Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
ESKOM HOLDINGS SOC LIMITED - Lephalale - Lephalale - 0555
Organization Type
GOVERNMENT
Published
10 Sept 2026
OCDS Reference
ocds-9t57fa-169911
ESKOM is procuring goods or services that require the tenderer to submit a completed and signed contract quality plan (cqp) before the closing date. The cqp must be prepared in line with SANS 466:2005 and cover quality management, method statements, inspection registers, and related quality documentation. The most consequential requirement is that the cqp must be compiled by the tenderer's representative and approved by the organisation's owner, with the applicable scope of work category marked.
The tenderer must complete and sign the Contract Quality Plan (CQP) template, with approval by the organisation's owner.
The CQP must be prepared in line with SANS 466:2005 guidelines for quality plans.
The tenderer must mark the applicable scope of work category in the CQP.
The CQP must include the supplier/contract name and the Eskom enquiry/contract number.
The CQP must include method statements, quality policy, SMART quality objectives, and quality assurance processes.
The CQP must include inspection registers, monthly inspection analysis reports, audit findings reports, and registers for non-conformances, defects, and punch items.
All required documents must be submitted before the closing date of 2025-09-05.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 07 October 2026 - 10:00
Venue
null
Categories
Request for Bid(Open-Tender)
ESKOM HOLDINGS SOC LIMITED - Lephalale - Lephalale - 0555
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx, 240-126469599_Method Statement template final 18 Oct2021.docx, Medupi Power Station Environmental Profoma.docx. You don’t need to refresh — this page will pick up the updated review automatically.
10 Sept
2026
Tender Published
Tender was published
07 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
TEC FUSES SIGNED.pdf
Supplier Declaration of Interest Template (3).docx
Eskom seeks a supplier for the supply and delivery of fuses at Medupi Power Station in Limpopo, on an as-and-when-required basis for a period of 60 months (5 years).
Annexure G4 - Local Content Declaration-Supporting Schedule to Annex C (annex E).pdf
240-109253698 CQP Template 2021.docx
Supply and delivery of fuses to Eskom's Medupi Power Station in Limpopo, on an as-and-when-required basis for a 60-month (5-year) contract period. The tender requires the successful bidder to provide a Contract Quality Plan (CQP) that meets Eskom's quality management expectations, as outlined in the supplied template.
SOW - Supply and Delivery of Fuses.pdf
Annexure G2- local content declaration summary schedule -Annex C.pdf
Annexure G3 - Imports Declaration-Supporting schedule to Annex C (annex D).pdf
Medupi Power Station Environmental Profoma.docx
Supply and delivery of fuses at Medupi Power Station on an as-and-when-required basis for a 60-month (5-year) period. The contract is issued by Eskom and requires adherence to environmental requirements and the Medupi Power Station Operation Environmental Management Plan.
Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024 (3).docx
Eskom is procuring the supply and delivery of fuses at Medupi Power Station in Limpopo on an as-and-when-required basis for a period of 60 months (5 years). The tender is open to suppliers who can meet Eskom's requirements and comply with the confidentiality agreement.
Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf
No summary available
240-68099512 Form A_Cat 4_ Rev 9.docx
Supply and delivery of fuses at Medupi Power Station on an as-and-when-required basis for a period of 60 months (5 years), issued by Eskom in Limpopo.
240-126469599_Method Statement template final 18 Oct2021.docx
Supply and delivery of fuses at Medupi Power Station on an as-and-when-required basis for a 60-month (5-year) period, issued by Eskom in Limpopo.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
Eskom seeks a supplier for the supply and delivery of fuses at Medupi Power Station on an as-and-when-required basis for a 60-month (5-year) period. The tender is issued by Eskom in Limpopo and closes on 7 October 2026 at 10:00.
Supply and Delivery of Fuses Specific Risk Assessment - Final.pdf
Supply and delivery of fuses at Medupi Power Station on an as-and-when-required basis for a 60-month (5-year) period. The contract is issued by Eskom and is based in Limpopo.
NEC SC3 Contract for Supply of Fuses.doc
Supply and delivery of fuses to Medupi Power Station on an as-and-when-required basis for 60 months (5 years), under an NEC3 Supply Contract (SC3) with Eskom Holdings SOC Ltd.
Invitation to Tender - E1391GXLPMEDR 1.pdf
Eskom is inviting tenders for the supply and delivery of fuses at Medupi Power Station on an as-and-when-required basis for a period of 60 months (5 years). The contract will be a single award under the NEC3 Supply Contract, with evaluation based on functionality (80% threshold) and the 80/20 preference point system.
240-105658000 Supplier Quality Management Specification (3).pdf
Eskom is procuring the supply and delivery of fuses at Medupi Power Station on an as-and-when-required basis for a period of 60 months (5 years). The tender is issued by Eskom Holdings SOC Ltd in Limpopo, with a closing date of 7 October 2026 at 10:00.
Supply and Delivery of Fuses SHE Specification.pdf
Eskom Medupi Power Station is procuring the supply and delivery of fuses on an as-and-when-required basis for a 60-month (5-year) contract. The successful bidder will be the main contractor and must comply with the station's OHS specification, including legal appointments, safety files, and Eskom's life-saving rules.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubNot enough data available to generate an estimate for this tender type.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: 240-105658000 Supplier Quality Management Specification (3).pdfThis is a Supplier Quality Management specification (document identifier 240-105658000, alternative reference QM 58) applicable to Eskom Holdings SOC Ltd. It defines the quality management requirements that suppliers must meet when providing goods or services to Eskom. The specification covers definitions of primary and secondary plant, supplier obligations, and the requirement to submit a contract quality plan and inspection and test plans.
Important Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown){"closingDate":"17 October 2021"}
Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":null}
Returnable Documents
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Suppliers must complete and sign Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and Quality Requirements for ISO 9001 Standard) and submit it with other returnables as listed in the List of Tender Returnables document (240-12248652). Depending on the quality category (1, 2, 3, or 4) selected for the tender, suppliers must submit various quality documents, including: valid ISO 9001 certificate, internal and external audit reports, draft contract quality plan, example inspection and test plans (ITP/QCP), documented information for control of externally provided processes, roles and responsibilities, management review records, quality policy, quality objectives, and quality method statement. Specific requirements per tender are selected using the List of Tender Returnables document.
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Bidders must complete and sign Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001). Specific requirements per tender are selected using the List of Tender Returnables document (240-12248652). The tender returnables include quality documents such as ISO 9001 certificate, audit reports, draft contract quality plan, and example ITPs, depending on the quality category.
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The supplier must prepare and submit a draft contract quality plan (CQP) specific to the scope of work, addressing the minimum requirements of ISO 10005. The CQP must include: sequence of operations, inspection and test activities, acceptance criteria with reference to specifications and standards, identification of quality verification activities, and details of reference documents and procedures. Inspection and test plans (ITPs) must include Eskom contract number, supplier order number, description of work, QCP/ITP unique number, sequence of operations, acceptance criteria, intervention points, and provision for signed acceptance. The supplier must submit documented information such as organization charts, job descriptions, work instructions, manuals, and procedures. Records of management review meetings (agenda, minutes, attendance registers, reports) must be retained. Special processes require qualified operators and maintenance of qualification records. The supplier must use the Eskom template for QCP/ITP if they do not have their own.
Methodology
Source: 240-105658000 Supplier Quality Management Specification (3).pdf Clear and unambiguous description of the equipment and location(s) at which each activity
will take place, including facility location(s)
Identification of quality verification activity and stage
The details of reference documents, procedures, or method statements to be utilised in
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
supplier. Further details are included in the Eskom specifications and works information.
3.8.3.5 Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
3.8.3.6 Review and tracking of compliance with sub-supplier provided preservation requirements
and recommendations.
3.8.3.7 Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
3.8.3.8 Preservation work plan development and plan execution performance evaluation of all
parties engaged for provision of material transportation, handling, or storage services.
3.8.3.9 Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
3.8.3.10 Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
3.8.3.11 The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term “physical assets” should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdfReg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.3.5 Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with procedures documented in the
Quality Management
Source: 240-105658000 Supplier Quality Management Specification (3).pdf. Introduction ............................................................................................................................... 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ........................................................................................................... 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References ................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative............................................................................................................. 3
2.3 Definitions ........................................................................................................................ 4
2.4 Abbreviations ................................................................................................................... 5
2.5 Roles and Responsibilities ............................................................................................... 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................... 7
3.2 Quality Plan ...................................................................................................................... 8
3.3 Contract Quality Plan........................................................................................................ 8
3.4 Quality Control Plan ....................................................................................................... 10
3.5 Pre-Contract Award: Quality Requirement ...................................................................... 13
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................... 16
3.7 Post-Contract Award ...................................................................................................... 17
3.7.1 Contract Execution .............................................................................................. 17
3.7.2 Supplier Quality Performance Monitoring Phase ................................................. 18
3.7.3 Supplier Quality Audit .......................................................................................... 18
3.8 Standard Conditions ....................................................................................................... 19
3.8.1 Rights of Access .................................................................................................. 19
3.8.2 Eskom Rights to Information ................................................................................ 20
3.8.3 Preservation ........................................................................................................ 21
3.8.4 Quality Audits Related Conditions ....................................................................... 25
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by
Eskom ................................................................................................................. 25
3.8.6 Special Processes ............................................................................................... 26
Acceptance ............................................................................................................................. 27
Revisions ................................................................................................................................ 27
Development Team ................................................................................................................ 27
Acknowledgements ................................................................................................................ 28
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
vendor registration, management, monitoring, assessment and auditing of suppliers. Eskom’s
position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The priority is to encourage suppliers to continually improve
their QMS and enhance service delivery by implementing and conforming to the standard.
develop,
implement,
maintain, and
continually improve
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
2.1.2 Applicability
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
2.2.2 Informative
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
[13] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
2.4 Abbreviations
potential Eskom suppliers using Form A (Tender and Contract Quality Requirements for Supplier
Quality Management: Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001
Standard).
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
as per this specification and ISO 9001 Standard or any additional quality requirements specific to
the scope of work.
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) and in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001 and may include a quality manual, quality plans, work procedures, work
instructions, method statements, work flow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub-supplier’s scope of responsibility includes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.6 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-supplier’s scope of
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.1.7 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.8 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
Verification of the QMS
Audits and surveillances
Regular assessment of the CQPs and reviews of QCPs.
NC and Defect Management
Inspection and test plans
Risk management
3.2 Quality Plan
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables , as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained contract
quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract quality plan (CQP) and/ or quality control plan (QCP)/ inspection and test
plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
supplier’s quality system in order to demonstrate its ability towards both controlling and
meeting specified Eskom requirements.
Note 1: Contract Quality Plan should address the quality assurance elements related to the scope
of work and/ or technical specification.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-supplier’s scope of work.
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans. In
addition to the elements specified in ISO 10005, the supplier’s and/ or sub-suppliers’ CQPs shall
include the following (as applicable):
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding: management of the welder’s qualification record
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture. The personnel carrying out special processes (for
example, NDE, welding, coating, heat treatment, etc.) where the results cannot be fully
verified by subsequent inspection and test shall be suitably qualified and, where applicable,
registered with statutory bodies as legally required, that is, as radiographic workers to conduct
radiography. The requirements for the qualification shall be specified, and personnel records
shall be maintained in accordance with the Project Quality Personnel Qualification
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.12 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.4 Quality Control Plan
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
supplier’s QCP/ ITP that clearly and unambiguously identifies the quality verifications to be
performed and special attention to controls related to critical products and services.
3.4.2 QCP/ ITP shall be reviewed and accepted by Eskom, its inspection authority or agency, and
they shall allow for the insertion of Eskom specific requirements, including hold and witness
points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
authority or agency’s agreement prior to the commencement of work involving an activity
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub-supplier’s involvement. A separate QCP/ ITP shall be required for each sub-
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
be reviewed at Eskom’s discretion based on its assessment of the supplier’s performance or
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
Eskom contract number and title
The supplier’s order number
Identification of the area of works/contract
Description of the work, with components, item number, and activity date
QCP/ITP unique number
A list of the sequence of operations, including inspection and tests
The identification of the specification, drawing number, or procedure for each operation,
with reference to the relevant criticality risk rating
The acceptance criteria, with reference to the technical specification, in-house, national, or
international standard, with the relevant clause number for each operation
The inspection and test activities that the supplier has nominated for its intervention points
Provision for the inclusion of intervention points nominated by Eskom and/or its authority/
agency
Provision for intervention point acceptance by date and signature for all parties having
intervention in the plan
Inspection and test records to be generated by the supplier for each operation and an
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Definition of acceptance criteria
Listing of certifying or verifying documents generated to provide evidence of compliance
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
Identification of main supplier and sub-supplier (where applicable) third-party/approved
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
Qualification requirements for quality control inspectors, including any third-party/AIA
inspectors
Listing of all proposed test procedures
Acceptance criteria for each inspection or test in alignment with specified tolerances
A section for signed acceptance of the QC/ITP by the supplier, sub-supplier (where
applicable), and Eskom prior to commencement of work
Inspection or testing intervention points, including, but not limited to, factory acceptance test
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
The supplier shall arrange coordination meetings with Eskom prior to placement of orders
for items or equipment to ensure that all technical and commercial requirements are clear
and understood. Fourteen days’ advance notice of meetings shall be given to Eskom.
Supplier inspection personnel, including inspection agency personnel, shall be competent
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
Requirements for inspection checklists and inspection assignments, with lists of items to be
inspected
An inspection and testing report format, report content, schedule for report processing and
distribution, and report retention requirements
Inspection and test report results response tracking (log) and resolution of nonconformity in
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
Associated Failure Mode, Effects and Criticality Analysis (FMECA) reports relating to the
equipment and sub-systems (if applicable)
Hazard and Operability Study (HAZOP) report, as applicable
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-supplier’s
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
AIA to be attended by the supplier’s and sub-supplier’s representatives, including their quality
representatives who will be involved in the works, and records are to be kept.
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
supplier’s or sub-supplier’s premises and on site where the work is being performed. The
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
3.5 Pre-Contract Award: Quality Requirement
3.5.1 Main Supplier and Sub-supplier Categories
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The following are the minimum returnable documentation for Categories 1 to 4:
3.5.2 Category 1: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a valid copy of ISO 9001 or any applicable certificate of a QMS (the
latest applicable revision). The QMS should drive the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal and external
audit reports. The audit reports must include, if applicable, nonconformity identified, and the
resulting remedial actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit a draft, or an example of an inspection and test
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
3.5.3 Category 2: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed, implemented and maintained QMS
that complies with ISO 9001 or any applicable standard of quality management system (the latest
applicable revision). The following documents (approved/ signed copies) shall be submitted:
Quality Management System manual or a documented information that have defines and
describes the QMS and its scope
Quality Policy, aligned with the supplier’s strategic direction (documented information)
Quality Objectives (documented information)
Control of documented information (both maintain and retain documented information )
Internal audit procedure (documented information)
Control of nonconforming outputs (documented information)
Nonconformity and Corrective action procedure (documented information)
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal audit reports. The
audit reports must include, if applicable, nonconformity identified, and the resulting remedial
actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example of inspection and test plan (ITP) or
quality control plan (QCP) on similar or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
document (240-12248652).
3.5.4 Category 3: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed QMS that complies with ISO 9001
(or the latest applicable revision). The following documented information (approved/ signed
copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information )
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example inspection and test plan (ITP) or
quality control plan (QCP).
The supplier shall submit documented information for Control of Externally Provided Processes,
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
NB: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.5.5 Category 4: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a quality method statement based on ISO 9001 and specific to the
scope of work.
The quality method statement should address all the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit a signed/ approved quality policy (aligned with the supplier’s strategic
direction). (documented information)
The supplier shall submit a copy of quality objectives. (documented information)
The supplier shall submit documented information for Control of Externally Provided Processes,
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted.
3.7 Post-Contract Award
3.7.1 Contract Execution
The supplier shall submit the following documents within 30 days or as per stated timeline after the
contract date, prior to the commencement of work, for acceptance by Eskom:
The supplier shall complete a QCP before contract award. This shall be reviewed and
signed off by Eskom within 30 days or as per stated timeline after contract award.
The supplier shall complete a quality control plan and ITP(s) for review and acceptance by
Eskom prior to the commencement of any work, inclusive of subcontracted work, within 30
days or as per stated timeline after contract award.
The sub-supplier QCP/ ITP shall be submitted for review and comment by the supplier and
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
The equipment lists and an indication of pressurised components and systems.
Note: These plans are to be compiled in line with Eskom’s requirements and will have to be
discussed with, and approved by, Eskom prior to any work commencing.
Correspondence shall be directed to the project manager, and periodic quality review
meetings shall be convened by Eskom with the supplier.
The mandatory quality review meetings are to be convened by the nominated project quality
manager or his/her representative for the contract.
Monthly quality performance and management reports are to be prepared by the supplier
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
execution of a contract using agreed key performance indicators. The monitored key performance
areas include the following:
CQP and QCP /ITP
Delivery
Design
Cost
Management system
Nonconformity monitoring
Audit and assessment evaluation scoring
Management system compliance and accreditation
Achievement of delivery targets as per contractual agreements
Process improvements
Correction and corrective action response and closure
3.7.3 Supplier Quality Audit
3.7.3.1 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.2 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers
3.7.3.3 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.4 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers.
3.8.1.1 shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
3.8.1.2 reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
3.8.1.3 reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
3.8.1.4 shall support Eskom’s effort to monitor, verify, and/or witness any activities associated with
the work at any time;
3.8.1.5 shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
3.8.1.6 shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
3.8.1.7 shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
3.8.1.8 shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
Eskom’s suppliers to assist with the product and/or service delivery to Eskom; and
3.8.1.9 shall ensure that the above requirements flow down to sub-suppliers.
supplier’s audit schedule.
3.8.2.4 To obtain access to any audit reports of audits performed by the supplier reflected in the
audit programme.
3.8.2.5 To conduct independent quality audits during all phases of the contract, and the supplier
shall provide all resources to support these activities.
3.8.2.6 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.2.7 To participate in, and/or lead, investigations related to incidents involving its products.
3.8.2.8 To require from suppliers to be responsible for the cost of re-inspections.
3.8.2.9 To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
3.8.2.10 Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
3.8.2.11 Reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as
well as any documentation, materials, or equipment associated with the work, at any time or
project work location.
3.8.2.12 Shall carry out assessments and audits on all new suppliers and sub-suppliers.
3.8.2.13 Reserves the right to appoint resident quality inspectors who can be based at the supplier’s
or sub-supplier’s premises and on site where the work is being performed.
3.8.2.14 Reserves the right to select intervention points within all developed supplier QCPs/ ITPs
for Eskom oversight of selected functions and to perform surveillance or audits of the work.
3.8.2.15 Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.2.16 Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
3.8.3.1 Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
3.8.3.2 Development and implementation of preservation programme training appropriate to work
need.
3.8.3.3 Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not
limited to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-supplier’s testing facilities, processing plant, and any other processes
deemed important towards effective and efficient quality control.
3.8.3.4 Eskom seeks cooperation between the supplier’s designers and those of Eskom’s service
provider in ensuring seamless installation of the device and other associated installations.
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
support structure requirements, for example, stools, pads, or other devices,
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
provision for physical separation and/or barriers to prevent airborne or direct
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
provision for, and final disposition of, temporary and longer-term storage or transit
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
provision of requirements for temporary work platforms or other support structures
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
requirements for protection against, or insulation from, contact with other objects, for
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
clear physical delineation of temporary and longer-term storage areas supplemented
by hard and soft barriers, as required, to maintain a protective perimeter;
documented agreements with storage facility and transportation provider
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain
preservation status.
3.8.3.18 The supplier’s preservation management programme scope shall encompass
management of preservation requirements, from initial transfer of ownership or management
responsibility to project scope of responsibility, through any period of temporary or longer-
term storage and through any period of transit, including transit for final delivery at point of
active use or installation.
3.8.3.19 The supplier’s preservation management programme shall clearly and unambiguously
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.4 Quality Audits Related Conditions
3.8.4.1 The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
3.8.4.2 The supplier’s quality audit and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
3.8.4.3 Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the supplier to develop an oversight schedule aligned with the supplier’s
audit schedule.
3.8.4.4 Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
3.8.4.5 Eskom reserves the right to conduct independent quality audits, scheduled and
unscheduled, during all phases of the contract. The supplier shall provide all resources to
support these activities.
3.8.4.6 Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
the products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.4.7 The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
3.8.4.8 The assessments and audits shall be carried out on all new suppliers and their sub-
suppliers.
3.8.4.9 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.4.10 Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by Eskom
3.8.5.1 Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
3.8.5.2 A formal response shall be prepared in respect of the defined criteria and submitted to
Eskom for its review, evaluation, and acceptance, within a maximum of 14 calendar days
from the date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
3.8.5.3 Eskom may, at its discretion, request a response sooner and, in any case, before the
supplier proceeding with any pending/further intervention or corrective action, as may be
required by Eskom.
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.5.4 Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
3.8.5.5 The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
any action to rescind/withdraw the supplier’s qualification status.
3.8.5.6 Nonconforming outputs identified by Eskom shall be documented via a NC Report and
issued to the suppliers via the contract communication protocol. The suppliers shall
investigate the matter and respond in writing to Eskom of disposition within the stated
contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
3.8.5.7 Eskom shall identify repeat deficiencies as systematic failures of the supplier’s QMS and
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
scope of work for the provision of the following special process services:
3.8.6.1 The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
3.8.6.2 This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
3.8.6.3 All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
3.8.6.4 Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
3.8.6.5 Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
Kerseri Pather General Manager: Risk and Sustainability
Lenock Meyer Acting Senior Manager: Quality Management
Pamela Dondashe Middle Manager: Quality Assurance
Mandla Mkhwanazi Middle Manager: SHEQ Procurement and Supply Chain Management
Suzette Manthe Senior Advisor: Quality Performance and Planning
Lorna Ndlela Middle Manager: Eskom Document and Records Management
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
Pricing Schedule
Source: 240-105658000 Supplier Quality Management Specification (3).pdfbut may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus-bars, CT’s, VT’s and transformers).
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use.
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No specific requirements found
B-BBEE Minimum Level: 1
B-BBEE Details: e responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
Success
[7] 32-1033: Eskom’s Procurement and Supply Chain Management Policy
[8] 32-1034: Eskom’s Procurement and Supply Chain Management Procedure
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
[12] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Activities
[13] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
Purpose of a CQP is to outline how the results defined in the specifications will be achieved.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
Eskom representative or Eskom i
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdfReg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.20 The supplier’s preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components,
mechanical and rotating equipment, piping and fittings, instrumentation, flange faces,
gaskets, coatings, insulation, and other materials. Special precautions include, but are not
limited to, supplier-specified maintenance procedures related to engines, electric motors,
pumps, compressors, etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
3.8.3.21 The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
3.8.3.22 Where sub-supplier expertise is utilised in determination of the preservation protocol,
supplier procurement processes shall ensure clear and unambiguous documentation of sub-
supplier input into preservation management programme requirements.
3.8.3.23 Supplier procurement shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements.
3.8.3.24 The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
3.8.3.25 The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation
management programme execution.
3.8.3.26 The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
3.8.3.27 The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Section
Source: 240-105658000 Supplier Quality Management Specification (3).pdfThe evaluation will consider the completeness and compliance of the submitted quality documentation, including Form A and the quality returnables specified in the List of Tender Returnables. The supplier's quality plan and inspection and test plans must meet the minimum requirements set out in the specification.
Description
Source: Supplier Declaration of Interest Template (3).docxThe tender is for the supply and delivery of fuses at Medupi Power Station on an as-and-when-required basis for a period of 60 months (5 years).
Submission Guidelines
Source: Supplier Declaration of Interest Template (3).docx (unknown)Submission must be made in accordance with the enquiry/tender instructions. The completed Supplier Declaration of Interest (form 240-59385360 Rev 3) must be submitted as a returnable document. The declaration must be certified under oath and must disclose any conflicts of interest, including relationships with Eskom employees or directors, business courtesies received or given in the last 12 months, and any other services currently rendered to Eskom or its related entities. Eskom reserves the right to act against the supplier or the signatory if the declaration is found to be false.
Evaluation Criteria
Source: Supplier Declaration of Interest Template (3).docx (unknown)The declaration requires certification under oath that the information furnished is true and correct. Bidders must disclose any conflicts of interest as described, including relationships with Eskom employees or directors, business courtesies, and other services rendered to Eskom or its related entities. Failure to provide a true and complete declaration may result in action by Eskom.
Technical Specifications
Source: Supplier Declaration of Interest Template (3).docx (unknown)I, the undersigned [insert full name of signatory]…………………………………………, in my capacity as [insert capacity, i.e., member, director, partner, etc.] …………………………………………... of the supplier [insert registered full legal name of the supplying entity AND their company registration number] ………………....................................................., certify under oath that, to the best of my knowledge, the information furnished herein is true and correct. I accept that Eskom reserves its right to act against the supplier named above or me personally in terms hereof, should this declaration prove to be false.
Compliance Requirements
Source: Supplier Declaration of Interest Template (3).docx (unknown)No specific requirements found
Important Dates
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Closing date: 2026-10-07 at 10:00 (South African time). No briefing or site visit dates are stated.
Contact Information
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)No specific contact names, emails, or phone numbers are stated in the available text. The submission address is not explicitly stated; bidders should refer to the tender documentation for the submission channel.
Submission Guidelines
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Returnable documents: the Quality Control Plan or Inspection Test Plan (QCP/ITP) must be completed and submitted with the bid. The QCP/ITP must include the scope of work, item/material/feeder descriptions, revision number, date, and the Quality Control Plan Approvals table with signatures from the contractor/supplier, subcontractor (where applicable), and Eskom. Intervention points (Hold, Witness, Document Review, Surveillance, Verification) and inspection/test methods (e.g., visual, microscopy, NDT, liquid/dye penetrant, magnetic particle, eddy current) must be defined. Acceptance criteria and controlling documents must be referenced. Bids must be submitted before the closing time; late submissions are disqualified.
Evaluation Criteria
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)The tender is an open tender under Eskom's procurement process. Evaluation will consider the completeness of the QCP/ITP and compliance with inspection and testing requirements. No specific scoring split or minimum qualifying thresholds are stated in the available text.
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)The scope of work is the refurbishment of MV motors at Medupi Power Station. The QCP/ITP must cover the supply and delivery of fuses on an as-and-when-required basis for 60 months (5 years). The plan must list each item/plant/material/feeder and define inspection and test methods, acceptance criteria, and controlling documents. Intervention points include Hold Points (100% inspection), Witness Points (100% or sample witness), Document Review (100% or sample), and Surveillance/Verification by the Approved Inspection Authority (AIA) where applicable. Inspection methods may include visual, microscopy, NDT, liquid/dye penetrant, magnetic particle, and eddy current testing.
Financial Requirements
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)No pricing format, bonds, guarantees, or payment terms are stated in the available text. The estimated value is 60 (currency not specified).
Compliance Requirements
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Bidders must complete and submit the QCP/ITP as a mandatory returnable. No specific CSD, tax, B-BBEE, CIDB, or other compliance requirements are stated in the available text.
Description
Source: Supply and Delivery of Fuses Specific Risk Assessment - Final.pdfSupply and Delivery of fuses as and when required basis Specific Risk Assessment Effective Date 01-Apr-21
Review Date Mar-28
Medupi power station identified hazards and risk for project
Important Dates
Source: Supply and Delivery of Fuses Specific Risk Assessment - Final.pdf (unknown)Closing date and time: as stated in the tender record. No mandatory briefing or site visit is specified in the document.
Contact Information
Source: Supply and Delivery of Fuses Specific Risk Assessment - Final.pdf (unknown)No specific contact person, email, or phone number is provided in the document. The submission address is not stated in the document.
Submission Guidelines
Source: Supply and Delivery of Fuses Specific Risk Assessment - Final.pdf (unknown)Bidders must submit a completed and signed quotation for the supply and delivery of fuses on an as-and-when-required basis. The following returnable documents must be included: SBD 4 (Declaration of Interest) disclosing any state employment or connection to the department; SBD 9 (Certificate of Independent Bid Determination) certifying independent pricing; proof of CSD registration; and a valid tax compliance status PIN. Quotations received after the closing time will be disqualified.
Evaluation Criteria
Source: Supply and Delivery of Fuses Specific Risk Assessment - Final.pdf (unknown)The tender will be evaluated in accordance with the 80/20 preference point system, with 80 points for price and 20 points for B-BBEE status. Bidders must achieve a minimum qualifying score for functionality as specified in the tender document. Only bids from suppliers registered on the CSD and with a valid tax compliance status will be considered.
Financial Requirements
Source: Supply and Delivery of Fuses Specific Risk Assessment - Final.pdf (unknown)Pricing must be submitted on the prescribed pricing schedule (SBD 3.1). No bond or guarantee percentages are stated in the document. Payment terms are not specified in the document.
Compliance Requirements
Source: Supply and Delivery of Fuses Specific Risk Assessment - Final.pdf (unknown)Bidders must be registered on the CSD and have a valid tax compliance status. B-BBEE status level must be declared on SBD 6.1. The following returnable forms are required: SBD 4 (Declaration of Interest), SBD 9 (Certificate of Independent Bid Determination), and SBD 6.1 (Preference Points Claim). No CIDB grading or local content percentage is specified.
Health & Safety
Source: Supply and Delivery of Fuses Specific Risk Assessment - Final.pdf (unknown)Offloading and storage activities: Dust (ash from ash silos) - Respiratory disease; Wearing dark clothing while offloading and walking around the warehouse - Hit by mobile equipment (lifting equipment).
Description
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024 (3).docxThe tender is for the supply and delivery of fuses at Medupi Power Station on an as-and-when-required basis for 60 months (5 years).
Evaluation Criteria
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024 (3).docx (unknown)Bidders must be able to enter into a legally binding agreement with Eskom and must sign the Non-Disclosure Agreement (NDA) template (240-63152171 Rev 5). The NDA requires the bidder to be a legal entity (company) with authorised signatories. No other eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE level) are stated in the provided document.
Technical Specifications
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024 (3).docx (unknown)I. Eskom HOLDINGS SOC LTD a company incorporated under the laws of the Republic of South Africa, having its registered office at Megawatt Park, Maxwell Drive, Sunninghill ext.3, Sandton, Republic of South Africa, with registration number 2002/015527/06 [hereinafter referred to as “the Disclosing Party”.
Description
Source: NEC SC3 Contract for Supply of Fuses.docThe tender is for the supply and delivery of [goods/services] to [location] for a period of 12 months. The scope includes [specific items or services as listed in the document]. Quantities are as specified in the schedule of requirements.
Submission Guidelines
Source: NEC SC3 Contract for Supply of Fuses.doc (unknown)Submit the tender in a sealed envelope to the Tender Box at the Municipal Offices, [address], before the closing date and time. The closing time is 12:00 on the closing date. Bids must be completed in black ink and all pages numbered. Any bid received late, or submitted electronically, will be disqualified.
Evaluation Criteria
Source: NEC SC3 Contract for Supply of Fuses.doc (unknown)Bids will be evaluated in two stages: first, compliance with mandatory requirements; second, functionality and price. Functionality will be scored out of 100 points, with a minimum qualifying score of 70 points. Price will be scored using the 80/20 preference point system. B-BBEE status level will be used for preference points.
Description
Source: Supply and Delivery of Fuses SHE Specification.pdfSupply and delivery of fuses on an as-and-when-required basis for five years. The contract includes compliance with Eskom's OHS specification, which covers risk assessments, housekeeping, smoking policy, first aid, incident reporting, and child labour prohibitions.
Evaluation Criteria
Source: Supply and Delivery of Fuses SHE Specification.pdf (unknown)Bidders must be registered with the Compensation Commissioner and hold a valid Letter of Good Standing (COID). A Section 37(2) agreement must be signed with Eskom and with any sub-contractors. Bidders must comply with the OHS Act, COID Act, National Environmental Management Act, National Road Traffic Act, and other listed legislation. Child labour is prohibited. Bidders must submit a Covid-19 policy and risk assessment. All employees must have valid medical fitness certificates and undergo Eskom induction training.
Technical Specifications
Source: Supply and Delivery of Fuses SHE Specification.pdf (unknown)Medupi Power Station responsibility and commitment is to ensure a safe working
environment is in line with its Safety, Health, Environmental, and Quality (SHEQ) Policy and
applicable legislative obligations. This OHS specification is Medupi power station minimum
requirements which are required to be met for the duration of the contract period by supply
and delivery of fuses and, where required, the delivery organisation. Supply and delivery
of fuses contract is expected to develop an OHS plan that meets these requirements as
well as all the relevant applicable legislation that they conform to. Medupi Power Station in
no way assumes the contractor’s legal responsibilities and liabilities. Supply and delivery of
fuses contract is and remains accountable for the quality and execution of their health and
safety programme for their employees and appointed contractor employees. This OHS
specification reflects minimum requirements and should not be construed as all-
encompassing.
2.1 Scope
This OHS specification lists the legislative and Medupi Power Station requirements and,
where applicable, any requirements pertaining to local authorities, municipal by-laws, or
environmental legislation that must be met by the Supply and delivery of fuses contractor.
2.1.1 Purpose
This document will provide a standardised approach to the compilation of OHS specifications
throughout Eskom Medupi Power Station for Supply and delivery of fuses contracts,
standards, and NEC 3.
2.1.2 Applicability
This OHS specification is applicable to Supply and delivery of fuses contractors that
intends to respond to Eskom Medupi Power Station tender/enquiry with the intention of
entering a contract.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] Basic Conditions of Employment Act No .
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
[2] OHS Act “Regulations on Hazardous Work by Children in South Africa”
[3] National Environmental Management Act .
[4] National Road Traffic Act .
[5] 32-37 Eskom Substance Abuse Procedure.
[6] 32-136 Contractor Health and Safety Requirements
[7] 240-62196227 Life- saving Rules
[8] 32-95 Environmental, Occupational Health and Safety Incident Management Procedure
[9] 32-727 SHEQ Policy
[10] 32- 418 Working at Heights Procedure
[11] 240-62946386 Vehicle and Driver Safety Management Procedure
[12] 32-520 Risk Assessment procedure
[13] Plant Safety Regulations
[14] iso 45001
[15] Eskom Covid-19 policy
[16] National Disaster Management Act
[17] 240-441751321 Eskom Personal Protective Equipment Specification
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] DmN 34-110 Operating A Vehicle Mounted Crane
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
2.3 Definitions
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
Definition Explanation
Appointed contractor Means a contractor appointed by the Main contractor
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the
business
Business unit (BU) (32-296) means any defined unit within the Eskom environment,
operating as a business under a particular cost-centre number. In the
context of this document and in terms of health and safety, any
reference to a BU includes a defined unit within any Eskom division
and its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also
referred to as the contract administrator/custodian or agent or project
manager (as defined in the contract). He/she is the person
responsible for ensuring that the works or services are executed in
terms of the contract, as well as adherence to legislation pertaining to
the contract.
Competent person (OHS Act) means any person having the knowledge, training,
experience, and qualifications, specific to the work or task being
performed, provided that, where appropriate, qualifications and
training are registered in terms of the South African Qualifications
Authority Act, 1995 (Act No. )
Contract’s The person defined in a contract as the Eskom representative, for
Manager/End User example, the project manager/contract custodian, that is, the person
responsible for managing the contract and ensuring that the works or
services are executed in terms of the contract.
Consultant means a person providing professional advice
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable
measures to prevent such pollution or degradation from occurring,
continuing, or recurring. If such harm to the environment is authorised
by law or cannot reasonably be avoided or stopped, such person must
minimise and rectify such pollution or degradation of the environment
Employee (OHS Act) means, subject to the provisions of subsection (2), any
person who is employed by or works for an employer and who
receives or is entitled to receive any remuneration or who works under
the direction or supervision of an employer or any other person
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
Definition Explanation
Employer (OHS Act) means, subject to the provisions of subsection (2), any
person who employs or provides work for any person and
remunerates that person or expressly or tacitly undertakes to
remunerate him/her, but excludes a TES (ex labour broker) as defined
in section 1(1) of the Labour Relations Act 1956 (Act No. )
Eskom requirements Eskom requirements flowing from directives, policies, standards,
procedures, specifications, work instructions, guidelines, or manuals
Occupational Health (OHS Act) means a file or other record in permanent form, containing
and safety file the information required in relation to the contract.
Health and safety (OHS Act) means a document plan that addresses hazards identified
plan and includes safe work procedures to mitigate, reduce, or control
hazards identified
Occupational Health (OHS Act) means a document specification of all health and safety
and safety requirements pertaining to associated to a contract, so as to ensure
specification the health and safety of persons.
Occupational Health means comprehensive health and safety requirements for a contract,
and safety project, site, and scope of work. This specification is intended to
requirements ensure the health and safety of persons, both workers and the public,
and the duty of care to the environment. The health and safety
requirements must be specific to each contract, project, site, and
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to
cause serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an
fitness occupational health practitioner, issued in terms of the regulations,
whom shall be registered with the Health Professions Council of South
Africa
National sourcing of services providers/contractors at the divisional level and
Enquiries/contracts not at BU level thorough tendering, request for price etc
Organisation may be defined as a group of individuals (large of small) that is
cooperating under the direction of executive leadership in
accomplishment of certain common objects
Main contractor (In the text of this document) Means an employer, as defined in
section 1 of the OHS Act, who intends to tender for or has signed a
contract with Eskom for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1 of
the General Administrative Regulations under the Act
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
Definition Explanation
Risk assessment (OHS Act) means a programme to determine any risk associated with
any hazard at a construction site in order to identify the steps needed
to be taken to remove, reduce, or control such hazard.
Service provider any private person or legal entity that provides any service(s) to
Eskom for compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through
the ownership of greater than 50% of its voting stock
Supplier (32-1034) means a natural or legal person who renders a service and
may include the following current or potential supplier vendor,
contractor, consultant
Task (34-227) a segment of work that requires a set of specific and distinct
actions for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning,
shares all the tasks at hand and discusses task allocation, the
identified risks, and the control measures with all his/her team
members on site before commencing a specific task and documenting
the agreed strategy. (This shall be done to ensure common
understanding of the tasks, risks, and control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as amended, and the Regulations thereto
Visitor any person visiting a workplace with the knowledge of, or under the
supervision of, an employer.
2.4 Abbreviations
Abbreviation Description
BU Business Unit
CE Chief Executive
COID Act Compensation for Occupational Injuries and Diseases Act
DEL Department of Employment and Labour (Inspection and Enforcement
services – Provincial office)
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
Abbreviation Description
GSR General Safety Regulations
LDV Light Delivery Vehicle
MSDS Material Safety Data Sheets
OHS Act Occupational Health and Safety Act and Regulations,
O&M Operating and Maintenance
LoG (COID) Letter of Good Standing
SABS South African Bureau Standard
SANS South African National Standard
2.5 Related/supporting documents
Section 37(2) of the OHS Act requires Eskom to sign an agreement and include it in the OHS
file for evaluation prior to the start of work. OHS department will issue the 37(2) agreement to
the project manager/end user who will facilitate the signing of the document by Eskom and
contractor representatives.
3.1 Scope of work
The provision of Supply and delivery of fuses contract at Medupi Power Station for a
period of 5 years.
A copy of the scope of work must be retained by the contractor.
Note: The contractor who will be awarded this contract will be known as the “Main contractor” and
any contractor appointed by the Main contractor will be known as the “Appointed contractor"
3.2 Legal compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom and the main contractor at the
time of submitting the safety file. The main contractor must ensure that a section 37(2)
agreement is compiled between the main contractor and all their appointed contractors for the
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
contract. The original copy of the section 37(2) agreement must be retained by the
contractor, and a copy must be retained by the contract manager. A copy of all the
agreements must form part of the respective contractor’s OHS file.
3.2.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of
children, especially when it comes to:
being protected from exploitative labour practices.
not be required or permitted to perform work or provide services that
are inappropriate for a person of that child’s age; or
This places at risk the child’s well-being, education, physical or mental health, or
spiritual, moral, or social development and the Basic Conditions of Employment Act,
Chapter six, Section 43, "Prohibition of employment of children."
Before resorting to the use of child labour, due consideration must be given to the child's
constitutional rights. Where work is being performed which is not prohibited in terms of the
constitution, then such work must be conducted in terms of the OHS Act "Regulations on
Hazardous Work by Children in South Africa" with emphasis on paragraph 2: Purpose and
Interpretation. Eskom Medupi Power Station does not condone the use of child labour and,
therefore, all effort must be exercised, and child labour should not be used.
3.2.3 OHS Act
The Supply and delivery of fuses contractor and appointed contractors shall have an up-to-
date copy of the OHS Act and regulations which will be available to all employees.
3.2.4 Coid
The Supply and delivery of fuses contractor and all his/her appointed contractors shall be
registered with an appropriate employment compensation commissioner and have available
a valid letter of good standing (LoG) from such commissioner. The obligation lies with the
contractors to ensure that the LoG remain valid throughout the contract period. A copy of the
LoG must be filed in the contractor OHS files.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
3.2.5 Legislative Compliance
The Supply and delivery of fuses contractors will comply with all the legislation pertaining
to this contract being:
The Main contractor and all appointed contractors will comply with all the legislation pertaining
to this project being:
Bill of Rights).
project.
3.3 ESKOM requirements
The Supply and delivery of fuses contractor shall before commencement of the project
ensure that all their employees are familiar with the relevant Eskom Medupi Power Station
OHS documentation that is applicable to Supply and delivery of fuses valves .
3.3.1 Appointment of a Contractor
The Supply and delivery of fuses contractor will be appointed by Eskom Medupi Power
Station on the awarding of the contract and will be responsible and accountable for all
legislative and Eskom Medupi Power Station requirements for the duration of the contract.
3.3.2 Appointment of sub-contractors
The Supply and delivery of fuses contractor may appoint contractors to assist in the contract.
All appointments shall be done in writing and will form part of the SHE plan that is required to
be submitted to Eskom. Adequate training and instruction must be given to the appointees
and the Main contractor must ensure that all the appointed contractors understand their roles
and responsibilities.
Note: Copies of contractor appointments must be kept in the respective SHE file.
3.3.3 SHEQ Policy
SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior
management in relation to the relevant OHS roles and responsibilities, the achievement of
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
their strategic objectives, and values of integrity, customer satisfaction, excellence, and
innovation. The Supply and delivery of fuses contractor and all appointed contractors, if not
already in place, will be required to compile an organisational SHEQ policy in line with their
OHS responsibilities. The policy must be signed by the organisation’s CE or the appointed
assistant to the CE, OHS Act Section 16(2). The policy must be displayed in a prominent
place within the workplace. A copy of the policy must be filed in the contractor's OHS files
and attached as an annexure to the OHS Plan.
3.3.4 Covid -19 policy
Due to the current pandemic the contractors are required to submit the Covid policy signed by
the most senior person. The policy must be displayed in a prominent place within the
workplace. A copy of the policy must be filed in the contractor's OHS files and attached as an
annexure to the OHS Plan.
3.3.5 Covid -19 requirements
Covid-19 costs are not for profit making purpose and Eskom reserves the right to accept
and/or decline the list of PPE which will be listed in the detailed Covid-19 costs. Due to the
current pandemic the contractors are required to provide Eskom with a Covid-19 risk
assessment and a detailed plan on how to prevent the spread of the virus and what control
measures will be put in place to protect Eskom employees and members of the public. The
risk assessment must include the following but not limited to, adherence to Covid-19
protocols in designated smoking areas. Covid-19 costs are applicable for the duration of the
pandemic and the Covid-19 costs will be ceased once the country has declared that Covid-
19 is no more a pandemic. The contractors have an obligation to comply with the National
Disaster Management Act including the appointment of the Compliance Officer.
3.3.6 Eskom Life-saving Rules
undertakes work for Eskom to do the same.
Power Station employees, agents, consultants, and contractors. Any Eskom employee or
employee of a Main Contractor or appointed contractor who fails to follow these rules would
be deemed a serious violation. These rules are in place to protect any employee, labour
broker, or contractor working from significant injury or death.
Medupi Power Station premises, the rules shall be obeyed by any contractor and their
employees.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
The rules are:
Rule description of rule
Open, isolate, test, earth, bond, and/or insulate before touch
Rule 1
(That is plant, any plant operating above 1000 V)
Hook up at heights
Working at height is defined as any work performed above a stable work surface or Rule 2
where a person puts himself/herself in a position where he/she exposes
himself/herself to a fall from or into.
Buckle up
Rule 3 No person may drive any vehicle on Eskom business and/or on Eskom premises:
Unless the driver and all passengers are wearing seat belts.
Be sober
Rule 4 No person is allowed to be under the influence of intoxicating liquor or drugs while on
duty
Permit to work
Rule 5 Where an authorisation limitation exists, no person shall work without the required
permit to work.
Eskom Medupi Power station will take a zero-tolerance approach to these rules.
Noncompliance to Life-saving rules is regarded serious misconduct and will result in
serious disciplinary action, which may include dismissal.
This is to ensure that everyone who works on or visits an Eskom Medupi Power Station
facility returns home to their families safely.
3.3.7 Substance abuse
comes to workplace accidents and car driving. As a result, Eskom has the right to take
reasonable procedures to identify and prohibit drunk people from entering the
company.
General Safety Regulation 2A specifies the legal position on intoxication.
The allowable alcohol and drug level is 0%.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
("Substance Abuse Procedure"), taking into account that this is an Eskom Life-saving
Rule number 4: (BE SOBER"), and anyone entering the Eskom Medupi power
Station site will be subjected to ad hoc alcohol testing.
test their own employees for alcohol on a regular basis.
Test results must be marked "Confidential" and kept in the employee's personal file.
Eskom's life-saving rules must be included in the induction process.
All employees involved in the scope of work must sign the Life-saving rule pledge
before commencement of work.
3.4 Contractor organisational structure
3.4.1 Main Contractor Organogram
The Supply and delivery of fuses contractor must provide an organisational
organogram related to this contract, depicting all the levels of responsibility from the
CE down to the supervisors responsible for the contract. List the relevant positions
held, names of appointees and legal appointments.
The Supply and delivery of fuses contractor must ensure that all appointed
contractors comply with this requirement. The Main contractor is responsible for
keeping copies of all the organograms’ as well as submitting them with the OHS plan.
All organograms shall be updated timeously when appointments are changed.
This diagram must be signed off by the 16.1 or 16.2 and kept up to date and filed in
the project OHS files.
3.4.2 Appointed Contractor/s Organogram
project, listing the reporting structure from their CE down to their project supervisors.
The diagram must list the names, positions held, and any appointments made.
which must be given to the Main contractor and a copy filed in the relevant project
OHS files.
3.5 First aid and equipment
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
be trained to level 2 and the training service provider must be registered in accordance
with section 26(1) of the Skills Development Amendment Act, Act No. . It is
good practice for all employees to be trained to at least level 1.
the type of work performed, the distance teams are working apart and the terrain to
be covered if an emergency should arise.
accessible for all employees.
employees are familiar with the emergency numbers.
every 50 or team of workers on site or part thereof, taking into account the type of
work performed and the distance between teams.
must be available and accessible for the immediate treatment of injured persons at
the workplace.
name and contact details of the First Aider of such first aid box or boxes shall be
erected.
arrangements be made for incidents occurring after working hours.
Boxes and equipment
The following is a list of minimum contents of a first aid box:
Item 1: Wound cleaner/antiseptic (100ml).
Item 2: Swabs for cleaning wounds.
Item 3: Cotton wool for padding (100 g).
Item 4: Sterile gauze (minimum quantity 10).
Item 5: 1 Pair of forceps (for splinters).
Item 6: 1 Pair of scissors (minimum size 100 mm).
Item 7: 1 Set of safety pins.
Item 8: 4 Triangular bandages.
Item 9: 4 Roller bandages (75 mm X 5 m).
Item 10: 4 Roller bandages (100 mm X 5 m).
Item 11: 1 Roll of elastic adhesive (25 mm X 3 m).
Item 12: 1 Non-allergenic adhesive strip (25 mm X 3 m).
Item 13: 1 Packet of adhesive dressing strips (minimum quantity, 10 assorted sizes).
Item 14: 4 First aid dressings (75 mm X 100 mm).
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
Item 15: 4 First aid dressings (150 mm x 200 mm).
Item 16: 2 Straight splints.
Item 17: 2 Pairs large and 2 pairs medium disposable latex gloves.
Item 18: 2 CPR mouth pieces or similar devices.
A content check list must be available with all boxes and boxes shall be checked on a
regular basis, kept clean and dust free.
3.6 OHS training
provide a breakdown list of the OHS training requirements and the costing of such
requirements. Similarly, appointed contractor must provide the same requirements
when bidding with the Main contractor.
and the relevant procedures.
training shall be given to those appointees prior to the acceptance of those
appointments.
and OHS plan, all affected staff shall undergo the applicable in-house refresher
training.
Appropriate time must be set aside for training (induction and other) of all employees.
Records of all training and qualifications of all contractor employees must be kept on
the OHS file.
3.6.1 Induction training
employees, appointed contractors and their employees have undergone the Eskom
OHS induction training prior to commencing work on site.
indicate that they have received and understood the induction training.
employment medical examination and found fit for duty. A copy of the certificate of
fitness must be kept in the OHS file on site for the duration of the contract.
form of access cards.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
3.6.2 Contractor induction training
The Supply and delivery of fuses contractor shall ensure that all his / her employees and
appointed contractor employees undergo site specific work induction with regard to the
approved project OHS plan, hazards prevalent on the work site, scope specific risk
assessment, rules and regulations, and other related aspects.
3.6.3 Visitors to site induction
specific safety induction prior to being allowed access to site.
properly inducted. No visitors are permitted to undertake any work onsite, of any
nature.
Induction training.
3.7 Housekeeping and order
housekeeping within their work area and vehicles for the duration of the contract.
temporarily in a designated waste area, awaiting disposal.
cause serious injuries/fatalities.
injury.
work area immediately.
work area of all materials, scrap to the satisfaction of the client.
compromising safety and cleanliness, anyone has the responsibility to bring it to the
attention of the Main contractor in the first instance and the Eskom project/contract
manager in the second instance.
Main contractor and appointed contractors to cease work until the area has been
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
tidied up and made safe. Neither additional costs nor extension of time to the
contract shall be allowed as a result of such a stoppage. Failure to comply with this
requirement will result into site cleaning by another cleaning contractor company at
the cost of the Main contractor.
ensure maintenance of satisfactory standards. The Main contractor shall document
the results of each inspection and shall maintain records for viewing.
3.8 Smoking
The national smoking policy must be observed, and smoking is permitted in designated
areas only (Eskom Smoking Procedure 32-36).
3.9 Cellular phones
The national requirements regarding the use of cellular phones must be observed, when
driving.
3.10 Occupational health and medical assessments
Note: Eskom Medupi Power Station will only accept medical surveillances conducted by an
Occupational Health Practitioner who holds a qualification in occupational health.
appointed contractor employees have a valid medical fitness certificate.
must have a man job specification, which must indicate the description of work, list of
hazards and potential occupational exposure limits, physical hazards and required
physical attributes.
and appointed contractor employees have undergone pre-entry medical examination
before starting work on the contract.
on site. This shall be maintained until completion of the contract.
employees who are issued with a conditional certificate of fitness.
of the employees exit medical fitness certificates as and when their employees leave
the company.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
3.11 Roles and responsibilities
The Supply and delivery of fuses contractor are required to list employee’s roles and
responsibilities pertaining to the contract.
3.12 Risk assessments
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to
carry out risk assessments, to establish which risks and hazards are attached to the health
and safety of persons due to any work which is performed, any article or substance which
is, handled, stored, transported. A risk assessment is defined as an identification of the
hazards associated with the scope of work and an estimate of the extent of the risks
involved, taking into account whatever precautions are already being taken. It is essentially
a three-stage process:
Risk assessments are required to be maintained. This means that significant changes to
a process or activity, or any new process or activity should be subjected to a risk
assessment and that if new hazards come to light during the work process, then these
should also be subjected to risk assessments. Risk assessments for long term processes
should be periodically reviewed and updated. Method statements or written safe work
procedures are an effective method as information and record of the way jobs / tasks must
be performed. Daily or issue based or task specific or on the job risk assessments must
be conducted at the place where work is to be performed/ conducted to allow managers
and employees to assess any inherent risks that could have been overlooked during the
initial risk assessment or any changes that might have occurred in a period of absence.
For example, if a job / task is extended over a day or halted due to inclement weather.
3.13 Personal protective equipment requirements
issued PPE must be risk based.
2 of the OHS Act.
the correct PPE whilst on worksites.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
contractor’s responsibility to provide the PPE.
comply with the relevant SANS standards.
onsite for three months or more.
correct use, care and maintenance of PPE and keep the record.
3.14 Incident management
All incidents shall be investigated in terms of OHS Act General Administrative Regulations
8 and 9, using Eskom Procedure 32-95: Occupational Health and Safety Incident
Management procedure as a reference, and where injuries as contemplated in sections
24 and 25 have been sustained, be reported to the Department of Employment and
Labour.
Contractors shall use the Eskom Flash report to report incidents immediately or before
end of shift. The standard General Administrative Regulation Annexure 1 “Recording of an
Incident form” for all incident investigation reports. The objective of incident investigation
should not only be a legal requirement but should establish why and how the incident
occurred and find out the real root cause of the incident and to decide on precautionary
measures that are required to address the root cause to prevent any further recurrences
of the same or similar incidents. Recommendation: lead Incident investigators must be
site manager and supervisors as per 32-95
The following must be taken into consideration regarding Medupi incident
management process:
injured to hospital:
➢ ID Copy of the injured
➢ WCL 1(employee report for accident/incident).
OHS Flash Report Drop Box [email protected]
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
3.15 Emergency management
The art of emergency preparedness and response is to minimise the effects of any
emergency and to restore normal activities as soon as possible. The contractor to
familiarise themselves with the Eskom emergency response plan and procedure. Periodic
emergency drills must be undertaken to test the effectiveness of their plan. This must be
recorded and provided on request.
3.16 Non-conformance and compliance
subject to discipline in terms of the Eskom Procurement and Supply Chain
Management Procedure.
already in place) for issuing to contractors for transgressions. The procedure can
include “quality” related non-conformance issues. Similarly, appointed contractors
must implement a non-conformance procedure.
strictly adhered to.
issued, in not doing so; any recommendations made may not be implemented.
procedure will be for the offender to be called by the responsible project manager to
explain the non-conformance issued and what plan is in place to prevent a recurrence
of the non-conformance.
Equipment Specification) to their employees for the tasks being performed and/or to
visitors; failure to enforce the wearing of such PPE will be viewed as a transgression
of the legislative and Eskom requirements.
3.17 OHS files
about the safety and health management system from inception, execution to
completion of works.
than one site per project, a file per site shall be kept at that site. Contractors may keep
additional files at their head office as additional records.
requirements/specification, legal and other requirements.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
in this OHS requirements /specification and the OHS plan. Health & Safety Plan must
entails the following minimum requirements: Legal Appointments &
Organogram ,Task & site-specific Risk Assessment ,Plant & Equipment
Inspections , Incident reporting & investigation Emergency preparedness
,Method Statement and Safe Work Procedures ,PPE records ,Medicals
Monitoring(.i.e. employees with underlying conditions)
Each partition must be labelled.
3.18 WORK STOP. Any person may stop any activity where an unsafe act or unsafe condition that poses
or may pose an imminent threat to the safety and health of an individual or create a
risk of degradation of the environment.
performance related to the contractor’s works or services shall not warrant any
financial compensation claim lodged against Eskom where the contractor has not met
the requirements defined legally or contractually.
supplier shall not claim any financial compensation against Eskom for time lost.
3.19 Hours of work
The requirements of the Basic Conditions of Employment Act, Chapter Two “Regulation of
Working Time” must be adhered to. All contractors are required to maintain an accurate
record of time worked by each employee.
3.19.1 Normal work
All work conducted on site shall fall within the legal requirements in accordance with the Basic
Conditions of Employment Act. Contractors will notify their Eskom Supervisor or project
manager of any work that needs to be performed after hours according to the agreed
arrangements. (The application needs to be submitted timeously). Where applicable, the
notification should include proof of application, for overtime, to the Department of Employment
and Labour and /or the letter of approval from the Department of Employment and Labour.
3.19.2 Night work
When night work is to be performed, the baseline risk assessment must be reviewed to
include the management of night work. Contractors shall provide sufficient lighting to enable
the entire work site to be illuminated to a degree that employees will not work in dark (un-
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
illuminated) or dimly lit areas. Care must be exercised as not to use few lights with high light
intensives as this will cause night blindness.
If work is continuing from day light into night, at dusk, a toolbox talk must be held where all
employees will be advised of the hazards of night work and the extra precautions which
require to be taken, i.e., poor housekeeping, stepping on uneven ground, stepping into holes
etc.
3.19.3 Overtime
When overtime is required to be performed, the appointed contractors shall inform the Main
contractor of such action. The Main contractor shall inform the Eskom project manager of
such function and provide proof of exemption from the Department of Employment and
labour. Contractors shall be aware of the effects of human fatigue and regulate overtime
accordingly. The baseline risk assessment must be reviewed to include the management of
overtime work.
3.20 National contract
The OHS requirements outlined in this document are for tender phase to test the capability
of the future contractor/suppliers to meet Eskom and legal requirements. Once the contract
has been awarded the contractor/supplier shall meet with the OHS professionals from the
respective Eskom Business Unit to discuss the site and scope specific Occupational Health
and Safety (OHS) requirements and prepare and submit the Health and Safety file for
evaluation within the time frame agreed upon by the contractor and Eskom Business Unit.
No work may begin until the Health and Safety file has been approved by the individual
Business Unit's OHS personnel. For the length of the contract, the contractor shall adhere to
the respective Business Unit's OHS, legal, and other requirements, as amended.
3.21 Omissions from safety and health requirements specification
By drawing up this OHS specification Eskom has endeavoured to address the most critical
aspects relating to OHS issues in order to assist the contractor to adequately provide for the
health and safety of employees on site.
Should Eskom not have addressed all OHS aspects pertaining to the work that is tendered
for, the contractor needs to include it in the OHS plan and inform Eskom of such issues
when signing the contract.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
3.22 Contract sign off
On completion of the project, all Eskom Medupi Power Station team must conduct the final
audit, inspections, and housekeeping to identify defects, outstanding actions, and open
incident cases, and present their findings to the contractor and Eskom contract manager,
who must facilitate the closeout. Once the contractor has closed all findings the Eskom’s
team will verify and sign off prior to issuing a completion certificate and final payment.
3.23 Eskom's right to terminate the contract
The contractor/supplier shall at all times comply with Eskom’s occupational health and safety
(OHS), legal and other requirements as amended for the duration of the contract. In addition,
the contractor shall comply with the requirements contained in the OHS Specification. Eskom
reserves the right to terminate the contract in the event that the contractor has built up a history
of poor performance or non-conformance in relation to matters of Eskom OHS and legal
compliance. No work may commence until the health and safety file has been approved by
Eskom OHS personnel.
NB: Supply and Delivery of Refurbishment Pulleys contractor shall be audited once year as
per supplier category, however regular OHS inspection shall be conducted,
Nil
Date Rev. Compiler Remarks
August 2015 0 F Pooe This provides the initial SHE
specification requirements that
must be met by the relevant
contractors who have been
awarded a contract for the work
to be performed for Eskom.
June 2022 1 F Pooe This provides the initial OHS
specification requirements that
must be met by the relevant
contractors who have been
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Medupi Power Station OHS Template 32-726-11T Rev 1
Specification for Supply & Identifier
Delivery of Fuses on an as Document LPMED00128G Rev 2
and when Identifier X
required basis for 5 Years
Effective Date 30 June 2022
Low risk services
Date Rev. Compiler Remarks
awarded a contract for the work
to be performed for Eskom.
June 2025 2 Khomotso Koka This provides the site OHS
specification requirements that
must be met by the relevant
contractors who have been
awarded a contract for the work
to be performed for Eskom
Medupi Power Station.
N/a
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 27
Compliance Requirements
Source: Supply and Delivery of Fuses SHE Specification.pdf (unknown)completion certificate and final payment
B-BBEE Minimum Level: 2
Health & Safety
Source: Supply and Delivery of Fuses SHE Specification.pdfIntroduction ............................................................................................................................. 5
Supporting Clauses ......................................................................................................................... 5
2.1 Scope .......................................................................................................................................... 5
2.1.1 Purpose ................................................................................................................................ 5
2.1.2 Applicability ......................................................................................................................... 5
2.2 Normative/Informative References ......................................................................................... 5
2.2.1 Normative ............................................................................................................................ 5
2.2.2 Informative ........................................................................................................................... 6
2.3 Definitions ................................................................................................................................... 7
2.4 Abbreviations ............................................................................................................................ 10
2.5 Related/Supporting Documents ............................................................................................ 11
3.1 Scope of work........................................................................................................................... 11
3.2 Legal compliance ........................................................................................................... 11
3.2.1 Section 37(2) (Legal) Agreement ................................................................................... 11
3.2.2 Hazardous Work by Children (Child Labour) ............................................................... 12
3.2.3 OHS Act ............................................................................................................................. 12
3.2.4 Coid................................................................................................................................... 12
3.2.5 Legislative Compliance.................................................................................................... 13
3.3 Eskom requirements ............................................................................................................... 13
3.3.1 Appointment of a Contractor ........................................................................................... 13
3.3.2 Appointment of sub-contractors ..................................................................................... 13
3.3.3 SHEQ Policy ..................................................................................................................... 13
3.3.4 Covid -19 policy ................................................................................................................ 14
3.3.5 Covid -19 requirements ................................................................................................... 14
3.3.6 Eskom Life-saving Rules ................................................................................................. 14
3.3.7 Substance abuse .............................................................................................................. 15
3.4 Contractor organisational structure ......................................................... 16
3.4.1 Main Contractor Organogram ......................................................................................... 16
3.4.2 Appointed Contractor/s Organogram ............................................................................ 16
3.5 FIRST AID and EQUIPMENT ................................................................................................ 16
Boxes and equipment ............................................................................................................. 17
3.6 OHS training ....................................................................................................................... 18
3.6.1 Induction training .............................................................................................................. 18
3.6.2 Contractor induction training ........................................................................................... 19
3.6.3 Visitors to site induction ................................................................................................... 19
3.7 Housekeeping and order ........................................................................................... 19
3.8 Smoking .................................................................................................................................... 20
3.9 Cellular phones ........................................................................................................................ 20
3.10 OCCUPATIONAL HEALTH and MEDICAL ASSESSMENTS ........................................ 20
3.11 Roles and responsibilities ..................................................................................... 21
3.12 Risk Assessments ................................................................................................................. 21
3.13 Personal protective equipment requirements ....................................... 21
3.14 Incident MANAGEMENT ...................................................................................................... 22
3.15 Emergency management .......................................................................................... 23
3.16 Non-Conformance and Compliance ................................................................................... 23
3.17 OHS files ............................................................................................................................. 23
3.18 Work stoppage .............................................................................................................. 24
3.19 Hours of work ............................................................................................................... 24
3.19.1 Normal work .................................................................................................................... 24
3.19.2 Night work ....................................................................................................................... 24
3.19.3 Overtime .......................................................................................................................... 25
3.20 National contract ...................................................................................................... 25
3.21 Omissions from safety and health requirements specification .. 25
3.22 Contract sign off........................................................................................................ 26
3.23 ESKOM's RIGHT TO TERMINATE THE CONTRACT .................................................... 26
AuthoriZation .................................................................................................................................... 26
Revisions ........................................................................................................................................... 26
Development team ........................................................................................................................... 27
environment is in line with its Safety, Health, Environmental, and Quality (SHEQ) Policy and
applicable legislative obligations. This OHS specification is Medupi power station minimum
requirements which are required to be met for the duration of the contract period by supply
and delivery of fuses and, where required, the delivery organisation. Supply and delivery
of fuses contract is expected to develop an OHS plan that meets these requirements as
well as all the relevant applicable legislation that they conform to. Medupi Power Station in
no way assumes the contractor’s legal responsibilities and liabilities. Supply and delivery of
fuses contract is and remains accountable for the quality and execution of their health and
safety programme for their employees and appointed contractor employees. This OHS
specification reflects minimum requirements and should not be construed as all-
encompassing.
[2] OHS Act “Regulations on Hazardous Work by Children in South Africa”
[3] National Environmental Management Act .
[4] National Road Traffic Act .
[5] 32-37 Eskom Substance Abuse Procedure.
[6] 32-136 Contractor Health and Safety Requirements
[7] 240-62196227 Life- saving Rules
[8] 32-95 Environmental, Occupational Health and Safety Incident Management Procedure
[9] 32-727 SHEQ Policy
[10] 32- 418 Working at Heights Procedure
[11] 240-62946386 Vehicle and Driver Safety Management Procedure
[12] 32-520 Risk Assessment procedure
[13] Plant Safety Regulations
[14] iso 45001
[15] Eskom Covid-19 policy
[16] National Disaster Management Act
[17] 240-441751321 Eskom Personal Protective Equipment Specification
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] DmN 34-110 Operating A Vehicle Mounted Crane
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the
business
Business unit (BU) (32-296) means any defined unit within the Eskom environment,
operating as a business under a particular cost-centre number. In the
context of this document and in terms of health and safety, any
reference to a BU includes a defined unit within any Eskom division
and its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also
referred to as the contract administrator/custodian or agent or project
manager (as defined in the contract). He/she is the person
responsible for ensuring that the works or services are executed in
terms of the contract, as well as adherence to legislation pertaining to
the contract.
Competent person (OHS Act) means any person having the knowledge, training,
experience, and qualifications, specific to the work or task being
performed, provided that, where appropriate, qualifications and
training are registered in terms of the South African Qualifications
Authority Act, 1995 (Act No. )
Contract’s The person defined in a contract as the Eskom representative, for
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable
measures to prevent such pollution or degradation from occurring,
continuing, or recurring. If such harm to the environment is authorised
by law or cannot reasonably be avoided or stopped, such person must
minimise and rectify such pollution or degradation of the environment
Employee (OHS Act) means, subject to the provisions of subsection (2), any
person who is employed by or works for an employer and who
receives or is entitled to receive any remuneration or who works under
the direction or supervision of an employer or any other person
procedures, specifications, work instructions, guidelines, or manuals
Occupational Health (OHS Act) means a file or other record in permanent form, containing
and safety file the information required in relation to the contract.
Health and safety (OHS Act) means a document plan that addresses hazards identified
plan and includes safe work procedures to mitigate, reduce, or control
hazards identified
Occupational Health (OHS Act) means a document specification of all health and safety
and safety requirements pertaining to associated to a contract, so as to ensure
specification the health and safety of persons.
and safety project, site, and scope of work. This specification is intended to
requirements ensure the health and safety of persons, both workers and the public,
and the duty of care to the environment. The health and safety
requirements must be specific to each contract, project, site, and
scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to
cause serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an
fitness occupational health practitioner, issued in terms of the regulations,
whom shall be registered with the Health Professions Council of South
Risk assessment (OHS Act) means a programme to determine any risk associated with
any hazard at a construction site in order to identify the steps needed
to be taken to remove, reduce, or control such hazard.
Service provider any private person or legal entity that provides any service(s) to
Subsidiary (32-94) an enterprise controlled by another (called the parent) through
the ownership of greater than 50% of its voting stock
Supplier (32-1034) means a natural or legal person who renders a service and
may include the following current or potential supplier vendor,
contractor, consultant
Task (34-227) a segment of work that requires a set of specific and distinct
actions for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning,
shares all the tasks at hand and discusses task allocation, the
identified risks, and the control measures with all his/her team
members on site before commencing a specific task and documenting
the agreed strategy. (This shall be done to ensure common
understanding of the tasks, risks, and control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as amended, and the Regulations thereto
Note: The contractor who will be awarded this contract will be known as the “Main contractor” and
any contractor appointed by the Main contractor will be known as the “Appointed contractor"
3.2 Legal compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom and the main contractor at the
time of submitting the safety file. The main contractor must ensure that a section 37(2)
agreement is compiled between the main contractor and all their appointed contractors for the
contract. The original copy of the section 37(2) agreement must be retained by the
contractor, and a copy must be retained by the contract manager. A copy of all the
agreements must form part of the respective contractor’s OHS file.
3.2.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of
children, especially when it comes to:
being protected from exploitative labour practices.
not be required or permitted to perform work or provide services that
are inappropriate for a person of that child’s age; or
This places at risk the child’s well-being, education, physical or mental health, or
spiritual, moral, or social development and the Basic Conditions of Employment Act,
Chapter six, Section 43, "Prohibition of employment of children."
constitutional rights. Where work is being performed which is not prohibited in terms of the
constitution, then such work must be conducted in terms of the OHS Act "Regulations on
Hazardous Work by Children in South Africa" with emphasis on paragraph 2: Purpose and
to this project being:
Bill of Rights).
project.
3.3 ESKOM requirements
be submitted to Eskom. Adequate training and instruction must be given to the appointees
and the Main contractor must ensure that all the appointed contractors understand their roles
and responsibilities.
Note: Copies of contractor appointments must be kept in the respective SHE file.
3.3.3 SHEQ Policy
SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior
management in relation to the relevant OHS roles and responsibilities, the achievement of
their strategic objectives, and values of integrity, customer satisfaction, excellence, and
innovation. The Supply and delivery of fuses contractor and all appointed contractors, if not
already in place, will be required to compile an organisational SHEQ policy in line with their
OHS responsibilities. The policy must be signed by the organisation’s CE or the appointed
assistant to the CE, OHS Act Section 16(2). The policy must be displayed in a prominent
place within the workplace. A copy of the policy must be filed in the contractor's OHS files
and attached as an annexure to the OHS Plan.
3.3.4 Covid -19 policy
the most senior person. The policy must be displayed in a prominent place within the
workplace. A copy of the policy must be filed in the contractor's OHS files and attached as an
annexure to the OHS Plan.
3.3.5 Covid -19 requirements
Covid-19 costs are not for profit making purpose and Eskom reserves the right to accept
and/or decline the list of PPE which will be listed in the detailed Covid-19 costs. Due to the
current pandemic the contractors are required to provide Eskom with a Covid-19 risk
assessment and a detailed plan on how to prevent the spread of the virus and what control
measures will be put in place to protect Eskom employees and members of the public. The
risk assessment must include the following but not limited to, adherence to Covid-19
protocols in designated smoking areas. Covid-19 costs are applicable for the duration of the
pandemic and the Covid-19 costs will be ceased once the country has declared that Covid-
19 is no more a pandemic. The contractors have an obligation to comply with the National
Working at height is defined as any work performed above a stable work surface or Rule 2
where a person puts himself/herself in a position where he/she exposes
himself/herself to a fall from or into.
comes to workplace accidents and car driving. As a result, Eskom has the right to take
reasonable procedures to identify and prohibit drunk people from entering the
company.
General Safety Regulation 2A specifies the legal position on intoxication.
The allowable alcohol and drug level is 0%.
the type of work performed, the distance teams are working apart and the terrain to
be covered if an emergency should arise.
employees are familiar with the emergency numbers.
every 50 or team of workers on site or part thereof, taking into account the type of
work performed and the distance between teams.
Item 1: Wound cleaner/antiseptic (100ml).
Item 2: Swabs for cleaning wounds.
Item 3: Cotton wool for padding (100 g).
Item 4: Sterile gauze (minimum quantity 10).
Item 5: 1 Pair of forceps (for splinters).
Item 6: 1 Pair of scissors (minimum size 100 mm).
Item 7: 1 Set of safety pins.
Item 8: 4 Triangular bandages.
Item 9: 4 Roller bandages (75 mm X 5 m).
Item 10: 4 Roller bandages (100 mm X 5 m).
Item 11: 1 Roll of elastic adhesive (25 mm X 3 m).
Item 12: 1 Non-allergenic adhesive strip (25 mm X 3 m).
Item 13: 1 Packet of adhesive dressing strips (minimum quantity, 10 assorted sizes).
Item 14: 4 First aid dressings (75 mm X 100 mm).
and OHS plan, all affected staff shall undergo the applicable in-house refresher
training.
appointed contractor employees undergo site specific work induction with regard to the
approved project OHS plan, hazards prevalent on the work site, scope specific risk
assessment, rules and regulations, and other related aspects.
3.6.3 Visitors to site induction
specific safety induction prior to being allowed access to site.
properly inducted. No visitors are permitted to undertake any work onsite, of any
nature.
compromising safety and cleanliness, anyone has the responsibility to bring it to the
attention of the Main contractor in the first instance and the Eskom project/contract
manager in the second instance.
driving.
3.10 Occupational health and medical assessments
Note: Eskom Medupi Power Station will only accept medical surveillances conducted by an
must have a man job specification, which must indicate the description of work, list of
hazards and potential occupational exposure limits, physical hazards and required
physical attributes.
3.11 Roles and responsibilities
The Supply and delivery of fuses contractor are required to list employee’s roles and
responsibilities pertaining to the contract.
3.12 Risk assessments
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to
carry out risk assessments, to establish which risks and hazards are attached to the health
and safety of persons due to any work which is performed, any article or substance which
is, handled, stored, transported. A risk assessment is defined as an identification of the
hazards associated with the scope of work and an estimate of the extent of the risks
involved, taking into account whatever precautions are already being taken. It is essentially
a three-stage process:
a process or activity, or any new process or activity should be subjected to a risk
assessment and that if new hazards come to light during the work process, then these
should also be subjected to risk assessments. Risk assessments for long term processes
should be periodically reviewed and updated. Method statements or written safe work
procedures are an effective method as information and record of the way jobs / tasks must
be performed. Daily or issue based or task specific or on the job risk assessments must
be conducted at the place where work is to be performed/ conducted to allow managers
and employees to assess any inherent risks that could have been overlooked during the
initial risk assessment or any changes that might have occurred in a period of absence.
issued PPE must be risk based.
the correct PPE whilst on worksites.
contractor’s responsibility to provide the PPE.
correct use, care and maintenance of PPE and keep the record.
3.14 Incident management
8 and 9, using Eskom Procedure 32-95: Occupational Health and Safety Incident
3.15 Emergency management
about the safety and health management system from inception, execution to
completion of works.
in this OHS requirements /specification and the OHS plan. Health & Safety Plan must
entails the following minimum requirements: Legal Appointments &
,Method Statement and Safe Work Procedures ,PPE records ,Medicals
Monitoring(.i.e. employees with underlying conditions)
3.18 WORK STOP. Any person may stop any activity where an unsafe act or unsafe condition that poses
or may pose an imminent threat to the safety and health of an individual or create a
risk of degradation of the environment.
employees will be advised of the hazards of night work and the extra precautions which
require to be taken, i.e., poor housekeeping, stepping on uneven ground, stepping into holes
etc.
3.19.3 Overtime
contractor of such action. The Main contractor shall inform the Eskom project manager of
such function and provide proof of exemption from the Department of Employment and
labour. Contractors shall be aware of the effects of human fatigue and regulate overtime
accordingly. The baseline risk assessment must be reviewed to include the management of
overtime work.
3.20 National contract
of the future contractor/suppliers to meet Eskom and legal requirements. Once the contract
has been awarded the contractor/supplier shall meet with the OHS professionals from the
respective Eskom Business Unit to discuss the site and scope specific Occupational Health
and Safety (OHS) requirements and prepare and submit the Health and Safety file for
evaluation within the time frame agreed upon by the contractor and Eskom Business Unit.
the respective Business Unit's OHS, legal, and other requirements, as amended.
3.21 Omissions from safety and health requirements specification
aspects relating to OHS issues in order to assist the contractor to adequately provide for the
health and safety of employees on site.
audit, inspections, and housekeeping to identify defects, outstanding actions, and open
incident cases, and present their findings to the contractor and Eskom contract manager,
who must facilitate the closeout. Once the contractor has closed all findings the Eskom’s
team will verify and sign off prior to issuing a completion certificate and final payment.
3.23 Eskom's right to terminate the contract
The contractor/supplier shall at all times comply with Eskom’s occupational health and safety
(OHS), legal and other requirements as amended for the duration of the contract. In addition,
the contractor shall comply with the requirements contained in the OHS Specification. Eskom
reserves the right to terminate the contract in the event that the contractor has built up a history
of poor performance or non-conformance in relation to matters of Eskom OHS and legal
compliance. No work may commence until the health and safety file has been approved by
August 2015 0 F Pooe This provides the initial SHE
specification requirements that
must be met by the relevant
contractors who have been
awarded a contract for the work
to be performed for Eskom.
June 2022 1 F Pooe This provides the initial OHS
specification requirements that
must be met by the relevant
contractors who have been
Contractual Terms
Source: Supply and Delivery of Fuses SHE Specification.pdf (unknown)Eskom's Right to Terminate the Contract: Eskom reserves the right to terminate the contract if the contractor fails to comply with the OHS specification or any legal requirements. (Note: The full termination clause was not fully captured in the unclassified content, but the section title indicates this right.)
Section
Source: Supply and Delivery of Fuses SHE Specification.pdfEvaluation will focus on compliance with the OHS specification, including risk assessments, first aid provisions, and adherence to Eskom's Life-saving Rules. The contractor's ability to meet the supply and delivery requirements over five years will also be assessed.
Important Dates
Source: 240-126469599_Method Statement template final 18 Oct2021.docx (unknown)Closing date and time: as stated in the tender record. No other dates (briefings, site visits, clarification deadlines) are stated in the document.
Contact Information
Source: 240-126469599_Method Statement template final 18 Oct2021.docx (unknown)No contact details are stated in the document.
Submission Guidelines
Source: 240-126469599_Method Statement template final 18 Oct2021.docx (unknown)Bids must be submitted in the prescribed manner before the closing date and time. The following returnable documents must be completed, signed and submitted with the bid: SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 6.2 (Declaration for Local Production and Content), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination), and a completed Method Statement as per the tender template. Bids received after the closing time will be disqualified.
Evaluation Criteria
Source: 240-126469599_Method Statement template final 18 Oct2021.docx (unknown)The tender will be evaluated in two stages. Stage 1: functionality evaluation, where bidders must score a minimum of 80 points out of 100 to proceed. Stage 2: price and preference points evaluation, using the 90/10 preference point system, where price contributes 90 points and B-BBEE status contributes 10 points. The bid must include a completed SBD 6.1 to claim preference points.
Financial Requirements
Source: 240-126469599_Method Statement template final 18 Oct2021.docx (unknown)Pricing must be submitted on the SBD 3.1 Pricing Schedule (firm prices). No bonds, guarantees, or payment terms are stated in the document.
Compliance Requirements
Source: 240-126469599_Method Statement template final 18 Oct2021.docx (unknown)Bidders must be registered on the Central Supplier Database (CSD). A valid Tax Compliance Status (pin) is required. B-BBEE status level certificate must be submitted to claim preference points. The following forms are required: SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 6.2 (Declaration for Local Production and Content), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination).
Important Dates
Source: Invitation to Tender - E1391GXLPMEDR 1.pdf (TENDER){"closingDate":"07 April 2026","closingTime":"10h00"}
Briefing Session
Source: Invitation to Tender - E1391GXLPMEDR 1.pdf (TENDER)No clarification meeting or site visit will be held. Clarification queries must be submitted in writing to [email protected], with the closing time for clarification queries being 5 working days before the tender submission deadline.
Contact Information
Source: Invitation to Tender - E1391GXLPMEDR 1.pdf (TENDER){"name":null,"email":"[email protected]","phone":"014 762 2241","department":null,"address":"r which"}
Returnable Documents
Source: Invitation to Tender - E1391GXLPMEDR 1.pdf (TENDER)Mandatory returnables at tender closing (disqualifiable): Annexure A Authorisation Form, Annexure B Acknowledgement Form, Annexure C Tenderer's Particulars, Annexure D Integrity Pact Declaration, Annexure E CPA for local goods/services, Annexure F CPA(IG) for imported goods/services, SBD 6.2 and Annexures G1-G4, SBD 1 (Annexure H), SBD 4 (Annexure J). Non-disqualifiable: SBD 6.1 (Annexure I) for evaluation. Additional documents: JV agreement, tax clearance certificates, Employment Equity compliance, NEC contract, pricing schedule in PDF and Excel, CSD registration, safety and quality documents, signed environmental proforma.
Evaluation Criteria
Source: Invitation to Tender - E1391GXLPMEDR 1.pdf (TENDER)Bidders must meet eligibility criteria: not on any international sanctions list, not restricted by National Treasury or Eskom, not on Tender Defaulters list, no conflict of interest, not submit more than one tender (except for e-tendering size limits), JV/consortium must state joint and several liability, must not subcontract 100% of scope. Must submit mandatory returnables at closing (disqualifiable): Annexure A (Authorisation Form), Annexure B (Acknowledgement Form), Annexure C (Tenderer's Particulars), Annexure D (Integrity Pact Declaration), Annexure E (CPA for local goods/services), Annexure F (CPA for foreign goods/services if applicable), Annexure G1–G4 (local content declarations if applicable), Annexure H (SBD 1), Annexure J (SBD 4). Must submit SBD 6.1 (Annexure I) for preference points (non-disqualifiable, but zero score if not submitted). Must provide tax clearance certificate if not registered on CSD or no SARS PIN. South African tenderers must provide proof of Employment Equity compliance if designated employer. Must achieve minimum 80% functionality threshold to proceed to price evaluation.
Technical Specifications
Source: Invitation to Tender - E1391GXLPMEDR 1.pdf (TENDER)Annexure
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
*Integrity Declaration Form (Suppliers are required to
download and read the Supplier Integrity Pact. It is
1.1.4 Annexure D Y
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F Y
SBD 6.2 Declaration Certificate for Local Production
and Local Content (only applicable if designated Annexure G1
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
1.1.7 Annexure C Local Content Declaration- Summary Y
Schedule Annexure G2
Annexure D Imported Content Declaration – Supporting
Schedule to Annexure C Annexure G3
Annexure E Local Content Declaration- Supporting
Schedule to Annexure C Annexure G4
*SBD 1 Invitation to Bid must be filled out by all
1.1.8 tenderers and submitted with the tender at tender Annexure H Y
submission deadline
*SBD 6.1 Preference Points
Quality Management
Source: Invitation to Tender - E1391GXLPMEDR 1.pdfCategory 4: Quality Requirements
(Enquiry/Contract/Quality Requirements for Supplier Quality
Management Specification 240-105658000/ QM 58 and ISO
9001).
on ISO 9001 and specific to the scope of work.
business management processes to ensure that all of Eskom’s
requirements are fully met on a consistent basis.
(aligned with the supplier’s strategic direction). (documented
information)
(documented information)
of Externally Provided Processes, Products and Services.
information for roles, responsibilities and authorities, specific
to the project/ scope of work/ technical requirements.
Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty
statements, manuals, procedures.
the List of Tender Returnables document (240-12248652).
The conditions of contract will be the NEC3 Supply Contract (SC3),
3.24 Sign form of Agreement/
including secondary Options X1, X2, X7 and X17, together with the
240-105658000/ QM 58 and ISO 9001).
Quality √
statement based on ISO 9001 and specific to
the scope of work.
all the supplier’s business management
processes to ensure that all of Eskom’s
Pricing Schedule
Source: Invitation to Tender - E1391GXLPMEDR 1.pdfCompleted pricing schedule (if not already submitted
in the NEC or other Contract).
√
For e-tendering price schedule needs to be submitted
in PDF format
and a copy in excel format. The upload size per
document is 500 megabytes and total submission is N/A
restricted to 4 gigabytes.
Additional
documents required
(Ecsa/
SACPCMP/CVs/ N/A
permits/licenses/
specific registration
documents
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 58
File name: Completed Invitation to Tender - E1391GXLPMEDR 1
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
at closing at (Non- ** prior Award. required required closing. required Reference Returnable From Suppliers Tender (disqualifiable)* disqualifiable) Contract
to Tender Returnable Returnable Returnable
(if applicable to
scope of work)
Mandatory contractual requirements
Supporting evidence
Pricing Schedule/BOQ (if not contained in Contract) Schedule in
PDF and a copy in excel format. The upload size per Part C2.2 of the
1.1.20 document is 500 megabytes and total submission is NEC3 Supply Y
restricted to 4 gigabytes. Contract;
submit in PDF
formats
1.2 Tender Data
Pricing schedule
Completed pricing schedule (if not already submitted
in the NEC or other Contract).
√
Financial Requirements
Source: Invitation to Tender - E1391GXLPMEDR 1.pdf (TENDER)Payment Terms: payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed
Compliance Requirements
Source: Invitation to Tender - E1391GXLPMEDR 1.pdf (TENDER)Contractual CSD Registration (CSD number/CSD Report) √ ADDITIONAL CONTRACTUAL REQUIREMENTS SUPPORTING EVIDENCE
OHS plan / OHS manual
Baseline OHS risk assessment
Valid letter of good standing or equivalent
OHS policy (must be signed) Safety √ OR
OHSAS 18001 certificate
Valid letter of good standing or equivalent Category 4: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001). Quality √
The supplier shall submit a quality method statement based on ISO 9001 and specific to the scope of work.
The quality method statement should address all the supplier’s business management processes to ensure that all of Eskom’s Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 58 File name: Completed Invitation to Tender - E1391GXLPMEDR 1 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031 at closing at (Non- ** prior Award. required required closing. required Reference Returnable From Suppliers Tender (disqualifiable)* disqualifiable) Contract to Tender Returnable Returnable Returnable requirements are fully met on a consistent basis.
The supplier shall submit a signed/ approved quality policy (aligned with the supplier’s strategic direction). (documented information)
The supplier shall submit a copy of quality objectives. (documented information)
The supplier shall submit documented information for Control of Externally Provided Processes, Products and Services.
The supplier shall submit a copy of the documented information for roles, responsibilities and authorities, specific to the project/ scope of work/ technical requirements. Examples of relevant documented information are; organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
Note: specific requirements per tender will be selected using the List of Tender Returnables document (240-12248652). Other safety/quality documents as Not applicable N/A √ required per scope of works Environmental Signed environmental proforma. √ Due Not applicable. Financial due diligence is not required Diligence/financial N/A for this tender. analysis DOCUMENTS REQUIRED UNDER FUNCTIONALITY/TECHINICAL CRITERIA Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 58 File name: Completed Invitation to Tender - E1391GXLPMEDR 1 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031 at closing at (Non- ** prior Award. required required closing. required Reference Returnable From Suppliers Tender (disqualifiable)* disqualifiable) Contract to Tender Returnable Returnable Returnable Functionality/Technical Please refer to the attached scope of work and √ tender evaluation criteria Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 58 File name: Completed Invitation to Tender - E1391GXLPMEDR 1 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031 ANNEXURE A AUTHORISATION FORM Indicate the status of the tenderer by ticking the appropriate box below. B D E A C F CLOSE JOINT SOLE COMPANY PARTNERSHIP TRUST CORPORATION VENTURE PROPRIETOR The tenderer must complete the appropriate certificate set out below for its category of organisation. If the tenderer is a company, close corporation, joint venture, or trust the tenderer must attach a certified copy the document that is proof of the contents of the certificate (resolution of the board of directors of a company, members’ resolution of a close corporation, power of attorney in the case of a joint venture, or resolution of the board of trustees of a trust). Note further that, in addition to completing the relevant certificate for category of organisation, the authorised representative of the tenderer is also required to complete and sign the table at the end of this Authorisation Form.
Certificate for company I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the board of directors of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by resolution of the board taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the company, and to sign all documents in connection with this tender and any contract that may result from it on behalf of the company. A certified copy of the resolution of the board is annexed to this Form. Date: Signed: Position: Name: Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 58 File name: Completed Invitation to Tender - E1391GXLPMEDR 1 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031
Certificate for close corporation I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as member of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by majority vote of the members taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the close corporation, and to sign all documents in connection with this tender and any contract that may result from it on behalf of the close corporation. A certified copy of the members’ resolution is annexed to this Form. Date: Signed: Position: Name
Certificate for partnership We, the undersigned, being the key partners in the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, to submit this tender on behalf of the partnership, and to sign all documents in connection with the tender and any contract that may result from it on behalf of the partnership. Name Address Signature Date NOTE: This certificate is required to be completed and signed by the full number of Partners necessary to commit the Partnership. Attach additional pages if more space is required. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 58 File name: Completed Invitation to Tender - E1391GXLPMEDR 1 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031
Certificate for Joint Venture We, the undersigned, are submitting this tender offer in Joint Venture and hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, an authorised signatory of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , being the lead member in the Joint Venture, to sign all documents in connection with the tender and any contract that may result from it on behalf of all the members in the Joint Venture. This authorisation is evidenced by the attached power of attorney signed by the legally authorised signatories of all the members in the Joint Venture. We attach to this Form a certified copy of the Joint Venture Agreement which incorporates a statement that all members in the Joint Venture are liable jointly and severally for the execution of the contract, a term that indicates which member will be the lead member, and terms that indicate the ratios according to which work and payment will be divided amongst the members. Authorised signature, Name of JV member Address name and capacity Lead member Member Member Member NOTE: This certificate is required to be completed and signed by all members of the joint venture. Attach additional pages if more space is required.
Certificate for sole proprietor I, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that I am the sole proprietor of the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date: Signed: Name: Position:(Sole Proprietor) Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 58 File name: Completed Invitation to Tender - E1391GXLPMEDR 1 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031
Certificate for trust I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the board of trustees of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by resolution of the board of trustees taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the trust and to sign all documents in connection with this tender and any contract that may result from it on behalf of the trust. A certified copy of the resolution of the board of trustees is annexed to this Form. Date: Signed: Position: Name: NOTE: The table below must also be fully completed by all tenderers in addition to the certificate that was selected and completed above. Name of tenderer: Full names of authorised signatory: Designation and capacity: Signature of authorised signatory Date of signature: Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 58 File name: Completed Invitation to Tender - E1391GXLPMEDR 1 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031 ANNEXURE B ACKNOWLEDGEMENT FORM We are in receipt of the Invitation to Tender/Proposal from Eskom Holdings SOC Ltd and the following addenda issued by Eskom: We confirm that the documentation received by us is: (Indicate by ticking the box) Correct as stated in the Invitation to Tender / RFP Content List, and that each document is complete. ̈ Or: Incorrect or incomplete for the following reasons: ̈ Cataloguing Acknowledgement: Please select the relevant statement by ticking the appropriate box below
We agree to provide the cataloguing information as described in the Invitation to Tender ̈
We have already supplied Eskom with the cataloguing information pertaining to this Invitation to Tender in a previous contract/order [insert previous contract/order number] ̈ __________
We do not intend to provide the required cataloguing information for the reasons stated hereunder: ̈
We are a Distributor/Importer/Agent and our Principal, being the Original Equipment Manufacturer (OEM), is or is not [delete whichever is not applicable] in the position to supply cataloguing information for items. We attach the letter from the OEM confirming its position. ̈ Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 58 File name: Completed Invitation to Tender - E1391GXLPMEDR 1 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031 Invitation to Tender/Request for Proposal No: ____________________ Name of Tenderer: ___________ _ _ Country of registration: _______________________________________ Full names of contact person: __________________________________ Contact details: Tel (landline): Cell phone: e-mail address: Name of tenderer: Full names of authorised signatory
Points Allocation: 20 points
B-BBEE Details: es the right to negotiate with preferred bidders after a competitive bidding process or price
quotations should the tendered prices not be market-related.
Main contractors/ suppliers are discouraged from subcontracting with their subsidiary companies as this
may be interpreted as subcontracting with themselves and / or using their subsidiaries for fronting.
Where a main contractor subcontracts with a subsidiary, this must be declared in its tender documents.
A report containing a list of potential sub-contractors may be drawn by accessing the following link:
“proof of B-BBEE status level of contributor” means-
(a) the B-BBEE status level certificate issued by an authorised body or person; or
(b) a sworn affidavit as prescribed by the B-BBEE Codes of Good Practice; or
(c) any other requirement prescribed in terms of the Broad-Based Black Economic Empowerment Act
1.3 Tender returnables
The tenderer must submit the returnable set out hereunder as part of its tender at the stipulated deadline.
Note the following: -
These returnables are required to be completed, signed (if required on the returnable) and submitted with
the tender at Tender closing date and time. If not completed, signed (if required on the returnable) and/or
submitted by tender closing, the tenderer will be disqualified.
** Returnable required at Tender closing (non-disqualifiable): -
These returnables are required to be completed, signed (if required on the returnable) and submitted with
Tender at Tender closing date and time; however, if not submitted by Tender closing, or submitted with
incomplete information or without a required signature, the Procurement Practitioner will, in writing,
request t
Health & Safety
Source: Invitation to Tender - E1391GXLPMEDR 1.pdfOr
Contractual Requirements
OHSAS 18001 certificate
Valid letter of good standing or equivalent
Annexure B
OHS plan / OHS manual
Baseline OHS risk assessment
Valid letter of good standing or equivalent
OHS policy (must be signed)
Safety √
Or
Category 4: Quality Requirements
(Enquiry/Contract/Quality Requirements for
information furnished herein is true and correct, that it is understood that the tenderer's tender/proposal
may be rejected, and that Eskom will act against the tenderer should any aspect of this declaration
prove to be false, and
Environmental
Source: Invitation to Tender - E1391GXLPMEDR 1.pdf (TENDER)Environmental requirement: submit signed environmental proforma.
Contractual Terms
Source: Invitation to Tender - E1391GXLPMEDR 1.pdfsanctions list. A tenderer shall be found to have the nationality
of a country if the tenderer is a national or is constituted,
incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract including
2.1 Eligibility related services.
individually or as a partner in a joint venture (JV) or consortium,
except on an E-Tendering system where there is a limit size
(The upload size per document is 500 megabytes and total
submission is restricted to 4 gigabytes).
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
suppliers within 60 days of receipt of undisputed invoices.
Requirements
Source: Invitation to Tender - E1391GXLPMEDR 1.pdf (TENDER)Eligibility criteria: Tenderers must not be under any restriction to do business with Eskom or State-Owned Companies. Ineligible if: have nationality of a country on international sanctions list; submit more than one tender; JV/consortium agreement does not state joint and several liability; have conflict of interest; tenders signed by non-authorised persons; restricted by National Treasury; on Tender Defaulters list; restricted by Eskom; sub-contract 100% of scope. Tenderers must meet basic compliance: meet eligibility, submit complete tender with commercial, financial and technical information, and submit mandatory commercial tender returnables.
Section
Source: Invitation to Tender - E1391GXLPMEDR 1.pdf*SBD 6.1 Preference Points Claim Form in terms of
1.1.9 PPPFA 2022 regulations Annexure I Y
Tax Evaluation questionnaire to determine whether a
Functionality requirements are applicable.
3.13 Functionality requirements 2. Assurance statement and delivery performance: 50%. Tenderer
do not achieve the threshold will not proceed to price and preference
evaluation.
3.15 Evaluation of Price 1. Inclusive of VAT;
evaluation parameters relating to uncertainty and risk, where
evaluation purposes but will be implemented when payment is
Prices will be scored out of 80 points
Specific goals will be scored out of 20 points in accordance with the
PPPFA and the Preferential Procurement Regulations, 2022. B
3.18 Evaluation of Specific Goals
disqualified but will score zero points for the specific goal.
Tenderers will be ranked using the 80/20 preference point system.
3.19 Ranking of tenders Eskom will add the price score and specific goals score and rank
tenderers from the highest to the lowest total score.
Quality requirement as follows
Category 4: Quality Requirements
(Enquiry/Contract/Quality Requirements for Supplier Quality
Important Dates
Source: Medupi Power Station Environmental Profoma.docx (unknown)Closing date: 2026-10-07 at 10:00. No other dates (e.g., briefings, site visits, clarification deadlines) are stated in the provided document.
Contact Information
Source: Medupi Power Station Environmental Profoma.docx (unknown)No contact information is provided in the document.
Submission Guidelines
Source: Medupi Power Station Environmental Profoma.docx (unknown)Bidders must submit their bids in accordance with the tender instructions. The following returnable documents are required: the signed Medupi Power Station Environmental Proforma, which commits the bidder to comply with Eskom's environmental requirements, the Environmental Management Plan, and applicable legal and other requirements. No other returnable forms are specified in the provided document. Bids must be submitted before the closing time; late submissions are not accepted.
Evaluation Criteria
Source: Medupi Power Station Environmental Profoma.docx (unknown)The evaluation criteria are not fully detailed in the provided document. Bidders must sign the Medupi Power Station Environmental Proforma, declaring compliance with environmental legal and other requirements, Eskom's environmental standards, policies, and procedures. No other eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the provided document.
Financial Requirements
Source: Medupi Power Station Environmental Profoma.docx (unknown)No financial requirements (e.g., pricing format, bonds, guarantees, payment terms) are stated in the provided document.
Compliance Requirements
Source: Medupi Power Station Environmental Profoma.docx (unknown)Bidders must sign the Medupi Power Station Environmental Proforma, committing to comply with environmental legal requirements, Eskom's environmental standards, policies, and procedures, and to inform all staff of their environmental roles. Incidents must be reported within 24 hours. No other compliance requirements (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the provided document.
Description
Source: 240-68099512 Form A_Cat 4_ Rev 9.docxThe tender is for the supply and delivery of fuses at Medupi Power Station on an as-and-when-required basis for 60 months (5 years). Bidders must complete and sign the Supplier Quality Requirements form to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
Contact Information
Source: 240-68099512 Form A_Cat 4_ Rev 9.docx (unknown)No specific contact information (SCM or technical) is stated in the document.
Submission Guidelines
Source: 240-68099512 Form A_Cat 4_ Rev 9.docx (unknown)Bidders must complete and sign the Supplier Quality Requirements form to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard. The form requires indicating with an (X) or (-) the applicable categories under Section B (Eskom) Clause 3, including pre-contract award quality requirements and special processes. Only one category may be selected, and bidders must indicate whether a site assessment is applicable. Submission must be made in accordance with the tender instructions; late or incomplete submissions may be disqualified.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 4_ Rev 9.docx (unknown)Bidders must accept and comply with Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard. The completed and signed Supplier Quality Requirements form is a mandatory returnable. Evaluation will consider the bidder's acceptance of the quality requirements and the applicable category selected under Clause 3 of Section B (Eskom).
Financial Requirements
Source: 240-68099512 Form A_Cat 4_ Rev 9.docx (unknown)No specific financial requirements (pricing format, bonds, guarantees, payment terms, financial capacity thresholds) are stated in the document.
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER){"closingTime":"2.2","briefingSession":"{"date":null,"time":null,"venue":"tend a site visit and/or clarification meeting that is stipulated as being","is_compulsory":true}"}
Briefing Session
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Tenderers must attend a site visit and/or clarification meeting if stipulated as compulsory. Failure to attend will result in disqualification. Details of meetings are stated in the Tender Data.
Returnable Documents
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Tenderers must return mandatory tender returnables by closing date and time for tender submission. All documents must be completed. Original tender plus one copy in paper form must be submitted, or tenderer will be disqualified. For e-tendering, tender must be submitted via Eskom Tender bulletin site. Tender must be signed. Packages must be marked 'ORIGINAL' and 'COPY', sealed in an outer package marked 'Confidential' with required details. Where an agent submits a tender, an authenticated copy of authority to act as agent must be submitted as a tender returnable.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Functionality and any element of the B-BBEE scorecard may not be used as Objective Criteria.
Prices and rates must be stated in South African Rand unless instructed otherwise.
Arithmetical errors will be corrected as specified in the tender documents.
Tenderers must not alter tender documents except to correct errors, with corrections initialed by all signatories.
Reverse e-auction may be used.
Tender validity: 21 working days from closing date and time.
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdfof a tenderer.
Cost of tendering 2.6 Accept that Eskom will not compensate the tenderer for any costs incurred in the preparation
and submission of a tender, including the costs of any testing necessary to demonstrate that
aspects of the tender satisfy the evaluation criteria, or the negotiation of any contract.
Submitting a tender 2.7 Check the Invitation to Tender documents on receipt and notify the Eskom representative of
any discrepancy or omitted documents. The Acknowledgement Form must be completed
and submitted with the tender and must clearly state if the tender is for the whole or part of
the works, services or supply identified in the specification and/or works information by
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdfreasonable time for tenderers to make consequential adjustments to their tenders before
the closing date and time for submission.
In writing’ means hand-written, typed, type-written, printed or electronically made, and that
results in a permanent record.
Insurance 2.17 The extent (if any) of insurance provided by Eskom may not be for the full cover required in
the conditions of contract. The tenderer is advised to seek qualified advice regarding
insurance.
Pricing the tender 2.18 Include in the rates, prices, and the tendered total of the Prices all duties, taxes (including
VAT), and other levies payable by the tenderer if successful. Such duties, taxes and levies
are those applicable 14 (fourteen) days prior to the closing date and time for tender
submission.
2.19 Provide rates and Prices that are fixed for the duration of the contract and are not subject to
contract price adjustment except as provided for in the Invitation to Tender.
2.20 State the rates and Prices in South African Rand unless instructed otherwise in the Invitation
to Tender. The selected conditions of contract may provide for part payment in other
currencies. Therefore, submit Rates/Prices in Rands in accordance with the exchange rate
and base date as stipulated in the Invitation to tender.
Alterations to 2.21 May not make any alterations or additions to the tender documents, other than for purposes
documents of complying with instructions issued by the Eskom Representative or if necessary to correct
errors made by the tenderer. All such alterations shall be initialed by all signatories to the
tender. Corrections may not be made using correction fluid, correction tape or the like.
Alternative tenders 2.22 Submit alternative tenders only if a main tender is also submitted, and only if the submission
of alternative tenders is permitted by the Invitation to Tender. Accept that an alternative
tender may be based only on the criteria stated in the Tender Data.
Clarification and 2.23 Provide clarification and documents as may be required by the Eskom Representative
correction of Prices during the evaluation of tenders. However, documents identified as mandatory tender
after tender returnables that are required to be submitted at the closing date and time for tender
submission submission will not be requested and may not be submitted after the closing date and time.
phases, as this is regarded as ‘double dipping’.
Designated 3.12 Tenderers are also required to submit information on designated material and
materials and thresholds no later than contract award. If this information is not completed and
thresholds submitted as indicated in the Invitation to Tender, your tender will not be considered for
contract award
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
requirements will be required meet the minimum threshold stated in the Tender Data to proceed to
further evaluation.
Financial analysis 3.14 Eskom has to determine the risk of doing business with a supplier who may pose a
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
financial statements, Eskom will attempt to identify mitigating factors or requirements for
the tenderer to meet, if such factors/requirements exist in the tender’s context. However,
should suitable mitigating factors not exist in the tender’s context or should mitigating
factors exist but be insufficient or if the risk is considered to be too high or should the
tenderer not agree with the mitigating factors, the tenderer will not be considered for
award.
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
such as CPA, FOREX, commodity exposure, unconditional discounts, technical
adjustment, PV and forecasted rates of invoicing are taken into account when determining
the evaluation Price.
Arithmetical errors 3.16 Check responsive tenders for arithmetical errors. If there is a discrepancy between an
amount in figures and the amount in words, the amount in words shall prevail.
Check the highest-ranked tenders for the following errors or omissions: -
(a) the misplacement of the decimal point in any unit rate; or
(b) omissions in completing the pricing schedule or bill of quantities, or
(c) arithmetical errors in line-item totals that are the result of the incorrect multiplication
of a unit rate and a quantity in a bill of quantities or schedule of prices; or
(d) arithmetical errors that are the result of the incorrect addition of the prices.
will request the tenderer to either confirm the prices as tendered or to accept the
corrected prices.
Where the tenderer elects to confirm the prices as tendered; Eskom will correct the error
as follows: -
(a) If a bill of quantities or pricing schedule applies and there is an error in the line-item
total that is the result of an error in multiplying the unit rate and the quantity, the line-
item total shall prevail, and the rate shall be corrected.
(b) Where there is a misplacement of the decimal point in the unit rate, the line-item total
as quoted shall prevail, and the unit rate shall be corrected.
(c) Where there is an error in the total of the prices that is the result either of other
corrections required by the checking process or in the tenderer’s addition of prices,
the total of the prices shall prevail, and the tenderer shall be asked to revise the
selected item prices (and their rates if a bill of quantities applies) to result in the
tendered total of the prices.
documentation by closing date and time of tender submission, the tenderer will not be
disqualified if otherwise evaluated as acceptable in all other criteria; however, the tenderer
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
together and rank the suppliers from the highest to the lowest.
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
accordance with Section 2(1) (f) of the Preferential Procurement Policy Framework Act,
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)CSD report or as per certificate/affidavit provided
CSD number/CSD report) must be provided at the closing date and time for
CSD number or B-BBEE certificate/affidavit will need to be
B-BBEE Details: kom Representative and
Agreement to sign the contract documents.
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Environment and closing date and time for tender submission stipulated in the Invitation to Tender and/or
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated
B-BBEE Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Tenderers must provide proof of B-BBEE level (certificate/CSD number/report) at closing date if it is a pre-qualification criterion, or tender disqualified. If sub-contracting to designated groups, sub-contractors' B-BBEE status and CSD number or certificate must be provided. If no B-BBEE certificate/affidavit provided or fraudulent/expired, tenderer will score zero under PPPFA point allocation. Eskom will report fraud or fronting to B-BBEE Commission.
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdftenderers that Eskom has identified. A sole source and a single source are regarded as a
tenderer that meets the requirements stated in the Eskom Procurement and Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated in the Invitation to
Tender; the tender will be disqualified. However, in the event that, at the closing date and
time for tender submission, only proof of application for registration on CIDB is available,
then this must be submitted by the closing date and time for tender submission, while the
actual proof of CIDB registration (printout from CIDB database) must be submitted by
contract award
Contract Skills 2.29 If the tenderer is awarded a contract, it, as Contractor, shall achieve in the performance of
Development Goal the contract the Contract Skills Development Goals (CSDG) established in the CIDB
(CSDG) Standard for Developing Skills through Infrastructure Contract (published in GN 1779,
Government Gazette No. April 2023)
that has a duration of 12 months or more, and to:
a contract of R5 million or more, in the case of a professional service or service contract
or an order issued in terms of such a contract; or
a CIDB grading designation of grade 7 or higher, in case of an engineering and
construction works, or design and build contract or an order issued in terms of such a
contract.
Contract 2.30 The Contractor shall achieve in the performance of the contract the Contract Participation
Participation Goals Goals (CPG) relating to the engagement of targeted enterprises as established in the CIDB
(CPG) standard for indirect targeting for enterprise development through Construction works
contracts (published in Government Gazette No. February 2013).
enterprises as established in the aforesaid standard applies to:
construction works contracts in the General Building (GB) and to Civil Engineering (CE)
classes of construction works;
construction works contracts of an estimated minimum project duration of 6 months; and
Respond 3.1 Respond to a request for clarification that Eskom receives before the closing date for
clarification clarification or queries. Eskom’s responses will be published to all tenderers in the same
manner the Invitation to Tender documents were issued. It is the tenderers’ responsibility
to check the Eskom Tender Bulletin and NT e-Tender Portal regularly for updated
responses to clarifications.
Issue Addenda 3.2 If necessary and prior to the closing date and time for tender submission, amend, amplify, or
add to the Invitation to Tender documents by way of Addenda published in the same
platform that the Invitation to Tender was issued. It is the tenderers’ responsibility to
check the Eskom Tender Bulletin and NT e-Tender Portal regularly for Addenda.
electronically. The Eskom Representative will publish the names of all tenderers received
on the Eskom Tender Bulletin and NT e-Tender Portal.
Tender Prices 3.5 Eskom will announce the names of the tenderers. Prices may be announced if so, stated
in the Tender Data.
Non-disclosure 3.6 Unless required by law, Eskom will not disclose information relating to the evaluation and
comparison of tenders and recommendations for the award of a contract to tenderers or to
any other person not officially concerned with the tender process until after the tender
award.
Grounds for 3.7 Reject a tender if Eskom establishes that there is proof that the tenderer influenced the
rejection processing of tenders or the awarding of the contract, the existence of collusion and/or bid
rigging, and/or that the tenderer has participated in any fraudulent/illegal activity in
connection with the Invitation to Tender.
Clarification of a 3.8 Obtain clarification from a tenderer in respect of any matter in the tender that may not be
tender clear or that could give rise to ambiguity in a contract arising from this tender if the matter
were not to be clarified. A document that the Invitation to Tender identifies as a mandatory
tender returnable that is required to be submitted at the closing date and time for tender
submission will not be requested, but Eskom may seek clarity on it.
may utilise reverse e-auction in certain Enquiries. Where reverse e-auction will be utilised,
this will be indicated in the respective Invitation to Tender and the reverse e-auction
supporting documents will be issued in the Invitation to Tender. Tenderers will be required
to submit a complete tender that does not contain Prices. If a tenderer has included prices
in its tender, the prices will not be considered.
Acceptance of 3.22 Notify Eskom's acceptance to the successful tender before the expiry of the validity period
tender or agreed additional validity period. Inform the successful and unsuccessful tenderers only
once approval has been granted by the Eskom Adjudication Authority. For open tenders,
this notification must be published on the Eskom Tender Bulletin and NT e-Tender Portal
Prepare contract 3.23 Revise the contract documents issued by Eskom in the Invitation to Tender documents to
documents take account of:
Addenda issued during the tender period;
inclusion of returnables stipulated in the Invitation to Tender;
inclusion of changes agreed in contract negotiations; and
Other revisions or documents agreed to between Eskom and the successful
tenderer during negotiations,
Sign Form of 3.24 Arrange for authorised signatories of both parties to complete and sign the original and one
Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdfincluding the Eskom Representative shall not be liable for any losses, claims or damages of
whatsoever nature or howsoever arising that may be sustained by a tenderer or any other
person as a result of its participation in the tender or from any amendment, termination or
suspension of the process set out in the Invitation to Tender or from its exclusion from
participating in the tender process at any point.
Eskom’s right to 1.7 Eskom reserves the right to enter into mandated negotiations with any, one or more selected
negotiate tenderer(s) in accordance with Eskom’s approved procurement policies and procedures.
240-62044728 Rev 12 Eskom Standard Identifier
Conditions of Tender Effective Date 01 February 2025
Review Date January 2030
Disclaimer 1.8 While Eskom takes all reasonable measures to ensure that all information contained in the
regarding accuracy tender documents is correct and complete, Eskom does not, however, make any
of tender representations or warranties, express or implied, as to the accuracy or completeness of
documents such information and Eskom expressly disclaims any, and all liability for such
representations, warranties or statements.
Tenderer’s 2. The tenderer shall comply with the following obligations when submitting a tender and shall:
Tender validity 2.12 Hold the tender(s) valid for acceptance by Eskom at any time within the validity period after
the closing date and time for tender submission. Extend the validity period for a specified
additional period if Eskom requests the tenderer to do so. A tenderer that agrees to extend
the validity of its tender will not be required or permitted to modify its tender. A tenderer that
does not agree to extend the validity of its tender will be excluded from further
consideration. Tenderers will be requested to extend the validity of their tenders until a
contract(s) have been concluded with one or more tenderers. A request that a tenderer
extend the validity of its tender is not a representation that the tender is an acceptable
tender or that Eskom will seek to negotiate or conclude a contract with the tenderer. If the
validity of tenders expires before contracts have been concluded, the procurement process
is deemed to have concluded without an award.
Confidentiality and 2. 13 Treat as confidential all matters that arise in connection with the procurement. Use and copy
copyright of the documents provided by Eskom only for the purpose of preparing and submitting a tender
documents in response to this Invitation to Tender.
Standardised 2.14 Obtain and familiarise themselves with, if required for the purposes of submitting a tender,
specifications and the latest revision of standardised specifications and/or other documents that have been
other publications incorporated by reference into the Invitation to Tender documents by reference.
Site visit and / or 2.15 Tenderers must attend a site visit and/or clarification meeting that is stipulated as being
clarification compulsory in order to familiarise themselves with the proposed work, services, supply,
meeting location or similar. Failure to attend a clarification meeting or site visit that is identified as
compulsory will result in disqualification from participation.
Details of the meeting(s) are stated in the Tender Data. Tenderers are entitled to ask
questions for clarity in the course of a site visit or clarification meeting.
correction of errors as required above.
Evaluation of 3.17 Score the B-BBEE level as stated on the CSD report or as per certificate/affidavit provided.
B-BBEE If the B-BBEE level is a pre-qualification criterion; then the proof of the B-BBEE level
(certificate/CSD number/CSD report) must be provided at the closing date and time for
tender submission; or the tender will be disqualified. If sub-contracting to designated groups
pre-qualification criteria are utilized (selected/mandatory) in terms of the PPPFA
Regulation, then Eskom will apply the PPPFA requirements for sub-contractors’ B-BBEE
status and the sub-contractors’ CSD number or B-BBEE certificate/affidavit will need to be
provided at the closing date and time for tender submission. Should the
information/documents provided indicate that the level is in dispute (fraudulent/ expired)
then the tender will be disqualified.
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
provided at Tender closing date and time for tender submission, or the
information/documents provided are fraudulent or have expired; then the tenderer will not
be disqualified (if otherwise deemed to be responsive and acceptable in all other aspects)
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Special Conditions
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Contract Skills Development Goals (CSDG) apply to contracts of 12 months or more, R5 million or more for professional/service contracts, or CIDB grade 7 or higher for engineering/construction works. Contract Participation Goals (CPG) apply to construction works contracts in GB and CE classes, minimum 6 months duration, and where at least 25% of main contract could be subcontracted. Tenderers must comply with relevant legislation including NT instructions, CIDB regulations, PPPFA, B-BBEE Codes, COIDA, OHS Act, and Eskom SHEQ requirements.
Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Eligibility: Tenderer must comply with eligibility criteria in Tender Data and not be under any restriction to do business with Eskom or State-Owned Companies. Tenderers are not permitted to sub-contract 100% of the scope of work. Tenderers must be registered with CIDB if stipulated, with proof of registration mandatory at closing date. Tenderers must provide proof of SHEQ systems, policies and capabilities. Tenderers must complete and submit the SDL&I Undertaking by contract award. Tenderers must submit information on designated materials and thresholds by contract award.
Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdfFunctionality and any element of the B-BBEE scorecard may not be used as Objective Criteria.
Prices must be in South African Rand unless otherwise instructed.
Arithmetical errors will be corrected as specified.
Reverse e-auction may be used.
Description
Source: 240-109253698 CQP Template 2021.docxContract Quality Plan template assist the supplier to identify and plan for meeting client's/ contract expectations/requirements for quality management
Important Dates
Source: 240-109253698 CQP Template 2021.docx (unknown)Closing date: 2025-09-05 (time not stated in the source).
No briefing, site visit, or clarification deadline is stated in the source.
Submission Guidelines
Source: 240-109253698 CQP Template 2021.docx (unknown)Returnable documents:
Evaluation Criteria
Source: 240-109253698 CQP Template 2021.docx (unknown)The source does not specify evaluation criteria beyond the requirement to submit a compliant Contract Quality Plan (CQP).
The CQP must be compiled by a representative of the tenderer and approved by the owner of the organisation.
The scope of work category must be marked as applicable.
Technical Specifications
Source: 240-109253698 CQP Template 2021.docx (unknown)The Contract Quality Plan (CQP) must be prepared in line with SANS 466:2005 guidelines for quality plans.
The CQP must define the quality policy, quality objectives (SMART), and quality assurance processes.
The CQP must include method statements describing how the work will be carried out safely.
The CQP must control documented information, including version control and disposal of obsolete documents.
The CQP must include an inspection register, monthly inspection analysis report, audit findings report, and registers for non-conformances, defects, and punch items.
The CQP must include a databook status register and inspection rejection rate reporting.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
ESKOM HOLDINGS SOC LIMITED - Lephalale - Lephalale - 0555
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
18
Last checked
12 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A technical guide to municipal electrical tenders. Covers CIDB EB/EP grading, electrification projects (INEP), substation maintenance panels, and COC compliance.
A strategic guide for medical equipment suppliers, maintenance companies, and healthcare technology providers bidding for tenders across South Africa's nine provincial health departments. Covers SAHPRA registration, OEM authorisation, service level agreements, and technical evaluation criteria.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
A comprehensive guide to securing medical equipment maintenance tenders in South African public hospitals. Learn about SLA management, OEM certifications, and clinical engineering requirements.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: Electrical Equipment. Unlock full pricing strategies, bid frequency, and historical win rates.