Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
No.1 Maxwell Drive, Megawatt Park - Sunninghill - Johannesburg -
Organization Type
GOVERNMENT
Published
24 Jul 2026
OCDS Reference
ocds-9t57fa-163481
ESKOM is seeking a qualified supplier to design, supply, and install executive office furniture and soft finishes on an as-and-when-required basis for a 12-month period. The successful bidder must comply with eskom's stringent safety, health, environment, and quality (sheq) requirements, including adherence to iso standards and a commitment to zero harm.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Categories
Request for Bid(Open-Tender)
No.1 Maxwell Drive, Megawatt Park - Sunninghill - Johannesburg -
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: Contractor Environmental Requirements Proforma.docx, Annexure G3-Imported Content Declaration.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
24 Jul
2026
Tender Published
Tender was published
21 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Supplier Quality Management Specification (3).pdf
The tender is for the design, supply, and installation of executive office furniture and soft finishes for Eskom in the Northern Cape on an as-and-when-required basis over a 12‑month period. Suppliers must comply with Eskom’s Supplier Quality Management Specification (240-105658000), which mandates a QMS aligned with ISO 9001, submission of Form A, and provision of quality documentation appropriate to the tender’s category (1‑4).
Exec Furniture - Environmental Requirements for Contractors and or Suppliers.pdf
Eskom's environmental compliance standard for Transmission contractors requiring suppliers to implement and maintain an Environmental Management System (preferably ISO 14001:2015), submit specific environmental documentation with tenders, and comply with ongoing monitoring and reporting obligations throughout the contract lifecycle for office furniture installation services in Northern Cape.
Qualiy Requirements.pdf
ESKOM is seeking tenders for the design, supply, and installation of executive office furniture and soft finishes on an as-needed basis over a 12-month period in the Northern Cape. The tender emphasizes compliance with ISO 9001 Quality Management System (QMS) standards, documented processes, and specific deliverables.
Environmental Tender Returnable.xls
Eskom (Northern Cape) seeks a contractor to design, supply and install executive office furniture and soft finishes on an as‑needed basis over a 12‑month period. The tender places strong emphasis on environmental compliance, requiring ISO 14001 certification (or equivalent EMS documentation) and a suite of environmental management deliverables. Bids will be scored across five sections (A‑E) and must achieve a weighted average of at least 80% to be considered.
Post contract award SHEQ Requirement.pdf
The tender is for a 12‑month, as‑and‑when‑required contract to design, supply and install executive office furniture and soft finishes for Eskom in the Northern Cape. Successful bidders must submit a comprehensive SHEQ (Safety, Health, Environment, Quality) compliance package post‑award, including policies, plans, registers, appointment letters, training matrices, risk assessments, environmental and quality management documents, and proof of competency.
NTCSA Standard Conditions of Tender.pdf
ESKOM (via NTCSA) invites tenders for the design, supply, and installation of executive office furniture and soft finishes on an as-and-when-required basis over a 12-month period in the Northern Cape. The tender follows NTCSA's Standard Conditions of Tender (Rev 1, effective July 2024) and requires strict adherence to procedural, legal, and technical compliance.
Invitation_to_Tender_(ITT).pdf
The tender, issued by the National Transmission Company South Africa (NTCSA) SOC Ltd (a subsidiary of Eskom), invites bids for the **design, supply, and installation of executive office furniture and soft finishes** on an as-and-when-required basis over a **12-month period**. The tender number is **E3287NTCSAMWP**, with submissions due electronically by **21 August 2026 at 10:00 UTC**. A **compulsory site clarification meeting** is scheduled for **07 August 2026 at Eskom Megawatt Park, Gauteng**. The contract will use the **NEC3 Supply Short Contract (SSC)** terms, and evaluation follows an **80/20 pricing-preference system** under the PPPFA 2022 regulations, with a **70% technical threshold** for functionality criteria.
Contract and Contractor OHS Management.pdf
Eskom is seeking proposals for the design, supply, and installation of executive office furniture and soft finishes on an as-needed basis over a 12-month period in the Northern Cape. The tender emphasizes strict compliance with Occupational Health and Safety (OHS) standards, as outlined in Eskom’s Contract and Contractor OHS Management document (32-726). The project requires adherence to a structured OHS management model, including phases such as project initiation, tendering, supplier registration, site mobilization, performance monitoring, and post-contract review. The tender is governed by Eskom’s OHS policies, legal requirements, and industry standards (e.g., OHS Act, Construction Regulations 2014).
240-77471499 Annexure B.pdf
Eskom is inviting tenders for the design, supply, and installation of executive office furniture and soft finishes on an as-and-when-required basis over a 12-month period in the Northern Cape. The tender emphasizes strict compliance with Occupational Health and Safety (OHS) legal and procedural requirements, including Eskom's internal policies, South African OHS legislation, and contractor management obligations.
Pricing Schedule or Bill of Quantities.xlsx
Tender for the design, supply and installation of executive office furniture and soft finishes on an as-and-when-required basis for a 12‑month period, using NEC3 SSC3 Pricing Option A. The scope includes SHEQ compliance (samples, method statements, PPE, training, waste disposal, site security, etc.) and a detailed list of furniture items such as executive desks, meeting tables, chairs, cabinets, soft‑finish vinyl wallcovering, appliances and accessories.
SDL&I Requirements.pdf
ESKOM's National Transmission Company South Africa (NTCSA) is inviting tenders for the design, supply, and installation of executive office furniture and soft finishes for its Interim NTCSA Head Office at MWP in the Northern Cape. The contract duration is 12 months, with a closing date of August 21, 2026. The tender emphasizes local content, B-BBEE compliance, skills development, job creation, and socio-economic development (SDL&I) objectives.
SHEQSP~1.PDF
This is a SHEQ (Safety, Health, Environmental, and Quality) Specification document issued by NTCSA (National Transmission Company of South Africa), a subsidiary of Eskom, for the appointment of a consultant/contractor to design, supply, and install executive office furniture and soft finishes at the NTCSA Head Office in Sandton on an as-and-when-required basis for a 12-month period. The document primarily outlines the minimum SHEQ compliance requirements that contractors must meet, rather than the full commercial tender specifications.
Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdf
Eskom is inviting tenders for the design, supply, and installation of executive office furniture and soft finishes on an as-needed basis over a 12-month period in the Northern Cape. The tender is governed by Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy, which mandates compliance with stringent safety, environmental, and quality standards, including ISO 9001, ISO 14001, and ISO 45001. The policy emphasizes Zero Harm, sustainability, and adherence to legal and ESG (Environmental, Social, and Governance) frameworks.
Contractor Environmental Requirements Proforma.docx
Eskom tender for the design, supply, and installation of executive office furniture and soft finishes on an 'as and when required' basis over a 12-month period in the Northern Cape province. The document primarily contains an Environmental Management Declaration that contractors must acknowledge and sign as part of compliance requirements.
Form A_Cat 4.docx
Eskom invites tenders for the design, supply, and installation of executive office furniture and soft finishes on an as-and-when-required basis for a 12‑month period in the Northern Cape. The tender requires compliance with Eskom Supplier Quality Requirements (specification 240-105658000) and ISO 9001 standards, including completion of a quality‑acknowledgement form and selection of applicable quality clauses.
eTendering_Supplier's User_Guide_v4.4.pdf
Eskom is inviting tenders for the design, supply, and installation of executive office furniture and soft finishes on an as-and-when-required basis over a 12-month period in the Northern Cape. Submissions must be made electronically via the eTendering system.
NEC3 Supply Short Contract( SSC).pdf
The tender seeks a supplier to design, supply, and install executive office furniture and soft finishes for NTCSA (an ESKOM subsidiary) on an as‑and‑when‑required basis over a 12‑month period. The contract follows the NEC3 Supply Short Contract (April 2013) with batch orders, and requires compliance with quality, health‑safety, environmental, BBBEE, insurance, and invoicing standards.
32-95 rev 9.pdf
The tender is for the design, supply, and installation of executive office furniture and soft finishes for Eskom in the Northern Cape over a 12-month period. The provided document is an internal Eskom Occupational Health and Safety (OHS) Incident Management Procedure, which outlines protocols for managing workplace incidents but is not directly related to the tender requirements. The tender likely requires compliance with Eskom's OHS standards as part of the project execution.
Provision of executive office furniture and soft furnishes _OHS Tender Evaluation.pdf
Eskom is inviting tenders for the design, supply, and installation of executive office furniture and soft finishes for the newly established NTCSA executive offices in the Northern Cape. The contract is on an as-and-when-required basis for a period of 12 months, with a closing date of 21 August 2026. The tender includes strict Occupational Health and Safety (OHS) compliance requirements, categorized as medium-risk work.
Annexure G3-Imported Content Declaration.pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 2 183 959
Range
Based on 16 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Other service activities. Unlock full pricing strategies, bid frequency, and historical win rates.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: Supplier Quality Management Specification (3).pdfThis specification outlines Eskom’s minimum quality requirements for suppliers and sub-suppliers. It defines the criteria for selecting, evaluating, and monitoring suppliers to ensure compliance with ISO 9001-based Quality Management Systems (QMS). The goal is to partner with suppliers committed to continual QMS improvement and enhanced service delivery. The specification applies to all Eskom divisions, subsidiaries, and procurement processes (RFI/RFQ/RFP).
Important Dates
Source: Supplier Quality Management Specification (3).pdf (unknown)Closing date: 17 October 2021.
Contact Information
Source: Supplier Quality Management Specification (3).pdf (unknown)Department: Supply Chain Management. No specific contact details (name, email, phone, or address) provided in the document.
Submission Guidelines
Source: Supplier Quality Management Specification (3).pdf (unknown)Submit the following returnable documents as specified in the List of Tender Returnables (240-12248652):
Evaluation Criteria
Source: Supplier Quality Management Specification (3).pdf (unknown)Eligible suppliers must have a documented, implemented, and maintained QMS that conforms to the latest ISO 9001 standard (or an equivalent QMS standard) and be able to provide the objective evidence required for the tender’s quality category (1‑4). They must be registered on the Eskom supplier database, comply with the Preferential Procurement Policy Framework Act (PPPFA) and any applicable CIDB grading, and not be excluded from participation under Eskom’s procurement policies. Sub‑suppliers used must also meet the same QMS requirements and be approved by the main supplier.
Technical Specifications
Source: Supplier Quality Management Specification (3).pdf (unknown)Scope: Design, supply, and install executive office furniture and soft finishes on an as-and-when-required basis for 12 months.
Quality Requirements:
Applicability: Applies to all Eskom divisions, subsidiaries, suppliers, and sub-suppliers for RFI/RFQ/RFP processes.
Methodology
Source: Supplier Quality Management Specification (3).pdfMethodology requirements for suppliers:
Experience & Qualifications
Source: Supplier Quality Management Specification (3).pdfSupplier and personnel qualifications:
Quality Management
Source: Supplier Quality Management Specification (3).pdfQuality Management System (QMS) requirements:
Compliance Requirements
Source: Supplier Quality Management Specification (3).pdf (unknown)Mandatory compliance requirements:
Health & Safety
Source: Supplier Quality Management Specification (3).pdfSafety, Health, Environment, and Quality (SHEQ) requirements:
Contractual Terms
Source: Supplier Quality Management Specification (3).pdfContractual terms include:
Section
Source: Supplier Quality Management Specification (3).pdfEvaluation is based on compliance with Eskom’s Supplier Quality Management Specification (240-105658000/QM 58) and ISO 9001. Key focus areas:
Description
Source: SDL&I Requirements.pdfContact Information
Source: SDL&I Requirements.pdf (TENDER)Submission Guidelines
Source: SDL&I Requirements.pdf (TENDER)Returnable Documents
Source: SDL&I Requirements.pdf (TENDER)Evaluation Criteria
Source: SDL&I Requirements.pdf (TENDER)Technical Specifications
Source: SDL&I Requirements.pdf (TENDER)Methodology
Source: SDL&I Requirements.pdfExperience & Qualifications
Source: SDL&I Requirements.pdf (TENDER)Pricing Schedule
Source: SDL&I Requirements.pdfFinancial Requirements
Source: SDL&I Requirements.pdf (TENDER)Compliance Requirements
Source: SDL&I Requirements.pdf (TENDER)B-BBEE Requirements
Source: SDL&I Requirements.pdf (TENDER)Health & Safety
Source: SDL&I Requirements.pdfSpecial Conditions
Source: SDL&I Requirements.pdf (TENDER)Requirements
Source: SDL&I Requirements.pdf (TENDER)Section
Source: SDL&I Requirements.pdfEvaluation Criteria
Source: Contractor Environmental Requirements Proforma.docx (unknown)The document does not specify detailed eligibility criteria beyond requiring the contractor to acknowledge and accept responsibility for environmental compliance. Contractors must be willing to sign the Environmental Management Declaration and comply with Eskom's environmental requirements (240-18100134). Specific vendor number and contract number fields are required, suggesting pre-registration with Eskom may be necessary.
Technical Specifications
Source: Contractor Environmental Requirements Proforma.docx (unknown)Scope: Design, supply, and installation of executive office furniture and soft finishes on an as-and-when-required basis for 12 months. Environmental compliance is a core requirement, including adherence to: the project-specific Environmental Management Plan/Programme or Environmental Authorisation, Eskom’s Environmental Requirements for Organizations (240-18100134), all applicable environmental laws, and Eskom’s environmental standards, policies, and procedures. Key obligations: inform all staff of their environmental roles, report incidents within 24 hours, implement best practices, address non-conformances promptly, and comply with Eskom’s environmental fine system. Required on-site documentation to submit to Eskom Project Manager upon project completion: approved project-specific Environmental File, incident/complaint register, herbicide and pesticide register, hazardous substance (including solvents) registers.
Compliance Requirements
Source: Contractor Environmental Requirements Proforma.docx (unknown)Environmental compliance: Must adhere to the project Environmental Management Plan/Programme or Environmental Authorisation, Eskom’s Environmental Requirements for Organizations (240-18100134), and all applicable environmental legal requirements. Must comply with Eskom’s environmental standards, policies, and procedures. Must maintain and submit on completion: approved project-specific Environmental File, incident/complaint register, herbicide and pesticide register, hazardous substance (including solvents) registers.
Important Dates
Source: Invitation_to_Tender_(ITT).pdf (TENDER){"closingDate":"24 July 2026","closingTime":"10h00","briefingSession":"{"date":null,"time":null,"venue":"ion meeting with representatives of","is_compulsory":true}"}
Contact Information
Source: Invitation_to_Tender_(ITT).pdf (TENDER){"name":null,"email":null,"phone":null,"department":"y to seek clarity on any of the NTCSA","address":null}
Submission Guidelines
Source: Invitation_to_Tender_(ITT).pdf (TENDER)Returnable Documents: The 5 working days period does not apply to CIDB proof of grading. Refer to the returnable table, the prescribed period for CIDB proof of grading.
Evaluation Criteria
Source: Invitation_to_Tender_(ITT).pdf (TENDER)Must not be on sanctions lists, defaulters list, or flagged suppliers (Zondo/SIU implicated).
No 100% subcontracting of scope allowed.
Tenderers must not submit multiple bids (individually or via JVs/consortia).
Joint ventures must have joint and several liability and a single designated bank account.
No conflict of interest (e.g., shared majority shareholders or access to competitor information).
Must comply with Employment Equity Act (if designated employer).
Must have valid CSD registration and tax compliance (SARS pin or certificate).
Foreign tenderers with a South African footprint must provide tax clearance; those without a footprint must complete SBD1 (no tax proof required).
Technical Specifications
Source: Invitation_to_Tender_(ITT).pdf (TENDER)Annexure Attached Returnable Returnable Returnable
(Y / N / required at required at required
N/A) Tender Tender prior to
closing closing. Contract
(disqualifiab (Non- Award.
le)* disqualifiabl
e) **
1.1.1 Basic √
Compliance
Electronic copy
of the tender in a
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 56
Methodology
Source: Invitation_to_Tender_(ITT).pdftenderers only)
1.1.37 Quality
scope.
management.
management.
roles, responsibilities and authorities.
1.1.41 Functionality/Te List of items √
chnical to be
complied
technically
Technical Scoring
and previous work
related to office furniture
supply and installation.
production to installation
date.
Effective Date July 2024
Review Date July 2027
supply and 1.2 Company years of 50 5- ≤ than 6 years’ experience
installation related experience 4- ≤ 5 years’ experience
(provide company profile 3 ≤ 4 years’ experience
and proof of previous 2 ≤ 3 years’ experience
contracts i.e. appointment
1 ≤ 2 years’ experience letters, signed contracts,
purchase orders) 0 < 1 years’ experience
2 Lead time from 40 Indicate time frame from 100 5 - within 2 weeks of appointment
production to production to installation 4 - within 2-4 weeks of
installation appointment
date 3 - within 4-5 weeks of
appointment
2 - within 5-6 weeks of
appointment
1 - ≥ 6 weeks
0 - ≥ 8 weeks
3 Method 20 Provide a detailed initial 100 5 - detailed plan providing
statement method statement with methodology, project timelines,
projected timelines, resources, and hours for the
including resources and project, risks.
hours, lead time for 4 - project method statement,
furniture production & not fully articulated and missing
installation, potential risks, some components. Plan
and mitigation. providing methodology, project
timelines, resources and hours
for the project.
3 - method statement provided
with more than 40% of required
components.
2 - poorly documented method
statement, missing 50% of
components.
0 - more than 50% of
components missing or not
submitted or no method
statement submitted.
Total 100
NB: The threshold is 70% and bidders who do not meet the threshold of 70% will be
disqualified for further evaluation.
Company experience and previous work related to 40%
office furniture supply and installation
Lead time from production to installation date 40%
Method statement 20%
Threshold 70%
For every R2 Million Invoiced the contracted supplier shall offer
a University of technology or University bursary valued at R 20
000.00. The process of developing these skills shall involve the
participation by tenderers directly and through their supply network.
In certain cases, the SETA’s accredited training providers can be
approached to participate in developing critical and scarce skills.
Experience & Qualifications
Source: Invitation_to_Tender_(ITT).pdfcriteria % Weighting
%
1 Company 40 1.1 Number of relevant 50 5- ≤ 5 relevant references
experience references with a 4- ≤ 4 relevant references
and previous description of scope work 3 ≤ 3 relevant references
work related to (submission of reference 2 ≤ 2 relevant references
office furniture letters as proof) 1 ≤ 1 relevant reference
0 < no relevant references
disqualified and will not be evaluated.
2.16 Seeking clarification The tenderer will notify NTCSA of any clarifications required before
the closing time for clarification queries, which is 05 working days
before the deadline for tender submission. This includes the requests
for extension for tender closing date.
Any addenda or clarifications to the Invitation to Tender (ITT) will be
posted on the e-tender portal and the Tender Bulletin. Tenderers must
review these platforms for updates before finalizing their bid
submissions. NTCSA will not be responsible for any disadvantages or
disqualifications resulting from Tenderers not accessing the latest ITT
information.
2.22 Alternative tenders Alternative tenders are not allowed.
2.33 Cataloguing Not applicable.
2.34 Provision of Security for Not applicable.
Pricing Schedule
Source: Invitation_to_Tender_(ITT).pdfGoals (CPG)
1.1.26 Scope of Work Attached
1.1.27 NEC Contract Attached √
1.1.28 Pricing Attached √
Effective Date July 2024
Review Date July 2027
3.19 Ranking of tenders Tenderers will be ranked by applying the preferential point scoring for
the 80/20 system. NTCSA will add the score from Pricing and Specific
Financial Requirements
Source: Invitation_to_Tender_(ITT).pdf (TENDER)Payment Terms: Payment Terms Tenderers are requested to bear in mind NTCSA's standard
payment terms as stipulated hereunder when submitting tenders
and concluding contracts with NTCSA:
For contracts valued below R50 000 000 (Fifty Million Rand) including
VAT, NTCSA is committed to paying Suppliers within 30 days of
receipt of undisputed invoices.
For contracts valued
Compliance Requirements
Source: Invitation_to_Tender_(ITT).pdf (TENDER)Electronic copy of the tender in a Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 56 File name: 559-235050781 Invitation_to_Tender_(ITT) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027 PDF format. The price list needs to be submitted in PDF and a copy in excel format (The upload size per document is 500 megabytes and total submission is restricted to 4 gigabytes) Please refer to point 3.9 below for full compliant 1.1.2 *Authorisation Annexure A Y √ Form 1.1.3 *Acknowledgem Annexure B Y √ ent form 1.1.4 *Tenderer’s Annexure C Y √ particulars 1.1.5 *Integrity Annexure D Y √ for Local Goods/Services 1.1.7 *CPA(IG) for Annexure F N/A Foreign Goods/Services 1.1.8 SBD 6.2 Annexure G1 Y √ A certified copy of a tax clearance certificate is required from foreign tenderers (with a footprint in South Africa but that are not registered on CSD and have not provided a SARS pin number) and local tenderers (that have not provided their SARS e-filing PIN number for Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 56 File name: 559-235050781 Invitation_to_Tender_(ITT) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027 verification by NTCSA and/or their CSD profile / CSD number). Foreign suppliers with no footprint in South Africa must complete the SBD1 document; however, no proof of tax compliance is required. 1.1.11 Tax Evaluation N/A questionnaire to determine whether a company, close corporation (CC) or Trust is a personal service provider for purposes of PAYE 1.1.12 *SBD 6.1 Annexure I Y √ Preference Points Claim Form in terms of PPPFA 2022 regulations 1.1.13 # Specific Goals √ A tenderer’s failure to submit proof that it meets the Proof of valid and current CSD Registration (CSD number/CSD Report) ADDITIONAL CONTRACTUAL REQUIREMENTS SUPPORTING EVIDENCE 1.1.36 Safety √ COIDA - Original certificate of good standing or proof of application issued by the Compensation Fund (COID) or a licensed compensation insurer (South African tenderers only) 1.1.37 Quality
Quality Policy Approved by top management.
Quality Objectives Approved by top management.
Documented information for defined roles, responsibilities and authorities.
Documented information for Control of Externally Provided Processes, Products and Services.
Form A is completed and signed.
Proof of work conducted as per the scope of work and/ or specification. Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 56 File name: 559-235050781 Invitation_to_Tender_(ITT) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027 1.1.38 Other safety
Costing for Health and Safety scope of works management.
Baseline OHS Risk Assessment (BRA).
Valid Letter of Good Standing.
OHS policy signed by CEO. 1.1.39 Environmental
Documented information for Nonconformity and Corrective action.
Environmental Human Resources.
Environmental Incident Reporting.
Waste Management Plan in line with the Scope of Work.
Aspect and Impact Register in line with the Scope of Work.
Human resources.
Contractor Environmental Requirements Proforma is completed and signed. 1.1.40 Due √ Diligence/financi al analysis Audited Financial Statements of the tenderer for the previous 18 months, or to the extent that such statements are not available, for the last year. In the case of a joint venture or special purpose vehicle (SPV) specially formed for this tender, audited financial statements for each participant in the JV / SPV Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 56 File name: 559-235050781 Invitation_to_Tender_(ITT) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027 must be submitted. Start-up enterprises formed within the last 12 months are not required to submit audited financial statements, but if successful in this enquiry, will be required to furnish statements for the first year once available. DOCUMENTS REQUIRED UNDER FUNCTIONALITY/TECHINICAL CRITERIA 1.1.41 Functionality/Te List of items √ chnical to be complied technically Technical Scoring
Lead time from production to installation date.
Method statement. Mandatory Technical Evaluation to be applied are as follows: For the technical scoring criteria, the criteria and weightings are as follows: Evaluation Weight Sub Criteria Sub Score criteria % Weighting % 1 Company 40 1.1 Number of relevant 50 5- ≤ 5 relevant references experience references with a 4- ≤ 4 relevant references and previous description of scope work 3 ≤ 3 relevant references work related to (submission of reference 2 ≤ 2 relevant references office furniture letters as proof) 1 ≤ 1 relevant reference 0 < no relevant references Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 56 File name: 559-235050781 Invitation_to_Tender_(ITT) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027 supply and 1.2 Company years of 50 5- ≤ than 6 years’ experience installation related experience 4- ≤ 5 years’ experience (provide company profile 3 ≤ 4 years’ experience and proof of previous 2 ≤ 3 years’ experience contracts i.e. appointment 1 ≤ 2 years’ experience letters, signed contracts, purchase orders) 0 < 1 years’ experience 2 Lead time from 40 Indicate time frame from 100 5 - within 2 weeks of appointment production to production to installation 4 - within 2-4 weeks of installation appointment date 3 - within 4-5 weeks of appointment 2 - within 5-6 weeks of appointment 1 - ≥ 6 weeks 0 - ≥ 8 weeks 3 Method 20 Provide a detailed initial 100 5 - detailed plan providing statement method statement with methodology, project timelines, projected timelines, resources, and hours for the including resources and project, risks. hours, lead time for 4 - project method statement, furniture production & not fully articulated and missing installation, potential risks, some components. Plan and mitigation. providing methodology, project timelines, resources and hours for the project. 3 - method statement provided with more than 40% of required components. 2 - poorly documented method statement, missing 50% of components. 0 - more than 50% of components missing or not submitted or no method statement submitted. Total 100 NB: The threshold is 70% and bidders who do not meet the threshold of 70% will be disqualified for further evaluation. Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 56 File name: 559-235050781 Invitation_to_Tender_(ITT) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027 1.2. Tender Data The Tender Data makes several references to the Standard Conditions of Tender and in those instances, the clause numbers are referenced hereunder. If the Standard Conditions of Tender are not attached to the enquiry, then tenderers are required to download this from www.ntcsa.co.za. The “Tender Data” as detailed herein shall take precedence over the Standard Conditions of Tender in the event of any ambiguity or inconsistency between the two documents. Clause Number from Standard Tender Data Conditions of Tender 1.1 Parties The Employer is NTCSA SOC Ltd The NTCSA Representative is: Name: Thendo Silimela Tel: 011 800 8269 E-mail: [email protected] 1st Escalation: Procurement Manager Name: Jabu Nkgapele Email: [email protected] 2nd Escalation: Middle Manager Name: Vongani Hlungwani Email address: [email protected] 1.3 Enquiry documents The Invitation to tender number is: E3287NTCSAMWP 1.4 Type of enquiry This enquiry is
An open invitation to tender 1.6 NTCSA's rights to accept or The tender shall be for the whole of the contract. reject any tender 2.1 Eligibility Tenderers (whether a single company or an incorporated or unincorporated joint venture or consortium) must meet the eligibility criteria stated in the Tender Data. The tenderer, or any of its principals, must not be under any restriction to do business with NTCSA or State-Owned Companies. Tenderers are ineligible to submit a tender if
Tenderers have the nationality of a country on any international sanctions list. A tenderer shall be found to have the nationality of a country if the tenderer is a national or is constituted, incorporated, or registered and operates in conformity with the provisions of the laws of that country. This criterion shall also apply to the determination of the nationality of proposed subcontractors or suppliers for any part of the Contract including related services. Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 56 File name: 559-235050781 Invitation_to_Tender_(ITT) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027
Tenderers submit more than one [tender/proposal] either individually or as a partner in a joint venture (JV) or consortium, except on an E-Tendering system where there is a limit size (The upload size per document is 500 megabytes and total submission is restricted to 4 gigabytes).
Tenders submitted by a joint venture or consortium where the JV/consortium agreement does not explicitly state that the parties of the JV or consortium shall be jointly and severally liable for the execution of the Contract in accordance with the Contract terms.
A Tenderer must not have a conflict of interest. All Tenderers found to have a conflict of interest shall be disqualified. Prima facie evidence that a tenderer has a conflict of interest with one or more parties in this [tendering/RFP] process is: (a) they have a controlling partner or majority shareholder in common; or (b) they have a relationship with each other, directly or through common third parties, that puts them in a position to have access to information about or influence on the tender of another tenderer, or to influence the decisions of the Employer regarding this bidding process;
Tenders signed by non- a uthorised persons.
Any tenderer that is restricted by National Treasury.
Any tenderer on the Tender Defaulters list.
A tenderer that sub-contracts 100% of the Scope of Work.
Flagged suppliers. Ineligible of the flagged suppliers/tenderers will be due to the following reasons
B-BBEE Details: Declaration-
Summary
Declaration-
Supporting
Schedule to
Annexure C
1.1.9 SBD 1 Invitation Annexure H Y √
to Bid must be
filled out by all
tenderers.
1.1.10 Tax Clearance √
will not result in
its
disqualification.
The tenderer
will, however, be
scored zero for
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 56
File name: 559-235050781 Invitation_to_Tender_(ITT)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Identifier
Invitation to Tender
Effective Date July 2024
Review Date July 2027
for purposes of
PPPFA scoring
and ranking.
1.1.14 Compliance with √
Employment
Equity Act
To the extent
that the tenderer
falls within the
definition of a
“designated
Employer” as
contemplated in
the Employment
Equity Act , the
tenderer is
required to
furnish the
Employer with
proof of
compliance with
the Employment
Equity Act,
including proof
of submission of
the Employment
Equity report to
the Department
of Labour.
(South African
tenderers only)
1.1.15 **SBD 4 – Annexure J Y √
Bidders
Disclosure
1.1.16 Additional Documents required in event of JV:-
1.1.16. Letter of intent to √
1 form a
JV/consortium
or Valid joint
venture
agreement
confirming the
rights and
obligations of
each of the joint
venture partners
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and th
Health & Safety
Source: Invitation_to_Tender_(ITT).pdfNational Transmission Company South Africa SOC Ltd (hereinafter “NTCSA”) invites you to submit a
tender for the design, supply, and install executive office furniture and soft finishes as and when required
basis for the period of twelve (12) months.
Effective Date July 2024
Review Date July 2027
1.1.38 Other safety
documents as
required per
management.
1.1.39 Environmental
management.
Effective Date July 2024
Review Date July 2027
which stands out as the most advantageous in terms of the
evaluation criteria detailed in the enquiry documentation.
than that of the lowest tender.
from the published requirements.
Effective Date July 2024
Review Date July 2027
Contractual Terms
Source: Invitation_to_Tender_(ITT).pdf1.1.33 Insurance N/A
sanctions list. A tenderer shall be found to have the nationality of
a country if the tenderer is a national or is constituted,
incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract including
related services.
measures against these suppliers; and
b) Other suppliers implicated in serious misconduct and a breach of
the Eskom Supplier Integrity Pact by a forensic report or other
source of credible information, such as the SAPS, the NPA, the
payment terms as stipulated hereunder when submitting tenders
and concluding contracts with NTCSA:
For contracts valued below R50 000 000 (Fifty Million Rand) including
VAT, NTCSA is committed to paying Suppliers within 30 days of
receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including
VAT, NTCSA is committed to paying suppliers within 60 days of
receipt of undisputed invoices.
2.29-2.30 Contract Skills Not Applicable
Development Goal (CSDG) and
Contract Participation Goals (CPG)
2.28 CIDB Requirements (where CIDB Requirements are not applicable
applicable for Engineering and
Construction Works Contracts) 2.29 Contract Skills Development Goals (CSDG) is
not applicable.
3.24 Sign Form of Agreement The conditions of contract will be the NEC3 Supply Short Contract
(Ssc).
when submitting tenders and concluding contracts with NTCSA:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, NTCSA is committed
to paying Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, NTCSA is committed
to paying suppliers within 60 days of receipt of undisputed invoices.
Section
Source: Invitation_to_Tender_(ITT).pdfnot be disqualified but will score zero.
Documents required under functionality/techinical criteria
1.1.41 Functionality/Te List of items √
Mandatory Technical Evaluation to be applied are as follows
Evaluation Weight Sub Criteria Sub Score
Specific goals for the tender and points claimed are indicated per the
B-BBEE Status Level of Number of points (80/20
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
B-BBEE rating. Whereas Tenderer/s will be allocated points in terms
of a preference point system based on specific goals, NTCSA also
1.1.37 Quality
1.1.11 Tax Evaluation N/A
Preference
Points Claim
PPPFA 2022
1.1.13 # Specific Goals √
specific goals
scored zero for
PPPFA scoring
Description
Source: Environmental Tender Returnable.xlsDesign, supply, and install executive office furniture and soft finishes on an as-and-when-required basis for a 12-month period. Scope includes compliance with Eskom’s environmental management and contractual requirements.
Submission Guidelines
Source: Environmental Tender Returnable.xls (unknown)Submit the following returnable documents as part of the tender: Environmental Management System (EMS) documentation, Waste Management Plan, Environmental Management Programme (EMPr), Aspect and Impact Register, and completed Contractor Environmental Requirements Proforma (240-180100129). Ensure all environmental documentation is provided as specified in the enquiry.
Evaluation Criteria
Source: Environmental Tender Returnable.xls (unknown)Compliance Requirements
Source: Environmental Tender Returnable.xls (unknown)Mandatory compliance with ISO 14001:2015 Environmental Management System (EMS) requirements. Bidders must provide objective evidence of either: (OPTION 1) Valid EMS certification by an ISO-accredited body, or (OPTION 2) Documented EMS conforming to ISO 14001:2015. Additional compliance includes adherence to National Environmental Management: Waste Act (Act No. 59 of 2008), National Water Act (Act No. 36 of 1998), and Eskom’s Environmental Requirements for Contractors/Suppliers (240-180100134).
Submission Guidelines
Source: Annexure G3-Imported Content Declaration.pdf (unknown)Returnable Documents: Not specified in the provided content.
Compliance Requirements
Source: Annexure G3-Imported Content Declaration.pdf (unknown)Insufficient searchable text - AI extraction recommended
Description
Source: Exec Furniture - Environmental Requirements for Contractors and or Suppliers.pdf (unknown)Revision: 1 Total Pages: 27 Next Review Date: December 2026
Important Dates
Source: Exec Furniture - Environmental Requirements for Contractors and or Suppliers.pdf (unknown){"closingDate":"19 Jan 2024","briefingSession":"{"date":null,"time":null,"venue":"the Environmental Acknowledgement Form (Appendix E) is reviewed by the","is_compulsory":false}"}
Contact Information
Source: Exec Furniture - Environmental Requirements for Contractors and or Suppliers.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":"Practitioner and Contract or Project managers (contract custodians). It also"}
Evaluation Criteria
Source: Exec Furniture - Environmental Requirements for Contractors and or Suppliers.pdf (unknown)Open to suppliers who can provide valid environmental documentation; exemptions apply to independent electricity generators, venue/accommodation services without Transmission contracts, municipalities, established retailers for consumables, and emergency procurement during declared disasters. Suppliers must be conversant with environmental obligations related to their specific work scope and Transmission's requirements.
Technical Specifications
Source: Exec Furniture - Environmental Requirements for Contractors and or Suppliers.pdf (unknown)Eskom is committed to creating and sustaining a Zero Harm culture and standard of safety, health,
the environment, and quality (SHEQ). Zero Harm means ensuring that the Eskom operational
activities do not inflict harm on Eskom’s assets, its employees, contractors, and members of the
public affected by its operations, and the environment in terms of compliance obligations. All
procurement has some level of impact on the environment that needs to be minimised to ensure
sustainable procurement practices. Most environmental impacts occur before goods, works or
services are procured, for example, resource extraction, design development, manufacturing,
transportation and storage, etc. Environment is an integral part of Eskom sustainable procurement
strategy.
This standard sets the minimum criteria for assessing supplier environmental conformity, based on
standards, procedures, policies, and compliance obligations with which Transmission suppliers need
to comply. It specifies a pre-determined set of environmental criteria to evaluate and monitor
potential and contracted Transmission suppliers. The objective is to ensure a common
understanding and consistent implementation of environmental requirements for procurement of
assets, goods, and services.
2.1 Scope
The standard outlines the key responsibilities of Procurement Practitioner, Contractor/Supplier,
Clients, Environmental Practitioner and Contract or Project managers (contract custodians). It also
provides the minimum environmental requirements to be addressed during:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
a) Design phase.
b) Tender enquiry, evaluation, and contract award.
c) Supplier registration on the Transmission vendor data base.
d) Site access /site mobilization.
e) Monitoring of performance during the contract execution period.
f) Contract completion, close out, and post-contract review and
g) Instances and criteria where works or services under a contract can be stopped, suspended or
termination of contracts.
2.1.1 Purpose
The purpose of this standard is to ensure that Suppliers, Contractors, and Sub-Contractors
contracted to Transmission have established an Environmental Management System for goods,
works, or services they provide.
2.1.2 Applicability
This document shall apply throughout Transmission including Suppliers, Service providers,
Contractors, and Sub-Contractors.
2.1.3 Effective date
This standard shall be effective from the date of the signature.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] 32-1034 Eskom Procurement and Supply Chain Management Procedure.
[2] 32-196 Eskom Disciplinary Code Standard.
[3] Project Specific Environmental Management Programmes/Environmental Management Plan.
[4] Project Specific Permits and Licenses (Construction stage).
[5] 240-43921804 Environmental Tender Evaluation Template.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
[6] 240-151560800 Environmental Evaluation-Commencement of work.
[7] 240-180100148 Pre-construction Access Agreement Form.
[8] 240-110600836 Contractor Environmental Requirements Proforma.
2.2.2 Informative
[9] National Environmental Management Act No
[10] ISO 14001: Environmental Management Systems
[11] National Environmental Management: Waste Act (Act )
[12] Environmental Impact Assessment Regulation (2014)
[13] National Water Act (Act )
[14] National Environmental Management: Air Quality Act (Act )
[15] National Environmental Management: Biodiversity Act (Act )
[16] National Environmental Management: Protected Areas Act (Act )
[17] National Heritage Resources Act (Act )
[18] National Veld and Forest Fire Act (Act )
[19] 240-82410629 Environmental Management Strategy
[20] 240-81146134 Implementing SHEQ as Objective Criteria Position Paper
2.3 Definitions
Definition Explanation
Environmental Any change to the environment, whether adverse or beneficial, wholly, or
Impact partially resulting from an organisation’s environmental aspects.
Environmental Authorisation obtained from a competent authority responsible for
Authorisation authorising listed activities in terms of the National Environmental
Management Act No .
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
Environmental It is a programme/plan of action for achieving organisational objectives
Management relating to the mitigation of environmental impacts of its activities, products,
Programme and services.
Environmental A programme for achieving organisational objectives and targets relating to
Management Plan mitigation of the environmental impacts of an organisation’s activities,
products, and services.
Project Means an activity or a group of activities that has a defined start and end
date, a defined scope, and as defined sum of money allocated to complete
the activities.
Project Life Cycle The project life cycle is a step-by-step framework of best practices used to
manage a project from its beginning to its end. It provides Project Managers
a structured way to create, execute, and finish a project.
Environmental file Means a permanent record containing information about the Environmental
management system during construction and all information relating to the
post-construction phase after the handover to the client, so that the client
can maintain the works in a healthy and safe way.
Method Statement Means a written document detailing the key environmental activities to
reduce the hazards identified in any risk assessment. In the case of internal
work, it includes procedures, safe work procedures, and work standards.
Environmental The measurable results of an organization's management of its
Performance environmental aspects.
Organisation A company, corporation, firm, enterprise, authority or institution, or part or
combination thereof, whether incorporated or not, public or private, that has
its own functions and administration.
Note: For organisations with more than one operating unit, a single
operating unit may be defined
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
Environmental authorisation obtained from a competent authority responsible for
Authorisation authorising listed activities in terms of the National Environmental
Management Act, 1998 (Act No.) Environmental Impact
Assessment Regulations (2014).
Contractor/Supplier Organisation or person that provides a product or service.
Organisation Example: Producers, distributor, retailer or vendor of a product, or provider
of a service or information.
Note 1: A supplier can be internal or external to the organisation.
Note 2: In a contractual situation, a supplier is sometimes called
“contractor”.
Document Controlled disclosure to external parties (either enforced by law or
Controlled discretionary).
Disclosure
Environmental Is a system which integrates policy, procedures, and processes for training
Management of personnel, monitoring, summarizing, and reporting of specialized
System environmental performance information to internal and external
stakeholders of an organisation.
2.4 Abbreviations
Abbreviation Explanation
EA Environmental Authorisation
ECO Environmental Control Officer
EMPr Environmental Management Programme
EMP Environmental Management Plan
EMS Environmental Management System
ISO International Organisation for Standardization
SDS Safety Data Sheet
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
Abbreviation Explanation
TDP Transmission Projects Delivery
SHE Safety Health and Environmental
SHEQ Safety Health Environment and Quality
P&SCM Procurement and Supply Chain Management
SHERQS Safety Health Environment Risk Quality & Security
2.5 Roles and Responsibilities
Procurement Practitioner shall:
Environmental Practitioners for the preparation of the relevant environmental requirements
for the enquiry.
the appropriate environmental practitioners prior to the release of tender documents.
input into the relevant meetings or forums, processes, and reports that lead to the awarding
of the contract (e.g., supplier evaluation, squad check meetings, contracting strategies,
negotiations, clarification meetings, tender evaluations and evaluation report compilations,
contract award, briefing meetings).
Environmental Practitioner to ensure that all applicable rules and requirements are
referenced in this form for Tenderers to acknowledge and comply with and ensure that its
completed and included in their tender.
Business Unit Manager shall be responsible for:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
The Environmental Practitioner shall:
lead to the awarding of the contract.
requirements together with members of the cross functional team for each tender/enquiry
and shall ensure that these requirements are handed over to commercial representative
for inclusion in the tender/enquiry.
work and environmental risk assessment conducted for the contract.
are submitted with the tender returnables.
execution and post-contract review and assessment and must also ensure that all reports
are provided to contracts management.
interventions taken and provide the report to the contract custodian and submit to
contracts management.
technical evaluation criteria for the contract.
The Contract Custodian (Contract Executor) shall:
Ensure that the Supplier adheres to the relevant contract environmental requirements.
Ensure that project-specific environmental specifications together with specific
environmental aspects and other relevant procedures and documents are developed in
conjunction with the Environmental Practitioner and provided with the tender package.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
environmental obligations during contract execution, environmental intervention or
standoff, post contract review, supplier reconsideration are adequately addressed,
recorded, and submitted to contracts management for record and future references.
impractical to comply with and suggested recommendations shall be submitted in writing
to contract management where it is impractical to implement and /or comply with
environmental requirements as set out in this standard.
results of such assessment are recorded, documented, and kept.
of the Bills of Quantities in the contract.
Supplier /Service Provider:
documentation for evaluation.
Practitioners during the tender clarification meeting to fully comply with the requirements
of this standard. Such support, guidance and advise shall be levelled in writing with the
Eskom Representative whose details are in the tender document. Direct communication
between tenderers and Environmental Practitioners shall not be allowed. .
Transmission environmental requirements always when contracted with Transmission
Business Units.
related to the works, services or goods tendered for.
site requirements, and it is the responsibility of the Supplier to ensure that these
requirements are met before work can commence.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
2.6 Process for Monitoring
Compliance to this standard will be monitored during tender evaluations, periodic inspections and
audits on the works, goods or services rendered. The procedure / process shall include documenting
information to monitor performance, applicable operational controls (method statements) and
conformity with the Transmission EMPr/EMP and/or the EA.
environmental management procedures, and/or any inspection authority acting on
supplier’s behalf, to make available all information at its disposal certificates for review
by Transmission or its appointed inspection agency.
shall be made available to Transmission business units. These shall not be limited to:
o A procedure for Monitoring, Measurement, Analysis and Evaluation of
Quality Management
Source: Exec Furniture - Environmental Requirements for Contractors and or Suppliers.pdfRevision: 1
Page:
environmental obligations during contract execution, environmental intervention or
standoff, post contract review, supplier reconsideration are adequately addressed,
recorded, and submitted to contracts management for record and future references.
impractical to comply with and suggested recommendations shall be submitted in writing
to contract management where it is impractical to implement and /or comply with
environmental requirements as set out in this standard.
results of such assessment are recorded, documented, and kept.
of the Bills of Quantities in the contract.
the supplier prior the work made available for review when requested by Transmission or
is executed its appointed inspection agency. The supplier shall provide
suitable facilities and safe working environmental to
Revision: 1
Page:
requirements to be co-ordinated by the Office of the Group Executive - environmental
practitioners. The co-ordinating environmental practitioner will hand over to the business unit
environmental practitioner (phase 4 to 6), where the works or goods/services will be executed
by the environmental practitioners at relevant business unit.
and/or qualification validity period and shall be submitted to Transmission or its inspection
agency prior to commencement of the works. Documents to be submitted to Transmission
include, but may not be limited to the following:
o A completed and signed contractor Environmental Requirements Pro – Forma
(Appendix E).
o Contractors/suppliers Environmental procedures/method statement will be in
accordance with Transmission specific requirements.
o EMS documentation as required for the works.
o All documentation shall be submitted to Transmission for evaluation 7 days after
contract award.
o Organisation’s EMS records (refer to Appendix D).
o Permits as applicable.
o Corrective actions taken because of non-conformances raised by either the
compliance and adherence by the contractor. The Environmental Practitioner reserves the
right to conduct the performance measures on all contractors.
mechanism (such as audits and reviews) is instituted with the support of the environmental
practitioners to ensure compliance with environmental legislative/ legal obligation and
environmental inspection is conducted with the assistance of the environmental practitioners
allocated for the work. The environmental practitioner will ensure that the rehabilitation is
executed according to the EMPr/EMP and EA conditions. The environmental practitioner will
sign off the project close out handover form. This must be done before a contract is closed.
form with all records will be signed by all and handed over to business unit on completion of
the works/project. For work/project where the Business unit Managers are on another division
/site, the handover shall include the environmental file that will be handed over to the client
or client agent (site owner /asset owner).
accompany every shipment of product to its specified delivery destination(s) include, but may
not be limited to the following:
Revision: 1
Page:
Organisation certificates of conformance.
Organisation test certificates etc. as required by the applicable technical specification(s).
Inspection release reports issued by Transmission or its inspection agency including but
may not limited to:
o ECO close out report
o Final rehabilitation report
o Final sites close out audit/inspection report/NCR close out
NOTE: The above can be submitted and summarised in a form of a controlled register.
3.9 Phase 6: Post-Contract Review
to review the supplier’s environmental performance during the execution of contract and ensure
that the assessment results are made accessible and available to all relevant stakeholders for
future reference.
review process, that is, audit reports and the environmental compact/contract.
management) for record keeping purposes and the results input into the supplier database for
future consideration of the specific contractor.
Compliance Requirements
Source: Exec Furniture - Environmental Requirements for Contractors and or Suppliers.pdf (unknown)o Document specific checklists and registers o Monitoring/Inspection reports o Findings and close out reports. o Natural resource consumption (water, fuel, electricity usage etc.) 2.7 Related/Supporting Documents [1] 32-1034 Eskom Procurement and Supply Chain Management Procedure [2] 240-106082683 SHEQ Requirements for the Procurement and Supply Chain Processes in Eskom CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134 Suppliers Revision: 1 Page
The Contractor Environmental Management Model Transmission has adopted a six-phase environmental contractor management model to effectively manage contracts and suppliers. Phase 2: Phase Phase 4: Site Phase Tender Phase 5:Contract Phase 6: Post Mobilisation 1:Design Enquiry, 3:Supplier Execution -Contract /Access to Phase Evaluation Registration and Continual Review site and Award Monitoring Figure 1: illustrate the six phases environmental contractor management model 3.1 Phase 1: Design Phase
Environmental Practitioners to provide the designer with an environmental specification that are specific to the contract or services to ensure integration of the environmental requirements into the design.
The designer and the responsible environmental practitioner to conduct a site visit before commencing with the design or contract goods and services environmental specification can be developed. 3.2 Phase 2: Tender Enquiry, Evaluation, and Award
Functional environmental requirements will form part of the tender/enquiry. The tender/ enquiry shall be accompanied by a contract specific environmental specification and risk assessment and applicable SHE policies and procedures. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134 Suppliers Revision: 1 Page: Transmission Supplier Conduct due diligence on All environmental documentation, records, reports shall be the supplier prior the work made available for review when requested by Transmission or is executed its appointed inspection agency. The supplier shall provide suitable facilities and safe working environmental to Transmission or its appointed environmental agency 3.3 Contractors Environmental Management System Requirements
The Contractor/supplier shall have a documented, implemented and maintained environmental management system, preferably guided by the ISO 14001:2015 Standard. New Suppliers can provide evidence of their compliance by maintaining accurate and up-to- date documentation and records related to their environmental management practices. This can include policies, procedures, training records, audits, and monitoring reports.
The Contractor shall be responsible for ensuring that all their Supplier Organisation’s environmental programmes comply with the Transmission requirements. The Contractor shall define the specific environmental control elements applicable to the scope of works, goods or services.
The Contractor shall inform Transmission of any changes to the environmental requirements that were evaluated during the tendering stage prior to implementation of these changes. 3.4 Environmental Planning
Any revisions to the plans/programmes shall require the agreement of Transmission or its environmental representatives prior to the commencement of work involving an activity affected by such changes.
The revision of environmental documents shall be subjected to review and approval by all parties previously responsible for evaluation prior to implementation. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134 Suppliers Revision: 1 Page
The following will form part of the supplier’s documented EMS, and shall be internally reviewed, and formally approved. The environmental management system must cover each distinct stage of work performed/undertaken and it shall include but not be limited to: o Site establishment. o Access control to site. o Site construction and installation work (civil, electrical, power lines etc.). o Manufacturing (site, factory, temporary workshops etc.). o Storage areas (plant, equipment, free issue material etc.). o Waste Management Plan (or method statement); Site and Vegetation Clearing. o Handling of Hazardous Chemical substances. o Site management (water management, dust and noise, landowner liaison, final release and settlement of disputes and claims). o Rehabilitation. o Site demobilization.
Different physical locations where the supplier’s work will be performed, the significant environmental conditions will be included and mitigated.
Work to be performed by the supplier and their pre-determined scoping requirements.
Waste management plan/procedure that includes waste segregation and minimisation, waste disposal register, anticipated waste streams to be generated and related legal requirements applicable to waste management for specific scope of work.
Environmental records to be retained at site for the specific scope of work and, shall include but not be limited to: o Environmental Authorisation (including all other permits and licenses). o Project specific Environmental Management Plan/Programme. o Aspects and Impacts register. o Incident register and Investigation reports. o Non – Conformance register. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134 Suppliers Revision: 1 Page: o Complaints register. o Waste statistics (reused, recycled, donated and disposal records). o Water use records. o Hazardous Substances registers and Safety Data Sheets. o Records of internal and external audits and inspections (reports, findings, action plans and close outs). o Records of site inspections conducted (checklists and reports). o ECO reports (where applicable). o Energy Efficiency Checklists. o Appointed environmental representative (Appointment Letter). 3.5 Organisational Environmental Aspects and Impacts Registers
Transmission Aspects and Impacts register shall identify/indicate/define/reflect the supplier’s scope as per the requirements of ISO 14001: 2015.
Transmission requires that the service providers ’s environmental requirements documentation meet the additional requirements below as a minimum
Identify and list all environmental aspects per activity.
Determine all the possible environmental impacts for each of the identified aspects.
All environmental aspects shall be assessed before and after controls.
Identify significant Aspects and Impacts and establish programmes/ procedures on how to address the impact to the environment.
The impacts shall be rated and must be included in a compiled Environmental Aspects and Impacts register (See Appendix A).
Aspects and Impacts register by the contractors/suppliers must be a revision-controlled document; An example of the Environmental Criteria for determining the significant impacts are explained in Appendix A. Note: this shall be managed according to the level of environmental risk. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134 Suppliers Revision: 1 Page: Transmission Supplier Significant aspects shall be considered in the Planned actions and impact control (corrective) setting of Objectives and Targets and the measures for the medium and high significant determination of the environmental risks and impacts shall be undertaken through opportunities at the project level. environmental management programme/plan and/or through operational controls. Note: These records shall be kept in a hard copy and submitted to the environmental practitioners
The supplier’s organisational structure shall indicate the current management hierarchy as per scope of work (include SHEQ representatives). The structure must clearly show lines of responsibility and authority and shall reflect both the names of the appointed persons and their respective designations and positions. The management representative (i.e. appointed responsible authority of site) having overall responsibility for environmental management and planning.
A qualified person (National Diploma or a degree e.g., Environmental Sciences/Management or Nature Conservation or relevant Natural Sciences) having the responsibility for monitoring environmental planning and activities and their relationship within the management structure according to the project EMPr/EMP and/or EA requirement. For low risk projects an environmental representative with two weeks environmental training will be sufficient to be an environmental representative.
Environmental tender returnable must be clear to suppliers. The environmental practitioner to identify and list all applicable environmental requirements in relation to the scope of work
Where applicable, the tenders or potential suppliers must conduct a site visit of the area where the work shall be executed before tendering.
The site visit will be conducted with the supervision of contract custodian together with the commercial practitioner. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134 Suppliers Revision: 1 Page: Items for informing the Tenderer
For the environmental requirements that were not met during the evaluation phase, the Tenderer will be given seven (7) days to submit the outstanding requirements. failure to submit the outstanding requirements within the seven (7) days period will render the tenderer non-compliant and the evaluated score will not change. As environmental requirements in a tender are contractual requirements, the non-compliance will not lead to a tenderer’s disqualification but will be highlighted in the submission report to the Delegated Approval Authority (DAA) for the Tenderer to address during the negotiations or post contract award.
Outstanding environmental issues at the clarification must be provided for in the contract with the tenderer given a specific period post contract award to address.
B-BBEE Minimum Level: 2
Health & Safety
Source: Exec Furniture - Environmental Requirements for Contractors and or Suppliers.pdfthe environment, and quality (SHEQ). Zero Harm means ensuring that the Eskom operational
activities do not inflict harm on Eskom’s assets, its employees, contractors, and members of the
public affected by its operations, and the environment in terms of compliance obligations. All
procurement has some level of impact on the environment that needs to be minimised to ensure
sustainable procurement practices. Most environmental impacts occur before goods, works or
services are procured, for example, resource extraction, design development, manufacturing,
transportation and storage, etc. Environment is an integral part of Eskom sustainable procurement
strategy.
reduce the hazards identified in any risk assessment. In the case of internal
work, it includes procedures, safe work procedures, and work standards.
for the enquiry.
the appropriate environmental practitioners prior to the release of tender documents.
input into the relevant meetings or forums, processes, and reports that lead to the awarding
of the contract (e.g., supplier evaluation, squad check meetings, contracting strategies,
negotiations, clarification meetings, tender evaluations and evaluation report compilations,
contract award, briefing meetings).
Ensure that the Environmental Acknowledgement Form (Appendix E) is reviewed by the
Participate in, and input into all the relevant meetings/forums, processes and reports that
lead to the awarding of the contract.
requirements together with members of the cross functional team for each tender/enquiry
and shall ensure that these requirements are handed over to commercial representative
for inclusion in the tender/enquiry.
work and environmental risk assessment conducted for the contract.
are submitted with the tender returnables.
execution and post-contract review and assessment and must also ensure that all reports
are provided to contracts management.
interventions taken and provide the report to the contract custodian and submit to
contracts management.
technical evaluation criteria for the contract.
The Contract Custodian (Contract Executor) shall:
Ensure that the Supplier adheres to the relevant contract environmental requirements.
Ensure that project-specific environmental specifications together with specific
environmental aspects and other relevant procedures and documents are developed in
conjunction with the Environmental Practitioner and provided with the tender package.
site
and Award Monitoring
Figure 1: illustrate the six phases environmental contractor management model
3.1 Phase 1: Design Phase
are specific to the contract or services to ensure integration of the environmental
requirements into the design.
commencing with the design or contract goods and services environmental specification can
be developed.
3.2 Phase 2: Tender Enquiry, Evaluation, and Award
enquiry shall be accompanied by a contract specific environmental specification and risk
assessment and applicable SHE policies and procedures.
Revision: 1
Page:
o Complaints register.
o Waste statistics (reused, recycled, donated and disposal records).
o Water use records.
o Hazardous Substances registers and Safety Data Sheets.
o Records of internal and external audits and inspections (reports, findings, action plans
and close outs).
o Records of site inspections conducted (checklists and reports).
o ECO reports (where applicable).
o Energy Efficiency Checklists.
o Appointed environmental representative (Appointment Letter).
3.5 Organisational Environmental Aspects and Impacts Registers
scope as per the requirements of ISO 14001: 2015.
documentation meet the additional requirements below as a minimum:
Identify and list all environmental aspects per activity.
Determine all the possible environmental impacts for each of the identified aspects.
All environmental aspects shall be assessed before and after controls.
Identify significant Aspects and Impacts and establish programmes/ procedures on how to
address the impact to the environment.
Impacts register (See Appendix A).
document; An example of the Environmental Criteria for determining the significant impacts
are explained in Appendix A.
Note: this shall be managed according to the level of environmental risk.
hazard and the magnitude is unknown (refer to appendix C to determine risk):
during the evaluation. The Tenderer to score full points against the specified criteria.
When the supplier does not score full marks, they will be given seven (7) days to
submit outstanding documents. Failure to do so will result in the original score being
retained. To be noted that while the all or nothing principle will be evaluated in this
process, suppliers will not be disqualified for not meeting all requirements. Suppliers
will be given the opportunity to meet the requirements at negotiations and if they again
fail, any outstanding requirements will be provided for in the contract for the supplier
to meet within the timeframe stipulated in the contract.
environmental impact regionally or locally that could result in a major uncontained or
sustained environmental release causing health hazard to humans and immediate vicinity
but not resulting in a critical or fatal injury/illness. This could result in an ecological damage
that can be remedied within one year. (Refer to appendix C to determine risk):
has little or no ecological effect and no measurable impact on human health (refer to
appendix C to determine risk): Environmental requirements shall be included as a
contractual requirement or as stipulated In the Procurement and Supply Chain
Independent electricity generators and demand response suppliers for rebate.
Venue and accommodation services where a contract does not exist between Transmission
and the supplier.
sanitation.
Purchasing of consumables from established retailers (trading outlets).
Disruption in transportation and distribution of goods/services due to extreme weather
condition and other declared emergencies and disasters (i.e., urgent procurement or
emergencies).
with environmental requirements.
3.7 Phase 4: Site Mobilisation /Access to Site
she/he is accountable for the management of her/his subcontractors and supplier and to
ensure that the subcontractors/suppliers comply with the applicable Environmental legal
obligation and other Eskom/ Transmission requirements (applicable during the contract
execution of works and services in terms of the contract).
conformances or non-compliance of the suppliers are dealt with as per the Transmission
supplier status reconsideration process (32-1034 Eskom Procurement and Supply Chain
Management Procedure)
Revision: 1
Page:
o Ad-hoc environmental intervention by Transmission management, all
work of similar nature may be stopped due to the occurrence of a
serious environmental incidents, and the relevant supplier will be
required to comply with the conditions stipulated in the work stoppage
instruction.
o Ad-hoc environmental intervention by any person, especially
environmental practitioners, may be due to activities by the contractor
that may degrade the environment. The conditions that may result to a
work stoppage will determine the corrective measures to be taken
urgently to protect the environment and plant or equipment to prevent
environmental pollution.
o Ad-hoc environmental intervention by government environmental
authorities, all work of similar nature may be stopped due to the
occurrence of a serious environmental incident or legal contravention,
and the relevant supplier will be required to comply with the conditions
stipulated in the work stoppage instruction.
Revision: 1
Page:
o A supplier had two or more contraventions of environmental legislation
including non-compliance with the condition contained in all
environmental approvals. The contractor has been issued with a
compliance notice that is issued by a government department, for an
example the Department of Forestry, Fisheries and the Environment
and Department of Water and Sanitation
o Violation of any of the Eskom Life-saving Rules occurs.
o Fraudulent environmental related documents are submitted by the
supplier.
C 240-108987034
Environmental
Source: Exec Furniture - Environmental Requirements for Contractors and or Suppliers.pdfTitle: Environmental Requirements for Document Identifier: 240-180100134
Area of Applicability: Transmission
Functional Area: Environmental
Date: 14/12/2023 Date: 19/01/2024 Date: 16/01/2024 Date: 19 Jan 2024
File name: Environmental Requirements for Contractors and or Suppliers Standard_Final_08 December2023
Template ID: 32-4 (Rev 11) Document template (for procedures, manuals, standards, instructions, etc.
Formatted by: EDC_TLN_17.03.2021 (Document Controller to update)
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
. Introduction ............................................................................................................................... 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 4
2.1.2 Applicability ........................................................................................................... 4
2.1.3 Effective date ......................................................................................................... 4
2.2 Normative/Informative References ................................................................................... 4
2.2.1 Normative .............................................................................................................. 4
2.2.2 Informative............................................................................................................. 5
2.3 Definitions ........................................................................................................................ 5
2.4 Abbreviations ................................................................................................................... 7
2.5 Roles and Responsibilities ............................................................................................... 8
2.6 Process for Monitoring .................................................................................................... 11
2.7 Related/Supporting Documents ...................................................................................... 11
3.1 Phase 1: Design Phase .................................................................................................. 12
3.2 Phase 2: Tender Enquiry, Evaluation, and Award ........................................................... 12
3.3 Contractors Environmental Management System Requirements .................................... 13
3.4 Environmental Planning .................................................................................................. 13
3.5 Organisational Environmental Aspects and Impacts Registers ....................................... 15
3.6 Phase 3: Supplier Registration ....................................................................................... 19
3.7 Phase 4: Site Mobilisation /Access to Site ...................................................................... 19
3.8 Phase 5: Contract Execution and Continual Monitoring .................................................. 20
3.9 Phase 6: Post-Contract Review ...................................................................................... 24
Acceptance ............................................................................................................................. 25
Revisions ................................................................................................................................ 25
Development Team ................................................................................................................ 26
Acknowledgements ................................................................................................................ 26
Appendices ................................................................................................................................... 27
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
standards, procedures, policies, and compliance obligations with which Transmission suppliers need
to comply. It specifies a pre-determined set of environmental criteria to evaluate and monitor
potential and contracted Transmission suppliers. The objective is to ensure a common
understanding and consistent implementation of environmental requirements for procurement of
assets, goods, and services.
Clients, Environmental Practitioner and Contract or Project managers (contract custodians). It also
provides the minimum environmental requirements to be addressed during:
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
contracted to Transmission have established an Environmental Management System for goods,
works, or services they provide.
2.1.2 Applicability
following paragraphs.
2.2.1 Normative
[1] 32-1034 Eskom Procurement and Supply Chain Management Procedure.
[2] 32-196 Eskom Disciplinary Code Standard.
[3] Project Specific Environmental Management Programmes/Environmental Management Plan.
[4] Project Specific Permits and Licenses (Construction stage).
[5] 240-43921804 Environmental Tender Evaluation Template.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Revision: 1
Page:
[6] 240-151560800 Environmental Evaluation-Commencement of work.
[7] 240-180100148 Pre-construction Access Agreement Form.
[8] 240-110600836 Contractor Environmental Requirements Proforma.
2.2.2 Informative
[9] National Environmental Management Act No
[10] ISO 14001: Environmental Management Systems
[11] National Environmental Management: Waste Act (Act )
[12] Environmental Impact Assessment Regulation (2014)
[13] National Water Act (Act )
[14] National Environmental Management: Air Quality Act (Act )
[15] National Environmental Management: Biodiversity Act (Act )
[16] National Environmental Management: Protected Areas Act (Act )
[17] National Heritage Resources Act (Act )
[18] National Veld and Forest Fire Act (Act )
[19] 240-82410629 Environmental Management Strategy
[20] 240-81146134 Implementing SHEQ as Objective Criteria Position Paper
2.3 Definitions
Impact partially resulting from an organisation’s environmental aspects.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Management Plan mitigation of the environmental impacts of an organisation’s activities,
products, and services.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Management Act, 1998 (Act No.) Environmental Impact
Assessment Regulations (2014).
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
documentation for evaluation.
between tenderers and Environmental Practitioners shall not be allowed. .
The Supplier must comply with, and adhere to, environmental legislation and
The Supplier as a legal entity must be conversant with the environmental obligations
related to the works, services or goods tendered for.
site requirements, and it is the responsibility of the Supplier to ensure that these
requirements are met before work can commence.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
audits on the works, goods or services rendered. The procedure / process shall include documenting
information to monitor performance, applicable operational controls (method statements) and
conformity with the Transmission EMPr/EMP and/or the EA.
environmental management procedures, and/or any inspection authority acting on
supplier’s behalf, to make available all information at its disposal certificates for review
by Transmission or its appointed inspection agency.
shall be made available to Transmission business units. These shall not be limited to:
o A procedure for Monitoring, Measurement, Analysis and Evaluation of
Compliance
o Document specific checklists and registers
o Monitoring/Inspection reports
o Findings and close out reports.
o Natural resource consumption (water, fuel, electricity usage etc.)
2.7 Related/Supporting Documents
[1] 32-1034 Eskom Procurement and Supply Chain Management Procedure
[2] 240-106082683 SHEQ Requirements for the Procurement and Supply Chain Processes in Eskom
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
3.3 Contractors Environmental Management System Requirements
environmental management system, preferably guided by the ISO 14001:2015 Standard.
date documentation and records related to their environmental management practices. This
can include policies, procedures, training records, audits, and monitoring reports.
environmental programmes comply with the Transmission requirements. The Contractor
shall define the specific environmental control elements applicable to the scope of works,
goods or services.
that were evaluated during the tendering stage prior to implementation of these changes.
3.4 Environmental Planning
environmental representatives prior to the commencement of work involving an activity
affected by such changes.
parties previously responsible for evaluation prior to implementation.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Revision: 1
Page:
reviewed, and formally approved. The environmental management system must cover each
distinct stage of work performed/undertaken and it shall include but not be limited to:
o Site establishment.
o Access control to site.
o Site construction and installation work (civil, electrical, power lines etc.).
o Manufacturing (site, factory, temporary workshops etc.).
o Storage areas (plant, equipment, free issue material etc.).
o Waste Management Plan (or method statement); Site and Vegetation Clearing.
o Handling of Hazardous Chemical substances.
o Site management (water management, dust and noise, landowner liaison, final
release and settlement of disputes and claims).
o Rehabilitation.
o Site demobilization.
environmental conditions will be included and mitigated.
Work to be performed by the supplier and their pre-determined scoping requirements.
Waste management plan/procedure that includes waste segregation and minimisation, waste
disposal register, anticipated waste streams to be generated and related legal requirements
applicable to waste management for specific scope of work.
but not be limited to:
o Environmental Authorisation (including all other permits and licenses).
o Project specific Environmental Management Plan/Programme.
o Aspects and Impacts register.
o Incident register and Investigation reports.
o Non – Conformance register.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Significant aspects shall be considered in the Planned actions and impact control (corrective)
setting of Objectives and Targets and the measures for the medium and high significant
determination of the environmental risks and impacts shall be undertaken through
opportunities at the project level. environmental management programme/plan
and/or through operational controls.
Note: These records shall be kept in a hard copy and submitted to the environmental
practitioners
per scope of work (include SHEQ representatives). The structure must clearly show lines of
responsibility and authority and shall reflect both the names of the appointed persons and
their respective designations and positions. The management representative (i.e. appointed
responsible authority of site) having overall responsibility for environmental management and
planning.
or Nature Conservation or relevant Natural Sciences) having the responsibility for monitoring
environmental planning and activities and their relationship within the management structure
according to the project EMPr/EMP and/or EA requirement. For low risk projects an
environmental representative with two weeks environmental training will be sufficient to be
an environmental representative.
to identify and list all applicable environmental requirements in relation to the scope of work
where the work shall be executed before tendering.
commercial practitioner.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Tenderer will be given seven (7) days to submit the outstanding requirements. failure to
submit the outstanding requirements within the seven (7) days period will render the tenderer
non-compliant and the evaluated score will not change. As environmental requirements in a
tender are contractual requirements, the non-compliance will not lead to a tenderer’s
disqualification but will be highlighted in the submission report to the Delegated Approval
Authority (DAA) for the Tenderer to address during the negotiations or post contract award.
the tenderer given a specific period post contract award to address.
meetings. Environment shall be on the agenda for the clarification meeting and records of
the presentation are to be kept by commercial. To be noted that guidance and support at the
clarification meeting and all clarifications associated the tender must be levelled with the
Eskom Representative (Buyer).
respectively
evaluations are carried out by the allocated environmental practitioner responsible for the
tender. The environmental evaluation report shall be compiled by the responsible
environmental practitioner and submitted to commercial.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Revision: 1
Page:
high risk that is recognised globally, widespread or permanent ecological damage locally.
responsible environmental practitioner for all contracts.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
requirements to be met before work can commence.
3.6 Phase 3: Supplier Registration
returnable as per scope of work).
award
least one week prior) of the contract award so that they can ensure that environmental file
evaluation is done before the supplier can mobilise on site and commence with work.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
the monitoring/assurance of this
performance and the supplier’s compliance at predetermined interval during contract
execution and that these reports are provided to the contract custodian, as well as the
commercial department during the execution of the contract and for the post-contract review
process.
a risk of degradation to the environment. This includes any unauthorised work or
commencement of the activity without required environmental authorisation or approvals or
service performed by, or legally or contractually non-compliant acts or omissions by the
concerns, including the following circumstances which shall not warrant any financial
compensation:
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
work)
D 240-43921804
E
F
Contractual Terms
Source: Exec Furniture - Environmental Requirements for Contractors and or Suppliers.pdfRevision: 1
Page:
a) Design phase.
b) Tender enquiry, evaluation, and contract award.
c) Supplier registration on the Transmission vendor data base.
d) Site access /site mobilization.
e) Monitoring of performance during the contract execution period.
f) Contract completion, close out, and post-contract review and
g) Instances and criteria where works or services under a contract can be stopped, suspended or
termination of contracts.
2.1.1 Purpose
commercial practitioner to the reconsideration of the supplier status committee when she/he
recommends the suspension or termination of the contract on the advice of environmental
practitioners.
shall be initiated when:
o A supplier has three major environmental non-conformances raised in
the same financial year.
Special Conditions
Source: Exec Furniture - Environmental Requirements for Contractors and or Suppliers.pdf (unknown)Note: No Transmission employee or representative is allowed to terminate or suspend a contractor or supplier at any given time. The contractor must be referred to the General Manager Operations and Maintenance (Grids) Transmission Group All Transmission Group BU’s Transmission Group All Transmission Group BU’s
Requirements
Source: Exec Furniture - Environmental Requirements for Contractors and or Suppliers.pdf (unknown)Implementation of the requirements as stipulated in this standard.
Section
Source: Exec Furniture - Environmental Requirements for Contractors and or Suppliers.pdfleast one week prior) of the contract award so that they can ensure that environmental file
evaluation is done before the supplier can mobilise on site and commence with work.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
requirements to be co-ordinated by the Office of the Group Executive - environmental
practitioners. The co-ordinating environmental practitioner will hand over to the business unit
environmental practitioner (phase 4 to 6), where the works or goods/services will be executed
by the environmental practitioners at relevant business unit.
and/or qualification validity period and shall be submitted to Transmission or its inspection
agency prior to commencement of the works. Documents to be submitted to Transmission
include, but may not be limited to the following:
o A completed and signed contractor Environmental Requirements Pro – Forma
(Appendix E).
o Contractors/suppliers Environmental procedures/method statement will be in
accordance with Transmission specific requirements.
o EMS documentation as required for the works.
o All documentation shall be submitted to Transmission for evaluation 7 days after
contract award.
o Organisation’s EMS records (refer to Appendix D).
o Permits as applicable.
o Corrective actions taken because of non-conformances raised by either the
Organisation or Transmission.
3.8 Phase 5: Contract Execution and Continual Monitoring
Continual Environmental performance monitoring
compliance and adherence by the contractor. The Environmental Practitioner reserves the
right to conduct the performance measures on all contractors.
mechanism (such as audits and reviews) is instituted with the support of the environmental
practitioners to ensure compliance with environmental legislative/ legal obligation and
Transmission requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
Management of Sub-Contractors and Suppliers
she/he is accountable for the management of her/his subcontractors and supplier and to
ensure that the subcontractors/suppliers comply with the applicable Environmental legal
obligation and other Eskom/ Transmission requirements (applicable during the contract
execution of works and services in terms of the contract).
conformances or non-compliance of the suppliers are dealt with as per the Transmission
supplier status reconsideration process (32-1034 Eskom Procurement and Supply Chain
Management Procedure)
Enforcement of compliance with Environmental requirements during contract execution and
the monitoring/assurance of this
performance and the supplier’s compliance at predetermined interval during contract
execution and that these reports are provided to the contract custodian, as well as the
commercial department during the execution of the contract and for the post-contract review
process.
Work stoppage stoppage/suspension of works and services under a contract
a risk of degradation to the environment. This includes any unauthorised work or
commencement of the activity without required environmental authorisation or approvals or
service performed by, or legally or contractually non-compliant acts or omissions by the
Supplier or such Contractors.
concerns, including the following circumstances which shall not warrant any financial
compensation:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
o Ad-hoc environmental intervention by Transmission management, all
work of similar nature may be stopped due to the occurrence of a
serious environmental incidents, and the relevant supplier will be
required to comply with the conditions stipulated in the work stoppage
instruction.
o Ad-hoc environmental intervention by any person, especially
environmental practitioners, may be due to activities by the contractor
that may degrade the environment. The conditions that may result to a
work stoppage will determine the corrective measures to be taken
urgently to protect the environment and plant or equipment to prevent
environmental pollution.
o Ad-hoc environmental intervention by government environmental
authorities, all work of similar nature may be stopped due to the
occurrence of a serious environmental incident or legal contravention,
and the relevant supplier will be required to comply with the conditions
stipulated in the work stoppage instruction.
Supplier status reconsideration
commercial practitioner to the reconsideration of the supplier status committee when she/he
recommends the suspension or termination of the contract on the advice of environmental
practitioners.
shall be initiated when:
o A supplier has three major environmental non-conformances raised in
the same financial year.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
o A supplier had two or more contraventions of environmental legislation
including non-compliance with the condition contained in all
environmental approvals. The contractor has been issued with a
compliance notice that is issued by a government department, for an
example the Department of Forestry, Fisheries and the Environment
and Department of Water and Sanitation
o Violation of any of the Eskom Life-saving Rules occurs.
o Fraudulent environmental related documents are submitted by the
supplier.
The investigation will be conducted, and the supplier will be informed about the outcome of the
investigation. If the supplier is found guilty of the above offences, they will be taken off the Eskom
data base with no future business prospect with Transmission. When the supplier is cleared on all
the offences, they will be re-considered to be reinstated on the Eskom database.
Note: No Transmission employee or representative is allowed to terminate or suspend a
contractor or supplier at any given time. The contractor must be referred to the
Reconsideration of Supplier Status Committee.
Contract Completion Process and Record Retention
environmental inspection is conducted with the assistance of the environmental practitioners
allocated for the work. The environmental practitioner will ensure that the rehabilitation is
executed according to the EMPr/EMP and EA conditions. The environmental practitioner will
sign off the project close out handover form. This must be done before a contract is closed.
form with all records will be signed by all and handed over to business unit on completion of
the works/project. For work/project where the Business unit Managers are on another division
/site, the handover shall include the environmental file that will be handed over to the client
or client agent (site owner /asset owner).
accompany every shipment of product to its specified delivery destination(s) include, but may
not be limited to the following:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
Organisation certificates of conformance.
Organisation test certificates etc. as required by the applicable technical specification(s).
Inspection release reports issued by Transmission or its inspection agency including but
may not limited to:
o ECO close out report
o Final rehabilitation report
o Final sites close out audit/inspection report/NCR close out
NOTE: The above can be submitted and summarised in a form of a controlled register.
3.9 Phase 6: Post-Contract Review
to review the supplier’s environmental performance during the execution of contract and ensure
that the assessment results are made accessible and available to all relevant stakeholders for
future reference.
review process, that is, audit reports and the environmental compact/contract.
management) for record keeping purposes and the results input into the supplier database for
future consideration of the specific contractor.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
This document has been seen and accepted by:
Name Designation
Group Executive Transmission Group
General Manager Asset Management
General Manager Engineering
General Manager Energy Market and Services
General Manager Grid Planning and Development
General Manager International Traders
General Manager Office of the Group Executive
General Manager Operations and Maintenance (Grids)
General Manager Transmission Projects Delivery
General Manager System Operator
Senior Manager Finance
Acting Senior Human Resources
Manager
General Manager Procurement and Supply Chain Management
Transmission Group All Transmission Group BU’s
Bms
Representatives
Transmission Group All Transmission Group BU’s
BUERs
Date Rev. Compiler Remarks
November 2023 1 P Likhethe Transmission did not have a
level 2 procurement standard.
The division adopted level 3
Transmission Project Delivery
standards to convert it into a
level 2 document.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
The following people were involved in the development of this document:
The compiler would like to acknowledge the Transmission Environmental Management Team for
putting this document together.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
Appendices
Appendix Description Document Reference Number
A 240-131655011
B 240-109832932
Providers or Suppliers
C 240-108987034
Medium, and Low risk
work)
D 240-43921804
E
Requirements Pro-forma
F
Statement Template for
Service Providers or
Suppliers
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Description
Source: NTCSA Standard Conditions of Tender.pdfImportant Dates
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)Contact Information
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)Submission Guidelines
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)Evaluation Criteria
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)Technical Specifications
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)Quality Management
Source: NTCSA Standard Conditions of Tender.pdfFinancial Requirements
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)Compliance Requirements
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)Health & Safety
Source: NTCSA Standard Conditions of Tender.pdfContractual Terms
Source: NTCSA Standard Conditions of Tender.pdfRequirements
Source: NTCSA Standard Conditions of Tender.pdf (TENDER)Returnable Documents
Source: Post contract award SHEQ Requirement.pdf (unknown)Evaluation Criteria
Source: Post contract award SHEQ Requirement.pdf (unknown)Technical Specifications
Source: Post contract award SHEQ Requirement.pdf (unknown)Compliance Requirements
Source: Post contract award SHEQ Requirement.pdf (unknown)Description
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdfEskom Holdings SOC Ltd (Registration Number 2002/015527/30) is South Africa’s primary electricity supplier, wholly owned by the South African Government. Its mandate is to ensure a stable electricity supply, contributing to lower business costs and economic growth. The SHEQ Policy governs its commitment to safety, health, environmental, and quality principles, ensuring no operating condition justifies exposing anyone to risks leading to incidents. The policy integrates SHEQ requirements into operations via the Plan-Do-Check-Act (PDCA) cycle, aligning with Eskom’s vision of ‘sustainable power for a better future’.
Evaluation Criteria
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdf (unknown)General:
Technical:
Financial:
Sheq:
Technical Specifications
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdf (unknown)Scope:
Context:
Quality Management:
Environmental Commitments:
Compliance Requirements
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdf (unknown)Contractors/suppliers must:
Health and Safety:
Health & Safety
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdfEskom’s health and safety principles prioritise Zero Harm for employees, contractors, the public, and the environment. Key requirements: Prevent occupational injuries, diseases, and environmental incidents through proactive measures. Ensure safe practices, environments, and activities to avoid work-related injuries and ill-health. Contractors/suppliers must comply with Occupational Health and Safety Act and Eskom’s Life-saving Rules: Open, isolate, test, earth, create an equipotential zone bond, and/or insulate before touch; Hook up at heights; Buckle up; Be sober; Permit to work; Ensure safe live working. Address risks and opportunities through governance structures and KPIs. No operating condition justifies exposing anyone to risks causing SHEQ incidents.
Environmental
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdfEskom’s environmental commitments include: Minimising business impact on the environment by adopting eco-friendly technologies. Preserving natural resources and setting/achieving environmental targets aligned with Eskom’s Environmental Strategy. Proactively managing environmental footprint by reducing pollution, degradation, and pursuing a low-carbon future. Prioritising energy and water conservation and demand management. Addressing climate change by: Reducing greenhouse gas (GHG) emissions while maintaining grid stability, meeting electricity demand, and minimising supply costs. Protecting and securing assets/operations from climate change impacts to promote resilience. Supporting national government objectives for a low-carbon, climate-resilient future.
Description
Source: Qualiy Requirements.pdfThe project involves the design, supply, and installation of executive office furniture and soft finishes as and when required.
Submission Guidelines
Source: Qualiy Requirements.pdf (unknown)Returnable Documents
Source: Qualiy Requirements.pdf (unknown)Form A must be completed and signed.
Evaluation Criteria
Source: Qualiy Requirements.pdf (unknown)Technical Specifications
Source: Qualiy Requirements.pdf (unknown)Experience & Qualifications
Source: Qualiy Requirements.pdf (unknown)Supplier experience and qualifications will be evaluated based on proof of work conducted as per the scope of work and/or specification.
Compliance Requirements
Source: Qualiy Requirements.pdf (unknown)Section
Source: Qualiy Requirements.pdfEvaluation is based on the quality management system requirements, quality objectives, and documented information for defined roles and responsibilities.
Description
Source: SHEQSP~1.PDFImportant Dates
Source: SHEQSP~1.PDF (unknown)Contact Information
Source: SHEQSP~1.PDF (unknown)Submission Guidelines
Source: SHEQSP~1.PDF (unknown)Evaluation Criteria
Source: SHEQSP~1.PDF (unknown)Technical Specifications
Source: SHEQSP~1.PDF (unknown)Experience & Qualifications
Source: SHEQSP~1.PDFQuality Management
Source: SHEQSP~1.PDFPricing Schedule
Source: SHEQSP~1.PDFFinancial Requirements
Source: SHEQSP~1.PDF (unknown)Compliance Requirements
Source: SHEQSP~1.PDF (unknown)Health & Safety
Source: SHEQSP~1.PDFContractual Terms
Source: SHEQSP~1.PDFSection
Source: SHEQSP~1.PDFDescription
Source: 32-95 rev 9.pdfScope: Design, supply, and install executive office furniture and soft finishes on an as-and-when-required basis for a period of 12 months.
Eskom’s SHEQ Policy outlines principles for occupational health and safety (OHS), environment, and quality. Incident management is integral to risk management, with the following aims:
Note: Incident management focuses on identifying and addressing areas for improvement, not assigning blame. Eskom is committed to Zero Harm as a core value.
Evaluation Criteria
Source: 32-95 rev 9.pdf (unknown)Evaluation is based on the following criteria:
Technical Specifications
Source: 32-95 rev 9.pdf (unknown)Scope: Design, supply, and install executive office furniture and soft finishes on an as-and-when-required basis for a period of 12 months.
Key Objectives:
Note: Incident management is not for assigning blame but for identifying and addressing areas for improvement to reduce future risks. Eskom is committed to a Zero Harm value.
Quality Management
Source: 32-95 rev 9.pdfQuality management requirements for incident handling:
Compliance Requirements
Source: 32-95 rev 9.pdf (unknown)Compliance with the following is required:
Health & Safety
Source: 32-95 rev 9.pdfOccupational Health and Safety (OHS) requirements:
Scope and Applicability:
Effective Date: 1 April 2021.
Normative References:
Informative References:
Definitions:
Roles and Responsibilities:
Process for Monitoring:
Environmental
Source: 32-95 rev 9.pdfEnvironmental requirements are excluded from this document. The procedure focuses solely on occupational health and safety (OHS) incident management.
Contractual Terms
Source: 32-95 rev 9.pdfContractual obligations include:
Section
Source: 32-95 rev 9.pdfEvaluation focuses on improving occupational health and safety (OHS) quality by learning from incidents, including near-misses. Corrective actions may include longer-term system-related improvements or evaluations.
Description
Source: Contract and Contractor OHS Management.pdf (unknown)2.1.2 Applicability
divisions, subsidiaries, and entities in which Eskom has a controlling interest or influence.
2.1.3 Effective date
Important Dates
Source: Contract and Contractor OHS Management.pdf (unknown){"closingDate":"18 May 2021","briefingSession":"{"date":null,"time":null,"venue":"ion and briefing ........................................................................................... 14","is_compulsory":false}"}
Contact Information
Source: Contract and Contractor OHS Management.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"gers (contract custodians), line management, suppliers, and OHS professionals underlining"}
Evaluation Criteria
Source: Contract and Contractor OHS Management.pdf (unknown)General
Specific
Exclusions
Technical Specifications
Source: Contract and Contractor OHS Management.pdf (unknown)Eskom is committed to creating and sustaining the Zero Harm value and standard of Occupational,
Hygiene and Safety (OHS). Achieving the OHS requirements will be integrated into the Eskom
procurement and supply chain processes.
This standard sets the minimum criteria for managing supplier OHS compliance and conformity
based on standards, procedures, policies, and legal obligations with which an Eskom
supplier/contractor needs comply from inception to completion of the contract/transaction.
2.1 Scope
This standard outlines the key responsibilities of procurement professionals, contract/project
managers (contract custodians), line management, suppliers, and OHS professionals underlining
the minimum OHS requirements that shall be addressed during the following phases, namely:
a) Project initiation and briefing, concept and feasibility study, design development;
b) Tender enquiry, evaluation, and contract award;
c) Supplier registration on the Eskom vendor database;
d) Site access/mobilisation;
e) Monitoring of performance during the contract execution period;
f) Contract completion, closeout, and post contract review; and
g) Instances where works or services under a contract can be stopped, suspended, or terminated.
2.1.1 Purpose
The purpose of this document is to guide Eskom employees when performing OHS-related
activities beginning from the procurement and supply chain process to the end of the
contract/transaction. To ensure standardisation of the OHS requirements within Eskom contract
and contractor OHS management as is reasonably practicable.
2.1.2 Applicability
The requirements contained in this document shall apply throughout Eskom Holdings SOC Ltd, its
divisions, subsidiaries, and entities in which Eskom has a controlling interest or influence.
2.1.3 Effective date
Effective from date of authorisation.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.2 Normative/Informative references
Parties using this document shall apply the most recent edition of the reference documents listed in
the following paragraphs.
2.2.1 Normative
[1] 32-727 Eskom Safety, Health, Environmental and Quality Policy
[2] 32-1034 Eskom’s Procurement and Supply Chain Management Procedure
[3] 32-196 Eskom Disciplinary Code Standard
[4] 240-62196227 Eskom Life-Saving Rules Standard
[5] National Environmental Management: Waste Act
[6] Occupational Health and Safety Act and Regulations
2.2.2 Informative
[1] 32-520 Occupational Health and Safety Risk Assessment Procedure
[2] ISO 9001 Quality Management Systems
[3] 32-95 Environmental, Occupational Health, and Safety Incident Management Procedure
[4] Compensation for Occupational Injuries and Diseases Act
[5] OHSAS 18001 Occupational Health and Safety Management Systems
[6] ISO 14001 Environmental Management Systems
[7] Mine Health and Safety Act
[8] The Constitution of the Republic of South Africa, 1996
[9] National Environmental Management Act
[10] Environment Conservation Act
[11] National Water Act
[12] National Environmental Management: Waste Act
[13] National Environmental Management: Air Quality Act
[14] National Forests Act
[15] National Environmental Management: Biodiversity Act
[16] National Environmental Management: Protected Areas Act
[17] National Heritage Resources Act
[18] National Veld and Forest Fire Act
[19] Conservation of Agricultural Resources Act
[20] 32-136 Eskom Contractor Health and Safety Requirements Standard
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.3 Definitions
Definition Explanation
Business unit A division, site, grid, operational unit, or project within, for, or on behalf
of, Eskom Holdings SOC Ltd.
An agreement with specific terms between two or more persons or
Contract entities in which there is a promise to do something in return for a
valuable benefit known as consideration/ payment.
Contract custodian The person defined in a contract as the Eskom representative, for
example, the project manager/end user, that is, the person
responsible for managing the contract and ensuring that the works or
services are executed in terms of the contract.
Contract management It is a process of managing contract creation, execution and analysis
in order to maximise operational performance and mitigate legal
ramifications, reducing financial risk at an organization. The art and
science of managing a contractual agreement throughout the contract
life cycle.
Contractual Contractual requirements consist of legal and other OHS requirements
requirements for OHS for procuring goods and/or services to be rendered for/on behalf of
Eskom. These are OHS documents required from tenderers at the
procurement phase (enquiry, evaluation, negotiation meeting and
contract award) and only tenderers that have met the mandatory and
functionality threshold will be evaluated.
Construction health A person who is registered as such in terms of the Project and
and safety agent Construction Management Profession Act, as amended.
(CHSA) Any competent person who acts as a representative for a client in
managing health and safety on a construction project for the client and
who has satisfied the registration criteria of the SACPCMP to perform
the required functions.
Competent person A person who, in respect to the work that has to be done, has the
required training, knowledge, and experience, and, where applicable,
qualification relevant to perform that work or task, provided that where
appropriate qualifications and training are registered in terms of the
provisions of the National Qualifications Framework Act ,
those qualifications and training are regarded as the required
qualifications and training, and is familiar with the Act and applicable
regulations made under the Act.
Contractor A contractor is a current or potential supplier, vendor, consultant, or
service provider. A contractor/supplier may be a natural or legal
person.
Environment The surroundings within which humans exist.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Definition Explanation
Health and Safety A site-specific plan that forms part of the project safety file containing
plan minimum requirements as defined in the OHS Act as well as the
Eskom OHS requirements.
OHS requirements Requirements prescribed in the applicable OHS legislation, SANS
codes, municipal by-laws, and Eskom OHS requirements.
Safety, health and An act, event, initiative, or campaign that is intended to alter the
environmental current levels of OHS awareness, knowledge and/or performance in
intervention the organisation, a specific division, operating unit, or business unit.
OHS professional The key individual in Eskom charged with OHS responsibilities, such
as OHS managers, officers, advisors, and co-ordinators (for this
purpose, the OHS individual allocated to the project/programme). An
OHS professional should not be confused with a health and safety
representative, as defined in sections 17 and 18 of the OHS Act.
OHS functional head The manager in Eskom charged with OHS responsibilities in a
division/operating unit/business unit.
Site An Eskom department, a specific project site, or the site where a
supplier provides a service to Eskom, directly or indirectly.
Tender An open or closed competitive request for quotations/prices against a
clearly defined scope/specification.
Transaction Exchange of goods or services or money between a buyer and a
seller.
2.4 Abbreviations
Abbreviation Explanation
BRA baseline risk assessment
CHSA Construction health and safety agent
COIDA Compensation for Occupational Injuries and Diseases Act
DE Divisional executive
DEL Department of Employment and Labour
DMR Department of Mineral Resources
EMP Environmental Management Programme
ESR Environmental status rating
ISO International Organization for Standardization
MTC Multidisciplinary committee
OHS Occupational hygiene and safety
ORHVS Operating Regulations for High-Voltage Systems
PPPFA Preferential Procurement Policy Framework Act
PSR Plant Safety Regulations
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Abbreviation Explanation
RFI Request for information
SACPCMP South African Council for Project and Construction Management
Professions
2.5 Roles and responsibilities
2.5.1 Designers shall:
The designer shall ensure that the occupational health and safety (OHS) requirements applicable
to the project/scope of work are incorporated into the design. Consider the associated risks
identified in the scope of specific OHS specification/requirements and baseline risk assessment.
The identification and analysis of hazards and risks must form part of the design process.
Note: Environmental issues, as they may affect the site/project, shall be identified, assessed,
controlled, and monitored for compliance and efficiency by the environmental professionals.
2.5.2 Procurement practitioners shall
2.5.2.1 Ensure that sufficient notification and preparation times are provided for the relevant OHS
professional to form part of the multidisciplinary team for the preparation of the relevant
and specific OHS requirements for the procurement enquiry.
2.5.2.2 Ensure that the appropriate OHS representative provides the OHS requirements and
specified documents before the release of the procurement enquiry.
2.5.2.3 Ensure that the OHS professional participates in, and provides input into, relevant
meetings or forums, processes, and reports that lead to the awarding of a contract (for
example, supplier evaluations, squad check meetings, contracting strategies,
negotiations, clarification meetings, tender evaluations, evaluation report compilation,
contract awarding, and briefing meetings).
2.5.2.4 Ensure that the records about supplier OHS non-conformances during contract
execution, post contract reviews, supplier suspensions, and contract terminations are
received from the contract custodian and where applicable, Procurement shall keep a
record of such information to make it easily accessible to the relevant stakeholders for
future reference, especially when determining the allocation of future works or services.
2.5.2.5 Ensure that applicable OHS requirements for any emergency work are provided to the
preferred contractor/supplier at the same time when the enquiry is made to avoid delays.
The supplier OHS documentation shall be received from the preferred contractor/supplier
and approved urgently to allow work to commence.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.5.3 Contract custodian (contract executor, end user)
The contract custodian shall:
2.5.3.1 Ensure that the contract specifies how OHS will be managed and reported on for the
duration of the contract/transaction and the supplier/contractor adheres to the relevant
contract OHS requirements.
2.5.3.2 Ensure that the OHS professional forms part of the cross-functional team and take part
in all relevant meetings.
2.5.3.3 Ensure that project-specific OHS requirements are provided by the OHS professional.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.5.3.4 Ensure that the OHS costing prepared is informed by the risks associated with the scope
of work and forms part of the bill of quantities or the pricing schedule.
2.5.3.5 Ensure that if any designs are to be carried out, the OHS requirements shall be
forwarded to the designer for inclusion in the design.
2.5.3.6 Ensure that a project OHS specification/requirements, together with the project baseline
risk assessment (BRA), Eskom’s Acknowledgement form for OHS legal and other
requirements (Annexure B), 32-136 standard, evaluation criteria, and other relevant
documents (for example, 32-418, if the scope of work includes working at heights, PSR.
or ORHV regulations, etc.) are prepared in conjunction with the OHS professional and
provided/published with the procurement enquiry.
2.5.3.7 Ensure that the principal contractor develops a project-specific OHS plan. When a tender
has been awarded, it is the contract custodian’s responsibility to ensure that the OHS
plan of the principal contractor is evaluated and approved before the commencement of
work.
2.5.3.8 Ensure that the OHS file is evaluated for compliance once the contract has been
awarded. Once satisfied that the contents of the OHS file meet the requirements, a letter
of acceptance shall be issued to the contractor.
2.5.3.9 Ensure that, after signing the contract (national/divisional/panel contracts), the contractor
shall immediately meet the OHS professional on site to discuss the site OHS
requirements and thereafter the contractor/supplier shall prepare the OHS file within
seven working days/or within the timeframe agreed between the contractor/supplier and
the site/BU/OU OHS professional.
2.5.3.10 Ensure that the OHS plan of the principal contractor and any appointed contractor is
audited throughout the execution of the project for compliance from a legislative and
OHS point of view
2.5.3.11 Ensure that the necessary details/issues pertaining to contractor non-conformances on
contractual OHS obligations during contract execution, safety interventions, post contract
review, and supplier reconsideration are adequately addressed, recorded, and submitted
to Procurement Department for recording and to support future reference;
2.5.3.12 Ensure that, after the initial procurement process has concluded for national or divisional
contracts (registration, tender evaluation and contract award phases), there is handover
to the site OHS professional at the site where the work/service is to be conducted.
2.5.3.13 Ensure that for national and divisional contracts, when a supplier mobilises to site, the
responsible manager based at the Eskom site must take over the responsibility for
ensuring that the supplier works according to the approved OHS plan and provides
oversight supervision over the contractor for task / activities / work / service being
performed.
2.5.3.14 Ensure that the Health and safety specification and BRA are made available to the
appointed contractors where additional contractors are appointed.
2.5.3.15 Ensure that the 37(2) agreement is signed by the contract custodian and the
contractor/supplier when signing the contract.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.5.4 Line managers
All managers to whom OHS professionals report (that is, project, grid, operating unit, business unit,
power station, etc.) shall:
2.5.4.1 Be responsible for allocating resources to participate in all phases of contractor OHS
management and the procurement and supply chain processes for their respective
division and sites.
2.5.4.2 Ensure that the OHS professionals allocated to participate in the procurement and
supply chain processes are competent and aware of their roles and responsibilities in
embedding OHS requirements to contract.
2.5.4.3 Apply discretion when allocating an OHS resource to represent OHS by considering the
value and complexity of the scope of work. A subject matter expert may be seconded or
sourced to assist with certain projects/transaction/scope of work.
2.5.4.4 Ensure that all parties are familiar with the inclusion of OHS requirements in the enquiry
documents.
2.5.5 OHS professionals shall:
2.5.5.1 Ensure that the relevant OHS procedures and documentation used during the
procurement processes are always applicable to the project and form part of the
procurement enquiry.
2.5.5.2 Conduct the research, preparation, and consolidation of the applicable OHS
requirements, together with the designer/project engineer and contract custodian (end
user) for each market engagement, supplier selection, contracting, contract execution,
etc.
2.5.5.3 Ensure that OHS requirements are handed over to the allocated procurement and supply
chain representative.
2.5.5.4 Determine which services are exempted or waived and advise the procurement
representative/contract custodian accordingly in writing.
2.5.5.5 Ensure that requirements listed in Annexure C1/C2/C3/C4/C5 (evaluation criteria) are
always relevant to the scope of work/project that shall be used during the tender
evaluation stage.
2.5.5.6 Audit the OHS plans and all the contents of the OHS file of the principal contractor and
any appointed contractor for compliance. Auditing will be conducted by the client’s
representatives as per the client’s OHS requirements and applicable legislation as
amended.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.5.5.7 Ensure the utilisation and support of the mechanism for monitoring OHS performance
and compliance during contract execution
2.5.5.8 Provide detailed information pertaining to supplier non-conformances and safety
interventions for the post contract OHS review and provides reports for the contract
custodian to submit to Procurement.
2.5.5.9 Ensure that the OHS plan/OHS systems of the principal contractor and any appointed
contractor is audited throughout the execution of the project for compliance from a
legislative and OHS point of view.
2.5.5.10 Determine whether the work falls within the definition of “construction work”. If the work
falls within “construction work”, he/she must ensure alignment of the OHS requirements
such that compliance with the Construction Regulations 2014 is achieved.
2.5.6 Construction and safety agent (CHSA)
The responsibilities and duties of the construction health and safety agent shall be aligned to the
Construction Regulations and CBE published scope of work as amended.
The construction health and safety agent shall:
2.5.6.1 Ensure that a BRA is prepared for an intended construction work project.
2.5.6.2 Provide the designer with a health and safety specification contemplated in paragraph
5(b) of the CR 2014.
2.5.6.3 Facilitate that the health and safety specification is included in the tender documents.
2.5.6.4 Facilitate that the potential principal contractors submitting tenders have made adequate
provision for the cost of health and safety.
2.5.6.5 Facilitate that the principal contractor to be appointed has the necessary competencies
and resources to carry out the construction work safely.
2.5.6.6 Facilitate that the principal contractor is registered and in good standing with the
compensation fund or with a licensed compensation insurer as contemplated in the
Compensation for Occupational Injuries and Diseases Act .
2.5.6.7 Ensure an appointment of every principal contractor in writing for the project or part
thereof on the construction site.
2.5.6.8 Ensure that copy of the principal contractor’s health and safety plan is available on
request by an employee, inspector, or contractor.
2.5.6.9 Conduct periodic health and safety audits in accordance with Construction Regulations
requirements.
2.5.6.10 Facilitate that the health and safety file contemplated in regulation 7(1) (b) of the CR
2014 is kept and maintained by the principal contractor.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.5.7 National and divisional contract
2.5.7.1 The responsible division that initiated the project/contract to be established must provide
or allocate an OHS resource for the project/contract/transaction.
2.5.7.2 After contract award, the OHS professional responsible for the procurement enquiry shall
hand over the relevant OHS documentation applicable to the scope of work/contract to
the division/BU/OU OHS professional.
2.5.7.3 The division/BU/OU that requested the work to be done and the division/BU/OU that will
be overseeing the execution of the work must have a service-level agreement to ensure
compliance during the project execution stage.
2.5.7.4 Eskom site management is responsible for directly supervising and managing such
contracts and ensuring that OHS is complied with. This will require that operational
control be managed and enforced at the operational level, and not by an oversight or
indirect supervisory function.
2.5.7.5 After signing the contract, the supplier/contractor must, within five working days, meet
the OHS professional on site to discuss the OHS site requirements. The site must allow
five to 15 working days for the preparation of the OHS site requirements by the
contractor/supplier.
2.5.6 Tender committee
It is the responsibility of the tender committee to ensure that OHS requirements have been catered
for with every transaction unless the services/products being procured are exempted from such.
2.5.7 Supplier/Contractor/Service provider
2.5.7.1 It is the responsibility of the supplier to provide valid and authentic documentation for
assessment.
2.5.7.2 The supplier may seek guidance, clarity, and advice from Eskom to comply with the
requirements of this standard (excluding the tender phase).
2.5.7.3 The supplier must comply with, and adhere to, OHS legislation and Eskom OHS
requirements at all times when conducting work for or on behalf of Eskom or any of its
subsidiaries.
2.5.7.4 The supplier, as a legal entity, must be conversant with OHS legal obligations related to
the works tendered for.
2.5.7.5 Each site or premises of Eskom and its subsidiaries has/have different OHS site-specific
requirements, and it is the responsibility of the supplier to ensure that those requirements
are met before work can commence. Approval from one site/premises does not
automatically provide authorisation to execute work at another site that is outside the
jurisdiction of the authorising OHS personnel, even if the scope is similar.
2.5.8 Training
All individuals or roles players involved in the procurement process of a service or enquiry shall be
rained on this procedure (procurement official, end users, designers, contract custodians and OHS
professionals).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.6 Process for monitoring
The implementation of this standard will be monitored as part of contract reviews, inspections,
and/or audits undertaken.
2.7 Related/Supporting documents
Quality Management
Source: Contract and Contractor OHS Management.pdf2.5.3.11 Ensure that the necessary details/issues pertaining to contractor non-conformances on
contractual OHS obligations during contract execution, safety interventions, post contract
review, and supplier reconsideration are adequately addressed, recorded, and submitted
to Procurement Department for recording and to support future reference;
2.5.3.12 Ensure that, after the initial procurement process has concluded for national or divisional
contracts (registration, tender evaluation and contract award phases), there is handover
to the site OHS professional at the site where the work/service is to be conducted.
2.5.3.13 Ensure that for national and divisional contracts, when a supplier mobilises to site, the
responsible manager based at the Eskom site must take over the responsibility for
ensuring that the supplier works according to the approved OHS plan and provides
oversight supervision over the contractor for task / activities / work / service being
performed.
2.5.3.14 Ensure that the Health and safety specification and BRA are made available to the
appointed contractors where additional contractors are appointed.
2.5.3.15 Ensure that the 37(2) agreement is signed by the contract custodian and the
contractor/supplier when signing the contract.
value, duration, complexity, environmental aspects, and impacts and the criticality of the
scope of working conditions of any applicable environmental approvals.
3.4.4 Phase 5: Contract/Service execution and continual monitoring
3.4.4.1 Continual OHS performance monitoring
a) Eskom shall conduct risk-based inspections, audits, and blitz inspections to monitor OHS
compliance and adherence to the OHS plan by the contractor.
b) The contractor performing construction work shall be audited in accordance with the
applicable legal and other requirements as amended.
c) For contractors performing non-construction work, the frequency of the audit/inspection
shall be determined by the risk associated with the scope of work based on legal and other
requirements as amended.
d) The contract custodian shall ensure that monitoring mechanisms (such as audits and
reviews) are instituted, with the support of OHS professionals, to ensure compliance with
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
3.4.4.2 Management of contractors
a) The contract custodian shall ensure that the principal contractor is notified that he/she is
accountable for the management of his/her employees/contractors/suppliers and also to
ensure that his/her contractors/suppliers comply with the applicable legal and other
requirements (applicable during contract execution of works and services in terms of the
contract).
b) The contract custodian, in consultation with the procurement practitioner, has to ensure that
all the non-conformances or non-compliances of the suppliers/contractors are dealt with by
means of approved Eskom contractor management processes, for example, supplier
reconsideration review committee.
3.4.4.3 Enforcement of compliance and monitoring during contract execution
review committee:
The supplier investigation report by BU/OU will be required.
The Non-conformance reports issued.
Written feedback from the supplier.
The minutes of the meetings held with the supplier.
Sanction: state the period of suspension/blacklisting.
Contract: will the supplier complete the outstanding work, or is there another option/plan B?
Project information: start and end date.
demobilisation inspection is carried out a month before the contract end date is reached with the
assistance of the OHS professionals or the contractor leaves site.
The contractor’s OHS file or copy thereof shall be handed over to the contract custodian on
completion of the project 10 days before the contract ceases. Eskom shall retain the OHS file for a
minimum of 40 years.
division’s premise/site, the project handover shall include the OHS file, which shall be handed over
to the client or client’s agent (site owner/asset owner).
3.7.2 Phase 6: Post contract review
3.7.2.1 The contract custodian has to inform the supplier about the OHSKPIs before work can
commence, and Annexure D can be used as a guideline. The contractor performance
monitoring process will be applied based on the risk of the project. The BU/OU should
develop its contractor monitoring process. The OHS professional has to be involved to
assist the contract custodian with setting the OHSKPIs and shall prepare the OHS
component in preparation for the review process, that is, audit reports and the OHS
compact/contract, inspections, minutes, presentations, etc.
3.7.2.2 After a contract has ceased or ended, the supplier must be evaluated on OHS
performance throughout the project by the contract custodian, with the support of the
a) OHS professionals shall conduct work stoppages, inspections, audits, and blitzes to monitor OHS compliance
Compliance Requirements
Source: Contract and Contractor OHS Management.pdf (unknown)240-77471651 Annexure C1: Supplier OHS tender evaluation template (high and medium risk)
240-77471969 Annexure C2: Supplier OHS tender evaluation template (medium risk)
240-106084657 Annexure C3: Supplier OHS tender evaluation template (low risk)
240-106084699 Annexure C4: Supplier OHS tender evaluation template (construction work)
240-77472561 Annexure D: Contract OHS performance evaluation template
240-108987034 Annexure E: OHS procurement process checklist
37(2) agreement
240-73198256 Professional services Health and safety specification template
240-73416879 High-risk services Health and safety specification template
240-157810171 Construction services Health and safety specification template_
240-73418055 Manufacturers Health and safety specification template
240-73419711 General services Health and safety specification template
240-157810099 Supply and delivery Health and safety specification template
240-162195779 Tender Evaluation report
Document content 3.1 The contractor OHS management model Eskom has adopted a six-phase OHS contractor management model to manage contracts, contractors and suppliers effectively. See Figure 1.1 on . 3.1 Phase 1: Project Initiation and briefing, concept and feasibility study, design development 3.1.1 Initiation and briefing The OHS professional/CHS agent shall form part of the meetings in this phase to assist in developing a clear construction/project health and safety requirements, ensure that OHS forms part of the initiation meetings and identify preliminary construction/project health and safety risk profile and record construction/project health and safety risk communication. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30. Contract and Contractor OHS management Unique Identifier: 32-726 Revision: 3 Page: 3.1.2 Concept and feasibility The OHS professional/CHS agent shall attend the design meetings in accordance with the project planning phases, take part in preliminary cost estimates/budgets for construction project health and safety, prepare the draft construction/project BRA, health and safety specification and share the required surveys, tests, and other investigations and related reports. 3.1.3 Design development For any product or service that includes compiling the design of a building, equipment, modification of existing plant, etc., the Eskom contract custodian, with the assistance of the OHS professional and occupational hygiene professional have to provide the designer with an health and safety specification/requirements specific to the project to ensure integration of OHS requirements in the design. The designer shall not commence with the design if the health and safety specification has not been provided. The designer (internal or external), contract custodian, and responsible OHS professional have to conduct a site visit before commencing with the design or before any health and safety specification/OHS requirements can be developed. (This phase may not apply to all projects/transactions). For the responsibilities of the Professional Construction health and safety agent, refer to the Construction regulations 2014 as amended. 3.2 Phase 2: Tender phase (procurement strategy, tender enquiry and documents, evaluation, and award) 3.2.1 Procurement strategy 3.2.1.1 OHS shall form part of the cross-functional team during the procurement of goods and services for, or on behalf of, Eskom. 3.2.1.2 OHS professional will influence the initial development of a procurement strategy to the market engagement for supplier selection, contracting, contract handover, and performance monitoring and contract execution based on the scope of work. 3.2.1.3 The OHS professionals shall ensure that the compiled scope-specific OHS requirements are listed in the procurement strategy. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30. Contract and Contractor OHS management Unique Identifier: 32-726 Revision: 3 Page: 3.2.2 Tender enquiry
OHS, legal, and other requirements are to be complied with at all times, and OHS professionals shall form part of the cross-functional team during the procurement of goods, products, and/or services in Eskom.
The OHS professional shall compile the scope-specific/risk-based OHS requirements and submit to the procurement professional. OHS requirements shall form part of the tender enquiry.
The OHS requirements shall be aligned with the Contractor OHS management risk category as per Annexure A. The tender enquiry shall be accompanied by scope-specific OHS requirements and the BRA, Annexure B (Acknowledgement form for Eskom’s OHS legal and other requirements, 32-136 (Contractor Health and Safety Requirements Standard), and the evaluation criteria.
OHS tender returnable must be clear and explicit to suppliers/contractors.
Where applicable, the tenderers or potential suppliers/contractors may be expected to conduct a site visit of the area where the work will be executed before tendering, under the supervision of the Eskom contract custodian and the procurement practitioner.
Further guidance and support with regard to OHS matters will be provided at the clarification meeting. OHS shall be a standard item on the agenda for the clarification meeting. 3.2.2.1 Other transactions (RFI, emergency procurement, sole source, contract extension or modification, etc.) The OHS requirements shall be provided to the contractor/supplier when requesting quotations to avoid delays. The supplier’s OHS documentation shall be received from the preferred contractor/supplier and approved before commencement of work. For tender prequalification (RFI) purpose, the OHS professional shall form part of the multidisciplinary committee (MTC). 3.2.2.2 International suppliers/contractors performing work for or on behalf of Eskom All international contractors conducting work for or on behalf of Eskom shall comply with Eskom OHS requirements and the applicable South African legislation. Their OHS documents shall be written in English. The OHS requirements to be communicated to the supplier/contractor shall be risk-based and scope-specific. 3.2.2.3 OHS documents to be published in the tender enquiry To avoid bombarding suppliers/contractors who wish to respond to the Eskom tender, the following minimum OHS requirements must be submitted to the procurement and supply chain. The applicable Eskom OHS policies and procedures will be given to the successful supplier/contractor. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30. Contract and Contractor OHS management Unique Identifier: 32-726 Revision: 3 Page: Scope-specific OHS specification/OHS requirements, including the project BRA, Annexure B: Eskom’s Acknowledgement form for OHS legal and other requirements (the listed legislature, Eskom policies and procedures shall be amended to align with the scope of work/identified risks)
32-136 Contractor Health and Safety Requirements
OHS tender evaluation criteria
Applicable Eskom procedures that contain the requirements the supplier/contractor needs to be informed of before responding to the enquiry/transaction in order to make provision for the OHS costs in the bill of quantities, for example, 32-418 for the scope of work that includes working at heights, plant safety regulations (PSR) for or scope of work requiring ORHV regulations training, etc. 3.2.2.4 Occupational health and safety specification and plan The health and safety specification shall be issued with the enquiry/transaction to inform the future contractors/suppliers of the health and safety requirements associated with the scope of work/contract/project, and the contractor/supplier shall submit the health and safety plan in response. The health and safety specification templates are made available and shall be updated, amended to cover the OHS requirements related to the scope of the risks of the project/contract. Once the health and safety specification is completed, it must be signed by both the OHS professional and the contract custodian. The health and safety specifications and plans shall be named in the following. For construction work: The health and safety specification and health and safety plan. For non-construction work: The health and safety requirements for the site/BU/OU (add BU/OU/site name) and audible OHS system/manual that satisfy the issued OHS site, legal and other requirements. For national contracts: The health and safety requirements for ... (include the name of the project/ scope of work) and audible OHS system/manual that satisfy the issued OHS, legal and other requirements. The Eskom OHS professional must communicate to the potential supplier/contractor that the health and safety plan must be approved internally before submission to Eskom. When the Eskom OHS professional is satisfied with the contents of the health and safety plan; the plan will first be signed by the OHS professional and approved by the contract custodian and initialled on every page at the bottom right corner. Note: Health and Safety specifications and plans are construction regulations requirements and only applicable to the construction work. For other projects/contracts the above identification will be used. 3.2.2.5 OHS application, evaluation, and reports OHS as a contractual requirement will only evaluate the shortlisted suppliers that have passed mandatory and functionality evaluation threshold. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30. Contract and Contractor OHS management Unique Identifier: 32-726 Revision: 3 Page
On completion of the tender evaluation of shortlisted suppliers, OHS will compile an initial tender evaluation report, which will highlight compliance/conformance gaps (outstanding documents/information or insufficient evidence of compliance) by the suppliers and recommend or not recommend supplier based on the level of compliance/conformance.
The procurement practitioner will engage the suppliers only once, requesting all the outstanding tender documents to be submitted within a period not exceeding seven working days.
When the procurement practitioner receives the submitted tender documents within the stipulated timelines, OHS will re-evaluate the submitted tender documents and will compile, and resubmit a final tender evaluation report. However, insufficient evidence of compliance/gaps will be addressed with the preferred supplier at the negotiation meeting as part of the contract conditions. The closeout timelines of the compliance/conformance/gaps will be determined by the OHS professional.
OHS as functionality; the technical, procurement and OHS teams will conduct the initial tender evaluation in line with the OHS functionality threshold of 70% (see Appendix A below) and the successful potential tenderers may undergo further evaluation. Where applicable, OHS will form part of the initial tender evaluation, including both desktop and onsite (supplier/contractor site) evaluations. For open market tender/enquiry, the suppliers that did not submit the requested OHS documents within the specified time will be regarded as non-responsive. In contrast, the suppliers that responded will be re-evaluated. Should the submitted OHS documents not conform to/meet the compliance standard, the gaps will be addressed with the preferred bidder/tenderer during the negotiation meeting. After negotiations, the supplier shall submit the site-specific OHS file for evaluation and must address the gaps prior to commencement of work on site. For panel contracts, the suppliers that did not submit the requested OHS documents within the specified time will be regarded as non-responsive. In contrast, the suppliers that responded will be re-evaluated. Should the submitted documents not conform to/meet the compliance standard, the gaps will be addressed with the preferred bidders/tenderers during the negotiation meeting. The reviewed OHS returnable will be submitted to Eskom by the preferred tenderers/bidders and the final OHS report will be submitted to the buyer. The site- or scope-specific OHS file requirements will be communicated to the supplier/contractor by the BU/OU when issuing the task order. The BU/OU must allow 5 to 15 working days for preparation of the OHS site requirements by the contractor/supplier in consultation with the OHS professional.
Note: For OHS as contractual requirements, each supplier will only be evaluated twice during tender evaluation stage before the final report is submitted to the procurement practitioner. To avoid the delays and the effective use of OHS resources, no supplier/contractor’s tender OHS documents shall be evaluated more than two times before contract award. However, the OHS file must be evaluated and approved before commencement of work.
However, should any further tender evaluations be required, the procurement manager will submit a motivation and supporting documentation for the request to the relevant OHS senior manager/OHS manager for approval.
B-BBEE Details: ge of goods or services or money between a buyer and a
seller.
2.4 Abbreviations
Abbreviation Explanation
BRA baseline risk assessment
CHSA Construction health and safety agent
COIDA Compensation for Occupational Injuries and Diseases Act
DE Divisional executive
DEL Department of Employment and Labour
DMR Department of Mineral Resources
EMP Environmental Management Programme
ESR Environmental status rating
ISO International Organization for Standardization
MTC Multidisciplinary committee
OHS Occupational hygiene and safety
ORHVS Operating Regulations for High-Voltage Systems
PPPFA Preferential Procurement Policy Framework Act
PSR Plant Safety Regulations
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Abbreviation Explanation
RFI Request for information
SACPCMP South African Council for Project and Construction Management
Professions
2.5 Roles and responsibilities
2.5.1 Designers shall:
The designer shall ensure that the occupational health and safety (OHS) requirements applicable
to the project/scope of work are incorporated into the design. Consider the associated risks
identified in the scope of specific OHS specification/requirements and baseline risk assessment.
The identification and analysis of hazards and risks must form part of the design process.
Note: Environmental issues, as they may affect the site/project, shall be identified
Health & Safety
Source: Contract and Contractor OHS Management.pdf. Introduction ............................................................................................................................... 4
2.1 Scope ............................................................................................................................... 4
2.1.1 Purpose ................................................................................................................. 4
2.1.2 Applicability ........................................................................................................... 4
2.1.3 Effective date ......................................................................................................... 4
2.2 Normative/Informative references ..................................................................................... 5
2.2.1 Normative .............................................................................................................. 5
2.2.2 Informative............................................................................................................. 5
2.3 Definitions ........................................................................................................................ 6
2.4 Abbreviations ................................................................................................................... 7
2.5 Roles and responsibilities ................................................................................................. 8
2.5.1 Designers shall: ..................................................................................................... 8
2.5.2 Procurement practitioners shall ............................................................................. 8
2.5.3 Contract custodian (contract executor, end user) .................................................. 9
2.5.4 Line managers ..................................................................................................... 11
2.5.5 OHS professionals shall: ..................................................................................... 11
2.5.6 Construction and safety agent (CHSA) ................................................................ 12
2.5.7 National and divisional contract ........................................................................... 13
2.5.6 Tender committee................................................................................................ 13
2.5.7 Supplier/Contractor/Service provider ................................................................... 13
2.5.8 Training................................................................................................13
2.6 Process for monitoring .................................................................................................... 14
2.7 Related/Supporting documents ...................................................................................... 14
3.1 The contractor OHS management model ....................................................................... 14
3.1 Phase 1: Project Initiation and briefing, concept and feasibility study, design
development ................................................................................................................... 14
3.1.1 Initiation and briefing ........................................................................................... 14
3.1.2 Concept and feasibility ........................................................................................ 15
3.1.3 Design development ............................................................................................ 15
3.2 Phase 2: Tender phase (procurement strategy, tender enquiry and documents,
evaluation, and award) ................................................................................................... 15
3.2.1 Procurement strategy .......................................................................................... 15
3.2.2 Tender enquiry .................................................................................................... 16
3.2.3 Phase 3: Supplier registration .............................................................................. 21
3.2.4 Phase 4: Site mobilisation/Access to the site ....................................................... 21
3.3 Site mobilisation/Access to the site ................................................................................. 22
3.4 Health and safety non-negotiable rules .......................................................................... 22
Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
3.5 Supplier relationship management ................................................................................. 23
3.6 Material handling and storage equipment ....................................................................... 24
3.7 Supplier review committee ............................................................................................. 24
3.7.1 Contract completion/handover ............................................................................. 25
3.7.2 Phase 6: Post contract review ............................................................................. 25
Acceptance ............................................................................................................................. 25
Revisions ................................................................................................................................ 26
Development Team ................................................................................................................ 26
Appendix A: OHS functionality evaluation criteria.......................................................................... 27
Appendix B: Tender/Enquiry process flow ..................................................................................... 28
Appendix C: Contractor OHS management model flow diagrams ................................................. 29
Hygiene and Safety (OHS). Achieving the OHS requirements will be integrated into the Eskom
procurement and supply chain processes.
managers (contract custodians), line management, suppliers, and OHS professionals underlining
the minimum OHS requirements that shall be addressed during the following phases, namely:
a) Project initiation and briefing, concept and feasibility study, design development;
b) Tender enquiry, evaluation, and contract award;
c) Supplier registration on the Eskom vendor database;
d) Site access/mobilisation;
e) Monitoring of performance during the contract execution period;
f) Contract completion, closeout, and post contract review; and
g) Instances where works or services under a contract can be stopped, suspended, or terminated.
2.1.1 Purpose
the following paragraphs.
2.2.1 Normative
[1] 32-727 Eskom Safety, Health, Environmental and Quality Policy
[2] 32-1034 Eskom’s Procurement and Supply Chain Management Procedure
[3] 32-196 Eskom Disciplinary Code Standard
[4] 240-62196227 Eskom Life-Saving Rules Standard
[5] National Environmental Management: Waste Act
[6] Occupational Health and Safety Act and Regulations
2.2.2 Informative
[1] 32-520 Occupational Health and Safety Risk Assessment Procedure
[2] ISO 9001 Quality Management Systems
[3] 32-95 Environmental, Occupational Health, and Safety Incident Management Procedure
[4] Compensation for Occupational Injuries and Diseases Act
[5] OHSAS 18001 Occupational Health and Safety Management Systems
[6] ISO 14001 Environmental Management Systems
[7] Mine Health and Safety Act
[8] The Constitution of the Republic of South Africa, 1996
[9] National Environmental Management Act
[10] Environment Conservation Act
[11] National Water Act
[12] National Environmental Management: Waste Act
[13] National Environmental Management: Air Quality Act
[14] National Forests Act
[15] National Environmental Management: Biodiversity Act
[16] National Environmental Management: Protected Areas Act
[17] National Heritage Resources Act
[18] National Veld and Forest Fire Act
[19] Conservation of Agricultural Resources Act
[20] 32-136 Eskom Contractor Health and Safety Requirements Standard
and safety agent Construction Management Profession Act, as amended.
(CHSA) Any competent person who acts as a representative for a client in
managing health and safety on a construction project for the client and
who has satisfied the registration criteria of the SACPCMP to perform
the required functions.
2.5 Roles and responsibilities
2.5.1 Designers shall:
The designer shall ensure that the occupational health and safety (OHS) requirements applicable
to the project/scope of work are incorporated into the design. Consider the associated risks
identified in the scope of specific OHS specification/requirements and baseline risk assessment.
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.5.3.4 Ensure that the OHS costing prepared is informed by the risks associated with the scope
of work and forms part of the bill of quantities or the pricing schedule.
2.5.3.5 Ensure that if any designs are to be carried out, the OHS requirements shall be
forwarded to the designer for inclusion in the design.
2.5.3.6 Ensure that a project OHS specification/requirements, together with the project baseline
risk assessment (BRA), Eskom’s Acknowledgement form for OHS legal and other
requirements (Annexure B), 32-136 standard, evaluation criteria, and other relevant
documents (for example, 32-418, if the scope of work includes working at heights, PSR.
or ORHV regulations, etc.) are prepared in conjunction with the OHS professional and
provided/published with the procurement enquiry.
2.5.3.7 Ensure that the principal contractor develops a project-specific OHS plan. When a tender
has been awarded, it is the contract custodian’s responsibility to ensure that the OHS
plan of the principal contractor is evaluated and approved before the commencement of
work.
2.5.3.8 Ensure that the OHS file is evaluated for compliance once the contract has been
awarded. Once satisfied that the contents of the OHS file meet the requirements, a letter
of acceptance shall be issued to the contractor.
2.5.3.9 Ensure that, after signing the contract (national/divisional/panel contracts), the contractor
shall immediately meet the OHS professional on site to discuss the site OHS
requirements and thereafter the contractor/supplier shall prepare the OHS file within
seven working days/or within the timeframe agreed between the contractor/supplier and
the site/BU/OU OHS professional.
2.5.3.10 Ensure that the OHS plan of the principal contractor and any appointed contractor is
audited throughout the execution of the project for compliance from a legislative and
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.5.5.7 Ensure the utilisation and support of the mechanism for monitoring OHS performance
and compliance during contract execution
2.5.5.8 Provide detailed information pertaining to supplier non-conformances and safety
interventions for the post contract OHS review and provides reports for the contract
custodian to submit to Procurement.
2.5.5.9 Ensure that the OHS plan/OHS systems of the principal contractor and any appointed
contractor is audited throughout the execution of the project for compliance from a
legislative and OHS point of view.
2.5.5.10 Determine whether the work falls within the definition of “construction work”. If the work
falls within “construction work”, he/she must ensure alignment of the OHS requirements
such that compliance with the Construction Regulations 2014 is achieved.
2.5.6 Construction and safety agent (CHSA)
2.5.6.1 Ensure that a BRA is prepared for an intended construction work project.
2.5.6.2 Provide the designer with a health and safety specification contemplated in paragraph
5(b) of the CR 2014.
2.5.6.3 Facilitate that the health and safety specification is included in the tender documents.
2.5.6.4 Facilitate that the potential principal contractors submitting tenders have made adequate
provision for the cost of health and safety.
2.5.6.5 Facilitate that the principal contractor to be appointed has the necessary competencies
and resources to carry out the construction work safely.
2.5.6.6 Facilitate that the principal contractor is registered and in good standing with the
compensation fund or with a licensed compensation insurer as contemplated in the
2.5.6.7 Ensure an appointment of every principal contractor in writing for the project or part
thereof on the construction site.
2.5.6.8 Ensure that copy of the principal contractor’s health and safety plan is available on
request by an employee, inspector, or contractor.
2.5.6.9 Conduct periodic health and safety audits in accordance with Construction Regulations
requirements.
2.5.6.10 Facilitate that the health and safety file contemplated in regulation 7(1) (b) of the CR
2014 is kept and maintained by the principal contractor.
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.5.7 National and divisional contract
2.5.7.1 The responsible division that initiated the project/contract to be established must provide
or allocate an OHS resource for the project/contract/transaction.
2.5.7.2 After contract award, the OHS professional responsible for the procurement enquiry shall
hand over the relevant OHS documentation applicable to the scope of work/contract to
the division/BU/OU OHS professional.
2.5.7.3 The division/BU/OU that requested the work to be done and the division/BU/OU that will
be overseeing the execution of the work must have a service-level agreement to ensure
compliance during the project execution stage.
2.5.7.4 Eskom site management is responsible for directly supervising and managing such
contracts and ensuring that OHS is complied with. This will require that operational
control be managed and enforced at the operational level, and not by an oversight or
indirect supervisory function.
2.5.7.5 After signing the contract, the supplier/contractor must, within five working days, meet
the OHS professional on site to discuss the OHS site requirements. The site must allow
five to 15 working days for the preparation of the OHS site requirements by the
contractor/supplier.
2.5.6 Tender committee
and/or audits undertaken.
2.7 Related/Supporting documents
requirements
risk)
work)
developing a clear construction/project health and safety requirements, ensure that OHS forms
part of the initiation meetings and identify preliminary construction/project health and safety risk
profile and record construction/project health and safety risk communication.
planning phases, take part in preliminary cost estimates/budgets for construction project health and
safety, prepare the draft construction/project BRA, health and safety specification and share the
required surveys, tests, and other investigations and related reports.
3.1.3 Design development
of existing plant, etc., the Eskom contract custodian, with the assistance of the OHS professional
and occupational hygiene professional have to provide the designer with an health and safety
specification/requirements specific to the project to ensure integration of OHS requirements in the
design. The designer shall not commence with the design if the health and safety specification has
not been provided.
The designer (internal or external), contract custodian, and responsible OHS professional have to
conduct a site visit before commencing with the design or before any health and safety
specification/OHS requirements can be developed. (This phase may not apply to all
projects/transactions). For the responsibilities of the Professional Construction health and safety
agent, refer to the Construction regulations 2014 as amended.
3.2 Phase 2: Tender phase (procurement strategy, tender enquiry and documents,
evaluation, and award)
3.2.1 Procurement strategy
3.2.1.1 OHS shall form part of the cross-functional team during the procurement of goods and
services for, or on behalf of, Eskom.
3.2.1.2 OHS professional will influence the initial development of a procurement strategy to the
market engagement for supplier selection, contracting, contract handover, and
performance monitoring and contract execution based on the scope of work.
3.2.1.3 The OHS professionals shall ensure that the compiled scope-specific OHS
requirements are listed in the procurement strategy.
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
3.2.2 Tender enquiry
a) OHS, legal, and other requirements are to be complied with at all times, and OHS
professionals shall form part of the cross-functional team during the procurement of goods,
products, and/or services in Eskom.
b) The OHS professional shall compile the scope-specific/risk-based OHS requirements and
submit to the procurement professional. OHS requirements shall form part of the tender
enquiry.
c) The OHS requirements shall be aligned with the Contractor OHS management risk
category as per Annexure A. The tender enquiry shall be accompanied by scope-specific
OHS requirements and the BRA, Annexure B (Acknowledgement form for Eskom’s OHS
legal and other requirements, 32-136 (Contractor Health and Safety Requirements
Standard), and the evaluation criteria.
d) OHS tender returnable must be clear and explicit to suppliers/contractors.
e) Where applicable, the tenderers or potential suppliers/contractors may be expected to
conduct a site visit of the area where the work will be executed before tendering, under the
supervision of the Eskom contract custodian and the procurement practitioner.
f) Further guidance and support with regard to OHS matters will be provided at the
clarification meeting. OHS shall be a standard item on the agenda for the clarification
meeting.
3.2.2.1 Other transactions (RFI, emergency procurement, sole source, contract
extension or modification, etc.)
written in English. The OHS requirements to be communicated to the supplier/contractor shall be
risk-based and scope-specific.
3.2.2.3 OHS documents to be published in the tender enquiry
Annexure B: Eskom’s Acknowledgement form for OHS legal and other requirements (the
listed legislature, Eskom policies and procedures shall be amended to align with the scope
of work/identified risks)
a) 32-136 Contractor Health and Safety Requirements
b) OHS tender evaluation criteria
c) Applicable Eskom procedures that contain the requirements the supplier/contractor needs
to be informed of before responding to the enquiry/transaction in order to make provision
for the OHS costs in the bill of quantities, for example, 32-418 for the scope of work that
includes working at heights, plant safety regulations (PSR) for or scope of work requiring
3.2.2.4 Occupational health and safety specification and plan
contractors/suppliers of the health and safety requirements associated with the scope of
work/contract/project, and the contractor/supplier shall submit the health and safety plan in
response. The health and safety specification templates are made available and shall be updated,
amended to cover the OHS requirements related to the scope of the risks of the project/contract.
professional and the contract custodian. The health and safety specifications and plans shall be
named in the following.
For construction work: The health and safety specification and health and safety plan.
For non-construction work: The health and safety requirements for the site/BU/OU
(add BU/OU/site name) and audible OHS system/manual that satisfy the issued OHS
site, legal and other requirements.
For national contracts: The health and safety requirements for ... (include the name of
the project/ scope of work) and audible OHS system/manual that satisfy the issued
and safety plan must be approved internally before submission to Eskom. When the Eskom OHS
professional is satisfied with the contents of the health and safety plan; the plan will first be signed
by the OHS professional and approved by the contract custodian and initialled on every page at
the bottom right corner.
Note: Health and Safety specifications and plans are construction regulations requirements and
only applicable to the construction work. For other projects/contracts the above identification will be
used.
3.2.2.5 OHS application, evaluation, and reports
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
a) On completion of the tender evaluation of shortlisted suppliers, OHS will compile an initial
tender evaluation report, which will highlight compliance/conformance gaps (outstanding
documents/information or insufficient evidence of compliance) by the suppliers and
recommend or not recommend supplier based on the level of compliance/conformance.
b) The procurement practitioner will engage the suppliers only once, requesting all the
outstanding tender documents to be submitted within a period not exceeding seven working
days.
c) When the procurement practitioner receives the submitted tender documents within the
stipulated timelines, OHS will re-evaluate the submitted tender documents and will compile,
and resubmit a final tender evaluation report. However, insufficient evidence of
compliance/gaps will be addressed with the preferred supplier at the negotiation meeting as
part of the contract conditions. The closeout timelines of the compliance/conformance/gaps
will be determined by the OHS professional.
d) OHS as functionality; the technical, procurement and OHS teams will conduct the initial
tender evaluation in line with the OHS functionality threshold of 70% (see Appendix A
below) and the successful potential tenderers may undergo further evaluation. Where
applicable, OHS will form part of the initial tender evaluation, including both desktop and
onsite (supplier/contractor site) evaluations.
For open market tender/enquiry, the suppliers that did not submit the requested OHS
documents within the specified time will be regarded as non-responsive. In contrast, the
suppliers that responded will be re-evaluated. Should the submitted OHS documents not
conform to/meet the compliance standard, the gaps will be addressed with the preferred
bidder/tenderer during the negotiation meeting. After negotiations, the supplier shall submit
the site-specific OHS file for evaluation and must address the gaps prior to commencement
of work on site.
For panel contracts, the suppliers that did not submit the requested OHS documents
within the specified time will be regarded as non-responsive. In contrast, the suppliers that
responded will be re-evaluated. Should the submitted documents not conform to/meet the
compliance standard, the gaps will be addressed with the preferred bidders/tenderers
during the negotiation meeting. The reviewed OHS returnable will be submitted to Eskom
by the preferred tenderers/bidders and the final OHS report will be submitted to the buyer.
acceptance will be issued to the supplier/contractor. Should the supplier not meet minimum OHS
requirements at this stage, the OHS professional will give the supplier another chance to address
the shortcomings within a period not exceeding seven working days or as agreed by the crossfunctional team in consultation with the OHS professional.
3.4 Health and safety non-negotiable rules
3.4.1 The health and safety file/document is to be evaluated before site mobilisation or task order
allocation to assess the compliance/conformance status of the supplier. No work shall
commence before the health and safety file/document has been accepted by the allocated
3.4.2 OHS requirements, after contract award, shall be enforceable on the successful supplier in
accordance with the OHS specification/health and safety file/documentation requirements.
3.4.3 OHS documents or actions that are required after contract award, that is, during the
execution of the contract, must be included as contractual obligations. The time frame for
submission will be negotiated as determined by the cross-functional team appointed by
supplier’s compliance at predetermined intervals during contract execution and that these reports
are provided to the contract custodian, during the execution of the contract and for the post
contract review process.
3.4.4.4 Work stoppage/Safety interventions/Suspension of works and services under a
contract
safety of Eskom employees, contractor employees, and the public. The BU/OU/project should
devise a process for reporting unsafe work /stopping working or conditions.
and safety of persons to the authorised person.
The temporary stoppage of an activity/activities or task(s) may be due to OHS concerns,
including the following circumstances:
a) Ad hoc safety intervention by Eskom management: all work of a similar nature may be
stopped due to the occurrence of a serious incident, and the relevant supplier will be
required to comply with, and/or verify, the conditions stipulated in the safety intervention
instruction pack.
b) Ad hoc safety intervention by any person, especially OHS professionals, may be due to
unsafe work or unsafe behaviour by the contractor. The conditions that gave rise to the
work stoppage will determine the corrective measures to be taken urgently to protect the
health and safety of employees and protect the environment and plant or equipment, etc.
c) Work stoppage initiated by the government and other relevant agencies.
3.5 Supplier relationship management
a) OHS professionals to participate and support the SD&L initiatives.
b) Supplier registration reviews for OHS are conducted as centralised function by Risk and
May 2021 3 F Pooe/D Review was conducted to combine 32-726, 32-524
Maunatlala and 37(2) agreement into one procedure and also to
align with the reviewed 32-1034.
August 2 D Maunatlala A review was conducted to align the standard with
2016 the new procurement process in Eskom.
June 2014 1 D Maunatlala A review was conducted to realign the standard with
the PPPF Act (Act ).
June 2011 0 Development This standard addresses minimum safety, health,
team and environmental requirements that must be
integrated into the Eskom procurement process.
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Appendix A: OHS functionality evaluation criteria
scoring / threshold per functional area to proceed to the next step
70%
Table 1: Evaluation Criteria on Functionality
score at least the minimum functional area
threshold per functional area
to proceed to the next step
Safety & Health 70% 100%
Minimum Threshold 70%
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Appendix B: Tender/Enquiry process flow
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Appendix C: Contractor OHS management model flow diagrams
Phase 1
briefing: Concept and
Project initiation OHS forms part of feasibility:
and briefing and the multidisciplinary Attend design and
concept and team. project review Design
feasibility and Attend the meetings. development
design construction/ project Prepare draft
development initiation meetings. construction/
Advise on OHS project baseline
requirements in line risk assessment.
with the project.
Phase 2
enquiry, OHS requirements form evaluation in recommended suppliers for
evaluation, part of the strategy accordance with the contract award.
and contract The following documents published Annexure 37(2) agreement must be
award are sent out with the C1/C2/C3/C4/C5. signed with the contract.
enquiry: OHS The OHS professional Contractor /supplier must
specification, Annexure B, compiles the evaluation be provided with relevant
Contractual Terms
Source: Contract and Contractor OHS Management.pdfNote: Environmental issues, as they may affect the site/project, shall be identified, assessed,
controlled, and monitored for compliance and efficiency by the environmental professionals.
2.5.2 Procurement practitioners shall
2.5.2.1 Ensure that sufficient notification and preparation times are provided for the relevant OHS
professional to form part of the multidisciplinary team for the preparation of the relevant
and specific OHS requirements for the procurement enquiry.
2.5.2.2 Ensure that the appropriate OHS representative provides the OHS requirements and
specified documents before the release of the procurement enquiry.
2.5.2.3 Ensure that the OHS professional participates in, and provides input into, relevant
meetings or forums, processes, and reports that lead to the awarding of a contract (for
example, supplier evaluations, squad check meetings, contracting strategies,
negotiations, clarification meetings, tender evaluations, evaluation report compilation,
contract awarding, and briefing meetings).
2.5.2.4 Ensure that the records about supplier OHS non-conformances during contract
execution, post contract reviews, supplier suspensions, and contract terminations are
received from the contract custodian and where applicable, Procurement shall keep a
record of such information to make it easily accessible to the relevant stakeholders for
future reference, especially when determining the allocation of future works or services.
2.5.2.5 Ensure that applicable OHS requirements for any emergency work are provided to the
preferred contractor/supplier at the same time when the enquiry is made to avoid delays.
these service providers or services or scope of work, are exempted from the OHS prerequisites for
tendering process. Thus, OHS will not form part of the tender evaluation criteria nor the crossfunctional team. However, OHS inputs on the design and product specification should not be
excluded from the tendering process.
a) Manufacturing and supply where the scope of work excludes delivery by the supplier to any
of the Eskom premises or sites
b) Services where the conditions of the service provided are not provided at any of the Eskom
premises or sites (for example, consulting, motor claim insurance, IT online service,
manufacturing, etc.)
c) Government entities or agencies
d) Independent electricity generators, electricity distributors, and demand response suppliers
for a rebate
e) Procurement of consumables from established retailers where there is no contract (for
example, Woolworths, Makro, Shoprite, Game, clothing trading outlets, etc.)
f) Accommodation that is booked once off where there is no contract
g) Professional registration bodies
h) Non-profit organisations (for funding purposes)
3.2.2.8 Contract awarding
a) All findings/observations recorded in the OHS tender evaluation report must be addressed
with the supplier at the negotiation meeting. If the contract is signed before addressing the
gaps, they should form part of the conditions of the contract, including the time frame
allowed to close the findings. The contract should clearly state that no work should
commence before the approval of the OHS file.
b) For contracts where the scope of work is classified as construction work and requires
c) a construction work permit in accordance with the Construction Regulations as amended, a
minimum of 30 days must be allocated to allow the application to the Department of
Employment and Labour (DEL) for the permit to be processed. Thus, work shall only
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
commence after obtaining the corresponding construction work permit from the DEL.
d) For national contracts that have been evaluated centrally, after signing the contract, the
supplier/contractor must within five working days meet the OHS professional on site to
discuss the OHS site requirements. The divisional/BU/OU OHS professionals shall
communicate and provide their corresponding OHS requirements to the supplier/contractor
and allow 5 to 15 working days for the preparation of the OHS site requirements by the
contractor/supplier.
e) The supplier shall, as a result, ensure compliance with each BU’s/OU’s OHS requirements,
regardless of being approved centrally.
3.2.2.9 OHS 37(2) Agreement (COID)
The function of the 37(2) Agreement is primarily to indemnify Eskom from any acts or omissions by
its contractors/suppliers and its employees in contravention of the OSH Act. This means that
contractors/suppliers are deemed to be employers in their own right, their employees are not
deemed to be employees of Eskom and acknowledges that is solely responsible for its employees,
employee insurance certificate written in English shall be submitted to Eskom. It shall be in line
with the South African legislation.
for registration purposes:
a) Where maintenance of Eskom’s assets or any service is performed/provided externally
off/beyond Eskom premises/site, for example, maintenance of vehicles at motor vehicle
manufacturer/supplier/repairer premises
b) Suppliers who mechanically repair Eskom vehicles off Eskom sites
c) Independent electricity generators, electricity distributors, and demand response
suppliers for a rebate
d) Venue, seminar, conference and accommodation services, where a contract does not
exist between Eskom and the supplier
e) Municipalities from which Eskom acquires utility services, for example, water, sanitation,
etc.
f) Purchasing of consumables from established retailers (for example, Woolworths, Makro,
Shoprite, Game, clothing trading outlets)
g) Agents: suppliers acting on behalf of Eskom to source out a certain commodity or
product
h) Property leasing: suppliers who lease building(s) to Eskom
i) Recruitment agencies and temporary employment services/labour brokers
j) Professional registration bodies and accreditation authorities
k) Suppliers providing online services from their premises (IT licensing, insurance, etc.)
l) Non-profit organisations (for funding purposes)
3.2.4 Phase 4: Site mobilisation/Access to the site
3.2.4.1 Prerequisites for the commencement of works or services following contract
award
a) The procurement practitioner shall ensure that the site OHS professionals are given notice
of the contract award to ensure that the supplier/contractor’s OHS file is evaluated and
approved before commencement of work.
b) For a national contract, OHS professionals responsible for the national contract shall within
five working days hand over the project to the relevant BU/OU OHS professional.
enables Eskom to terminate the contract in the event when the supplier has built up a history of
poor performance in relation to matters or aspects of compliance with safety and health
regulations, policies, and/or procedures. The contract termination process can run concurrently
with the initiation process of referring the supplier/contractor to the review committee while
terminating the contract.
Special Conditions
Source: Contract and Contractor OHS Management.pdf (unknown)3.2.2.6 Funded projects
For projects that are funded by national/international funders, the funder’s accompanying
supplementary requirements are to be considered, in conjunction with the requirements contained
in this standard. In instances where the funders’ procurement processes supersede Eskom’s
procurement process, discretion is allowed to ensure that there is suitable OHS compliance.
Where the funder’s OHS requirements are mandatory and are in conflict with the OHS
requirements as set out in this standard, the funder’s requirements shall take precedence.
However, the responsible OHS professional shall ensure that Eskom’s requirements are aligned,
as far as is reasonably possible. Suppliers shall ensure compliance with the relevant OHS statutory
requirements in accordance with the South African legal framework.
set out in this standard, an exemption request, together with suggested recommendations, shall be
submitted in writing to Sustainability Systems by the contract/project manager and supported by
the relevant OHS manager.
3.2.2.7 Exempted service
a) When the supplier is awarded a contract, an OHS Act section 37(2) agreement shall be
concluded and signed between the supplier and the contract custodian/end user, together
with the contractual documents.
b) For every site where the contractor is performing work, a 37(2) agreement shall be signed
by the site contract custodian and the contractor.
c) Due to the centralised nature of certain procurement activities, such as national contracts,
the allocated OHS professionals are responsible for the tender phase. Thereafter shall
hand over the reports to the BU/OU OHS professionals. The contract custodian, together
with OU/BU OHS professionals, must ensure that OHS requirements are adhered to by the
supplier including the signing of the 37(2) agreement on site/BU/OU.
3.2.2.10 International suppliers conducting work for or on behalf of Eskom
Requirements
Source: Contract and Contractor OHS Management.pdf (unknown)3.2.3 Phase 3: Supplier registration
3.2.3.1 The Procurement Department shall ensure that, when a supplier is being registered on
the Eskom vendor database, such supplier has been subjected to an OHS tender
evaluation.
3.2.3.2 The supplier shall meet the minimum Eskom OHS requirements before approval and
registration. See Annexure A for minimum requirements and conditions applicable to
vendor registration.
3.2.3.3 All OHS requirements applicable to South African-based companies are also
equivalently applicable to international suppliers, depending on the supplier risk
category.
3.2.3.4 Exempted suppliers (both national and international) for OHS assessments for vendor
database registration purposes.
Section
Source: Contract and Contractor OHS Management.pdfa) The procurement practitioner shall ensure that the site OHS professionals are given notice
of the contract award to ensure that the supplier/contractor’s OHS file is evaluated and
approved before commencement of work.
b) For a national contract, OHS professionals responsible for the national contract shall within
five working days hand over the project to the relevant BU/OU OHS professional.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
c) When the OHS professional is satisfied with the contents of the OHS plan, it must be
signed and initialled on the bottom right of each page by the client (Eskom OHS
professional and the project manager) and the supplier/contractor representative.
d) The contractor employees shall also undergo the company’s induction, which must be risk-
or scope-based before commencement of any activities.
e) Eskom shall induct the contractor employees before commencement of any activities.
3.3 Site mobilisation/Access to the site
The allocated OHS professional shall evaluate the health and safety file. If satisfied, the letter of
acceptance will be issued to the supplier/contractor. Should the supplier not meet minimum OHS
requirements at this stage, the OHS professional will give the supplier another chance to address
the shortcomings within a period not exceeding seven working days or as agreed by the crossfunctional team in consultation with the OHS professional.
3.4 Health and safety non-negotiable rules
3.4.1 The health and safety file/document is to be evaluated before site mobilisation or task order
allocation to assess the compliance/conformance status of the supplier. No work shall
commence before the health and safety file/document has been accepted by the allocated
OHS professional.
3.4.2 OHS requirements, after contract award, shall be enforceable on the successful supplier in
accordance with the OHS specification/health and safety file/documentation requirements.
3.4.3 OHS documents or actions that are required after contract award, that is, during the
execution of the contract, must be included as contractual obligations. The time frame for
submission will be negotiated as determined by the cross-functional team appointed by
Procurement and Supply Chain Management. The decision will be risk-based, based on the
value, duration, complexity, environmental aspects, and impacts and the criticality of the
scope of working conditions of any applicable environmental approvals.
3.4.4 Phase 5: Contract/Service execution and continual monitoring
3.4.4.1 Continual OHS performance monitoring
a) Eskom shall conduct risk-based inspections, audits, and blitz inspections to monitor OHS
compliance and adherence to the OHS plan by the contractor.
b) The contractor performing construction work shall be audited in accordance with the
applicable legal and other requirements as amended.
c) For contractors performing non-construction work, the frequency of the audit/inspection
shall be determined by the risk associated with the scope of work based on legal and other
requirements as amended.
d) The contract custodian shall ensure that monitoring mechanisms (such as audits and
reviews) are instituted, with the support of OHS professionals, to ensure compliance with
OHS legislative and other requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
3.4.4.2 Management of contractors
a) The contract custodian shall ensure that the principal contractor is notified that he/she is
accountable for the management of his/her employees/contractors/suppliers and also to
ensure that his/her contractors/suppliers comply with the applicable legal and other
requirements (applicable during contract execution of works and services in terms of the
contract).
b) The contract custodian, in consultation with the procurement practitioner, has to ensure that
all the non-conformances or non-compliances of the suppliers/contractors are dealt with by
means of approved Eskom contractor management processes, for example, supplier
reconsideration review committee.
3.4.4.3 Enforcement of compliance and monitoring during contract execution
OHS professionals shall ensure that there is a mechanism to monitor OHS performance and the
supplier’s compliance at predetermined intervals during contract execution and that these reports
are provided to the contract custodian, during the execution of the contract and for the post
contract review process.
3.4.4.4 Work stoppage/Safety interventions/Suspension of works and services under a
contract
Eskom reserves the right to stop any unsafe work that poses a risk or harm to the health and
safety of Eskom employees, contractor employees, and the public. The BU/OU/project should
devise a process for reporting unsafe work /stopping working or conditions.
Should an imminent risk with the potential to cause harm to an Eskom employee, contractor
employee, or the public be identified, the observer may engage with the affected parties because
of addressing the risk.
Individuals may report an activity, unsafe act, or unsafe condition that poses a threat to the health
and safety of persons to the authorised person.
The temporary stoppage of an activity/activities or task(s) may be due to OHS concerns,
including the following circumstances:
a) Ad hoc safety intervention by Eskom management: all work of a similar nature may be
stopped due to the occurrence of a serious incident, and the relevant supplier will be
required to comply with, and/or verify, the conditions stipulated in the safety intervention
instruction pack.
b) Ad hoc safety intervention by any person, especially OHS professionals, may be due to
unsafe work or unsafe behaviour by the contractor. The conditions that gave rise to the
work stoppage will determine the corrective measures to be taken urgently to protect the
health and safety of employees and protect the environment and plant or equipment, etc.
c) Work stoppage initiated by the government and other relevant agencies.
3.5 Supplier relationship management
a) OHS professionals to participate and support the SD&L initiatives.
b) Supplier registration reviews for OHS are conducted as centralised function by Risk and
Sustainability.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
c) For due diligence, OHS will conduct a desktop evaluation and/or site supplier site capability
and capacity assessment to verify the processes for the products and services contracted
and due diligence OHS report to be generated and submitted to Procurement and Supply
Chain /the initiator.
3.6 Material handling and storage equipment
a) Material handling and storage (preservation) manuals/procedures shall be provided to
Eskom by the suppliers/contractors during delivery or receipt inspection of the
goods/products/services.
b) The above requirements shall be stated in the enquiry/transaction documents. This is the
responsibility of the contract custodian/end user.
c) OHS professionals will advise the cross-functional team to ensure the above is included in
the enquiry/transaction documents.
3.7 Supplier review committee
The supplier review committee has been established to take such remedial measures, as
bestowed upon it by the Executive Tender Committee (ETC) and to the extent allowed by law,
against any tenderer or supplier found to have abused the supply chain management system or to
have been found guilty of misconduct, which measures include, but are not limited to,
reconsidering the registration status of such bidder or supplier based on the general or additional
grounds for consideration.
The Eskom contracts between Eskom and contractors/suppliers must include a clause that
enables Eskom to terminate the contract in the event when the supplier has built up a history of
poor performance in relation to matters or aspects of compliance with safety and health
regulations, policies, and/or procedures. The contract termination process can run concurrently
with the initiation process of referring the supplier/contractor to the review committee while
terminating the contract.
However, all the necessary steps need to be taken to assist the supplier/contractor to address their
shortcomings/gaps. The Eskom representatives must consider implementing the rehabilitation
process assisting the supplier/contractor to improve their performance and rectify the nonconformances, incidents, fatalities, etc. The review process should follow to assess the
effectiveness of the initiatives/action plan/recommendations.
Note: referring the contractor/supplier to the review committee should be the last resort. All
avenues to help the contractor/supplier should be exhausted.
The following process shall be followed when referring to the supplier/contractor to the
review committee:
The supplier investigation report by BU/OU will be required.
The Non-conformance reports issued.
Written feedback from the supplier.
The minutes of the meetings held with the supplier.
Sanction: state the period of suspension/blacklisting.
Contract: will the supplier complete the outstanding work, or is there another option/plan B?
Project information: start and end date.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
3.7.1 Contract completion/handover
Where applicable, it is the responsibility of the contract custodian to ensure that the final OHS
demobilisation inspection is carried out a month before the contract end date is reached with the
assistance of the OHS professionals or the contractor leaves site.
The contractor’s OHS file or copy thereof shall be handed over to the contract custodian on
completion of the project 10 days before the contract ceases. Eskom shall retain the OHS file for a
minimum of 40 years.
For in-house projects, where an Eskom department or division manages a project at another
division’s premise/site, the project handover shall include the OHS file, which shall be handed over
to the client or client’s agent (site owner/asset owner).
3.7.2 Phase 6: Post contract review
3.7.2.1 The contract custodian has to inform the supplier about the OHSKPIs before work can
commence, and Annexure D can be used as a guideline. The contractor performance
monitoring process will be applied based on the risk of the project. The BU/OU should
develop its contractor monitoring process. The OHS professional has to be involved to
assist the contract custodian with setting the OHSKPIs and shall prepare the OHS
component in preparation for the review process, that is, audit reports and the OHS
compact/contract, inspections, minutes, presentations, etc.
3.7.2.2 After a contract has ceased or ended, the supplier must be evaluated on OHS
performance throughout the project by the contract custodian, with the support of the
OHS professional.
3.7.2.3 The Procurement Practitioner shall ensure that post contract reviews are incorporated
in the procurement process, to review the supplier OHS performance during the
execution of the contract and ensure that the assessment results are made accessible
and available to relevant stakeholders for future reference.
3.7.2.4 The output of the post contract assessment shall be submitted to Procurement
(supplier management) for record-keeping purposes.
This document has been seen and accepted by:
Name Designation
K Pather General Manager – Sustainability Systems
M Moahlodi Senior Manager- Corporate Hygiene and Safety
Marius Atterbury Operational and Contractor OHS Manager (Acting)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Date Rev. Compiler Remarks
May 2021 3 F Pooe/D Review was conducted to combine 32-726, 32-524
Maunatlala and 37(2) agreement into one procedure and also to
align with the reviewed 32-1034.
August 2 D Maunatlala A review was conducted to align the standard with
2016 the new procurement process in Eskom.
June 2014 1 D Maunatlala A review was conducted to realign the standard with
the PPPF Act (Act ).
June 2011 0 Development This standard addresses minimum safety, health,
team and environmental requirements that must be
integrated into the Eskom procurement process.
Florence Pooe
Diane Maunatlala
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Appendix A: OHS functionality evaluation criteria
scoring / threshold per functional area to proceed to the next step
70%
Table 1: Evaluation Criteria on Functionality
Functionality Criteria Tenderers will be expected to Total percentage allocated per
score at least the minimum functional area
threshold per functional area
to proceed to the next step
Safety & Health 70% 100%
Minimum Threshold 70%
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Appendix B: Tender/Enquiry process flow
The process flow below shall be followed in implementing OHS in the procurement and supply chain processes.
Provide scope-specific OHS requirements
OHS shall form part of the negotiation meeting and highlight the gaps identified and influence the procurement strategy
during the tender evaluation. Further clarify the OHS file requirements and
negotiate the new submission date.
OHS will participate in all the meetings, i.e. The suppliers that did not respond to the request within the stipulated time will
clarification, squad check, negotiation, etc. be rendered non-responsive, whereas the suppliers that responded will be re-
evaluated. The final OHS tender evalution report will be generated and
submitted to the procurement and supply chain management. Note: The Evaluate the OHS file. If
supplier will only be evaluated twice during the tender phase prior to contract satisfied, provide a letter
award, this is also applicable to due diligence transactions. of acceptance. Should
the supplier/contractor
not meet most of the
critical OHS
requirements, OHS shall
For contractal requirements, OHS will only evaluate the shortlisted suppliers. give the
OHS professionals will conduct the initial tender evaluation and OHS report will be supplier/contractor an For functionality, OHS must form part of the
generated and submtted to procurement and supply chain management. opportunity to address mandatory tender requirements. For
evaluations under functionality, refer to the The procurement and supply chain will engage the suppliers only ONCE, requesting the the shortcomings and
outstanding documents to be submitted within a period not exceeding seven working the OHS file must be Annexure A for setting the threshold criteria
days or as agreed by the cross-functional team approves prior to the in applying OHS.
commencement of work.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Appendix C: Contractor OHS management model flow diagrams
Phase 1
Project initiation and
briefing: Concept and
Project initiation OHS forms part of feasibility:
and briefing and the multidisciplinary Attend design and
concept and team. project review Design
feasibility and Attend the meetings. development
design construction/ project Prepare draft
development initiation meetings. construction/
Advise on OHS project baseline
requirements in line risk assessment.
with the project.
Phase 2
Tender enquiry Tender evaluation Contract award
OHS forms part of the OHS function conducts The OHS professional
Tender multidisciplinary team the OHS tender must advise on
enquiry, OHS requirements form evaluation in recommended suppliers for
evaluation, part of the strategy accordance with the contract award.
and contract The following documents published Annexure 37(2) agreement must be
award are sent out with the C1/C2/C3/C4/C5. signed with the contract.
enquiry: OHS The OHS professional Contractor /supplier must
specification, Annexure B, compiles the evaluation be provided with relevant
Project risk assessment report and submits to OHS procedures, policies
and 32-136 Contractor the procurement office. and standards.
OHS requirements and
Annexure C1/2/3/4/5
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Phase 3
Supplier registration
It is conducted centrally by Sustainability.
The supplier registers on the portal.Supplier/Vendor
registration
Phase 4
OHS File Induction
OHS file must be submitted The contractor employees Access
to the OHS professional to shall undergo Eskom The contractor employeesAccess to site/Site
evaluate and approve induction must be provided accessmobilization
The end-user/project The contractor must provide after complying with the
manager/contract custodian his/her employees with the site’s OHS prerequisite
must co-sign the approved company’s risk based/scope
OHS file specific induction
Phase 5
Continual monitoring
a) OHS professionals shall conduct work stoppages, inspections, audits, and blitzes to monitor OHS compliance
Contracts/Services and adherence by the contractor. The Eskom OHS professional reserves the right to conduct these
execution, performance measurement activities on all its contractors.
continual
b) The project manager shall ensure that monitoring mechanisms (such as audits and reviews) are instituted, with
monitoring OHS file
CONTROLLEDthe supportDISCLOSUREof OHS professionals, to ensure compliance with OHS legislative and Eskom requirements.
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Description
Source: NEC3 Supply Short Contract( SSC).pdfImportant Dates
Source: NEC3 Supply Short Contract( SSC).pdf (unknown)Contact Information
Source: NEC3 Supply Short Contract( SSC).pdf (unknown)Submission Guidelines
Source: NEC3 Supply Short Contract( SSC).pdf (unknown)Returnable Documents
Source: NEC3 Supply Short Contract( SSC).pdf (unknown)Evaluation Criteria
Source: NEC3 Supply Short Contract( SSC).pdf (unknown)Technical Specifications
Source: NEC3 Supply Short Contract( SSC).pdf (unknown)Methodology
Source: NEC3 Supply Short Contract( SSC).pdfQuality Management
Source: NEC3 Supply Short Contract( SSC).pdfPricing Schedule
Source: NEC3 Supply Short Contract( SSC).pdfFinancial Requirements
Source: NEC3 Supply Short Contract( SSC).pdf (unknown)Compliance Requirements
Source: NEC3 Supply Short Contract( SSC).pdf (unknown)B-BBEE Requirements
Source: NEC3 Supply Short Contract( SSC).pdf (unknown)Z2 Change of Broad Based Black Economic Empowerment (B-BBEE) status Z2.1 Where a change in the Supplier’s legal status, ownership or any other change to his business composition or business dealings results in a change to the Supplier’s B-BBEE status
Health & Safety
Source: NEC3 Supply Short Contract( SSC).pdfEnvironmental
Source: NEC3 Supply Short Contract( SSC).pdfContractual Terms
Source: NEC3 Supply Short Contract( SSC).pdfSpecial Conditions
Source: NEC3 Supply Short Contract( SSC).pdf (unknown)Section
Source: NEC3 Supply Short Contract( SSC).pdfDescription
Source: Provision of executive office furniture and soft furnishes _OHS Tender Evaluation.pdfDesign, supply, and install new executive office furniture and soft finishes for the newly established NTCSA executive offices in MWP. Work is to be performed on an as-and-when-required basis over a 12-month period.
Important Dates
Source: Provision of executive office furniture and soft furnishes _OHS Tender Evaluation.pdf (unknown)Effective date for OHS tender returnables: 23 November 2023.
Review date: November 2026.
Contact Information
Source: Provision of executive office furniture and soft furnishes _OHS Tender Evaluation.pdf (unknown)Eskom’s/Client’s OHS Representative (designation, signature, and date required).
Submission Guidelines
Source: Provision of executive office furniture and soft furnishes _OHS Tender Evaluation.pdf (unknown)Submit the following returnable documents as part of your tender:
Returnable Documents
Source: Provision of executive office furniture and soft furnishes _OHS Tender Evaluation.pdf (unknown)Required returnable documents:
Evaluation Criteria
Source: Provision of executive office furniture and soft furnishes _OHS Tender Evaluation.pdf (unknown)General
Documentation
Technical Specifications
Source: Provision of executive office furniture and soft furnishes _OHS Tender Evaluation.pdf (unknown)Scope of work: Design, supply, and install new executive office furniture and soft finishes for NTCSA executive offices in MWP on an as-and-when-required basis for 12 months.
Key deliverables:
Compliance Requirements
Source: Provision of executive office furniture and soft furnishes _OHS Tender Evaluation.pdf (unknown)Mandatory compliance requirements:
OHS Plan must include:
Health & Safety
Source: Provision of executive office furniture and soft furnishes _OHS Tender Evaluation.pdfOHS policy document must comply with OHS Act Section 7.
Description
Source: Pricing Schedule or Bill of Quantities.xlsxSubmission Guidelines
Source: Pricing Schedule or Bill of Quantities.xlsx (unknown)Evaluation Criteria
Source: Pricing Schedule or Bill of Quantities.xlsx (unknown)Technical Specifications
Source: Pricing Schedule or Bill of Quantities.xlsx (unknown)Financial Requirements
Source: Pricing Schedule or Bill of Quantities.xlsx (unknown)Compliance Requirements
Source: Pricing Schedule or Bill of Quantities.xlsx (unknown)Description
Source: 240-77471499 Annexure B.pdfSubmission Guidelines
Source: 240-77471499 Annexure B.pdf (unknown)Returnable Documents
Source: 240-77471499 Annexure B.pdf (unknown)Evaluation Criteria
Source: 240-77471499 Annexure B.pdf (unknown)Technical Specifications
Source: 240-77471499 Annexure B.pdf (unknown)Compliance Requirements
Source: 240-77471499 Annexure B.pdf (unknown)Health & Safety
Source: 240-77471499 Annexure B.pdfDescription
Source: eTendering_Supplier's User_Guide_v4.4.pdfImportant Dates
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Contact Information
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Submission Guidelines
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Returnable Documents
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Evaluation Criteria
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Technical Specifications
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Methodology
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Compliance Requirements
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Special Conditions
Source: eTendering_Supplier's User_Guide_v4.4.pdf (TENDER)Section
Source: eTendering_Supplier's User_Guide_v4.4.pdfDescription
Source: Form A_Cat 4.docxSubmission Guidelines
Source: Form A_Cat 4.docx (unknown)Evaluation Criteria
Source: Form A_Cat 4.docx (unknown)Technical Specifications
Source: Form A_Cat 4.docx (unknown)Compliance Requirements
Source: Form A_Cat 4.docx (unknown)Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
No.1 Maxwell Drive, Megawatt Park - Sunninghill - Johannesburg -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
20
Last checked
04 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog