Toggle Global Chat
Contract Awarded This tender has been awarded to DIOPOINT for R 540 785 78.
All Tenders Awarded Award Details Other Professional, Scientific and Technical Activities
Request for quotation (RFQ) for the supply, installation, configuration, and commissioning of a complete video conferencing solutions to the csir. Issuing Organization
Council for Scientific and Industrial Research (CSIR)
Awarding Entity
Council for Scientific and Industrial Research (CSIR)
Award Value
R 540 785 78
Awarded: 16 April 2026
Council for Scientific and Industrial Research (CSIR) GOVERNMENT
Stellenbosch Central, Stellenbosch, 7600, South Africa Winning History (5) Bidding History (5)
View Supplier Intelligence Get a full report on DIOPOINT including tender win history, total contract values, and bidding patterns.
Request for quotation (RFQ) for the supply, installation, configuration, and commissioning of a complete video conferencing solutions to the csir.
Tender source analysis
What the tender required and what the award supports Source material and existing AI analysis appear first. Supplier conclusions remain qualified by the evidence Tenders-SA holds.
The csir is inviting quotations for the supply, installation, configuration and commissioning of a complete, fully offline video‑conferencing solution for two boardrooms in pretoria and stellenbosch. Suppliers must provide a turnkey system that operates on an internal LAN with NO internet or cloud connectivity and submit their bids electronically by 18 february 2026.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: RFQ No. 6657-18-02-2026.pdf . You don’t need to refresh — this page will pick up the updated review automatically.
Document RFQ No. 6657-18-02-2026.pdf Compliance review in progress 1 Inferred operational need
video conferencing solution for two boardrooms at CSIR Pretoria and Stellenbosch Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
An award confirms appointment. It does not prove why a supplier was selected, that every qualification remains current, or that delivery was completed successfully.
Continue exploring related tenders Follow the links below to explore this tender context.
SA Tenders Awards Request for Quotation (RFQ) For the Supply, Installation, Configuration, and Commissioning of a Complete Video Conferencing Solutions to the CSIR.
Tender context Return to this tender’s issuing organisation, province, or category.
Related opportunities Continue with tenders sharing this issuer, category, or province.
Active provinces Compare tender activity across provinces.
Active buying organisations Explore organisations currently publishing tenders.
Intelligence and resources Tools and research to help you assess opportunities.
Explore this section SA Tenders Awards Request for Quotation (RFQ) For the Supply, Installation, Configuration, and Commissioning of a Complete Video Conferencing Solutions to the CSIR.
Tender context Return to this tender’s issuing organisation, province, or category.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Important Dates
Source: RFQ No. 6657-18-02-2026.pdf
Issue date: 04 February 2026
Enquiries/clarifications deadline: 18 February 2026
Closing date and time: 18 February 2026 at 16:30 (late submissions will not be accepted)
RFQ validity period: 90 calendar days from the closing date
Contact Information
Source: RFQ No. 6657-18-02-2026.pdf Email: [email protected] (use RFQ number and description in the subject). No phone or physical address is provided in the extracted text.
Submission Guidelines
Source: RFQ No. 6657-18-02-2026.pdf
Submit the quotation electronically to [email protected] ; use the RFQ number 6657/18/02/2026 and the description as the email subject.
Email size must not exceed 25 MB; if larger, split into multiple emails.
Do NOT use cloud‑storage links (WeTransfer, Google Drive, Dropbox, etc.).
All required returnable documents (Annexures C‑F, Pricing Schedule, technical design overview, equipment datasheets, offline‑operation confirmation letter) must be completed, signed and attached.
Late submissions or submissions to the wrong email address will be rejected.
Failure to provide any mandatory returnable document (Table 2) results in disqualification.
Ensure the quotation is on company letterhead and aligns to the Pricing Schedule (Annexure B).
The CSIR may extend the closing date, correct errors, request additional documentation, or cancel the process at any time.
Evaluation Criteria
Source: RFQ No. 6657-18-02-2026.pdf Phase 1 – Elimination Criteria: any bidder that submits late, uses the wrong submission address, is listed on the NT restricted‑supplier or tender‑defaulter registers, fails to provide all mandatory returnable documents, or does not meet the technical specification is eliminated and will not be scored further.
Phase 2 – Price and Preference Points: remaining bidders are scored on an 80/20 system (80 points for price, 20 points for preference points as per Annexure E). Preference points are awarded for black‑ownership (up to 20 points) and any other specific goals defined in the tender. The lowest acceptable price (P min) is used to calculate price points.
Disqualification can also occur if the bidder does not meet the specification requirements.
Technical Specifications
Source: RFQ No. 6657-18-02-2026.pdf Scope: Supply, installation, configuration and commissioning of a complete video‑conferencing solution for two boardrooms (one at CSIR Pretoria, one at CSIR Stellenbosch).
Key requirements:
Fully offline solution – no internet or cloud services; all traffic must stay on the internal LAN.
SIP and/or H.323 IP‑to‑IP calling, point‑to‑point between the two boardrooms only.
Enterprise‑grade codecs, professional PTZ cameras, table‑mounted microphones, room‑wide speakers.
Support for a dedicated Windows desktop per boardroom, HDMI (or equivalent) local input, on‑premise control software and touch controller.
All components must be locally supported in South Africa and be enterprise‑grade.
Deliverables: technical design overview, equipment datasheets, confirmation letter stating full offline operation, installation and commissioning services at both sites.
Standards: solution must operate in a 100 % air‑gapped environment; no external internet connectivity.
Financial Requirements
Source: RFQ No. 6657-18-02-2026.pdf
Prices must be quoted in South African Rand, inclusive of all taxes and any applicable discounts.
Include all costs (freight, insurance to acceptance, duties, etc.) in the quoted price.
Indicate any escalation or exchange‑rate elements and the rate of exchange used.
Use the Pricing Schedule (Annexure B) – submit a completed schedule and any explanatory notes for deviations.
Payment will be made according to CSIR Payment Terms and Conditions (not detailed in the extract).
No performance bond or guarantee is explicitly mentioned; bidders should be prepared to provide any such documents if requested during the due‑diligence stage.
Compliance Requirements
Source: RFQ No. 6657-18-02-2026.pdf
Register on the Central Supplier Database (CSD); the CSIR will verify tax compliance via CSD.
Provide a valid Tax Compliance Status (TCS) PIN or Tax Clearance Certificate (SARS) with the bid.
Submit proof of B‑BBEE black‑ownership if claiming preference points (valid SANAS‑accredited certificate required).
All bidders must be compliant with the Preferential Procurement Regulations 2022 and the PPPFA.
No persons employed by the state or entities on the restricted‑supplier/tender‑defaulter lists may participate.
Complete and sign Annexure F (Mutual Non‑Disclosure Agreement).
Ensure compliance with POPI Act for any personal information exchanged.
Supported inference
The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
2 Inferred operational need
BID RESPONSE DOCUMENTS MAY BE DEPOSITED IN THE BID BOX SITUATED AT (STREET ADDRESS) Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
3 Inferred operational need
The CSIR requires that all tender submissions be submitted electronically to [email protected] . Should tender file size Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
Qualified inference
Supported inference The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
4 Inferred operational need
exceed 25MB, bidders submit tender in multiple emails. Use the tender number 6657/18/02/2026 and description of the Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
5 Inferred operational need
tender as the subject on your email. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
6 Inferred operational need
BIDDING PROCEDURE ENQUIRIES MAY BE DIRECTED Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
7 Inferred operational need
TO TECHNICAL ENQUIRIES MAY BE DIRECTED TO: Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
8 Inferred operational need
CONTACT PERSON SCM CONTACT PERSON SCM Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
9 Inferred operational need
TELEPHONE Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
10 Inferred operational need
NUMBER TELEPHONE NUMBER Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
11 Inferred operational need
FACSIMILE NUMBER FACSIMILE NUMBER Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
12 Inferred operational need
Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
Qualified inference
Supported inference The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
13 Inferred operational need
SUPPLIER INFORMATION Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
14 Inferred operational need
NAME OF BIDDER Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
15 Inferred operational need
POSTAL ADDRESS Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
16 Inferred operational need
STREET ADDRESS Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
17 Inferred operational need
NUMBER CODE NUMBER Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
18 Inferred operational need
CELLPHONE Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
19 Inferred operational need
NUMBER Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
20 Inferred operational need
FACSIMILE Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
21 Inferred operational need
E-MAIL ADDRESS Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
22 Inferred operational need
VAT REGISTRATION Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
Qualified inference
Supported inference The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
23 Inferred operational need
SUPPLIER TAX CENTRAL Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
24 Inferred operational need
COMPLIANCE COMPLIANCE SUPPLIER Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
25 Inferred operational need
OR Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
26 Inferred operational need
STATUS SYSTEM PIN: DATABASE Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
27 Inferred operational need
No: MAAA Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
28 Inferred operational need
1 ARE YOU Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
29 Inferred operational need
2 ARE YOU A Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
30 Inferred operational need
THE ACCREDITED Yes No Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
31 Inferred operational need
FOREIGN BASED Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
32 Inferred operational need
REPRESENTATIVE Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
33 Inferred operational need
SUPPLIER FOR THE Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
34 Inferred operational need
IN SOUTH AFRICA Yes No [IF YES, ANSWER THE Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
35 Inferred operational need
GOODS /SERVICES Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
Qualified inference
Supported inference The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
36 Inferred operational need
FOR THE GOODS QUESTIONNAIRE Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
Qualified inference
Supported inference The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
37 Inferred operational need
/WORKS OFFERED? Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
38 Inferred operational need
/SERVICES /WORKS [IF YES ENCLOSE PROOF] BELOW] Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
39 Inferred operational need
OFFERED? Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
40 Inferred operational need
QUESTIONNAIRE TO BIDDING FOREIGN SUPPLIERS Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
41 Inferred operational need
IS THE ENTITY A RESIDENT OF THE REPUBLIC OF SOUTH AFRICA (RSA)? YES NO Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
42 Inferred operational need
DOES THE ENTITY HAVE A BRANCH IN THE RSA? YES NO Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
43 Inferred operational need
RFQ No. 6657/18/02/2026 Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
44 Inferred operational need
This is not a Purchase Order. of 27 Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
Qualified inference
Supported inference The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
45 Inferred operational need
CSIR Tender Documentation Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
Qualified inference
Supported inference The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
46 Inferred operational need
DOES THE ENTITY HAVE A PERMANENT ESTABLISHMENT IN THE RSA? YES NO Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
47 Inferred operational need
DOES THE ENTITY HAVE ANY SOURCE OF INCOME IN THE RSA? YES NO Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
48 Inferred operational need
IS THE ENTITY LIABLE IN THE RSA FOR ANY FORM OF TAXATION? YES NO Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
49 Inferred operational need
IF THE ANSWER IS “NO” TO ALL OF THE ABOVE, THEN IT IS NOT A REQUIREMENT TO REGISTER FOR A TAX Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
50 Inferred operational need
COMPLIANCE STATUS SYSTEM PIN CODE FROM THE SOUTH AFRICAN REVENUE SERVICE (SARS) AND IF NOT Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
Qualified inference
Supported inference The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
51 Inferred operational need
REGISTER AS PER 2.3 BELOW. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
52 Inferred operational need
PART B: TERMS AND CONDITIONS FOR BIDDING Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
53 Inferred operational need
1. BID SUBMISSION: Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
54 Mandatory requirement
1.1. BIDS MUST BE DELIVERED BY THE STIPULATED TIME TO THE CORRECT ADDRESS. LATE BIDS WILL NOT BE Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
55 Inferred operational need
ACCEPTED FOR CONSIDERATION. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
56 Mandatory requirement
1.2. ALL BIDS MUST BE SUBMITTED ON THE OFFICIAL FORMS PROVIDED–(NOT TO BE RE-TYPED) OR IN THE Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
57 Inferred operational need
MANNER PRESCRIBED IN THE BID DOCUMENT. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
58 Inferred operational need
1.3. THIS BID IS SUBJECT TO THE PREFERENTIAL PROCUREMENT POLICY FRAMEWORK ACT, 2000 AND THE Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
59 Inferred operational need
PREFERENTIAL PROCUREMENT REGULATIONS, 2022, THE GENERAL CONDITIONS OF CONTRACT (GCC) Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
60 Inferred operational need
AND, IF APPLICABLE, ANY OTHER SPECIAL CONDITIONS OF CONTRACT. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
61 Delivery obligation
1.4. THE SUCCESSFUL BIDDER WILL BE REQUIRED TO FILL IN AND SIGN A WRITTEN CONTRACT FORM (SBD7). Why it matters: The source says this applies after appointment and concerns contract delivery.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
62 Inferred operational need
2. TAX COMPLIANCE REQUIREMENTS Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
63 Mandatory requirement
2.1 BIDDERS MUST ENSURE COMPLIANCE WITH THEIR TAX OBLIGATIONS. Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
64 Mandatory requirement
2.2 BIDDERS ARE REQUIRED TO SUBMIT THEIR UNIQUE PERSONAL IDENTIFICATION NUMBER (PIN) ISSUED BY SARS TO Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
65 Inferred operational need
ENABLE THE ORGAN OF STATE TO VERIFY THE TAXPAYER’S PROFILE AND TAX STATUS. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
66 Inferred operational need
2.3 APPLICATION FOR TAX COMPLIANCE STATUS (TCS) PIN MAY BE MADE VIA E-FILING THROUGH THE SARS WEBSITE Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
67 Inferred operational need
WWW.SARS.GOV.ZA. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
68 Inferred operational need
2.4 BIDDERS MAY ALSO SUBMIT A PRINTED TCS CERTIFICATE TOGETHER WITH THE BID. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
69 Mandatory requirement
2.5 IN BIDS WHERE CONSORTIA / JOINT VENTURES / SUB-CONTRACTORS ARE INVOLVED, EACH PARTY MUST SUBMIT A Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
70 Inferred operational need
SEPARATE TCS CERTIFICATE / PIN / CSD NUMBER. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
71 Inferred operational need
2.6 WHERE NO TCS PIN IS AVAILABLE BUT THE BIDDER IS REGISTERED ON THE CENTRAL SUPPLIER DATABASE (CSD), A Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
72 Mandatory requirement
CSD NUMBER MUST BE PROVIDED. Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
73 Inferred operational need
2.7 NO BIDS WILL BE CONSIDERED FROM PERSONS IN THE SERVICE OF THE STATE, COMPANIES WITH DIRECTORS WHO Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
Qualified inference
Supported inference The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
74 Inferred operational need
ARE PERSONS IN THE SERVICE OF THE STATE, OR CLOSE CORPORATIONS WITH MEMBERS PERSONS IN THE SERVICE Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
Qualified inference
Supported inference The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
75 Inferred operational need
OF THE STATE.” Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
76 Inferred operational need
NB: FAILURE TO PROVIDE / OR COMPLY WITH ANY OF THE ABOVE PARTICULARS MAY RENDER Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
77 Inferred operational need
THE BID INVALID. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
78 Inferred operational need
SIGNATURE OF BIDDER: Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
79 Inferred operational need
................................................... Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
80 Inferred operational need
CAPACITY UNDER WHICH THIS BID IS SIGNED: Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
81 Mandatory requirement
(Proof of authority must be submitted e.g. company resolution) Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
82 Inferred operational need
DATE: Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
83 Inferred operational need
Annexure D Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
84 Inferred operational need
Standard Bidding Document (SBD) 4 Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
85 Inferred operational need
BIDDER’S DISCLOSURE Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
86 Inferred operational need
1. PURPOSE OF THE FORM Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
87 Inferred operational need
Any person (natural or juristic) may make an offer or offers in terms of this Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
88 Inferred operational need
invitation to bid. In line with the principles of transparency, accountability, Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
89 Inferred operational need
impartiality, and ethics as enshrined in the Constitution of the Republic of Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
90 Inferred operational need
South Africa and further expressed in various pieces of legislation, it is Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
91 Mandatory requirement
required for the bidder to make this declaration in respect of the details Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
92 Mandatory requirement
required hereunder. Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
93 Inferred operational need
Where a person/s are listed in the Register for Tender Defaulters and / or the Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
94 Inferred operational need
List of Restricted Suppliers, that person will automatically be disqualified from Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
95 Inferred operational need
the bid process. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
96 Inferred operational need
2. Bidder’s declaration Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
97 Inferred operational need
2.1 Is the bidder, or any of its directors / trustees / shareholders / members / Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
98 Inferred operational need
partners or any person having a controlling interest1 in the enterprise, Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
99 Inferred operational need
employed by the state? YES /NO Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
100 Inferred operational need
2.1.1 If so, furnish particulars of the names, individual identity numbers, and, if Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
101 Inferred operational need
applicable, state employee numbers of sole proprietor/ directors / trustees / Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
102 Inferred operational need
shareholders / members/ partners or any person having a controlling interest Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
103 Inferred operational need
in the enterprise, in table below. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
104 Inferred operational need
Full Name Identity Number Name of State Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
105 Inferred operational need
institution Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
106 Inferred operational need
2.2 Do you, or any person connected with the bidder, have a relationship with any Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
107 Inferred operational need
person who is employed by the procuring institution? YES /NO Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
108 Inferred operational need
1 the power, by one person or a group of persons holding the majority of the equity of an Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
109 Inferred operational need
enterprise, alternatively, the person/s having the deciding vote or power to influence or to Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
110 Inferred operational need
direct the course and decisions of the enterprise. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
111 Inferred operational need
2.2.1 If so, furnish particulars: Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
112 Inferred operational need
2.3 Does the bidder or any of its directors / trustees / shareholders / members / Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
113 Inferred operational need
partners or any person having a controlling interest in the enterprise have any Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
114 Inferred operational need
interest in any other related enterprise whether or not they are bidding for this Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
Qualified inference
Supported inference The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
115 Inferred operational need
contract? YES /NO Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
116 Inferred operational need
2.3.1 If so, furnish particulars: Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
117 Mandatory requirement
No specific requirements found Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
118 Inferred operational need
Deliver a fully offline video‑conferencing system (no internet/cloud, LAN‑only, SIP/H.323 IP‑to‑IP calling) for two CSIR boardrooms. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Source: AI key requirements · requirements
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
Qualified inference
Supported inference The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
119 Inferred operational need
Provide enterprise‑grade hardware (codec, PTZ camera, table microphones, speakers) and on‑premise control software with HDMI input and touch controller. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Source: AI key requirements · requirements
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
120 Inferred operational need
Submit a complete quotation on company letterhead using the Pricing Schedule (Annexure B), including all costs, taxes and any escalation rates, in ZAR. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Source: AI key requirements · requirements
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
121 Mandatory requirement
Attach all mandatory returnable documents (Annexures C‑F, technical design overview, equipment datasheets, offline‑operation confirmation letter) by the 16:30 deadline on 18 February 2026. Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
No source document identifier is stored for this item.
Source: AI key requirements · requirements
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
122 Inferred operational need
Be registered on the Central Supplier Database, provide a valid Tax Compliance Status PIN or SARS clearance, and comply with B‑BBEE preference point requirements if claiming points. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Source: AI key requirements · requirements
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
123 Inferred operational need
Meet the elimination criteria: on‑time electronic submission to the correct email, no listing on restricted‑supplier or tender‑defaulter registers, and full compliance with the technical specifications. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Source: AI key requirements · requirements
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
124 Inferred operational need
Submit the quotation electronically to [email protected] ; use the RFQ number 6657/18/02/2026 and the description as the email subject. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
Qualified inference
Supported inference The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
125 Mandatory requirement
Email size must not exceed 25 MB; if larger, split into multiple emails. Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
126 Inferred operational need
Do NOT use cloud‑storage links (WeTransfer, Google Drive, Dropbox, etc.). Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
127 Mandatory requirement
All required returnable documents (Annexures C‑F, Pricing Schedule, technical design overview, equipment datasheets, offline‑operation confirmation letter) must be completed, signed and attached. Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
128 Inferred operational need
Late submissions or submissions to the wrong email address will be rejected. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
129 Mandatory requirement
Failure to provide any mandatory returnable document (Table 2) results in disqualification. Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
130 Inferred operational need
Ensure the quotation is on company letterhead and aligns to the Pricing Schedule (Annexure B). Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
131 Inferred operational need
The CSIR may extend the closing date, correct errors, request additional documentation, or cancel the process at any time. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
Qualified inference
Supported inference The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
132 Mandatory requirement Conflicting classification
Phase 1 – Elimination Criteria: any bidder that submits late, uses the wrong submission address, is listed on the NT restricted‑supplier or tender‑defaulter registers, fails to provide all mandatory returnable documents, or does not meet the technical specification is eliminated and will not be scored further. Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Conflicting evidence The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
Relevant records disagree; review the cited sources and dates.
133 Scored criterion
Phase 2 – Price and Preference Points: remaining bidders are scored on an 80/20 system (80 points for price, 20 points for preference points as per Annexure E). Preference points are awarded for black‑ownership (up to 20 points) and any other specific goals defined in the tender. The lowest acceptable price (P min) is used to calculate price points. Threshold: 80 points
Why it matters: The source places this item in the evaluation criteria; the recorded weight or threshold is shown when available.
No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
134 Scored criterion
Disqualification can also occur if the bidder does not meet the specification requirements. Why it matters: The source places this item in the evaluation criteria; the recorded weight or threshold is shown when available.
No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
135 Inferred operational need
Scope: Supply, installation, configuration and commissioning of a complete video‑conferencing solution for two boardrooms (one at CSIR Pretoria, one at CSIR Stellenbosch). Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
Qualified inference
Supported inference The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
136 Inferred operational need
Key requirements: Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
137 Mandatory requirement
Fully offline solution – no internet or cloud services; all traffic must stay on the internal LAN. Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
138 Inferred operational need
SIP and/or H.323 IP‑to‑IP calling, point‑to‑point between the two boardrooms only. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
139 Inferred operational need
Enterprise‑grade codecs, professional PTZ cameras, table‑mounted microphones, room‑wide speakers. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
140 Inferred operational need
Support for a dedicated Windows desktop per boardroom, HDMI (or equivalent) local input, on‑premise control software and touch controller. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
141 Mandatory requirement
All components must be locally supported in South Africa and be enterprise‑grade. Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
142 Inferred operational need
Deliverables: technical design overview, equipment datasheets, confirmation letter stating full offline operation, installation and commissioning services at both sites. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
143 Mandatory requirement
Standards: solution must operate in a 100 % air‑gapped environment; no external internet connectivity. Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
144 Mandatory requirement
Prices must be quoted in South African Rand, inclusive of all taxes and any applicable discounts. Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
145 Inferred operational need
Include all costs (freight, insurance to acceptance, duties, etc.) in the quoted price. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
146 Inferred operational need
Indicate any escalation or exchange‑rate elements and the rate of exchange used. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
147 Inferred operational need
Use the Pricing Schedule (Annexure B) – submit a completed schedule and any explanatory notes for deviations. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
148 Inferred operational need
Payment will be made according to CSIR Payment Terms and Conditions (not detailed in the extract). Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
Qualified inference
Supported inference The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
149 Inferred operational need
No performance bond or guarantee is explicitly mentioned; bidders should be prepared to provide any such documents if requested during the due‑diligence stage. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
150 Inferred operational need
Register on the Central Supplier Database (CSD); the CSIR will verify tax compliance via CSD. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for DIOPOINT.
Qualified inference
Supported inference The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
151 Inferred operational need
Provide a valid Tax Compliance Status (TCS) PIN or Tax Clearance Certificate (SARS) with the bid. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
152 Inferred operational need
Submit proof of B‑BBEE black‑ownership if claiming preference points (valid SANAS‑accredited certificate required). Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
153 Mandatory requirement
All bidders must be compliant with the Preferential Procurement Regulations 2022 and the PPPFA. Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
154 Inferred operational need
No persons employed by the state or entities on the restricted‑supplier/tender‑defaulter lists may participate. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
155 Inferred operational need
Complete and sign Annexure F (Mutual Non‑Disclosure Agreement). Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
156 Inferred operational need
Ensure compliance with POPI Act for any personal information exchanged. Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Known supplier evidence
The linked award records DIOPOINT as appointed for this tender.
Qualified inference
Inference only The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
1 x delegate to be trained on certified data analysis, POS9489B
KwaZulu-Natal
3
Passenger Rail Agency of South Africa (PRASA)
485
Supplier readiness
Council for Scientific and Industrial Research (CSIR)
Related opportunities Continue with tenders sharing this issuer, category, or province.
Active provinces Compare tender activity across provinces.
View all Active buying organisations Explore organisations currently publishing tenders.
View all Intelligence and resources Tools and research to help you assess opportunities.