166 K E Masinga Road (Formerly Old Fort Road) - Durban - KZN - 4001
Organization Type
GOVERNMENT
Published
28 May 2026
OCDS Reference
ocds-9t57fa-157340
Summary
This tender involves upgrading a 375m gravel track to a 3m concrete footpath in ward 41, ethekwini municipality, including earthworks, stormwater upgrades, kerbing, and retaining walls. IT requires strict adherence to comprehensive health and safety specifications, including mandatory appointments, coida compliance, and a detailed h&s plan.
Key Requirements
Submit a comprehensive Health & Safety (H&S) Plan including risk assessments, method statements, and traffic management strategy. - Appoint a full-time Construction Manager, SACPCMP-registered Construction Safety Officer, and Construction Supervisor(s) with written proof of competence. - Provide proof of COIDA compliance (Letter of Good Standing) and maintain it for the project duration. - Ensure financial provision in the tender for H&S costs (e.g., safety officer, medicals, PPE, training, dust mitigation). - Conduct periodic H&S audits (minimum every 30 days) and maintain records of inductions, toolbox talks, and inspections. - Display the construction work permit at the site entrance and notify the provincial director 7 days before excavation or high-risk work. - Comply with SANS standards for PPE, fire safety, electrical installations, and hazardous chemicals.
Review in progress · 2 of 4 documents being finalised
AI Document Analysis Stages
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: 36459-1R Tender Document.pdf, Drawing.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
Document36459-1R Tender Document.pdfCompliance review in progress
Important Dates
28 May
2026
PUBLICATION
Tender Published
Tender was published
12 Jun
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Tender for upgrading Intulo Walk in Ward 41, Kwa Mashu/Ntuzuma from gravel to concrete surface within a 5m wide road reserve, including ancillary works. Issued by Ethekwini Municipality, closing 12 June 2026.
The tender is for the upgrade of Intulo Walk in Ward 41, Ethekwini Metropolitan Municipality, KwaZulu-Natal, from a gravel track to a surfaced walkway. The scope includes site clearance, drainage installation (culverts and manholes), bulk earthworks, kerbing, and layerworks/surfacing with concrete multi-cell paving and precast concrete steps. The contract duration is indicated as 4 months, with a closing date of June 12, 2026.
36459-1R Health & Safety-Upgrading -gravel to surface of Intulo Walk CBP Blocksum.pdf
This is a Site-Specific Health and Safety Specification (CHSS) issued by the eThekwini Metropolitan Municipality for the upgrading of Intulo Walk from gravel to a surfaced concrete footpath in Ward 41. The document outlines the mandatory health and safety management framework that the appointed Principal Contractor must implement, as required by the Construction Regulations (2014). It details roles, responsibilities, plans, and procedures to ensure compliance with the Occupational Health and Safety Act throughout the project lifecycle.
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Based on 5 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Important Dates
Source: 36459-1R Tender Document.pdf (TENDER)
Compulsory Clarification Meeting: 02 June 2026 at 11h00
Location: Nkonka Road (Ward 41) off Impungushe Road, Kwa Mashu
GPS: 29° 44' 50" s 30° 57' 08" e
Clarification Q&A posted on eTenders/Municipal website: 09 June 2026
Tender Closing Date/Time: 12 June 2026 at 11h00 (hard copy and electronic submission)
Queries to Employer’s Agent: Submit at least 5 working days before closing date/time
eThekwini Municipality JDE System access (requires CSD and Supplier Portal registration)
CIDB registration: Grade 4 CE or higher (Civil Engineering)
Valid Tax Compliance Status PIN (at tender closing and before final award)
B-BBEE Certificate/Status (verified via CSD)
Municipal compliance:
No undisputed commitments for municipal services to any municipality
Municipal rates and taxes must not be in arrears at time of award
If in arrears, a formalised payment agreement must be in place at tender closing
Joint ventures:
Each JV member must submit separate Tax Compliance Status PINs
All single-entity documentation requirements apply to each JV member
JV Agreement or formal intention to establish JV must be submitted
Tender validity:
Tender must remain valid for 12 months from closing date
Municipality may request written confirmation of validity during this period
Preference system:
80/20 Price Preference Point System: 20 points allocated for B-BBEE status
Other:
CIDB B.U.I.L.D. Programme: Not applicable to this contract
Potentially Emerging (PE) status provisions do not apply
Complaints/objections require a non-refundable tariff (proof of payment must be attached)
Document36459-1R Health & Safety-Upgrading -gravel to surface of Intulo Walk CBP Blocksum.pdfReview complete
Description
Source: 36459-1R Health & Safety-Upgrading -gravel to surface of Intulo Walk CBP Blocksum.pdf
Project scope:
Upgrade a 375 m gravel road in Ward 41 to a 3 m concrete footpath.
Works include: site clearance, service relocation, concrete works, earthworks, drainage, stormwater upgrades, kerbing, retaining walls/gabions, traffic management, and full health-and-safety compliance.
Contact Information
Source: 36459-1R Health & Safety-Upgrading -gravel to surface of Intulo Walk CBP Blocksum.pdf (unknown)
Contact for Health & Safety queries:
Name: Siziwe Chiliza (Occupational Health & Safety Unit)
Department: eThekwini Municipality – Occupational Health & Safety Unit
Evaluation Criteria
Source: 36459-1R Health & Safety-Upgrading -gravel to surface of Intulo Walk CBP Blocksum.pdf (unknown)
To qualify, bidders must demonstrate:
Ability to appoint a SACPCMP-registered Construction Safety Officer.
Proof of COIDA compliance (Letter of Good Standing or equivalent).
Experience in developing and implementing Health and Safety Plans for roadwork projects.
Financial provision in the tender for all health and safety costs (e.g., safety officer, medicals, PPE, training).
Competent management and supervisory personnel with written appointments.
Submission and client approval of a Traffic Accommodation Strategy.
Quality and maintenance of health-and-safety signage.
Adherence to the H&S Plan, risk assessments, and audit findings.
Technical Specifications
Source: 36459-1R Health & Safety-Upgrading -gravel to surface of Intulo Walk CBP Blocksum.pdf (unknown)
Scope of work:
Upgrade 375 m of existing gravel road to a 3 m concrete footpath in Ward 41.
Required activities: Site clearance, service relocation, concrete works, earthworks, excavation, drainage, stormwater upgrades, kerbing, retaining walls/gabions.
Health & Safety requirements:
Submit a comprehensive H&S Plan covering: risk assessments, method statements, PPE, fire precautions, electrical safety, hazardous chemicals, flammable liquids, excavation shoring, public protection, employee facilities, housekeeping, and traffic management.
Mandatory appointments: Full-time Construction Manager, SACPCMP-registered Construction Safety Officer, Construction Supervisor(s).
Documentation: Proof of COIDA good standing, appointment letters, H&S File (work permit, COIDA letter, mandatory agreements, risk assessments, safe work procedures, inspection registers, incident registers, training records, emergency plan, traffic plan).
Monitoring: Periodic H&S audits (minimum every 30 days) with reports provided within 7 days.
Emergency & Contingency: Emergency response plan with local contact numbers, fire extinguishers, first-aid provisions.
Signage: Quality safety signage for traffic control, emergency numbers, PPE requirements, and fall-hazard warnings.
Environmental: Dust mitigation and stormwater management.
Experience & Qualifications
Source: 36459-1R Health & Safety-Upgrading -gravel to surface of Intulo Walk CBP Blocksum.pdf (unknown)
Key personnel requirements:
Construction Manager: Full-time competent person with demonstrated experience in managing similar road-upgrading projects.
Construction Supervisor(s): Appointed in writing; documented competence for specific work sections.
Construction Safety Officer: Registered with SACPCMP and possess relevant H&S experience.
All appointed personnel must provide appointment letters outlining duties and qualifications.
Compliance Requirements
Source: 36459-1R Health & Safety-Upgrading -gravel to surface of Intulo Walk CBP Blocksum.pdf (unknown)
Statutory and regulatory compliance:
COIDA: Current Letter of Good Standing (or equivalent) required before work commences; must remain updated for the project duration.
SACPCMP: Construction Safety Officer must be registered with the South African Council for the Project and Construction Management Professions.
CIPC: Principal Contractor must be a registered company with a valid tax clearance certificate.
B-BBEE: Minimum B-BBEE level 1 required.
Occupational Health & Safety Act 85/1993 and Construction Regulations 2014: Full compliance required.
SANS standards: PPE, fire safety, electrical installations, hazardous chemicals, and facilities must comply with relevant SANS standards.
Additional requirements:
Medical Certificate of Fitness (Annexure 3) for each worker.
Daily inspections of electrical installations; weekly inspections of temporary electrical installations by a competent person.
Notify the provincial director in writing at least 7 days before excavation, demolition, work at height, or use of explosives (Annexure 2 format).
Display the construction work permit conspicuously at the main site entrance.
Conduct regular health-and-safety inductions and toolbox talks; maintain records on site.
Prepare an Emergency Preparedness Plan with local emergency contact numbers.
Health & Safety
Source: 36459-1R Health & Safety-Upgrading -gravel to surface of Intulo Walk CBP Blocksum.pdf
Health & Safety obligations:
Provide a Medical Certificate of Fitness (Annexure 3) for each worker.
Conduct daily inspections of electrical installations; maintain a register of findings.
Ensure all temporary electrical installations are inspected weekly by a competent person.
Follow Electrical Installation Regulations (Reg 5, 6, 9) and Construction Regulations (Reg 5.1(b)).
Implement traffic accommodation responsibilities as per the Traffic Management Plan.
Maintain fire extinguishers (serviced per manufacturer recommendations) and display fire-safety signage.
Ensure all PPE complies with SANS standards and is used as per risk assessments.
Conduct regular health-and-safety inductions and toolbox talks; keep records on site.
Prepare an Emergency Preparedness Plan with local emergency contact numbers.
Contractual Terms
Source: 36459-1R Health & Safety-Upgrading -gravel to surface of Intulo Walk CBP Blocksum.pdf (unknown)
Contractual terms:
Contract duration: Complete the project as per the approved schedule (no specific end date stated).
Mandatory Agreements: Principal Contractor must enter into a Section 37(2) Mandatory Agreement with the Client; all subcontractors must also be covered.
Termination: Client may terminate for non-compliance with H&S requirements, failure to maintain COIDA good standing, or breach of mandatory agreements.
Penalties: Non-adherence to the H&S Plan, failure to provide required documentation, or unsafe work practices may result in penalties or disqualification.
Documentation: All H&S-related documents (work permit, COIDA letter, appointment letters, H&S File) must be kept on-site and available for inspection.
Handover: Submit a consolidated H&S File to the Business Unit for final close-out.
Requirements
Source: 36459-1R Health & Safety-Upgrading -gravel to surface of Intulo Walk CBP Blocksum.pdf (unknown)
Mandatory requirements:
Provide a current COIDA Letter of Good Standing (or equivalent) before work commences.
Notify the provincial director in writing at least 7 days before commencing excavation, demolition, work at height, or use of explosives (Annexure 2 format).
Display the construction work permit conspicuously at the main site entrance as required by the Department of Labour.
Section
Source: 36459-1R Health & Safety-Upgrading -gravel to surface of Intulo Walk CBP Blocksum.pdf
Evaluation focus areas:
Submission and client approval of Traffic Accommodation Strategy.
Quality and maintenance of health-and-safety signage.
Compliance with COIDA good-standing and SACPCMP registration.
Adherence to the H&S Plan, risk assessments, and audit findings.
DocumentDrawing.pdfCompliance review in progress
Submission Guidelines
Source: Drawing.pdf (unknown)
Returnable Documents:
Note: Document content is extremely limited. The source file (Drawing.pdf) contains no extractable text content. Bidders should obtain the complete tender documentation package from Ethekwini Metropolitan Municipality's official tender portal or SCM office to access full submission requirements, compulsory documentation list, and returnable/incomplete returnable schedules.
DocumentBOQ.pdfReview complete
Description
Source: BOQ.pdf
Project scope: Upgrade Intulo Walk (CBP) track from gravel to surface in Ward 41, eThekwini.
Key preliminary requirements:
Submit and implement a Health and Safety plan for 4 months.
Monitor and report on Environmental Management Plan (EMP) compliance for 4 months.
Submit a Full Contract Programme and all specified reports, including local labour reporting, for 4 months.
Conduct stakeholder management and liaison (COTO/CLO) for 4 months.
Survey and set out the works, including handling costs and profit for this item.
Evaluation Criteria
Source: BOQ.pdf (unknown)
No explicit scoring method or thresholds are provided. However, the following is implied:
Compliance with COLTO standard specifications (C-series clauses) is mandatory.
Bidders must demonstrate capacity to execute civil engineering works, including health and safety, environmental management, and stakeholder engagement over a 4-month period.
VAT registration is required if claiming VAT on the submission.
Technical Specifications
Source: BOQ.pdf (unknown)
Scope: Upgrade Intulo Walk (CBP) track from gravel to surface in Ward 41, eThekwini.
Key deliverables and requirements:
Health and Safety: Submit a Health and Safety plan (lump sum). Implement the plan for 4 months.
Environmental Management: Monitor and report on Environmental Management Plan (EMP) compliance for 4 months.
Programming and Reporting: Submit a Full Contract Programme (lump sum). Prepare and submit all specified reports, including local labour reporting, for 4 months.
Stakeholder Management: Conduct stakeholder management and liaison (COTO/CLO) for 4 months.
Surveying: Survey and set out the works (PC Sum R30,000). Include handling costs and profit for this sub-item.
Work sections:
Site Clearance: Clear 2000 m² using machines and hand labour.
Add VAT at 15% if a registered VAT vendor. Total carried to Form of Offer and Acceptance.
Financial Requirements
Source: BOQ.pdf (unknown)
Pricing must be submitted using the provided Bill of Quantities format. Key points:
Pricing includes lump sums, time-related rates (e.g., 4 months for H&S, EMP, reporting), and unit rates for materials and works.
VAT at 15% must be added if the bidder is a registered VAT vendor.
Total price is carried to the Form of Offer and Acceptance (C.1.1).
Handling costs and profit must be included where applicable (e.g., surveying).
All items in the Bill of Quantities must be priced, including preliminary, site clearance, drainage, earthworks, kerbing, layerworks, fill, pavement layers, and concrete works.
Compliance Requirements
Source: BOQ.pdf (unknown)
Explicit requirements:
Submit a Health and Safety plan.
Implement the Health and Safety plan for the duration of the project (4 months).
Monitor and report on compliance with the Environmental Management Plan (EMP) for 4 months.
Implied requirements:
Compliance with COLTO standard specifications (C-series clauses) and referenced standard drawings (e.g., 38571, 38572, 38576, 38577).
VAT registration if claiming VAT on the submission.
Capacity to execute civil engineering works, including stakeholder liaison, reporting, and local labour management.
Health & Safety
Source: BOQ.pdf
Submit a Health and Safety plan (lump sum item).
Implement the Health and Safety plan for the duration of the project (4 months).
Environmental
Source: BOQ.pdf
Monitor compliance with the Environmental Management Plan (EMP).
Report on EMP compliance for the duration of the project (4 months).
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Prevention and Combating of Corrupt Activities Act (PRECCA)
Act 12 of 2004
high
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Public Procurement Act, 2024 (PPA)
Act 28 of 2024
high
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Promotion of Access to Information Act (PAIA)
Act 2 of 2000
medium
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Promotion of Administrative Justice Act (PAJA)
Act 3 of 2000
medium
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
166 K E Masinga Road (Formerly Old Fort Road) - Durban - KZN - 4001
Document-Backed
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
26 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.