ESKOM is seeking suppliers for the supply and delivery of capacitive graded transformer bushings. This tender is part of eskom's commitment to socio-economic transformation, requiring bidders to demonstrate local content, skills development, job creation, and b-bbee improvement plans. Suppliers must commit to south african localization targets and supplier development obligations as eligibility requirements.
Key Requirements
Local Content: 100% South African content target required; SDL&I proposals must be submitted for bid eligibility
B-BBEE Compliance: Submit Improvement or Retention Plan with bid; Level 5-8 or non-compliant bidders must achieve Level 4 by end of first contract year, improving at least one level annually thereafter
Skills Development: Provide R60,000 bursary per Eskom-assigned beneficiary at a South African university for every R4.8 million invoiced, due within one month of reaching threshold
Job Creation: At least 50% of semi-skilled and 100% of unskilled labour must be sourced from the local municipality where the service is consumed
Socio-Economic Development: Spend 0.1% of invoiced amount on CSI initiatives for black communities as identified by Eskom
Penalties: 2.5% penalty on invoiced amount for non-compliance with any SDL&I obligations, including B-BBEE milestone failures or status drops post-award
Reporting: Submit quarterly SDL&I compliance reports to Eskom; complete and return SDL&I implementation schedule before contract award
Review in progress · 1 of 18 document being finalised
AI Document Analysis Stages
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: 240-109253302 (Rev 2) - Quality Control Plan or Inspection Test Plan (QCP or ITP) - Template.docx. You don’t need to refresh — this page will pick up the updated review automatically.
DocumentSpecifications for Power transformers ST_240-68973110 specification Rev 3 TC signed.pdfReview complete
Important Dates
12 Jun
2026
PUBLICATION
Tender Published
Tender was published
03 Jul
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
10 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Eskom tender for supply and delivery of capacitive graded bushings, with technical evaluation based on company profile, Eskom approval documentation, method statement, and drawings. Minimum technical score threshold is 80%.
Eskom is inviting tenders for the supply and delivery of capacitive graded bushings (oil-to-air, dry type) for power transformers and shunt reactors over a four-year period. The components must meet Eskom's specifications (240-56062799 rev.4) and have a lifespan of 35-40 years, matching the transformers. Deliveries will be on an as-needed basis to Rosherville, Gauteng, with technical support included. Compliance with IEC, BS EN standards, and Eskom safety/procedural requirements is mandatory.
240- 68099512 (Rev 9) - Form A Tender & Contract Quality Requirements for 240-105658000 and Quality Requirements for ISO 9001 Standard.pdf
Eskom tender for the supply and delivery of oil to air capacitive bushings over a four-year period. The tender emphasizes quality management compliance with ISO 9001 standards and includes pre- and post-contract award quality requirements.
Specifications for Power transformers ST_240-68973110 specification Rev 3 TC signed.pdf
The tender is for the supply and delivery of capacitive graded bushings for power transformers rated for 1.25MVA and above, with a highest voltage of 2.2kV or above, issued by ESKOM in Gauteng. The document outlines comprehensive technical specifications, compliance standards, and quality assurance requirements for transformers, including design, materials, testing, and maintenance. The closing date is July 3, 2026.
ESKOM Technical Specification 240-56062799 Rev 4 for the supply and delivery of capacitance-graded bushings for power transformers and shunt reactors. This specification covers oil to air capacitance graded bushings from 33 kV system voltage and above for new transformers, shunt reactors, and strategic spares. The specification mandates dry type condenser bushings with paperless technology preferred. Bushings must comply with IEC 60137 and other referenced standards, with testing witnessed by Eskom/NTCSA. Closing date is July 3, 2026 at 10:00 AM UTC.
Tender for the supply and delivery of capacitive graded bushings by ESKOM in Gauteng, requiring compliance with specific quality management specifications and ISO9001 standards.
32-136 Contractor Health and Safety Requirements.pdf
This is Eskom's standard Contractor Health and Safety Requirements document (Revision 4), not the complete tender for 'Supply and delivery of capacitive graded bushings'. It defines the mandatory health, safety, and environmental (SHE) management system that all contractors, suppliers, and service providers must implement when working for Eskom. The core objective is 'Zero Harm'. The document outlines comprehensive roles, responsibilities, and specific procedural requirements across 46 key SHE areas.
ITT Supply and delivery of Capacitive Bushings.pdf
Eskom Holdings SOC Ltd invites tenders for the supply and delivery of capacitive graded transformer bushings for a period of 4 years. The contract covers oil-to-air bushings for power transformers and shunt reactors, with technical support included. The tender closes on 03 July 2026 at 10:00 AM UTC, with a validity period of 120 days post-closing. Submissions must be electronic via Eskom’s e-tendering portal.
240-108987034 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work) - Copy.docx
Eskom tender for supply and delivery of capacitive graded bushings in Gauteng, closing July 2026. The evaluation focuses heavily on environmental and SHE (Safety, Health, Environment) compliance, with requirements varying by risk category (low, medium, high).
Eskom (Gauteng) tender for supply and delivery of capacitive graded bushings. The document focuses on Occupational Health and Safety (OHS) compliance requirements, with two alternative submission paths depending on the supplier's OHS certification status.
This is Eskom's Supplier Quality Management Specification document (240-105658000, Revision 3) that outlines mandatory quality requirements for all suppliers. It is not the specific tender for capacitive graded bushings but the overarching quality framework that will apply to that tender. The document mandates that suppliers must have a Quality Management System (QMS) conforming to ISO 9001, with requirements categorized into four levels (Category 1-4) based on the tender's scope and criticality. Compliance with this specification is a condition for bidding on and executing Eskom contracts.
240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf
Eskom tender for supply and delivery of capacitive graded bushings in Gauteng, with a closing date of July 3, 2026. The document focuses primarily on Safety, Health, and Environment (SHE) compliance requirements for contractors and suppliers.
Template for NEC3 Supply Contract Supply of Capacitive Bushings.pdf
Eskom Holdings SOC Ltd is inviting tenders for the supply and delivery of capacitive graded bushings for power transformers and shunt reactors over a 4-year period. The contract is based on the NEC3 Supply Contract (SC3) framework, with delivery to Eskom's premises in Rosherville, Gauteng. The bushings must meet Eskom's technical specifications, including a lifespan of 35-40 years, compliance with IEC standards, and suitability for coastal/chemical environments. The tender closes on July 3, 2026.
240-109253698 (Rev 3) - Contract Quality Plan (QCP) - Template.docx
This tender document is a Contract Quality Plan template for suppliers bidding to supply and deliver capacitive graded bushings to Eskom in Gauteng. The document outlines a comprehensive quality management framework that suppliers must follow, referencing SANS 466:2005/ISO 10005:2005. It requires detailed planning across 20 key areas including scope definition, communication protocols, supplier management, documentation control, and post-delivery activities. The closing date is July 3, 2026.
240-12248652 (Rev 7) - List of Tender Returnables.pdf
Eskom tender for supply and delivery of oil to air capacitive bushings for four years, requiring comprehensive quality management system documentation and compliance with ISO standards.
240-109253302 (Rev 2) - Quality Control Plan or Inspection Test Plan (QCP or ITP) - Template.docx
Eskom tender for supply and delivery of capacitive graded bushings in Gauteng, with a closing date of July 3, 2026. The document outlines a Quality Control Plan (QCP) framework requiring detailed inspection, testing, and approval processes.
Eskom tender for supply and delivery of capacitive graded transformer bushings in Gauteng, with strong emphasis on supplier development, localisation, and socio-economic transformation. The tender includes mandatory commitments to B-BBEE improvement, skills development, job creation, and local content.
Eskom Gauteng tender for supply and delivery of capacitive graded bushings with submission deadline of July 3, 2026. The tender involves procurement of specialized electrical components for power transmission applications.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Description
Source: Specifications for Power transformers ST_240-68973110 specification Rev 3 TC signed.pdf
Purpose: This specification defines requirements for all new oil-filled power transformers procured by/for Eskom, rated above 1.25 MVA with highest voltage winding at or above 2.2 kV.
Objectives: Ensure transformers are fit for purpose and reliable for an expected service life beyond 40 years. Achieve optimized standardization for interchangeability across Eskom. Support low-maintenance, maintenance-free technologies. Reduce carbon footprint, ensure zero harm to people and the environment, and support Business Productivity Program (BPP) initiatives. Minimize total cost of ownership.
Scope: Applies to transformers used in Generation (Gx), Transmission (Tx), and Distribution (Dx) Operating Units. Not primarily intended for shunt reactors, HVDC converter transformers, or smoothing reactors, but may be referenced.
Applicability: Mandatory for all contractors tendering to supply transformers to Eskom Holdings Limited Divisions.
Contact Information
Source: Specifications for Power transformers ST_240-68973110 specification Rev 3 TC signed.pdf (unknown)
Source: Specifications for Power transformers ST_240-68973110 specification Rev 3 TC signed.pdf (unknown)
General: Applicants must be registered suppliers with proven experience in manufacturing/supplying power transformers and bushings for utilities. Compliance with Eskom’s vendor pre-qualification requirements (if applicable). Ability to meet technical specifications and delivery timelines.
Technical: Demonstrated track record of transformer reliability (e.g., low failure rates, ≥40-year service life). Experience with capacitive graded bushings and related technologies (e.g., composite materials, vacuum tap-changers). Certification to ISO 9001 and other relevant standards.
Financial: Financial stability to fulfill large-scale orders. Ability to provide performance guarantees and warranties.
Local: Preference may be given to applicants offering local support (e.g., maintenance, training) in South Africa. Compliance with Eskom’s Broad-Based Black Economic Empowerment (B-BBEE) policies (if applicable).
Quality Assurance: Referenced in the specification, but no detailed criteria or scoring method provided.
Loss Evaluation: Referenced in the specification, but no detailed criteria or scoring method provided.
Technical Specifications
Source: Specifications for Power transformers ST_240-68973110 specification Rev 3 TC signed.pdf (unknown)
Scope: Applies to all Eskom oil-filled new power transformers with a highest voltage winding operating at or above 2.2 kV and a rating above 1.25 MVA. Not primarily intended for shunt reactors, HVDC converter transformers, or smoothing reactors.
Purpose: Standardize requirements for procuring transformers for use across Eskom divisions, including direct purchases, turn-key projects, and through Independent Power Producers (IPPs).
Key Intentions: Acquire transformers fit for purpose with an expected service life beyond 40 years. Achieve optimized standardization for interchangeability. Support low-maintenance, maintenance-free technologies. Reduce carbon footprint, ensure zero harm to people and the environment, and support Business Productivity Program (BPP) initiatives. Minimize total cost of ownership.
Design Reviews: Mandatory for the first transformer of each type before procurement of materials or manufacturing. Objectives include verifying technical requirements, compliance, and identifying prototype features.
Site Conditions: Transformers must operate under specified outdoor conditions including altitude (1800m), ambient temperatures, humidity, solar radiation, UV radiation, seismic conditions (0.3g minimum), symmetrical three-phase supply voltages with up to 2% unbalance, and very heavy pollution levels.
Network Conditions: Must withstand frequency variations (±2.5Hz), voltage unbalances (2%), harmonic pollution (THD up to 3%), and for 400kV and above, geomagnetically induced currents (GIC) of 10A in the neutral for 30 minutes under maximum operating conditions.
Ratings and Impedance: Standard MVA ratings and impedances are provided in tables for different transformer classes. Impedance tolerance is ±7.5% on the nominal tap position.
Short Circuit Withstand: Transformers must withstand short circuits based on specified criteria including pre-fault voltage, infinite bus source impedance, 2-second fault duration, and conductor stress limits.
Construction Requirements: Detailed requirements for core design (3-limb preferred for GIC control), materials (copper conductors, enamelled windings for class 2 and above to prevent corrosive sulphur effects), insulation, bushings (dry technology composite insulator preferred), tap changers (on-load and off-circuit types), and terminal arrangements.
Testing and Documentation: Includes factory testing, transportation testing, site installation, functional tests, and documentation submission.
Standards Compliance: Must adhere to ISO 9001 and numerous IEC standards (e.g., IEC 60076 series).
Eskom Specifications: Compliance required with various Eskom internal specifications covering components like bushings, relays, breathers, fans, oil standards, and safety requirements.
Quality Assurance Programs: Manufacturers must have established programs for detecting and repairing conductor imperfections, ensuring joint compliance, and controlling manufacturing processes (e.g., drying, clamping).
Testing and Verification: Requires submission of test certificates, calculations for short circuit withstand, and demonstration of design compliance through design reviews and factory tests.
Environmental Considerations: Includes requirements to reduce environmental impact, such as use of dry technology bushings (composite insulator), specific oils to reduce corrosive sulphur failures, and climate change considerations integrated into design parameters.
Mitigation of GIC Effects: For transformers at 400kV and above, design must mitigate geomagnetically induced currents to prevent damage and excessive heating.
Design and Layout: Standard terminal arrangement (neutral on left, line terminals in alphabetical order) and winding configurations to ensure interchangeability.
Clearances: Specific electrical clearances in air provided in tables and figures, ensuring safe distances for live parts under impulse and temporary overvoltage conditions.
Methodology
Source: Specifications for Power transformers ST_240-68973110 specification Rev 3 TC signed.pdf
Design and Layout: Standard terminal arrangement (neutral on left, line terminals in alphabetical order) and winding configurations (core/LV/HV/RW for two-winding; core/TW/CW/RW/SW for three-winding) to ensure interchangeability.
Clearances: Specific electrical clearances in air provided in tables and figures, ensuring safe distances for live parts under impulse and temporary overvoltage conditions.
Figures and Tables: The document includes multiple figures and tables illustrating transformer classes, terminal positioning, clearances, control circuits, oil sampling interfaces, jacking pads, surge arrester brackets, and rating plates to guide design and installation.
Compliance Requirements
Source: Specifications for Power transformers ST_240-68973110 specification Rev 3 TC signed.pdf (unknown)
General Compliance: All contractors must comply with this specification. Any deviation constitutes a non-conformance unless approved in writing by a delegated Eskom transformer specialist based on sound engineering judgement.
Quality Management: Reference to ISO 9001 Quality Management Systems.
Health and Safety: Reference to South African National OHS Act and Eskom ORHVS.
Environmental and Safety: Support for reducing carbon footprint, zero harm to people and the environment.
Technical Standards: Compliance with numerous IEC standards, Eskom internal standards (e.g., EST32-136 for contractor health and safety), and other referenced documents is required.
Note: No specific requirements for CSD, tax, B-BBEE, CIDB, CIPC, professional registrations, or local content are mentioned in the provided text.
Health & Safety
Source: Specifications for Power transformers ST_240-68973110 specification Rev 3 TC signed.pdf
Safety Integration: The specification incorporates learnings from past transformer failures to enhance safety, including composite bushings to reduce failure and fire risks, enamelled windings to eliminate corrosive sulphur effects, design limits on dielectric stresses and inclusion of safety margins, use of specific oils to reduce corrosive sulphur failures, and introduction of maintenance-free vacuum tap-changers.
Construction Safety: Requirements for core earthing, conductor joints (brazed, welded, or compression type only), and secure support of leads to prevent faults.
Operational Safety: Transformers must withstand short circuits, GIC, and environmental stresses without damage or unsafe conditions (e.g., excessive gassing, partial discharge).
Compliance: References South African National OHS Act and Eskom ORHVS.
Environmental
Source: Specifications for Power transformers ST_240-68973110 specification Rev 3 TC signed.pdf
Environmental Considerations: The specification includes requirements to reduce environmental impact, such as use of dry technology bushings (composite insulator) which are environmentally friendly and reduce fire risk, specific oils to reduce corrosive sulphur failures, and climate change considerations integrated into design parameters (e.g., adjusted ambient temperatures).
Mitigation of GIC Effects: For transformers at 400kV and above, design must mitigate geomagnetically induced currents to prevent damage and excessive heating.
Contractual Terms
Source: Specifications for Power transformers ST_240-68973110 specification Rev 3 TC signed.pdf
Design and Construction: Detailed requirements for transformer components including windings, core, bushings, tap changers, tank, auxiliary supplies, rating plates, painting, special auxiliaries, insulating oil, cooling, current transformers, testing, transportation, erection, condition monitoring, and documentation.
Quality and Compliance: All materials and workmanship must meet specified standards. Any non-conformance requires written approval from Eskom.
Performance: Transformers must operate reliably under specified site and network conditions, including withstanding short circuits, GIC, and environmental factors.
Documentation and Reviews: Mandatory design reviews, submission of test certificates, calculations, and compliance with referenced standards and schedules (AB schedules).
Requirements
Source: Specifications for Power transformers ST_240-68973110 specification Rev 3 TC signed.pdf (unknown)
Roles and Responsibilities: All Eskom employees and/or appointed bodies involved in procurement must ensure the product meets specification requirements. Any deviation constitutes a non-conformance unless approved in writing by a delegated Eskom transformer specialist. All contractors must be conversant with and comply with the requirements. Deviations must be listed in the deviation schedule as part of tender deliverables. No deviations accepted without Eskom written approval. The Eskom Transformer Corporate Specialist is responsible for ensuring document validity.
Section
Source: Specifications for Power transformers ST_240-68973110 specification Rev 3 TC signed.pdf (unknown)
3.2 Site Conditions
Outdoor installation
Altitude above sea level – 1800m
Ambient temperatures o Maximum + 40C o Monthly average +28C o Yearly average + 25C o Minimum - 10C
Average humidity of 90%.
Solar radiation 2500kWh/m2
Atmospheric UV radiation = High
Seismic conditions at a minimum of 0.3g, this requirement must be proved by calculation.
Symmetrical three phase network supply voltages, negative and zero phase sequence voltages up to 2%.
Pollution level: Very Heavy NOTE: The yearly average for South Africa is 23C according to the SA Weather Services website, which is 3K higher than that in IEC 60076-7. A further 2K was added for climate change reasons and hence the yearly average is considered 25C. This information is important when considering the temperature rise limits.
DocumentSOW 2026.pdfReview complete
Description
Source: SOW 2026.pdf
Supply and delivery of oil-to-air capacitive bushings for power transformers and shunt reactors.
Contract period: Four years, with purchases made on an 'as-and-when-required' basis for transformer repair and rewind projects.
Technical expertise and support for installation and use of supplied components is included in the quoted prices.
Contact Information
Source: SOW 2026.pdf (unknown)
Compiled by: Project Manager T. Nonyane (document dated 19/05/2026).
No email, phone, or submission address provided in the document.
Submission Guidelines
Source: SOW 2026.pdf (unknown)
Submit delivery period for each item from task order receipt to delivery at T&SS Receipt and Dispatch premises, Lower Germiston Road, Rosherville.
Include all delivery costs in the quoted price.
Ensure vehicles comply with Eskom Rotek Industries safety policies and security search procedures upon entry/exit.
Protect materials against mechanical damage, moisture, and dirt during transit.
Protect oil side of bushings with a fitted storage container to prevent mechanical damage and moisture ingress.
Deliver each bushing with: Factory Acceptance Test (FAT) results, dimensional drawings, installation and maintenance manuals, and special lifting equipment (if applicable).
Note: T&SS reserves the right to inspect materials at the supplier’s premises before delivery. Offloading facilities and labour will be provided by the purchaser.
Evaluation Criteria
Source: SOW 2026.pdf (unknown)
Suppliers must demonstrate capability to meet Eskom’s technical and quality standards.
Ability to supply components with a 35-40 year operational lifespan, matching transformer life expectancy.
Compliance with all referenced standards: Eskom specifications 240-56062799 rev.4 and 240-68973110 rev.4, as well as IEC 60137, IEC 60076-7, IEC 60076-18, IEC 61463, IEC 60815, and BS EN 13601:2002.
Willingness to adhere to Eskom’s safety, security, and inspection protocols.
Required documentation: Proof of compliance with technical standards (e.g., test reports, certifications).
Technical Specifications
Source: SOW 2026.pdf (unknown)
Supply oil-to-air dry type transformer bushings per Eskom specification 240-56062799 rev.4.
Bushings must: support various voltage/current ratings, have optimal dissipation factor, include a dedicated test tap with self-earthing cap, be environmentally friendly, and suit coastal/chemical environments.
Must be installable at an angle, horizontally, or vertically, withstanding cantilever forces and dielectric requirements.
Components must meet a 35-40 year operational life expectancy, matching transformer lifespan.
Must comply with Eskom standard 240-68973110 rev.4 ('SPECIFICATION FOR POWER TRANSFORMERS RATED FOR 1.25MVA AND ABOVE AND WITH HIGHEST VOLTAGE OF 2.2KV OR ABOVE').
Must adhere to referenced international standards: IEC 60137, IEC 60076-7, IEC 60076-18, IEC 61463, IEC 60815, BS EN 13601:2002.
Technical expertise and support for installation/use is included in quoted prices.
Quality Management
Source: SOW 2026.pdf
All delivery costs must be included in the quoted price.
Vehicles must comply with Eskom Rotek Industries safety policies and security procedures on site.
Materials must be protected against mechanical damage, moisture, and dirt during delivery.
Oil side of bushings must be protected with a fitted storage container.
Each bushing must be delivered with: Factory Acceptance Test (FAT) results, dimensional drawings, installation/maintenance manuals, and special lifting equipment (if applicable).
T&SS reserves the right to inspect materials at the supplier’s premises before delivery.
Offloading facilities and labour will be provided by the purchaser.
Health & Safety
Source: SOW 2026.pdf
Vehicles entering the premises must comply with Eskom Rotek Industries safety policies and procedures.
All vehicles are subject to security searches upon entry and exit.
Environmental
Source: SOW 2026.pdf
Bushings must be environmentally friendly.
Must be suitable for use in coastal and chemical environments.
Contractual Terms
Source: SOW 2026.pdf
Contract duration: Four years.
Supply is on an 'as-and-when-required' basis; no guaranteed minimum quantity.
Supplied components must have a life expectancy of 35-40 years, matching the transformer unit in service.
Scope includes provision of technical expertise and support for installation and use, included in quoted prices.
Requirements
Source: SOW 2026.pdf (unknown)
Supplier must indicate the delivery period from task order receipt to delivery at T&SS Receipt and Dispatch premises, Lower Germiston Road, Rosherville.
Components must meet a 35-40 year operational life expectancy and comply with the latest Eskom standards, including:
Eskom specification 240-56062799 rev.4 for bushings.
Eskom specification 240-68973110 rev.4 ('SPECIFICATION FOR POWER TRANSFORMERS RATED FOR 1.25MVA AND ABOVE AND WITH HIGHEST VOLTAGE OF 2.2KV OR ABOVE').
Section
Source: SOW 2026.pdf (unknown)
Document compiled by Project Manager T. Nonyane on 19/05/2026.
No additional contact details (email, phone, or address) provided.
Document240-109253302 (Rev 2) - Quality Control Plan or Inspection Test Plan (QCP or ITP) - Template.docxCompliance review in progress
Submission Guidelines
Source: 240-109253302 (Rev 2) - Quality Control Plan or Inspection Test Plan (QCP or ITP) - Template.docx (unknown)
This document is a Quality Control Plan (QCP) / Inspection Test Plan (ITP) template, not the main tender document. Submission guidelines are not provided here. Bidders must obtain the full tender documentation for: submission method, deadline, required forms, returnables, and disqualification risks.
Evaluation Criteria
Source: 240-109253302 (Rev 2) - Quality Control Plan or Inspection Test Plan (QCP or ITP) - Template.docx (unknown)
Bidders must demonstrate capability to implement rigorous quality control processes, including:
100% testing (T1) and sample testing (T2)
100% inspection (A1) and sample inspection (A2)
100% document review (R1) and sample document review (R2)
Compliance with statutory (S) and non-statutory (N) requirements
Identification of subcontractors where applicable
Acceptance criteria must address functionality, performance measures, regulatory compliance, and chemical tests.
Technical Specifications
Source: 240-109253302 (Rev 2) - Quality Control Plan or Inspection Test Plan (QCP or ITP) - Template.docx (unknown)
This QCP/ITP template defines quality control procedures for the supply of capacitive graded bushings. Key requirements include:
Intervention Points:
Hold Points (H): Work stops pending inspection approval
Inspection Methods: Visual, Microscopy, NDT, Liquid/Dye Penetrant, Magnetic Particle, EDDY, etc.
Parties Involved: Contractor/Supplier, Subcontractor (where applicable), Eskom, Approved Inspection Authority (AIA), Notification Body (NOBO), Third Party Inspection (TPI)
Note: This template does not contain the technical specifications for the bushings themselves.
Document240-12248652 (Rev 7) - List of Tender Returnables.pdfReview complete
Contact Information
Source: 240-12248652 (Rev 7) - List of Tender Returnables.pdf (TENDER)
Eskom Representative: Paulo Infante
Date Issued: 26/05/2026
Returnable Documents
Source: 240-12248652 (Rev 7) - List of Tender Returnables.pdf (TENDER)
Form A must be completed and signed.
Evaluation Criteria
Source: 240-12248652 (Rev 7) - List of Tender Returnables.pdf (TENDER)
Quality evaluation is scored across five sections:
Section A (QMS Requirements): Choose Option 1 (valid ISO 9001 certification with defined product/service scope, accredited authority, and valid expiry date) for 4 points. OR Option 2 (documented QMS evidence: manual, quality policy, objectives, document control, nonconformity control, corrective action, and internal audit records) for 7 points.
Section B (QMS in Operation): Provide organization chart, external provider control criteria, internal audit report (with nonconformity/corrective action records), certification audit report (≤12 months old), and management review records (4 points).
Section C (Contract Quality Plan): Submit a draft contract quality plan specific to the tender scope (1 point).
Section D (Quality Control Plan): Provide a draft or example Inspection and Test Plan (ITP) or Quality Control Plan (QCP) for similar/previous work (1 point).
Section E (Additional Requirements): Complete and sign Form A (1 point). Additional scope-specific requirements may apply.
Technical Specifications
Source: 240-12248652 (Rev 7) - List of Tender Returnables.pdf (TENDER)
Supply and delivery of oil-to-air capacitive bushings for a period of four years.
Quality Management
Source: 240-12248652 (Rev 7) - List of Tender Returnables.pdf (TENDER)
Quality requirements include:
ISO 9001 certification (Option 1) or documented QMS compliance (Option 2).
Evidence of QMS operation: roles/responsibilities, external provider controls, audit reports, and management reviews.
Draft Contract Quality Plan and Quality Control Plan (ITP/QCP) required.
Additional customer-specific requirements may apply per the scope.
Section
Source: 240-12248652 (Rev 7) - List of Tender Returnables.pdf
Quality evaluation is scored across five sections:
Section A (QMS Requirements): Option 1 (ISO 9001 certification) = 4 points. Option 2 (documented QMS evidence) = 7 points.
Section B (QMS in Operation): Evidence includes organization chart, external provider controls, audit reports, and management review records (4 points).
Section C (Contract Quality Plan): Draft plan specific to the scope (1 point).
Section D (Quality Control Plan): Draft ITP/QCP for similar work (1 point).
Section E (Additional Requirements): Form A must be completed and signed (1 point).
Document240-106084675 Annexure C 3.docxReview complete
Description
Source: 240-106084675 Annexure C 3.docx
Scope: Supply and delivery of capacitive graded bushings. No additional details on quantity, technical specifications, or delivery requirements are provided.
Evaluation Criteria
Source: 240-106084675 Annexure C 3.docx (unknown)
Evaluation is based on OHS compliance. Key points:
Submission of all required OHS documentation is mandatory.
For suppliers with certified auditable OHS systems (Part B): ISO 45001 or equivalent certification is required.
OHS policy must be signed by the CEO and comply with OHS Act Section 7.
Valid Letter of Good Standing (COIDA or equivalent) is mandatory.
Non-compliance with OHS returnables (e.g., Annexure B, OHS Plan, Baseline Risk Assessment) may result in disqualification.
Technical Specifications
Source: 240-106084675 Annexure C 3.docx (unknown)
Scope: Supply and delivery of capacitive graded bushings. No further technical details, standards, or specifications are provided in the document.
Compliance Requirements
Source: 240-106084675 Annexure C 3.docx (unknown)
Mandatory OHS Compliance:
Submit signed Annexure B (acknowledgement of Eskom's OHS legal and other requirements).
Provide an OHS Plan addressing project/scope-specific risks, aligned with Eskom’s health and safety specifications.
Include a Baseline OHS Risk Assessment (BRA) with methodology, covering identification, assessment, and management of OHS risks.
Valid Letter of Good Standing (COIDA or equivalent) required.
OHS Policy must be signed by the CEO and comply with OHS Act Section 7.
Additional for Certified Suppliers:
ISO 45001 certificate or equivalent required if claiming auditable OHS system certification.
Document32-136 Contractor Health and Safety Requirements.pdfReview complete
Description
Source: 32-136 Contractor Health and Safety Requirements.pdf
The tender involves the supply and delivery of capacitive graded bushings for Eskom. The scope requires contractors to:
Safeguard contractors, employees, and the environment against occupational health and safety risks.
Identify and mitigate all practical risks to prevent incidents, injuries, or environmental damage.
Ensure all activities comply with Eskom’s Safety, Health, Environmental, and Quality Policy.
Address specialized activities by developing tailored SHE plans, procedures, manuals, or work instructions.
Standardize health and safety requirements across Eskom Holdings SOC Limited and its subsidiaries to achieve Zero Harm.
Evaluation Criteria
Source: 32-136 Contractor Health and Safety Requirements.pdf (unknown)
The contractor must be a legally recognized entity (natural or legal person).
Must demonstrate competence and resources to fulfill all Safety, Health, and Environmental (SHE) responsibilities outlined in the document.
Key personnel (e.g., Construction Health and Safety Officer, Project/Construction Managers) must have required professional registrations (e.g., with SACPCMP) as mandated by law.
The contractor's SHE management system must be appropriate to the service scope and risk profile, and comply with applicable legal requirements.
For joint ventures, each entity is individually liable and must meet SHE requirements; if operating as a single entity, that entity must comply.
Must agree to and sign a Section 37(2) agreement under the OHS Act if required.
Technical Specifications
Source: 32-136 Contractor Health and Safety Requirements.pdf (unknown)
The tender focuses on the supply and delivery of capacitive graded bushings. Contractors must:
Ensure all materials and equipment conform to manufacturer and legislative health and safety requirements.
Factor in health and safety during work to ensure materials/equipment remain safe for future use.
Ensure workmanship acceptability is determined by Eskom and/or the designer/agent/client.
Address specialized activities or operations by developing specific safety, health, and environmental plans/procedures/manuals/work instructions.
Experience & Qualifications
Source: 32-136 Contractor Health and Safety Requirements.pdf
Contractors and key personnel must meet the following experience and qualification requirements:
Competent Persons: Must have the knowledge, training, experience, and qualifications specific to the work or task, with registrations aligned to the South African Qualifications Authority Act, 1995, where applicable.
Construction Health and Safety Officer: Must be appointed in writing for the duration of the contracted work (per OHS Act Construction Regulation 8(5) and MHS Act). The officer must be competent, registered with a statutory body approved by the Chief Inspector, and liaise with Eskom’s OHS departments.
Construction Supervisors: Must be appointed in writing, competent, and have extensive knowledge of the work they supervise.
Professional Registration: All persons responsible for construction project management, construction management, or construction health and safety must be registered with the South African Council for the Project and Construction Management Professions (SACPCMP).
Quality Management
Source: 32-136 Contractor Health and Safety Requirements.pdf
Quality management requirements include:
Compliance with ISO 9001 Quality Management Systems.
Occupational hygiene assessments must be performed by a SANAS-accredited and Department of Labour (DOL)-approved inspection authority.
Protection against thermal conditions must adhere to OHS Act Environmental Regulations for Workplaces (WBGT Index of 30 for heat, dry bulb temperature of not less than 6°C for cold).
Regular audits must be conducted to maintain organizational efficiency and statutory compliance.
Safety inspections (reactive or proactive) must identify, evaluate, and control hazards before incidents occur.
Compliance Requirements
Source: 32-136 Contractor Health and Safety Requirements.pdf (unknown)
Compliance with all applicable occupational health and safety legislative requirements and Eskom policies/procedures.
Contractors must ensure their employees and subcontractors comply with SHE statutory requirements.
Statutory appointments (e.g., health and safety officers) must comply with legislative requirements and Eskom standards (e.g., 32-296 for statutory appointments).
Construction supervisors must be appointed in writing for the duration of the project and must be competent.
Professional registration with SACPCMP is required for persons assuming responsibility for construction project management, construction management, and construction health and safety.
Joint ventures must ensure each partner fulfills SHE requirements and signs a Section 37(2) agreement under the OHS Act.
Compliance with Eskom-specific standards and procedures, including those referenced in the document (e.g., ISO 9001, OHS Act, NEMA, etc.).
Environmental
Source: 32-136 Contractor Health and Safety Requirements.pdf
Environmental requirements include:
Asbestos Control: Handle asbestos-containing materials only in compliance with OHS Act Asbestos Regulations due to serious health and environmental risks.
Noise Management: Implement a hearing conservation program if the 8-hour rating level exceeds 85 dBA.
Auditing: Conduct regular audits to ensure compliance with environmental regulations and organizational efficiency.
General Duty of Care: Take reasonable measures to prevent, minimize, or rectify pollution or environmental degradation.
Contractual Terms
Source: 32-136 Contractor Health and Safety Requirements.pdf
Contractors must adhere to the following contractual terms:
Eskom’s Group Chief Executive (GCE) holds overall responsibility for health and safety at all Eskom sites, with duties delegable to section 16(2) appointees and responsible managers.
Contractors, as employers, must abide by Eskom’s SHE requirements and relevant safety, health, and environmental legislation.
Appointed managers are responsible for health, safety, and the environment on sites under their control.
Contractors remain accountable for their appointed subcontractors and must ensure compliance with contractual and legislative requirements.
Requirements
Source: 32-136 Contractor Health and Safety Requirements.pdf (unknown)
further requirements contained in the contractual agreements they enter into with Eskom.
DocumentQuality Requirements.docxReview complete
Description
Source: Quality Requirements.docx
Supply and delivery must comply with Supply Quality Management – Specification 240-105658000.
Submit Form A for Tender and Contract Quality Requirements (240-105658000) and ISO 9001 Standard (240-68099512).
Include all documents listed in Supplier Quality Management – List of Tender Returnable Documents (240-12248652).
Use the mandatory templates provided in the returnable documents list.
Submission Guidelines
Source: Quality Requirements.docx (unknown)
Submit all required returnable documents using the provided templates as per the List of Tender Returnable Documents (240-12248652). Failure to include these may result in disqualification.
Evaluation Criteria
Source: Quality Requirements.docx (unknown)
Compliance: Must fully meet all specified quality management and ISO 9001 requirements (240-105658000 and 240-68099512).
Documentation: Must submit all required returnable documents and templates without omission.
Timeliness: Tender must be submitted before the closing date to be considered.
Technical Specifications
Source: Quality Requirements.docx (unknown)
Comply with Supply Quality Management – Specification 240-105658000.
Meet Tender and Contract Quality Requirements (Form A) for 240-105658000 and ISO 9001 Standard (240-68099512).
Adhere to Supplier Quality Management – List of Tender Returnable Documents (240-12248652).
Use the required templates as specified in the returnable documents list.
DocumentTemplate for NEC3 Supply Contract Supply of Capacitive Bushings.pdfReview complete
Description
Source: Template for NEC3 Supply Contract Supply of Capacitive Bushings.pdf
Supply and delivery of capacitive graded transformer bushings for a period of 4 years.
Scope covers oil to air bushings for power transformers and shunt reactors.
Components are for transformer repair and rewind projects on an as-and-when-required basis.
Includes provision of technical expertise and support for installation and use.
No guaranteed minimum quantity over the contract period.
Contact Information
Source: Template for NEC3 Supply Contract Supply of Capacitive Bushings.pdf (unknown)
Scope covers oil to air bushings for power transformers and shunt reactors.
Components are for transformer repair and rewind projects on an as-and-when-required basis.
Includes provision of technical expertise and support for installation and use.
No guaranteed minimum quantity over the contract period.
Methodology
Source: Template for NEC3 Supply Contract Supply of Capacitive Bushings.pdf (unknown)
Deliver to T&SS Receipt and Dispatch, Lower Germiston Road, Rosherville.
All delivery costs included in quoted price.
Vehicles must comply with Eskom Rotek safety policies and security searches.
Materials must be protected; oil side must have storage container.
Required documentation: FAT results, drawings, manuals, special lifting equipment.
Eskom may inspect materials at supplier's premises.
Offloading facilities and labour provided by Eskom.
Quality Management
Source: Template for NEC3 Supply Contract Supply of Capacitive Bushings.pdf
Delivery includes FAT results, dimensional drawings, installation/maintenance manuals, and special lifting equipment.
Materials must be protected against damage, moisture, and dirt.
Eskom reserves right to inspect materials at supplier's premises before delivery.
Factory acceptance testing (FAT) required; Supply Manager may witness tests.
Pricing Schedule
Source: Template for NEC3 Supply Contract Supply of Capacitive Bushings.pdf
Pricing via a Price Schedule with items priced as lump sums or rates multiplied by quantities.
Supplier must prepare schedule assuming prices are fully inclusive.
No adjustment to lump sums for quantity changes except via compensation events.
Format: Items listed with description, unit, quantity, rate, and price.
Financial Requirements
Source: Template for NEC3 Supply Contract Supply of Capacitive Bushings.pdf (unknown)
Contract uses the NEC3 Supply Contract (SC3) pricing structure.
Prices are derived from a Price Schedule with lump sums or rates multiplied by quantities.
The total of Prices must be fully inclusive of all obligations.
Payment assessments occur monthly.
Currency: South African Rand.
Payment period: To be specified in weeks.
Interest rate: Standard Bank prime rate for ZAR, LIBOR for other currencies.
A performance bond amount may be required (amount to be specified).
Advanced payment option available, with possible bond requirement.
Delay damages and low performance damages may apply.
Supplier must provide a tax invoice within one week of payment certificate, including Eskom's VAT number 4740101508.
No adjustment to lump sums for quantity changes except via compensation events.
Compliance Requirements
Source: Template for NEC3 Supply Contract Supply of Capacitive Bushings.pdf (unknown)
B-BBEE: Supplier must notify Eskom within 7 days of any change in B-BBEE status and submit an updated verification certificate within 30 days. A decrease in status may lead to contract re-negotiation or termination.
Joint ventures/consortia are jointly and severally liable; composition changes require Purchaser consent.
Confidentiality: Supplier must not disclose contract information without consent.
Health, safety, and environment: Supplier must comply with all applicable laws and Eskom's procedures, including asbestos regulations if relevant.
Insurance: Supplier must provide insurance as per Insurance Table A (covering goods, liability, etc.). Purchaser provides insurance per Insurance Table B.
Ethics: Prohibited actions include corruption, fraud, coercion, collusion, and obstruction; violations can lead to termination.
Tax: Supplier must comply with VAT Act and include Eskom's VAT number on invoices.
Law of contract: South Africa.
Language: English.
Liability: Supplier's liability for indirect/consequential loss limited to R0; total liability capped at contract value.
Defects: Defects date weeks after delivery; defect correction period in weeks.
Termination and dispute resolution: Adjudicator from ICE-SA; arbitration under Association of Arbitrators (Southern Africa).
Health & Safety
Source: Template for NEC3 Supply Contract Supply of Capacitive Bushings.pdf
Supplier must take all reasonable precautions for health and safety.
Prices must include sufficient amount for compliance with health & safety laws and Eskom procedures.
Supplier and subcontractors must comply with all applicable health, safety, and environmental laws.
Specific asbestos management requirements if asbestos is present, including exposure limits, monitoring, and safe work procedures.
Environmental
Source: Template for NEC3 Supply Contract Supply of Capacitive Bushings.pdf
Bushings must be environmentally friendly, suitable for coastal and chemical environments.
Asbestos removal and disposal must be done by a registered contractor at Eskom's expense, in line with South African legislation.
Contractual Terms
Source: Template for NEC3 Supply Contract Supply of Capacitive Bushings.pdf
Contract based on NEC3 Supply Contract (April 2013 or December 2009 edition).
Includes options for price adjustment, changes in law, multiple currencies, parent company guarantee, delay damages, partnering, performance bond, advanced payment, low performance damages, KPIs, and additional Z-clauses.
Law of contract: South Africa.
Language: English.
Payment terms: Assessment interval monthly; payment period in weeks; interest at prime rate/LIBOR.
Liability: Supplier's liability for indirect/consequential loss limited to R0; total liability capped at contract value.
Defects: Defects date weeks after delivery; defect correction period in weeks.
Termination and dispute resolution: Adjudicator from ICE-SA; arbitration under Association of Arbitrators (Southern Africa).
Technical evaluation criteria (weighted total 100 points):
Company Profile (20 points): Must be detailed, comprehensive, and clearly indicate services related to this bid. Not related or not submitted scores 0.
Eskom Approval Documentation (30 points): Must include previous technical evaluation documentation (Eskom letters, manufacturing approvals, approved drawings). Compulsory returnable.
Method Statement (30 points): Must be detailed and cover procurement, handling, transportation, and storage from order placement to delivery. Scoring: 0 (not submitted/not related), 5 (basic/vague), 10 (clear, minimal errors, covers majority), 30 (clearly defined, detailed, comprehensive, covers full scope).
Drawings (20 points): Full dimensional drawings as per Eskom specification for all items offered. Compulsory returnable.
Minimum weighted final score (threshold) required to be considered technically is 80%.
A detailed method statement covering the full process from procurement, handling, transportation, to storage of spares from the moment Eskom places an order.
Full dimensional drawings for all items offered, conforming to Eskom specifications.
No specific compliance requirements (e.g., CSD, tax, B-BBEE, CIDB, CIPC) are stated in the provided document.
Section
Source: Technical Evaluation Bushings.pdf
Technical evaluation criteria are detailed in the main evaluationCriteria section.
DocumentITT Supply and delivery of Capacitive Bushings.pdfReview complete
Description
Source: ITT Supply and delivery of Capacitive Bushings.pdf
Supply and delivery of capacitive graded transformer bushings (oil-to-air, dry type) for Power Transformers and Shunt Reactors to Eskom’s premises in Rosherville over a 4-year period. Bushings must comply with Eskom specification 240-56062799 rev.4, match transformer life expectancy (35-40 years), and suit coastal/chemical environments. Scope includes technical expertise/support for installation and use, with costs included in quoted prices. Purchases are on an 'as-and-when-required' basis; no guaranteed quantities.
Important Dates
Source: ITT Supply and delivery of Capacitive Bushings.pdf (TENDER)
Closing date and time: 03 July 2026 at 10h00. Non-compulsory clarification meeting: 18 June 2026 at 10h00 via Microsoft Teams. Tender validity period: 120 days from closing date. Clarification queries deadline: 10 working days before tender closing (23 June 2026).
Contact Information
Source: ITT Supply and delivery of Capacitive Bushings.pdf (TENDER)
Source: ITT Supply and delivery of Capacitive Bushings.pdf (TENDER)
Submit tender electronically via https://tenderbulletin.eskom.co.za/ by 03 July 2026 at 10h00. Late submissions will not be accepted. Upload all documents in PDF format (max 500MB per file, total submission max 4GB). Price list must be submitted in both PDF and Excel. No ZIP files or hard copies accepted. Ensure submission status is marked as 'complete'. If resubmitting, only the latest version will be considered. Mandatory returnables (e.g., Annexures A-J, SBD forms) must be fully completed and signed where required. Failure to submit mandatory documents by the deadline will result in disqualification. Non-disqualifiable returnables may be requested within 5 working days if incomplete. Clarification queries must be submitted in writing to the Eskom Representative at least 10 working days before the tender deadline.
Evaluation Criteria
Source: ITT Supply and delivery of Capacitive Bushings.pdf (TENDER)
Eligibility: Tenderers must not be on international sanctions lists, restricted by National Treasury, or on Eskom’s Tender Defaulters list. No conflicts of interest (e.g., shared majority shareholders, access to competitor information). No 100% subcontracting of scope. Only one tender per tenderer (or as part of a JV/consortium) unless system limits apply. Joint ventures must explicitly state joint and several liability. Tenders must be signed by authorised personnel. Scoring: 90/10 preference point system (90 points for price, 10 points for specific goals under PPPFA 2022). Functionality threshold: 80% minimum. Price evaluation includes VAT, error corrections, and unconditional discounts. Specific goals: 0 points if evidence not submitted (no disqualification). Ranking based on total score (price + specific goals). Contractual requirements (e.g., CSD, COIDA, quality standards) assessed post-evaluation.
Technical Specifications
Source: ITT Supply and delivery of Capacitive Bushings.pdf (TENDER)
Supply and deliver capacitive graded transformer bushings (oil-to-air, dry type) for Power Transformers and Shunt Reactors to Eskom’s premises in Rosherville for 4 years. Bushings must: comply with Eskom specification 240-56062799 rev.4; match transformer life expectancy (35-40 years); suit coastal/chemical environments; be installable at any angle (horizontal/vertical) with cantilever forces and dielectric withstand capabilities; include a dedicated test tap with self-earthing cap; be environmentally friendly. Deliverables per bushing: FAT results, dimensional drawings, installation/maintenance manuals, special lifting equipment (if applicable). Delivery requirements: to T&SS Receipt and Dispatch, Lower Germiston Road, Rosherville; all delivery costs included in quoted price; materials protected against mechanical damage, moisture, and dirt; oil side protected with storage container; vehicles must comply with Eskom Rotek Industries safety policies and undergo security searches. Eskom reserves the right to inspect materials at supplier premises pre-delivery. Offloading facilities/labour provided by Eskom. Technical support for installation/use is included in quoted prices. Normative references: IEC 60137, IEC 60076-7, IEC 60076-18, IEC 61463, IEC 60815, BS EN 13601:2002. Purchases are on an 'as-and-when-required' basis; no guaranteed quantities.
Quality Management
Source: ITT Supply and delivery of Capacitive Bushings.pdf
Comply with Eskom quality standards: Supply Quality Management (240-105658000), ISO9001 (240-68099512), Form A (240-105658000). Submit: quality control plan, inspection plan, contract quality plan. Materials must be protected against mechanical damage, moisture, and dirt. Oil side must have storage container. Deliver with: FAT results, dimensional drawings, installation/maintenance manuals, special lifting equipment (if applicable). Eskom may inspect materials at supplier premises pre-delivery.
Pricing Schedule
Source: ITT Supply and delivery of Capacitive Bushings.pdf
Submit pricing schedule in PDF and Excel. Include all costs (delivery, cataloguing if applicable). Alternative tenders not allowed. Cataloguing: if required, include line item in pricing schedule; Eskom pays for cataloguing. Prices evaluated inclusive of VAT, corrected for errors, and adjusted for unconditional discounts. Conditional discounts applied at payment.
Financial Requirements
Source: ITT Supply and delivery of Capacitive Bushings.pdf (TENDER)
Pricing schedule must be submitted in PDF and Excel. Include all costs (delivery, cataloguing if applicable). Payment terms: within 30 days for contracts ≤ R50M (incl. VAT); within 60 days for contracts > R50M (incl. VAT). Unconditional discounts are considered for evaluation; conditional discounts applied at payment. Performance security (bond/guarantee) may be required; select at least 2 Eskom-approved financial institutions if applicable. Cataloguing may be required post-award; include a line item in pricing schedule if applicable. Eskom may negotiate with preferred bidders if prices are not market-related. Alternative tenders not allowed. Prices evaluated inclusive of VAT, corrected for errors, and adjusted for acceptable variations or deviations.
Compliance Requirements
Source: ITT Supply and delivery of Capacitive Bushings.pdf (TENDER)
Mandatory: Proof of valid CSD registration. Tax clearance: Certified copy required for local tenderers (or foreign tenderers with SA footprint). COIDA certificate of good standing or proof of application (South African tenderers only). Compliance with Employment Equity Act (South African designated employers only). CIDB grading (if applicable, within 21 working days of tender closing). SHEQ requirements: COIDA, safety/quality documents. Quality standards: Supply Quality Management (240-105658000), ISO9001 (240-68099512), Form A (240-105658000). B-BBEE: Submit proof of status (certificate, sworn affidavit, or other prescribed requirement). Joint ventures: Submit valid JV agreement, single designated bank account, and confirmation of joint/severe liability. Subcontracting with subsidiaries must be declared. Financial viability: Submit latest audited financial statements or equivalent (e.g., public interest score for non-audited entities).
Health & Safety
Source: ITT Supply and delivery of Capacitive Bushings.pdf
COIDA certificate of good standing or proof of application required (South African tenderers only). Vehicles must comply with Eskom Rotek Industries safety policies and undergo security searches. SHEQ requirements apply; submit relevant safety/quality documents as per scope. Objective evaluation criteria include safety and quality.
Environmental
Source: ITT Supply and delivery of Capacitive Bushings.pdf
Bushings must be environmentally friendly and suitable for coastal/chemical environments. Must include a dedicated test tap with self-earthing cap. Normative references: IEC 60137, IEC 60076-7, IEC 60076-18, IEC 61463, IEC 60815, BS EN 13601:2002.
Contractual Terms
Source: ITT Supply and delivery of Capacitive Bushings.pdf
Contract duration: 4 years. Contract type: NEC3 SC. Payment terms: 30 days for contracts ≤ R50M (incl. VAT); 60 days for contracts > R50M (incl. VAT). Performance security may be required (bond/guarantee from Eskom-approved institutions). Cataloguing may be required post-award; include a line item in pricing schedule if applicable. Eskom reserves the right to negotiate with preferred bidders if prices are not market-related. Subcontracting with subsidiaries must be declared. No public tender opening; tenders downloaded electronically. Prices will not be read out.
Document240- 68099512 (Rev 9) - Form A Tender & Contract Quality Requirements for 240-105658000 and Quality Requirements for ISO 9001 Standard.pdfReview complete
Contact Information
Source: 240- 68099512 (Rev 9) - Form A Tender & Contract Quality Requirements for 240-105658000 and Quality Requirements for ISO 9001 Standard.pdf (unknown)
Eskom’s Quality Representative: Paulo Infante (Quality Manager).
Signature and date recorded: 26/05/2026.
Evaluation Criteria
Source: 240- 68099512 (Rev 9) - Form A Tender & Contract Quality Requirements for 240-105658000 and Quality Requirements for ISO 9001 Standard.pdf (unknown)
Suppliers must have an ISO 9001 certified quality management system.
Must comply with Eskom’s quality requirements document 240-105658000.
Must appoint a Quality Representative (Section E of the tender document must be completed).
Must accept Eskom’s rights of access, information, and audit provisions.
Post-award, quality performance monitoring and audits will be conducted.
ISO 9001 quality principles apply: customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making, and relationship management.
Pre-contract award quality requirements must be met.
Methodology
Source: 240- 68099512 (Rev 9) - Form A Tender & Contract Quality Requirements for 240-105658000 and Quality Requirements for ISO 9001 Standard.pdf
ISO 9001 quality principles must guide the supplier’s approach: customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making, and relationship management.
Quality Management
Source: 240- 68099512 (Rev 9) - Form A Tender & Contract Quality Requirements for 240-105658000 and Quality Requirements for ISO 9001 Standard.pdf
Eskom reserves rights of access, information, preservation, and quality audits.
Management of nonconformities and special processes are required.
ISO 9001 standard clauses and quality principles apply.
Pre-contract award quality requirements apply (Clause 3 of document 240-105658000).
Category 2 quality requirements are applicable (refer to Clause 3.5 of document 240-105658000).
Main supplier and sub-supplier capability and capacity assessment is not applicable.
Post-contract award: Eskom will monitor contract execution and supplier quality performance.
Compliance Requirements
Source: 240- 68099512 (Rev 9) - Form A Tender & Contract Quality Requirements for 240-105658000 and Quality Requirements for ISO 9001 Standard.pdf (unknown)
ISO 9001 certification is mandatory for the supplier’s quality management system.
Compliance with Eskom’s quality requirements document 240-105658000 is required.
Appointment of a Quality Representative is mandatory (Section E of the tender document).
Acceptance of Eskom’s rights to access, information, and audit provisions is required.
Section
Source: 240- 68099512 (Rev 9) - Form A Tender & Contract Quality Requirements for 240-105658000 and Quality Requirements for ISO 9001 Standard.pdf
Quality performance monitoring and audits will be conducted post-award.
ISO 9001 quality principles apply: customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making, and relationship management.
Pre-contract award quality requirements must be met.
Supplier quality performance will be monitored.
DocumentAnnexure K - Capacitive transformer bushing..pdfReview complete
Description
Source: Annexure K - Capacitive transformer bushing..pdf
Supply and delivery of capacitive graded transformer bushings. The tender includes Supplier Development and Localisation Targets focusing on socio-economic transformation and empowerment.
Evaluation Criteria
Source: Annexure K - Capacitive transformer bushing..pdf (unknown)
Preference point system based on specific goals, including Reconstruction and Development Programme (RDP) implementation. SDL&I Matrix is not an evaluation criterion but is an objective requirement for eligibility. Points allocated for: B-BBEE Improvement/Retention Plan, Skills Development, Job Creation, Socio-Economic Development, and Local Content (100% South African target).
Technical Specifications
Source: Annexure K - Capacitive transformer bushing..pdf (unknown)
Supply and delivery of capacitive graded transformer bushings. Procurement promotes socio-economic transformation, empowerment of small enterprises, rural/township enterprises, designated groups, and local industrial development.
Compliance Requirements
Source: Annexure K - Capacitive transformer bushing..pdf (unknown)
Mandatory compliance with Public Procurement Act and PPPFA Section 2(1)(f). Submit SDL&I proposals for eligibility. B-BBEE: Submit Improvement or Retention Plan with bid. Level 5-8 or non-compliant bidders must achieve Level 4 by end of first contract year, then improve at least one level annually. 2.5% penalty on invoiced amount for B-BBEE milestone non-compliance or status drop post-award. Skills Development: Provide R60,000 bursary per Eskom-assigned beneficiary at a chosen SA university for every R4.8 million invoiced; due within one month of reaching threshold. 2.5% penalty and contract hold for non-compliance. Job Creation: Indicate jobs created/retained; at least 50% of semi-skilled and 100% of unskilled labour must be sourced from the local municipality. Socio-Economic Development: Spend 0.1% of invoiced amount on CSI initiatives for black communities as identified by ERI. Local Content: 100% South African content target. Quarterly SDL&I compliance reports to ERI required; penalties apply for non-compliance. Complete and return SDL&I implementation schedule before contract award.
B-BBEE Requirements
Source: Annexure K - Capacitive transformer bushing..pdf (unknown)
ERI reserves the right to award to suppliers committing to Transformation (B-BBEE Improvement or Retention Plan), Skills Development, Job Creation, and Socio-Economic Development benefiting local municipalities. Submit B-BBEE Improvement Plan with bid. Level 5-8 or non-compliant bidders must achieve Level 4 by end of first contract year, then improve at least one level annually. 2.5% penalty on invoiced amount for non-compliance or status drop post-award. Compliance Matrix: Local Content to South Africa (50% weight, 100% target) and Skills Development (50% weight).
Contractual Terms
Source: Annexure K - Capacitive transformer bushing..pdf (unknown)
Legislative requirements of the Public Procurement Act will be cascaded into the contract within three months of gazette publication. 2.5% penalty on invoiced amount for B-BBEE milestone non-compliance or status drop post-award. 2.5% penalty for non-compliance with skills development commitments; contract may be placed on hold. Quarterly SDL&I compliance reports to ERI required; ERI reviews within 60 days and notifies if obligations are not met. Implement corrective measures before next quarter or face penalty clause invocation. Complete and return SDL&I implementation schedule to SDL&I representative for acceptance before contract award; used for monitoring progress.
Section
Source: Annexure K - Capacitive transformer bushing..pdf
SDL&I Matrix is not an evaluation criterion but is an objective requirement for eligibility. Respondents will be allocated points under a preference point system based on specific goals, including Reconstruction and Development Programme (RDP) implementation.
This tender provides a Contract Quality Plan (CQP) template to guide suppliers in meeting Eskom's quality expectations and contractual requirements. Key points:
The template is structured to align with SANS 466:2005 / ISO 10005:2005 standards.
Its purpose is to ensure suppliers plan and document their approach to quality management for the supply and delivery of capacitive graded bushings.
The tender requires the submission of a detailed Contract Quality Plan (CQP) as a core deliverable. Key requirements include:
Use the provided CQP template to document your quality management approach.
Align the plan with SANS 466:2005 / ISO 10005:2005 guidelines.
Complete all mandatory sections, including:
Scope of work (full description of works as per NEC or FIDIC documents).
Communication channels between supplier and Eskom (e.g., emails, meeting minutes, progress reports).
Organogram with roles, responsibilities, and qualifications of team members (including QA/QC functions).
Index of interfacing documents (processes, standards, codes, specifications, work instructions, policies, and procedures).
List of suppliers, sub-suppliers, and sub-contractors, including their roles and performance monitoring methods.
Index of items to be manufactured, refurbished, or newly purchased, with production schedules and sourcing details.
Description of quality control activities for deliverables requiring special controls (e.g., welding, NDT/NDE).
Index of documented information to be submitted to Eskom (e.g., technical records, inspection reports, QCP sign-offs, warranty certificates, material certificates, test reports).
Processes for record control, retention, concession management, and non-conformance handling.
Data book management process, including review and acceptance procedures.
Management of tools, equipment, and customer property.
Product preservation, identification, and traceability methods.
Commissioning and post-delivery activities, including warranty conditions and technical support.
This document sets out Eskom/NTCSA requirements for oil to air capacitance graded bushings fitted to Power Transformers and Shunt Reactors.
Scope: Covers technical requirements for selection and purchase.
Purpose: Serves as a minimum requirement.
Applicability: Applies to bushings for new transformers/reactors, strategic spares, or repaired units. Excludes single bushings requiring exact dimensional match.
Normative references include IEC 60137, IEC 60076-7, IEC 60076-18, IEC 61463, IEC 60815, BS EN 13601:2002.
Returnable Documents: Type test reports must be submitted with the tender returns. All test certificates and documentation must be supplied to Eskom/NTCSA on delivery.
This specification applies to bushings for new Power Transformers and Shunt Reactors, and bushings purchased for Strategic Spares or repaired units. It excludes single bushing replacement on existing transformers where exact dimensional match is required. Suppliers must demonstrate capability to provide dry type condenser bushings meeting all technical requirements. Type tests for new bushing types must be witnessed by Eskom/NTCSA for all orders originating from Eskom/NTCSA. All test facilities must be accredited to ISO 17025. Final approval subject to technical evaluation demonstrating compliance with specification and Eskom/NTCSA requirements.
Technical evaluation and final approval: This specification is a minimum requirement. Any deviation requires written approval from Eskom/NTCSA. Final written approval follows technical evaluation confirming compliance.
Scope: Technical requirements for selection and purchase of oil to air capacitance graded bushings for Power Transformers and Shunt Reactors.
Applicability: New bushings, strategic spares, or repaired units. Excludes single bushing replacements requiring exact dimensional match.
Key requirements:
Bushings from 33kV and above must be condenser type and dry type.
Paperless technology preferred where matured; otherwise resin impregnated paper (RIP) dry type.
External insulation from silicon composite rubber.
Proof required that no moisture can move through external insulation to condenser body.
Environmental: Outdoor installation at 1800m altitude, ambient temperatures -10°C to +40°C, average humidity 90%, very heavy pollution, seismic minimum 0.3g.
Factory testing: Each bushing undergoes electrical tests for C1/C2 power factor and capacitance. Type tests per IEC 60137, witnessed by Eskom/NTCSA for Eskom orders. All test facilities must be ISO 17025 accredited.
Creepage distance: 31 mm/kV, with protected creepage not exceeding 50% of total.
Detailed requirements cover terminal stem sizes, internal electrical connections, test point construction, corrosion proofing, lifting lugs, installation position, air vents, nameplate information, documentation, impact indicators, stress shields, corona shields, and packing.
General requirements: Bushings from 33kV and above must be condenser type and dry type. Paperless preferred where matured; otherwise RIP dry type. External insulation from silicon composite rubber. Proof required that no moisture can move through external insulation.
Environmental requirements: Outdoor installation at 1800m, temperatures -10°C to +40°C, humidity 90%, very heavy pollution, seismic 0.3g.
Factory testing: Each bushing tested for C1/C2 power factor and capacitance. Type tests per IEC 60137, witnessed by Eskom/NTCSA for Eskom orders. All test facilities ISO 17025 accredited.
Pricing schedule template provided as Annex B. Includes sections for purchasing details, operating environment, technical data, and testing requirements. Bidders must complete Schedule A and Schedule B with specific quantities, delivery dates, and technical specifications.
Pricing schedule template (Annex B) includes:
Purchasing details: Delivered to, quantity, delivery date.
Technical compliance: All bushings must meet this technical specification. Any deviation requires written approval from Eskom/NTCSA.
Terminal stems: Solid copper, silver plated min 20 micron, dimensional tolerances per BS 1433. Manufactured from single piece; spacers not acceptable.
Internal connection: Designed for partial drain replacement. Flexible draw leads with separate stems required where possible; otherwise removable solid conductor.
Test point construction: Positioned ≤45° from deaeration point. Two test points considered for condition monitoring.
Fasteners: Stainless steel grade 316 bolts with grade 304 nuts/washers. Thread lubrication with high-temperature grease (silicone preferred).
Packing: Crate lined with watertight plastic sheeting. Permanent markings for correct side up, centre of gravity, sling connections, total weight.
Environmental requirements: Outdoor installation at 1800m altitude. Ambient temperatures max +40°C, yearly average +25°C, min -10°C. Average humidity 90%. Solar radiation 2500kW/m2. High UV radiation. Seismic conditions min 0.3g. Pollution level: Very Heavy. Bushings must withstand full vacuum at sea level and extended positive pressure of at least 100 kPa.
All bushings from 33 kV (system voltage) and above shall be of the condenser type and dry type. Paperless technology is preferred for classes where the technology has matured, and this shall be demonstrated by each supplier during each tender. Where the paperless is not matured, resin impregnated paper (RIP) dry type will be an alternative. External insulation material shall be manufactured from silicon composite rubber, except otherwise specified in the schedules. No movement of moisture must be possible through the external insulation to the condenser body, and proof of this must be supplied by the Contractor during a tendering stage.
Document240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdfReview complete
Description
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf
General Scope:
The tender involves the appointment of contractors or suppliers for the commencement of work.
Submission Guidelines
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf (unknown)
Returnable Documents:
Submit a signed Acknowledgement Form for Eskom SHE Rules and other Requirements.
The form must be signed by an authorised person (CEO/Director/Managing Director) and witnessed by two individuals.
Include the location, date, and full name of the authorised signatory.
Confirm in writing that you understand all SHE requirements and the consequences of non-compliance.
Returnable Documents
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf (unknown)
Returnable Document Instructions:
Submit a signed Acknowledgement Form for Eskom SHE Rules and other Requirements.
The form must include a statement confirming full understanding of the SHE requirements and consequences of non-compliance.
The form must be signed at a specified location and date, with witness details (two witnesses required).
The signatory must be an authorised person (CEO/Director/Managing Director).
Evaluation Criteria
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf (unknown)
Evaluation will consider:
Documented SHE compliance processes and alignment with Eskom’s SHE requirements (policies, procedures, standards).
Ability to manage subcontractors/suppliers, including selection criteria, resource adequacy, and competency verification.
Willingness to accept financial penalties for non-conformance to Eskom or statutory SHE requirements.
Provision of testimonials/references and contact details for previous similar work when requested by Eskom.
Technical Specifications
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf (unknown)
Scope and Management Requirements:
Notify Eskom prior to appointing any contractors or suppliers for work commencement.
Ensure contractors and suppliers possess adequate resources and competencies.
Monitor contractors/suppliers through audits and assessments for SHE compliance during work execution.
Provide grounds for termination of work done by contractors and suppliers.
Financial penalties apply to the main supplier for non-conformance to Eskom or statutory SHE requirements, including those of subcontractors/suppliers.
Work stoppages due to SHE-related issues will not warrant financial compensation claims against Eskom.
Quality Management
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf
Quality and Compliance Enforcement:
Financial penalties will be enforced on the main supplier for non-conformance to Eskom or statutory SHE requirements, including those of subcontractors or suppliers.
Ensure all employees (contractors/suppliers) undergo relevant Eskom induction and your company’s induction.
Compliance Requirements
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf (unknown)
Mandatory Compliance:
Comply with Eskom’s SHE specifications, the Occupational Health and Safety Act, the Compensation for Occupational Diseases and Illnesses Act, and the National Environmental Management Act.
After contract award, fully align company processes to Eskom’s SHE requirements (policies, procedures, standards).
Ensure all employees (including contractors/suppliers) undergo relevant Eskom induction and your company’s induction.
Demonstrate the process and selection criteria used when appointing contractors and suppliers.
Eskom reserves the right to verify compliance and may request copies of testimonials/references and contact details of previous clients (including Eskom) for similar work.
Non-conformances by contractors/suppliers (all tiers) will be addressed directly with the main supplier under performance and penalty processes.
Health & Safety
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf
SHE Requirements and Compliance:
Understand and comply with all SHE requirements listed in the document.
Mandatory compliance with: Eskom’s SHE specifications, the Occupational Health and Safety Act, the Compensation for Occupational Diseases and Illnesses Act, and the National Environmental Management Act.
After contract award, fully align company processes to Eskom’s SHE requirements (policies, procedures, standards).
SHE Rules effective date: November 2016; review date: December 2021.
Contractual Terms
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf
Contractual Terms:
The main supplier must demonstrate the process and selection criteria used for appointing contractors and suppliers.
Prior notification to Eskom is required before appointing any contractors or suppliers for work commencement.
The main supplier is accountable for ensuring contractors/suppliers possess adequate resources and competencies.
The main supplier must manage contractors/suppliers to ensure compliance with applicable legal and Eskom requirements.
Contractors/suppliers must be monitored through audits and assessments for SHE compliance during work execution.
The main supplier must provide grounds for termination of work done by contractors and suppliers.
All non-conformances by contractors/suppliers (all tiers) will be addressed with the main supplier under performance and penalty processes.
Eskom reserves the right to verify compliance and may request testimonials/references and contact details of previous clients (including Eskom) for similar work.
Work stoppages initiated due to SHE-related issues will not warrant financial compensation claims against Eskom.
Financial penalties will be enforced on the main supplier for non-conformance to Eskom or statutory SHE requirements, including those of subcontractors/suppliers.
DocumentClarification link.docxReview complete
Description
Source: Clarification link.docx
The tender scope is for the supply and delivery of capacitive graded bushings.
No explicit compliance requirements (e.g., CSD, CIDB, CIPC, or professional registrations) are stated.
Tax clearance certificate is required.
B-BBEE certification is preferred.
Document240-108987034 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work) - Copy.docxReview complete
Submission Guidelines
Source: 240-108987034 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work) - Copy.docx (unknown)
Submit the following returnable documents as part of the tender: Signed acknowledgement of Eskom's SHE rules and requirements form (Annexure B).
Evaluation Criteria
Source: 240-108987034 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work) - Copy.docx (unknown)
Scoring is binary (0 or 1) per KPI. Pre-requisites must all score 1 (document submitted and meets minimum requirements), otherwise score is 0. Risk category determines additional requirements: Low risk: Waste management (reduction, re-use, recycling, disposal) and environmental induction. Medium risk: Adds environmental incident management and emergency planning. High risk: Adds environmental management structure (professional registration, responsibility, accountability), method statements for significant environmental impacts, compliance approach, environmental competency/training, and communication/awareness. High risk only: Identification of environmental aspects/impacts with methodology and controls. ISO 14001 certificate is required where applicable.
Compliance Requirements
Source: 240-108987034 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work) - Copy.docx (unknown)
Mandatory compliance documents: Signed acknowledgement of Eskom's SHE rules and requirements (Annexure B). Environmental Management Plan (EMP) aligned to risk category (low, medium, high) with specific requirements per category. Signed Environmental/SHE/SHEQ policy by Company Owner/CEO/MD. For high-risk work: Proof of environmental competency (e.g., Environmental Officer, Control Officer, Incident Investigator qualifications/certificates). ISO 14001 Environmental Management Standard certificate (if applicable).
Closing Date: 17 October 2021 (as per document authorisation).
Note: The tender listing indicates a closing date of 2026-07-03. Bidders must refer to the official tender invitation for the correct, applicable closing date and any other deadlines.
Complete and sign Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001). This is mandatory for all categories.
Submit quality documentation as per the tender's selected category (Category 1, 2, 3, or 4) indicated in Form A.
Use the List of Tender Returnables document (240-12248652) to determine specific required documents for your category.
Ensure all returnable documents are submitted with your bid.
The main supplier is responsible for ensuring sub-suppliers also meet quality requirements and submit necessary plans.
Submit documents as per your assigned category (1-4) using the List of Tender Returnables (240-12248652).
Category-specific documents may include ISO 9001 certificate, audit reports, draft CQP, example QCP/ITP, QMS manual, quality policy, objectives, and documented roles/responsibilities.
Eligibility is contingent on meeting the quality requirements defined in this specification. The specific criteria depend on the 'Category' (1-4) assigned to the tender.
At a minimum, all bidders must complete and sign 'Form A'.
Higher categories require ISO 9001 certification (Category 1) or objective evidence of a developed QMS (Categories 2-4).
Suppliers must demonstrate the capability and capacity to meet the technical and quality demands, especially for high-risk or critical plant items.
References include ISO 9001, ISO 10005, CIDB 1004, and the PPPFA.
Specific scoring weights or thresholds are not provided in this extracted text.
Suppliers are classified into four categories (1-4) for pre-contract quality requirements.
Category 1 & 2: Typically require submission of a valid ISO 9001 certificate, audit reports, a draft Contract Quality Plan (CQP), and documented QMS information.
Category 3 & 4: Require objective evidence of a developed QMS (manual, policy, objectives, procedures) and a draft CQP.
All suppliers must submit Form A.
Post-contract, suppliers must submit a Quality Control Plan (QCP) and Inspection & Test Plans (ITPs) for Eskom acceptance within 30 days (or as stated) before work commences.
Suppliers will be monitored on key performance indicators including CQP/QCP adherence, delivery, design, cost, and management system compliance.
Eskom will conduct quality audits and performance reviews.
Suppliers must have a Quality Management System (QMS). Requirements vary by category (1-4) as indicated in Form A.
Category 1 & 2: Typically require a valid ISO 9001 certificate from an accredited body.
Category 3 & 4: Require objective evidence of a developed QMS complying with ISO 9001.
References are made to the Preferential Procurement Policy Framework Act (PPPFA) and CIDB guidelines.
Specific B-BBEE, tax, or CSD requirements are not detailed in this quality specification. Refer to the main tender documents.
The specification references Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy (32-727).
Eskom has extensive rights of access to review, inspect, and audit the supplier's QMS, documentation, materials, and work at any time.
The supplier must provide free workspace for Eskom-appointed resident quality inspectors at no cost.
Eskom may appoint any inspection agency it prefers, and the supplier cannot object or hinder their work.
Eskom reserves the right to withhold payment due to outstanding nonconformities and to suspend deliveries.
The supplier is liable for costs of repair, rework, and follow-up inspections if nonconforming products are identified.
The supplier must ensure all special processes (e.g., welding, NDT) are pre-qualified, and operators are suitably qualified. Records must be maintained and made available to Eskom.
Capability and capacity assessments will be conducted on suppliers providing high-risk products/services, working on critical plant, supplying critical components, or providing special processes.
Critical plant includes Generation Level 1 & 2, Transmission & Distribution Power Plant & Control Plant, and Mega Projects.
All sub-suppliers used for critical work must also be assessed.
The specification defines the quality criteria for supplier evaluation, based on conformance to ISO 9001 and adherence to Eskom's quality requirements.
References include ISO 9001, ISO 10005, CIDB 1004, and the PPPFA.
Specific scoring weights or thresholds are not provided in this extracted text.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.