This expression of interest invites suppliers to tender for the complete so₃ package covering procurement, design, manufacturing, shipping, transportation, storage, decommissioning, installation, testing, commissioning, documentation and handover of six sulphur trioxide skids and common plant for ESKOM in mpumalanga. Bidders must have proven experience in industrial chemical processing equipment and must comply with eskom's standard tender conditions including sheq requirements, b-bbee regulations, PPPFA preference point system, and applicable legislative requirements.
Key Requirements
Submit one original and one hard copy (or upload via Eskom e-tendering portal) before the closing date of 9 July 2026 at 10:00 SAST; late submissions will not be accepted
Tenderers must not subcontract 100% of the scope of work; such tenders will be disqualified
Provide proof of Safety, Health, Environment and Quality (SHEQ) systems, policies and capabilities at tender closing; costs must be reflected in the submission
Submit a valid B-BBEE CSD report or certificate/affidavit at closing if B-BBEE is a pre-qualification criterion; fraudulent or expired documents lead to disqualification
Include all duties, taxes (VAT) and levies in quoted prices; rates must be fixed for the contract duration and quoted in South African Rand
Comply with applicable legislation including CIDB regulations, PPPFA, Amended B-BBEE Codes, OHS Act, and Eskom's SHEQ requirements
Attend any compulsory site visit or clarification meeting; failure to attend will result in disqualification
The scope of work for so3 package includes procurement, design, manufacturing, shipping, transportation, storage, decommissioning, installation, testing, commissioning, documentation, and handover of unit 1 to 6 sulphur trioxide skids and common plant.
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
DocumentE-tendering Help Manual for supplier - 27 January 2025.pdfReview complete
Description
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf
Important Dates
17 Jun
2026
PUBLICATION
Tender Published
Tender was published
09 Jul
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
20260608 Expression of Interest (EOI) for Tutuka EOI Final (002).pdf
Eskom invites Expressions of Interest for the procurement, design, manufacturing, installation, commissioning, and handover of a Sulphur Trioxide (SO3) Flue Gas Conditioning Plant at Tutuka Power Station, Mpumalanga. The scope includes six unitized skids and a common plant, covering the full project lifecycle from design to handover.
E-tendering Help Manual for supplier - 27 January 2025.pdf
This document is NOT the actual tender specification but rather the Eskom eTendering System User Manual (v3.0, dated 28 August 2023). The actual tender referenced is for SO3 package work at Eskom's Mpumalanga province facilities, involving procurement, design, manufacturing, shipping, transportation, storage, decommissioning, installation, testing, commissioning, documentation, and handover of sulphur trioxide skids for units 1-6. The document provides instructions for electronic tender submission through Eskom's eTendering portal.
Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Eskom tender for procurement, design, manufacturing, shipping, installation, testing, commissioning, and handover of six Sulphur trioxide skids and common plant in Mpumalanga. The tender follows Eskom's Standard Conditions of Tender with a closing date of July 9, 2026.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
This document is a user manual for Eskom’s eTendering system.
The system is a web-based platform for electronic submission of tender documents.
It replaces physical submission at Eskom tender offices.
Suppliers must register with a CSD number, email, and mobile number to access the system.
Source: 20260608 Expression of Interest (EOI) for Tutuka EOI Final (002).pdf (EOI)
Submit electronically via Eskom E-tendering site by the closing date and time (09 July 2026, 10:00 SAST).
Upload all documents in PDF and Excel format.
Maximum upload size per document: 500 MB. Total submission size must not exceed 4 GB.
Verify that the submission status is marked as 'complete' before the deadline.
Supplier Help Manual and video guide are available on the Eskom E-Tendering page.
Responsibility for timely submission lies solely with the supplier.
Evaluation Criteria
Source: 20260608 Expression of Interest (EOI) for Tutuka EOI Final (002).pdf (EOI)
Mandatory: Registration on Central Supplier Database (CSD).
Likely required: CIDB registration and grading for construction-related works.
B-BBEE compliance: Must provide a valid B-BBEE Certificate and level. Foreign companies must submit a letter from a SANAS-accredited B-BBEE Verification Agent confirming they cannot be assessed due to lack of South African presence.
Experience: Must demonstrate prior work on similar projects within Eskom Power Generation or other utilities, including role (main contractor, subcontractor, OEM partner).
Financial capacity: Must prove ability to undertake large-scale projects of this magnitude.
OEM status: Must have or be capable of obtaining an OEM status letter for SO3/NH3 systems or a partnership letter with the OEM.
Compliance: Must adhere to South African occupational health and safety regulations.
Technical Specifications
Source: 20260608 Expression of Interest (EOI) for Tutuka EOI Final (002).pdf (EOI)
Scope: Full turnkey delivery including procurement, design, manufacturing, shipping, transportation, storage, decommissioning, installation, testing, commissioning, documentation, and handover.
Deliverables: Unit 1 to 6 Sulphur trioxide (SO3) skids and common plant.
Key components: Steam stations, steam drain stations, sulphur storage tanks with auxiliaries (submerged Sulphur Circulating Pumps, sulphur offloading pumps), burner and convertor vessels, sulphur injection lances, process air heaters, process blower/fan, pressure reducing stations, associated pipeworks, valves, electrical apparatus, and control instrumentation.
Additional works: Installation of a Sulphur supply line ring main, enclosure for the plant, and steam supply tie-in from the cold reheat or auxiliary steam range supply manifold (including all associated pipeworks).
Compliance Requirements
Source: 20260608 Expression of Interest (EOI) for Tutuka EOI Final (002).pdf (EOI)
Company registration: Provide valid company registration number.
CSD registration: Provide CSD registration number.
CIDB registration: Provide CIDB registration number and grading (if applicable).
B-BBEE: Submit B-BBEE Certificate and level. Foreign companies must provide a SANAS-accredited verification letter.
Professional registration: Must have an ECSA-registered professional (Pr Eng or Pr Tech Eng) with at least 4 years of experience.
Health and safety: Confirm compliance with South African occupational health and safety regulations.
Local presence: Confirm availability of local teams and resources in South Africa.
Financial history: Disclose any past project failures due to financial constraints.
Financial capacity: Provide evidence of financial capability to execute projects of this scale.
OEM status: Provide or obtain an OEM status letter for SO3/NH3 systems or a partnership letter with the OEM.
B-BBEE Requirements
Source: 20260608 Expression of Interest (EOI) for Tutuka EOI Final (002).pdf (EOI)
Submit a valid B-BBEE Certificate and state the B-BBEE level.
Foreign companies: Provide a letter from a SANAS-accredited B-BBEE Verification Agent confirming inability to be assessed due to lack of South African presence.
Requirements
Source: 20260608 Expression of Interest (EOI) for Tutuka EOI Final (002).pdf (EOI)
Provide company registration number.
Provide CSD registration number.
Provide CIDB registration number and grading (if registered).
Indicate whether the company is local (South African) or international.
Specify typical lead times from contract placement to: design completion, common plant and first unitized skid commissioning, and unitized skids commissioning between units.
Employ an ECSA-registered professional (Pr Eng or Pr Tech Eng) with at least 4 years of experience.
Confirm availability of local teams and resources in South Africa.
Disclose any history of project failure due to financial constraints.
Provide financial capacity details for projects of this scale.
Provide or obtain an OEM status letter for SO3/NH3 systems or a partnership letter with the OEM.
DocumentEskom - Standard Conditions of Tender - 30 January 2025.pdfReview complete
Description
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf
The Invitation to Tender includes all annexures and any additional requirements referenced in the Tender Data. • Addenda will be issued in the same manner as the original tender and become part of the tender documents. • All communications with Eskom must be directed to the Eskom Representative and must be in writing.
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Closing date and time – as stated in the Tender Data (all times are South African Standard Time, SAST). • Compulsory site visit / clarification meeting – date, time and venue are listed in the Tender Data; attendance is mandatory. • Addenda, clarifications and extensions – published on the Eskom Tender Bulletin and NT e‑Tender Portal; tenderers must check these platforms regularly.
Contact Information
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
All communications must be addressed in writing to the Eskom Representative named in the Invitation to Tender. • The Representative’s name, email, telephone and postal address are provided in the Tender Data (only those details may be used). • Clarification requests must be submitted in writing to the Representative; Eskom will publish all queries and responses on the Tender Bulletin and NT e‑Tender Portal.
Submission Guidelines
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Submit one original tender in paper form and one complete hard‑copy copy to the address and tender box specified in the Tender Data by the closing date and time (SAST). • For e‑tendering, upload the full tender package to the Eskom Tender Bulletin site and finalise it before the closing time – electronic submission only; no paper submission will be accepted. • All documents must be in English, completed in ink (no pencil), and be readable and non‑corrupt. • Sign the original (or electronic) tender; the signatory is liable for the submission. • Package the original and the copy in separate envelopes marked “ORIGINAL” and “COPY”. If an electronic copy is required, mark it “ELECTRONIC COPY”. Seal all envelopes together in an outer package labelled “Confidential” with the Eskom address, Invitation to Tender number, tenderer’s name, physical address, email and telephone of the authorised representative. • Return all mandatory tender returnables (forms, certificates, schedules, etc.) fully completed by the closing date and time. • Proof of posting or courier does not constitute proof of delivery; Eskom is not responsible for mis‑addressed or unsealed packages. • Late tenders will be rejected; the e‑tendering system will not allow submissions after the deadline. • Attendance at any compulsory site visit or clarification meeting is mandatory – failure to attend results in disqualification. • Sub‑contracting 100 % of the scope of work is prohibited; such tenders will be deemed ineligible.
Returnable Documents
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Tender closing time 2.2 Ensure that Eskom has received the complete original tender and one (1) complete hard copy of the original tender at the address and in the tender box or e-mail address specified in the Tender Data by no later than the closing date and time for tender submission. Proof of posting or of courier delivery does not equate to proof of delivery. Eskom will not accept a tender submitted by e-mail unless stated otherwise in the Tender Data. For E-tendering the tenderer must upload and finalize the tender via Eskom Tender bulletin site on the Eskom E- tendering page by no later than the closing date and time for tender submission. It remains the sole responsibility of the tenderer to ensure that the documents (PDF/Excel) are submitted and accessible for downloading/evaluation without any challenges as well as they are not corrupt or unreadable. It is the tenderer’s responsibility to ensure that their tenders documents are submitted/uploaded, and the submission is finalised before the closing date and time For E-tendering tenderers are not permitted to deposit a tender into the Eskom tender box only electronic submission via the Eskom Tender bulletin site on the Eskom E- tendering page will be accepted.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Eligibility – tenderer must meet the criteria set out in the Tender Data and must not be restricted from doing business with Eskom or any state‑owned entity. • No double‑counting – a criterion will not be measured in more than one evaluation phase. • Functionality – if listed as a criterion, the tender must meet the minimum functionality threshold stated in the Tender Data to progress. • Financial analysis – Eskom will assess the financial risk of the supplier; any required mitigating measures must be satisfied. • Price evaluation – rates must include all duties, taxes (incl. VAT) and levies as of 14 days before the closing date; prices must be fixed for the contract duration and quoted in South African Rand unless otherwise instructed. • B‑BBEE – level is scored from the CSD report or certificate/affidavit. If a pre‑qualification criterion, proof must be submitted at closing; fraudulent or expired documents lead to disqualification. • PPPFA point allocation – lack of valid B‑BBEE proof results in zero PPPFA points but does not automatically disqualify if the tender is otherwise responsive. • Specific Goals – must be supported by documentation; failure to provide results in zero points within the 90/10 or 80/20 weighting. • Ranking – total score = price score + specific‑goals score (PPPFA). • Objective criteria – may be applied only if expressly stipulated; functionality and B‑BBEE scores cannot be used as objective criteria. • Reverse e‑auction – if indicated, tenderers must submit a complete tender without prices; prices will be ignored.
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Scope – procurement, design, manufacture, shipping, transportation, storage, de‑commissioning, installation, testing, commissioning, documentation and hand‑over of six (6) Sulphur Trioxide (SO₃) skids and associated common plant. • Tenderer must complete the Acknowledgement Form indicating whether the tender covers the whole or part of the works/services/supply. • All annexes and additional requirements referenced in the Tender Data form part of the tender documents and must be complied with. • Any discrepancies or missing documents identified on receipt of the Invitation to Tender must be reported to the Eskom Representative immediately.
Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Eskom will not reimburse any costs incurred by tenderers for preparation, submission, testing or negotiation of the tender. • Upon receipt of the Invitation to Tender, tenderers must review the documents and immediately notify the Eskom Representative of any discrepancies or missing items. • The Acknowledgement Form must be completed and submitted with the tender, clearly stating whether the tender covers the whole or part of the works/services/supply.
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Include all duties, taxes (incl. VAT) and levies payable as of 14 days before the closing date. • Quote fixed rates and prices for the full contract duration; rates must not be subject to adjustment except as expressly permitted. • Prices must be quoted in South African Rand unless otherwise instructed; use the exchange rate and base date specified in the Tender Data. • No unauthorised alterations – any changes to the tender documents must be initialed by all signatories; corrections may only be made to comply with instructions or to fix errors. • Alternative tenders – may be submitted only if a main tender is also submitted and if the Invitation to Tender allows it. • Price corrections – Eskom may request clarification or correction of pricing errors; the corrected total, once agreed, is binding. • Cataloguing – if required, include a line item for cataloguing in the pricing schedule; Eskom will pay for this service. • Functionality – if a functionality criterion applies, meet the minimum threshold to remain in evaluation. • Financial risk – Eskom will assess the supplier’s financial stability; any required mitigating measures must be satisfied. • Price evaluation – consider CPA, FOREX, commodity exposure, unconditional discounts, technical adjustments, PV and invoicing rates. • Arithmetical errors – will be corrected by Eskom; discrepancies are resolved in favour of the amount in words. • Specific Goals – must be supported by documentation; failure results in zero points within the 90/10 or 80/20 weighting. • Ranking – total score = price score + specific‑goals score (PPPFA). • Objective criteria – may be applied only if expressly stipulated; functionality and B‑BBEE scores cannot be used as objective criteria.
Financial Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Pricing – include all duties, taxes (incl. VAT) and levies payable as of 14 days before the closing date; rates must be fixed for the entire contract period and not subject to adjustment except as expressly allowed. • Currency – quote all prices in South African Rand unless the Tender Data specifies another currency; use the exchange rate and base date stipulated. • No unauthorised alterations – any changes to the tender documents (except to correct errors or comply with instructions) are prohibited; all alterations must be initialed by every signatory. • Alternative tenders – may be submitted only if a main tender is also submitted and if the Invitation to Tender permits it. • Price corrections – Eskom may request clarification or correction of pricing errors during evaluation; the corrected total, once agreed, is binding. • Cataloguing – if required, a line item for cataloguing must be included in the pricing schedule; Eskom will pay for this service. • Security for performance – if required, tenderer must name at least two financial institutions likely to provide the security; Eskom may reject unsuitable institutions.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Legislation – comply with all applicable laws and regulations (National Treasury instructions, CIDB regulations, PPPFA, Amended B‑BBEE Codes, COIDA, OHS Act, and Eskom’s SHEQ requirements). • SHEQ – provide proof of Safety, Health, Environment and Quality systems, policies and capabilities at the closing date; related costs and personnel must be reflected in the tender. • CIDB – if a CIDB grade is stipulated, be registered with the CIDB by the closing date or be able to register within 21 working days; submit proof of registration (or application) as a mandatory returnable. • CSDG – Contract Skills Development Goals apply to contracts ≥12 months and ≥R5 million (or CIDB grade ≥ 7). • CPG – Contract Participation Goals apply to construction works contracts (GB/CE classes) of ≥6 months duration with ≥25 % subcontracting. • B‑BBEE – submit a valid CSD report or certificate/affidavit at closing; fraudulent or expired documents lead to disqualification and possible reporting to the B‑BBEE Commission. • SDL&I Undertaking – must be completed and submitted by contract award. • Misrepresentation – any false or misleading information will result in disqualification and may lead to suspension from state‑owned contracts for up to ten years.
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Comply with all relevant legislation, including the Occupational Health and Safety Act and Eskom’s Safety, Health, Environment and Quality (SHEQ) requirements. • Provide proof of SHEQ systems, policies and capabilities at the closing date; associated costs and personnel must be reflected in the tender. • CIDB registration – if required, be registered or capable of registration within 21 working days and submit proof as a mandatory returnable. • Contract Skills Development Goals (CSDG) apply to contracts of 12 months or more and meeting the value/grade thresholds. • Contract Participation Goals (CPG) apply to construction contracts (GB/CE classes) of at least 6 months duration with ≥25 % subcontracting. • Misrepresentation or falsification of information may lead to disqualification, reporting to the B‑BBEE Commission, suspension for up to ten years, or legal action. • Submit the SDL&I Undertaking by contract award. • All clarifications and addenda will be published on the Eskom Tender Bulletin and NT e‑Tender Portal. • Grounds for rejection include collusion, bid‑rigging, fraud or other illegal activity. • If a reverse e‑auction is used, tenderers must submit a complete tender without prices.
Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Eskom may enter into mandated negotiations with selected tenderer(s) in line with approved procurement policies. • Eskom disclaims liability for any inaccuracy or incompleteness in the tender documents and for any loss incurred by tenderers participating in the process. • Tender validity – the tender remains valid for acceptance for the period stated in the Tender Data; Eskom may request an extension, and refusal to extend will result in exclusion from further consideration. • Confidentiality – all procurement information is confidential; documents may only be used for preparing and submitting the tender. • Mandatory site visits/clarification meetings – attendance is compulsory as per the Tender Data. • B‑BBEE scoring – proof must be submitted at closing if it is a pre‑qualification criterion; fraudulent or expired certificates lead to disqualification. • PPPFA points – lack of valid B‑BBEE proof yields zero points but does not automatically disqualify a responsive tender. • Specific Goals – must be supported by documentation; failure results in zero points within the 90/10 or 80/20 weighting.
Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Eligibility – tenderer must satisfy the eligibility criteria set out in the Tender Data and must not be restricted from doing business with Eskom or any state‑owned entity. • 100 % sub‑contracting of the scope of work is prohibited; such tenders will be deemed ineligible and disqualified.
Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf
No double‑counting – a criterion will not be measured in more than one evaluation phase. • Functionality – if listed, the tender must meet the minimum functionality threshold in the Tender Data to proceed. • Financial analysis – Eskom will assess the supplier’s financial risk and may require mitigating actions. • Price evaluation – rates must include all duties, taxes (incl. VAT) and levies as of 14 days before closing; prices must be fixed for the contract duration and quoted in Rand unless otherwise instructed. • B‑BBEE – level is scored from the CSD report or certificate/affidavit; proof must be submitted at closing if it is a pre‑qualification criterion. • PPPFA – lack of valid B‑BBEE proof results in zero PPPFA points but does not automatically disqualify a responsive tender. • Specific Goals – must be supported by documentation; failure results in zero points within the 90/10 or 80/20 weighting. • Ranking – total score = price score + specific‑goals score (PPPFA). • Objective criteria – may be used only if expressly stipulated; functionality and B‑BBEE scores cannot be used as objective criteria. • Reverse e‑auction – if indicated, tenderers must submit a complete tender without prices; prices will be ignored.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.