The Highgate Hotel 2 Voortrekker Rd, Cambridge West - KuGompo City - KuGompo City - 5247
Organization Type
GOVERNMENT
Published
03 Aug 2026
OCDS Reference
ocds-9t57fa-164372
Summary
This tender from the agricultural research council (arc) seeks a qualified contractor to supply, deliver, and install a renewable green energy (solar-powered) borehole water pumping system at a site in the eastern cape. The scope includes a 150m deep borehole, water testing, solar modules, pump, electrical work, and associated infrastructure. The successful bidder will be responsible for the full installation, commissioning, and training of the farmer.
Key Requirements
Compulsory site briefing must be attended; failure to attend will lead to disqualification.
Submit official manufacturer data sheets (PDF) for solar modules with the bid, showing 12-year product warranty, 25-year linear power performance warranty, and compliance with SANS/IEC standards and SABS approval.
Provide a signed Declaration of Acceptance of Special Conditions for the RFQ with the bid on the closing date.
All electrical work must be supervised by a qualified electrician who can sign the Certificate of Compliance (CoC); a Single-Phase Tester cannot sign off on DC/solar installations.
Conduct water tests (chemical and microbial) per SANS 241-1:2015 at a SANAS-accredited laboratory and provide the test report with conclusions.
Perform a borehole yield test (step-drawdown, constant discharge, and recovery) and provide a certificate with key parameters.
Supply and install specified equipment including 6 x 550W monocrystalline solar modules (approved brands), 1.1kW borehole pump with MPPT controller, lithium batteries, inverter, and all associated components.
Provide warranties as specified (e.g., 12-year product warranty on solar modules, 25-year linear power performance, 1-year workmanship) and submit warranty certificates and operation/maintenance manuals during commissioning.
The Highgate Hotel 2 Voortrekker Rd, Cambridge West - KuGompo City - KuGompo City - 5247
Construction & Civil Engineering Industry Profile
Critical Requirements
CIDB Contractor Grading
Regulatory Bodies
ECSASACPCMPCIDBSAIA
Tenders in this industry often require registration with these bodies.
CIDB Registration
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Typical Documents
10 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
CIDB Registration Certificate
NHBRC Registration (if applicable)
Health & Safety Plan
Insurance Certificates
Previous Project Completion Certificates
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
RFQSpecification-Annexure A.pdfReview complete
Description
Source: Specification-Annexure A.pdf
Important Dates
03 Aug
2026
PUBLICATION
Tender Published
Tender was published
11 Aug
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
11 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
This tender from the Agricultural Research Council (ARC) seeks a contractor to supply, deliver, and install a renewable green energy powered borehole water pumping system. The scope includes water testing, survey work, solar installation, pump and controller supply, structural mounting, electrical work, and comprehensive commissioning with training and warranties. The system must meet SANS standards, include a 150m deep borehole pump, 6 x 550W monocrystalline solar modules, lithium battery storage, and comply with strict technical and compliance requirements.
The Agricultural Research Council (ARC) is requesting quotations for the supply, delivery, and installation of a renewable green energy powered borehole water pumping system. The tender is a national procurement with a compulsory site briefing scheduled for 06 August 2026, and the closing date is 11 August 2026 at 11:00. The evaluation will follow the 80/20 preferential procurement system, with 80 points for price and 20 points for specific goals (e.g., ownership by HDIs, women, youth, persons with disabilities, BEE status, and SMME promotion). Bidders must be registered on the Central Supplier Database (CSD) and submit all required Standard Bidding Documents (SBD forms).
This tender from the Agricultural Research Council (ARC) seeks a service provider to supply, deliver, and install a renewable green energy powered borehole water pumping system. The system includes solar modules, a submersible pump, controllers, batteries, inverters, and associated infrastructure. The project involves water testing, borehole yield testing, structural work, electrical installation, and commissioning. The scope includes a 150m deep borehole, a 40m distance to shade net tanks, and a 30m distance to a garage. The system must include a 5kW lithium battery and inverter, a 1.1kW pump, and 6 solar modules (550W each). The work must comply with SANS standards, and the contractor must provide warranties, training, and documentation.
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Supply, delivery and installation of renewable green energy powered borehole water pumping system. Includes equipping a borehole 150m deep, approximately 40m distance to shade net tanks and 30m to garage. Work includes water testing, survey work, solar electrical installation, warranties, project management, handover and commissioning, borehole cap.
Important Dates
Source: Specification-Annexure A.pdf (RFQ)
Compulsory site briefing: date and time not specified in document. Venue not specified. Attendance is compulsory and failure to attend leads to disqualification.
Submission Guidelines
Source: Specification-Annexure A.pdf (RFQ)
Returnable Documents:
Signed Declaration of Acceptance of Special Conditions for the RFQ must accompany the bid on the closing date.
Data sheets for solar modules/panels must be submitted with all bidding documents (official PDF from manufacturer, not copied from internet).
Compulsory site briefing must be attended.
Failure to provide the above listed documents will lead to disqualification.
Returnable Documents
Source: Specification-Annexure A.pdf (RFQ)
then back to PDF will not be allowed.
Evaluation Criteria
Source: Specification-Annexure A.pdf (RFQ)
Bidders must be registered on the Central Supplier Database (CSD) (implied by government tender). They must have the capacity to perform the work, including access to a qualified electrician with appropriate qualifications (not just Single-Phase Tester). They must be able to provide manufacturer data sheets for solar modules from approved brands (Jinko Solar, Canadian Solar, JA Solar, etc.). They must be able to attend the compulsory site briefing. They must be able to provide all required documentation and comply with all specifications. No explicit financial or legal criteria are listed, but standard government procurement rules apply.
Technical Specifications
Source: Specification-Annexure A.pdf (RFQ)
Borehole is 150m deep, approximately 40m distance to shade net tanks and 30m to garage.
Water test: Chemical and microbial analysis per SANS 241-1-1:2015 at SANAS accredited laboratory. Drinking water test parameters: EC, pH, SAR, Langelier, Ryznar, Turbidity, Colour, Odour, TDS, TSS, Free Cl, F, SO4, NH4-N, NO3-N, NO2-N, Ca, Mg, Na, K, Mn, Fe, Al, HPC, Heterotrophic plate count, Total coliforms, Faecal coliforms. Irrigation water test parameters: EC, pH, COD, SAR, Langelier, Ryznar, TSS, F, Cl, SO4, NH4-N, NO3-N, NO2-N, Alkalinity, CO3, HCO3, Ca, Mg, Na, K, B, Mn, Fe, Faecal coliform, TDS.
Survey work: alignment/mounting of solar modules to North Facing Position, done before mounting and submitted to ARC.
Electrical installation: qualified electrician signing off CoC must be in control on site. Single-Phase Tester cannot work with DC and cannot sign off on DC installations (including solar PV).
Concrete collar around borehole: shallow circular collar, volume 0.08m3, concrete mix: 20L water, 42kg Portland cement, 0.07m3 stone aggregate (10mm), 0.07m3 river sand, strength 30MPa after 28 days.
Borehole cap to prevent foreign material entry.
Borehole yield test certificate must include: yield rate (L/s and L/hr), static water level, dynamic water level, installation depths.
Water distribution system: trenching 500mm below ground, 40mm high pressure pipe from borehole to shade net tanks (4 x 5000L tanks), including irrigation connectors and accessories.
Solar modules: Monocrystalline, 550W x 6, aligned true north, tilt angle 20-35 degrees. Approved brands: Jinko Solar, Canadian Solar, JA Solar, RenewSys, Trinasolar, SunPro, Risen, Haitai Solar, Astroenergy or equivalent.
Pump: 1.1 kW centrifugal borehole pump with non-return valve, pressure head 150m, flow 4 m3/hour. Pump and solar PV capacity may change based on borehole yield test results.
Solar pump controller: 1.1 kW with built-in MPPT, dry-run protection.
Level sensor for submersible pump (dry-run protection).
Float level switch in 2000L tank for pump control.
Protection cabinet: overload protection (fuses), main switch ON/OFF, surge arresters (SPD), central grounding point.
Grounding: equipment grounding (solar module frame, mounting structure, enclosures, metal frames, conduits to grounding electrode) and system grounding (current carrying conductors to negative/neutral to grounding electrode).
Enclosures: suitable protection against outdoor conditions.
Mounting structure: steel structure, painted with two layers (rust-proof and thick finish) or galvanized, height 3.5m, structurally strong to withstand winds, can mount 6 solar panels, concreted around structure.
Cables: PV red and black solar cables, pump power supply cable (submersible wire 6-10mm, 2-4 core), grounding wires, other related cables.
Lithium batteries 5kW and inverter 5kW stored and mounted in garage approx. 30m from borehole. AC and DC control boxes provided. Power connected to irrigation control box, solenoids, booster pump approx. 40m to shadenet.
Lightning protection and earthing for solar PV: proper grounding, surge protection, adherence to safety guidelines. Only registered qualified electrician allowed to work on electrical installation. SPT cannot issue CoC for solar installations.
Test-pumping of boreholes: Step-drawdown test (4-6 x 1-hour steps, yields: 1/3, 2/3, 1, 1.5 times expected yield), Constant discharge test (24-72 hours at constant rate, variation >5% requires restart), Recovery test (until water levels recover to <5% of total drawdown, or three identical readings, or time equal to constant discharge test). Data collection includes date/time, static water level, borehole depth, distance to observation boreholes, pump installation depth, water strike depths, borehole diameter, rainfall, drawdown, discharge rate. Pump must have non-return valve. Flow measurement methods: bucket and stopwatch, flow meter, orifice weir, V-notch weir. Observation boreholes monitored, rested at least a day before pumping.
Methodology
Source: Specification-Annexure A.pdf (RFQ)
Survey work must be done before mounting solar modules to guide alignment/mounting to North Facing Position, submitted to ARC.
Qualified electrician must be in control on site for solar installation and sign off CoC.
Project management: service provider must organize activity schedule for project execution in consultation with ARC project manager/personnel, allowing time for coordination.
Handover and commissioning: comprehensive training for farmer on use of solar powered borehole (operation and maintenance), provide standard operating procedure (SOP) in English, soft copy sent to ARC-VIMP:MP&IC division for comments.
Borehole test-pumping methodology:
Step-drawdown test: 4-6 x 1-hour steps at incrementally increasing rates. Yields: Step1 – 1/3 expected yield, Step2 – 2/3 expected yield, Step3 – equal to expected yield, Step4 – 1.5 times expected yield. Yield must be constant during steps, measured at least 3 times. Recovery monitored until water level recovers to ~1m of static water level or ~12 hours.
Constant discharge test: 24-72 hours at constant rate. If water level drawn down to pump inlet, stop pump immediately and monitor recovery. Yield constancy critical; variation >5% requires restart. Water level measurements per SANS 10299-4:2003.
Recovery test: measure water levels until recovery to <5% of total drawdown, or three identical readings, or time equal to constant discharge test duration. Data collected: date/time, static water level, borehole depth, distance to observation boreholes, pump installation depth, water strike depths, borehole diameter, rainfall, drawdown, discharge rate.
Pump must have suitable power drive and correct pumping capacity. Pumping rate must be constant. Pump inlet at main water strike, or 3-5m from bottom if unknown. Pump must have non-return valve.
Flow measurement: bucket of known volume and stopwatch (most reliable), flow meter (only when discharge pipe full and flow not turbulent), orifice weir, V-notch weir.
Observation boreholes: monitor water levels during test, rest area boreholes at least a day before pumping.
Quality Management
Source: Specification-Annexure A.pdf
Water tests must be done according to SANS 241-1-1:2015 standards at a SANAS Accredited Laboratory.
Test report must be provided with conclusions.
Drinking water test parameters: EC, pH, SAR, Langelier, Ryznar, Turbidity, Colour, Odour, TDS, TSS, Free Cl, F, SO4, NH4-N, NO3-N, NO2-N, Ca, Mg, Na, K, Mn, Fe, Al, HPC, Heterotrophic plate count, Total coliforms, Faecal coliforms.
Irrigation water test parameters: EC, pH, COD, SAR, Langelier, Ryznar, TSS, F, Cl, SO4, NH4-N, NO3-N, NO2-N, Alkalinity, CO3, HCO3, Ca, Mg, Na, K, B, Mn, Fe, Faecal coliform, TDS.
Financial Requirements
Source: Specification-Annexure A.pdf (RFQ)
Pricing must be provided per the Bill of Quantities (BOQ) with unit prices and totals for each line item:
Supply and installation of mounting steel structure (including concrete) – 1
Monocrystalline solar module 550W – 6
1.1 kW borehole pump (with non-return valve) and 1.1kW built-in MPPT controller/solar pump, dry run protection including cable ties, base plate, control box, rope, high pressure pipe 40mm – 1
Protection cabinet with central grounding point, all switches and surge arrestors – 1
Submersible wire length, 4 core 10mm2 – 1
Solar cables, grounding wires and earth spikes – 1
Electrical installation and CoC – 1
Sundries – 1
Connection of irrigation control box, pump and solenoids to green energy – 1
Lithium Battery 5kW (including fuses holder) – 2
AC control box (2 way) – 1
DC control box (2 way) – 1
Inverter 5kW – 1
Borehole yield test – 1
PV red and black cables – 1
Total must be provided. No specific bonds, guarantees, or payment terms stated.
Compliance Requirements
Source: Specification-Annexure A.pdf (RFQ)
Compulsory site briefing (failure leads to disqualification).
Data sheets for solar modules/panels must be submitted with all bidding documents. Solar modules must comply with SANS/IEC standards and SABS approved.
Data sheets must be official documents (PDF) from manufacturer; copied from internet and pasted into word then back to PDF not allowed.
Data sheets must show: 12-year product warranty, 25-year linear power performance warranty, compliance with applicable IEC/international standards or SANS and SABS approved.
Warranty requirements: Solar module 12 years product warranty, 25 years linear power performance warranty; Pump/motor minimum 1 year; MPPT solar pump controller minimum 1 year; Remaining components minimum 1 year; Workmanship warranty/guaranty for all installation 1 year; Solar module structural support 5 years. Warranties checked against products delivered onsite.
All warranty and workmanship certificates must be submitted to ARC, including operation and maintenance manual, handed during commissioning.
No specific CSD, tax, B-BBEE, CIDB, CIPC, or professional registration requirements stated in document, but standard government procurement rules apply.
Health & Safety
Source: Specification-Annexure A.pdf
Only registered qualified electrician allowed to work on electrical installation. Electrician signing off CoC must be in control on site and supervise work effectively.
Single-Phase Tester (SPT) cannot work with DC and cannot sign off on DC installations (including PV and three-phase). SPT cannot issue Certificate of Compliance for solar installations.
Lightning protection and earthing for solar PV: proper grounding, surge protection, adherence to safety guidelines to minimize damage from lightning strikes.
Grounding: equipment grounding (solar module frame, mounting structure, enclosures, metal frames, conduits to grounding electrode) and system grounding (current carrying conductors to negative/neutral to grounding electrode).
Protection cabinet with overload protection (fuses), main switch, surge arresters (SPD), central grounding point.
Enclosures must have suitable protection against outdoor conditions.
Contractual Terms
Source: Specification-Annexure A.pdf
Warranty periods: Solar module 12 years product warranty, 25 years linear power performance warranty; Pump/motor minimum 1 year; MPPT solar pump controller minimum 1 year; Remaining components minimum 1 year; Workmanship warranty/guaranty for all installation 1 year; Solar module structural support 5 years.
Warranties checked against products delivered onsite.
Compulsory requirements: Compulsory site briefing, data sheets for solar modules/panels submitted with bidding documents, solar modules comply with SANS/IEC standards and SABS approved. Data sheets must be official PDF from manufacturer; copied from internet not allowed. Data sheets must show 12-year product warranty, 25-year linear power performance warranty, compliance with applicable IEC/international standards or SANS and SABS approved.
All warranty and workmanship certificates must be submitted to ARC, including operation and maintenance manual, handed during commissioning.
The bidder shall provide signed Declaration of Acceptance of Special Conditions for the RFQ.
Section
Source: Specification-Annexure A.pdf (RFQ)
concrete collar around the borehole. This collar shall have the dimensions set out in, yielding a volume of 0.08m3. The concrete mix shall consist of water, Portland cement, stone aggregate (10mm), and river sand. Quantities of these materials sufficient to make 0.1m3 of concrete with the required strength of 30MPa after 28 days are (1) 20 litre of water, (2) 42kg (0.8bags) of Portland cement, (3) 0.07 m3 of stone aggregate and (4) 0.07 m3 of river sand.
RFQSpecification-Annexure A.pdfReview complete
Description
Source: Specification-Annexure A.pdf
Scope: Supply, delivery, and installation of a renewable green energy powered borehole water pumping system.
Borehole depth: 150m.
Distance to shade net tanks: approximately 40m.
Distance to garage: approximately 30m.
System includes solar modules, pump, controller, batteries, inverter, and all associated electrical and plumbing work.
Important Dates
Source: Specification-Annexure A.pdf (RFQ)
Compulsory site briefing: required, but date, time, and venue are not specified in the document.
Closing date: 11 August 2026 at 11:00 (as per tender record).
No other dates (e.g., clarification deadline, site visit) are provided.
Submission Guidelines
Source: Specification-Annexure A.pdf (RFQ)
Submit the signed Declaration of Acceptance of Special Conditions for the RFQ with your bid on the closing date.
Provide official data sheets (PDF format from manufacturer) for solar modules/panels. Data sheets copied from internet and pasted into Word will not be accepted.
Data sheets must show: 12-year product warranty, 25-year linear power performance warranty, and compliance with applicable IEC/SANS standards and SABS approval.
Attendance at the compulsory site briefing is mandatory.
Failure to provide any of the above compulsory documents will lead to disqualification.
Submit all bidding documents together; no separate submission address specified.
Evaluation Criteria
Source: Specification-Annexure A.pdf (RFQ)
Evaluation is based on compliance with compulsory requirements (site briefing attendance, data sheet submission) and technical specifications.
Bidders must meet SANS/IEC standards for solar modules and SABS approval.
Technical compliance includes water testing at SANAS accredited lab, borehole yield testing per SANS 10299-4:2003, and proper electrical installation by a qualified electrician.
No scoring method or minimum thresholds are stated; likely pass/fail on compulsory items.
Technical Specifications
Source: Specification-Annexure A.pdf (RFQ)
Borehole depth: 150m; distance to shade net tanks ~40m, to garage ~30m.
Water test: Chemical and microbial analysis per SANS 241-1:2015 at a SANAS accredited laboratory. Test report must include conclusions.
Survey work: Determine north-facing alignment for solar modules; submit to ARC before mounting.
Solar modules: Monocrystalline, 550W x 6, aligned true north, tilt angle 20-35°. Approved brands: Jinko Solar, Canadian Solar, JA Solar, RenewSys, Trinasolar, SunPro, Risen, Haitai Solar, Astroenergy or equivalent.
Pump: 1.1 kW centrifugal borehole pump with MPPT solar pump controller, non-return valve, pressure head 150m, flow 4 m³/hour. Actual pump and PV capacity based on borehole yield test results.
Level sensor for dry-run protection; float level switch in 2000L tank.
Protection cabinet: overload protection, main switch, surge arresters (SPD), central grounding point.
Grounding: Equipment grounding (frames, structure) and system grounding (negative/neutral to earth spike).
Enclosures: Suitable for outdoor conditions.
Mounting structure: Steel, painted with rust-proof and thick finish or galvanized, height 3.5m, strong enough for 6 panels, concreted.
Lithium batteries 5kW and inverter 5kW stored in garage ~30m from borehole; AC and DC control boxes provided.
Lightning protection and earthing: Specific measures for solar PV due to high lightning density in South Africa.
Borehole yield test: Step-drawdown test (4-6 x 1-hour steps), constant discharge test (24-72 hours), recovery test. Flow must be constant within 5%.
Concrete collar around borehole: 0.08m³ volume, 30MPa strength after 28 days, mix specified.
Borehole cap to prevent foreign material entry.
Water distribution: Trenching 500mm deep, 40mm high pressure pipe from borehole to 4 x 5000L shade net tanks.
Bill of quantities includes 15 items (mounting structure, solar modules, pump, protection cabinet, cables, electrical installation, batteries, control boxes, inverter, borehole yield test, etc.).
Quality Management
Source: Specification-Annexure A.pdf
Water testing: Chemical and microbial analysis must be performed per SANS 241-1:2015 at a SANAS accredited laboratory.
Borehole yield testing: Must follow SANS 10299-4:2003 for step-drawdown, constant discharge, and recovery tests.
Solar modules must comply with applicable IEC or SANS standards and be SABS approved.
All tests must be documented with conclusions and certificates.
Compliance Requirements
Source: Specification-Annexure A.pdf (RFQ)
Compulsory site briefing attendance.
Solar modules must comply with SANS/IEC standards and be SABS approved.
Data sheets must be official manufacturer PDFs with specified warranty information.
Water testing must be conducted at a SANAS accredited laboratory.
Borehole yield testing must follow SANS 10299-4:2003.
Electrical installation: Only a registered qualified electrician may perform work. The electrician signing the Certificate of Compliance (CoC) must be in control on site. A Single-Phase Tester (SPT) cannot sign off on DC installations (including PV).
No specific CSD, tax, B-BBEE, CIDB, or CIPC requirements mentioned.
Health & Safety
Source: Specification-Annexure A.pdf
Lightning protection and earthing: Specific measures required for solar PV due to high lightning density in South Africa. Proper grounding, surge protection, and adherence to safety guidelines are crucial.
Only a registered qualified electrician may work on electrical installations. The electrician signing the Certificate of Compliance (CoC) must be in control on site.
A licensed Single-Phase Tester (SPT) cannot work with DC and cannot sign off on DC installations (including PV and three-phase).
Protection cabinet must include overload protection, main switch, and surge arresters.
Equipment grounding: Connect solar module frames, mounting structure, enclosures, and metal frames to a grounding electrode.
System grounding: Connect current-carrying conductors to negative/neutral and earth spike.
Contractual Terms
Source: Specification-Annexure A.pdf
Warranty periods:
Solar module: 12 years product warranty, 25 years linear power performance warranty.
Pump/motor: minimum 1 year.
MPPT solar pump controller: minimum 1 year.
Remaining components: minimum 1 year.
Workmanship/guaranty for all installation: 1 year.
Solar module structural support: 5 years.
Product warranties will be checked against delivered products onsite.
Compulsory requirements (failure leads to disqualification):
Compulsory site briefing.
Data sheets for solar modules must be submitted with bidding documents, in official PDF format from manufacturer.
Data sheets must show 12-year product warranty, 25-year linear power performance warranty, and compliance with IEC/SANS standards and SABS approval.
The contractor must provide operation and maintenance manuals and train the farmer during handover.
A standard operating procedure (SOP) in English must be provided and sent to ARC-VIMP:MP&IC for comments.
RFQRFQ VIM01REQ007095.pdfReview complete
Description
Source: RFQ VIM01REQ007095.pdf
Supply, delivery and installation of a renewable green energy powered borehole water pumping system.
Refer to Annexure A for the specification (quantity: 1.00 EA).
Important Dates
Source: RFQ VIM01REQ007095.pdf (RFQ)
Closing date and time: as per tender record (11 August 2026 at 11:00).
Compulsory site briefing: Thursday, 06 August 2026 at 11:00. Venue: The Highgate Hotel, 2 Voortrekker Rd, Cambridge West, KuGompo City, 5247. Bidders will proceed to drive to the farm.
SBD forms must be signed and returned with the quotation; failure may result in disqualification.
Complete SBD 4 (Bidder's Disclosure) – declare any state employment, relationships, or interests.
Complete SBD 6.1 (Preference Points Claim Form) if claiming specific goals.
Ensure you are not listed on the Register for Tender Defaulters or List of Restricted Suppliers.
Evaluation Criteria
Source: RFQ VIM01REQ007095.pdf (RFQ)
Evaluation will follow the 80/20 preference point system as the estimated value is between R2,000 and R50,000,000 (including VAT).
Price scores a maximum of 80 points; the lowest acceptable price receives 80 points.
Specific goals score a maximum of 20 points. Only bidders that claim specific goals will be considered for scoring on these points.
Specific goals and points (80/20 system):
Ownership by HDIs (51%+): 6 points
Ownership by Women (51%+): 4 points
Ownership by Youth (51%+): 4 points
Ownership by PwD (51%+): 2 points
BEE Status Level 1-4: 2 points
RDP Goals – Promotion of SMMEs: 2 points
Total points for price and specific goals = 100.
Bidders must submit proof/documentation to claim specific goals; failure to do so means no preference points are awarded.
The ARC may require substantiation of any preference claims before or after adjudication.
Bidders must be registered on the Central Supplier Database (CSD) to be considered.
Bidders must not be listed on the Register for Tender Defaulters or List of Restricted Suppliers.
Bidders must complete and sign all required SBD forms.
Bidders must comply with the Preferential Procurement Policy Framework Act and its regulations.
Technical Specifications
Source: RFQ VIM01REQ007095.pdf (RFQ)
Scope: Supply, delivery and installation of a renewable green energy powered borehole water pumping system.
Refer to Annexure A for the full specification (quantity: 1.00 EA).
Delivery address: ARC Institute at the above-mentioned address (The Highgate Hotel, 2 Voortrekker Rd, Cambridge West, KuGompo City, 5247).
The system must be installed and operational as per the terms of reference.
Financial Requirements
Source: RFQ VIM01REQ007095.pdf (RFQ)
Prices must be quoted in South African Rand and inclusive of VAT, delivery, insurance, taxes, and any other costs.
No price adjustments or amendments to delivery particulars will be considered after submission.
The quotation must indicate the validity period.
The ARC reserves the right to benchmark prices quoted.
Payment will be made upon receipt of a purchase order from the ARC; goods/services to be supplied after receipt of the purchase order.
Compliance Requirements
Source: RFQ VIM01REQ007095.pdf (RFQ)
Must be registered on the Central Supplier Database (CSD) – include CSD registration number and full CSD report.
Must complete and sign all Standard Bidding Documents (SBD) forms.
Must not be listed on the Register for Tender Defaulters or List of Restricted Suppliers.
Must comply with the Preferential Procurement Policy Framework Act and its regulations.
B-BBEE: Specific goals apply – see evaluation criteria for points. Bidders claiming specific goals must provide supporting documentation.
Must comply with the General Conditions of Contract issued by National Treasury.
Must comply with the ARC supply chain management code of conduct.
Must complete SBD 6.1 (Preference Points Claim Form) and SBD 4 (Bidder's Disclosure).
B-BBEE Requirements
Source: RFQ VIM01REQ007095.pdf (RFQ)
Specific goals and points (80/20 system):
Ownership by HDIs (51%+): 6 points
Ownership by Women (51%+): 4 points
Ownership by Youth (51%+): 4 points
Ownership by PwD (51%+): 2 points
BEE Status Level 1-4: 2 points
RDP Goals – Promotion of SMMEs: 2 points
Bidders must complete SBD 6.1 (Preference Points Claim Form) and provide supporting documentation.
Failure to submit proof means no preference points are awarded.
False claims may lead to disqualification, cancellation of contract, and legal action.
Health & Safety
Source: RFQ VIM01REQ007095.pdf
No specific health and safety requirements are stated in the document. However, bidders must comply with all applicable laws and regulations during execution.
Bidders must ensure safe installation and operation of the pumping system.
Contractual Terms
Source: RFQ VIM01REQ007095.pdf
General Conditions of Contract issued by National Treasury apply.
ARC supply chain management code of conduct applies.
Special Conditions
Source: RFQ VIM01REQ007095.pdf (RFQ)
ARC reserves the right to do due diligence on quotations.
ARC reserves the right to benchmark prices quoted.
The organ of state may require substantiation of preference claims at any time.
Requirements
Source: RFQ VIM01REQ007095.pdf (RFQ)
The quotation must indicate the delivery date.
Section
Source: RFQ VIM01REQ007095.pdf
Evaluation uses the 80/20 preference point system (price 80 points, specific goals 20 points).
Only bidders claiming specific goals are scored on the 20 points.
Specific goals points (80/20 system):
Ownership by HDIs (51%+): 6
Ownership by Women (51%+): 4
Ownership by Youth (51%+): 4
Ownership by PwD (51%+): 2
BEE Status Level 1-4: 2
Promotion of SMMEs: 2
Total points = 100.
The lowest acceptable price scores 80 points.
Bidders must submit proof to claim specific goals; otherwise no points awarded.
The ARC may require substantiation of claims at any time.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
1134 Park St, Hatfield, Pretoria, 0083, South Africa
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
03 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.