Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Generation Division - Lephalale - Lephalale - 0555
Organization Type
GOVERNMENT
Published
21 Aug 2026
OCDS Reference
ocds-9t57fa-166517
ESKOM is seeking a supplier for the ssc drive replacement project at matimba power station in limpopo, with a contract period of 38 months. Bidders must submit a contract quality plan as part of their tender response.
Closing date: 15 September 2026 at 10:00 AM.
Contract period: 38 months.
Location: Matimba Power Station, Limpopo.
The tender is an open tender by Eskom in the Construction category.
Bidders must complete and submit a Contract Quality Plan based on the template provided in the tender document.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Tuesday, 15 September 2026 - 10:00
Venue
Matimba Power Station Lapa Auditorium
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
Generation Division - Lephalale - Lephalale - 0555
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: SUPPLI~1.DOC, 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.docx. You don’t need to refresh — this page will pick up the updated review automatically.
21 Aug
2026
Tender Published
Tender was published
15 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
ITT for SSC Drive replacement for a period of 38 months.pdf
Eskom is procuring a contractor to replace SSC drives at Matimba Power Station in Limpopo over a 38-month period, under an NEC contract. The tender is open to all eligible bidders and includes mandatory local content and subcontracting requirements.
Tender Technical Evaluation Strategy - SSC Drives Gearbox Replacement 20260629.pdf
Eskom is procuring a contractor to design and install replacement submerged scraper conveyor (SSC) drive gearboxes at Matimba Power Station in Limpopo, over a 38-month period. The existing PIV gearbox drive assemblies, producing 75,000 Nm of torque, have high failure rates, long lead times, and have reached end of life. The tender includes mandatory and qualitative technical evaluation criteria, with a minimum technical threshold of 70%.
NEC for SSC Drive Gearbox Replacement Contract .doc
The tender is for the SSC Drive Replacement Project at Matimba Power Station, which includes the removal and replacement of the existing SSC drives with new hydraulic drive systems. The project is expected to take 38 months to complete.
240-12248652_List of Tender Returnables_Cat 1_ Rev 7.docx
ESKOM is procuring a 38-month SSC Drive Replacement Project at Matimba Power Station in Limpopo. The tender requires bidders to demonstrate a robust Quality Management System (ISO 9001), provide a Contract Quality Plan and Quality Control Plan, and meet specific quality-related evaluation criteria.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx
Eskom is procuring a 38-month project to replace the SSC (supervisory control system) drives at Matimba Power Station in Limpopo. The tender requires bidders to complete mandatory e-Tendering training and submit an acknowledgement form to be considered responsive.
E-tendering Help Manual for supplier - 27 January 2025.docx
The procurement concerns the replacement of the SSC drive system at Matimba Power Station, with a contract duration of 38 months, issued by Eskom.
Scope of work.pdf
ESKOM is procuring a contractor to replace the Submerged Scraper Conveyor (SSC) drive systems at Matimba Power Station with new hydraulic drives across all six units. The contract duration is 38 months. The scope includes mechanical, electrical, and control design, installation, commissioning, and associated documentation.
240-68~1.PDF
Eskom is procuring an SSC Drive Replacement Project at Matimba Power Station in Limpopo, with a contract duration of 38 months. The tender requires bidders to comply with Eskom's quality requirements (specification 240-105658000) and ISO 9001 standards, as detailed in Form A.
240-109253698 Template for a Typical Contract Quality Plan.docx
Eskom is procuring a contractor for the SSC Drive Replacement Project at Matimba Power Station in Limpopo, for a period of 38 months. The bidder must submit a Contract Quality Plan (CQP) following the provided template, referencing SANS 466:2005 (ISO 10005:2005), as part of the tender submission.
SUPPLI~1.DOC
240-12248652 (Rev 7)_List of Tender Returnables-EDC Formatted LTN 03.02.2022.pdf
ESKOM is procuring a contractor to replace the SSC drives at Matimba Power Station in Limpopo over a 38-month period. The tender is subject to strict quality management requirements, including ISO 9001 certification, a contract quality plan, and quality control plans.
Supplier Development Localisation Industrialisation (SDLI) Strategy SSC Drive Replacement 1.pdf
Eskom is procuring a contractor to replace SSC drives at Matimba Power Station in Limpopo over a 38-month period. The tender includes specific goals for B-BBEE preference points, mandatory subcontracting of at least 30% of the contract value to designated groups, and SDL&I obligations covering local procurement, job creation, and skills development.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 37 794 947
Range
Based on 12 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: 240-68~1.PDF (unknown)Closing date: 2026-09-15 at 10:00. No briefing or site visit is mentioned.
Submission Guidelines
Source: 240-68~1.PDF (unknown)Complete and sign Form A (Tender & Contract Quality Requirements) including the tenderer's quality representative section (name, designation, date, signature). No other submission instructions are stated in the provided document.
Evaluation Criteria
Source: 240-68~1.PDF (unknown)The only stated evaluation requirement is completion of Form A (Category 1 quality requirements). No scoring split, minimum thresholds, or preference points are provided.
Technical Specifications
Source: 240-68~1.PDF (unknown)Scope: SSC Drive Replacement Project at Matimba Power Station. Contract duration: 38 months. Quality requirements are defined in Form A, which references ISO 9001 and Eskom's 240-105658000 specification.
Quality Management
Source: 240-68~1.PDF (unknown)Eskom requires compliance with quality requirements of specification 240-105658000. Pre-contract award quality requirements: Category 1 selected (site assessment may be applicable). Post-contract award quality requirements: contract execution, supplier quality performance monitoring, Eskom rights of access, rights to information, preservation, quality audits, management of nonconformities, and special processes. The bidder must complete and sign Form A.
Compliance Requirements
Source: 240-68~1.PDF (unknown)Bidders must submit a completed and signed Form A confirming compliance with Eskom's quality requirements (Category 1). No other compliance documents (e.g., CSD, tax clearance, B-BBEE, CIDB) are mentioned.
Description
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)Eskom provides a Contract Quality Plan (CQP) template for the SSC Drive Replacement Project at Matimba Power Station. The supplier must use this template to develop a quality plan that addresses all required sections, including scope of work, communication, organogram, quality control, non-conformance management, and documentation. The template is a guide for meeting Eskom's quality expectations.
Evaluation Criteria
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)No eligibility criteria specified
Technical Specifications
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)Contract Quality Plan template assist the supplier to identify and plan for meeting client's/ contract expectations/requirements for quality management
Compliance Requirements
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)No specific requirements found
Description
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)SSC drive replacement at Matimba Power Station over 38 months.
Contact Information
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Inquiries: direct any questions through the Eskom e-Tendering clarification meeting or the Noddy Guide. No specific contact details are provided.
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Returnable documents: the completed E-Tendering Training Acknowledgement Form. This form must be fully completed, signed, and submitted within the prescribed period. Bidders must use the Eskom e-Tendering solution for submission. Failure to submit the form on time will render the bid non-responsive and result in disqualification.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Submission of the E-Tendering Training Acknowledgement Form is mandatory. Bidders who do not submit this form within the prescribed period will be disqualified. No further evaluation criteria are stated.
Technical Specifications
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)The tender is for replacing SSC drives at Matimba Power Station over 38 months. No further technical specifications are given.
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Mandatory returnable form:
Important Dates
Source: SUPPLI~1.DOC (unknown)Closing date: 15 September 2026 at 10:00 AM.
No other dates (briefings, site visits, clarification deadlines) are stated in the available document content.
Compliance Requirements
Source: SUPPLI~1.DOC (unknown)No document content found in ZIP archive
Description
Source: Scope of work.pdfThe project involves upgrading the Submerged Scraper Conveyor (SSC) drive system at Matimba Power Station. The existing electro-mechanical drives on all six units will be replaced with hydraulic drive systems, including modifications to drive shafts, bearings, head-end structures, and installation of hydraulic motors, power pack cabinets, and associated control and instrumentation. Objectives: improve SSC availability and reliability, standardize drive technology to be compatible with other power stations. Includes definitions and abbreviations relevant to the project.
Methodology
Source: Scope of work.pdf (unknown)Management meetings as required, minutes within five days. Documentation control: all documents subject to Eskom approval in English; Vendor Document Submission Schedule (VDSS) required; electronic and hard copy submissions to Eskom Documentation Centre. Engineering change management per Eskom procedure. Drawings in MicroStation DGN and PDF; no AutoCAD or TIFF. Plant coding and labelling using KKS system; Contractor to manufacture and install labels per Matimba guideline. Programming: single programme integrating all subcontractors; float shown as 'project float'; time reporting via remaining duration; monthly progress reports with written analysis; outage planning coordinated with Employer's Outage Planner; programme updated three times per week during outages. Engineering design: Contractor to design hydraulic drive installation, shaft modification, bearings, torque arm modifications, electrical power supply, and C&I system. Technical risk assessments: HAZOP, FMEA, fire protection, safety signs. Submission of as-built drawings and operating manuals.
Quality Management
Source: Scope of work.pdfContractor to implement QMS meeting Generation Standard GGS 0462; ISO 9001 certificate if registered. Submit quality policy and typical quality control plan with tender. After contract, submit detailed Quality Assurance Programme (QAP) within four weeks, including Quality Manual, Quality System Procedure, Contract Quality Management Plan, Quality Control Plans, inspection and test records index. Quality Control Plans to cover inspection/test sequence, hold/witness points. Contractor gives 72 hours notice for inspections; quality records stored and presented as data package at completion.
Financial Requirements
Source: Scope of work.pdf (unknown)Invoicing: submit tax invoice after payment certificate, addressed to Matimba Power Station, P.O Box 215, Lephalale, 0555. Include Eskom VAT registration number 4740101508.
Compliance Requirements
Source: Scope of work.pdf (unknown)Quality: Implement QMS meeting Generation Standard GGS 0462. If ISO 9001 registered, provide certificate with tender. Submit quality policy and typical quality control plan with tender.
Health & Safety
Source: Scope of work.pdfContractor must comply with OHS Act, Eskom & Matimba No Smoking Policy, and Matimba Health & Safety Specifications (PA/270/003). All staff undergo Safety Induction. Contractor to follow Matimba Permit to Work System; supervisors authorized as 'Responsible Persons' after training. SHE documentation required at tender: Health and Safety Plan (compiled after award per guideline), Section 37 agreement. Safety procedures: daily cleaning, barricading of danger zones, scaffolding only after authorization, hazardous waste handling per government legislation.
Environmental
Source: Scope of work.pdfContractor must adhere to Matimba Environmental Policy (PP/240/001). Within 30 days of work commencement, obtain and train on environmental procedures, legal register, aspect register. Provide labelled storage containers for general and hazardous waste; no hazardous waste stored over 90 days; dispose at licensed Class H site with disposal certificate. General waste to municipal dump. Good housekeeping required; scrap cleared daily. Non-adherence may result in contract termination.
Contractual Terms
Source: Scope of work.pdfInvoicing and payment: submit invoices within one week of payment certificate; include contract number, VAT details, description per price list; submit by 25th for local currency, 19th for foreign; payment after work acceptance. Insurance provided by Employer. Contract change management per Eskom procedure. Provision of bonds and guarantees as required.
Section
Source: Scope of work.pdfQuality documents required at tender: quality policy, typical quality control plan. Post-contract: submit detailed Quality Assurance Programme within four weeks, including Quality Manual, System Procedure, Contract QMP, QCPs, inspection records. No other evaluation criteria specified.
Description
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC Drive Replacement 1.pdf (TENDER)The project is the SSC Drive Replacement at Matimba Power Station with a duration of 38 months.
Important Dates
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC Drive Replacement 1.pdf (TENDER)Closing date: 2026-09-15 at 10:00 (from tender record).
No mandatory briefing or site visit date stated in the document.
No clarification deadline stated.
Contact Information
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC Drive Replacement 1.pdf (TENDER)Buyer: Kamogelo Nkadimeng (name only, no contact details provided).
Department: Matimba Power Station.
No email, phone, or submission address stated in the document.
Submission Guidelines
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC Drive Replacement 1.pdf (TENDER)Returnable forms and documents — all must be completed, signed and submitted with the bid:
Disqualification risks:
Returnable Documents
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC Drive Replacement 1.pdf (TENDER)Tenderers shall submit the following mandatory returnable documents for sub-contracting, including a sub-contracting agreement signed by both parties with subcontractors' company registration documents.
Evaluation Criteria
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC Drive Replacement 1.pdf (TENDER)Scoring split:
B-BBEE points table:
Award: The contract is awarded to the tenderer scoring the highest total points (price + specific goals), subject to section 2(1)(f) of the PPPFA.
If a tenderer fails to provide documentation for preference points, they will not be disqualified but:
Objective criteria (Section 2): If the tenderer does not meet objective criteria, it may lead to the second-ranked tenderer being recommended for award.
Mandatory subcontracting (Section 2.4): A condition for contract award on contracts above R30 million. Tenderers must subcontract a minimum of 30% of the contract value to designated groups (an EME or QSE which is 51% owned by black people living in rural or underdeveloped areas or townships).
NIPP: Applicable if imported content is USD 5 million or more. The winning bidder must negotiate and enter into a NIPP obligation agreement with the dtic before signing the contract with Eskom.
SDL&I objectives (Section 3): Do not form part of scoring but commitments become contractual obligations. Tenderers who submit objectives but do not meet Eskom's targets will not be disqualified.
Technical Specifications
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC Drive Replacement 1.pdf (TENDER)Scope: SSC Drive Replacement at Matimba Power Station.
Duration: 38 months.
Designated sector component: Air Insulated MV Switchgear Switching Devices with a local content threshold of 5%.
Potential scope to be subcontracted/outsourced:
SDL&I objectives (contractual commitments, not scoring):
Methodology
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC Drive Replacement 1.pdf (TENDER)Tenderers are required to submit proposals in tables for:
Skills development must target unemployed candidates (not Eskom employees or registered learners). Tenderers bear the full cost. They may approach relevant SETAs for grants, subsidies, and incentives, and SARS for tax rebates.
Experience & Qualifications
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC Drive Replacement 1.pdf (TENDER)B-BBEE improvement obligations (not experience):
Financial Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC Drive Replacement 1.pdf (TENDER)Pricing format: The tender response must be separated into its components as per the Price Schedule included with the tender documents. Local procurement content is total spending minus the imported component.
No bond, guarantee, or insurance requirements stated.
No financial capacity or turnover thresholds stated.
Compliance Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC Drive Replacement 1.pdf (TENDER)CSD registration: Not mentioned.
Tax compliance: Not mentioned.
B-BBEE: A valid B-BBEE certificate (SANAS accredited) or sworn affidavit is a condition for contract award. For EMEs (annual total revenue ≤ R10 million): sworn affidavit acceptable. For QSEs (annual total revenue ≤ R50 million): must comply with QSE scorecard unless 51% black owned, then sworn affidavit. For annual total revenue above R50 million: valid B-BBEE certificate required.
CIDB grading: Not mentioned.
CIPC registration: Proof of ownership/shareholding (preferably CIPC documentation) required.
Local content: SBD 6.2 Declaration Form and Annex C required if applicable. Minimum local content threshold of 5% for Air Insulated MV Switchgear Switching Devices.
NIPP: If imported content is USD 5 million or more, the winning bidder must enter into a NIPP obligation agreement with the dtic before signing the contract.
Mandatory subcontracting: Minimum 30% of contract value to designated groups (EME or QSE 51% owned by black people living in rural/underdeveloped areas or townships).
B-BBEE improvement plan: Must be submitted within 30 days of contract award. Tenderers with Level 4 at award must achieve Level 3 by end of first year. Tenderers with Level 5-8 or non-compliant must achieve Level 4 by end of first year and improve one level each subsequent year.
B-BBEE Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC Drive Replacement 1.pdf (TENDER)B-BBEE points are awarded per the 80/20 or 90/10 system as per the table. To claim points, bidders must submit a valid B-BBEE certificate (SANAS accredited), sworn affidavit (for EMEs/QSEs), or CIPS affidavit, plus proof of ownership/shareholding (CIPC), certified ID copies of shareholders, and proof of disability where applicable. For trusts, consortia, or joint ventures, a consolidated B-BBEE certificate is required. Deponent electrical signature is not accepted.
Contractual Terms
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC Drive Replacement 1.pdf (TENDER)Penalty: Eskom will apply a penalty of 2% of the contract value for failure to meet SDL&I obligations.
Retention: Eskom will retain 2% of every invoice (excluding VAT) as security for fulfilment of all SDL&I obligations. Retained amounts are released only upon fulfilment of all SDL&I obligations.
Reporting: Suppliers must submit quarterly reports on SDL&I compliance using the Data Collection Template. Eskom reviews reports within 30 days and notifies suppliers if obligations are not met. Suppliers must implement corrective measures before the next report, failing which retention clauses are invoked.
SDL&I Implementation Schedule: Must be completed and returned to the SDL&I representative within 28 days of contract award. It serves as a reference document for monitoring, measuring, and reporting progress.
B-BBEE improvement plan: Must be submitted within 30 days of signing the contract.
Special Conditions
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC Drive Replacement 1.pdf (TENDER)Subcontracting is mandatory on contracts above R30 million and is a condition for award. The tenderer may not subcontract more than 25% of the contract value to any entity that does not have an equal or higher B-BBEE status level than the supplier, unless the subcontract is to an EME with the capability to execute.
Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC Drive Replacement 1.pdf (TENDER)Mandatory subcontracting: Tenderers shall subcontract a minimum of 30% of the contract value to designated groups, including an EME or QSE which is 51% owned by black people living in rural or underdeveloped areas or townships.
Section
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC Drive Replacement 1.pdf (TENDER)A maximum of 10/20 points may be awarded for the specific goal (B-BBEE). Points are added to price points. The total is rounded to two decimal places. The contract is awarded to the tenderer scoring the highest points, subject to section 2(1)(f) of the PPPFA.
Description
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)SSC Drive Replacement Project at Matimba Power Station for a period of 38 months. Tender number E3401GXMPMAT. Issue date 21 August 2026. Closing date 15 September 2026 at 10:00. Tender validity 90 days.
Important Dates
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)Closing date: 15 September 2026 at 10:00 (South African time).
Compulsory clarification meeting/site visit: 02 September 2026 at 10:00 at Matimba Power Station Lapa Auditorium. Attendance is mandatory; failure to attend results in disqualification. Bidders must confirm attendance with the Eskom Representative.
Validity period: 90 days from the closing date.
Clarification queries deadline: 7 working days before the tender closing date.
Briefing Session
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)A compulsory clarification meeting/site visit will be held on 02 September 2026 at 10:00 at Matimba Power Station Lapa Auditorium. Attendance is mandatory; bidders must confirm attendance with the Eskom Representative. Failure to attend results in disqualification.
Contact Information
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)Eskom Representative (commercial/SCM queries): Kamogelo Nkadimeng, Tel: 011 800 3720, Email: [email protected].
Procurement Manager: Dumisani Makamu.
Fraud and corruption reporting: 0800 11 2722, Email: [email protected].
Electronic submission platform: Eskom E-tendering at https://etendering.eskom.co.za.
Submission Guidelines
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)Tenders must be submitted electronically via the Eskom E-tendering site (https://etendering.eskom.co.za) under folders Technical, Commercial, Financial, and Other. All documents must be in PDF format; the price list must also be submitted in a separate Excel file. Upload size per document is 500 MB, total submission limited to 4 GB. No zip/compressed files or hard copies accepted. Tenders received after the closing time will be disqualified.
Returnable forms are categorised as:
All mandatory returnables must be completed, signed (where required) and submitted by the closing deadline. Failure to do so results in disqualification.
Returnable Documents
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)The table of returnables is detailed in the tender document. Categories:
All documents must be uploaded in PDF format; price list also in Excel.
Evaluation Criteria
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)Evaluation uses the 80/20 preferential point system.
Technical Specifications
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)Scope: SSC Drive Replacement Project at Matimba Power Station for a period of 38 months.
A detailed Scope of Work document is provided as an annexure to the tender. Bidders must prepare a method statement demonstrating understanding of the project and how activities will be executed to minimise environmental impact.
Specific technical details are not included in the ITT; refer to the attached Scope of Work.
Methodology
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)A method statement must be prepared for the works, demonstrating understanding of the project as a whole and detailing how activities will be executed to minimise or prevent pollution to the environment. This is part of the environmental requirements.
Quality Management
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)Quality requirements: ISO 9001 certificate valid and relevant; evidence of QMS operation (organisation chart, control of external providers, internal audit report, certification audit report not older than 12 months, management review records); draft Contract Quality Plan (CQP) specific to scope; draft Quality Control Plan (QCP) or Inspection and Test Plan (ITP); completed Form A. All submitted for evaluation.
Pricing Schedule
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)The Pricing Schedule is included in the NEC contract (attached) and must also be uploaded as a separate Excel file. Both PDF and Excel versions are required. The upload size per document is 500 MB, total submission 4 GB. Cataloguing: if applicable, the Pricing Schedule must include a line item for cataloguing. No other pricing format details are specified.
Financial Requirements
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)Pricing format: The Pricing Schedule is included in the NEC contract and must also be submitted as a separate Excel file. Both PDF and Excel versions are required.
No performance security is required.
Payment terms: Eskom commits to pay suppliers within 30 days of receipt of undisputed invoices for contracts valued below R50 million (including VAT), and within 60 days for contracts above R50 million.
Eskom reserves the right to negotiate with preferred bidders if tendered prices are not market-related.
Cataloguing: The successful tenderer may be required to provide cataloguing information; if so, the Pricing Schedule must include a line item for cataloguing. No bond or guarantee is mentioned.
Compliance Requirements
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)Mandatory contractual requirements (assessed prior to award):
B-BBEE Requirements
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)Specific goals are scored out of 10 points. Bidders must submit SBD 6.1 Preference Points Claim Form and may claim points for B-BBEE status level. B-BBEE proof can be a certificate from an authorised body, a sworn affidavit, or other prescribed requirement. Objective criteria require local production and content with a minimum threshold of 5% for switching devices. Mandatory subcontracting of 30% contract value to an EME or QSE that is 51% owned by black people living in rural or underdeveloped areas or townships. SBD 6.2 and supporting annexures (G1-G4) are required if designated materials are included.
Health & Safety
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)Safety requirements: Health and Safety Plan addressing project OHS risks; detailed costing for OHS management (not lump sum); Letter of Good Standing (COIDA); Baseline OHS Risk Assessment with methodology; OHS policy signed by CEO complying with OHS Act Section 7; OHS competency evidence (CVs, qualifications).
Environmental
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)Environmental requirements: Appointment of Environmental Officer (3+ years experience, relevant qualification); Environmental Policy (compliance and pollution prevention); Aspect and Impact Register; Method Statement; Waste Management plan (including zero liquid effluent discharge); Emergency preparedness and response plan; Hazardous Chemical Substances plan (including spill management).
Contractual Terms
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)NEC contract conditions apply. Cataloguing may be required; pricing schedule must include line item. No performance security. Payment terms: 30 days (<R50m) or 60 days (>R50m). Eskom may negotiate if prices not market-related. Subcontracting with subsidiaries discouraged; must be declared.
Requirements
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)Eligibility criteria: Tenderers must not be under any restriction to do business with Eskom or State-Owned Companies. Ineligible if: nationality on international sanctions list, submit more than one tender (except due to e-tendering size limits), joint venture/consortium without joint and several liability, conflict of interest, tender signed by non-authorised person, restricted by National Treasury, on Tender Defaulters list, restricted by Eskom, or subcontract 100% of scope.
Basic compliance: meet eligibility, submit complete tender with commercial, financial, and technical information, and mandatory commercial returnables.
CIDB: required grading 7ME or higher (or JV with lead partner at least 6ME and combined grading meeting threshold).
Mandatory subcontracting: 30% of contract value to qualifying EME/QSE (51% black-owned in rural/townships).
No alternative tenders allowed.
Section
Source: ITT for SSC Drive replacement for a period of 38 months.pdf (RFP)Functionality evaluation includes quality criteria scored out of 12 points (Section A-E). Bidders must meet the minimum functionality threshold (not specified in the ITT). Price scored out of 90 points, specific goals out of 10 points (80/20 system). Objective criteria: local content threshold of 5% for switching devices; mandatory subcontracting 30% to qualifying EME/QSE. CIDB grading 7ME required. Ranking by total score with potential application of objective criteria.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.docx (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Disqualification risks:
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.docx (unknown)Bidders must hold a valid ISO 9001 Quality Management System certificate from an accredited certification body with international accreditation. The certificate's scope must be relevant to the tender and valid (not expired).
Bidders must demonstrate an operational QMS through documented evidence including:
Each quality deliverable is scored as pass/fail (indicator = 1). All sections must be passed.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.docx (unknown)The project involves the replacement of SSC drives at Matimba Power Station over a period of 38 months. The scope includes design, installation, and commissioning of drive systems. Bidders must provide a Contract Quality Plan and Quality Control Plan demonstrating how consistency of design and installation practices will be managed across all units during project implementation.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.docx (unknown)Bidders must hold a valid ISO 9001 Quality Management System certificate from an accredited certification body with international accreditation. The certificate must be relevant to the tender scope and valid (not expired).
Returnable compliance forms:
Contact Information
Source: 240-12248652 (Rev 7)_List of Tender Returnables-EDC Formatted LTN 03.02.2022.pdf (TENDER)Andani Muthelo is the Eskom representative who issued the document.
Submission Guidelines
Source: 240-12248652 (Rev 7)_List of Tender Returnables-EDC Formatted LTN 03.02.2022.pdf (TENDER)Returnable documents must be completed, signed and submitted with the bid. All quality deliverables listed in the List of Tender Returnables are mandatory. Form A must be completed and signed.
Returnable Documents
Source: 240-12248652 (Rev 7)_List of Tender Returnables-EDC Formatted LTN 03.02.2022.pdf (TENDER)E.1 Form A is completed and signed.
Evaluation Criteria
Source: 240-12248652 (Rev 7)_List of Tender Returnables-EDC Formatted LTN 03.02.2022.pdf (TENDER)The quality requirements are evaluated on a pass/fail basis with an indicator of 1 per item. Bidders must score on all applicable items in Sections A through E. Section A requires a valid ISO 9001 certificate with relevant product/service scoping, from an accredited certification authority with recognized international accreditation, and the certificate must be valid at bid closing. Section B requires evidence of an operational QMS including organization chart, responsibility matrix, control of externally provided processes, internal audit report, certification audit report (not older than 12 months), and management review records. Section C requires a draft Contract Quality Plan specific to the scope. Section D requires an Inspection and Test Plan (ITP) or Quality Control Plan (QCP) for similar previous work. Section E requires Form A completed and signed.
Technical Specifications
Source: 240-12248652 (Rev 7)_List of Tender Returnables-EDC Formatted LTN 03.02.2022.pdf (TENDER)The scope is the SSC Drive Replacement Project at Matimba Power Station. The contract period is 38 months.
Quality Management
Source: 240-12248652 (Rev 7)_List of Tender Returnables-EDC Formatted LTN 03.02.2022.pdf (TENDER)Bidders must have a certified Quality Management System (QMS) ISO 9001 certificate from an accredited body. Evidence of an operational QMS is required:
A draft Contract Quality Plan specific to the scope of work (ref ISO 10005) is required.
A draft Inspection and Test Plan (ITP) or Quality Control Plan (QCP) for similar previous work is required.
Form A must be completed and signed.
Compliance Requirements
Source: 240-12248652 (Rev 7)_List of Tender Returnables-EDC Formatted LTN 03.02.2022.pdf (TENDER)Bidders must hold a valid ISO 9001 certificate from an accredited body, with the certificate's scope relevant to the work. The certification authority must have recognized international accreditation. The certificate must be valid at the time of bid.
Returnable forms (one line each):
Section
Source: 240-12248652 (Rev 7)_List of Tender Returnables-EDC Formatted LTN 03.02.2022.pdf (TENDER)The evaluation is based on the quality returnables checklist with an indicator of 1 per applicable item across Sections A to E. All items must be scored to pass. Section A scores 4 points, Section B scores 5 points, Section C scores 1 point, Section D scores 1 point, Section E scores 1 point. The overall requirement is Category 1 – Quality Requirements Deliverables.
Important Dates
Source: NEC for SSC Drive Gearbox Replacement Contract .doc (unknown)Closing date: 2026-09-15 at 10:00 AM (from tender record). Contract start date: November 2026 (outage). Completion of works: 36 months after start date. Defects date: 52 weeks after completion. No mandatory briefing or site visit dates are stated.
Contact Information
Source: NEC for SSC Drive Gearbox Replacement Contract .doc (unknown)Employer: Eskom Holdings SOC Ltd, registered office at Megawatt Park, Maxwell Drive, Sandton, Johannesburg. Site: Matimba Power Station, Nelson Mandela Drive, Lephalale, 0555. Project Manager and Supervisor are to be appointed; no names or direct contact details provided.
Evaluation Criteria
Source: NEC for SSC Drive Gearbox Replacement Contract .doc (unknown)Bidders must have a valid CIDB registration and a valid B-BBEE certificate. The evaluation will consider price and functionality, but no specific scoring split or minimum thresholds are stated in the document. The contract is a NEC3 Option A (priced contract with activity schedule) with secondary options including price adjustment, delay damages, retention, and limitation of liability. Preference will be given to production during outages.
Technical Specifications
Source: NEC for SSC Drive Gearbox Replacement Contract .doc (unknown)Scope: Replacement of the Submerged Scraper Conveyor (SSC) drive system on all six units at Matimba Power Station with hydraulic drive systems. Work includes: removal of existing drives, installation of hydraulic drive motors, power pack cabinets, drive shaft modifications, bearings, structural modifications, and control & instrumentation design. Bidders must design the mechanical, electrical, and C&I systems. The contract requires compliance with Eskom's standards for documentation, plant coding (KKS), and health & safety. Training of Eskom staff and provision of data books are required.
Financial Requirements
Source: NEC for SSC Drive Gearbox Replacement Contract .doc (unknown)Pricing format: NEC3 Option A – Priced contract with Activity Schedule. The activity schedule includes items for material, delivery, installation, and commissioning. Payment assessed monthly between the 25th day of each month. Delay damages: R80,000 per day for late completion of sections. Retention free amount: R0; retention percentage not stated. Limitation of liability: R1,000,000 for indirect or consequential loss. A performance guarantee (ASGI-SA Guarantee) is required, but the amount is not specified in the extracted text.
Compliance Requirements
Source: NEC for SSC Drive Gearbox Replacement Contract .doc (unknown)CIDB registration is required (tenderer must provide registration number). B-BBEE status is important; the contract includes a clause requiring notification of any change in B-BBEE status, which may lead to renegotiation or termination. A valid tax invoice and compliance with VAT are required. Bidders must comply with the Occupational Health and Safety Act and Eskom's safety standards. No specific B-BBEE level, local content percentage, or other registration thresholds are stated.
Contact Information
Source: Tender Technical Evaluation Strategy - SSC Drives Gearbox Replacement 20260629.pdf (unknown)TET Members:
Other contacts: Tshegofatso Modiba, Coal Plant System Engineer; Gift Nkuna, Auxiliary Engineering Manager; Jacky Mathobela, Engineering Manager.
Evaluation Criteria
Source: Tender Technical Evaluation Strategy - SSC Drives Gearbox Replacement 20260629.pdf (unknown)The minimum weighted final score (threshold) required for a tender to be considered from a technical perspective is 70%. Qualitative Technical Evaluation Criteria: 1. Company's Capacity to execute the works (40%): 1.1 Related Experience - contractor must have successfully completed projects of similar scope; scoring based on number of completed hydraulic drives projects. 2. Method statements (55%): 2.1 Mechanical works - method statement demonstrating compliance with scope, including drive solution, installation, safety, environment, testing; CVs and qualifications for key resources (Mechanical registered engineer, Site Manager, Safety Officer, Mechanical Fitter, Quality Control Inspector, Rigger) with experience-based scoring. 2.2 Electrical works - method statement for concept/basic design, electrical connection diagram; CVs for ECSA registered Electrical Engineer and Installation Electrician with experience scoring. 2.3 C&I works - method statement for Control System IO Allocation, HMI on Teleperm ME & Teleperm XP, field instruments, etc.; CVs for ECSA registered C&I Engineer/Technologist with experience scoring. 3. Project Schedule (5%): detailed project schedule with critical milestones and durations.
Technical Specifications
Source: Tender Technical Evaluation Strategy - SSC Drives Gearbox Replacement 20260629.pdf (unknown)Matimba Power Station is designed to have the SSC employed underneath the boiler for the purpose of boiler bottom ash (BBA) and slag removal, as well as furnace sealing. SSCs are driven by an input gearbox which is directly connected to the first reduction gearbox, the variable speed drive links these gearboxes to the electric motor. This drive assembly is supplied by PIV Gearboxes and Drives and produces 75 000 Nm of torque.
Methodology
Source: Tender Technical Evaluation Strategy - SSC Drives Gearbox Replacement 20260629.pdf (unknown)Method statement detailing how the work will be executed showing a thorough understanding of C&I Scope of the works. Method statement detailing a high-level Control System concept.
Experience & Qualifications
Source: Tender Technical Evaluation Strategy - SSC Drives Gearbox Replacement 20260629.pdf (unknown)Site Manager with 6 or more years relevant experience. Safety Officer with 6 or more years relevant experience. Qualified Mechanical Fitter with 7 or more years relevant experience. Quality Control Inspector with 6 or more years relevant experience. Rigger with a minimum of 6 or more years relevant experience.
Quality Management
Source: Tender Technical Evaluation Strategy - SSC Drives Gearbox Replacement 20260629.pdf (unknown)Method Statements lack details and does not meet technical requirement(s), safety and environment. No method statement submitted.
Compliance Requirements
Source: Tender Technical Evaluation Strategy - SSC Drives Gearbox Replacement 20260629.pdf (unknown)Provide valid ECSA certification. All (Mechanical, Electrical and C&I) discipline engineers are required to be professionally recognised/registered engineer/technologist with ECSA.
Health & Safety
Source: Tender Technical Evaluation Strategy - SSC Drives Gearbox Replacement 20260629.pdf (unknown)Method statement must include but not limited: requirement(s), safety, and environment.
Description
Source: E-tendering Help Manual for supplier - 27 January 2025.docxThis document is a user manual for Eskom's eTendering system, not the tender document for the SSC Drive Replacement Project. It describes how suppliers register, upload, and submit tender documents electronically.
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)For system problems, contact the buyer responsible for the published tender. No specific contact details are provided in this document.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Submission is electronic via the Eskom eTendering system at https://eTendering.eskom.co.za. Bidders must register with a valid CSD number and verify their email. Files must be uploaded under the correct category (Technical, Commercial, Finance, etc.). Final submission is made by clicking 'Finalize Submission'. Total file size must not exceed 900MB, with a single file limit of 50MB. A submission ID is emailed upon completion and should be retained.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Bidders must register on the eTendering system with a valid CSD number. Registration requires completion of all fields, a contact number starting with +27 (e.g., +27), and email verification. There is no mention of B-BBEE level, CIDB grading, tax clearance, or other specific pre-qualifications in the supplied text.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)eTendering system is a web-based system that allows suppliers bidding for various tenders advertised on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers submit tender documents at various Eskom tender offices. eTendering system replaces the manual or physical submission of tender documents at various Eskom tender offices. eTendering system in a nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will be required to register their details before they can be granted access to the eTendering system. An OTP (one time pin) will be sent to both their cell phone and email address.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Bidders must have a CSD (Central Supplier Database) number to access the eTendering system.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Generation Division - Lephalale - Lephalale - 0555
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
12
Last checked
21 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.