Tender Type
Request for Quotation
Delivery Location
Matla Power Station - Kriel - Kriel - 2271
Organization Type
GOVERNMENT
Published
26 May 2026
OCDS Reference
ocds-9t57fa-157128
This tender, issued by ESKOM, seeks suppliers to perform repairs on ash dam filter drains and piezometers to enhance stability at matla power station over a 12-month period. IT is targeted at contractors with proven expertise in civil/geotechnical works and strict adherence to occupational health and safety (OHS) standards.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Request for Quotation
Matla Power Station - Kriel - Kriel - 2271
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Good Manufacturing Practice (GMP), SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: Invitation to Tender (ITT).pdf, SAFETY REQUIREMENTS.pdf, ENVIRONMENTAL RREQUIREMENTS .pdf and 6 more. You don’t need to refresh — this page will pick up the updated review automatically.
26 May
2026
Tender Published
Tender was published
19 Jun
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
SDL&I REQUIREMENTS.pdf
Eskom is seeking tenders for the repair of ash dam filter drains and piezometers to improve ash dam stability at Matla Power Station in the North West Province. The project duration is 60 months, with a focus on B-BBEE compliance, local content, job creation, and skills development. The tender closes on June 19, 2026, and scoring is based on price (90/80 points) and specific goals (10/20 points for B-BBEE status). SDL&I objectives are contractual obligations but do not affect scoring.
ENVIRONMENTAL RREQUIREMENTS .pdf
Tender for repairs of ash dam filter drains and piezometer to improve stability at Matla Power Station in North West Province. The project duration is 12 months, with a strong emphasis on environmental management and compliance.
ACTIVITY SCHEDULE.pdf
Eskom tender for a 12-month project to improve ash dam stability at Matla Power Station in North West province. The work involves repairing ash dam filter drains and piezometers, with the project structured into four main sections: preliminaries, piezometer installation, a trial phase for 12 drains, and full implementation for 48 drains.
Invitation to Tender (ITT).pdf
Eskom invites tenders for a 12-month contract to repair ash dam filter drains and piezometers to improve ash dam stability at Matla Power Station in North West. The tender is open, requires CIDB CE Level 6 or higher, and includes mandatory functionality evaluation with a 70% threshold.
QUALITY REQUIREMENT .pdf
Eskom tender for repair of ash dam filter drains and piezometer at Matla Power Station in North West province to improve ash dam stability. The contract duration is 12 months, with a closing date of June 19, 2026. The tender emphasizes a structured quality management approach aligned with ISO 9001 principles.
TECHNICAL EVALUATION CRITERIA.pdf
Eskom is seeking a Civil Engineering contractor to refurbish gravel roads at the New and Old Ash Dam at Matla Power Station. The work includes grading, blading, and re-gravelling to address water ponding and improve vehicle accessibility. The tender evaluation focuses on technical criteria (mandatory and qualitative) with a minimum threshold of 70%. The project duration is 12 months, and the closing date is June 19, 2026.
Ash dam drains NEC.pdf
Eskom tender for repairs to ash dam filter drains and piezometers at Matla Power Station to improve stability, using NEC3 Engineering & Construction Contract, with a 12-month duration.
SAFETY REQUIREMENTS.pdf
The tender, issued by ESKOM for Matla Power Station in the North West Province, focuses on improving ash dam stability through repairs of filter drains and piezometers over a 12-month period. The closing date is June 19, 2026. The tender emphasizes strict Occupational Health and Safety (OHS) compliance, with mandatory documentation and evaluations required for shortlisting. Only responsive and compliant tenderers will proceed to contract award consideration.
SCOPE OF WORK .pdf
The tender titled 'Improve ash dam stability - ESKOM' involves the repair of ash dam filter drains and piezometers at Matla Power Station over a 12-month period. The scope includes installing horizontal drains and vibrating wire piezometers to enhance stability, with a phased approach starting with a pilot test of 12 drains before proceeding with the remaining 48. The project emphasizes compliance with safety, environmental, and quality management standards, including OHS Act, ISO 14001, and ISO 9001:2015. Designs must be approved by an ECSA-registered engineer, and all work must adhere to SANS and DWS requirements.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: Invitation to Tender (ITT).pdfClosing date: 19 June 2026 at 10:00.
Non-compulsory clarification meeting: 8 June 2026, 14:00–15:00 via Microsoft Teams (Join: https://teams.microsoft.com/meet/366145625275019?p=ndz9jis0JqEFFRz09G; Meeting ID: 366 145 625 275 019; Passcode: nJ6QZ3wE). Confirm attendance in writing with Eskom Representative (Katlego Tsatsane), including attendee names, positions, and contact details.
Clarification queries deadline: 10 June 2026 (5 working days before tender closing). Requests for tender closing extensions must be submitted by 5 June 2026.
Tender validity period: 84 days (12 weeks) from closing date.
Contact Information
Source: Invitation to Tender (ITT).pdfEskom Representative: Katlego Tsatsane. Tel: 013 296 3566. Email: [email protected].
Submission portal: Eskom E-tendering (Tenderbulletin.eskom.co.za).
Fraud/corruption reporting: Hotline 0800 11 2722 or email [email protected].
Submission Guidelines
Source: Invitation to Tender (ITT).pdfSubmit electronically via Eskom E-tendering portal (Tenderbulletin.eskom.co.za) by 19 June 2026 at 10:00. No hard copies or ZIP files accepted. All documents must be in PDF format (max 500MB per file, total submission ≤4GB). Upload under folders: Technical, Commercial, Financial, and Other. Latest submission version overrides previous ones—ensure submission status shows as 'complete'.
Mandatory returnables at closing (disqualifiable if missing/incomplete):
Non-disqualifiable returnables: May be requested within 5 working days if missing/incomplete (excluding CIDB proof, which has a 21-day grace period if agreed).
Disqualification risks: Late submission, missing mandatory returnables, non-PDF format, ZIP files, or failure to meet eligibility criteria.
Evaluation Criteria
Source: Invitation to Tender (ITT).pdfEvaluation stages:
Ranking: Total score = Price (80/90) + Specific Goals (10/20). Highest to lowest ranking determines preference. Lowest acceptable tender sets the preference system (90/10 or 80/20).
Contractual Requirements (post-evaluation): CSD registration, CIDB CE Level 6+, financial viability, SHEQ, CSI (2%), SDL&I. Failure to meet these may render the tender non-responsive.
Technical Specifications
Source: Invitation to Tender (ITT).pdfScope: Repairs of ash dam filter drains and piezometer to improve stability at Matla Power Station for 12 months.
Health and Safety:
Environmental Management:
Quality Management:
Contract: NEC3 Engineering and Construction Contract (ECC) with:
Financial Requirements
Source: Invitation to Tender (ITT).pdfPricing schedule must be submitted in PDF (max 500MB per file, total submission ≤4GB).
Payment terms:
Discounts:
Performance Security: If required, must be a bond or demand guarantee from Eskom-approved financial institutions (minimum 2 institutions to be selected).
Financial Viability:
Compliance Requirements
Source: Invitation to Tender (ITT).pdfMandatory:
Additional:
Post-Award Requirements:
Submission Guidelines
Source: SAFETY REQUIREMENTS.pdfEvaluation Criteria
Source: SAFETY REQUIREMENTS.pdfTechnical Specifications
Source: SAFETY REQUIREMENTS.pdfFinancial Requirements
Source: SAFETY REQUIREMENTS.pdfCompliance Requirements
Source: SAFETY REQUIREMENTS.pdfSubmission Guidelines
Source: ENVIRONMENTAL RREQUIREMENTS .pdfThe document does not specify submission address, deadline, or required forms. Refer to the official tender notice (E2933GXMPMAT) for these details.
Evaluation Criteria
Source: ENVIRONMENTAL RREQUIREMENTS .pdfEvaluation will focus on:
Technical Specifications
Source: ENVIRONMENTAL RREQUIREMENTS .pdfScope requires the following deliverables:
Important Dates
Source: QUALITY REQUIREMENT .pdfClosing date: 12 March 2026. No other dates (e.g., briefings, site visits, clarification deadlines) are provided.
Contact Information
Source: QUALITY REQUIREMENT .pdfPhone: 0105658000. No name, email, department, or submission address is provided.
Submission Guidelines
Source: QUALITY REQUIREMENT .pdfSubmit all returnable documents as listed in the tender. This includes:
Evaluation Criteria
Source: QUALITY REQUIREMENT .pdfEvaluation is based on a scoring system for quality deliverables:
Technical Specifications
Source: QUALITY REQUIREMENT .pdfScope: Repair of ash dam filter drains and piezometer to improve ash dam stability at Matla Power Station for 12 months.
Compliance Requirements
Source: QUALITY REQUIREMENT .pdfMandatory compliance with ISO 9001:2015-aligned Quality Management System (QMS). Required evidence includes:
Submission Guidelines
Source: SDL&I REQUIREMENTS.pdfEvaluation Criteria
Source: SDL&I REQUIREMENTS.pdfTechnical Specifications
Source: SDL&I REQUIREMENTS.pdfFinancial Requirements
Source: SDL&I REQUIREMENTS.pdfCompliance Requirements
Source: SDL&I REQUIREMENTS.pdfImportant Dates
Source: Ash dam drains NEC.pdfDefects date: 52 weeks after completion of the whole of the works. Defect correction period: 1 week (24 hours for production loss and SHE requirements; 1 week for low-risk defects as determined by Eskom). Assessment interval for payments: by the 25th of each month. Payment due: 30 days from invoice submission date. Starting date: As per contract award. Completion date: As per programme. Key dates include site establishment acceptance, test pilot, drainable pavement system, drainage pipe installation, and geotechnical tests/reports.
Contact Information
Source: Ash dam drains NEC.pdfProject Manager: Matla Power Station, Delmas Road, Kriel, 2271. Phone: 013 699 7871. Fax: N/A. Email: Not explicitly provided. For insurance details, refer to: http://www.eskom.co.za/live/content.php?Item_ID=9248. Adjudicator nominating body: Chairman of ICE-SA (www.ice-sa.org.za) or Arbitration Foundation of Southern Africa (AFSA). Arbitration location: Johannesburg, South Africa.
Submission Guidelines
Source: Ash dam drains NEC.pdfSubmit the following returnable documents: C1.1 Form of Offer and Acceptance (3 pages). The tenderer must sign the Offer section, authorising a representative to legally bind the company. Eskom accepts the Offer by signing the Acceptance section and returning one copy to the tenderer. All deviations from tender documents must be recorded in the Schedule of Deviations. Covering letters are not part of the final contract. Alternative tenders require a separate Form of Offer and Acceptance. Within two weeks of receiving the signed agreement, the Contractor must arrange delivery of securities, bonds, guarantees, proof of insurance, and other required documentation. Failure to do so constitutes a repudiation of the agreement.
Evaluation Criteria
Source: Ash dam drains NEC.pdfContractor must be a legally constituted entity capable of entering a contract under South African law. Must have (or provide) CIDB registration if applicable. Must agree to joint and several liability if a joint venture. Must comply with Eskom's ethical clauses (Z12) prohibiting corrupt, fraudulent, collusive, coercive, or obstructive actions. Non-compliance may result in termination. Evaluation will consider compliance with statutory SHE and legal requirements, workmanship quality, and risk management (e.g., dust control, disease prevention, Covid-19 protocols).
Technical Specifications
Source: Ash dam drains NEC.pdfScope: Repair of Ash Dam Filter drains and Piezometer to improve Ash Dam Stability at Matla Power Station for 12 months. Works Information is detailed in Part C3 (Scope of Work). Site: Matla Power Station, North West Province (coordinates: halfway between Bethal and Ogies on R545, 13 km north-west of Kriel). Site Information is in Part C4. Key risks in the Risk Register: non-compliance with statutory SHE and legal requirements, poor system performance due to workmanship, excessive dust, disease outbreak, and Covid-19. Works must comply with Construction Regulations 2014 (OHSA) and all applicable health, safety, and environmental laws. Contractor may be appointed as the Principal Contractor under OHSA. Weather data and compensation events are defined in Annexure A (1-in-10-year rainfall, temperature, and wind data from SA Weather Bureau). Topography: Gently undulating plateau at ±1540m above sea level. Air quality considerations: Dust control for ash dam and surrounding areas.
Financial Requirements
Source: Ash dam drains NEC.pdfContract type: NEC3 Engineering & Construction Contract (ECC3) Option A - Priced contract with activity schedule. Pricing: Lump sum prices for each activity on the Activity Schedule (Part C2.2). No partial payments for incomplete activities. Payment terms: Contractor must submit a tax invoice within 1 week of receiving a payment certificate from the Project Manager. Invoice must include Eskom’s VAT number (4740101508). Payment due within 30 days of invoice submission. Interest rate: Publicly quoted prime rate (Standard Bank of SA) for Rand amounts; LIBOR for other currencies. Retention: 5% of every payment, with 50% released after project completion and 50% after 52 weeks. Delay damages: 2% of total order value per week, capped at 5% of the order value. Contractor’s liability for indirect/consequential loss is limited to R0.00. Currency: South African Rand. Method of measurement: As stated in Part C2.1, Pricing Assumptions.
Compliance Requirements
Source: Ash dam drains NEC.pdfB-BBEE: Contractor must notify Eskom within 7 days of any change in B-BBEE status and submit an updated verification certificate within 30 days. Failure to notify may result in termination. If B-BBEE status decreases, Eskom may renegotiate or terminate the contract. Joint ventures: All parties are jointly and severally liable. Contractor must notify Eskom of key personnel within 2 weeks of contract date and cannot alter joint venture composition without written consent. CIDB registration number must be provided in the Form of Offer. Insurance: Contractor must provide insurances as per Insurance Table A (e.g., loss/damage to works, equipment, liability for property damage, bodily injury). Employer provides insurances as per Insurance Table B (e.g., Assets All Risk, Contract Works, Environmental Liability). Tax compliance: Contractor must comply with VAT Act and include Eskom’s VAT number (4740101508) on invoices. Ethics: Prohibited actions (corruption, fraud, collusion, coercion, obstruction) may result in termination. Asbestos: Contractor must comply with Eskom’s Asbestos Standard 32-303 and South African regulations (e.g., OEL of 0.2 fibres/ml, AL of 0.1 fibres/ml). Nuclear liability: Eskom indemnifies Contractor for nuclear damage unless caused by Contractor’s unlawful intent. Confidentiality: Contractor must not disclose contract-related information without Eskom’s consent.
Submission Guidelines
Source: SCOPE OF WORK .pdfSubmit the following returnable documents: Data books, reviews, reports, and diagrams/drawings to Engineering after completion of work. Engineering will forward these to the Quality Department (Document Control). All Quality Control Plans (QCPs) must be submitted to Engineering and Quality for approval prior to the commencement of any outage, project, or maintenance work.
Evaluation Criteria
Source: SCOPE OF WORK .pdfGeneral: Must be a registered and compliant contractor with valid certifications (e.g., ISO 9001:2015, ISO 14001:2015). Must have experience in ash dam stabilization, drainage systems, and piezometer installations. Must employ ECSA-registered engineers/technologists for design sign-offs. Must comply with Eskom’s vendor registration and pre-qualification requirements. Must have a proven track record in similar projects (references may be required). Legal: Must adhere to South African OHS Act, Construction Regulations 2014, and NEMA. Must have valid environmental authorizations for the scope of work. Must comply with Eskom’s Plant Safety Regulations (PSR 36-681). Financial: Must demonstrate financial capability to execute the project (e.g., bank guarantees, insurance). Must be able to phase expenditures as per Eskom’s payment milestones.
Technical Specifications
Source: SCOPE OF WORK .pdfScope: Repair and installation of machinery and equipment for ash dam stability at Matla Power Station over 12 months. Key deliverables: Install additional drains and vibrating wire piezometers at the Ash Dam Facility. Drainage system: Supply and install perforated 110mm diameter HDPE pipes with factory-installed geotextile filter surrounds, inserted horizontally into the ash dam at varying depths and elevations. Drainage pipes must have a minimum slope of 3 degrees for gravity flow. Drainage collection system: 160mm diameter perforated HDPE collector pipes to convey water from benches to the existing solution trench. Rodding eyes (110mm Y-junctions) must be provided for cleaning. Pilot testing: Install 12 pilot drains (minimum 50m long) at predetermined locations. After one month of monitoring, Eskom will advise on proceeding with the remaining 48 drains. Piezometers: Supply and install 16 automated electronic vibrating wire piezometers (4 sets of 4) on the ash dam benches. System must include data loggers, wireless gateways, software, and hardware for web-based monitoring. Power supply: Contractor must coordinate with Eskom’s electrical engineer to identify and implement power supply modifications. Design: Contractor is responsible for all temporary works design, signed off by an ECSA-registered Professional Civil Engineer. All designs must comply with SANS and DWS requirements. Geotextile: Must meet soil-retention, permeability, clogging resistance, and durability criteria per FHWA Demonstration 87. Methodology: Horizontal directional drilling, temporary casing insertion, drainage pipe installation with geotextile, and withdrawal of casing. Waste disposal: Must be managed in predetermined areas as advised by Eskom. Phased installation: Prioritize critical areas for economic and time-distributed expenditure.
Compliance Requirements
Source: SCOPE OF WORK .pdfHealth and Safety: Health and safety file must be approved by Eskom’s risk management department prior to work commencement. All work must comply with the OHS Act, Matla plant procedures, and Plant Safety Regulations. Contractor must ensure all employees are competent for their tasks. Matla Power Station SHEQ induction is mandatory before site access. Occupational Health and Safety Requirements: Area must be securely barricaded. Risk assessments must be conducted prior to work, with all hazards communicated to employees. PPE must be worn at all times. No work may commence without a supervisor present. All incidents must be reported to Eskom Supervisor, Construction Health and Safety Agent, and Eskom SHE Manager/Officer. Environmental Management: All activities must have environmental authorization under the National Environmental Management Act and EIA Regulations. Contractor must comply with all applicable legal and environmental requirements. Polluter pays principle applies. EMS file based on ISO 14001 is required. Last payment is contingent on the status of the final housekeeping check sheet (Annexure C: OMOP 4402). Equipment using diesel or petrol must be placed on drip trays. Waste streams must be identified, listed, and managed accordingly. Quality Management: Contractor must develop all QCP documentation, approved by Engineering and authorized by the Quality Department before work begins. Must adhere to QM 58 and OMOP 4497. Number of Non-Conformance Reports (NCRs) issued can impact future tendering. QCPs must be progressively signed by Engineer/Supervisor, Eskom QC Inspector, Contractor QC Inspector, and/or AIA. No procurement of outage items without Quality approval. All scope changes must be approved by Quality. Contractor is subject to quality audits at any time. Quality Requirements: Work must comply with ISO 9001:2015. Reinforcing steel must meet SABS 920, 4449, or 4461 standards, with bending per SABS 82. Mix designs require Eskom approval before concrete works. Construction Regulations 2014: Contractor must fulfill duties of Designer as per Construction Regulations 2014, Sections 6(1) a-j and 6(2) a-d. Contractor must highlight design risks and mitigation measures to Eskom. Contractor is responsible for construction monitoring to certify compliance with their design.
Submission Guidelines
Source: TECHNICAL EVALUATION CRITERIA.pdfReturnable Documents: Submit a valid CIDB Grading 7 CE certificate. Omission will disqualify the submission. Ensure all tender returnables are fully addressed as per the technical specification.
Evaluation Criteria
Source: TECHNICAL EVALUATION CRITERIA.pdfEvaluation Process:
Technical Specifications
Source: TECHNICAL EVALUATION CRITERIA.pdfScope: Refurbishment of gravel roads at the New and Old Ash Dam at Matla Power Station’s Ash Dam Facility. Roads are degraded, causing water ponding and operational hazards.
Key Deliverables:
Standards: Follow the latest editions of Eskom’s referenced documents (e.g., Tender Technical Evaluation Procedure, Technical Scoring Form).
Compliance Requirements
Source: TECHNICAL EVALUATION CRITERIA.pdfMandatory:
Evaluation Criteria
Source: ACTIVITY SCHEDULE.pdfEvaluation will assess the following: - Capability to provide police clearance certificates for staff. - Provision of valid medical certifications for all personnel. - Demonstrated ability to comply with all SHEQ (Safety, Health, Environment, Quality) requirements. - Financial capacity to sustain a 16-month project, including staff logistics (transportation and accommodation). - Technical expertise in geotechnical drilling, piezometer installation, and ash dam engineering.
Technical Specifications
Source: ACTIVITY SCHEDULE.pdfScope of work: - Site establishment and de-establishment (one-time activities). - Compilation and submission of a safety file. - Provision of police clearance and medical certifications for staff. - Full adherence to SHEQ requirements throughout the project. - Management of staff transportation and accommodation for 16 months. - Provision and installation of piezometers and connections. - Trial phase: clearing, drilling, excavation, and connection installation for 12 filter drains (including 600M drilling, 240M excavation, and 60 junctions). - Implementation phase: same activities for 48 additional filter drains (including 2440M drilling, 960M excavation, and 200 junctions). - Overall management of works for the 12-month contract period.
Financial Requirements
Source: ACTIVITY SCHEDULE.pdfPricing structure: - Breakdown required for all items in the activity schedule. - Preliminaries and General (Items 1-9): includes site establishment, de-establishment, safety file, police clearance, medicals, SHEQ adherence, staff transportation, accommodation, and works management. - Piezometer and General (Items 10-11): provision of APP sign-off and piezometers with connections. - Trial with 12 drains (Items 12-17): clearing, drilling, setup, excavation, installation, and junction connectivity. - Implementation of 48 drains (Items 18-23): same activities as trial phase, scaled to 48 drains. - Submit rates per unit (Sum, Month, M, No) and quantities as specified. - Provide subtotals for each section, total excluding VAT, VAT amount, and total including VAT.
Compliance Requirements
Source: ACTIVITY SCHEDULE.pdfMandatory compliance: - Submission of a valid safety file. - Police clearance certificates for all relevant personnel. - Medical certifications for staff. - Full adherence to SHEQ requirements.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Matla Power Station - Kriel - Kriel - 2271
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
9
Last checked
12 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 205 700
Range
Based on 19 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Repair and installation of machinery and equipment. Unlock full pricing strategies, bid frequency, and historical win rates.