Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Eskom Holdings SOC Limited - Viljoensdrift, Deneysville - Vereeniging - 1930
Organization Type
GOVERNMENT
Published
11 Sept 2026
OCDS Reference
ocds-9t57fa-169993
Date & Time
Wednesday, 07 October 2026 - 10:00
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Venue
https://teams.microsoft.com/meet/3526720060866 48?p=1kkuY2yzAF2ITAQb9Z.
Categories
Request for Bid(Open-Tender)
Eskom Holdings SOC Limited - Viljoensdrift, Deneysville - Vereeniging - 1930
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
Source: Tender Documents.zip11 Sept
2026
Tender Published
Tender was published
07 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Tender Documents.zip
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 690 793
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
provisions above, please complete the table hereunder with all required
Annexure a – integrity declaration form)
information.
Full Name & Capacity/ Identity Confirm and provide Full Names & To your
Position within tenderer (e.g. Number details (including Capacity/Position of knowledge
employee/Director/member/ employee number) if Eskom employee/ is thi
supply identified in the
specification and/or works
payment terms initiative of Eskom, and its aim is to explore the extent to which Eskom can
benefit financially from either extending the supplier payment terms or offering an early
settlement discount.
payment terms, and further guidance will come on early settlement discounts. The document
provides an update on the thresholds on which the 60-day payment term is applicable and
provides guidance on compliance reporting and the applicability of the Policy.
Threshold
of VAT. This means that all contracts exceeding this threshold must be established on the
60-day payment term.
Applicability of policy
However, the Policy is applicable to contracts concluded between subsidiaries and their own
suppliers.
of an extended payment term must be applied as a lever.
Monitoring of compliance
Committee (“Cost Steerco”) on a monthly basis. Divisional Procurement Senior Managers shall
provide reasons for non-compliance to the oCPO on request and shall present these to the
Cost Steerco. This arrangement shall continue until the end of the 2022/23 financial year.
Compiled by: ms reshma maghoo
Contract advisor
Date: 28/9/2022
Guidance note: implementation of supplier payment term policy
Recommended: mr godfrey quickfall
Senior manager: contract management (acting)
Date: 2022-09-28
Supported: ms jainthree sankar
Chief procurement officer
DATE: 5 October 2022
Approved: mr calib cassim
Chief financial officer
DATE: 05 October 2022
Eskom Holdings SOC Ltd Reg No 2002/015527/30
Supply chain management system should
This declaration prove to be false.
.................................... .....................................................
Signature Date
.................................... ......................................................
Position Name of bidder
income-generating contracts)
of services, works or goods Stipulated minimum threshold
_______________________________ _______%
_______________________________ _______%
_______________________________ _______%
have any imported content?
(Tick applicable box)
Yes NO
3..1 If yes, the rate(s) of exchange to be used in this bid to calculate the local content as
prescribed in paragraph 1.5 of the general conditions must be the rate(s) published
by SARB for the specific currency at 12:00 on the date of advertisement of the bid.
The relevant rates of exchange information is accessible on www.reservebank.co.za
Indicate the rate(s) of exchange against the appropriate currency in the table below
(refer to Annex A of SATS 1286:2011):
Currency Rates of exchange
US Dollar
Pound Sterling
Euro
Yen
Other
NB: Bidders must submit proof of the SARB rate (s) of exchange used.
minimum threshold for local content the dtic must be informed accordingly in order for the
DTIC to verify and in consultation with the AO/AA provide directives in this regard.
Local content declara
supplying entity AND their company registration
number] ......................................................................., certify under oath that, to the best of my
knowledge, the information furnished herein is true and correct. I accept that Eskom reserves its right to act
against the supplier named above or me personally in terms hereof, should this declaration prove to be false.
Eskom employees and directors that engage in private work
Copyright © Eskom Holdings SOC Ltd Registration Number 2002/015527/00
Reverse e-Auction, means an electronic evaluation of Price and Preference point as outlined in the PPPFA (The Regulation) and aims to achieve the most competitive and market related prices for clearly specified items.
Acknowledgement form – reverse e-auctioning training
Business name/JV: _______________________________________________________
eTendering system is a web-based system that allows suppliers bidding for various tenders advertised on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers submit tender documents at various Eskom tender offices. eTendering system replaces the manual or physical submission of tender documents at various Eskom tender offices. eTendering system in a nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will be required to register their details before they can be granted access to the eTendering system. An OTP (one time pin) will be sent to both their cell phone and email address.
Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F Y
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content (only applicable if designated
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary
Schedule Annexure G2 Y
Annexure D Imported Content Declaration – Supporting
Schedule to Annexure C Annexure G3 Y
Annexure E Local Content Declaration- Supporting
Schedule to Annexure C Annexure G4 Y
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *
Title: Supplier Quality Management: Document Identifier: 240-105658000
Alternative Reference QM 58
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Quality Management
Revision: 3
Total Pages: 28
Next Review Date: October 2024
Disclosure Controlled Disclosure
Classification:
Compiled by Supported by Functional Authorized by
Responsibility
SA Sambo P Dondashe L Meyer K Pather
Chief Advisor Middle Manager Acting Senior General Manager
Quality Quality Manager Quality Risk and
Management Management Management Sustainability
Date: 15/10/2021 Date: 15/10/2021 Date: 15/10/2021 Date: 17 October 2021
EDC TN Formatted 15.10.2021
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Content
. Introduction ............................................................................................................................... 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ........................................................................................................... 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References ................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative............................................................................................................. 3
2.3 Definitions ........................................................................................................................ 4
2.4 Abbreviations ................................................................................................................... 5
2.5 Roles and Responsibilities ............................................................................................... 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................... 7
3.2 Quality Plan ...................................................................................................................... 8
3.3 Contract Quality Plan........................................................................................................ 8
3.4 Quality Control Plan ....................................................................................................... 10
3.5 Pre-Contract Award: Quality Requirement ...................................................................... 13
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................... 16
3.7 Post-Contract Award ...................................................................................................... 17
3.7.1 Contract Execution .............................................................................................. 17
3.7.2 Supplier Quality Performance Monitoring Phase ................................................. 18
3.7.3 Supplier Quality Audit .......................................................................................... 18
3.8 Standard Conditions ....................................................................................................... 19
3.8.1 Rights of Access .................................................................................................. 19
3.8.2 Eskom Rights to Information ................................................................................ 20
3.8.3 Preservation ........................................................................................................ 21
3.8.4 Quality Audits Related Conditions ....................................................................... 25
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by
Eskom ................................................................................................................. 25
3.8.6 Special Processes ............................................................................................... 26
Acceptance ............................................................................................................................. 27
Revisions ................................................................................................................................ 27
Development Team ................................................................................................................ 27
Acknowledgements ................................................................................................................ 28
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
vendor registration, management, monitoring, assessment and auditing of suppliers. Eskom’s
position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The priority is to encourage suppliers to continually improve
their QMS and enhance service delivery by implementing and conforming to the standard.
2.1 Scope
2.1.1 Purpose
The purpose of this specification is to outline the requirements according to which suppliers shall
develop,
implement,
maintain, and
continually improve
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
2.1.2 Applicability
This specification shall apply throughout Eskom Holdings Limited divisions, its subsidiaries,
suppliers, and sub-suppliers and shall form part of all Eskom requests for information (RFI)/ requests
for quotation (RFQ)/ requests for proposal (RFP), including contracts for the procurement of products
and services.
2.1.3 Effective date
Date of authorisation of the specification
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
2.2.2 Informative
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
Success
[7] 32-1033: Eskom’s Procurement and Supply Chain Management Policy
[8] 32-1034: Eskom’s Procurement and Supply Chain Management Procedure
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
[12] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Activities
[13] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
Purpose of a CQP is to outline how the results defined in the specifications will be achieved.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
Eskom representative or Eskom inspection agency, whichever is applicable.
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
Requirements are generally specified in the purchase order and/or contract documentation,
but may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus-bars, CT’s, VT’s and transformers).
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use.
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
A supplier may be a natural or legal person and includes any employee acting within the
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
2.4 Abbreviations
Abbreviation Explanation
AIA Approved Inspection Authority
CA Corrective Action
CQP Contract Quality Plan
FIDIC Federation Internationale Des Ingenieurs- Conseils
FMECA Failure Mode, Effects and Criticality Analysis
HAZOP Hazard and Operability Study
ISO International Organisation for Standardisation
ITP Inspection and Test Plan
NC Nonconformity
NDT Non Destructive Testing
PMI Positive Material Identification
QCP Quality Control Plan
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Abbreviation Explanation
QMS Quality Management System
PQP Project Quality Plan
RFI Request for Information
RFQ Request for Quotation
RFP Request for Proposal
SHEQ Safety, Health, Environment, and Quality
SETA Skills Education Training Authorities
WPS Welding procedure specifications
WQR Welder’s Qualification Record
2.5 Roles and Responsibilities
Eskom Quality representative/ professional will select applicable requirements for existing and
potential Eskom suppliers using Form A (Tender and Contract Quality Requirements for Supplier
Quality Management: Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001
Standard).
The existing and/ or potential suppliers must complete, sign and return Form A with the other
returnable as listed in the List of Tender Returnable document (240-12248652). Other roles and
responsibilities for this standard are defined within the text of this specification.
2.6 Process for Monitoring
The application of this specification throughout Eskom shall be audited as per the management
system audit schedule.
2.7 Related/Supporting Documents
The documents superseded by this specification: all divisional and business unit supplier quality
requirements standards and/or specifications.
Forms and templates:
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The quality assessment criteria and Form A of this specification will be selected and completed by
an Eskom Quality representative/ professional who will identify the applicable supplier quality
requirements to be met.
Form A of this specification must also be completed and signed by the supplier responding to an
Eskom invitation to tender, in order to acknowledge and accept Eskom Supplier Quality requirements
as per this specification and ISO 9001 Standard or any additional quality requirements specific to
the scope of work.
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) and in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001 and may include a quality manual, quality plans, work procedures, work
instructions, method statements, work flow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub-supplier’s scope of responsibility includes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.6 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-supplier’s scope of
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.1.7 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.8 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
Verification of the QMS
Audits and surveillances
Regular assessment of the CQPs and reviews of QCPs.
NC and Defect Management
Inspection and test plans
Risk management
3.2 Quality Plan
The information in this section constitutes the minimum requirements for a quality plan.
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables , as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained contract
quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract quality plan (CQP) and/ or quality control plan (QCP)/ inspection and test
plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
supplier’s quality system in order to demonstrate its ability towards both controlling and
meeting specified Eskom requirements.
Note 1: Contract Quality Plan should address the quality assurance elements related to the scope
of work and/ or technical specification.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-supplier’s scope of work.
The supplier shall, where applicable, based on scope of work criticality, ensure that procurement
documents clearly and unambiguously require sub-supplier submission of a sub-supplier CQP for
supplier and Eskom review.
The main supplier shall ensure that sub-supplier CQPs are developed and implemented in
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans. In
addition to the elements specified in ISO 10005, the supplier’s and/ or sub-suppliers’ CQPs shall
include the following (as applicable):
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding: management of the welder’s qualification record
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture. The personnel carrying out special processes (for
example, NDE, welding, coating, heat treatment, etc.) where the results cannot be fully
verified by subsequent inspection and test shall be suitably qualified and, where applicable,
registered with statutory bodies as legally required, that is, as radiographic workers to conduct
radiography. The requirements for the qualification shall be specified, and personnel records
shall be maintained in accordance with the Project Quality Personnel Qualification
Specification and, where applicable, legal requirements.
3.3.6 The personnel required to perform special processes shall be certified competent through a
certificate of competency in accordance with the company’s internal training management
and competency control procedures or an external certification body (for example, NDT)
through an accredited service provider as per Skills Education Training Authorities (SETA)
requirements.
3.3.7 All personnel who perform activities that affect quality shall have their training needs identified
and documented. The required training shall be implemented in accordance with the
company’s training management and competency control procedures. All the training
certificates shall meet the SETA requirements in terms of having the unit standard completed
and the accreditation number of the service providers.
3.3.8 Instructions and requirements for equipment and materials storage, preservation, and
maintenance, including identification of materials required for preservation and maintenance,
are to be provided sufficiently prior to receipt (prior to shipment or earlier) to ensure that
appropriate resources are available at the time of delivery.
3.3.9 Specific quality monitoring and verification activities are to be undertaken on the supplier’s
sub-suppliers by Eskom or it agent.
3.3.10 The CQP information need to include, but not limited to:
Spells out the aspects of the QMS to be applied within a specific Eskom project, and the
methods to be utilised to ensure quality.
Outline the resources, the communication channels, applicable documents and records to be
generated.
Management Authority and Responsibility from both supplier and client need to outline in the
Cqp.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
List of documents and records that will be used and submitted during the execution of the
project.
Communications channels should include contact person and contact details
Monitoring & measurement procedures for activities need to be indicated.
3.3.11 The main supplier and sub-supplier CQPs shall comply with the Eskom Quality Requirements
Specifications and shall be submitted prior to the initial scope of work kick-off or initial pre-
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.12 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.4 Quality Control Plan
The supplier shall develop and implement processes and procedures that efficiently and effectively
monitor, verify and document the quality of the scope of work for deliverables.
The main supplier shall ensure that sub-supplier QCPs/ ITPs are prepared at a level of detail
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
supplier’s QCP/ ITP that clearly and unambiguously identifies the quality verifications to be
performed and special attention to controls related to critical products and services.
3.4.2 QCP/ ITP shall be reviewed and accepted by Eskom, its inspection authority or agency, and
they shall allow for the insertion of Eskom specific requirements, including hold and witness
points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
authority or agency’s agreement prior to the commencement of work involving an activity
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
Qcp/ itp.
3.4.6 All applicable codes, standards, and relevant acceptance criteria documents are available at
the work location, and Eskom representatives on site shall have on-going access to this
information. Workplace documentation shall be available in English and in any workforce-
appropriate language.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub-supplier’s involvement. A separate QCP/ ITP shall be required for each sub-
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
be reviewed at Eskom’s discretion based on its assessment of the supplier’s performance or
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
Eskom contract number and title
The supplier’s order number
Identification of the area of works/contract
Description of the work, with components, item number, and activity date
QCP/ITP unique number
A list of the sequence of operations, including inspection and tests
The identification of the specification, drawing number, or procedure for each operation,
with reference to the relevant criticality risk rating
The acceptance criteria, with reference to the technical specification, in-house, national, or
international standard, with the relevant clause number for each operation
The inspection and test activities that the supplier has nominated for its intervention points
Provision for the inclusion of intervention points nominated by Eskom and/or its authority/
agency
Provision for intervention point acceptance by date and signature for all parties having
intervention in the plan
Inspection and test records to be generated by the supplier for each operation and an
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Specifications, including, but not limited to, the following requirements:
Clear and unambiguous description of the equipment and location(s) at which each activity
will take place, including facility location(s)
Identification of quality verification activity and stage
The details of reference documents, procedures, or method statements to be utilised in
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Definition of acceptance criteria
Listing of certifying or verifying documents generated to provide evidence of compliance
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
Identification of main supplier and sub-supplier (where applicable) third-party/approved
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
Qualification requirements for quality control inspectors, including any third-party/AIA
inspectors
Listing of all proposed test procedures
Acceptance criteria for each inspection or test in alignment with specified tolerances
A section for signed acceptance of the QC/ITP by the supplier, sub-supplier (where
applicable), and Eskom prior to commencement of work
Inspection or testing intervention points, including, but not limited to, factory acceptance test
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
The supplier shall arrange coordination meetings with Eskom prior to placement of orders
for items or equipment to ensure that all technical and commercial requirements are clear
and understood. Fourteen days’ advance notice of meetings shall be given to Eskom.
Supplier inspection personnel, including inspection agency personnel, shall be competent
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
Specification.
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
Requirements for inspection checklists and inspection assignments, with lists of items to be
inspected
An inspection and testing report format, report content, schedule for report processing and
distribution, and report retention requirements
Inspection and test report results response tracking (log) and resolution of nonconformity in
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
Associated Failure Mode, Effects and Criticality Analysis (FMECA) reports relating to the
equipment and sub-systems (if applicable)
Hazard and Operability Study (HAZOP) report, as applicable
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-supplier’s
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
AIA to be attended by the supplier’s and sub-supplier’s representatives, including their quality
representatives who will be involved in the works, and records are to be kept.
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
supplier’s or sub-supplier’s premises and on site where the work is being performed. The
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
3.5 Pre-Contract Award: Quality Requirement
3.5.1 Main Supplier and Sub-supplier Categories
Eskom supplier quality requirements for all existing and potential suppliers and sub-suppliers are
classified into four categories (category 1, 2, 3 and 4). Suppliers must prepare and submit quality
documentation as per the tender selected category (indicated in Form A) using the list of tender
returnables document.
NOTE: Only one (1) category must be applicable per procurement process e.g. [Eskom requests for
information (RFI)/ requests for quotation (RFQ)/ requests for proposal (RFP), including contracts for
the procurement of products and services].
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The following are the minimum returnable documentation for Categories 1 to 4:
3.5.2 Category 1: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a valid copy of ISO 9001 or any applicable certificate of a QMS (the
latest applicable revision). The QMS should drive the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal and external
audit reports. The audit reports must include, if applicable, nonconformity identified, and the
resulting remedial actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit a draft, or an example of an inspection and test
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
3.5.3 Category 2: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed, implemented and maintained QMS
that complies with ISO 9001 or any applicable standard of quality management system (the latest
applicable revision). The following documents (approved/ signed copies) shall be submitted:
Quality Management System manual or a documented information that have defines and
describes the QMS and its scope
Quality Policy, aligned with the supplier’s strategic direction (documented information)
Quality Objectives (documented information)
Control of documented information (both maintain and retain documented information )
Internal audit procedure (documented information)
Control of nonconforming outputs (documented information)
Nonconformity and Corrective action procedure (documented information)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal audit reports. The
audit reports must include, if applicable, nonconformity identified, and the resulting remedial
actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example of inspection and test plan (ITP) or
quality control plan (QCP) on similar or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
document (240-12248652).
3.5.4 Category 3: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed QMS that complies with ISO 9001
(or the latest applicable revision). The following documented information (approved/ signed
copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information )
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example inspection and test plan (ITP) or
quality control plan (QCP).
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
NB: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.5.5 Category 4: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a quality method statement based on ISO 9001 and specific to the
scope of work.
The quality method statement should address all the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit a signed/ approved quality policy (aligned with the supplier’s strategic
direction). (documented information)
The supplier shall submit a copy of quality objectives. (documented information)
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of the documented information for roles, responsibilities and
authorities, specific to the project/ scope of work/ technical requirements. Examples of relevant
documented information are; organization charts, job descriptions, work instructions, duty
statements, manuals, procedures.
Note: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment
Supplier capability and capacity assessments shall be performed prior to contract award on potential
suppliers participating in Eskom Holdings procurement process to:
provide products and services with high risk to operational sustainability
work on critical plant and equipment
supply of critical plant items or components
provide special processes
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
All sub-suppliers used by the main supplier/ contractor, performing work on Eskom critical plant
equipment, supplying commodities and providing specialised services shall be subjected to the
capability and capacity assessment.
Critical plant includes the following:
Generation Level 1 & 2 plant
Transmission and Distribution Power Plant & Control Plant
Mega Projects
All potential quality risks identified will be included in the assessment report provided for the tender
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted.
3.7 Post-Contract Award
3.7.1 Contract Execution
The supplier shall submit the following documents within 30 days or as per stated timeline after the
contract date, prior to the commencement of work, for acceptance by Eskom:
The supplier shall complete a QCP before contract award. This shall be reviewed and
signed off by Eskom within 30 days or as per stated timeline after contract award.
The supplier shall complete a quality control plan and ITP(s) for review and acceptance by
Eskom prior to the commencement of any work, inclusive of subcontracted work, within 30
days or as per stated timeline after contract award.
The sub-supplier QCP/ ITP shall be submitted for review and comment by the supplier and
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
The equipment lists and an indication of pressurised components and systems.
Note: These plans are to be compiled in line with Eskom’s requirements and will have to be
discussed with, and approved by, Eskom prior to any work commencing.
Correspondence shall be directed to the project manager, and periodic quality review
meetings shall be convened by Eskom with the supplier.
The mandatory quality review meetings are to be convened by the nominated project quality
manager or his/her representative for the contract.
Monthly quality performance and management reports are to be prepared by the supplier
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.2 Supplier Quality Performance Monitoring Phase
During the contract execution phase, suppliers shall be monitored by Eskom for performance on
quality-related aspects.
The outcomes of such monitoring will enable Eskom to take any appropriate actions pertaining to
the supplier.
The monitoring shall be carried out periodically by Eskom or at predetermined intervals during the
execution of a contract using agreed key performance indicators. The monitored key performance
areas include the following:
CQP and QCP /ITP
Delivery
Design
Cost
Management system
Subsequent key performance indicators associated with these areas will include the following:
Nonconformity monitoring
Audit and assessment evaluation scoring
Management system compliance and accreditation
Achievement of delivery targets as per contractual agreements
Process improvements
Correction and corrective action response and closure
3.7.3 Supplier Quality Audit
3.7.3.1 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.2 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers
3.7.3.3 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.4 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.3.5 Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with procedures documented in the
Cqp.
3.7.3.6 The supplier shall submit, for Eskom review, documented processes for conducting project
scope of work quality audits and related quality performance reviews. Supplier quality audits
and related quality performance review processes shall be designed to address evaluation
of progress towards completion of project functional area deliverables as well as final
deliverable quality.
3.7.3.7 The supplier shall provide a schedule of anticipated quality audits covering all functional
areas and related quality performance reviews at the time of first post-contract award CQP
submission.
3.8 Standard Conditions
3.8.1 Rights of Access
Eskom:
3.8.1.1 shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
3.8.1.2 reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
3.8.1.3 reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
The supplier:
3.8.1.4 shall support Eskom’s effort to monitor, verify, and/or witness any activities associated with
the work at any time;
3.8.1.5 shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
3.8.1.6 shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
3.8.1.7 shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
3.8.1.8 shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
Eskom’s suppliers to assist with the product and/or service delivery to Eskom; and
3.8.1.9 shall ensure that the above requirements flow down to sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.2 Eskom Rights to Information
3.8.2.1 To expect that the works will be conducted in accordance with the contract between the
parties.
3.8.2.2 To have access to the supplier’s information as determined by applicable legislation.
3.8.2.3 Eskom reserves the right to oversee the supplier’s audit programmes by participating in
selected audits as an observer and by assessing the supplier during key work stages.
Eskom will coordinate with the supplier to develop an oversight schedule aligned with the
supplier’s audit schedule.
3.8.2.4 To obtain access to any audit reports of audits performed by the supplier reflected in the
audit programme.
3.8.2.5 To conduct independent quality audits during all phases of the contract, and the supplier
shall provide all resources to support these activities.
3.8.2.6 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.2.7 To participate in, and/or lead, investigations related to incidents involving its products.
3.8.2.8 To require from suppliers to be responsible for the cost of re-inspections.
3.8.2.9 To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
3.8.2.10 Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
3.8.2.11 Reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as
well as any documentation, materials, or equipment associated with the work, at any time or
project work location.
3.8.2.12 Shall carry out assessments and audits on all new suppliers and sub-suppliers.
3.8.2.13 Reserves the right to appoint resident quality inspectors who can be based at the supplier’s
or sub-supplier’s premises and on site where the work is being performed.
3.8.2.14 Reserves the right to select intervention points within all developed supplier QCPs/ ITPs
for Eskom oversight of selected functions and to perform surveillance or audits of the work.
3.8.2.15 Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.2.16 Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3 Preservation
The supplier shall develop and implement a comprehensive preservation programme consisting of
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
3.8.3.1 Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
3.8.3.2 Development and implementation of preservation programme training appropriate to work
need.
3.8.3.3 Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not
limited to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-supplier’s testing facilities, processing plant, and any other processes
deemed important towards effective and efficient quality control.
3.8.3.4 Eskom seeks cooperation between the supplier’s designers and those of Eskom’s service
provider in ensuring seamless installation of the device and other associated installations.
Moreover, there is also a need to integrate data flows and systems between Eskom and the
supplier. Further details are included in the Eskom specifications and works information.
3.8.3.5 Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
3.8.3.6 Review and tracking of compliance with sub-supplier provided preservation requirements
and recommendations.
3.8.3.7 Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
3.8.3.8 Preservation work plan development and plan execution performance evaluation of all
parties engaged for provision of material transportation, handling, or storage services.
3.8.3.9 Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
3.8.3.10 Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
3.8.3.11 The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term “physical assets” should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.12 Where the project responsibility for equipment and materials management has been
formally delegated, the supplier’s preservation programme shall ensure clear and
unambiguous communication of pre-operation preservation of goods quality requirements
to sub-suppliers.
3.8.3.13 The supplier’s preservation programme shall clearly and unambiguously document
processes and procedures for efficient and effective monitoring of compliance with
programme requirements.
3.8.3.14 Compliance monitoring shall commence with ensuring comprehensive consideration of
preservation requirements in the engineering instruction and subsequent inclusion of said
instruction in procurement documentation and shall be applicable until such time as
equipment or materials have been incorporated in an operating or operational system or
structure.
3.8.3.15 Compliance evaluation frequency shall anticipate transfer of tactical-level responsibility for
management of preservation responsibilities between project functional areas, for example,
procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to
construction, etc., and shall, in similar fashion, anticipate transfer of support for tactical-level
responsibility between various subcontracted service providers.
3.8.3.16 Supplier engineering shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project procurement, logistics, construction management,
quality, security, and other project functional areas, as required, for efficient and effective
implementation of preservation requirements. This shall take the form of a preservation
programme applicable to all systems, system components, equipment, materials, customer-
supplied materials, and other goods procured or managed under the scope of work.
3.8.3.17 The supplier’s preservation management programme shall clearly and unambiguously
address temporary, long-term, and in-transit preservation requirements, including, but not
limited to:
requirements for protection against, or insulation from, atmospheric conditions,
sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, or
other physical environment conditions;
detailed procedures for application, use, monitoring, and maintenance of coatings,
coverings, fasteners, lines, and other components for internal and external weather
proofing;
requirements for electrical grounding or isolation;
requirements for internal or external environment creation, for example, inert gas
charging, heating, cooling, etc., inclusive of gas storage, electric power supply, etc.;
detailed procedures for initial set-up, charging, activation, and maintenance of
internal atmosphere generation, regeneration, monitoring, and relieving systems, for
example, inert gas management systems;
requirements for protection against, or insulation from, vibration or long-period
cyclical motion in transit, for example, wave-generated movement during sea
transport;
internal and external structural integrity protection, for example, internal and external
bracing, padding, framing, chocking, etc.;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
support structure requirements, for example, stools, pads, or other devices,
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
provision for physical separation and/or barriers to prevent airborne or direct
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
provision for, and final disposition of, temporary and longer-term storage or transit
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
provision of requirements for temporary work platforms or other support structures
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
requirements for protection against, or insulation from, contact with other objects, for
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
clear physical delineation of temporary and longer-term storage areas supplemented
by hard and soft barriers, as required, to maintain a protective perimeter;
documented agreements with storage facility and transportation provider
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain
preservation status.
3.8.3.18 The supplier’s preservation management programme scope shall encompass
management of preservation requirements, from initial transfer of ownership or management
responsibility to project scope of responsibility, through any period of temporary or longer-
term storage and through any period of transit, including transit for final delivery at point of
active use or installation.
3.8.3.19 The supplier’s preservation management programme shall clearly and unambiguously
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.20 The supplier’s preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components,
mechanical and rotating equipment, piping and fittings, instrumentation, flange faces,
gaskets, coatings, insulation, and other materials. Special precautions include, but are not
limited to, supplier-specified maintenance procedures related to engines, electric motors,
pumps, compressors, etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
3.8.3.21 The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
3.8.3.22 Where sub-supplier expertise is utilised in determination of the preservation protocol,
supplier procurement processes shall ensure clear and unambiguous documentation of sub-
supplier input into preservation management programme requirements.
3.8.3.23 Supplier procurement shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements.
3.8.3.24 The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
3.8.3.25 The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation
management programme execution.
3.8.3.26 The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
3.8.3.27 The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.4 Quality Audits Related Conditions
3.8.4.1 The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
3.8.4.2 The supplier’s quality audit and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
3.8.4.3 Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the supplier to develop an oversight schedule aligned with the supplier’s
audit schedule.
3.8.4.4 Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
3.8.4.5 Eskom reserves the right to conduct independent quality audits, scheduled and
unscheduled, during all phases of the contract. The supplier shall provide all resources to
support these activities.
3.8.4.6 Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
the products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.4.7 The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
3.8.4.8 The assessments and audits shall be carried out on all new suppliers and their sub-
suppliers.
3.8.4.9 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.4.10 Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by Eskom
3.8.5.1 Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
3.8.5.2 A formal response shall be prepared in respect of the defined criteria and submitted to
Eskom for its review, evaluation, and acceptance, within a maximum of 14 calendar days
from the date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
3.8.5.3 Eskom may, at its discretion, request a response sooner and, in any case, before the
supplier proceeding with any pending/further intervention or corrective action, as may be
required by Eskom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.5.4 Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
3.8.5.5 The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
any action to rescind/withdraw the supplier’s qualification status.
3.8.5.6 Nonconforming outputs identified by Eskom shall be documented via a NC Report and
issued to the suppliers via the contract communication protocol. The suppliers shall
investigate the matter and respond in writing to Eskom of disposition within the stated
contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
3.8.5.7 Eskom shall identify repeat deficiencies as systematic failures of the supplier’s QMS and
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
Cause Analysis. In such cases, QMS rectification and/ or update measures shall be taken
immediately.
3.8.5.8 Should the Supplier fail to respond and rectify nonconforming products within stipulated
contractual conditions. The Project Manager should apply contractual remedies in
accordance with Fidic/ NEC contract.
3.8.5.9 Repeated Nonconformities; if there are any identified repeat nonconformities from the same
supplier within a period of 6 months or less. This must then be escalated to the management
review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not resolved, then
the matter must be escalated to the supplier review committee for recommendation.
3.8.6 Special Processes
The following requirements shall be applicable as well as additional requirements as specified in the
scope of work for the provision of the following special process services:
3.8.6.1 The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
3.8.6.2 This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
3.8.6.3 All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
3.8.6.4 Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
3.8.6.5 Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.6.6 The supplier shall ensure that all operators are suitably qualified for these processes in
accordance with the procedures, processes and/ or applicable standards/ codes.
3.8.6.7 The records of qualification of procedures, processes and operators shall be maintained by
the supplier in accordance with the applicable procedure or code and these made available
to Eskom at all times.
This document has been seen and accepted by:
Name Designation
Kerseri Pather General Manager: Risk and Sustainability
Lenock Meyer Acting Senior Manager: Quality Management
Pamela Dondashe Middle Manager: Quality Assurance
Mandla Mkhwanazi Middle Manager: SHEQ Procurement and Supply Chain Management
Suzette Manthe Senior Advisor: Quality Performance and Planning
Lorna Ndlela Middle Manager: Eskom Document and Records Management
Date Rev. Compiler Remarks
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
The following people were involved in the development of this document:
Andrew Else
Bongi Tshabalala
Feziwe Mogamisi
Lesego Garegae
Patrick Thwane
Xolani Zuma
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Eskom Operational Quality Forum Members
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supply and delivery of Pneumatic Actuators for Stock Replenishment for a period of five
Project
years at Lethabo Power Station on an as and when required basis.SECTION (TENDERER)
Clauses of 240- clause description indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also indicate
whether site assessment is applicable.
Category 1 (refer to clause 3.5.-105658000) -
Category 2 (refer to clause 3.5.-105658000) X
Category 3 (refer to clause 3.5.-105658000) -
Category 4 (refer to clause 3.5.-105658000) -
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3.-105658000) -
3 post-contract award(eskom)
appointment of contractors or suppliers for the commencement
of work
Cell A3: Occupational Health and Safety Baseline risk assessment template
Eskom’s responsibility and commitment is to ensure a safe working environment is in line with its
Safety, Health, Environmental, and Quality (SHEQ) Policy and applicable legislative obligations.
This OHS specification is Eskom Generation's minimum requirements which are required to be
met for the duration of the contract period by contractors/suppliers and, where required, the
delivery organisation. The contractor is expected to develop an OHS plan that meets these
requirements as well as all the relevant applicable legislation that they conform to. Eskom in no
way assumes the contractor’s legal responsibilities and liabilities. The contractor is and remains
accountable for the quality and execution of their health and safety programme for their employees
and appointed contractor employees. This OHS specification reflects minimum requirements and
should not be construed as all-encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not supersede or
replace any organizational OHS requirements.
Where requirements listed are already in place, then the organizational requirements must be
taken cognisance of and listed in the respective OHS plans. If there are any additional Eskom
and/or legislative requirements listed in the OHS specification, then these must be addressed.
2.1 Scope
This OHS specification lists the legislative and Eskom requirements and, where applicable, any
requirements pertaining to local authorities, municipal by-laws, or environmental legislation that
must be met by the contractor.
2.1.1 Purpose
This document will provide a standardised approach to the compilation of OHS specifications
throughout Eskom Generation business for contracts, standards, and NEC 3.
2.1.2 Applicability
This OHS specification is applicable to any contracting organisation that intends to respond to
Eskom Generation's tender/enquiry with the intention of entering into a contract.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
2.2.2 Informative
2.3 Definitions
Definition Explanation
Appointed contractor Means a contractor appointed by the Main contractor
Baseline risk assessment (32-520) baseline operational risks refer to the health and safety risks
associated with all standard processes and routine activities in the
business
Business unit (BU) (32-296) means any defined unit within the Eskom environment,
operating as a business under a particular cost-centre number. In the
context of this document and in terms of health and safety, any
reference to a BU includes a defined unit within any Eskom division and
its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred
to as the contract administrator/custodian or agent or project manager
(as defined in the contract). He/she is the person responsible for
ensuring that the works or services are executed in terms of the
contract, as well as adherence to legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training,
experience, and qualifications, specific to the work or task being
performed, provided that, where appropriate, qualifications and training
are registered in terms of the South African Qualifications Authority Act,
1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes Main contractors
Contract’s Manager/End Contract’s Manager/End User
User
Consultant means a person providing professional advice
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Definition Explanation
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable
measures to prevent such pollution or degradation from occurring,
continuing, or recurring. If such harm to the environment is authorised
by law or cannot reasonably be avoided or stopped, such person must
minimise and rectify such pollution or degradation of the environment
Employee (OHS Act) means, subject to the provisions of subsection (2), any
person who is employed by or works for an employer and who receives
or is entitled to receive any remuneration or who works under the
direction or supervision of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any
person who employs or provides work for any person and remunerates
that person or expressly or tacitly undertakes to remunerate him/her,
but excludes a TES (ex labour broker) as defined in section 1(1) of the
Labour Relations Act 1956 (Act No. )
Environment (32-94) means:
the land, water, and atmosphere of the earth;
micro-organisms and plant and animal life; and
any part or combination of (a) and (b) and the interrelationships among
and between them, and the physical, chemical, aesthetic, and cultural
properties and conditions of the foregoing that influence human health
and well-being
Eskom requirements Eskom requirements flowing from directives, policies, standards,
procedures, specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from
an elevated position, considering the nature of work undertaken, and
setting out the procedures and methods to be applied in order to
eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or
expected hazards to the health and safety of persons, which are
normally associated with the type of construction work being executed
or to be executed
Occupational Health and (OHS Act) means a file or other record in permanent form, containing
safety file the information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified
and includes safe work procedures to mitigate, reduce, or control
hazards identified
Occupational Health and (OHS Act) means a document specification of all health and safety
safety specification requirements pertaining to associated to a contract, so as to ensure the
health and safety of persons.
Occupational Health and means comprehensive health and safety requirements for a contract,
safety requirements project, site, and scope of work. This specification is intended to ensure
the health and safety of persons, both workers and the public, and the
duty of care to the environment. The health and safety requirements
must be specific to each contract, project, site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Definition Explanation
Medical Certificate of fitness (OHS Act) means a certificate valid for one year, issued by an
occupational health practitioner, issued in terms of the regulations,
whom shall be registered with the Health Professions Council of South
Africa
Medical surveillance (OHS Act) means a planned programme or periodic examination (which
may include clinical examinations, biological monitoring, or medical
tests) of employees by an occupational health practitioner or, in
prescribed cases, by an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
National Enquiries/contracts sourcing of services providers/contractors at the divisional level and not
at BU level thorough tendering, request for price etc
Organisation may be defined as a group of individuals (large of small) that is
cooperating under the direction of executive leadership in
accomplishment of certain common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement of
the day’s work and that is attended by all the relevant employees
associated with the work task
Main contractor (In the text of this document) Means an employer, as defined in section
1 of the OHS Act, who intends to tender for or has signed a contract
with Eskom for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1 of
the General Administrative Regulations under the Act
Responsible Manager Is a Manager of a department, section or operating/business unit who
has been appointed as part of the Eskom delegation of authority
process with the aim to assist the applicable 16(2) assigned person in
executing his/her duties in terms of the Occupational Health and Safety
Act
Risk assessment (OHS Act) means a programme to determine any risk associated with
any hazard at a construction site in order to identify the steps needed
to be taken to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, Main contractors,
contractors, suppliers, vendors, and service providers provide a service
to Eskom, directly or indirectly
Service provider any private person or legal entity that provides any service(s) to Eskom
for compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through
the ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and
may include the following current or potential supplier vendor,
contractor, consultant
Task (34-227) a segment of work that requires a set of specific and distinct
actions for its completion
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Definition Explanation
Toolbox talks (34-227) where the team leader, after conducting pre-task planning,
shares all the tasks at hand and discusses task allocation, the identified
risks, and the control measures with all his/her team members on site
before commencing a specific task and documenting the agreed
strategy. (This shall be done to ensure common understanding of the
tasks, risks, and control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as amended, and the Regulations thereto
Visitor any person visiting a workplace with the knowledge of, or under the
supervision of, an employer.
2.4 Abbreviations
Abbreviation Description
BU Business Unit
CE Chief Executive
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DEL Department of Employment and Labour ( Inspection and Enforcement services
– Provincial office)
EP Emergency Preparedness
EAP Employee Assistance Program
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GSR General Safety Regulations
HCS Hazardous Chemical Substances
LDV Light Delivery Vehicle
MSDS Material Safety Data Sheets
OHS Act Occupational Health and Safety Act and Regulations,
O&M Operating and Maintenance
LoG (COID) Letter of Good Standing
SABS South African Bureau Standard
SANS South African National Standard
2.5 Related/supporting documents
Section 37(2) of the OHS Act requires Eskom to sign an agreement and include it in the OHS file
for evaluation prior to the start of work. OHS department will issue the 37(2) agreement to the
project manager/end user who will facilitate the signing of the document by Eskom and contractor
representatives.
3.1 Scope of work
Supply and delivery of Pneumatic Actuators for Stock Replenishment for a period of five years at
Lethabo Power Station on an as and when required basis.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Note: The contractor who will be awarded this contract will be known as the “Main contractor”
and any contractor appointed by the Main contractor will be known as the “Appointed contractor"
3.2 Legal compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom and the main contractor at the time of
submitting the safety file. The main contractor must ensure that a section 37(2) agreement is
compiled between the main contractor and all their appointed contractors for the contract. The
original copy of the section 37(2) agreement must be retained by the contractor, and a copy must
be retained by the responsible project manager/end user. A copy of all the agreements must form
part of the respective contractor’s OHS file.
3.2.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of
children, especially when it comes to:
moral, or social development and the Basic Conditions of Employment Act, Chapter six,
Section 43, "Prohibition of employment of children."
Before resorting to the use of child labour, due consideration must be given to the child's
constitutional rights. Where work is being performed which is not prohibited in terms of the
constitution, then such work must be conducted in terms of the OHS Act "Regulations on
Hazardous Work by Children in South Africa" with emphasis on paragraph 2: Purpose and
Interpretation. Eskom does not condone the use of child labour and, therefore, all effort must be
exercised, and child labour should not be used.
3.2.3 OHS Act
The main contractor and appointed contractors shall have an up-to-date copy of the OHS Act and
regulations which will be available to all employees.
3.2.4 Legislative Compliance
All contractors will comply with all the legislation pertaining to this contract being:
The Main contractor and all appointed contractors will comply with all the legislation pertaining to
this project being:
Rights).
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
3.3 ESKOM requirements
All contractors shall, before commencement of the project ensure that all their employees are
familiar with the relevant Eskom OHS documentation that is applicable to contract services.
3.4 Sheq policy & OHS plan
A SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior management
in relation to the relevant OHS roles and responsibilities, the achievement of their strategic objectives, and
values of integrity, customer satisfaction, excellence, and innovation. The main contractor and all appointed
contractors, if not already in place, will be required to compile an organisational SHEQ policy in line with
their OHS responsibilities. The policy must be signed by the organisation’s CE or the appointed assistant
to the CE, OHS Act Section 16(2). The policy must be displayed in a prominent place within the workplace.
A copy of the policy must be filed in the contractor's OHS files and attached as an annexure to the OHS
Plan. The supplier shall develop occupational health and safety plan in line with the scope of work and this
OHS plan shall be submitted with the rest of the documents as returnables.
3.5 Hazardous biological agents
Due to the current pandemic the contractors are required to submit the Covid policy signed by the
most senior person. The policy must be displayed in a prominent place within the workplace. A
copy of the policy must be filed in the contractor's OHS files and attached as an annexure to the
OHS Plan.
3.5.1 Severe Acute Respiratory Syndrome (SARS-CoV- 2)
The Main Contractor and all appointed contractors shall ensure that a Baseline risk assessment is
conducted and communicated with all employees. All the requirements of RHBA 10,11,12 are met.
3.6 Coid
The Main contractor and all his/her appointed contractors shall be registered with an appropriate
employment compensation commissioner and have available a valid letter of good standing (LoG)
from such commissioner. The obligation lies with the contractors to ensure that the LoG remain
valid throughout the contract period. A copy of the LoG must be filed in the contractor OHS files.
3.7 Costing for OHS within the project
The costing for OHS must be itemised based on the overall scope of the project (i.e.) Training,
provision of PPE, safety equipment purchases etc.
3.8 Statutory appointments
The Main contractor and all appointed contractors must appoint competent workers who will
comply with the OHS Act for the duration of the contract. Before requiring appointees
to accept an appointment, the employer must ensure that they have received appropriate training
and/or information about their responsibilities. The relevant statutory appointments must be made
in compliance with the OHS Act's criteria, which include appointing a qualified individual to the
appropriate roles. The following should be included in the statutory appointments, but not limited
to:
3.9 ESKOM life-saving rules
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
work for Eskom to do the same.
consultants, and contractors. Any Eskom employee or employee of a Main Contractor or appointed
contractor who fails to follow these rules would be deemed a serious violation. These rules are in
place to protect any employee, labour broker, or contractor working from significant injury or death.
the rules shall be obeyed by any contractor and their employees.
The rules are:
Rule description of rule
Open, isolate, test, earth, bond, and/or insulate before touch
Rule 1
( That is plant, any plant operating above 1000 V)
Hook up at heights
Rule 2 Working at height is defined as any work performed above a stable work surface or where a person puts
himself/herself in a position where he/she exposes himself/herself to a fall from or into.
Buckle up
Rule 3 No person may drive any vehicle on Eskom business and/or on Eskom premises:
Unless the driver and all passengers are wearing seat belts.
Be sober
Rule 4
No person is allowed to be under the influence of intoxicating liquor or drugs while on duty
Permit to work
Rule 5
Where an authorisation limitation exists, no person shall work without the required permit to work.
Ensure safe live working
To ensure safe live work, each live worker shall:
a) Ensure all live work basic principles are adhered to, as outlined (for the method being used) in
the High Voltage Live Working Standard for the respective division.
Rule 6 b) Observe and maintain the minimum approach distance (MAD).
c) Only perform live work (never mix live and dead work on the same site at the same time – Refer
to ORHVS Section 7 and 5 handouts respectively
Perform tasks they are authorised for and only undertake tasks that are documented in the respective Task
Manual (TM). Only work on one potential (voltage) at a time.
Rule 7
Use of cellphones on site
Site
Use of cell phones (either texting or talking) when walking or driving is strictly prohibited.
Specific
Eskom will take a zero-tolerance approach to these policies.
Noncompliance to Life-saving rules is regarded as a serious misconduct and will result in serious
disciplinary action, which may include dismissal.
This is to ensure that everyone who works on or visits an Eskom facility returns home to their
families safely.
3.10 Substance abuse
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
comes to workplace accidents and car driving. As a result, Eskom has the right to take
reasonable procedures to identify and prohibit drunk people from entering the company.
taking into account that this is an Eskom Life-saving Rule number 4: (BE SOBER"), and
anyone entering the Eskom site will be subjected to ad hoc alcohol testing if the BU has
self-alcohol testing equipment.
alcohol on a regular basis.
commencement of work.
3.11 Contractor organisational structure
3.11.1 Main Contractor Organogram
The Main contractor must provide an organisational organogram on the company’s letter head
related to this contract, depicting all the levels of responsibility from the CE down to the supervisors
responsible for the contract. List the relevant positions held, names of appointees, legal
appointments and the Organogram must be signed off by the company's 16(1) or 16 (2).
The Main contractor must ensure that all appointed contractors comply with this requirement. The
Main contractor is responsible for keeping copies of all the organograms’ as well as submitting
them with the OHS plan. All organograms shall be updated timeously when appointments are
changed.
This diagram must be kept up to date and filed in the project OHS files.
3.11.2 Appointed Contractor/s Organogram
on the company’s letter head, listing the reporting structure from their CE down to their
project supervisors. The diagram must list the names, positions held, any appointments
made and must be signed off by the company's 16(1) or 16 (2).
and a copy filed in the relevant project OHS files.
3.12 Roles and responsibilities
Commitment
Visible commitment is essential to providing a safe work environment. Managers, supervisors and
employees at all levels must demonstrate their commitment by being proactively involved in the
day to day operations, in particular the Occupational Health and Safety aspects of any project /
contract. Legislation requires that each employee must take reasonable care of themselves and
their fellow workers, from management level down to the lowest employee level.
3.12.1 Main contractors and appointed contractors
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Note 1: Most of the roles and responsibilities listed apply to both Main contractors and any appointed
contractors. Where some of the listed do not apply to both, then the specific responsibilities will be
listed and titled. The contractors shall:
part of the OHS Act and Regulation 7 of the Construction Regulations.
their appointed contractors within their working area, as contemplated by section 37(2) of
the OHS Act ;
including date of induction, relevant skills and licenses and be able to produce this list at
the request of the Eskom Project Manager.
responsibilities in terms of their appointment and that they advise and assist these
appointees in the execution of their duties.
complied with on all work sites.
participation and cooperation.
records must be kept for each work site.
Commissioner’s valid letter of good standing before the commencement of work and any
future renewal letters obtained during the contract for record-keeping purposes. The letter
of good standing shall reflect the name of the contractor’s company. Similarly, the Main
contractor must provide the Eskom project manager with all the valid letters of good
standing from their appointed contractors.
Commissioner’s valid letter of good standing before the commencement of work and any
future renewal letters obtained during the contract for record-keeping purposes. The letter
of good standing shall reflect the name of the contractor’s company.
trained in the health and safety aspects relating to such work and that the employees
understand the hazards associated with all other work being carried out on the project.
adhere to such procedures. Similarly (without removing the appointed contractors’
responsibilities), ensure that their appointed contractors and their employees are
conversant with all relevant work procedures and that they adhere to such procedures.
health;
for the cost of safety and health measures throughout the project.
health and safety of persons or a risk of degradation to the environment.
evaluate, and assess the appointed contractors OHS files. Only appoint contractors who
are competent to do work, have satisfied the OHS compliance requirements and satisfied
that the contractor has the necessary competencies and resources to perform the work
safely.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
specified work throughout the contract period.
site for which such supervisor has been appointed for.
safety information or suspecting such information has been divulged, in the interests of
health and safety requirements.
contractor employees have transgressed any of the requirements of the health and safety
specification, safety and health plans, site rules or any other requirements.
include site or emerging risks. This should be done by a competent person appointed in
writing with a view to identify hazardous and potentially hazardous work operations.
the starting of any new task, irrespective of whether it is a repetitive task or not.
contract is in place and maintained.
person/man job specifications must be compiled and handed to the occupational health
practitioner.
employees, inspect such equipment regularly and ensure recipients of PPE are trained in
the proper use, care and where necessary, the maintenance of PPE;
site, they will be held responsible for the provision and wearing PPE.
investigators as and aligned with 32-95 requirements.
his/her approval prior to them commencing work.
3.12.2 Contractor site supervisor (This will not be applicable to this project)
The contractor site supervisor must be trained in the following:
liability
Must:
and Eskom project requirements;
Inspect all work done by the contractors to ensure adherence to Eskom’s standards and
Conduct follow-up inspections to ensure findings are closed out and preventative action
is in place.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
the first instance and thereafter the Eskom project manager in the second instance
relating to procedure requirements, non-conformances identified, corrective actions,
audits and inspection schedules.
procedures, work instructions and safety regulations issued by Eskom:
inspection reports.
incident statistics report etc.
meetings.
perform the tasks assigned.
contractors deviate from safety requirements.
3.12.3 Contractor Health and Safety Officer full/time
The contractor health and Safety officer must be trained in the following:
SAMTRAC, HIRA, Incident investigation training, Legal liability, Training, knowledge and
understanding of ISO 4500, Minimum work experience 2yrs,
3.13 RISK ASSESSMENT (refer to 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry out
risk assessments, to establish which risks and hazards are attached to the health and safety of
persons due to any work which is performed, any article or substance which is, handled, stored,
transported. A risk assessment is defined as an identification of the hazards present in the activity,
work, site, and an estimate of the extent of the risks involved, considering whatever precautions
are already being taken.
It is essentially a three-stage process:
Risk assessments are required to be maintained. This means that significant changes to a process
or activity, or any new process or activity should be subjected to a risk assessment and that if new
hazards become known during the work process, then these should also be subjected to risk
assessments. Risk assessments for long-term processes should be periodically reviewed and
updated.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Method statements or written safe work procedures are an effective method as information and
record of the way jobs / tasks must be performed. Daily or issue based or task specific or on the
job risk assessments must be conducted at the place where work is to be performed/ conducted
to allow managers and employees to assess any inherent risks that could have been overlooked
during the initial risk assessment or any changes that might have occurred in a period of absence.
For example if a job / task is extended over a day or halted due to inclement weather.
Guidelines for actual steps involved in a job/task specific risk assessment are:
procedures exist for ladders.
to rectify this shall be recorded, and safe working procedures drawn up.
nominated and duly assigned.
must be nominated.
for comment and approval.
Supervisor nominated as the responsible person; and the names of workmen who have
received instruction on the work content and the sequence of the activities listed in the
risk assessment shall be recorded, and their competence established. This instruction
shall be done through an interpreter if required and recorded on the Pre-Job Brief (Daily
Safe Task Instructions), with reference to applicable Risk Assessments.
3.14 Safe work procedures / method statements
There must be written safe work procedures for all activities, the safe work procedures must align
with the risk assessments. Method statements / written safe work procedure are control measures
used to prevent an incident from occurring during the execution of the project. A written safe work
procedure/ method statements provide guidance how to execute the task safely. A safe working
procedure should be written when: -
a. Designing a new job or task.
b. Changing jobs or task;
c. Introducing new equipment or substances; and
The safe working procedure should identify:
a. The supervisor for the task or job and the employees who will undertake the task;
b. The tasks that are to be undertaken that pose risks;
c. The equipment and substances that are used in these tasks;
d. The control measures that have been built into these tasks;
e. Any training or qualification needed to undertake the task;
f. The personal protective equipment to be worn;
g. J. Actions to be undertaken to address safety issues that may arise while undertaking the
task.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
3.15 Fire equipment and maintenance on transporting vehicles
a. Be clearly labelled
b. Conspicuously numbered
c. Entered in a register
d. Inspected monthly by a competent person
3.16 FIRST AID and EQUIPMENT
trained to level 2 and the training service provider must be registered in accordance with
section 26(1) of the Skills Development Amendment Act, Act No. . It is good
practice for all employees to be trained to at least level 1.
type of work performed, the distance teams are working apart and the terrain to be
covered if an emergency should arise.
for all employees.
employees are familiar with the emergency numbers.
50 or team of workers on site or part thereof, taking into account the type of work
performed and the distance between teams.
be available and accessible for the immediate treatment of injured persons at the
workplace.
and contact details of the First Aider of such first aid box or boxes shall be erected.
be made for incidents occurring after working hours.
3.16.1 Boxes and equipment
The following is a list of minimum contents of a first aid box:
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
A content check list must be available with all boxes and boxes shall be checked on a regular
basis, kept clean and dust free.
3.17 OHS communication systems
outlining how they intend to communicate OHS issues to their staff, the mediums they will
employ and how they will measure the effectiveness of their OHS communication. Below
is a brief on how communication should take place. Where project meetings are
conducted on site, OHS shall be included as a standing agenda point and minutes of
these meetings shall be available on site at all times. Minutes of meeting must be compiled
and filed in the relevant OHS files. All employees shall have access to these minutes.
Attendance register shall be kept for all the health and safety meetings.
3.17.1 Statutory Health and Safety Committees
Section 19 of the OHS Act. Similarly, appointed contractors shall establish their own
statutory health and safety committee.
performed, training, upcoming work and OHS requirements, incidents and lessons
learned specific OHS problems, safety performance, action plans and other relevant OHS
issues. Listed below is a preferred agenda.
committees (Refer to Section 19 (2) (a) of the OHS Act ).
Safety Representatives on that specific statutory health and safety committee. (Refer to
Section 19(2)(c) of the OHS Act)
medium to high risk work is involved, more frequent if required), and all appointed
members of the committee shall attend the meeting.
contractor and the project manager and the Inspector at DoEL.
and 25 incidents and other notified serious incidents.
and shall keep record of all recommendations made by the committee.
current standards, procedures and practices.
statutory health and safety committees carry out their duties.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
the contractor. The appointed chairperson must be competent to chair meetings and be
able to make informed decisions.
3.17.2 Non-statutory health and safety committees
within that worksite to assist with the communication of health and safety related matters
between the statutory health and safety committee and the workplace.
the same as the statutory safety committee
3.17.2.1 Agenda
o List of agenda items:
o Matters arising from previous minutes
o Matters arising from Contractor’s OHS meetings.
o Covid-19 compliance
o Audit results and feedback
o Review Health and Safety Representative Inspection Reports
o Review
Incident investigation reports
Non-Conformances
Announcements (near miss/injury/damage)
Follow up on recommendations made by the employer in incident
investigation reports
o Accident Prevention – Safety Promotion
Planned Job Observations
OHS Training
Protective clothing and equipment
Incident Announcements / Recall
o Forthcoming High hazard activities.
o Non-conformances.
o Housekeeping.
o Work permits.
o Work procedures.
o Hazardous materials / substances.
o Fire Prevention
o Occupational Hygiene Assessments, Health Risks and Actions
o Security
o Rules, Instructions
o Public Safety
o Environmental Management
o Emergency Preparedness
o Statistics report
o Closure
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
3.17.2.2 Minutes and action items for all health and safety committee meetings
meetings.
minutes and shall be completed during the meeting.
be kept for the duration of the project or a minimum period of three years.
of the project or a minimum period of 12 months.
period of 12 months.
chairperson.
his/her recommendations and return the minutes to the relevant contractors chairperson
within 14 calendar days of the meeting.
3.18 Tool box talks / daily team talks / prior to the delivery
personnel associated with the work task in attendance. The job, relevant procedures,
associated hazards, safety measures, i.e. the task risk assessments shall be discussed.
Each employee who attends the briefing shall sign an attendance list of that pre-job brief
form undertaking that they have an understanding of the tasks, risks and control measures
required.
not occur, then weekly tool box talks must be conducted. The toolbox talk topics will be
based on OHS issues pertaining to the project site. The topic and the contents shall be in
writing. Attendance registers with the topic listed shall be kept.
3.19 OHS training as per annexure c1 OHS tender evaluation (high risk)
the OHS training requirements and the costing of such requirements. Similarly, appointed
contractor must provide the same requirements when bidding with the Main contractor.
the relevant procedures. Additional to the requirements, will be that the Main contractor
and appointed contractors must have the appropriate qualifications, certificates and
employees should always be under competent supervision.
shall be given to those appointees prior to the acceptance of those appointments.
OHS plan, all affected staff shall undergo the applicable refresher training.
OHS file.
3.19.1 Main Contractor Induction training
The contractor is required to arrange with the Business Unit for its employees to attend induction
in order to be granted permission to access site.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
their employees have undergone the Eskom OHS induction training prior to commencing
work on site.
indicate that they have received and understood the induction training.
medical examination and found fit for duty. A copy of the certificate of fitness must be kept
in the OHS file on site for the duration of the project.
3.19.2 Appointed Contractor induction training
The Main contractor shall ensure that all his / her employees and appointed contractor employees
undergo site-specific work induction with regard to the approved project OHS plan, hazards
prevalent on the work site, scope specific risk assessment, rules and regulations, and other related
aspects. The induction training should also include identification of sensitive features such as
wetlands/vlei areas, red data species, graves, etc.
3.19.3 Visitors to site induction
safety induction prior to being allowed access to site.
inducted. No visitors are permitted to undertake any work onsite, of any nature.
Induction training.
3.20 General training
The Main contractor will be required to ensure that before an employee commences work on the
project/site, the respective supervisor informs the employee of his scope of authority, the hazards
associated with work as well as the control measures to be taken. This will include man-job
specifications, the discussion of any task procedures or hazardous operational procedures to be
performed by the employee. The Main Contractor is to ensure that the supervisor has satisfied
himself that the employee understands the hazards associated with the work to be performed by
conducting task/job observations.
3.21 Site roads
equipment’s as well as roadways for ease of manoeuvrability of these vehicles.
vehicles traversing the sites.
3.22 Vehicle management
a. Their passengers wear seat belts whilst the vehicle is in motion.
b. Comply with all traffic road rules, safety, direction and speed signs.
c. Ensure that vehicle loads are properly secured prior to moving off.
d. Ensure that vehicles are not overloaded.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
be services annually and inspected monthly. Drivers must be trained on how to use the
First aid box and fire extinguishers.
the back of the vehicle.
vehicle access to site.
must be valid at all times and this is applicable to yellow plant.
least 30 (thirty) meters must be left clear between such a vehicle and such a machine.
Vehicles which are not roadworthy will not be permitted to be used on site.
them. Precautions shall be taken to secure all loads properly. Loads projecting from
vehicles shall be securely loaded and in daytime a red flag and during darkness a red light
or red reflective material shall be attached to the extreme end of such projecting materials.
o Reverse alarm / beeper
o Yellow reflective tape
o Mud flaps
o Fire Extinguisher
o 2 Triangles
o First Aid Box
o Safety belts for every seat
o No fold-up or jockey seat
o Tyres
o License disc
o Yellow reflective tape that must be fitted at a height of between 250mm and 1.5
metres
o Speed warning sigh (100km/h) at the back of the minibus
o Driver have a Public Driving Permit
3.23 Housekeeping and order
vehicles for the duration of the project/contract.
temporarily in a designated waste area, awaiting disposal.
serious injuries/fatalities.
area immediately.
area of all materials, scrap, temporary buildings and building bases to the satisfaction of
the client/agent.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
safety and cleanliness, anyone has the responsibility to bring it to the attention of the Main
contractor in the first instance and the Eskom project/contract manager in the second
instance.
appointed contractors to cease work until the area has been tidied up and made safe.
Neither additional costs nor extension of time to the contract shall be allowed because of
such a stoppage. Failure to comply with this requirement will result into site cleaning by
another cleaning contractor company at the cost of the Main contractor.
ensure maintenance of satisfactory standards. The Main contractor shall document the
results of each inspection and shall maintain records for viewing.
3.24 Stacking and storage
stacking and storage on site and when transporting the goods to Lethabo Power Station.
manager for authorisation to use such an area for stacking purposes. This is to prevent
haphazard arrangements.
carried out correctly and safely.
small on top.
3.25 Auditing
3.25.1 Approval and compliance of Main contractor OHS plan
The Contractor’s OHS Plan will be audited against compliance checklist so as to verify compliance
to the requirements of the Eskom OHS specifications. Once there is compliance only then will the
Main contractors OHS plan be approved by the project manager or an appointed Eskom contract
custodian. The implementation of the OHS Plan shall be assessed / audited by Eskom personnel
on a regular basis. This will include physical conditions evaluation.
3.25.2 Eskom OHS audits
Eskom shall evaluate all contractors’ OHS performance on an ongoing basis against the legal,
Eskom requirements, OHS specification and the contractors OHS plans.
Note: Eskom reserves the right to conduct unannounced audits on contractors
There will be no audits conducted by Eskom on the Main contractor/s and/or appointed contractors
as this is going to be on as and when required basis.
3.26 Smoking
The national smoking policy must be observed and smoking is permitted in designated areas only
(Eskom Smoking Procedure 32-36).
3.27 Cellular phones
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
The National Road Traffic Act requirements regarding the use of cellular phones must be observed,
when driving and or operating mobile equipment and or machinery. The personal use of cell
phones in the plant is prohibited unless it is an emergency or for work purpose. The use of cell
phone camera in the plant must be in line with the national key point Act and the Plant safety
regulation.
3.28 Occupational health, hygiene and rehabilitation
All contractors are required to develop an Occupational Health, Hygiene and Rehabilitation
program. The program is intended to ensure that the risks to health are identified and controlled.
3.28.1 Medical Assessments
Note: Eskom will only accept medical surveillances conducted by an Occupational Health Practitioner
who holds a qualification in occupational health.
employees have a medical surveillance program whereby their employees undergo entry,
periodic and exit medical fitness examinations.
address the hazards that the employees will be exposed to.
man job specification, which must indicate the description of work, list of hazards and
potential occupational exposure limits, physical hazards and required physical attributes.
site. This shall be maintained until completion of the contract.
employees have undergone pre-entry medical examination before starting work on the
contract.
who are issued with a conditional certificate of fitness.
fitness certificates as and when their employees leave the company.
3.29 Roles and responsibilities
All contractors are required to list employee’s roles and responsibilities pertaining to the contract.
3.30 Personal protective equipment requirements
maintenance and replacement of PPE for all his employees and appointed contractors on
site.
Specification Standard 240-44175132.
to be issued to employees performing the respective tasks.
additional PPE, a risk assessment must be done, in which such PPE requirements will be
determined and issued.
worksites.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
contractor’s responsibility to provide the PPE.
with the relevant SANS standards.
be worn.
maintenance of PPE and keep the record.
3.31 Incident investigation
All incidents shall be investigated in terms of OHS Act General Administrative Regulations 8 and
9, using Eskom Procedure 32-95 OHS incident management as a reference, and where injuries
as contemplated in sections 24 and 25 have been sustained, be reported to the Department of
Employment and Labour.
Contractors shall use the Eskom Flash report to report incidents immediately or before end of shift.
The standard General Administrative Regulation Annexure 1 “Recording of an Incident form” for
all incident investigation reports. The objective of incident investigation, should not only be a legal
requirement, but should establish why and how the incident occurred and find out the real root
cause of the incident and to decide on precautionary measures that are required to address the
root cause to prevent any further recurrences of the same or similar incidents.
3.32 Emergency management
The art of emergency preparedness and response is to minimise the effects of any emergency and
to restore normal activities as soon as possible. The contractor must develop and align their own
Emergency response plan with Eskom’s to address any emergency which might arise at any given
point in time. The contractor to familiarise themselves with the Eskom emergency response plan
and procedure. Periodic emergency drills must be undertaken to test the effectiveness of their plan.
This must be recorded and provided on request.
3.33 Non-conformance and compliance
subject to discipline in terms of the Eskom Procurement and Supply Chain Management
Procedure.
in place) for issuing to contractors for transgressions. The procedure can include “quality”
related non-conformance issues. Similarly, appointed contractors must implement a non-
conformance procedure.
adhered to.
in not doing so; any recommendations made may not be implemented.
procedure will be for the offender to be called by the responsible project manager to
explain the non-conformance issued and what plan is in place to prevent a recurrence of
the non-conformance.
employees for the tasks being performed and/or to visitors; failure to enforce the wearing
of such PPE will be viewed as a transgression of the legislative and Eskom requirements.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
3.34 OHS files
about the safety and health management system from inception, execution to completion
of works.
than one site per project, a file per site shall be kept at that site. Contractors may keep
additional files at their head office as additional records. The OHS file shall be maintained
by all the contractors on their project sites and shall be available on request for audit and
inspection purposes.
requirements/specification, legal and other requirements.
this OHS requirements /specification and the OHS plan.
partition must be labelled.
health and safety file to the project manager.
cumbersome, the older documentation must be archived in boxes which shall be correctly
labelled and be available for auditing purposes. The archived documentation must be
handed over at the completion of the project.
3.35 WORK STOP. Any person may stop any activity where an unsafe act or unsafe condition that poses or
may pose an imminent threat to the safety and health of an individual or create a risk of
degradation of the environment. This includes any unauthorised work or service
performed by, or legally or contractually non-compliant acts or omissions by, any
contractor contracted to work at that site.
performance related to the contractor’s works or services shall not warrant any financial
compensation claim lodged against Eskom where the contractor has not met the
requirements defined legally or contractually.
custodians.
3.36 Hours of work
The requirements of the Basic Conditions of Employment Act, Chapter Two “Regulation of Working
Time” must be adhered to. All contractors are required to maintain an accurate record of time
worked by each employee.
3.36.1 Normal work
All work conducted on site shall fall within the legal requirements in accordance with the Basic
Conditions of Employment Act. Contractors will notify their Eskom Supervisor or project manager
of any work that needs to be performed after hours according to the agreed arrangements. (The
application needs to be submitted timeously). Where applicable, the notification should include
proof of application, for overtime, to the Department of Employment and Labour and /or the letter
of approval from the Department of Employment and Labour.
3.36.2 Night work
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
When night work is to be performed, the baseline risk assessment must be reviewed to include the
management of night work. Contractors shall provide sufficient lighting to enable the entire work
site to be illuminated to a degree that employees will not work in dark (un-illuminated) or dimly lit
areas. Care must be exercised as not to use few lights with high light intensives, as this will cause
night blindness.
If work is continuing from day light into night, at dusk, a tool box talk must be held where all
employees will be advised of the hazards of night work and the extra precautions which require to
be taken, i.e. poor housekeeping, stepping on uneven ground, stepping into holes etc.
3.36.3 Overtime
When overtime is required to be performed, the appointed contractors shall inform the Main
contractor of such action. The Main contractor shall inform the Eskom project manager of such
function and provide proof of exemption from the Department of Employment and labour.
Contractors shall be aware of the effects of human fatigue and regulate overtime accordingly. The
baseline risk assessment must be reviewed to include the management of overtime work.
3.37 Omissions from safety and health requirements specification
By drawing up this OHS specification Eskom has endeavoured to address the most critical aspects
relating to OHS issues in order to assist the contractor to adequately provide for the health and
safety of employees on site.
Should Eskom not have addressed all OHS aspects pertaining to the work that is tendered for, the
contractor needs to include it in the OHS plan and inform Eskom of such issues when signing the
contract.
3.38 Contractor performance monitoring
Contractor management is required to do the following as part of the continuous improvement
initiatives:
Business Unit Power Station General Managers meeting
3.39 Contract sign off
On completion of the project, all Eskom team must conduct the final audit, inspections, and
housekeeping to identify defects, outstanding actions, and open incident cases, and present their
findings to the contractor and Eskom contract manager, who must facilitate the closeout. Once
the contractor has closed all findings the Eskom’s team, will verify and sign off prior to issuing a
completion certificate and final payment.
3.40 ESKOM's RIGHT TO TERMINATE THE CONTRACT
The contractor/supplier shall at all times comply with Eskom’s occupational health and safety
(OHS), legal and other requirements as amended for the duration of the contract. In addition, the
contractor shall comply with the requirements contained in the SHE Specification. Eskom reserves
the right to terminate the contract in the event that the contractor has built up a history of poor
performance or non-conformance in relation to matters of Eskom OHS and legal compliance. No
work may commence until the health and safety file has been approved by Eskom OHS personnel.
The OHS Manager & Contracts Manager to authorise, include their names
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Date Rev. Compiler Remarks
February 2 T.Mofokeng The specifications were reviewed to align it with the scope of
2025 supply and delivery of Carbon Brushes.
May 2022 1 F Pooe This provides the initial OHS specification requirements that
must be met by the relevant contractors who have been
awarded a contract for the work to be performed for Eskom
Generation.
August 2015 0 F Pooe This provides the initial OHS specification requirements that
must be met by the relevant contractors who have been
awarded a contract for the work to be performed for Eskom.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Supply Contract (SC3)
Between ESKOM HOLDINGS SOC Ltd
(Reg No. 2002/015527/30)
and TBA
(Reg No. ___________)
for Supply and delivery of Pneumatic Actuators to
Lethabo Power Station on an as and when required
basis for a period of five (5) years.
Contents: No of
pages
Part C1 Agreements & Contract Data 2
Part C2 Pricing Data 20
Part C3 Scope of Work
Important Dates
Source: Tender Documents.zip (RFP){"closingDate":"11 September 2026","closingTime":"10:00am","briefingSession":"{"date":"22 September 2026","time":"10:00am","venue":"ion A non-compulsory clarification with representatives of Eskom will","is_compulsory":true}"}
Contact Information
Source: Tender Documents.zip (RFP){"name":null,"email":"[email protected]","phone":"016 457 5819","department":null,"address":"akoele"}
Evaluation Criteria
Source: Tender Documents.zip (RFP)1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.11 Tax Evaluation questionnaire to determine whether a Attached Y
3.13 Functionality requirements
Qualitative technical evaluation criteria
Table 1: Mandatory Technical Evaluation Criteria
The evaluation of the tenders will be based on the tenderer’s ability to meet the requirements defined under the
will not be used for evaluation purposes.
questionnaire seeking YES or NO response from the tenderers with no point scores or weighted
consideration or short listing for detailed technical evaluation. Gatekeepers will be minimum criterion
will score 0 points for Specific goals (out of 20)
documents/proof of specific goals for purpose of evaluation and
other aspects). The tenderer will, however, be scored zero for
specific goals for purposes of PPPFA scoring and ranking.
the [90/10 or 80/20] system. Eskom will add the score from Pricing
and Specific Goals together and rank the suppliers from the highest to
Eskom will then add the score from Pricing and Specific goals
Actuators 70%
QMS (Quality latest ISO 9001 certification or proof of QMS. deliverables meet the required quality
established Quality Management
to quality assurance and continuous either ISO 9001 certification or
quality assurance and process control
Table 2: qualitative technical evaluation criteria - returnable
The minimum weighted final score (threshold) required for a tender to be considered from a technical perspective
Technical Specifications
Source: Tender Documents.zip (RFP)provisions above, please complete the table hereunder with all required
Annexure a – integrity declaration form)
information.
Full Name & Capacity/ Identity Confirm and provide Full Names & To your
Position within tenderer (e.g. Number details (including Capacity/Position of knowledge
employee/Director/member/ employee number) if Eskom employee/ is thi
supply identified in the
specification and/or works
payment terms initiative of Eskom, and its aim is to explore the extent to which Eskom can
benefit financially from either extending the supplier payment terms or offering an early
settlement discount.
payment terms, and further guidance will come on early settlement discounts. The document
provides an update on the thresholds on which the 60-day payment term is applicable and
provides guidance on compliance reporting and the applicability of the Policy.
Threshold
of VAT. This means that all contracts exceeding this threshold must be established on the
60-day payment term.
Applicability of policy
However, the Policy is applicable to contracts concluded between subsidiaries and their own
suppliers.
of an extended payment term must be applied as a lever.
Monitoring of compliance
Committee (“Cost Steerco”) on a monthly basis. Divisional Procurement Senior Managers shall
provide reasons for non-compliance to the oCPO on request and shall present these to the
Cost Steerco. This arrangement shall continue until the end of the 2022/23 financial year.
Compiled by: ms reshma maghoo
Contract advisor
Date: 28/9/2022
Guidance note: implementation of supplier payment term policy
Recommended: mr godfrey quickfall
Senior manager: contract management (acting)
Date: 2022-09-28
Supported: ms jainthree sankar
Chief procurement officer
DATE: 5 October 2022
Approved: mr calib cassim
Chief financial officer
DATE: 05 October 2022
Eskom Holdings SOC Ltd Reg No 2002/015527/30
Supply chain management system should
This declaration prove to be false.
.................................... .....................................................
Signature Date
.................................... ......................................................
Position Name of bidder
income-generating contracts)
of services, works or goods Stipulated minimum threshold
_______________________________ _______%
_______________________________ _______%
_______________________________ _______%
have any imported content?
(Tick applicable box)
Yes NO
3..1 If yes, the rate(s) of exchange to be used in this bid to calculate the local content as
prescribed in paragraph 1.5 of the general conditions must be the rate(s) published
by SARB for the specific currency at 12:00 on the date of advertisement of the bid.
The relevant rates of exchange information is accessible on www.reservebank.co.za
Indicate the rate(s) of exchange against the appropriate currency in the table below
(refer to Annex A of SATS 1286:2011):
Currency Rates of exchange
US Dollar
Pound Sterling
Euro
Yen
Other
NB: Bidders must submit proof of the SARB rate (s) of exchange used.
minimum threshold for local content the dtic must be informed accordingly in order for the
DTIC to verify and in consultation with the AO/AA provide directives in this regard.
Local content declara
supplying entity AND their company registration
number] ......................................................................., certify under oath that, to the best of my
knowledge, the information furnished herein is true and correct. I accept that Eskom reserves its right to act
against the supplier named above or me personally in terms hereof, should this declaration prove to be false.
Eskom employees and directors that engage in private work
Copyright © Eskom Holdings SOC Ltd Registration Number 2002/015527/00
Reverse e-Auction, means an electronic evaluation of Price and Preference point as outlined in the PPPFA (The Regulation) and aims to achieve the most competitive and market related prices for clearly specified items.
Acknowledgement form – reverse e-auctioning training
Business name/JV: _______________________________________________________
eTendering system is a web-based system that allows suppliers bidding for various tenders advertised on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers submit tender documents at various Eskom tender offices. eTendering system replaces the manual or physical submission of tender documents at various Eskom tender offices. eTendering system in a nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will be required to register their details before they can be granted access to the eTendering system. An OTP (one time pin) will be sent to both their cell phone and email address.
Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F Y
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content (only applicable if designated
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary
Schedule Annexure G2 Y
Annexure D Imported Content Declaration – Supporting
Schedule to Annexure C Annexure G3 Y
Annexure E Local Content Declaration- Supporting
Schedule to Annexure C Annexure G4 Y
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *
Title: Supplier Quality Management: Document Identifier: 240-105658000
Alternative Reference QM 58
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Quality Management
Revision: 3
Total Pages: 28
Next Review Date: October 2024
Disclosure Controlled Disclosure
Classification:
Compiled by Supported by Functional Authorized by
Responsibility
SA Sambo P Dondashe L Meyer K Pather
Chief Advisor Middle Manager Acting Senior General Manager
Quality Quality Manager Quality Risk and
Management Management Management Sustainability
Date: 15/10/2021 Date: 15/10/2021 Date: 15/10/2021 Date: 17 October 2021
EDC TN Formatted 15.10.2021
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Content
. Introduction ............................................................................................................................... 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ........................................................................................................... 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References ................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative............................................................................................................. 3
2.3 Definitions ........................................................................................................................ 4
2.4 Abbreviations ................................................................................................................... 5
2.5 Roles and Responsibilities ............................................................................................... 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................... 7
3.2 Quality Plan ...................................................................................................................... 8
3.3 Contract Quality Plan........................................................................................................ 8
3.4 Quality Control Plan ....................................................................................................... 10
3.5 Pre-Contract Award: Quality Requirement ...................................................................... 13
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................... 16
3.7 Post-Contract Award ...................................................................................................... 17
3.7.1 Contract Execution .............................................................................................. 17
3.7.2 Supplier Quality Performance Monitoring Phase ................................................. 18
3.7.3 Supplier Quality Audit .......................................................................................... 18
3.8 Standard Conditions ....................................................................................................... 19
3.8.1 Rights of Access .................................................................................................. 19
3.8.2 Eskom Rights to Information ................................................................................ 20
3.8.3 Preservation ........................................................................................................ 21
3.8.4 Quality Audits Related Conditions ....................................................................... 25
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by
Eskom ................................................................................................................. 25
3.8.6 Special Processes ............................................................................................... 26
Acceptance ............................................................................................................................. 27
Revisions ................................................................................................................................ 27
Development Team ................................................................................................................ 27
Acknowledgements ................................................................................................................ 28
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
vendor registration, management, monitoring, assessment and auditing of suppliers. Eskom’s
position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The priority is to encourage suppliers to continually improve
their QMS and enhance service delivery by implementing and conforming to the standard.
2.1 Scope
2.1.1 Purpose
The purpose of this specification is to outline the requirements according to which suppliers shall
develop,
implement,
maintain, and
continually improve
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
2.1.2 Applicability
This specification shall apply throughout Eskom Holdings Limited divisions, its subsidiaries,
suppliers, and sub-suppliers and shall form part of all Eskom requests for information (RFI)/ requests
for quotation (RFQ)/ requests for proposal (RFP), including contracts for the procurement of products
and services.
2.1.3 Effective date
Date of authorisation of the specification
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
2.2.2 Informative
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
Success
[7] 32-1033: Eskom’s Procurement and Supply Chain Management Policy
[8] 32-1034: Eskom’s Procurement and Supply Chain Management Procedure
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
[12] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Activities
[13] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
Purpose of a CQP is to outline how the results defined in the specifications will be achieved.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
Eskom representative or Eskom inspection agency, whichever is applicable.
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
Requirements are generally specified in the purchase order and/or contract documentation,
but may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus-bars, CT’s, VT’s and transformers).
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use.
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
A supplier may be a natural or legal person and includes any employee acting within the
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
2.4 Abbreviations
Abbreviation Explanation
AIA Approved Inspection Authority
CA Corrective Action
CQP Contract Quality Plan
FIDIC Federation Internationale Des Ingenieurs- Conseils
FMECA Failure Mode, Effects and Criticality Analysis
HAZOP Hazard and Operability Study
ISO International Organisation for Standardisation
ITP Inspection and Test Plan
NC Nonconformity
NDT Non Destructive Testing
PMI Positive Material Identification
QCP Quality Control Plan
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Abbreviation Explanation
QMS Quality Management System
PQP Project Quality Plan
RFI Request for Information
RFQ Request for Quotation
RFP Request for Proposal
SHEQ Safety, Health, Environment, and Quality
SETA Skills Education Training Authorities
WPS Welding procedure specifications
WQR Welder’s Qualification Record
2.5 Roles and Responsibilities
Eskom Quality representative/ professional will select applicable requirements for existing and
potential Eskom suppliers using Form A (Tender and Contract Quality Requirements for Supplier
Quality Management: Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001
Standard).
The existing and/ or potential suppliers must complete, sign and return Form A with the other
returnable as listed in the List of Tender Returnable document (240-12248652). Other roles and
responsibilities for this standard are defined within the text of this specification.
2.6 Process for Monitoring
The application of this specification throughout Eskom shall be audited as per the management
system audit schedule.
2.7 Related/Supporting Documents
The documents superseded by this specification: all divisional and business unit supplier quality
requirements standards and/or specifications.
Forms and templates:
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The quality assessment criteria and Form A of this specification will be selected and completed by
an Eskom Quality representative/ professional who will identify the applicable supplier quality
requirements to be met.
Form A of this specification must also be completed and signed by the supplier responding to an
Eskom invitation to tender, in order to acknowledge and accept Eskom Supplier Quality requirements
as per this specification and ISO 9001 Standard or any additional quality requirements specific to
the scope of work.
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) and in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001 and may include a quality manual, quality plans, work procedures, work
instructions, method statements, work flow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub-supplier’s scope of responsibility includes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.6 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-supplier’s scope of
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.1.7 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.8 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
Verification of the QMS
Audits and surveillances
Regular assessment of the CQPs and reviews of QCPs.
NC and Defect Management
Inspection and test plans
Risk management
3.2 Quality Plan
The information in this section constitutes the minimum requirements for a quality plan.
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables , as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained contract
quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract quality plan (CQP) and/ or quality control plan (QCP)/ inspection and test
plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
supplier’s quality system in order to demonstrate its ability towards both controlling and
meeting specified Eskom requirements.
Note 1: Contract Quality Plan should address the quality assurance elements related to the scope
of work and/ or technical specification.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-supplier’s scope of work.
The supplier shall, where applicable, based on scope of work criticality, ensure that procurement
documents clearly and unambiguously require sub-supplier submission of a sub-supplier CQP for
supplier and Eskom review.
The main supplier shall ensure that sub-supplier CQPs are developed and implemented in
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans. In
addition to the elements specified in ISO 10005, the supplier’s and/ or sub-suppliers’ CQPs shall
include the following (as applicable):
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding: management of the welder’s qualification record
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture. The personnel carrying out special processes (for
example, NDE, welding, coating, heat treatment, etc.) where the results cannot be fully
verified by subsequent inspection and test shall be suitably qualified and, where applicable,
registered with statutory bodies as legally required, that is, as radiographic workers to conduct
radiography. The requirements for the qualification shall be specified, and personnel records
shall be maintained in accordance with the Project Quality Personnel Qualification
Specification and, where applicable, legal requirements.
3.3.6 The personnel required to perform special processes shall be certified competent through a
certificate of competency in accordance with the company’s internal training management
and competency control procedures or an external certification body (for example, NDT)
through an accredited service provider as per Skills Education Training Authorities (SETA)
requirements.
3.3.7 All personnel who perform activities that affect quality shall have their training needs identified
and documented. The required training shall be implemented in accordance with the
company’s training management and competency control procedures. All the training
certificates shall meet the SETA requirements in terms of having the unit standard completed
and the accreditation number of the service providers.
3.3.8 Instructions and requirements for equipment and materials storage, preservation, and
maintenance, including identification of materials required for preservation and maintenance,
are to be provided sufficiently prior to receipt (prior to shipment or earlier) to ensure that
appropriate resources are available at the time of delivery.
3.3.9 Specific quality monitoring and verification activities are to be undertaken on the supplier’s
sub-suppliers by Eskom or it agent.
3.3.10 The CQP information need to include, but not limited to:
Spells out the aspects of the QMS to be applied within a specific Eskom project, and the
methods to be utilised to ensure quality.
Outline the resources, the communication channels, applicable documents and records to be
generated.
Management Authority and Responsibility from both supplier and client need to outline in the
Cqp.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
List of documents and records that will be used and submitted during the execution of the
project.
Communications channels should include contact person and contact details
Monitoring & measurement procedures for activities need to be indicated.
3.3.11 The main supplier and sub-supplier CQPs shall comply with the Eskom Quality Requirements
Specifications and shall be submitted prior to the initial scope of work kick-off or initial pre-
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.12 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.4 Quality Control Plan
The supplier shall develop and implement processes and procedures that efficiently and effectively
monitor, verify and document the quality of the scope of work for deliverables.
The main supplier shall ensure that sub-supplier QCPs/ ITPs are prepared at a level of detail
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
supplier’s QCP/ ITP that clearly and unambiguously identifies the quality verifications to be
performed and special attention to controls related to critical products and services.
3.4.2 QCP/ ITP shall be reviewed and accepted by Eskom, its inspection authority or agency, and
they shall allow for the insertion of Eskom specific requirements, including hold and witness
points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
authority or agency’s agreement prior to the commencement of work involving an activity
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
Qcp/ itp.
3.4.6 All applicable codes, standards, and relevant acceptance criteria documents are available at
the work location, and Eskom representatives on site shall have on-going access to this
information. Workplace documentation shall be available in English and in any workforce-
appropriate language.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub-supplier’s involvement. A separate QCP/ ITP shall be required for each sub-
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
be reviewed at Eskom’s discretion based on its assessment of the supplier’s performance or
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
Eskom contract number and title
The supplier’s order number
Identification of the area of works/contract
Description of the work, with components, item number, and activity date
QCP/ITP unique number
A list of the sequence of operations, including inspection and tests
The identification of the specification, drawing number, or procedure for each operation,
with reference to the relevant criticality risk rating
The acceptance criteria, with reference to the technical specification, in-house, national, or
international standard, with the relevant clause number for each operation
The inspection and test activities that the supplier has nominated for its intervention points
Provision for the inclusion of intervention points nominated by Eskom and/or its authority/
agency
Provision for intervention point acceptance by date and signature for all parties having
intervention in the plan
Inspection and test records to be generated by the supplier for each operation and an
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Specifications, including, but not limited to, the following requirements:
Clear and unambiguous description of the equipment and location(s) at which each activity
will take place, including facility location(s)
Identification of quality verification activity and stage
The details of reference documents, procedures, or method statements to be utilised in
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Definition of acceptance criteria
Listing of certifying or verifying documents generated to provide evidence of compliance
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
Identification of main supplier and sub-supplier (where applicable) third-party/approved
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
Qualification requirements for quality control inspectors, including any third-party/AIA
inspectors
Listing of all proposed test procedures
Acceptance criteria for each inspection or test in alignment with specified tolerances
A section for signed acceptance of the QC/ITP by the supplier, sub-supplier (where
applicable), and Eskom prior to commencement of work
Inspection or testing intervention points, including, but not limited to, factory acceptance test
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
The supplier shall arrange coordination meetings with Eskom prior to placement of orders
for items or equipment to ensure that all technical and commercial requirements are clear
and understood. Fourteen days’ advance notice of meetings shall be given to Eskom.
Supplier inspection personnel, including inspection agency personnel, shall be competent
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
Specification.
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
Requirements for inspection checklists and inspection assignments, with lists of items to be
inspected
An inspection and testing report format, report content, schedule for report processing and
distribution, and report retention requirements
Inspection and test report results response tracking (log) and resolution of nonconformity in
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
Associated Failure Mode, Effects and Criticality Analysis (FMECA) reports relating to the
equipment and sub-systems (if applicable)
Hazard and Operability Study (HAZOP) report, as applicable
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-supplier’s
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
AIA to be attended by the supplier’s and sub-supplier’s representatives, including their quality
representatives who will be involved in the works, and records are to be kept.
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
supplier’s or sub-supplier’s premises and on site where the work is being performed. The
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
3.5 Pre-Contract Award: Quality Requirement
3.5.1 Main Supplier and Sub-supplier Categories
Eskom supplier quality requirements for all existing and potential suppliers and sub-suppliers are
classified into four categories (category 1, 2, 3 and 4). Suppliers must prepare and submit quality
documentation as per the tender selected category (indicated in Form A) using the list of tender
returnables document.
NOTE: Only one (1) category must be applicable per procurement process e.g. [Eskom requests for
information (RFI)/ requests for quotation (RFQ)/ requests for proposal (RFP), including contracts for
the procurement of products and services].
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The following are the minimum returnable documentation for Categories 1 to 4:
3.5.2 Category 1: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a valid copy of ISO 9001 or any applicable certificate of a QMS (the
latest applicable revision). The QMS should drive the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal and external
audit reports. The audit reports must include, if applicable, nonconformity identified, and the
resulting remedial actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit a draft, or an example of an inspection and test
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
3.5.3 Category 2: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed, implemented and maintained QMS
that complies with ISO 9001 or any applicable standard of quality management system (the latest
applicable revision). The following documents (approved/ signed copies) shall be submitted:
Quality Management System manual or a documented information that have defines and
describes the QMS and its scope
Quality Policy, aligned with the supplier’s strategic direction (documented information)
Quality Objectives (documented information)
Control of documented information (both maintain and retain documented information )
Internal audit procedure (documented information)
Control of nonconforming outputs (documented information)
Nonconformity and Corrective action procedure (documented information)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal audit reports. The
audit reports must include, if applicable, nonconformity identified, and the resulting remedial
actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example of inspection and test plan (ITP) or
quality control plan (QCP) on similar or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
document (240-12248652).
3.5.4 Category 3: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed QMS that complies with ISO 9001
(or the latest applicable revision). The following documented information (approved/ signed
copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information )
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example inspection and test plan (ITP) or
quality control plan (QCP).
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
NB: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.5.5 Category 4: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a quality method statement based on ISO 9001 and specific to the
scope of work.
The quality method statement should address all the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit a signed/ approved quality policy (aligned with the supplier’s strategic
direction). (documented information)
The supplier shall submit a copy of quality objectives. (documented information)
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of the documented information for roles, responsibilities and
authorities, specific to the project/ scope of work/ technical requirements. Examples of relevant
documented information are; organization charts, job descriptions, work instructions, duty
statements, manuals, procedures.
Note: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment
Supplier capability and capacity assessments shall be performed prior to contract award on potential
suppliers participating in Eskom Holdings procurement process to:
provide products and services with high risk to operational sustainability
work on critical plant and equipment
supply of critical plant items or components
provide special processes
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
All sub-suppliers used by the main supplier/ contractor, performing work on Eskom critical plant
equipment, supplying commodities and providing specialised services shall be subjected to the
capability and capacity assessment.
Critical plant includes the following:
Generation Level 1 & 2 plant
Transmission and Distribution Power Plant & Control Plant
Mega Projects
All potential quality risks identified will be included in the assessment report provided for the tender
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted.
3.7 Post-Contract Award
3.7.1 Contract Execution
The supplier shall submit the following documents within 30 days or as per stated timeline after the
contract date, prior to the commencement of work, for acceptance by Eskom:
The supplier shall complete a QCP before contract award. This shall be reviewed and
signed off by Eskom within 30 days or as per stated timeline after contract award.
The supplier shall complete a quality control plan and ITP(s) for review and acceptance by
Eskom prior to the commencement of any work, inclusive of subcontracted work, within 30
days or as per stated timeline after contract award.
The sub-supplier QCP/ ITP shall be submitted for review and comment by the supplier and
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
The equipment lists and an indication of pressurised components and systems.
Note: These plans are to be compiled in line with Eskom’s requirements and will have to be
discussed with, and approved by, Eskom prior to any work commencing.
Correspondence shall be directed to the project manager, and periodic quality review
meetings shall be convened by Eskom with the supplier.
The mandatory quality review meetings are to be convened by the nominated project quality
manager or his/her representative for the contract.
Monthly quality performance and management reports are to be prepared by the supplier
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.2 Supplier Quality Performance Monitoring Phase
During the contract execution phase, suppliers shall be monitored by Eskom for performance on
quality-related aspects.
The outcomes of such monitoring will enable Eskom to take any appropriate actions pertaining to
the supplier.
The monitoring shall be carried out periodically by Eskom or at predetermined intervals during the
execution of a contract using agreed key performance indicators. The monitored key performance
areas include the following:
CQP and QCP /ITP
Delivery
Design
Cost
Management system
Subsequent key performance indicators associated with these areas will include the following:
Nonconformity monitoring
Audit and assessment evaluation scoring
Management system compliance and accreditation
Achievement of delivery targets as per contractual agreements
Process improvements
Correction and corrective action response and closure
3.7.3 Supplier Quality Audit
3.7.3.1 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.2 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers
3.7.3.3 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.4 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.3.5 Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with procedures documented in the
Cqp.
3.7.3.6 The supplier shall submit, for Eskom review, documented processes for conducting project
scope of work quality audits and related quality performance reviews. Supplier quality audits
and related quality performance review processes shall be designed to address evaluation
of progress towards completion of project functional area deliverables as well as final
deliverable quality.
3.7.3.7 The supplier shall provide a schedule of anticipated quality audits covering all functional
areas and related quality performance reviews at the time of first post-contract award CQP
submission.
3.8 Standard Conditions
3.8.1 Rights of Access
Eskom:
3.8.1.1 shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
3.8.1.2 reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
3.8.1.3 reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
The supplier:
3.8.1.4 shall support Eskom’s effort to monitor, verify, and/or witness any activities associated with
the work at any time;
3.8.1.5 shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
3.8.1.6 shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
3.8.1.7 shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
3.8.1.8 shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
Eskom’s suppliers to assist with the product and/or service delivery to Eskom; and
3.8.1.9 shall ensure that the above requirements flow down to sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.2 Eskom Rights to Information
3.8.2.1 To expect that the works will be conducted in accordance with the contract between the
parties.
3.8.2.2 To have access to the supplier’s information as determined by applicable legislation.
3.8.2.3 Eskom reserves the right to oversee the supplier’s audit programmes by participating in
selected audits as an observer and by assessing the supplier during key work stages.
Eskom will coordinate with the supplier to develop an oversight schedule aligned with the
supplier’s audit schedule.
3.8.2.4 To obtain access to any audit reports of audits performed by the supplier reflected in the
audit programme.
3.8.2.5 To conduct independent quality audits during all phases of the contract, and the supplier
shall provide all resources to support these activities.
3.8.2.6 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.2.7 To participate in, and/or lead, investigations related to incidents involving its products.
3.8.2.8 To require from suppliers to be responsible for the cost of re-inspections.
3.8.2.9 To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
3.8.2.10 Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
3.8.2.11 Reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as
well as any documentation, materials, or equipment associated with the work, at any time or
project work location.
3.8.2.12 Shall carry out assessments and audits on all new suppliers and sub-suppliers.
3.8.2.13 Reserves the right to appoint resident quality inspectors who can be based at the supplier’s
or sub-supplier’s premises and on site where the work is being performed.
3.8.2.14 Reserves the right to select intervention points within all developed supplier QCPs/ ITPs
for Eskom oversight of selected functions and to perform surveillance or audits of the work.
3.8.2.15 Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.2.16 Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3 Preservation
The supplier shall develop and implement a comprehensive preservation programme consisting of
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
3.8.3.1 Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
3.8.3.2 Development and implementation of preservation programme training appropriate to work
need.
3.8.3.3 Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not
limited to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-supplier’s testing facilities, processing plant, and any other processes
deemed important towards effective and efficient quality control.
3.8.3.4 Eskom seeks cooperation between the supplier’s designers and those of Eskom’s service
provider in ensuring seamless installation of the device and other associated installations.
Moreover, there is also a need to integrate data flows and systems between Eskom and the
supplier. Further details are included in the Eskom specifications and works information.
3.8.3.5 Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
3.8.3.6 Review and tracking of compliance with sub-supplier provided preservation requirements
and recommendations.
3.8.3.7 Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
3.8.3.8 Preservation work plan development and plan execution performance evaluation of all
parties engaged for provision of material transportation, handling, or storage services.
3.8.3.9 Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
3.8.3.10 Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
3.8.3.11 The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term “physical assets” should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.12 Where the project responsibility for equipment and materials management has been
formally delegated, the supplier’s preservation programme shall ensure clear and
unambiguous communication of pre-operation preservation of goods quality requirements
to sub-suppliers.
3.8.3.13 The supplier’s preservation programme shall clearly and unambiguously document
processes and procedures for efficient and effective monitoring of compliance with
programme requirements.
3.8.3.14 Compliance monitoring shall commence with ensuring comprehensive consideration of
preservation requirements in the engineering instruction and subsequent inclusion of said
instruction in procurement documentation and shall be applicable until such time as
equipment or materials have been incorporated in an operating or operational system or
structure.
3.8.3.15 Compliance evaluation frequency shall anticipate transfer of tactical-level responsibility for
management of preservation responsibilities between project functional areas, for example,
procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to
construction, etc., and shall, in similar fashion, anticipate transfer of support for tactical-level
responsibility between various subcontracted service providers.
3.8.3.16 Supplier engineering shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project procurement, logistics, construction management,
quality, security, and other project functional areas, as required, for efficient and effective
implementation of preservation requirements. This shall take the form of a preservation
programme applicable to all systems, system components, equipment, materials, customer-
supplied materials, and other goods procured or managed under the scope of work.
3.8.3.17 The supplier’s preservation management programme shall clearly and unambiguously
address temporary, long-term, and in-transit preservation requirements, including, but not
limited to:
requirements for protection against, or insulation from, atmospheric conditions,
sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, or
other physical environment conditions;
detailed procedures for application, use, monitoring, and maintenance of coatings,
coverings, fasteners, lines, and other components for internal and external weather
proofing;
requirements for electrical grounding or isolation;
requirements for internal or external environment creation, for example, inert gas
charging, heating, cooling, etc., inclusive of gas storage, electric power supply, etc.;
detailed procedures for initial set-up, charging, activation, and maintenance of
internal atmosphere generation, regeneration, monitoring, and relieving systems, for
example, inert gas management systems;
requirements for protection against, or insulation from, vibration or long-period
cyclical motion in transit, for example, wave-generated movement during sea
transport;
internal and external structural integrity protection, for example, internal and external
bracing, padding, framing, chocking, etc.;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
support structure requirements, for example, stools, pads, or other devices,
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
provision for physical separation and/or barriers to prevent airborne or direct
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
provision for, and final disposition of, temporary and longer-term storage or transit
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
provision of requirements for temporary work platforms or other support structures
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
requirements for protection against, or insulation from, contact with other objects, for
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
clear physical delineation of temporary and longer-term storage areas supplemented
by hard and soft barriers, as required, to maintain a protective perimeter;
documented agreements with storage facility and transportation provider
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain
preservation status.
3.8.3.18 The supplier’s preservation management programme scope shall encompass
management of preservation requirements, from initial transfer of ownership or management
responsibility to project scope of responsibility, through any period of temporary or longer-
term storage and through any period of transit, including transit for final delivery at point of
active use or installation.
3.8.3.19 The supplier’s preservation management programme shall clearly and unambiguously
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.20 The supplier’s preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components,
mechanical and rotating equipment, piping and fittings, instrumentation, flange faces,
gaskets, coatings, insulation, and other materials. Special precautions include, but are not
limited to, supplier-specified maintenance procedures related to engines, electric motors,
pumps, compressors, etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
3.8.3.21 The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
3.8.3.22 Where sub-supplier expertise is utilised in determination of the preservation protocol,
supplier procurement processes shall ensure clear and unambiguous documentation of sub-
supplier input into preservation management programme requirements.
3.8.3.23 Supplier procurement shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements.
3.8.3.24 The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
3.8.3.25 The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation
management programme execution.
3.8.3.26 The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
3.8.3.27 The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.4 Quality Audits Related Conditions
3.8.4.1 The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
3.8.4.2 The supplier’s quality audit and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
3.8.4.3 Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the supplier to develop an oversight schedule aligned with the supplier’s
audit schedule.
3.8.4.4 Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
3.8.4.5 Eskom reserves the right to conduct independent quality audits, scheduled and
unscheduled, during all phases of the contract. The supplier shall provide all resources to
support these activities.
3.8.4.6 Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
the products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.4.7 The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
3.8.4.8 The assessments and audits shall be carried out on all new suppliers and their sub-
suppliers.
3.8.4.9 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.4.10 Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by Eskom
3.8.5.1 Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
3.8.5.2 A formal response shall be prepared in respect of the defined criteria and submitted to
Eskom for its review, evaluation, and acceptance, within a maximum of 14 calendar days
from the date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
3.8.5.3 Eskom may, at its discretion, request a response sooner and, in any case, before the
supplier proceeding with any pending/further intervention or corrective action, as may be
required by Eskom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.5.4 Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
3.8.5.5 The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
any action to rescind/withdraw the supplier’s qualification status.
3.8.5.6 Nonconforming outputs identified by Eskom shall be documented via a NC Report and
issued to the suppliers via the contract communication protocol. The suppliers shall
investigate the matter and respond in writing to Eskom of disposition within the stated
contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
3.8.5.7 Eskom shall identify repeat deficiencies as systematic failures of the supplier’s QMS and
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
Cause Analysis. In such cases, QMS rectification and/ or update measures shall be taken
immediately.
3.8.5.8 Should the Supplier fail to respond and rectify nonconforming products within stipulated
contractual conditions. The Project Manager should apply contractual remedies in
accordance with Fidic/ NEC contract.
3.8.5.9 Repeated Nonconformities; if there are any identified repeat nonconformities from the same
supplier within a period of 6 months or less. This must then be escalated to the management
review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not resolved, then
the matter must be escalated to the supplier review committee for recommendation.
3.8.6 Special Processes
The following requirements shall be applicable as well as additional requirements as specified in the
scope of work for the provision of the following special process services:
3.8.6.1 The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
3.8.6.2 This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
3.8.6.3 All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
3.8.6.4 Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
3.8.6.5 Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.6.6 The supplier shall ensure that all operators are suitably qualified for these processes in
accordance with the procedures, processes and/ or applicable standards/ codes.
3.8.6.7 The records of qualification of procedures, processes and operators shall be maintained by
the supplier in accordance with the applicable procedure or code and these made available
to Eskom at all times.
This document has been seen and accepted by:
Name Designation
Kerseri Pather General Manager: Risk and Sustainability
Lenock Meyer Acting Senior Manager: Quality Management
Pamela Dondashe Middle Manager: Quality Assurance
Mandla Mkhwanazi Middle Manager: SHEQ Procurement and Supply Chain Management
Suzette Manthe Senior Advisor: Quality Performance and Planning
Lorna Ndlela Middle Manager: Eskom Document and Records Management
Date Rev. Compiler Remarks
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
The following people were involved in the development of this document:
Andrew Else
Bongi Tshabalala
Feziwe Mogamisi
Lesego Garegae
Patrick Thwane
Xolani Zuma
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Eskom Operational Quality Forum Members
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supply and delivery of Pneumatic Actuators for Stock Replenishment for a period of five
Project
years at Lethabo Power Station on an as and when required basis.SECTION (TENDERER)
Clauses of 240- clause description indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also indicate
whether site assessment is applicable.
Category 1 (refer to clause 3.5.-105658000) -
Category 2 (refer to clause 3.5.-105658000) X
Category 3 (refer to clause 3.5.-105658000) -
Category 4 (refer to clause 3.5.-105658000) -
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3.-105658000) -
3 post-contract award(eskom)
appointment of contractors or suppliers for the commencement
of work
Cell A3: Occupational Health and Safety Baseline risk assessment template
Eskom’s responsibility and commitment is to ensure a safe working environment is in line with its
Safety, Health, Environmental, and Quality (SHEQ) Policy and applicable legislative obligations.
This OHS specification is Eskom Generation's minimum requirements which are required to be
met for the duration of the contract period by contractors/suppliers and, where required, the
delivery organisation. The contractor is expected to develop an OHS plan that meets these
requirements as well as all the relevant applicable legislation that they conform to. Eskom in no
way assumes the contractor’s legal responsibilities and liabilities. The contractor is and remains
accountable for the quality and execution of their health and safety programme for their employees
and appointed contractor employees. This OHS specification reflects minimum requirements and
should not be construed as all-encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not supersede or
replace any organizational OHS requirements.
Where requirements listed are already in place, then the organizational requirements must be
taken cognisance of and listed in the respective OHS plans. If there are any additional Eskom
and/or legislative requirements listed in the OHS specification, then these must be addressed.
2.1 Scope
This OHS specification lists the legislative and Eskom requirements and, where applicable, any
requirements pertaining to local authorities, municipal by-laws, or environmental legislation that
must be met by the contractor.
2.1.1 Purpose
This document will provide a standardised approach to the compilation of OHS specifications
throughout Eskom Generation business for contracts, standards, and NEC 3.
2.1.2 Applicability
This OHS specification is applicable to any contracting organisation that intends to respond to
Eskom Generation's tender/enquiry with the intention of entering into a contract.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
2.2.2 Informative
2.3 Definitions
Definition Explanation
Appointed contractor Means a contractor appointed by the Main contractor
Baseline risk assessment (32-520) baseline operational risks refer to the health and safety risks
associated with all standard processes and routine activities in the
business
Business unit (BU) (32-296) means any defined unit within the Eskom environment,
operating as a business under a particular cost-centre number. In the
context of this document and in terms of health and safety, any
reference to a BU includes a defined unit within any Eskom division and
its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred
to as the contract administrator/custodian or agent or project manager
(as defined in the contract). He/she is the person responsible for
ensuring that the works or services are executed in terms of the
contract, as well as adherence to legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training,
experience, and qualifications, specific to the work or task being
performed, provided that, where appropriate, qualifications and training
are registered in terms of the South African Qualifications Authority Act,
1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes Main contractors
Contract’s Manager/End Contract’s Manager/End User
User
Consultant means a person providing professional advice
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Definition Explanation
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable
measures to prevent such pollution or degradation from occurring,
continuing, or recurring. If such harm to the environment is authorised
by law or cannot reasonably be avoided or stopped, such person must
minimise and rectify such pollution or degradation of the environment
Employee (OHS Act) means, subject to the provisions of subsection (2), any
person who is employed by or works for an employer and who receives
or is entitled to receive any remuneration or who works under the
direction or supervision of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any
person who employs or provides work for any person and remunerates
that person or expressly or tacitly undertakes to remunerate him/her,
but excludes a TES (ex labour broker) as defined in section 1(1) of the
Labour Relations Act 1956 (Act No. )
Environment (32-94) means:
the land, water, and atmosphere of the earth;
micro-organisms and plant and animal life; and
any part or combination of (a) and (b) and the interrelationships among
and between them, and the physical, chemical, aesthetic, and cultural
properties and conditions of the foregoing that influence human health
and well-being
Eskom requirements Eskom requirements flowing from directives, policies, standards,
procedures, specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from
an elevated position, considering the nature of work undertaken, and
setting out the procedures and methods to be applied in order to
eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or
expected hazards to the health and safety of persons, which are
normally associated with the type of construction work being executed
or to be executed
Occupational Health and (OHS Act) means a file or other record in permanent form, containing
safety file the information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified
and includes safe work procedures to mitigate, reduce, or control
hazards identified
Occupational Health and (OHS Act) means a document specification of all health and safety
safety specification requirements pertaining to associated to a contract, so as to ensure the
health and safety of persons.
Occupational Health and means comprehensive health and safety requirements for a contract,
safety requirements project, site, and scope of work. This specification is intended to ensure
the health and safety of persons, both workers and the public, and the
duty of care to the environment. The health and safety requirements
must be specific to each contract, project, site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Definition Explanation
Medical Certificate of fitness (OHS Act) means a certificate valid for one year, issued by an
occupational health practitioner, issued in terms of the regulations,
whom shall be registered with the Health Professions Council of South
Africa
Medical surveillance (OHS Act) means a planned programme or periodic examination (which
may include clinical examinations, biological monitoring, or medical
tests) of employees by an occupational health practitioner or, in
prescribed cases, by an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
National Enquiries/contracts sourcing of services providers/contractors at the divisional level and not
at BU level thorough tendering, request for price etc
Organisation may be defined as a group of individuals (large of small) that is
cooperating under the direction of executive leadership in
accomplishment of certain common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement of
the day’s work and that is attended by all the relevant employees
associated with the work task
Main contractor (In the text of this document) Means an employer, as defined in section
1 of the OHS Act, who intends to tender for or has signed a contract
with Eskom for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1 of
the General Administrative Regulations under the Act
Responsible Manager Is a Manager of a department, section or operating/business unit who
has been appointed as part of the Eskom delegation of authority
process with the aim to assist the applicable 16(2) assigned person in
executing his/her duties in terms of the Occupational Health and Safety
Act
Risk assessment (OHS Act) means a programme to determine any risk associated with
any hazard at a construction site in order to identify the steps needed
to be taken to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, Main contractors,
contractors, suppliers, vendors, and service providers provide a service
to Eskom, directly or indirectly
Service provider any private person or legal entity that provides any service(s) to Eskom
for compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through
the ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and
may include the following current or potential supplier vendor,
contractor, consultant
Task (34-227) a segment of work that requires a set of specific and distinct
actions for its completion
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Definition Explanation
Toolbox talks (34-227) where the team leader, after conducting pre-task planning,
shares all the tasks at hand and discusses task allocation, the identified
risks, and the control measures with all his/her team members on site
before commencing a specific task and documenting the agreed
strategy. (This shall be done to ensure common understanding of the
tasks, risks, and control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as amended, and the Regulations thereto
Visitor any person visiting a workplace with the knowledge of, or under the
supervision of, an employer.
2.4 Abbreviations
Abbreviation Description
BU Business Unit
CE Chief Executive
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DEL Department of Employment and Labour ( Inspection and Enforcement services
– Provincial office)
EP Emergency Preparedness
EAP Employee Assistance Program
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GSR General Safety Regulations
HCS Hazardous Chemical Substances
LDV Light Delivery Vehicle
MSDS Material Safety Data Sheets
OHS Act Occupational Health and Safety Act and Regulations,
O&M Operating and Maintenance
LoG (COID) Letter of Good Standing
SABS South African Bureau Standard
SANS South African National Standard
2.5 Related/supporting documents
Section 37(2) of the OHS Act requires Eskom to sign an agreement and include it in the OHS file
for evaluation prior to the start of work. OHS department will issue the 37(2) agreement to the
project manager/end user who will facilitate the signing of the document by Eskom and contractor
representatives.
3.1 Scope of work
Supply and delivery of Pneumatic Actuators for Stock Replenishment for a period of five years at
Lethabo Power Station on an as and when required basis.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Note: The contractor who will be awarded this contract will be known as the “Main contractor”
and any contractor appointed by the Main contractor will be known as the “Appointed contractor"
3.2 Legal compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom and the main contractor at the time of
submitting the safety file. The main contractor must ensure that a section 37(2) agreement is
compiled between the main contractor and all their appointed contractors for the contract. The
original copy of the section 37(2) agreement must be retained by the contractor, and a copy must
be retained by the responsible project manager/end user. A copy of all the agreements must form
part of the respective contractor’s OHS file.
3.2.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of
children, especially when it comes to:
moral, or social development and the Basic Conditions of Employment Act, Chapter six,
Section 43, "Prohibition of employment of children."
Before resorting to the use of child labour, due consideration must be given to the child's
constitutional rights. Where work is being performed which is not prohibited in terms of the
constitution, then such work must be conducted in terms of the OHS Act "Regulations on
Hazardous Work by Children in South Africa" with emphasis on paragraph 2: Purpose and
Interpretation. Eskom does not condone the use of child labour and, therefore, all effort must be
exercised, and child labour should not be used.
3.2.3 OHS Act
The main contractor and appointed contractors shall have an up-to-date copy of the OHS Act and
regulations which will be available to all employees.
3.2.4 Legislative Compliance
All contractors will comply with all the legislation pertaining to this contract being:
The Main contractor and all appointed contractors will comply with all the legislation pertaining to
this project being:
Rights).
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
3.3 ESKOM requirements
All contractors shall, before commencement of the project ensure that all their employees are
familiar with the relevant Eskom OHS documentation that is applicable to contract services.
3.4 Sheq policy & OHS plan
A SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior management
in relation to the relevant OHS roles and responsibilities, the achievement of their strategic objectives, and
values of integrity, customer satisfaction, excellence, and innovation. The main contractor and all appointed
contractors, if not already in place, will be required to compile an organisational SHEQ policy in line with
their OHS responsibilities. The policy must be signed by the organisation’s CE or the appointed assistant
to the CE, OHS Act Section 16(2). The policy must be displayed in a prominent place within the workplace.
A copy of the policy must be filed in the contractor's OHS files and attached as an annexure to the OHS
Plan. The supplier shall develop occupational health and safety plan in line with the scope of work and this
OHS plan shall be submitted with the rest of the documents as returnables.
3.5 Hazardous biological agents
Due to the current pandemic the contractors are required to submit the Covid policy signed by the
most senior person. The policy must be displayed in a prominent place within the workplace. A
copy of the policy must be filed in the contractor's OHS files and attached as an annexure to the
OHS Plan.
3.5.1 Severe Acute Respiratory Syndrome (SARS-CoV- 2)
The Main Contractor and all appointed contractors shall ensure that a Baseline risk assessment is
conducted and communicated with all employees. All the requirements of RHBA 10,11,12 are met.
3.6 Coid
The Main contractor and all his/her appointed contractors shall be registered with an appropriate
employment compensation commissioner and have available a valid letter of good standing (LoG)
from such commissioner. The obligation lies with the contractors to ensure that the LoG remain
valid throughout the contract period. A copy of the LoG must be filed in the contractor OHS files.
3.7 Costing for OHS within the project
The costing for OHS must be itemised based on the overall scope of the project (i.e.) Training,
provision of PPE, safety equipment purchases etc.
3.8 Statutory appointments
The Main contractor and all appointed contractors must appoint competent workers who will
comply with the OHS Act for the duration of the contract. Before requiring appointees
to accept an appointment, the employer must ensure that they have received appropriate training
and/or information about their responsibilities. The relevant statutory appointments must be made
in compliance with the OHS Act's criteria, which include appointing a qualified individual to the
appropriate roles. The following should be included in the statutory appointments, but not limited
to:
3.9 ESKOM life-saving rules
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
work for Eskom to do the same.
consultants, and contractors. Any Eskom employee or employee of a Main Contractor or appointed
contractor who fails to follow these rules would be deemed a serious violation. These rules are in
place to protect any employee, labour broker, or contractor working from significant injury or death.
the rules shall be obeyed by any contractor and their employees.
The rules are:
Rule description of rule
Open, isolate, test, earth, bond, and/or insulate before touch
Rule 1
( That is plant, any plant operating above 1000 V)
Hook up at heights
Rule 2 Working at height is defined as any work performed above a stable work surface or where a person puts
himself/herself in a position where he/she exposes himself/herself to a fall from or into.
Buckle up
Rule 3 No person may drive any vehicle on Eskom business and/or on Eskom premises:
Unless the driver and all passengers are wearing seat belts.
Be sober
Rule 4
No person is allowed to be under the influence of intoxicating liquor or drugs while on duty
Permit to work
Rule 5
Where an authorisation limitation exists, no person shall work without the required permit to work.
Ensure safe live working
To ensure safe live work, each live worker shall:
a) Ensure all live work basic principles are adhered to, as outlined (for the method being used) in
the High Voltage Live Working Standard for the respective division.
Rule 6 b) Observe and maintain the minimum approach distance (MAD).
c) Only perform live work (never mix live and dead work on the same site at the same time – Refer
to ORHVS Section 7 and 5 handouts respectively
Perform tasks they are authorised for and only undertake tasks that are documented in the respective Task
Manual (TM). Only work on one potential (voltage) at a time.
Rule 7
Use of cellphones on site
Site
Use of cell phones (either texting or talking) when walking or driving is strictly prohibited.
Specific
Eskom will take a zero-tolerance approach to these policies.
Noncompliance to Life-saving rules is regarded as a serious misconduct and will result in serious
disciplinary action, which may include dismissal.
This is to ensure that everyone who works on or visits an Eskom facility returns home to their
families safely.
3.10 Substance abuse
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
comes to workplace accidents and car driving. As a result, Eskom has the right to take
reasonable procedures to identify and prohibit drunk people from entering the company.
taking into account that this is an Eskom Life-saving Rule number 4: (BE SOBER"), and
anyone entering the Eskom site will be subjected to ad hoc alcohol testing if the BU has
self-alcohol testing equipment.
alcohol on a regular basis.
commencement of work.
3.11 Contractor organisational structure
3.11.1 Main Contractor Organogram
The Main contractor must provide an organisational organogram on the company’s letter head
related to this contract, depicting all the levels of responsibility from the CE down to the supervisors
responsible for the contract. List the relevant positions held, names of appointees, legal
appointments and the Organogram must be signed off by the company's 16(1) or 16 (2).
The Main contractor must ensure that all appointed contractors comply with this requirement. The
Main contractor is responsible for keeping copies of all the organograms’ as well as submitting
them with the OHS plan. All organograms shall be updated timeously when appointments are
changed.
This diagram must be kept up to date and filed in the project OHS files.
3.11.2 Appointed Contractor/s Organogram
on the company’s letter head, listing the reporting structure from their CE down to their
project supervisors. The diagram must list the names, positions held, any appointments
made and must be signed off by the company's 16(1) or 16 (2).
and a copy filed in the relevant project OHS files.
3.12 Roles and responsibilities
Commitment
Visible commitment is essential to providing a safe work environment. Managers, supervisors and
employees at all levels must demonstrate their commitment by being proactively involved in the
day to day operations, in particular the Occupational Health and Safety aspects of any project /
contract. Legislation requires that each employee must take reasonable care of themselves and
their fellow workers, from management level down to the lowest employee level.
3.12.1 Main contractors and appointed contractors
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Note 1: Most of the roles and responsibilities listed apply to both Main contractors and any appointed
contractors. Where some of the listed do not apply to both, then the specific responsibilities will be
listed and titled. The contractors shall:
part of the OHS Act and Regulation 7 of the Construction Regulations.
their appointed contractors within their working area, as contemplated by section 37(2) of
the OHS Act ;
including date of induction, relevant skills and licenses and be able to produce this list at
the request of the Eskom Project Manager.
responsibilities in terms of their appointment and that they advise and assist these
appointees in the execution of their duties.
complied with on all work sites.
participation and cooperation.
records must be kept for each work site.
Commissioner’s valid letter of good standing before the commencement of work and any
future renewal letters obtained during the contract for record-keeping purposes. The letter
of good standing shall reflect the name of the contractor’s company. Similarly, the Main
contractor must provide the Eskom project manager with all the valid letters of good
standing from their appointed contractors.
Commissioner’s valid letter of good standing before the commencement of work and any
future renewal letters obtained during the contract for record-keeping purposes. The letter
of good standing shall reflect the name of the contractor’s company.
trained in the health and safety aspects relating to such work and that the employees
understand the hazards associated with all other work being carried out on the project.
adhere to such procedures. Similarly (without removing the appointed contractors’
responsibilities), ensure that their appointed contractors and their employees are
conversant with all relevant work procedures and that they adhere to such procedures.
health;
for the cost of safety and health measures throughout the project.
health and safety of persons or a risk of degradation to the environment.
evaluate, and assess the appointed contractors OHS files. Only appoint contractors who
are competent to do work, have satisfied the OHS compliance requirements and satisfied
that the contractor has the necessary competencies and resources to perform the work
safely.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
specified work throughout the contract period.
site for which such supervisor has been appointed for.
safety information or suspecting such information has been divulged, in the interests of
health and safety requirements.
contractor employees have transgressed any of the requirements of the health and safety
specification, safety and health plans, site rules or any other requirements.
include site or emerging risks. This should be done by a competent person appointed in
writing with a view to identify hazardous and potentially hazardous work operations.
the starting of any new task, irrespective of whether it is a repetitive task or not.
contract is in place and maintained.
person/man job specifications must be compiled and handed to the occupational health
practitioner.
employees, inspect such equipment regularly and ensure recipients of PPE are trained in
the proper use, care and where necessary, the maintenance of PPE;
site, they will be held responsible for the provision and wearing PPE.
investigators as and aligned with 32-95 requirements.
his/her approval prior to them commencing work.
3.12.2 Contractor site supervisor (This will not be applicable to this project)
The contractor site supervisor must be trained in the following:
liability
Must:
and Eskom project requirements;
Inspect all work done by the contractors to ensure adherence to Eskom’s standards and
Conduct follow-up inspections to ensure findings are closed out and preventative action
is in place.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
the first instance and thereafter the Eskom project manager in the second instance
relating to procedure requirements, non-conformances identified, corrective actions,
audits and inspection schedules.
procedures, work instructions and safety regulations issued by Eskom:
inspection reports.
incident statistics report etc.
meetings.
perform the tasks assigned.
contractors deviate from safety requirements.
3.12.3 Contractor Health and Safety Officer full/time
The contractor health and Safety officer must be trained in the following:
SAMTRAC, HIRA, Incident investigation training, Legal liability, Training, knowledge and
understanding of ISO 4500, Minimum work experience 2yrs,
3.13 RISK ASSESSMENT (refer to 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry out
risk assessments, to establish which risks and hazards are attached to the health and safety of
persons due to any work which is performed, any article or substance which is, handled, stored,
transported. A risk assessment is defined as an identification of the hazards present in the activity,
work, site, and an estimate of the extent of the risks involved, considering whatever precautions
are already being taken.
It is essentially a three-stage process:
Risk assessments are required to be maintained. This means that significant changes to a process
or activity, or any new process or activity should be subjected to a risk assessment and that if new
hazards become known during the work process, then these should also be subjected to risk
assessments. Risk assessments for long-term processes should be periodically reviewed and
updated.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Method statements or written safe work procedures are an effective method as information and
record of the way jobs / tasks must be performed. Daily or issue based or task specific or on the
job risk assessments must be conducted at the place where work is to be performed/ conducted
to allow managers and employees to assess any inherent risks that could have been overlooked
during the initial risk assessment or any changes that might have occurred in a period of absence.
For example if a job / task is extended over a day or halted due to inclement weather.
Guidelines for actual steps involved in a job/task specific risk assessment are:
procedures exist for ladders.
to rectify this shall be recorded, and safe working procedures drawn up.
nominated and duly assigned.
must be nominated.
for comment and approval.
Supervisor nominated as the responsible person; and the names of workmen who have
received instruction on the work content and the sequence of the activities listed in the
risk assessment shall be recorded, and their competence established. This instruction
shall be done through an interpreter if required and recorded on the Pre-Job Brief (Daily
Safe Task Instructions), with reference to applicable Risk Assessments.
3.14 Safe work procedures / method statements
There must be written safe work procedures for all activities, the safe work procedures must align
with the risk assessments. Method statements / written safe work procedure are control measures
used to prevent an incident from occurring during the execution of the project. A written safe work
procedure/ method statements provide guidance how to execute the task safely. A safe working
procedure should be written when: -
a. Designing a new job or task.
b. Changing jobs or task;
c. Introducing new equipment or substances; and
The safe working procedure should identify:
a. The supervisor for the task or job and the employees who will undertake the task;
b. The tasks that are to be undertaken that pose risks;
c. The equipment and substances that are used in these tasks;
d. The control measures that have been built into these tasks;
e. Any training or qualification needed to undertake the task;
f. The personal protective equipment to be worn;
g. J. Actions to be undertaken to address safety issues that may arise while undertaking the
task.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
3.15 Fire equipment and maintenance on transporting vehicles
a. Be clearly labelled
b. Conspicuously numbered
c. Entered in a register
d. Inspected monthly by a competent person
3.16 FIRST AID and EQUIPMENT
trained to level 2 and the training service provider must be registered in accordance with
section 26(1) of the Skills Development Amendment Act, Act No. . It is good
practice for all employees to be trained to at least level 1.
type of work performed, the distance teams are working apart and the terrain to be
covered if an emergency should arise.
for all employees.
employees are familiar with the emergency numbers.
50 or team of workers on site or part thereof, taking into account the type of work
performed and the distance between teams.
be available and accessible for the immediate treatment of injured persons at the
workplace.
and contact details of the First Aider of such first aid box or boxes shall be erected.
be made for incidents occurring after working hours.
3.16.1 Boxes and equipment
The following is a list of minimum contents of a first aid box:
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
A content check list must be available with all boxes and boxes shall be checked on a regular
basis, kept clean and dust free.
3.17 OHS communication systems
outlining how they intend to communicate OHS issues to their staff, the mediums they will
employ and how they will measure the effectiveness of their OHS communication. Below
is a brief on how communication should take place. Where project meetings are
conducted on site, OHS shall be included as a standing agenda point and minutes of
these meetings shall be available on site at all times. Minutes of meeting must be compiled
and filed in the relevant OHS files. All employees shall have access to these minutes.
Attendance register shall be kept for all the health and safety meetings.
3.17.1 Statutory Health and Safety Committees
Section 19 of the OHS Act. Similarly, appointed contractors shall establish their own
statutory health and safety committee.
performed, training, upcoming work and OHS requirements, incidents and lessons
learned specific OHS problems, safety performance, action plans and other relevant OHS
issues. Listed below is a preferred agenda.
committees (Refer to Section 19 (2) (a) of the OHS Act ).
Safety Representatives on that specific statutory health and safety committee. (Refer to
Section 19(2)(c) of the OHS Act)
medium to high risk work is involved, more frequent if required), and all appointed
members of the committee shall attend the meeting.
contractor and the project manager and the Inspector at DoEL.
and 25 incidents and other notified serious incidents.
and shall keep record of all recommendations made by the committee.
current standards, procedures and practices.
statutory health and safety committees carry out their duties.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
the contractor. The appointed chairperson must be competent to chair meetings and be
able to make informed decisions.
3.17.2 Non-statutory health and safety committees
within that worksite to assist with the communication of health and safety related matters
between the statutory health and safety committee and the workplace.
the same as the statutory safety committee
3.17.2.1 Agenda
o List of agenda items:
o Matters arising from previous minutes
o Matters arising from Contractor’s OHS meetings.
o Covid-19 compliance
o Audit results and feedback
o Review Health and Safety Representative Inspection Reports
o Review
Incident investigation reports
Non-Conformances
Announcements (near miss/injury/damage)
Follow up on recommendations made by the employer in incident
investigation reports
o Accident Prevention – Safety Promotion
Planned Job Observations
OHS Training
Protective clothing and equipment
Incident Announcements / Recall
o Forthcoming High hazard activities.
o Non-conformances.
o Housekeeping.
o Work permits.
o Work procedures.
o Hazardous materials / substances.
o Fire Prevention
o Occupational Hygiene Assessments, Health Risks and Actions
o Security
o Rules, Instructions
o Public Safety
o Environmental Management
o Emergency Preparedness
o Statistics report
o Closure
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
3.17.2.2 Minutes and action items for all health and safety committee meetings
meetings.
minutes and shall be completed during the meeting.
be kept for the duration of the project or a minimum period of three years.
of the project or a minimum period of 12 months.
period of 12 months.
chairperson.
his/her recommendations and return the minutes to the relevant contractors chairperson
within 14 calendar days of the meeting.
3.18 Tool box talks / daily team talks / prior to the delivery
personnel associated with the work task in attendance. The job, relevant procedures,
associated hazards, safety measures, i.e. the task risk assessments shall be discussed.
Each employee who attends the briefing shall sign an attendance list of that pre-job brief
form undertaking that they have an understanding of the tasks, risks and control measures
required.
not occur, then weekly tool box talks must be conducted. The toolbox talk topics will be
based on OHS issues pertaining to the project site. The topic and the contents shall be in
writing. Attendance registers with the topic listed shall be kept.
3.19 OHS training as per annexure c1 OHS tender evaluation (high risk)
the OHS training requirements and the costing of such requirements. Similarly, appointed
contractor must provide the same requirements when bidding with the Main contractor.
the relevant procedures. Additional to the requirements, will be that the Main contractor
and appointed contractors must have the appropriate qualifications, certificates and
employees should always be under competent supervision.
shall be given to those appointees prior to the acceptance of those appointments.
OHS plan, all affected staff shall undergo the applicable refresher training.
OHS file.
3.19.1 Main Contractor Induction training
The contractor is required to arrange with the Business Unit for its employees to attend induction
in order to be granted permission to access site.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
their employees have undergone the Eskom OHS induction training prior to commencing
work on site.
indicate that they have received and understood the induction training.
medical examination and found fit for duty. A copy of the certificate of fitness must be kept
in the OHS file on site for the duration of the project.
3.19.2 Appointed Contractor induction training
The Main contractor shall ensure that all his / her employees and appointed contractor employees
undergo site-specific work induction with regard to the approved project OHS plan, hazards
prevalent on the work site, scope specific risk assessment, rules and regulations, and other related
aspects. The induction training should also include identification of sensitive features such as
wetlands/vlei areas, red data species, graves, etc.
3.19.3 Visitors to site induction
safety induction prior to being allowed access to site.
inducted. No visitors are permitted to undertake any work onsite, of any nature.
Induction training.
3.20 General training
The Main contractor will be required to ensure that before an employee commences work on the
project/site, the respective supervisor informs the employee of his scope of authority, the hazards
associated with work as well as the control measures to be taken. This will include man-job
specifications, the discussion of any task procedures or hazardous operational procedures to be
performed by the employee. The Main Contractor is to ensure that the supervisor has satisfied
himself that the employee understands the hazards associated with the work to be performed by
conducting task/job observations.
3.21 Site roads
equipment’s as well as roadways for ease of manoeuvrability of these vehicles.
vehicles traversing the sites.
3.22 Vehicle management
a. Their passengers wear seat belts whilst the vehicle is in motion.
b. Comply with all traffic road rules, safety, direction and speed signs.
c. Ensure that vehicle loads are properly secured prior to moving off.
d. Ensure that vehicles are not overloaded.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
be services annually and inspected monthly. Drivers must be trained on how to use the
First aid box and fire extinguishers.
the back of the vehicle.
vehicle access to site.
must be valid at all times and this is applicable to yellow plant.
least 30 (thirty) meters must be left clear between such a vehicle and such a machine.
Vehicles which are not roadworthy will not be permitted to be used on site.
them. Precautions shall be taken to secure all loads properly. Loads projecting from
vehicles shall be securely loaded and in daytime a red flag and during darkness a red light
or red reflective material shall be attached to the extreme end of such projecting materials.
o Reverse alarm / beeper
o Yellow reflective tape
o Mud flaps
o Fire Extinguisher
o 2 Triangles
o First Aid Box
o Safety belts for every seat
o No fold-up or jockey seat
o Tyres
o License disc
o Yellow reflective tape that must be fitted at a height of between 250mm and 1.5
metres
o Speed warning sigh (100km/h) at the back of the minibus
o Driver have a Public Driving Permit
3.23 Housekeeping and order
vehicles for the duration of the project/contract.
temporarily in a designated waste area, awaiting disposal.
serious injuries/fatalities.
area immediately.
area of all materials, scrap, temporary buildings and building bases to the satisfaction of
the client/agent.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
safety and cleanliness, anyone has the responsibility to bring it to the attention of the Main
contractor in the first instance and the Eskom project/contract manager in the second
instance.
appointed contractors to cease work until the area has been tidied up and made safe.
Neither additional costs nor extension of time to the contract shall be allowed because of
such a stoppage. Failure to comply with this requirement will result into site cleaning by
another cleaning contractor company at the cost of the Main contractor.
ensure maintenance of satisfactory standards. The Main contractor shall document the
results of each inspection and shall maintain records for viewing.
3.24 Stacking and storage
stacking and storage on site and when transporting the goods to Lethabo Power Station.
manager for authorisation to use such an area for stacking purposes. This is to prevent
haphazard arrangements.
carried out correctly and safely.
small on top.
3.25 Auditing
3.25.1 Approval and compliance of Main contractor OHS plan
The Contractor’s OHS Plan will be audited against compliance checklist so as to verify compliance
to the requirements of the Eskom OHS specifications. Once there is compliance only then will the
Main contractors OHS plan be approved by the project manager or an appointed Eskom contract
custodian. The implementation of the OHS Plan shall be assessed / audited by Eskom personnel
on a regular basis. This will include physical conditions evaluation.
3.25.2 Eskom OHS audits
Eskom shall evaluate all contractors’ OHS performance on an ongoing basis against the legal,
Eskom requirements, OHS specification and the contractors OHS plans.
Note: Eskom reserves the right to conduct unannounced audits on contractors
There will be no audits conducted by Eskom on the Main contractor/s and/or appointed contractors
as this is going to be on as and when required basis.
3.26 Smoking
The national smoking policy must be observed and smoking is permitted in designated areas only
(Eskom Smoking Procedure 32-36).
3.27 Cellular phones
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
The National Road Traffic Act requirements regarding the use of cellular phones must be observed,
when driving and or operating mobile equipment and or machinery. The personal use of cell
phones in the plant is prohibited unless it is an emergency or for work purpose. The use of cell
phone camera in the plant must be in line with the national key point Act and the Plant safety
regulation.
3.28 Occupational health, hygiene and rehabilitation
All contractors are required to develop an Occupational Health, Hygiene and Rehabilitation
program. The program is intended to ensure that the risks to health are identified and controlled.
3.28.1 Medical Assessments
Note: Eskom will only accept medical surveillances conducted by an Occupational Health Practitioner
who holds a qualification in occupational health.
employees have a medical surveillance program whereby their employees undergo entry,
periodic and exit medical fitness examinations.
address the hazards that the employees will be exposed to.
man job specification, which must indicate the description of work, list of hazards and
potential occupational exposure limits, physical hazards and required physical attributes.
site. This shall be maintained until completion of the contract.
employees have undergone pre-entry medical examination before starting work on the
contract.
who are issued with a conditional certificate of fitness.
fitness certificates as and when their employees leave the company.
3.29 Roles and responsibilities
All contractors are required to list employee’s roles and responsibilities pertaining to the contract.
3.30 Personal protective equipment requirements
maintenance and replacement of PPE for all his employees and appointed contractors on
site.
Specification Standard 240-44175132.
to be issued to employees performing the respective tasks.
additional PPE, a risk assessment must be done, in which such PPE requirements will be
determined and issued.
worksites.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
contractor’s responsibility to provide the PPE.
with the relevant SANS standards.
be worn.
maintenance of PPE and keep the record.
3.31 Incident investigation
All incidents shall be investigated in terms of OHS Act General Administrative Regulations 8 and
9, using Eskom Procedure 32-95 OHS incident management as a reference, and where injuries
as contemplated in sections 24 and 25 have been sustained, be reported to the Department of
Employment and Labour.
Contractors shall use the Eskom Flash report to report incidents immediately or before end of shift.
The standard General Administrative Regulation Annexure 1 “Recording of an Incident form” for
all incident investigation reports. The objective of incident investigation, should not only be a legal
requirement, but should establish why and how the incident occurred and find out the real root
cause of the incident and to decide on precautionary measures that are required to address the
root cause to prevent any further recurrences of the same or similar incidents.
3.32 Emergency management
The art of emergency preparedness and response is to minimise the effects of any emergency and
to restore normal activities as soon as possible. The contractor must develop and align their own
Emergency response plan with Eskom’s to address any emergency which might arise at any given
point in time. The contractor to familiarise themselves with the Eskom emergency response plan
and procedure. Periodic emergency drills must be undertaken to test the effectiveness of their plan.
This must be recorded and provided on request.
3.33 Non-conformance and compliance
subject to discipline in terms of the Eskom Procurement and Supply Chain Management
Procedure.
in place) for issuing to contractors for transgressions. The procedure can include “quality”
related non-conformance issues. Similarly, appointed contractors must implement a non-
conformance procedure.
adhered to.
in not doing so; any recommendations made may not be implemented.
procedure will be for the offender to be called by the responsible project manager to
explain the non-conformance issued and what plan is in place to prevent a recurrence of
the non-conformance.
employees for the tasks being performed and/or to visitors; failure to enforce the wearing
of such PPE will be viewed as a transgression of the legislative and Eskom requirements.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
3.34 OHS files
about the safety and health management system from inception, execution to completion
of works.
than one site per project, a file per site shall be kept at that site. Contractors may keep
additional files at their head office as additional records. The OHS file shall be maintained
by all the contractors on their project sites and shall be available on request for audit and
inspection purposes.
requirements/specification, legal and other requirements.
this OHS requirements /specification and the OHS plan.
partition must be labelled.
health and safety file to the project manager.
cumbersome, the older documentation must be archived in boxes which shall be correctly
labelled and be available for auditing purposes. The archived documentation must be
handed over at the completion of the project.
3.35 WORK STOP. Any person may stop any activity where an unsafe act or unsafe condition that poses or
may pose an imminent threat to the safety and health of an individual or create a risk of
degradation of the environment. This includes any unauthorised work or service
performed by, or legally or contractually non-compliant acts or omissions by, any
contractor contracted to work at that site.
performance related to the contractor’s works or services shall not warrant any financial
compensation claim lodged against Eskom where the contractor has not met the
requirements defined legally or contractually.
custodians.
3.36 Hours of work
The requirements of the Basic Conditions of Employment Act, Chapter Two “Regulation of Working
Time” must be adhered to. All contractors are required to maintain an accurate record of time
worked by each employee.
3.36.1 Normal work
All work conducted on site shall fall within the legal requirements in accordance with the Basic
Conditions of Employment Act. Contractors will notify their Eskom Supervisor or project manager
of any work that needs to be performed after hours according to the agreed arrangements. (The
application needs to be submitted timeously). Where applicable, the notification should include
proof of application, for overtime, to the Department of Employment and Labour and /or the letter
of approval from the Department of Employment and Labour.
3.36.2 Night work
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
When night work is to be performed, the baseline risk assessment must be reviewed to include the
management of night work. Contractors shall provide sufficient lighting to enable the entire work
site to be illuminated to a degree that employees will not work in dark (un-illuminated) or dimly lit
areas. Care must be exercised as not to use few lights with high light intensives, as this will cause
night blindness.
If work is continuing from day light into night, at dusk, a tool box talk must be held where all
employees will be advised of the hazards of night work and the extra precautions which require to
be taken, i.e. poor housekeeping, stepping on uneven ground, stepping into holes etc.
3.36.3 Overtime
When overtime is required to be performed, the appointed contractors shall inform the Main
contractor of such action. The Main contractor shall inform the Eskom project manager of such
function and provide proof of exemption from the Department of Employment and labour.
Contractors shall be aware of the effects of human fatigue and regulate overtime accordingly. The
baseline risk assessment must be reviewed to include the management of overtime work.
3.37 Omissions from safety and health requirements specification
By drawing up this OHS specification Eskom has endeavoured to address the most critical aspects
relating to OHS issues in order to assist the contractor to adequately provide for the health and
safety of employees on site.
Should Eskom not have addressed all OHS aspects pertaining to the work that is tendered for, the
contractor needs to include it in the OHS plan and inform Eskom of such issues when signing the
contract.
3.38 Contractor performance monitoring
Contractor management is required to do the following as part of the continuous improvement
initiatives:
Business Unit Power Station General Managers meeting
3.39 Contract sign off
On completion of the project, all Eskom team must conduct the final audit, inspections, and
housekeeping to identify defects, outstanding actions, and open incident cases, and present their
findings to the contractor and Eskom contract manager, who must facilitate the closeout. Once
the contractor has closed all findings the Eskom’s team, will verify and sign off prior to issuing a
completion certificate and final payment.
3.40 ESKOM's RIGHT TO TERMINATE THE CONTRACT
The contractor/supplier shall at all times comply with Eskom’s occupational health and safety
(OHS), legal and other requirements as amended for the duration of the contract. In addition, the
contractor shall comply with the requirements contained in the SHE Specification. Eskom reserves
the right to terminate the contract in the event that the contractor has built up a history of poor
performance or non-conformance in relation to matters of Eskom OHS and legal compliance. No
work may commence until the health and safety file has been approved by Eskom OHS personnel.
The OHS Manager & Contracts Manager to authorise, include their names
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Date Rev. Compiler Remarks
February 2 T.Mofokeng The specifications were reviewed to align it with the scope of
2025 supply and delivery of Carbon Brushes.
May 2022 1 F Pooe This provides the initial OHS specification requirements that
must be met by the relevant contractors who have been
awarded a contract for the work to be performed for Eskom
Generation.
August 2015 0 F Pooe This provides the initial OHS specification requirements that
must be met by the relevant contractors who have been
awarded a contract for the work to be performed for Eskom.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 28
Supply Contract (SC3)
Between ESKOM HOLDINGS SOC Ltd
(Reg No. 2002/015527/30)
and TBA
(Reg No. ___________)
for Supply and delivery of Pneumatic Actuators to
Lethabo Power Station on an as and when required
basis for a period of five (5) years.
Contents: No of
pages
Part C1 Agreements & Contract Data 2
Part C2 Pricing Data 20
Part C3 Scope of Work
Financial Requirements
Source: Tender Documents.zip (RFP)Payment Terms: payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed
Compliance Requirements
Source: Tender Documents.zip (RFP)Insufficient searchable text - AI extraction recommended
joint venture agreement which incorporates a statement that all partners are
No specific requirements found
CSD report or as per certificate/affidavit provided
CSD number/CSD report) must be provided at the closing date and time for
CSD number or B-BBEE certificate/affidavit will need to be
ADDITIONAL CONTRACTUAL REQUIREMENTS SUPPORTING Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 68 File name: Invitation to Tender (ITT)_Actuators Supply And Delivery Of Pneumatic Actuators Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Identifier Invitation to Tender Effective Date 30 October 2025 Review Date October 2030 Reference Returnable From Suppliers at at ** closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable) to Tender Returnable Returnable Returnable Safety COIDA - Original certificate of good standing or proof √ of application issued by the Compensation Fund (COID) or a licensed compensation insurer (South African tenderers only) Quality Documents that may be required per scope of work √ Other safety/quality √ documents as required per scope of works Environmental Documents that may be required per scope of work √ Due
A signed copy of the public interest score (only applicable to South African entities that are not audited) o Giving the actual score o Indicating whether the company is owner managed or not Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 68 File name: Invitation to Tender (ITT)_Actuators Supply And Delivery Of Pneumatic Actuators Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Identifier Invitation to Tender Effective Date 30 October 2025 Review Date October 2030 Reference Returnable From Suppliers at at ** closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable) to Tender Returnable Returnable Returnable o Confirming whether the annual financial statements were externally prepared or not.
Copies of the ITA34C for the current & previous years of assessment (only applicable to South African entities that are not audited)
For unincorporated JV or a SPV, each partner in the JV or a SPV must submit its annual financial statements including all items listed above. DOCUMENTS REQUIRED UNDER FUNCTIONALITY/TECHINICAL CRITERIA Technical (required for Refer to the attached functionality requirements √ functionality scoring) ANNEXURE A AUTHORISATION FORM Indicate the status of the tenderer by ticking the appropriate box below. A B C D E F COMPANY CLOSE PARTNERSHIP JOINT SOLE TRUST CORPORATION VENTURE PROPRIETOR The tenderer must complete the appropriate certificate set out below for its category of organisation. If the tenderer is a company, close corporation, joint venture, or trust the tenderer must attach a certified copy the document that is proof of the contents of the certificate (resolution of the board of Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 68 File name: Invitation to Tender (ITT)_Actuators Supply And Delivery Of Pneumatic Actuators Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Identifier Invitation to Tender Effective Date 30 October 2025 Review Date October 2030 directors of a company, members’ resolution of a close corporation, power of attorney in the case of a joint venture, or resolution of the board of trustees of a trust). Note further that, in addition to completing the relevant certificate for category of organisation, the authorised representative of the tenderer is also required to complete and sign the table at the end of this Authorisation Form.
Certificate for company I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the board of directors of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by resolution of the board taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the company, and to sign all documents in connection with this tender and any contract that may result from it on behalf of the company. A certified copy of the resolution of the board is annexed to this Form. Signed: Date: Name: Position
Certificate for close corporation I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as member of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by majority vote of the members taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the close corporation, and to sign all documents in connection with this tender and any contract that may result from it on behalf of the close corporation. A certified copy of the members’ resolution is annexed to this Form. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 68 File name: Invitation to Tender (ITT)_Actuators Supply And Delivery Of Pneumatic Actuators Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Identifier Invitation to Tender Effective Date 30 October 2025 Review Date October 2030 Signed: Date: Name: Position
Certificate for partnership We, the undersigned, being the key partners in the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, to submit this tender on behalf of the partnership, and to sign all documents in connection with the tender and any contract that may result from it on behalf of the partnership. Name Address Signature Date NOTE: This certificate is required to be completed and signed by the full number of Partners necessary to commit the Partnership. Attach additional pages if more space is required.
Certificate for Joint Venture We, the undersigned, are submitting this tender offer in Joint Venture and hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, an authorised signatory of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , being the lead member in the Joint Venture, to sign all documents in connection with the tender and any contract that may result from it on behalf of all the members in the Joint Venture. This authorisation is evidenced by the attached power of attorney signed by the legally authorised signatories of all the members in the Joint Venture. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 68 File name: Invitation to Tender (ITT)_Actuators Supply And Delivery Of Pneumatic Actuators Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Identifier Invitation to Tender Effective Date 30 October 2025 Review Date October 2030 We attach to this Form a certified copy of the Joint Venture Agreement which incorporates a statement that all members in the Joint Venture are liable jointly and severally for the execution of the contract, a term that indicates which member will be the lead member, and terms that indicate the ratios according to which work and payment will be divided amongst the members. Name of JV member Address Authorised signature, name and capacity Lead member Member Member Member NOTE: This certificate is required to be completed and signed by all members of the joint venture. Attach additional pages if more space is required.
Certificate for sole proprietor I, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that I am the sole proprietor of the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Signed: Date: Name: Position:(Sole Proprietor)
Certificate for trust I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the board of trustees of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by resolution of the board of trustees taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the trust and to sign all documents in connection with this tender and any contract that may result from it on behalf of the trust. A certified copy of the resolution of the board of trustees is annexed to this Form. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 68 File name: Invitation to Tender (ITT)_Actuators Supply And Delivery Of Pneumatic Actuators Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Identifier Invitation to Tender Effective Date 30 October 2025 Review Date October 2030 Signed: Date: Name: Position: NOTE: The table below must also be fully completed by all tenderers in addition to the certificate that was selected and completed above. Name of tenderer: Full names of authorised signatory: Designation and capacity: Signature of authorised signatory Date of signature: ANNEXURE B ACKNOWLEDGEMENT FORM We are in receipt of the Invitation to Tender/Proposal from Eskom Holdings SOC Ltd and the following addenda issued by Eskom: We confirm that the documentation received by us is: (Indicate by ticking the box) Correct as stated in the Invitation to Tender / RFP Content List, and that each document is complete. Or: Incorrect or incomplete for the following reasons: Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 68 File name: Invitation to Tender (ITT)_Actuators Supply And Delivery Of Pneumatic Actuators Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
NOTE: the supplier/contractor/tenderer has to ensure that he/she understands the OHS requirements listed hereunder.
The supplier/contractor/tenderer is expected to comply to the following documents when working at/rendering a service to Eskom but not limited to the following
Eskom contractor Health and Safety requirements standards 32-136
OHS specification/requirements provided
Occupational Health and Safety Act
Compensation for Occupational Diseases and Illnesses Act Note: Please note that after contract award, it is your responsibility to fully align the company’s processes to Eskom’s OHS requirements (policies, procedures, standards etc).
Penalties shall be enforced on the main supplier for non-conformance/s (identified for the main supplier and/or its contractor and/or supplier) pertaining to Eskom and/or Statutory OHS requirement/s.
Ensure that all employees (contractors/suppliers) undergo the relevant Eskom induction and the company’s
Management of Contractors/ Suppliers The main contractor/supplier
Has to demonstrate to Eskom the process and selection criteria applied when appointing contractors and suppliers.
Has to provide notification to Eskom, prior to the appointment of contractors or suppliers for the commencement of work.
Has to ensure that contractors/ suppliers have adequate resources and competencies.
Is accountable for the management of its contractors/ suppliers in order to ensure that the applicable legal and Eskom requirements (that are applicable to the main supplier during contract execution) are complied with by the contractors or suppliers.
The main supplier shall monitor contractors or suppliers through audits and assessments with regard to OHS compliance during the execution of the work.
The grounds for the termination of work done by contractors/suppliers shall be provided by the main supplier.
All non-conformances/non-compliance by the contractors/suppliers (all tiers) to the main supplier shall be dealt with directly with the main contractor/supplier in terms of performance and penalty processes.
Eskom reserves the right to verify this when deemed necessary. The contractor may be instructed to provide copies of testimonials/references and the contact detail of clients (including Eskom) for whom the Company has done previous work of a similar nature I, the undersigned, hereby acknowledge that I have obtained copies of the above documents and confirm that I fully understand them and the consequences of non-compliance. Signed at ................................................ on ........ day of .................................. 20............ Public When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30. of 2 Template Annexure B: Eskom Identifier 240-43921804 Rev 5 Acknowledgement Form for Document 240-77471499 Rev 3 OHS legal and other Identifier requirements Effective Date May 2021 Company/Supplier Name
Name of Authorised person (CEO/Director/ Managing Director)
Signature Date Witness 1 ......................................... Witness 2 ........................................ Public When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30. of 2
completion certificate and final payment
B-BBEE Minimum Level: 1
Points Allocation: 20 points
B-BBEE Details: m previously disadvantaged Communities around
Sedibeng and Fezile Dabi District Municipalities
Note: SDLI objectives shall be sourced from previously disadvantaged Communities around
Sedibeng and Fezile Dabi District Municipalities.
3.1. Transformation – BBBEE Improvement or Retention Plan
Transformation remains an area of focus, where Eskom continuously strives to align itself with national
transformation imperatives to unlock growth, drive industrialization, create employment and contribute
to skills development. Eskom encourages its suppliers to constantly strive to improve their B-BBEE
rating. Whereas Tenderer/s will be allocated points in terms of a preference point system based on
specific goals, Eskom also requests that tenderer/s submits their B-BBEE improvement or retention
plan within 30 days of signing the contract.
Tenderer/s are therefore requested to indicate the extent to which they will maintain (only if the
respondent is a Level 1) or may improve/maintain their B-BBEE status over the contract period if their
B-BBEE status is level 2 or 3. Tenderer/s with a B-BBEE status level 4 at the time of contract award,
shall migrate and achieve as a non-negotiable a milestone of B-BBEE Level 3 by the end of the first
year of the contract and thereafter improve their B-BBEE status level or migrate by one level higher.
Tenderer/s with a B-BBEE recognition status of Level 5 to Level 8 or non-compliant at the time of
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduce
Section
Source: Tender Documents.zip1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.11 Tax Evaluation questionnaire to determine whether a Attached Y
3.13 Functionality requirements
Qualitative technical evaluation criteria
Table 1: Mandatory Technical Evaluation Criteria
The evaluation of the tenders will be based on the tenderer’s ability to meet the requirements defined under the
will not be used for evaluation purposes.
questionnaire seeking YES or NO response from the tenderers with no point scores or weighted
consideration or short listing for detailed technical evaluation. Gatekeepers will be minimum criterion
will score 0 points for Specific goals (out of 20)
documents/proof of specific goals for purpose of evaluation and
other aspects). The tenderer will, however, be scored zero for
specific goals for purposes of PPPFA scoring and ranking.
the [90/10 or 80/20] system. Eskom will add the score from Pricing
and Specific Goals together and rank the suppliers from the highest to
Eskom will then add the score from Pricing and Specific goals
Actuators 70%
QMS (Quality latest ISO 9001 certification or proof of QMS. deliverables meet the required quality
established Quality Management
to quality assurance and continuous either ISO 9001 certification or
quality assurance and process control
Table 2: qualitative technical evaluation criteria - returnable
The minimum weighted final score (threshold) required for a tender to be considered from a technical perspective
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Eskom Holdings SOC Limited - Viljoensdrift, Deneysville - Vereeniging - 1930
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
11 Sept 2026
AI status
Not enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A technical guide to municipal electrical tenders. Covers CIDB EB/EP grading, electrification projects (INEP), substation maintenance panels, and COC compliance.
A strategic guide for medical equipment suppliers, maintenance companies, and healthcare technology providers bidding for tenders across South Africa's nine provincial health departments. Covers SAHPRA registration, OEM authorisation, service level agreements, and technical evaluation criteria.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
A comprehensive guide to securing medical equipment maintenance tenders in South African public hospitals. Learn about SLA management, OEM certifications, and clinical engineering requirements.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: Electrical Equipment. Unlock full pricing strategies, bid frequency, and historical win rates.