safety .................................................................................................................. 19
3.13 Emergency Preparedness .............................................................................................. 19
3.14 Occupational Health and Hygiene .................................................................................. 20
3.15 Auditing .......................................................................................................................... 21
3.16 Inspections ..................................................................................................................... 21
3.17 Transport/Mobile Plant Equipment.................................................................................. 22
3.18 Hazardous Materials/Chemicals Management................................................................ 22
3.19 Machinery, Tools and Equipment ................................................................................... 22
3.20 Explosive-Powered Tools ............................................................................................... 23
3.21 Lifting Equipment ............................................................................................................ 23
3.22 Boilers, Pressurised Systems and Vessels under Pressure ............................................ 23
3.23 Working at Heights ......................................................................................................... 23
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.24 Excavations and Tunnelling ............................................................................................ 24
3.25 Confined Spaces ............................................................................................................ 25
3.26 Danger of Engulfment..................................................................................................... 25
3.27 Barricading ..................................................................................................................... 25
3.28 Explosives ...................................................................................................................... 25
3.29 Demolition Work ............................................................................................................. 26
3.30 Permit to Work................................................................................................................ 26
3.31 Radiography, Ultrasonic or Non-destructive Testing (NDT) ............................................ 26
3.32 Work in Close Proximity to/on Public Roads ................................................................... 26
3.33 Work Stoppage............................................................................................................... 27
3.34 Substance Abuse ........................................................................................................... 27
3.35 Statistical Reporting ....................................................................................................... 27
3.36 Housekeeping ................................................................................................................ 28
3.37 Workplace Signage and Colour Coding .......................................................................... 28
3.38 Personal Protective Equipment (PPE) ............................................................................ 29
3.39 Safety, Health and Environment (SHE) Specification ..................................................... 29
3.40 Safety, Health and Environment (SHE) Plan .................................................................. 30
3.41 Safety, Health and Environment (SHE) File .................................................................... 30
3.42 Hours of Work ................................................................................................................ 30
3.43 SHE Recognition and Reward System ........................................................................... 31
3.44 Environmental Care ........................................................................................................ 31
3.45 Unlawful Orders .............................................................................................................. 31
3.46 Section 37(2) Agreement ................................................................................................ 31
3.47 Security .......................................................................................................................... 32
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
Eskom is committed to safeguarding its contractors (principal contractors, appointed contractors,
suppliers, vendors, service providers and consultants) and the environment against undesired
exposure to its operations, which is in line with its Safety, Health, Environmental and Quality
practical occupational health and safety risks to which contractors are exposed and to take the
appropriate measures that are necessary to prevent any incidents, injuries or environmental
damage resulting from accidental exposure.
The term “contractor requirements” means a comprehensive documented prerequisite of the
imperative safety, health and environmental requirements for a contract or project.
taking measures to ensure contractor health, safety and environment during their activities/services
to prevent any injury to employees and/or other people and members of the public, or damage to
the environment. Each contractor is responsible for ensuring that its employees and the
employees of any appointed contractors comply with all the applicable occupational health and
safety legislative requirements and the policies and procedures of Eskom.
specialised activity or operation. In such a situation, contractors shall be responsible for
developing their safety, health and environmental plans/procedures/manuals/work instructions to
adequately address these specialised activities and scope of operation.
2.1.1 Purpose
aspects for the purposes of contractor health and safety conformity and standardisation.
Eskom’s contractors have the fundamental accountability and responsibility for the on-site safety
and health of people, and environmental protection in their activities, services, products and work.
contractors comply with all the occupational safety, health, and environmental (SHE) statutory
requirements and the policies and procedures of Eskom Holdings SOC Limited.
The contractor’s SHE management system must demonstrate compliance with the level
appropriate to the service provided and with the applicable legal requirements. The contractor and
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
its employees must be able to carry out their work safely, using the correct procedures for the
safety of plant, equipment and substances, by employing safe systems of work, and providing
adequate instruction, training and supervision for all employees.
[3] 32-727: Safety, Health, Environment, and Quality Policy
[4] 32-726: SHE Requirements for the Eskom Commercial Process
[5] 240-62196227: Life-Saving Rules Standard
[6] 32-245: Waste Management Procedure
[7] 32-477: Safety, Health, and Environment Training and Development
[8] 32-524 Developing Health & Safety Specifications
[9] 32-529: Occupational Health and Safety Risk Management Process
[10] 32-407: Behavioural Safety Observations
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
[11] 32-123: Emergency Planning
[12] 32-124: Eskom Fire Risk Management
[13] 32-108: Firefighting Organisation
[14] 32-37: Substance Abuse Procedure
[15] 32-95: Environmental, Occupational Health and Safety Incident Management Procedure
[16] 32-418: Working at Heights Standard
[17] 32-520: Occupational Health & Safety Risk Assessment Procedure
[18] 32-345: Eskom Vehicle Safety Specification
[19] 32-1112: Eskom Disciplinary Code (Standard)
[20] 32-1113: Eskom Disciplinary Procedure
[21] 32-1034: Eskom Procurement and Supply Chain Management Procedure
[22] 240-62946386: Vehicle and Driver Safety Management Procedure
[23] 240-44175038: Control of Non-Conforming Product or Service Procedure
[24] 240-46569633: Professional and Statutory Registration for Construction Project Managers and
[25] Project and Construction Management Professions Act, 2000 (Act No. )
[26] National Environmental Management Act, 1998 (Act No. )
[27] National Environmental Management: Waste Act, 2008 (Act No. )
[28] All relevant South African legislation (at national, provincial and municipal level)
[29] Occupational Health and Safety Act, 1993 (Act No. ), and regulations.
2.2.2 Informative
NOTE: the following is a list of documents that can be used as a guide in order to meet legal and Eskom requirements.
[1] 240-84520108: Public Safety Standard
[2] 32-726: SHE Requirements for the Eskom Commercial Process
[3] 32-303: Requirements for the Safe Processing, Storage, Removing and Handling of Asbestoscontaining Materials, Equipment and Articles Procedure
[4] 240-46569633 Professional and Statutory Registration for Construction Project Managers and
2.3 Definitions
NOTE: where there are no listed Eskom definitions, the definitions listed in the Occupational
Health and Safety Act, 1993 (Act No. ) (OHS Act), or its regulations should be referred
to.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.3.1 Agent: (OHS Act) means any person who acts as a representative for a client.
2.3.2 Baseline risk assessment: means the OHS hazards and risks that are identified and
assessed before the inception of a new project and the commencement of operations. The
baseline risk assessment shall include both routine and non-routine tasks.
2.3.3 Client: means the Eskom representative (Internal – Asset Owner), also referred to as the
contract administrator/custodian or agent or project manager (as defined in the contract).
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
ii. checks and approves a design;
iii arranges for a person at work under his or her control to prepare a design, including an
employee of that person where she or he is the employer; or
iv designs temporary work, including its components;
b) an architect or engineer contributing to, or having overall responsibility for a design;
c) a building services engineer designing details for fixed plant;
d) a surveyor specifying articles or drawing up specifications;
e) a contractor carrying out design work as part of a design and building project; or
f) an interior designer, shop-fitter or landscape architect.
2.3.13 Duty of care to the environment: anyone who causes or has caused or may cause
significant pollution or degradation of the environment must take reasonable measures to
prevent such pollution or degradation from occurring, continuing or recurring. If such harm
to the environment is authorised by law or cannot reasonably be avoided or stopped, such
person must minimise and rectify such pollution or degradation of the environment.
2.3.14 Employee: means, subject to the provisions of subsection (2), any person who is employed
by or works for an employer and who receives or is entitled to receive any remuneration or
who works under the direction or supervision of an employer or any other person.
2.3.15 Employer: means, subject to the provisions of subsection (2), any person who employs or
provides work for any person and remunerates that person or expressly or tacitly
undertakes to remunerate him/her, but excludes a TES (ex labour broker) as defined in
section 1(1) of the Labour Relations Act 1956 (Act No. ).
2.3.16 Environment: means –
a) the land, water, and atmosphere of the earth;
b) micro-organisms and plant and animal life; and
c) any part or combination of (a) and (b) and the interrelationships among and between them,
and the physical, chemical, aesthetic and cultural properties and conditions of the foregoing
that influence human health and well-being.
2.3.17 Eskom requirements: mean the Eskom requirements flowing from directives, policies,
standards, procedures, specifications, work instructions, guidelines or manuals.
2.3.18 Fall protection plan: means a documented plan of all the risks relating to working from an
elevated position, considering the nature of the work undertaken, and setting out the
procedures and methods to be applied in order to eliminate the risk.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.3.19 Hazard: means a source of, or exposure to, danger.
2.3.20 Hazard identification: means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated with the type of
construction work being executed or to be executed.
2.3.21 Health and safety file: means a file or other record in permanent form, containing the
information required as contemplated in these regulations (the Construction Regulations).
2.3.22 Health and safety specification: means a document specification of all health and safety
requirements pertaining to associated works on a construction site, so as to ensure the
health and safety of persons.
2.3.23 Health and safety requirements: mean the comprehensive health and safety
requirements for a contract, project, site and scope of work. This specification is intended
to ensure the health and safety of persons, both workers and the public, and the duty of
care to the environment. The health and safety requirements must be specific to each
contract, project, site and scope of work.
2.3.24 Internal: means an Eskom department that performs work for another Eskom department.
2.3.25 Joint venture: means a strategic alliance between two or more parties to undertake
economic activity together. The parties agree to create a new entity (incorporated or
unincorporated) by each party’s contribution of equity, and they then share in the profits,
losses and control of the enterprise. The venture may be for one specific project only or a
continuing business relationship.
2.3.26 Life-Saving Rules: mean the set of Eskom safety rules that, if not adhered to, have the
potential to cause serious harm to people.
2.3.27 Maintenance: (maintenance management) means the schemes that can be based on a
number of techniques to focus on those parts which deteriorate and need to be maintained,
such as the following:
a) Preventive – planned maintenance which involves replacing parts and consumables or
making necessary adjustments at pre-set intervals, so that no hazards are created by
component deterioration or failure.
b) Condition-based –involves monitoring the condition of critical parts and carrying out
maintenance whenever necessary to prevent hazards which could otherwise occur.
c) Breakdown-based –the maintenance carried out when faults or failures have occurred. This
is acceptable if the failure does not present an immediate hazard and can be corrected
before the risk is increased.
2.3.28 Mandatary: includes an agent, a contractor, or an appointed contractor for work, but
without derogating from his/her status in his/her own right as an employer or user.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.3.29 Medical Certificate of Fitness: (OHS Act) means a certificate valid for one year, issued in
terms of the regulations by an occupational health practitioner who shall be registered with
the Health Professions Council of South Africa.
2.3.30 Medical surveillance: (OHS Act) means a planned programme of periodic examination
(which may include clinical examinations, biological monitoring or medical tests) of
employees by an occupational health practitioner or, in prescribed cases, by an
occupational medicine practitioner.
2.3.31 Method statement: (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards identified in any
risk assessment.
2.3.32 Mine
a) when used as a noun, means –
i. any borehole or excavation, in any tailings on or in the earth, including the portion of the
earth that is under the sea or other water, made for the purpose of searching for or winning
a mineral, whether it is being worked or not; or
ii. any other place where a mineral deposit is being exploited, including the mining area and
all buildings, structures, machinery, mine dumps, access roads or objects situated on or in
that area that are used or intended to be used in connection with searching, winning,
exploiting or processing of a mineral, or for health and safety purposes. But, if two or more
excavations, boreholes or places are being worked in conjunction with one another, they
are deemed to comprise one mine, unless the Chief Inspector of Mines notifies their
employer in writing that those excavations, boreholes or places comprise two or more
mines; or
iii. a works; and
(b) when used as a verb, the making of any excavation or borehole referred to in paragraph (a)(i),
or the exploitation of any mineral deposit in any other manner, for the purpose of winning a
mineral, including prospecting in connection with the winning of a mineral.
2.3.33 Organisation: may be defined as a group of individuals (large of small) which is co-
operating under the direction of executive leadership in the accomplishment of certain
common objects.
2.3.34 Project: means an activity or a group of activities which has a defined start and end date, a
defined scope and a defined sum of money allocated to complete the activities.
2.3.35 Project manager/leader: means the person who has the responsibility for the successful
planning and execution of a project. The project manager must satisfy the certification
requirements set by the South African Council for the Project and Construction
Management Professions. Note: the project manager is the duly authorised Eskom
representative who acts on Eskom’s behalf as the administrating officer for the purposes of
the contract. (The term “project manager” in the context of this procedure should be used in
its broader sense and should not be restricted to the designation of project manager in any
specific work environment.)
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.3.36 Risk assessment: (OHS Act) means a programme to determine any risk associated with
any hazard at a construction site in order to identify the steps that have to be taken to
remove, reduce or control such hazard.
2.3.37 Service provider: means any private person or legal entity that provides any service(s) to
2.3.38 Subsidiary: means an enterprise controlled by another (called the parent) through the
ownership of greater than 50% of its voting stock.
2.3.39 Task: means a segment of work that requires a set of specific and distinct actions for its
completion.
2.3.40 Toolbox talks: where the team leader, after conducting pre-task planning, shares all the
tasks at hand and discusses task allocation, the identified risks and the control measures
with all his/her team members on site before commencing a specific task and documenting
the agreed strategy. (This shall be done to ensure a common understanding of the tasks,
risks and control measures required.)
2.3.41 The Act: (OHS Act) means the Occupational Health and Safety Act, 1993 (Act No. ), as amended, and the regulations made under it.
2.3.42 Visitor: means any person visiting a workplace with the knowledge of, or under the
supervision of, an employer or who is not providing a specific service to Eskom.
2.4 Abbreviations
MHS Act Mine Health and Safety Act, 1996 (Act No. )
NEMA National Environmental Management Act, 1998 (Act No. )
OHS Act Occupational Health and Safety Act, 1993 (Act No. )
property and the environment.
The contractor, being an employer in his/her own right, is still required to abide by Eskom’s SHE
requirements, as well as the relevant safety, health and environmental legislation.
manner and also administer and execute engineering and technology projects (including control
plant) within cost, quality and time.
Eskom: Project health and safety manager/practitioner
to advise, assist and support the project manager, supervisor and project engineer with managing
the health and safety issues on the project, which include ensuring proper co-ordination among the
various contractors. The health and safety manager/practitioner shall also be responsible for
assisting with the development of site- and project-specific health and safety specifications and for
ensuring that health and safety specifications are issued with the enquiry documents and that the
contractor’s health and safety plans are submitted, evaluated and approved. He/she shall be
responsible for auditing these plans and ensuring they comply with legal requirements.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.5.3 Contractor health and safety officer
Where appointed, a contractor’s health and safety officer shall be competent to perform the
required duties contemplated in the OHS Act and contained in the project requirements.
2.5.4 MHS Act
of the contracted work. The contractor’s health and safety officer shall assist and support the
contractor’s construction manager to ensure that the organisation’s health and safety
responsibilities are fulfilled and that there is compliance with the health and safety specifications
and the health and safety plan.
of work being performed shall be taken into consideration.
All contractor health and safety officers must liaise closely with Eskom’s OHS departments for the
2.5.5 OHS Act
In terms of Construction Regulation 8(5) a contractor must, after consultation with the client and
having considered the size of the project, the degree of danger likely to be encountered or the
accumulation of hazards or risks on the site, appoint in writing a full-time construction health and
safety officer to assist with controlling the health and safety-related matters on the site: provided
that, where the question arises as to whether a construction health and safety officer is necessary,
the inspector makes thedecision.
him/her to carry out his/her tasks efficiently, and must be registered with a statutory body approved
by the Chief Inspector.
The contractor’s health and safety officer shall assist with the control of all safety-related matters at
the sites, and give inputs at the design stage.
of the work being performed shall be taken into consideration.
All contractor health and safety officers must maintain constant liaison with Eskom’s divisional
health and safety departments and co-operate with the health and safety managers/practitioners
responsible for providing a health and safety service.
2.5.6 Contractors
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
and/or responsibilities.
2.5.7 Employees
Section 14 of the OHS Act has reference; contractor employees are responsible for their own
health and safety, as well as the health and safety of their colleagues while at work. The
client/employer/contract manager cannot be expected to be totally responsible if any of their
employees do not comply with legislative and Eskom health and safety requirements. Employees
will be held jointly responsible where situations so require. In their own interests, contractor
employees must be aware of the responsibilities of their contractor management.
2.5.8 Construction professional registration
The legislation and the SACPCMP’s publications direct that all persons assuming responsibility for
construction project management, construction management and construction health and safety
should be registered as professionals in the appropriate category with the SACPCMP in order to
comply with the legal and statutory requirements in South Africa.
2.5.9 Joint ventures
the contractors shall also apply to the joint venture partner, therefore each contractor shall be
responsible and accountable for its own organisation’s health and safety. All organisations shall be
signatories to the required section 37(2) agreement of the OHS Act.
agreement, the single business entity must fulfil all the SHE requirements.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.7 Related/Supporting documents
appointments must be made using Eskom Standard 32-296: Integrated SHE Organisation, Roles
and Responsibilities, and Statutory Appointments.
(in terms of the BU’s Legal Appointments Manual, where compiled). All appointments/copies made
by the contractor shall be included in the health and safety file, and be available to the client/agent.
the manufacturer and legislative requirements. Where reclaimed material is authorised to be used,
it shall meet the manufacturer’s safety requirements, as if it were new.
Cognisance of the health and safety factor during work: the health and safety of such
material/equipment shall be factored in, to ensure that it remains safe for use by others at a time
after the completion of the contract. Eskom and/or the designer/agent/client shall determine the
acceptability of workmanship.
3.2 Risk assessments
In terms of section 8(2)(d) of the OHS Act and section 9 of the CR for an employer, it is a legal
requirement to carry out risk assessments to establish what hazards to the health and safety of
persons are attached to any work which is performed, any article or substance which is produced,
processed, used, handled, stored or transported, and any plant or machinery which is used in
his/her business and he/she shall, as far as is reasonably practicable, further establish what
precautionary measures should be taken with respect to such work, article, substance, plant or
machinery in order to protect the health and safety of persons and shall provide the necessary
means to take such precautionary measures.
estimate of the extent of the risks involved, taking into account whatever precautions are already
being taken.
Risk assessment is essentially a three-stage process to –
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
activity, or any new process, activity or operation, should be subjected to a risk assessment and, if
new hazards come to light during the work process, these should also be subjected to risk
assessments.
supervisors and employees to assess any inherent risks which might have been overlooked during
the initial risk assessment or any changes which might have occurred in a period of absence, in
particular if a job or task is extended over a day or halted owing to inclement weather.
3.3 Record keeping
by any party who is entitled to audit or inspect the project. SHE files should be handed over by the
contractor to the client or asset owners for archiving on completion of the project.
3.4 Disciplinary process
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.6 Health and safety behaviour observations
courses. Such training shall be conducted by contractor management, construction safety officers
or construction supervisors.
Induction training is an opportunity to inform persons of the organisation’s health and safety
requirements, not only in the organisation’s offices but also at the workplaces.
3.8.2 Site-specific awareness training
commences work on the project, that the supervisor in control with responsibility for the employee
has informed the employee of his/her scope of authority for that site/workplace.
3.9 Health and safety representative
The requirements of sections 17 and 18 of the OHS Act shall be complied with. Where contractors
perform operational work, they shall appoint health and safety representatives for each workplace.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
of the nature and risk level of work in terms of sections 17 and 18 of the OHS Act.
3.10 Health and safety communication
changing behaviour or influencing decision-making. Communication is a process which allows
information to be shared and exchanged, using different methods that sometimes require
feedback.
3.10.1 SHE Committees
Statutory SHE Committees shall be established in terms of sections 19 and 20 and General
Administrative Regulation 5 of the OHS Act and Eskom’s requirements.
as making recommendations to an employer on health and safety matters, incident investigations
and any other health and safety-related matters as such committees may prescribe.
meetings, and the minutes of these meetings must be available on site at all times.
NOTE: this project meeting does not replace or act as a substitute for the required SHE Committee
meeting.
3.10.2 Toolbox talks
employees about the hazards and risks they will be exposed to when they perform work. Use
toolbox talks to create awareness among the employees to recognise and avoid unsafe conditions.
management and other employees can take actions to correct them. Employees will learn to avoid
the potentially hazardous situations discussed during toolbox talks as well as become able to
identify hazards and correct those hazards prior to starting a task/job if there are hazards present.
Toolbox talks are an effective way of fulfilling one’s legal requirements.
3.10.3 General SHE communication
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
use their facilities, must ensure that adequate facilities are provided for their employees on the
site/project.
When such facilities are provided, they must comply with the Facilities Regulations, SANS 10400
standard A to XA and CR 30.
3.12 Public safety
members of the public against their activities during the project, without damaging Eskom’s name
and reputation.
3.13 Emergency preparedness
of the organisation so as to achieve a quick response and recovery and return the situation to
normal in the shortest possible time and the most cost-effective way.
3.13.1 Fire safety
Regulations, SANS 10400 (T regulations).
3.13.2 First-aid planning and emergency care
meet the first-aid requirements of General Safety Regulation 3:
“An employer shall take all reasonable steps that are necessary under the circumstances, to
ensure that persons at work receive prompt first aid treatment in the case of injury or emergency.”
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
Eskom has established a contract with Netcare 911 for all its employees, contractors and their
employees for emergency medical assistance while on duty anywhere in South Africa. The
telephone number is 086 1237 566 (0861 2ESKOM).
3.13.3 Emergency escape routes
The SANS 10400 T regulations provide that escape routes have to be incorporated in buildings.
were unable to evacuate the burning building. This is attributed to there being no escape routes
and/or, if there were such routes in the building, egress was restricted because the routes were
being used as storage areas.
3.14 Occupational health and hygiene
3.14.1 Medicals
requirement in terms of the Occupational Health and Safety Act, 1993 (Act No. ) and is
an essential component of an Occupational Health and Safety programme.
Where there is a possibility of occupational hygiene stressors (for example noise, dust,
illumination, heat and cold stressors, ergonomics, vibration (hand, arm and whole body, etc.),
health risk assessments must be carried out to determine whether there is any possible worker
exposure. Records of all these assessments should be documented and kept up to date.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
less than 6 oC for cold. Any exposure beyond these limits can lead to organ damage/failure and
death.
3.14.4 Asbestos control management
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.17 Transport/Mobile plant equipment
OHS Act Construction Regulation 23, NRTA, the Mine Health and Safety Act and the National
3.18 Management of hazardous materials/chemicals
all persons and the environment. Various requirements for the handling and storage of hazardous
materials and chemicals are listed in the OHS Act.
used machinery or using unsafe machinery can cause serious harm and/or damage, it is important
to ensure that all mechanical equipment is safeguarded in order to protect the health and safety of
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
persons who may be exposed to such mechanical equipment, and also to ensure that competent
persons operate the machinery.
3.20 Explosive-powered tools
includes all the lifting machine codes as listed in the regulations and the national code of
practice for the training providers of lifting machine operators).
When working in close proximity (with tower cranes) to power lines, the contractor shall apply for a
permit. See the Eskom Plant Safety Regulations and/or Operating Regulations for High-Voltage
Systems and Electrical Machinery Regulations 19(4) and 19(5) of the OHS Act.
3.22 Boilers, pressurised systems and vessels under pressure
compressors, mobile compressors and pressure vessels, to fire extinguishers and all piping
associated with such equipment.
rescue plans must be compiled and implemented. The Occupational Health and Safety Act places
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
duties on employers, employees and anyone who controls the way that work at height is
undertaken.
reasonably practicable, any person from falling a distance liable to cause personal injury. Where a
fall from any height could result in harm, an effective means of fall prevention has to be put in
place. You are required to take practicable steps to ensure your safety and the safety of others, as
well as not knowingly exposing yourself or others to harm.
3.23.2 Floor and wall openings
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.24.2 Tunnelling
excavating or tunnelling is taking place or work is being done in them. Ground collapse is
extremely hazardous, especially where people are working inside a tunnel, and usually results in
serious injuries and fatalities.
Any contractor performing tunnelling activities shall comply with Construction Regulation 15, which
then refers to the Tunnelling Regulations published under the Mine Health and Safety Act, 1996
(Act No. ), as amended, and regulation 15 of the Construction Regulations.
3.25 Confined spaces
being discharged, unless that person is issued with an appropriate safety belt/harness fitted with a
rope, where at least one other person who has been trained in rescue is available and observing.
requirements of the Explosives Regulations of the OHS Act, the Mine, Health and Safety Act, 1996
(Act No. ) and the Explosives Act, 1956 (Act No. ).
Explosives Regulation 13(4) of the OHS Act and SANS 100228 Code of Practice for the
Identification and Classification of Dangerous Substances and Goods for Transport (published by
the South African Bureau of Standards).
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
competent persons.
All demolition work must be planned, and all role players must be involved in the planning; this
includes making thorough risk assessments.
adhered to.
Where structures (power lines, poles, lattice towers, etc.) have to be demolished, this shall be done
in terms of Eskom requirements (task manuals).
All demolition work shall be carried out in accordance with Construction Regulation 14 Demolition
potentially hazardous.
that all foreseeable hazards have been considered.
dropped or when the work introduces new hazards. Examples are entry into vessels, hot work and
pipeline breaking.
If the type of work requires working with Eskom power systems/networks (low voltage, medium
voltage or high voltage), then the appropriate permits will be required.
3.31 Radiography, ultrasonic or non-destructive testing (NDT)
persons carrying out the work but also to the motorists, where the persons working do not take
care of their own safety and ignore any rules and regulations. It is imperative to comply with all the
requirements of the National Road Traffic Act when work is performed. For additional worker
safety, organisations should enhance the national requirements.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.33 Work stoppage
Section 8(2)(f) and Construction Regulation 5(q) of the OHS Act have clear requirements for not
permitting an employee to work unless adequate precautionary measures are taken and for
stopping any work which is not in accordance with health and safety plans.
may pose an imminent threat to the health and safety of an individual or of creating a risk of
degrading the environment. This includes any unauthorised work or service performed by, or
legally or contractually non-compliant acts or omissions by, any contractor contracted to work at
that site.
Eskom standard SHE Requirements for the Eskom Commercial Process (32-726).
incidents and when driving vehicles. Eskom is therefore entitled to take reasonable steps to ensure
that intoxicated persons are identified and prevented from entering Eskom’s premises, or working
on any of Eskom’s equipment.
General Safety Regulation 2A is clear on the legal stance regarding intoxication.
either or both substances and are not permitted to be under the influence of or consume
intoxicating substances while at/in the workplace. There is a provision regarding the taking of
medication.
The permissible blood level of alcohol and/or drugs is 0%.
3.35 Statistical reporting
There is a legal requirement in terms of the Occupational Health and Safety Act, 1993 (Act No. ) (General Administrative Regulations) that certain serious incidents shall be reported to the
the progress and current status of the strategies, processes and activities used by Eskom to
control risks to health and safety.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
employer:
superfluous material.
of refuse bins, store areas comply with good storage practices and stacking is done in
accordance with accepted stacking practices.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
present or the equipment is a requirement. For example, if the sign indicates that hearing
protection is required, which is now no longer needed although the sign is still in place, hearing
protection shall be worn.
All signs and notices shall conform to the requirements of SANS 1186 in terms of standard signs,
safety colours, geometric forms and dimensions.
appropriate colours of SANS 10140 and 1091.
3.38 Personal protective equipment (PPE)
workplace to protect the worker from risks and hazards, and includes but is not limited to
equipment and clothing worn on the body as well as equipment used to determine, measure or
indicate danger. The objective of protective clothing is to prevent exposure or injury to any body
parts exposed to operations.
to the human body. Employees must be trained on the limitations of PPE and on how to fit PEE
correctly.
General Safety Regulation 2 of the OHS Act provides for employers to make the workplace safe
and where required to provide appropriate PPE.
3.39 Safety, Health and Environment (SHE) Specification
NOTE: this paragraph is included for information sharing only. The guideline for the compilation of
SHE specifications is contained in the Eskom document 32-524 “Developing a Construction Safety,
Health, and Environmental Specification”.
various project tasks have to be defined, the associated hazards identified, and the associated
risks listed.
factors relating to health and safety issues in order to assist the contractor to provide adequately
for the health and safety of employees on site. Should additional risks be identified later by Eskom
or its agents/clients, these will be included in the contract works information and/or relayed at the
clarification or negotiation meeting.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.40 Safety, Health and Environment (SHE) Plan
safe work procedures to mitigate, reduce or control the hazards identified. It is specific to each
project undertaken and site where work is done, is compiled by the contractor and appointed
contractor, and must be approved by the client/agent prior to the commencement of any activities
on a project. The contractor and the client/agent must both be signatories to the health and safety
plan once it has been negotiated, agreed upon and accepted. This plan has to be regularly
updated to take account of any changes in project scope and unanticipated conditions.
accepted and signed by an Eskom SHE functionary, and approved and signed by the contract
custodian. The main contractor is required to evaluate its appointed contractors and proof of
compliance shall be included in the main contractor’s safety file. The contractor shall not be
allowed to commence work on site until the health and safety file has been accepted and
approved.
3.41 Safety, Health and Environment (SHE) File
health and safety management system for the project and the site during the project, and all
information relating to the post-project phase after handover to the client.
threaten the health and safety of the employee or others.
Description
Source: Authority to submit a tender (Returnable Schedule) Template.docxBidders must indicate their legal status by selecting the appropriate category (Company, Close Corporation, Partnership, Joint Venture, or Sole Proprietor). A signed certificate or certified company document confirming the authorisation of the signatory is required.
Submission Guidelines
Source: Authority to submit a tender (Returnable Schedule) Template.docx (unknown)Submit a completed and signed 'Authority to Submit a Tender' certificate. Select the appropriate category (Company, Close Corporation, Partnership, Joint Venture, or Sole Proprietor) and provide the required details. Alternatively, attach a certified copy of a company/organisation document that confirms the same information. For Joint Ventures, include a power of attorney and a copy of the joint venture agreement stating joint and several liability and lead partner authorisation.
Evaluation Criteria
Source: Authority to submit a tender (Returnable Schedule) Template.docx (unknown)Tenderers must be a legally recognized entity falling into one of the five specified categories: Company, Close Corporation, Partnership, Joint Venture, or Sole Proprietor. The person signing the tender documents must be formally authorized to do so, as evidenced by this completed certificate (or an equivalent certified company document). For Joint Ventures, a valid joint venture agreement with specific clauses on liability and authority is a prerequisite.
Description
Source: E-tendering Help Manual for supplier.docxThe tender involves electronic submission of documents via Eskom’s eTendering system. Key points: 1) Web-based platform for uploading tender documents. 2) Replaces manual/physical submissions at Eskom tender offices. 3) Suppliers must register and verify via OTP (sent to email and cellphone). 4) CSD number required for access.
Contact Information
Source: E-tendering Help Manual for supplier.docx (unknown)For system or submission issues, contact the buyer responsible for the published tender. No direct contact details provided in the document.
Submission Guidelines
Source: E-tendering Help Manual for supplier.docx (unknown)Submission is electronic via Eskom’s eTendering portal (https://eTendering.eskom.co.za). Steps: 1) Register on the portal with valid email and cellphone (OTP verification required). 2) Access tender via reference number, then click 'Create New Submission'. 3) Upload documents under correct categories (e.g., Technical, Commercial, Finance). 4) Ensure file names are clear and file types match the category. 5) Individual file size ≤ 50MB; total submission ≤ 900MB. 6) Verify all documents are uploaded, then click 'Finalize Submission'. 7) Save the submission confirmation email (includes submission ID) for future reference. Note: CSD number is required to access the eTendering system. For issues, contact the buyer responsible for the tender.
Evaluation Criteria
Source: E-tendering Help Manual for supplier.docx (unknown)General
Technical
Technical Specifications
Source: E-tendering Help Manual for supplier.docx (unknown)The tender requires electronic submission via Eskom’s eTendering system. Key technical points: 1) Web-based platform replaces physical submissions. 2) Suppliers must register and verify via OTP (sent to email and cellphone). 3) Compatible with most browsers, but Microsoft Edge is recommended. 4) CSD number is mandatory for access.
Compliance Requirements
Source: E-tendering Help Manual for supplier.docx (unknown)CSD registration is mandatory to access the eTendering system and submit bids.
Important Dates
Source: Invitation to Tender- Supply and delivery of Gaskets and Seals .pdf (TENDER){"closingDate":"07 August 2026","closingTime":"10h00","briefingSession":"{"date":"22 July 2026","time":"10h00","venue":"ion A non-compulsory clarification meeting with representatives of","is_compulsory":true}"}
Contact Information
Source: Invitation to Tender- Supply and delivery of Gaskets and Seals .pdf (TENDER){"name":"MS Teams","email":"[email protected]","phone":null,"department":null,"address":"2 July 2026"}
Evaluation Criteria
Source: Invitation to Tender- Supply and delivery of Gaskets and Seals .pdf (TENDER)1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.11 Tax Evaluation questionnaire to determine whether a N
3.13 Functionality requirements Functionality requirements are applicable
functionality criteria
Tenderers who do not meet the 75% threshold for functionality scoring
3.15 Evaluation of Price Prices will be evaluated as follows
evaluation parameters relating to uncertainty and risk, where
evaluation purposes but will be implemented when payment is
Prices will be scored out of 80 points
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 points in accordance with the
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
the 80/20 system. Eskom will add the score from Pricing and Specific
Contractual Requirements are not evaluation criteria.
They will be assessed after the evaluation and ranking of the
of 20 points in accordance with the
They will be assessed after the evaluation a
Technical Specifications
Source: Invitation to Tender- Supply and delivery of Gaskets and Seals .pdf (TENDER)Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F Y
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content (only applicable if designated
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary Annexure G2 Y
Schedule
Annexure D Imported Content Declaration – Supporting Annexure G3 Y
Schedule to Annexure C
Annexure E Local Content Declaration- Supporting Annexure G4 Y
Schedule to Annexure C
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *
Pricing Schedule
Source: Invitation to Tender- Supply and delivery of Gaskets and Seals .pdffor Proposal Effective Date 07 April 2026
Review Date April 2031
Number Description Annexure Attached (Y /
N / n/a)
i) Civil Engineering (CE)
ii) Electrical Engineering Work (EB)
iii) General Building Works (GB)
iv) Mechanical Engineering (ME)
1.1.18 Scope of Work Y
1.1.19 NEC or other Contract Y
1.1.20 Pricing Schedule/BOQ (if not contained in Contract) Y
meeting is mandatory/compulsory, then tenderers must attend
such meeting. Tenderers that do not attend such
mandatory/compulsory meetings will be disqualified and will not
be evaluated.
2.16 Seeking clarification The tenderer will notify Eskom of any clarifications required before the
closing time for clarification queries, which is 10 working days before
the deadline for tender submission.
2.22 Alternative tenders Alternative tenders are not allowed.
2.33 Cataloguing The successful tenderer may be required to provide the cataloguing
information per item after contract award and will need to ensure that
all materials delivered to Eskom are labelled in line with Eskom’s
labelling specifications as may be stipulated by Eskom. Where
cataloguing is a requirement, the Pricing Schedule must also include
a line item for cataloguing, which tenderers are required to quote for.
Goal, it will not be disqualified. However, it will be awarded 0 points
for that Specific Goal.
3.19 Ranking of tenders Tenderers will be ranked by applying the preferential point scoring for
the 80/20 system. Eskom will add the score from Pricing and Specific
Pricing schedule Completed pricing schedule (if not already submitted √
in the NEC or other Contract).
Financial Requirements
Source: Invitation to Tender- Supply and delivery of Gaskets and Seals .pdf (TENDER)Payment Terms: payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the a
Compliance Requirements
Source: Invitation to Tender- Supply and delivery of Gaskets and Seals .pdf (TENDER)ADDITIONAL CONTRACTUAL REQUIREMENTS SUPPORTING EVIDENCE Safety COIDA - Original certificate of good standing or proof √ of application issued by the Compensation Fund (COID) or a licensed compensation insurer (South African tenderers only) Refer to Safety requirement Quality Refer to Quality requirements √ Other safety/quality √ documents as Refere SHEQ requirements required per scope of works Environmental √ Due
A signed copy of the public interest score (only applicable to South African entities that are not audited) o Giving the actual score o Indicating whether the company is owner managed or not o Confirming whether the annual financial statements were externally prepared or not.
Copies of the ITA34C for the current & previous years of assessment (only applicable to South African entities that are not audited)
For unincorporated JV or a SPV, each partner in the JV or a SPV must submit its annual financial statements including all items listed above. DOCUMENTS REQUIRED UNDER FUNCTIONALITY/TECHINICAL CRITERIA Functionality/Technical Refer to Technical Evaluation Criteria √ Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 61 File name: Invitation to Tender- Supply and delivery of Gaskets and Seals (Zenie)– Supply and delivery of Gaskets and Seals Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Invitation to Tender/ Request Identifier for Proposal Effective Date 07 April 2026 Review Date April 2031 ANNEXURE A AUTHORISATION FORM Indicate the status of the tenderer by ticking the appropriate box below. A B C D E F COMPANY CLOSE PARTNERSHIP JOINT SOLE TRUST CORPORATION VENTURE PROPRIETOR The tenderer must complete the appropriate certificate set out below for its category of organisation. If the tenderer is a company, close corporation, joint venture, or trust the tenderer must attach a certified copy the document that is proof of the contents of the certificate (resolution of the board of directors of a company, members’ resolution of a close corporation, power of attorney in the case of a joint venture, or resolution of the board of trustees of a trust). Note further that, in addition to completing the relevant certificate for category of organisation, the authorised representative of the tenderer is also required to complete and sign the table at the end of this Authorisation Form.
Certificate for company I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the board of directors of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by resolution of the board taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the company, and to sign all documents in connection with this tender and any contract that may result from it on behalf of the company. A certified copy of the resolution of the board is annexed to this Form. Signed: Date: Name: Position: Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 61 File name: Invitation to Tender- Supply and delivery of Gaskets and Seals (Zenie)– Supply and delivery of Gaskets and Seals Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Invitation to Tender/ Request Identifier for Proposal Effective Date 07 April 2026 Review Date April 2031
Certificate for close corporation I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as member of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by majority vote of the members taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the close corporation, and to sign all documents in connection with this tender and any contract that may result from it on behalf of the close corporation. A certified copy of the members’ resolution is annexed to this Form. Signed: Date: Name: Position
Certificate for partnership We, the undersigned, being the key partners in the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, to submit this tender on behalf of the partnership, and to sign all documents in connection with the tender and any contract that may result from it on behalf of the partnership. Name Address Signature Date NOTE: This certificate is required to be completed and signed by the full number of Partners necessary to commit the Partnership. Attach additional pages if more space is required. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 61 File name: Invitation to Tender- Supply and delivery of Gaskets and Seals (Zenie)– Supply and delivery of Gaskets and Seals Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Invitation to Tender/ Request Identifier for Proposal Effective Date 07 April 2026 Review Date April 2031
Certificate for Joint Venture We, the undersigned, are submitting this tender offer in Joint Venture and hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, an authorised signatory of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , being the lead member in the Joint Venture, to sign all documents in connection with the tender and any contract that may result from it on behalf of all the members in the Joint Venture. This authorisation is evidenced by the attached power of attorney signed by the legally authorised signatories of all the members in the Joint Venture. We attach to this Form a certified copy of the Joint Venture Agreement which incorporates a statement that all members in the Joint Venture are liable jointly and severally for the execution of the contract, a term that indicates which member will be the lead member, and terms that indicate the ratios according to which work and payment will be divided amongst the members. Name of JV member Address Authorised signature, name and capacity Lead member Member Member Member NOTE: This certificate is required to be completed and signed by all members of the joint venture. Attach additional pages if more space is required.
Certificate for sole proprietor I, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that I am the sole proprietor of the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Signed: Date: Name: Position:(Sole Proprietor) Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 61 File name: Invitation to Tender- Supply and delivery of Gaskets and Seals (Zenie)– Supply and delivery of Gaskets and Seals Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Invitation to Tender/ Request Identifier for Proposal Effective Date 07 April 2026 Review Date April 2031
Certificate for trust I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the board of trustees of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by resolution of the board of trustees taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the trust and to sign all documents in connection with this tender and any contract that may result from it on behalf of the trust. A certified copy of the resolution of the board of trustees is annexed to this Form. Signed: Date: Name: Position: NOTE: The table below must also be fully completed by all tenderers in addition to the certificate that was selected and completed above. Name of tenderer: Full names of authorised signatory: Designation and capacity: Signature of authorised signatory Date of signature: Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 61 File name: Invitation to Tender- Supply and delivery of Gaskets and Seals (Zenie)– Supply and delivery of Gaskets and Seals Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Invitation to Tender/ Request Identifier for Proposal Effective Date 07 April 2026 Review Date April 2031 ANNEXURE B ACKNOWLEDGEMENT FORM We are in receipt of the Invitation to Tender/Proposal from Eskom Holdings SOC Ltd and the following addenda issued by Eskom: We confirm that the documentation received by us is: (Indicate by ticking the box) Correct as stated in the Invitation to Tender / RFP Content List, and that each document is complete. Or: Incorrect or incomplete for the following reasons: Cataloguing Acknowledgement: Please select the relevant statement by ticking the appropriate box below
We agree to provide the cataloguing information as described in the Invitation to Tender
We have already supplied Eskom with the cataloguing information pertaining to this Invitation to Tender in a previous contract/order [insert previous contract/order number] __________
We do not intend to provide the required cataloguing information for the reasons stated hereunder:
We are a Distributor/Importer/Agent and our Principal, being the Original Equipment Manufacturer (OEM), is or is not [delete whichever is not applicable] in the position to supply cataloguing information for items. We attach the letter from the OEM confirming its position. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 61 File name: Invitation to Tender- Supply and delivery of Gaskets and Seals (Zenie)– Supply and delivery of Gaskets and Seals Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Invitation to Tender/ Request Identifier for Proposal Effective Date 07 April 2026 Review Date April 2031 Invitation to Tender/Request for Proposal No: ____________________ Name of Tenderer: ___________ _ _ Country of registration: _______________________________________ Full names of contact person: __________________________________ Contact details: Tel (landline): Cell phone: e-mail address: Name of tenderer: Full names of authorised signatory
Points Allocation: 20 points
B-BBEE Details: es the right to negotiate with preferred bidders after a competitive bidding process or price
quotations should the tendered prices not be market-related.
Main contractors/ suppliers are discouraged from subcontracting with their subsidiary companies as this
may be interpreted as subcontracting with themselves and / or using their subsidiaries for fronting.
Where a main contractor subcontracts with a subsidiary, this must be declared in its tender documents.
A report containing a list of potential sub-contractors may be drawn by accessing the following link:
“proof of B-BBEE status level of contributor” means-
(a) the B-BBEE status level certificate issued by an authorised body or person; or
(b) a sworn affidavit as prescribed by the B-BBEE Codes of Good Practice; or
(c) any other requirement prescribed in terms of the Broad-Based Black Economic Empowerment Act
1.3 Tender returnables
The tenderer must submit the returnable set out hereunder as part of its tender at the stipulated deadline.
Note the following: -
These returnables are required to be completed, signed (if required on the returnable) and submitted with
the tender at Tender closing date and time. If not completed, signed (if required on the returnable) and/or
submitted by tender closing, the tenderer will be disqualified.
** Returnable required at Tender closing (non-disqualifiable): -
These returnables are required to be completed, signed (if required on the returnable) and submitted with
Tender at Tender closing date and time; however, if not submitted by Tender closing, or submitted with
incomplete information or without a required signature, the Procurement Practitioner will, in writing,
request t
Health & Safety
Source: Invitation to Tender- Supply and delivery of Gaskets and Seals .pdfReport]
the contract the CSDG established in the CIDB
Infrastructure contracts published in GN 1779,
Government Gazette No. April 2023].
1.1.17 Contract Participation Goals (CPG) [To be N/A
(if applicable) downloaded from
CIDB
(Annexure A- [Note that the requirements of a contract
targeted enterprises as established in the aforesaid Declaration
standard applies to: Affidavit; Project
(a) construction works contracts in the General Interim Report,
Building (GB) and to Civil Engineering (CE) classes Project
of construction works; Completion
(b) construction works contracts of an estimated Report and
minimum project duration of 6 months; and Declaration)]
(c) construction works contracts in which at least
25% of the main contract could reasonably be
expected to be subcontracted out in one or more of
the following CIDB classes of construction works:
3.20 Objective Criteria The following objective criteria apply to the tender:
applicable:
through Infrastructure contracts (published in GN 1779,
Government Gazette No. April 2023)
the Contract Participation Goals (CPG) relating to the
engagement of targeted enterprises as established in the
development through Construction Works Contract (published
in Government Gazette No. February 2013)
the engagement of targeted enterprises as established in the
aforesaid standard applies to:
a) construction works contracts in the General Building (GB)
and to Civil Engineering (CE) classes of construction
works;
b) construction works contracts of an estimated minimum
project duration of 6 months; and
c) construction works contracts in which at least 25% of the
main contract could reasonably be expected to be sub-
contracted out in one or more of the following CIDB
classes of construction works:
for Proposal Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
Additional Refer SHEQ requirements √
documents required
(Ecsa/
Safety COIDA - Original certificate of good standing or proof √
of application issued by the Compensation Fund
(COID) or a licensed compensation insurer (South
African tenderers only)
Quality Refer to Quality requirements √
Other safety/quality √
documents as Refere SHEQ requirements
required per scope
of works
Environmental √
Due
Contractual Terms
Source: Invitation to Tender- Supply and delivery of Gaskets and Seals .pdfsanctions list. A tenderer shall be found to have the nationality
of a country if the tenderer is a national or is constituted,
incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract including
related services.
individually or as a partner in a joint venture (JV) or consortium,
except on an E-Tendering system where there is a limit size
(The upload size per document is 500 megabytes and total
submission is restricted to 4 gigabytes).
performance bond or a demand guarantee is a requirement, the
tenderer must select a minimum of two (2) financial institutions that it
is likely to approach from the list provided of Eskom-approved
financial institutions.
3.4 Tender Opening For E-tendering. There will be no public opening of tenders. Tenders
will be downloaded electronically.
3.5 Tender Prices Prices will not be read out.
3.9 Basic Compliance Basic compliance with this Invitation to Tender requires a tenderer to
meet all the following requirements:
for Proposal Effective Date 07 April 2026
Review Date April 2031
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
suppliers within 60 days of receipt of undisputed invoices.
Description
Source: SOW- Supply and delivery of Gaskets and Seals.pdfSupply and delivery of a comprehensive range of gaskets and seals, including:
Submission Guidelines
Source: SOW- Supply and delivery of Gaskets and Seals.pdf (unknown)Returnable Documents: Not explicitly specified in the provided document. Ensure all required forms and supporting documentation are submitted as per standard tender procedures.
Evaluation Criteria
Source: SOW- Supply and delivery of Gaskets and Seals.pdf (unknown)General
Technical
BEECompliance
Preferential consideration may be given to suppliers who comply with South Africa’s Broad-Based Black Economic Empowerment (B-BBEE) Act, depending on Eskom’s procurement policies.
Technical Specifications
Source: SOW- Supply and delivery of Gaskets and Seals.pdf (unknown)Scope: Supply and delivery of various gaskets and seals as per the specified material numbers and dimensions.
Categories of Items:
Pricing Schedule
Source: SOW- Supply and delivery of Gaskets and Seals.pdf (unknown)Pricing must be provided for each item as listed by material number and specification. Items include:
Submission Guidelines
Source: Annexure B- Acknowledgement Form for Eskom SHE Rules and other requirements.pdf (unknown)Submit the following returnable document: Signed Annexure B (Acknowledgement Form for Eskom SHE Rules and other requirements). Ensure the form is completed by an authorised person (CEO/Director/Managing Director) with signature and date. Use the latest authorised version from Eskom’s document management system. Uncontrolled copies downloaded by the user are not guaranteed to be current.
Returnable Documents
Source: Annexure B- Acknowledgement Form for Eskom SHE Rules and other requirements.pdf (unknown)Required returnable: Signed Annexure B (Acknowledgement Form for Eskom SHE Rules and other requirements, Identifier 240-43921804 Rev 5). Must be completed by an authorised person (CEO/Director/Managing Director) with signature and date.
Evaluation Criteria
Source: Annexure B- Acknowledgement Form for Eskom SHE Rules and other requirements.pdf (unknown)General
SHE
Experience
Quality Management
Source: Annexure B- Acknowledgement Form for Eskom SHE Rules and other requirements.pdfFinancial penalties apply for non-conformance to Eskom and/or Statutory SHE requirements by the main supplier, sub-contractors, or suppliers. All employees (contractors/suppliers) must complete the relevant Eskom induction before commencing work.
Financial Requirements
Source: Annexure B- Acknowledgement Form for Eskom SHE Rules and other requirements.pdf (unknown)Financial penalties will be enforced on the main supplier for non-conformance to Eskom and/or Statutory SHE requirements, including non-compliance by sub-contractors or suppliers. No financial compensation will be paid for work stoppages initiated due to SHE-related issues.
Compliance Requirements
Source: Annexure B- Acknowledgement Form for Eskom SHE Rules and other requirements.pdf (unknown)Mandatory compliance with the following: Eskom SHE specification, Occupational Health and Safety Act, Compensation for Occupational Diseases and Illnesses Act, and National Environmental Management Act. All employees (contractors/suppliers) must undergo Eskom induction. The main supplier must: demonstrate selection criteria for appointing contractors/suppliers, notify Eskom prior to their appointment, ensure they possess adequate resources and competencies, manage their compliance with legal and Eskom requirements, monitor them via audits/assessments for SHE compliance, provide grounds for termination, and handle non-conformances directly. Eskom may request testimonials/references and client contact details for verification.
Contractual Terms
Source: Annexure B- Acknowledgement Form for Eskom SHE Rules and other requirements.pdfThe main supplier must: demonstrate the process and selection criteria for appointing contractors/suppliers, notify Eskom prior to their appointment, ensure they have adequate resources and competencies, and remain accountable for their compliance with legal and Eskom requirements during contract execution. The main supplier must monitor contractors/suppliers via audits/assessments for SHE compliance, provide grounds for termination, and handle all non-conformances directly, including performance and penalty processes. Eskom reserves the right to verify compliance and may request testimonials/references or client contact details.
Special Conditions
Source: Annexure B- Acknowledgement Form for Eskom SHE Rules and other requirements.pdf (unknown)No part of this document may be reproduced without the expressed consent of Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2025 to 29 February 2026.xls (unknown)Eligibility criteria are not explicitly stated in the readable portion of the document. Common criteria for ESKOM tenders may include valid business registration, compliance with B-BBEE (Broad-Based Black Economic Empowerment) requirements, financial stability, and relevant experience in supplying similar materials.
Contact Information
Source: 240-12248652 (Rev 7) - List of Tender Returnables.pdf (TENDER)Eskom Representative: Paulo Infante. Document issued on 23/06/2026.
Submission Guidelines
Source: 240-12248652 (Rev 7) - List of Tender Returnables.pdf (TENDER)Submit the following returnable documents as part of your bid: Form A (completed and signed).
Returnable Documents
Source: 240-12248652 (Rev 7) - List of Tender Returnables.pdf (TENDER)Form A must be completed and signed as part of the tender submission.
Evaluation Criteria
Source: 240-12248652 (Rev 7) - List of Tender Returnables.pdf (TENDER)Mandatory
Scoring
Section A
QMS requirements (max score: Option 1 = 4, Option 2 = 7)
Section B
Operational evidence (max score: 5)
Section C
Contract Quality Plan (1 point if submitted)
Section D
Quality Control Plan (1 point if submitted)
Section E
Additional requirements (1 point for Form A, others if applicable)
Disqualification Risks
Technical Specifications
Source: 240-12248652 (Rev 7) - List of Tender Returnables.pdf (TENDER)Supply and delivery of gaskets and seals for a period of 3 years.
Compliance Requirements
Source: 240-12248652 (Rev 7) - List of Tender Returnables.pdf (TENDER)No specific compliance requirements explicitly stated. Additional requirements may apply as per the scope of work and/or specification.
Section
Source: 240-12248652 (Rev 7) - List of Tender Returnables.pdfQuality Requirements (Category 4) will be evaluated with the following scoring structure:
Section A: Quality Management System (QMS) Requirements (ISO 9001)
Option 1 (Certified QMS): Valid ISO 9001 certification from an accredited body (0 points if not met).
Option 2 (Non-Certified but Compliant QMS):
Quality Method Statement based on scope (use Method Statement Template-Ref 240-126469599).
Quality Policy and Objectives approved by top management.
Documented information for Control of Documented Information, Nonconforming Outputs, Nonconformity and Corrective Action, and Internal Audit (per ISO 9001:2015 clauses).
Score for Option 2: 3 points.
Section B: Evidence of QMS in Operation
Roles, responsibilities, and authorities documented (e.g., organization chart, responsibility matrix).
Control of Externally Provided Processes, Products, and Services (per Clause 8.4 of ISO 9001:2015).
Latest internal and certification audit reports (with Nonconformity, Correction, and/or Corrective Action Reports).
Records of Management Review meetings.
Score for Section B: 2 points.
Section C: Contract Quality Plan Requirements
Draft Contract Quality Plan specific to the scope of work (per ISO 10005).
Score for Section C: 0 points.
Section D: Quality Control Plan Requirements
Quality Control Plans (QCP), Checklists, or Inspection and Test Plans (ITP) as per Scope of Works (per ISO 10005).
Draft/example of an ITP or QCP from similar/previous work.
Score for Section D: 0 points.
Section E: User-Defined Additional Requirements
Form A must be completed and signed.
Score for Section E: 1 point.
Important Dates
Source: E0226TSSERI RR Clarification Meeting LINK.pdf (unknown)Clarification meeting: 22 July 2026 at 10:00. Closing date: 22 July 2026 at 10:00.
Briefing Session
Source: E0226TSSERI RR Clarification Meeting LINK.pdf (unknown)Clarification meeting details: Date: 22 July 2026, Time: 10:00. Microsoft Teams link: https://teams.microsoft.com/meet/323849178489164?p=vVvwZZVjONjowbI9L7. Meeting ID: 323 849 178 489 164. Passcode: mA6mv9vQ.
Evaluation Criteria
Source: E0226TSSERI RR Clarification Meeting LINK.pdf (unknown)Eligibility criteria are not specified in this document. Suppliers should attend the clarification meeting to learn about qualification requirements, which typically include B-BBEE status, tax compliance, and relevant industry experience for Eskom tenders.
Technical Specifications
Source: E0226TSSERI RR Clarification Meeting LINK.pdf (unknown)Supply and delivery of gaskets and seals.
Compliance Requirements
Source: E0226TSSERI RR Clarification Meeting LINK.pdf (unknown)No specific compliance requirements stated in the document.
Description
Source: Annexure K- Supply and delivery of Gaskets and Seals.docSupply and delivery of Gaskets and Seals with a strong emphasis on Supplier Development, Localisation, and Industrialisation (SDL&I) targets. Key objectives include socio-economic transformation, empowerment of small and rural enterprises, and promotion of local industrial development in alignment with the Reconstruction and Development Programme (RDP).
Submission Guidelines
Source: Annexure K- Supply and delivery of Gaskets and Seals.doc (unknown)Returnable Documents: Bid must include a signed Supplier Development, Localisation and Industrialisation (SDL&I) Undertaking. Successful supplier must submit a completed SDL&I Implementation Schedule before contract award. Quarterly SDL&I compliance reports must be submitted using the SDL&I Data Collection Template.
Evaluation Criteria
Source: Annexure K- Supply and delivery of Gaskets and Seals.doc (unknown)B BBEECompliance
Suppliers must have a valid B-BBEE certificate. Non-compliant suppliers (Level 5–8) must commit to achieving **Level 4 within the first year** and improve annually.
Local Content
Must demonstrate compliance with **50% Local Content to South Africa**.
Skills Development Plan
Must commit to the **bursary program** and skills development initiatives.
Job Creation Plan
Must provide a plan for **job creation and retention**, with local hiring commitments.
Socio Economic Development
Must allocate **1% of the contract value** to CSI initiatives.
SDL&IUndertaking
Must sign and submit the **Supplier Development, Localisation, and Industrialisation Undertaking** form.
Technical Specifications
Source: Annexure K- Supply and delivery of Gaskets and Seals.doc (unknown)Scope: Supply and delivery of Gaskets and Seals. Additional focus on Supplier Development, Localisation, and Industrialisation (SDL&I) targets, including local content, skills development, job creation, and socio-economic development commitments.
Financial Requirements
Source: Annexure K- Supply and delivery of Gaskets and Seals.doc (unknown)Skills Development: Bursary of R80,000 per ERI-assigned beneficiary at a registered South African university for every R4.8 million invoiced. Socio-Economic Development: 1% of the contract amount must be allocated to Corporate Social Investment (CSI) initiatives. SDL&I Penalty: 2.5% of the invoiced amount (excluding VAT) per quarter for non-compliance with SDL&I obligations.
Compliance Requirements
Source: Annexure K- Supply and delivery of Gaskets and Seals.doc (unknown)B-BBEE: Submit a B-BBEE Improvement or Retention Plan. Suppliers with Level 5–8 or non-compliant status must achieve Level 4 by the end of the first contract year and improve by at least one level annually thereafter. Local Content: 100% local content to South Africa is targeted. Labour: At least 50% of semi-skilled and 100% of unskilled labour must be sourced from the Local Municipality where the service is consumed. SDL&I Compliance: Mandatory acceptance of SDL&I objectives as per Section 2(1)(f) of the Preferential Procurement Policy Framework Act (PPPFA).
Evaluation Criteria
Source: Form A.pdf (unknown)Suppliers must have a Quality Management System compliant with ISO 9001 and must meet the specific capability and capacity assessment criteria under Category 4 of the pre-contract award requirements.
Methodology
Source: Form A.pdfMethodology must align with ISO 9001 principles: Context of the organisation, Leadership, Planning, Support, Operation, Performance evaluations, and Improvement.
Quality Management
Source: Form A.pdfPre-contract award quality requirements: Category 4 is selected. Main supplier and sub-supplier capability and capacity assessment is not applicable.
Section
Source: Form A.pdfEvaluation is based on ISO 9001 quality management principles, including Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, and Relationship management. Post-award evaluation includes supplier quality performance monitoring and quality audits.
Description
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdfScope and purpose:
Key definitions:
Important Dates
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Closing date for Integrity Pact compliance: 27 June 2023 (as per document metadata).
Contact Information
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Ethics reporting contacts:
Submission Guidelines
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Required returnable documents and actions:
Disqualification risks:
Returnable Documents
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Required documents for submission:
Evaluation Criteria
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)The pact applies to all natural or juristic persons registered or seeking to register on Eskom's Vendor Database, including consultants, contractors, and providers of goods/services. Eligibility to tender is contingent upon accepting and complying with this pact.
Compliance Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Mandatory compliance actions:
Note: No explicit B-BBEE, CSD, or CIDB requirements are stated in this document.
B-BBEE Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Employment equity:
Contractual Terms
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdfLegal and validity terms:
Special Conditions
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Conflict of interest and ethical conditions:
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdf (TENDER)Briefing Session
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdf (TENDER)Contact Information
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdf (TENDER)Submission Guidelines
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdf (TENDER)Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdf (TENDER)Tenderers must meet eligibility criteria specified in the Tender Data, not be restricted from doing business with Eskom or state-owned companies, and cannot subcontract 100% of the work. Proof of CIDB registration (if applicable) and B-BBEE status (certificate/affidavit or CSD report) may be required. Attendance at compulsory site visits or clarification meetings is mandatory. Tenderers must submit valid, current documents for the entire tender validity period.
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdf (TENDER)Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdfFinancial Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdf (TENDER)Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdf (TENDER)Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdf (TENDER)Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdfDescription
Source: NEC-Complete Supply Contract-Supply and delivery of Gaskets and Seals.pdfImportant Dates
Source: NEC-Complete Supply Contract-Supply and delivery of Gaskets and Seals.pdf (unknown)Contact Information
Source: NEC-Complete Supply Contract-Supply and delivery of Gaskets and Seals.pdf (unknown)Submission Guidelines
Source: NEC-Complete Supply Contract-Supply and delivery of Gaskets and Seals.pdf (unknown)Returnable Documents
Source: NEC-Complete Supply Contract-Supply and delivery of Gaskets and Seals.pdf (unknown)Evaluation Criteria
Source: NEC-Complete Supply Contract-Supply and delivery of Gaskets and Seals.pdf (unknown)Technical Specifications
Source: NEC-Complete Supply Contract-Supply and delivery of Gaskets and Seals.pdf (unknown)Quality Management
Source: NEC-Complete Supply Contract-Supply and delivery of Gaskets and Seals.pdfPricing Schedule
Source: NEC-Complete Supply Contract-Supply and delivery of Gaskets and Seals.pdfFinancial Requirements
Source: NEC-Complete Supply Contract-Supply and delivery of Gaskets and Seals.pdf (unknown)Compliance Requirements
Source: NEC-Complete Supply Contract-Supply and delivery of Gaskets and Seals.pdf (unknown)B-BBEE Requirements
Source: NEC-Complete Supply Contract-Supply and delivery of Gaskets and Seals.pdf (unknown)Health & Safety
Source: NEC-Complete Supply Contract-Supply and delivery of Gaskets and Seals.pdfContractual Terms
Source: NEC-Complete Supply Contract-Supply and delivery of Gaskets and Seals.pdfSpecial Conditions
Source: NEC-Complete Supply Contract-Supply and delivery of Gaskets and Seals.pdf (unknown)Section
Source: NEC-Complete Supply Contract-Supply and delivery of Gaskets and Seals.pdf (unknown)Data conflicts
None detected
Get deep intelligence on Supplies: General. Unlock full pricing strategies, bid frequency, and historical win rates.