Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Development Bank of Southern Africa (DBSA)Location
Gauteng
Closing Date
22 Jul 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
1258 Lever Road - Headwayhill - Midrand - 1619
Organization Type
GOVERNMENT
Published
01 Jul 2026
OCDS Reference
ocds-9t57fa-160870
The development bank of southern africa (DBSA), acting as agent for the department of water and sanitation, invites tenders from contractors for drilling and grouting works at the tzaneen dam in limpopo. The appointed contractor will work under the management of the main contractor, dws construction north (pty) ltd, and must comply with the gcc 2015 contract conditions and strict health and safety regulations.
Continue with tenders sharing this issuer, category, or province.
Return to this tenderβs issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 22 July 2026 - 00:00
Venue
No. 1 Voortrekker Road, Tzaneen Dam, Construction North office- Tzaneen. Please use Deer Park Road t
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Please visit the DBSA website for additional information pertaining to tender.
Categories
Request for Bid(Open-Tender)
1258 Lever Road - Headwayhill - Midrand - 1619
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: Annexure C - DBSA SHEQ Policy.pdf. You donβt need to refresh β this page will pick up the updated review automatically.
01 Jul
2026
Tender Published
Tender was published
22 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
PPS 9.pdf
This tender is for the appointment of a contractor to perform drilling and grouting works for the Tzaneen Dam Raising project in Limpopo Province. The works include exploratory drilling, water pressure testing, pressure grouting for seepage control curtains, consolidation grouting, cavity grouting, contact grouting, and drainage hole drilling. The project requires specialized expertise in dam foundation grouting techniques with strict quality control measures and testing protocols.
RFP082.2026_Volume 2 Returnables.pdf
The Development Bank of Southern Africa (DBSA) is inviting tenders for the appointment of a contractor to perform drilling and grouting works for the Tzaneen Dam Project in Limpopo. The tender requires comprehensive submission of returnable documents, including mandatory forms, declarations, and compliance certificates, with a closing date of July 22, 2026.
Annexure A - Health & Safety Specifications - Drilling & Grouting.pdf
The tender is for the appointment of a contractor to perform drilling and grouting works in preparation for the construction of the Tzaneen Dam in Limpopo, South Africa. The project is part of the Groot Letaba River Water Development (GLeWaP) and is managed by the Development Bank of Southern Africa (DBSA) on behalf of the Department of Water and Sanitation (DWS). The tender emphasizes strict compliance with the Occupational Health and Safety (OH&S) Act, Construction Regulations 2014, and other relevant legal frameworks. The scope includes health and safety management, risk assessments, training, incident reporting, and site-specific requirements such as working at heights, crane operations, and hazardous chemical handling.
Drilling Grouting unPriced BOQ.xlsx
This tender document outlines the requirements for drilling and grouting works for the Tzaneen Dam Project, issued by the Development Bank of Southern Africa. It includes detailed bill of quantities covering preliminary items, health and safety, environmental management, and specific drilling and grouting activities. The project involves extensive drilling for grouting and drainage holes, water pressure testing, and material supply, with a 3-month duration for key activities.
Annexure C - DBSA SHEQ Policy.pdf
RFP082.2026_Volume 3 The Contract.pdf
The Development Bank of Southern Africa (DBSA) is tendering for a contractor to perform drilling and grouting works for the Tzaneen Dam Project. The contract will be governed by the General Conditions of Contract for Construction Works (GCC 2015, 3rd Edition). The contractor will work under the management of a designated Main Contractor (DWS Construction North (Pty) Ltd) and must coordinate closely with both the Employer's Agent and the Main Contractor. The tender closing date is July 22, 2026.
RFP082.2026_Volume 1 Procedures.pdf
This tender (RFP082/2026) issued by the Development Bank of Southern Africa (DBSA) seeks a contractor for drilling and grouting works at the Tzaneen Dam Project. The client is the Department of Water and Sanitation. Bidders must have a minimum CIDB grading of 6 CE or higher. The evaluation uses CIDB Method 1 with a 3-stage process: Responsiveness, Financial Offer & Preference (80/20 split), and Risk Analysis. A compulsory site tender briefing is scheduled for July 10, 2026, and the tender closes on July 22, 2026 at 23h55.
Annexure B - Baseline Risk Assessment - Drilling & Grouting.pdf
This document is a Baseline Risk Assessment (BLRA) prepared for the 'Raising of Tzaneen Dam' project as part of the Groot Letaba River Water Development Project (GLeWaP). It is a mandatory health and safety document required by Construction Regulation 5(1)(a) of the Occupational Health and Safety Act. The assessment identifies and categorizes potential hazards (low to high) associated with the project's construction activities, including drilling, grouting, concrete works, and earthworks, to establish a benchmark for risk management. The document outlines the risk analysis methodology, control measures, and assigns responsibilities. It is not the main tender specification but a critical supporting document detailing the safety framework contractors must operate within.
To download these documents and access AI-powered analysis, visit the main tender page.
Secure DBSA tenders with AI Matching Engine, development finance intelligence, compliance analysis, and bid support for infrastructure and consulting.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
RΒ 21Β 485Β 030
Range
Based on 19 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Description
Source: RFP082.2026_Volume 2 Returnables.pdf (RFP)Scope: Appointment of a contractor for drilling and grouting works for the Tzaneen Dam Project. Bidders must confirm understanding of the work scope, conditions, and cost influences via T2.1.10 (Certificate of Acquaintance with Tender Document).
Important Dates
Source: RFP082.2026_Volume 2 Returnables.pdf (RFP)Contact Information
Source: RFP082.2026_Volume 2 Returnables.pdf (RFP)Submission Guidelines
Source: RFP082.2026_Volume 2 Returnables.pdf (RFP)Returnable Documents
Source: RFP082.2026_Volume 2 Returnables.pdf (RFP)Evaluation Criteria
Source: RFP082.2026_Volume 2 Returnables.pdf (RFP)Technical Specifications
Source: RFP082.2026_Volume 2 Returnables.pdf (RFP)Methodology
Source: RFP082.2026_Volume 2 Returnables.pdf (RFP)Pricing Schedule
Source: RFP082.2026_Volume 2 Returnables.pdf (RFP)Financial Requirements
Source: RFP082.2026_Volume 2 Returnables.pdf (RFP)Compliance Requirements
Source: RFP082.2026_Volume 2 Returnables.pdf (RFP)Contractual Terms
Source: RFP082.2026_Volume 2 Returnables.pdf (RFP)Description
Source: Drilling Grouting unPriced BOQ.xlsxThe project involves the appointment of a contractor for drilling and grouting works at the Tzaneen Dam. Key deliverables include establishment and de-establishment on site with all necessary storage.
Evaluation Criteria
Source: Drilling Grouting unPriced BOQ.xlsx (unknown)Contractors must demonstrate capability in dam drilling and grouting works, have SACPCMP-registered safety personnel, comply with South African construction regulations (CR 7 and CR 8(5)), provide necessary insurances (Performance Bond, All Risk Contractors Insurance, SASRIA), and show experience in environmental management on construction sites. Financial capacity to handle the project scope and provide required bonds is essential.
Technical Specifications
Source: Drilling Grouting unPriced BOQ.xlsx (unknown)The scope covers drilling and grouting works for the Tzaneen Dam project. Key requirements include:
Financial Requirements
Source: Drilling Grouting unPriced BOQ.xlsx (unknown)The document contains a detailed unpriced bill of quantities. Key financial items include:
Compliance Requirements
Source: Drilling Grouting unPriced BOQ.xlsx (unknown)Key compliance requirements include:
Description
Source: Annexure A - Health & Safety Specifications - Drilling & Grouting.pdf (unknown)Project: Groot Letaba River Water Development (GLeWaP) - Raising of Tzaneen Dam.
Scope: Drilling and grouting works in preparation for the construction of Tzaneen Dam.
Contact Information
Source: Annexure A - Health & Safety Specifications - Drilling & Grouting.pdf (unknown)Project Manager: Cobus Nienaber (DBSA) - Email: [email protected]
SHEQ Specialist: Cindie Venter (DBSA) - Email: [email protected]
Construction Project Manager: Jacob Tshiwilowilo (DBSA) - Email: [email protected]
Designers: Henry-John Wright (ARQ Dams (Pty) Ltd) - Email: [email protected]
Clientβs Construction Health and Safety Agent (Pr. CHSA): Francois du Toit (SHE Group) - Email: [email protected], Phone: 044 873 2530, Address: 96 Merriman Street, George, 6530
Evaluation Criteria
Source: Annexure A - Health & Safety Specifications - Drilling & Grouting.pdf (unknown)Legal Requirements:
Technical Requirements:
Financial Requirements:
Documentation:
Technical Specifications
Source: Annexure A - Health & Safety Specifications - Drilling & Grouting.pdf (unknown)Scope: Drilling and grouting works in preparation for the construction of Tzaneen Dam under the Groot Letaba River Water Development (GLeWaP) project.
Key Technical Requirements:
Audit and Inspection Requirements:
Environmental and Waste Management:
Personnel Competency Requirements:
Compliance Requirements
Source: Annexure A - Health & Safety Specifications - Drilling & Grouting.pdf (unknown)Legal and Regulatory Compliance:
Contractor Responsibilities:
Site-Specific Health and Safety Requirements:
Health & Safety
Source: Annexure A - Health & Safety Specifications - Drilling & Grouting.pdf (unknown)Specifications
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
Document Number DWS/DBSA/TZANEEN/HSS/AR/2026/02
Groot Letaba River Water Development: Raising of Tzaneen Dam:
00 20/05/2026 F du Toit Francois du Toit For Construction
No.
Designer - ARQ Dams (Pty) Ltd 00 20/05/2026
Employer β DBSA 00 20/05/2026
Client - Department of Water and Sanitation: Republic of South Africa 00 20/05/2026
DBSA Jacob Tshiwilowilo [email protected]
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
4.1 Construction Work Permit
4.2 Structure and Organisation of OH&S Responsibilities
4.3 Communication & Liaison
4.4 OH&S File
4.5 OH&S Goals and Objectives and Arrangements for Monitoring and Review of OH&S
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
intended project and provide such specification to Contractor.
Construction of Tzaneen Dam. For the detailed scope of Work, please refer to Part C3 in the
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
Worker means any person who works in an employerβs workplace including an employee of
the employer or contractor, a self-employed person or volunteer;
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
Work Permit Number: LP-TZN-316/05/2023 was issued to Project
work permit number shall be displayed at the entrance to the Construction Site.
4.2 Structure and Organisation of OH&S Responsibilities
4.2.1. Overall Supervision and Responsibility for OH&S
Construction Regulation 7, implements and maintains the agreed and approved
ensure that his Employees (as defined in the Act) complies with the Act. Legal
respective appointment forms
Assistant Construction Supervisor/s appointed in terms of Construction Regulation 8.
4.2.2 Further (Specific) Responsibilities for OH&S
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
Delegation of Duties Section 16(2)
Construction Manager Construction Regulation 8(1)
OH&S Officer (Part-Time) Construction Regulation 8(5)
Construction Supervisor Construction Regulation 8(7)
Risk Assessor Construction Regulation 9
Fall Protection Plan Developer Construction Regulation 10
Structures Supervisor/Inspector Construction Regulation 11
Temporary Works Supervisor Construction Regulation 12
Scaffold Supervisor, Erector & Inspector Construction Regulation 16
Construction Vehicle / Mobile Plant / Construction Regulation 23
Drivers / Operators of Construction Vehicles / Construction Regulation 23
Electrical Installation and Appliances Construction Regulation 24
together with the period for which the appointment is made. This information shall be
communicated and agreed with the appointees.
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
4.3.3 Consultation with the workforce on OH&S matters will be through their Supervisors, OH&S
4.3.4 The Principal Contractor will be responsible for the dissemination of all relevant OH&S
information to the other Contractors e.g. design changes agreed with the Client and the
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
that must be approved by the client and the contractor will be held liable for the cost.
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
4.7.3. A representative of the Principal Contractor and other Contractors must accompany the
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
progresses and each time changes are made to the designs, plans and construction methods
and processes.
4.7.5.2 The Principal Contractor must provide the Client, other Contractors and all other concerned
parties with copies of any changes, alterations or amendments.
4.8 Site Rules and other Restrictions
4.8.1 Site OH&S Rules
the Contractorβs OH&S File.
4.9.1 General Induction Training
4.9.2 Site Specific Induction Training
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
4.10.4. The Contractor is responsible for the investigation of all road traffic accidents and keeping a
record of the results of such investigations including the steps taken to prevent similar
accidents in future.
4.11 H&S Representatives
4.11.1 Designation of OH&S Representatives
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
specific project. The agreement must also indicate whether the contractor will make use of the
Principal Contractorβs First Aid facilities, if they have less than 10 persons on site or does not have their
own appointed and trained First Aider.
contractor, contact person / responsible person, contact number and scope of work. The list must be
updated on a monthly basis and as the work progress.
with the Compensation Commissioner (COIDA).
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
5.2 Working at Heights β Construction Regulation 10
person, appointed in writing as per Construction Regulation 10.
obtained by at least one person who will be full-time on site (e.g. Supervisor)
training
declared fit for work at heights.
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
of the harnesses and other fall protection equipment will be conducted on issue (daily) and record
kept thereof. All defective fall protection equipment must be discarded immediately.
inspector, appointed in writing. Scaffolding will be erected in accordance with SANS 10085.
demarcated to prevent employees from entering the critical work area.
5.3 Cranes & Lifting β Construction Regulation 22
assessment for the equipment
documented and recorded checklist
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
over power lines or lifts over water; and lifts involving personnel cages
No lifting is permitted above 90% of the maximum rated load in the specific lifting configuration
conducted prior to the lift.
phones shall not be used.
suspended. The load must be well secured and properly balanced in the sling or lifting device
representative. The OEM lifting chart shall always be used and there shall be no interpolation
between the chart listings
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
equipment.
5.4 Construction Vehicles and Mobile Plant β Construction Regulation 23
The Contractor shall ensure that drivers of motor vehicles are in possession of a driverβs license, valid
for the class of vehicle which they are required to drive, and shall produce the license on request.
influence of alcohol, drugs or other substance.
plant, certification of competency and authorization of operators to operate machinery, vehicles or
plant.
said operators before allowing operators to operate machinery, vehicles or plant.
different construction vehicles and mobile plant.
according to their design. All construction vehicles and mobile plant must be maintained in good
working order.
for each. The register shall report all maintenance activities performed on these vehicles and plant
as well as signatures certifying the condition of the vehicles as in a good working order.
inspected and certified.
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
adequate steps must be taken to establish the presence of and guard against any danger to the
workers in respect to electrical cables or apparatus.
of which the handles are insulated or rubber insulated gloves.
When Distribution Boards are removed the incoming power supplies shall be cut by the clientβs
authorized Electrician. The incomer electricity supply feeder shall be earthed by a suitable earth wire
or spike to prevent cable of becoming live during the installation of new Distribution Boards.
dead and the above effective measures has been taken to ensure that such cables remains dead.
locked out and the cable earthed to prevent any injury to workers by Electrical Shock.
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
No person shall use or permit to use a portable electric load operating at a voltage exceeding 50V
to earth unless it is connected to a source of electrical energy incorporating an earth leakage
protection device.
signed by the responsible person. Checks shall include condition of plug top, power cord, on-off
switch and insulation condition of electric tool. All tools shall be numbered and entered accordingly
into the register. Condition of tools as listed in the register shall be inspected and signed by the
construction supervisor at regular intervals as required by the nature of the equipment.
5.6 Barricading and Demarcation
the construction area.
to persons or risk of damage to any property.
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
materials stored within.
adequate and suitable fire-fighting equipment shall be provided within easy reach of the materials
stores.
controlled with access points.
5.9 Stacking and Storage on Construction Sites β Regulation 28
storage of material on site.
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
5.10.2 First Aid Equipment
occur.
5.10.4 Reporting of Incidents and/or Injuries
submitted to the Site Agent and the Department of Employment and Labour within twenty four (24)
hours of the occurrence of the incident.
5.11 Fire Precautions on Construction Sites β Construction Regulation 29
place. (On vehicles and other positions as deemed necessary).
be trained in the use of firefighting equipment.
firefighting training completed with date.
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
5.12 Construction Welfare Facilities β Regulation 30
AS PER CONSTRUCTION REGULATION 5(1)(b), 2014
Important Dates
Source: RFP082.2026_Volume 1 Procedures.pdf (RFP)Contact Information
Source: RFP082.2026_Volume 1 Procedures.pdf (RFP)Submission Guidelines
Source: RFP082.2026_Volume 1 Procedures.pdf (RFP)Returnable Documents
Source: RFP082.2026_Volume 1 Procedures.pdf (RFP)Evaluation Criteria
Source: RFP082.2026_Volume 1 Procedures.pdf (RFP)Pre-qualifying criteria (disqualification if not met):
Responsiveness criteria (must respond within 48 hours of clarification request):
Evaluation stages:
Joint ventures: must be registered as a JV, all members CIDB registered in CE class, lead partner with 6 CE or higher, combined grading meets requirement, signed JV agreement, consolidated B-BBEE certificate.
Technical Specifications
Source: RFP082.2026_Volume 1 Procedures.pdf (RFP)Financial Requirements
Source: RFP082.2026_Volume 1 Procedures.pdf (RFP)Compliance Requirements
Source: RFP082.2026_Volume 1 Procedures.pdf (RFP)Requirements
Source: RFP082.2026_Volume 1 Procedures.pdf (RFP)Section
Source: RFP082.2026_Volume 1 Procedures.pdf (RFP)Description
Source: RFP082.2026_Volume 3 The Contract.pdfContact Information
Source: RFP082.2026_Volume 3 The Contract.pdf (RFP)Submission Guidelines
Source: RFP082.2026_Volume 3 The Contract.pdf (RFP)Returnable Documents
Source: RFP082.2026_Volume 3 The Contract.pdf (RFP)Evaluation Criteria
Source: RFP082.2026_Volume 3 The Contract.pdf (RFP)Technical Specifications
Source: RFP082.2026_Volume 3 The Contract.pdf (RFP)Quality Management
Source: RFP082.2026_Volume 3 The Contract.pdfPricing Schedule
Source: RFP082.2026_Volume 3 The Contract.pdfFinancial Requirements
Source: RFP082.2026_Volume 3 The Contract.pdf (RFP)Compliance Requirements
Source: RFP082.2026_Volume 3 The Contract.pdf (RFP)Health & Safety
Source: RFP082.2026_Volume 3 The Contract.pdfContractual Terms
Source: RFP082.2026_Volume 3 The Contract.pdfDescription
Source: PPS 9.pdfEvaluation Criteria
Source: PPS 9.pdf (unknown)Technical Specifications
Source: PPS 9.pdf (unknown)Methodology
Source: PPS 9.pdfExperience & Qualifications
Source: PPS 9.pdfQuality Management
Source: PPS 9.pdfPricing Schedule
Source: PPS 9.pdfFinancial Requirements
Source: PPS 9.pdf (unknown)Compliance Requirements
Source: PPS 9.pdf (unknown)Health & Safety
Source: PPS 9.pdfEnvironmental
Source: PPS 9.pdfContractual Terms
Source: PPS 9.pdfSection
Source: PPS 9.pdfDescription
Source: Annexure B - Baseline Risk Assessment - Drilling & Grouting.pdfThe project is the raising of Tzaneen Dam, part of the Groot Letaba River Water Development Project (GLeWaP) to enhance water resources for the Mopani District, Limpopo. It is being developed by the Department of Water and Sanitation (DWS) through implementation agent Lepelle Northern Water, in tandem with construction of the new Nwamitwa Dam. The dam raising aims to increase assurance of yield.
Contact Information
Source: Annexure B - Baseline Risk Assessment - Drilling & Grouting.pdf (unknown)Project Manager: Cobus Nienaber ([email protected]). SHEQ Specialist: Cindie Venter ([email protected]). Construction Project Manager: Jacob Tshiwilowilo ([email protected]). Designers: ARQ (Pty) Ltd, Henry-John Wright ([email protected]). Pr. CHSA SHE Group: Francois du Toit ([email protected]). Can. CHSA SHE Group: Ernie Pieterse ([email protected]).
Evaluation Criteria
Source: Annexure B - Baseline Risk Assessment - Drilling & Grouting.pdf (unknown)While explicit commercial eligibility criteria (e.g., B-BBEE, CIDB rating) are not stated in this BLRA document, contractors must demonstrably meet the following operational/safety criteria to be considered capable: 1. Proven ability to implement and manage the extensive health and safety controls outlined. 2. Access to and competence in using the required specialized equipment (drill rigs, cranes, concrete pumps). 3. Employment of personnel with verified competencies and medical fitness for the tasks. 4. A history of compliance with OHS Act and Construction Regulations. 5. Ability to conduct detailed task-specific risk assessments and integrate them into work methods.
Technical Specifications
Source: Annexure B - Baseline Risk Assessment - Drilling & Grouting.pdf (unknown)The project involves raising Tzaneen Dam by 3m to increase gross storage from 157.3 million mΒ³ to 193 million mΒ³. Key works include: demolition of approximately 4m of concrete from the existing Ogee crest; construction of a reinforced concrete labyrinth to a new crest elevation of RL 726.99m; raising of concrete NOC tongue wall sections; modifying the inlet works control house for impermeability; raising and strengthening embankment NOCs to RL 732.3m; and revising energy dissipation measures. The dam is a concrete gravity spillway with earthfill embankments, located on the Groot Letaba River upstream of Tzaneen, Limpopo. It was completed in 1977, is classified as Category III (Large size, High hazard potential), and registered under Dam Safety Legislation.
The project is the raising of Tzaneen Dam, part of the Groot Letaba River Water Development Project (GLeWaP) to enhance water resources for the Mopani District, Limpopo. It is being developed by the Department of Water and Sanitation (DWS) through implementation agent Lepelle Northern Water, in tandem with construction of the new Nwamitwa Dam. The dam raising aims to increase assurance of yield.
Maintain high standards of housekeeping and appoint a stacking and storage supervisor. Conduct monthly inspections on stacking and storing. Ensure competent/registered electricians conduct temporary electrical installations and issue Electrical Certificates of Compliance (COC). Conduct pre-start inspections, ensure good operator visibility, adhere to speed limits, provide proper supervision, and use water trucks for dust suppression. For lifting operations: ensure cranes are load tested, conduct daily pre-start inspections, and only allow competent operators. For drilling: conduct visual inspections, use drip trays and spill kits, adhere to maintenance schedules, and use only certified competent operators. Inspect equipment monthly and report deviations. Erect scaffolding in accordance with SANS 10085, conduct daily inspections by a competent person, and ensure safety harnesses are worn and in good condition. For welding: ensure flashback arrestors are fitted, conduct task-specific training, issue welding helmets and correct PPE, and conduct monthly inspections on welding machines.
The risk assessment considers environmental impact as part of the consequence evaluation, where events may cause environmental impact.
Quality Management
Source: Annexure B - Baseline Risk Assessment - Drilling & Grouting.pdfMaintain high standards of housekeeping and appoint a stacking and storage supervisor. Conduct monthly inspections on stacking and storing. Ensure competent/registered electricians conduct temporary electrical installations and issue Electrical Certificates of Compliance (COC). Conduct pre-start inspections, ensure good operator visibility, adhere to speed limits, provide proper supervision, and use water trucks for dust suppression. For lifting operations: ensure cranes are load tested, conduct daily pre-start inspections, and only allow competent operators. For drilling: conduct visual inspections, use drip trays and spill kits, adhere to maintenance schedules, and use only certified competent operators. Inspect equipment monthly and report deviations. Erect scaffolding in accordance with SANS 10085, conduct daily inspections by a competent person, and ensure safety harnesses are worn and in good condition. For welding: ensure flashback arrestors are fitted, conduct task-specific training, issue welding helmets and correct PPE, and conduct monthly inspections on welding machines.
Compliance Requirements
Source: Annexure B - Baseline Risk Assessment - Drilling & Grouting.pdf (unknown)The contractor must comply with Occupational Health and Safety Act requirements, including conducting baseline risk assessments. Key compliance points: ensure all responsible personnel submit CVs and have legal appointment letters signed prior to work commencement; verify competencies; conduct occupational medicals before work starts; provide site-specific induction training; appoint a Risk Assessor with a HIRA certificate; implement task-specific risk assessments; maintain attendance registers; use method statements/Safe Operating Procedures; ensure all contractors develop effective controls for high and critical risk scenarios; and communicate the Baseline Risk Assessment to all construction partners.
The contractor must manage legal liability risks. Key requirements: ensure legal appointment letters are signed prior to work commencement; verify competencies; refer to design drawings for underground services; plan work to avoid overhead power lines; use pre-start checklists; appoint competent, medically fit operators; supervise work; use banksmen/spotters; appoint a Demolition Work Supervisor; ensure no person works in an area not declared safe; and have a watchman present during demolition by machinery.
This is a Baseline Risk Assessment prepared per Construction Regulation 5(1)(a) of the Occupational Health and Safety Act. The objective is to identify and categorise hazards associated with tasks during different work categories to assist management in eliminating, minimising, or controlling risks. The assessment must be reviewed periodically (about every year, after incidents, or changes in workforce/equipment). The risk analysis method includes describing tasks, evaluating probability and severity of risks, and evaluating controls. Risk levels are defined: Low (1-6), Medium (7-15), High (16-25). Consequence ratings range from medical treatment only (1) to fatality/permanent disability (5). Probability ratings range from very unlikely (1) to common occurrence (5). High-risk activities require immediate attention; training is often a solution. The hierarchy of control must be applied. Basic PPE required: hard hat, overalls, ear protection, dust mask, safety vest, safety glasses, safety footwear, gloves, fall protection equipment. References required: method statement, SDS, planned task observation, safe work procedure, work instruction, transmittable disease control, daily safety task instruction. Specific control measures are listed for numerous activities including project mobilization, site establishment, vehicle operations, excavations, lifting, drilling, concrete works, scaffolding, working at heights, handling hazardous chemical agents, hot work, electrical works, working near water, brickwork, demolition, and site demobilization.
AS PER CONSTRUCTION REGULATION 5(1)(a), 2014
Document Number DWS/DBSA/TZANEEN/BLRA/2023/01
Project Name Groot Letaba River Water Development: Raising of Tzaneen Dam
Revision Number Rev 03
Rev 01 11/03/2023 Francois du Toit Francois du Toit For Construction
Rev 02 15/01/2025 Francois du Toit Francois du Toit As per legal requirements
Rev 03 20/05/2026 Francois du Toit Francois du Toit Procurement: Specialised Contractors
No.
Designer - ARQ Dams (Pty) Ltd 03 20/05/2026
Employer β DBSA 03 20/05/2026
Client - Department of Water and Sanitation: Republic of South Africa 03 20/05/2026
DBSA Jacob Tshiwilowilo [email protected]
associated with performing tasks during different work categories.
associated with the tasks performed or exposure to the working environment.
(DWS) through its implementation agent, Lepelle Northern Water, in tandem with the
construction of the new Nwamitwa Dam and as part of the Groot Letaba River Water
Development Project (GLeWaP) to increase the assurance of yield and to enhance the water
resources of the Groot Letaba River in serving the needs of the Mopani District of eastern
2.1 Description of the Dam
The construction of Tzaneen Dam was completed in 1977 and the dam comprises a concrete
gravity spillway section flanked with zoned earthfill embankments, as illustrated on the as-
Built drawings in Volume 4. The existing spillway is an uncontrolled ogee type, with a crest
length of 91,44 m (at FSL 723,90 m), while the total dam crest length is 1 140 m.
elevation of RL 726,99 m (raised 3 m);
an additional 3 m water depth; and
pattern of a labyrinth spillway.
preceded the actual raising construction contract. These include:
portion of the dam.
Fatality or permanent disability - 5
Major Injury - 4
Average lost time injury - 3
Minor Injury - 2
Medical treatment only or less - 1
will, in most instances, solve the problem satisfactorily.
against the sacrifice needed to implement the measures necessary to
be implemented unless it can be shown that the sacrifice is grossly
disproportionate to the benefit.
Critical Controls consequence of an event (if removed, they will significantly impact the
risk rating).
particular interval of time. Events involve releases or manifestations of, or
includes the nature, magnitude, and potential consequences as well as
relevant "target" or impact characteristics, potential timeframes,
pathways or mechanisms of its manifestation and residual harm. Also,
understanding sources of harm to the community may require
recognition of incentives.
the scope of activities for the Project.
Department of water and sanitation: republic of south africa
GROOT LETABA RIVER WATER DEVELOPMENT PROJECT (GLeWaP): RAISING OF TZANEEN DAM
Scope of Work (logical steps on how task will be performed) X X
Procedures: (WI / SOP / Vendor Spec) X X
Special permits required (specify) X X Construction Work Permit issued by DoEL: LP β TZN-316/05/2023
Equipment / Tool Registers / Others (specify) X X
3 2 6
alcohol policy to be available and
while transporting machinery
implemented by communicating
and equipment to site
Serious Injuries or Fatalities 3 5 15 the policy to all employees.
establishment area
Pedestrians passing by 3 5 15
and machinery
signs to be displayed.
Project interruption 3 3 9
machinery equipment to be left unattended.
Security to be implemented.
Special arrangements to be made
1 for abnormal loads.
Establishment Abnormal load Accident 2 5 10
displayed on trucks if applicable.
Containers placed on uneven
Property damage 2 3 6
surfaces on level surface.
Setting up Camp &
Lifting equipment to be load
Load test certificates to be
available.
installations.
installation
Installation of Temporary Electrocution 3 5 15 kept on H&S file
to be done on exact location
Incorrect location / layout plan Financial loss 3 3 9
escape routes are Serious injuries (3rd degree burns) fire fighters to ensure all personnel Fire occurring 3 4 12
Task specific training
Drivers/Operators authorised,
competent and medically fit
Incompetent person operating 3 5 15
Prestart checklist Incident / Accident / Fatality
Dust suppression Driving / Operating Driving/Operating Hitting other plant or road users /
Vehicles and plant conforming to
Operator/driver authorised,
competent and medically fit
Warning devices on vehicles not Incident / accidents 3 3 9
working
limits on site
Project interruption 3 4 12 vehicle.
5 and bringing new to site and bringing new
Proper communication between Fatalities 3 5 15
Supervision
Dust Eye and respiratory irritation 3 4 12
Financial Loss 3 3 9
to be communicated to all
Employees standing too close to
bucket of machine causing 3 4 12
machinery machinery in operation
serious injury
occupational medical
surveillance.
Incompetent / unfit operator Accident-causing fatality 3 5 15
available
Trenching / Excavate by
Machinery Financial Loss 3 4 12
Trenches / services to be communicated to 8
Project Interruption 3 4 12 only as per approved permit /
instruction
case of deep excavations
Collapse of trench / excavation
edge / placing excavated 4 5 20
(sides caving in) placed away from excavation
material next to excavation
edge
Operator to be competent
Crane / Truck-mounted crane
operator to be competent in the
Incident / Accident 3 4 12
medically fit to operate surveillance. Medical certificates
and Annexure 3 to be placed on
Operation
mounted crane
displayed on Crane. Outriggers
Crane toppling over 3 5 15 of crane to be placed in order to
capacity
keep crane steady. Crane spec
to be available for reference
purposes.
tested. Load test certificates to
be available. Lifting equipment
to be placed on register and
Load falling on employees 4 5 20 inspected on a monthly basis.
causing falling objects
to employees.
Temporary works material. Improper manual lifting Injuries 3 2 6
material techniques
account
11 Temporary Works Temporary Works collapsing 3 5 15
accordance with SANS
Serious injuries or fatalities 3 5 15
Drilling resulting into injury to Single Fatality C 5 19
Moving Rotary Core Setting up rig into a
Plan Task Observation to be employees
Rig operator to warn people in the
prevent them from falling over
Fatality 3 5 15
edge
Major injuries (fractures), etc. 3 3 9
Incorrect handling Skin irritation 2 3 6
Handling Exposed to HCA Occupational Illness or Disease 3 4 12
employees handling HCA
Not trained to work with HCA Occupational Illness or Disease 3 4 12
Incorrect storage of gas cylinders 3 4 12 To be stored in a designated
gas
area. Gas cylinders to be
chained.
conducted on employees
conducting hot works.
19 Hot Work Gas Welding & Cutting Hot surfaces Burns 3 3 9
be readily available on site.
Employees to wear the relevant
Gas welding equipment to be in
accordance with requirements.
No flashback arrestors Explosion 4 5 20
to gas welding and cutting
equipment
conducted.
Incident / Accident 3 3 9
electrical installation work
Project interruption 4 5 20
electrical installations
available
when conducting installation Exposure to live electricity Electrocution 4 5 20
work
electricity to existing
electrician to conduct the
systems
used in wet areas or wet
areas or outside in wet Electrocution 4 5 20
conditions
conditions
Task specific training
Competent and registered
electrician to conduct the
Overloaded power-points Fire risk 3 4 12 electrical installation work
Fire equipment to be readily
Competent and registered equipment and whilst using
electrician to conduct the portable electrical equipment
Fire Risk 3 4 12 electrical installation work
available
electrician to conduct the
Electrocution 4 5 20
electrical installation work
available
Electrical Work Electrocution 4 5 20 electrical plugs, etc.
installing plugs, light fittings, etc.
electrician
Construction of
them from falling over platform
Fatality 3 5 15 edge
Major injuries (fractures), etc. 3 3 9
Incident / Accident 3 4 12
medically fit to operate
4 5 20 Complied with
capacity damage to existing structures Construction of Dam Tower Cranes
Structure Operation (Lifting) signed off by Competent Person
Defective equipment used to Load falling on employees 4 5 20
causing objects to fall
Objects not correctly hooked 4 5 20
falling loads / objects
Occupational
Noise Survey to be conducted by
Medical surveillance
Supervision
Maintenance
Occupational Vibration 2 4 8
machinery. Shortage of workers to lift heavy
Serious back injuries 3 4 12
heights
Electrocution 3 3 9
potable electrical equipment
transmittable disease
Property damage 3 2 6
electrician to conduct the
Health & Safety
Source: Annexure B - Baseline Risk Assessment - Drilling & Grouting.pdfThis is a Baseline Risk Assessment prepared per Construction Regulation 5(1)(a) of the Occupational Health and Safety Act. The objective is to identify and categorise hazards associated with tasks during different work categories to assist management in eliminating, minimising, or controlling risks. The assessment must be reviewed periodically (about every year, after incidents, or changes in workforce/equipment). The risk analysis method includes describing tasks, evaluating probability and severity of risks, and evaluating controls. Risk levels are defined: Low (1-6), Medium (7-15), High (16-25). Consequence ratings range from medical treatment only (1) to fatality/permanent disability (5). Probability ratings range from very unlikely (1) to common occurrence (5). High-risk activities require immediate attention; training is often a solution. The hierarchy of control must be applied. Basic PPE required: hard hat, overalls, ear protection, dust mask, safety vest, safety glasses, safety footwear, gloves, fall protection equipment. References required: method statement, SDS, planned task observation, safe work procedure, work instruction, transmittable disease control, daily safety task instruction. Specific control measures are listed for numerous activities including project mobilization, site establishment, vehicle operations, excavations, lifting, drilling, concrete works, scaffolding, working at heights, handling hazardous chemical agents, hot work, electrical works, working near water, brickwork, demolition, and site demobilization.
Environmental
Source: Annexure B - Baseline Risk Assessment - Drilling & Grouting.pdfThe risk assessment considers environmental impact as part of the consequence evaluation, where events may cause environmental impact.
Contractual Terms
Source: Annexure B - Baseline Risk Assessment - Drilling & Grouting.pdfThe contractor must manage legal liability risks. Key requirements: ensure legal appointment letters are signed prior to work commencement; verify competencies; refer to design drawings for underground services; plan work to avoid overhead power lines; use pre-start checklists; appoint competent, medically fit operators; supervise work; use banksmen/spotters; appoint a Demolition Work Supervisor; ensure no person works in an area not declared safe; and have a watchman present during demolition by machinery.
Section
Source: Annexure B - Baseline Risk Assessment - Drilling & Grouting.pdfThe evaluation of results will assist management to eliminate, minimise or control risks to workers.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
1258 Lever Rd, Headway Hill, Midrand, 1685, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
8
Last checked
02 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
011-313-3437[email protected]www.dbsa.org1258 Lever Rd, Headway Hill, Midrand, 1685, South Africa
Key Personnel
Learn how to submit a winning bid with these related articles
A practical guide for small and medium building contractors on winning government tenders for schools, clinics, housing, and municipal buildings in South Africa.
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
How small and medium construction contractors use Joint Ventures to combine CIDB grades, win larger infrastructure projects, and grow beyond their current grading ceiling.
π‘ Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction of buildings. Unlock full pricing strategies, bid frequency, and historical win rates.