Tender Type
Request for Bid(Open-Tender)
Delivery Location
Steenbokpan Road - Onverwacht - Lephalale - 0555
Organization Type
GOVERNMENT
Published
13 Aug 2026
OCDS Reference
ocds-9t57fa-165414
ESKOM is procuring staff bus transportation services for the medupi power station project in limpopo. Bidders must submit a complete original tender plus one hard copy, comply with all mandatory returnables by the closing deadline, and meet eskom's eligibility and compliance requirements. The most consequential requirement is that failure to submit the required hard copy or mandatory documents by the deadline results in disqualification.
Closing date and time: 28 August 2026 at 10:00 SAST (Telkom time signal).
Submission: one complete original tender plus one (1) complete hard copy, in English, written in ink, signed by an authorised signatory, sealed in separate packages marked "ORIGINAL" and "COPY", then placed in an outer package marked "CONFIDENTIAL" with only the Eskom address and Invitation to Tender number.
Mandatory returnables must be submitted by the closing deadline; they cannot be provided after the deadline. This includes the Acknowledgement Form and, if applicable, an authenticated copy of authority to act as agent.
Bidders must not be under any restriction to do business with Eskom or State Owned Companies, and tenders based on 100% sub-contracting are ineligible.
Proof of CSD registration is required; where CIDB applies, proof of CIDB registration must be submitted by the closing deadline (or proof of application by closing, with actual CIDB printout by contract award).
A valid B-BBEE certificate or affidavit (or CSD number/report) must be provided; if B-BBEE level is a pre-qualification criterion, proof must be at submission deadline or the tender is disqualified.
The SD&L (Supplier Development & Localisation) Undertaking must be completed and submitted by contract award; failure to do so means the tender will not be considered for award.
If security for performance is required, bidders must name at least two (2) financial institutions they are likely to approach for the security.
Date & Time
Friday, 28 August 2026 - 10:00
Venue
https://teams.microsoft.com/meet/34355745672118?p=DKBoAWxw5Znwyr1bUG
Categories
Request for Bid(Open-Tender)
Steenbokpan Road - Onverwacht - Lephalale - 0555
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: 348-860846 Environmental Policy Rev 08.pdf, 348-31313 Medupi Amended Water Use License Rev 1 December 2020 (Station).pdf. You don’t need to refresh — this page will pick up the updated review automatically.
13 Aug
2026
Tender Published
Tender was published
28 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Blank Pricelist New Bus Contract - 17032026.pdf
Provision of staff bus transportation services for the Medupi Power Station project, including scheduled routes and ad hoc services, for Eskom.
348-860846 Environmental Policy Rev 08.pdf
348 - 681011 Medupi EMP Revision 2 - September 2010.pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station construction project in Lephalale, Limpopo. The service involves transporting staff to and from the power station site, which is under construction and will employ up to 7,400 people at peak. The tender is managed by Eskom's Medupi Execution Team, with environmental compliance governed by the project's Environmental Management Plan.
Tech Evaluation Strategy Bus_Transportation Medupi .pdf
Eskom Medupi Power Station is procuring staff bus transportation services for employees, covering daily home-to-work and work-to-home routes within the Lephalale area (Onverwacht, Lephalale Town, Marapong). The tender is evaluated on a technical scorecard with a minimum qualifying threshold of 75%, assessing bidder experience, bus specifications, driver compliance, and physical vehicle inspection.
348-10082055 Environmental File for contractors Rev 0 - Final.pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station project in Limpopo. The document provided is an environmental file evaluation checklist that contractors working at Medupi must comply with, covering environmental approvals, management plans, and safety procedures.
240-109253698 Template for a Typical Contract Quality Plan.pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station project in Limpopo. The tender requires bidders to provide a Contract Quality Plan (CQP) in line with the supplied template, covering quality management for the service.
SOW Bus Transport Contract (003)-348-10125421.pdf
Eskom is procuring staff bus transportation services for employees at the Medupi Power Station project in Limpopo, covering home-to-work-to-home routes in Onverwacht, Lephalale Town, and Marapong, with ad hoc weekend and stakeholder transport. The contract runs for 17 months starting 1 August 2026, initially serving approximately 80 employees using 22-seater buses.
348-10131333 SHE Spec for Provision of Transportation Final.pdf
Analysis completed but response format was invalid
348-880696 SPCC Work Instruction Rev 4 - Final.pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station Project in Limpopo, with the closing date of 28 August 2026. The tender requires bidders to provide reliable bus services for staff, likely involving daily commutes to and from the power station site.
348-882048 Medupi EMS Scope and Manual Rev 9_ Final.pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station project in Limpopo. The service involves providing staff transport, with the contract closing on 28 August 2026. The tender is managed by Eskom, and the service will be delivered at the Medupi Power Station site.
348- 275284 Environmental Audit Work Instruction Rev 10- Final (003).pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station project in Limpopo. The tender is open until 28 August 2026, and the successful bidder will be responsible for providing reliable transport for staff to and from the power station site.
240-105658000 Supplier Quality Management Specification Rev. 3.pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station project in Limpopo. The tender requires bidders to comply with Eskom's Supplier Quality Management specification (240-105658000), which mandates a quality management system conforming to ISO 9001 and submission of quality documentation depending on the applicable category.
Medupi PS Project Aspect & Impact.pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station project in Limpopo. The tender includes an Environmental Aspects and Impacts Register for the construction phase, detailing environmental management requirements, controls, and monitoring procedures that the service provider must adhere to.
NEC - Document.pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station Project in Limpopo, providing home-to-work-to-home transport for approximately 80 employees using 22-seater buses, with ad hoc services for weekends and stakeholder engagements within a 90 km radius. The contract is a NEC3 Term Service Contract (TSC3) with a 14-month service period, priced under Option A (rates-based).
348-22367 Medupi Waste Management Work Instruction Rev 8.pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station project in Limpopo. The service involves providing reliable, safe, and compliant bus transport for staff, likely to and from the power station site, with the contract closing on 28 August 2026.
Blank Pricelist New Bus Contract - 17032026.xlsx
Staff bus transportation services are being procured for the Medupi Power Station project, covering scheduled trips from Marapong, Onverwacht, and Lephalale to the Medupi site, as well as ad hoc and daily hire of 22-seater buses. The contract is issued by Eskom in Limpopo.
348-389557 Medupi-Matimba Contractor Quality Specification Rev 5 ._.pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station project in Limpopo. The tender is governed by a comprehensive Contractor Quality Specification (348-389557) that mandates a project-specific Quality Management System compliant with ISO 9001:2015, including quality assurance, control, inspection, and testing requirements.
348-693723 Environmental Incident Management Procedure Rev 9.pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station project in Limpopo. The service involves providing bus transport for staff, with the contract closing on 28 August 2026. Bidders must comply with Eskom's environmental incident management procedures, including notification, reporting, investigation, and corrective action requirements.
Invitation to Tender (ITT).pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station project in Limpopo, with the contract covering the provision of buses, drivers, and related services to transport employees. The tender is open to suppliers who can meet the experience, vehicle, driver, and safety requirements, with a preference for local taxi associations in the Lephalale area.
348-717685 Handling of Environmental Nonconformances Rev 9- Final.pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station project in Limpopo. The tender is issued by Eskom Holdings SOC Ltd and requires bidders to provide transportation services for staff at the Medupi site.
240-68099512 Form A Rev 9.pdf
Staff bus transportation services for the Medupi Power Station project, procured by Eskom, with tender and contract quality requirements aligned to ISO 9001.
E-Tenderers E-Tendering Training Acknowledgement Form.pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station project in Limpopo, requiring bidders to complete e-tendering self-training and submit an acknowledgement form as a mandatory returnable.
240-77037682 - Occupational Health and Safety Act Section 37(20 Agreement Form - Rev 7.pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station project in Limpopo, with the contract governed by a Section 37(2) agreement under the Occupational Health and Safety Act. The contractor must comply with SHE specifications and ensure all work and plant use adheres to the Act.
348-31313 Medupi Amended Water Use License Rev 1 December 2020 (Station).pdf
Provision of staff bus transportation services for the Medupi Power Station project, issued by Eskom in Limpopo. The service involves transporting staff to and from the power station, with the tender closing on 28 August 2026.
348-275237 Environmental Communications Procedure Rev 09_signing.pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station project in Limpopo, with bids closing on 28 August 2026. The service involves transporting staff to and from the power station site, and bidders must comply with the project's environmental communication and management procedures.
Enviromental objectives - 2025 &2026 FY.pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station project in Limpopo. The tender requires bidders to provide reliable transport for staff, with the contract running under Eskom's environmental and safety management framework.
348-631731 Medupi RoD all conditions.pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station project near Lephalale, Limpopo. The service involves providing bus transport for staff, likely to and from the power station site, under a contract to be awarded by Eskom.
Eskom - Standard Conditions of Tender (May 2022 update).pdf
Eskom is procuring staff bus transportation services for the Medupi Power Station project in Limpopo. The tender is governed by Eskom's Standard Conditions of Tender, which set out strict submission, compliance, and evaluation requirements.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 234 900
Range
Based on 13 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: 348-10131333 SHE Spec for Provision of Transportation Final.pdf (unknown)The document is a Safety, Health and Environmental (SHE) specification for the provision of bus transport services at the Medupi Power Station project. It sets out the minimum legislative and organisational SHE requirements for all works related to the bus transport services. The Principal Contractor is required to develop an OHS plan that meets these requirements and applicable legislation. The specification applies to all Principal Contractors, Contractors, Service Providers, and Consultants in all activities and processes carried out for and on behalf of Medupi Power Station Project. Where the work scope does not fall within the definition of the Construction Regulations 2014, the specification shall also apply as a minimum.
Evaluation Criteria
Source: 348-10131333 SHE Spec for Provision of Transportation Final.pdf (unknown)Unable to extract eligibility criteria
Technical Specifications
Source: 348-10131333 SHE Spec for Provision of Transportation Final.pdf (unknown)The document is a Safety, Health and Environmental (SHE) specification for the provision of bus transport services at the Medupi Power Station project. It sets out the minimum legislative and organisational SHE requirements for all works related to the bus transport services. The Principal Contractor is required to develop an OHS plan that meets these requirements and applicable legislation. The specification covers areas such as legislative compliance, Section 37(2) agreement, OHS Act, COIDA, SHEQ policy, Eskom Life-saving Rules, appointments and training, safety culture, substance abuse, occupational health and hygiene, emergency care and preparedness, fire safety, SHE training, access and security, hazard identification and risk assessment, safe work procedures, PPE, vehicle safety, housekeeping, hazardous materials management, incident management, environmental management, SHE plan and file, auditing, reporting, and work stoppage.
Methodology
Source: 348-10131333 SHE Spec for Provision of Transportation Final.pdf (unknown)The specification requires the Principal Contractor to develop a SHE plan and related procedures, including method statements, safe work procedures, and a hazard identification and risk assessment (HIRA) process. It mandates daily safety task instructions (DSTIs) and job safety analyses (JSAs) to be conducted at the workplace, with no generic hazards accepted. DSTIs must be amended when the work activity changes, and must be compiled and conducted at the workplace, not in offices. Supervisors and safety officers must sign and acknowledge that the DSTI was checked for quality and correctness. No work shall be done unless DSTI/JSA has been presented and signed by all team members. Employees have the right to stop any work or refuse to work if risks and hazards are not properly identified and/or controlled effectively.
Experience & Qualifications
Source: 348-10131333 SHE Spec for Provision of Transportation Final.pdf (unknown)The specification requires the Principal Contractor to provide a list of employees with their skills and licenses, and to ensure that appointments and competencies are in line with the OHS Act and Construction Regulations. The contractor must have a disciplinary process and organisational structure. The contractor must provide a proposed OHS resource plan, highlighting the reporting structure from their Senior Management (Chief Executive) down to their project employees, with position titles, names of appointees, qualifications, and competencies for each position. The contractor must ensure that all appointed contractors comply with this requirement.
Quality Management
Source: 348-10131333 SHE Spec for Provision of Transportation Final.pdf (unknown)The specification references ISO 9001, ISO 45001 and ISO 14001 as normative standards. It includes requirements for auditing, non-conformance management, and compliance monitoring. The contractor must undergo Eskom SHE audits, contractor audits, and third-party legal compliance verification audits. The contractor must have a SHE plan and SHE file, and must comply with the Medupi/Matimba Contractor Quality Specification.
Compliance Requirements
Source: 348-10131333 SHE Spec for Provision of Transportation Final.pdf (unknown)The Principal Contractor must comply with the OHS Act, Construction Regulations 2014, COIDA, NEMA and related environmental legislation. The specification references ISO 9001, ISO 45001 and ISO 14001 as normative standards. The contractor must have a Section 37(2) legal agreement in place. The contractor must ensure all employees undergo site induction before commencing work and receive a site access permit. The contractor must provide a list of all employees with their skills and licenses, and maintain records of induction, skills and licenses in the OHS file. The contractor must have a disciplinary process and an organisational structure to deal with transgressions. The contractor must develop a SHE plan and related procedures, including method statements, safe work procedures, and a hazard identification and risk assessment (HIRA) process. Daily safety task instructions (DSTIs) and job safety analyses (JSAs) must be conducted at the workplace, with no generic hazards accepted. The contractor must appoint competent persons in line with the OHS Act and ensure they are suitably trained and informed of their responsibilities.
Health & Safety
Source: 348-10131333 SHE Spec for Provision of Transportation Final.pdf (unknown)The specification requires the Principal Contractor to develop an OHS plan that meets the requirements of the OHS Act and applicable legislation. It mandates compliance with Eskom Life-saving Rules, behavioural safety observations (BSO) and visible felt leadership (VFL). The contractor must implement a substance abuse procedure, smoking policy, and cellular phone policy. The contractor must have an occupational hygiene management program, employee health and wellness programme, medical surveillance programme, employee assistance programs, and rehabilitation. The contractor must provide emergency care (first aid) and have emergency preparedness and response plans, including fire safety plans and fire equipment maintenance. The contractor must conduct SHE training including induction training, site-specific induction, visitor induction, and general training. The contractor must implement access and security control, public safety measures, hazard identification and risk assessment (HIRA), safe work procedures and method statements, planned task observations, and PPE requirements. The contractor must comply with construction vehicle and private vehicle safety rules, housekeeping and order, hazardous materials/chemicals/agents management, refuelling at the construction site, record keeping, and incident management. The contractor must have a SHE plan and SHE file, and must participate in reporting and SHE governance including OHS performance status reports, environmental monthly inspection reporting, emergency coordinators meetings, SHE managers meetings, contractors environmental meetings, statutory health and safety committees, and toolbox talks/daily team talks/pre-job meetings. The contractor must allow employees the right to refuse to work in an unsafe situation and must comply with work stoppage requirements. The contractor must adhere to hours of work including normal work, night work, and overtime.
Environmental
Source: 348-10131333 SHE Spec for Provision of Transportation Final.pdf (unknown)The specification includes environmental management requirements such as spillage of hazardous chemical agents, fire hazard, waste management, bus maintenance, dust and noise control, environmental incidents, water management, and maintenance of an environmental file. It references the Environmental Management Plan for the Medupi Coal-fired Power Station, the Record of Decision, Atmospheric Emission Licence, and other environmental legislation. The contractor must comply with NEMA and related legislation, and must have an environmental file. The contractor must appoint competent employees who meet the requirements of the OHS Act and Medupi Power Station's environmental approvals/authorisations.
Contractual Terms
Source: 348-10131333 SHE Spec for Provision of Transportation Final.pdf (unknown)The specification defines roles and responsibilities of the Client (Eskom General Manager, Contract Manager, Health and Safety Manager, Environmental Practitioner, Independent Environmental Control Officer) and the Principal Contractor. The Principal Contractor carries primary accountability for health, safety and environmental compliance of their employees and contractors, as per Section 37(2) of the OHS Act and NEMA. The contractor must have a disciplinary process and organisational structure. The contractor must provide a list of all employees and contractor employees on site, updated as new employees commence. The contractor must keep records of all employees including date of induction, relevant skills and licenses, filed in the OHS file.
Description
Source: 348-882048 Medupi EMS Scope and Manual Rev 9_ Final.pdf (unknown)This document defines the scope of the Medupi Power Station Project's Environmental Management System (EMS) and the method for controlling EMS documents. It applies to the project management, construction management and commissioning of the Medupi Power Station by Team Medupi. Principal Contractors, direct Suppliers and Consultants must comply with requirements defined in procedures emanating from this manual, and must also comply with all relevant legal and contractual requirements. Contractors are viewed as employers in their own right in relation to their scope of work.
Important Dates
Source: 348-882048 Medupi EMS Scope and Manual Rev 9_ Final.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ive Action (348-717865).","is_compulsory":false}"}
Contact Information
Source: 348-882048 Medupi EMS Scope and Manual Rev 9_ Final.pdf (unknown){"name":null,"email":null,"phone":null,"department":"ies ........................................................... 19","address":"............................................................................................................... 19"}
Evaluation Criteria
Source: 348-882048 Medupi EMS Scope and Manual Rev 9_ Final.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD). Bidders must have a valid Tax Clearance (SARS TCS) and be B-BBEE compliant. Bidders must complete and submit all required SBD forms, including SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), and SBD 9 (Certificate of Independent Bid Determination).
Technical Specifications
Source: 348-882048 Medupi EMS Scope and Manual Rev 9_ Final.pdf (unknown)The purpose of this document is to define the scope of the Medupi Power Station Project’s EMS, as
well as the method of controlling documents required by the EMS and their relationship within the
EMS. This document also provides an overview of how roles and responsibilities are structured
within the system.
The scope of the EMS, and this Document, relates to the Project Management, Construction
Management and Commissioning of the Medupi Power Station project by Team Medupi. The
contents of this Manual shall be applied by the Medupi Project Team. Requirements placed upon
Principal Contractors, direct Suppliers and Consultants are specifically defined in procedures
emanating from this Manual. It should also be noted that conformance (or non- conformance) with
this Manual, or any other part of the TM EMS, does not absolve Principal Contractors, Suppliers or
Consultants from complying with relevant Legal or Contractual requirements. Contractors are
specifically viewed as Employers in relation to their particular Scope of Work.
Contractors are required to provide information to TM as per contractual/legal or other requirements,
to demonstrate compliance to legal and other requirements/environmental specifications particular
to their Scope of Works.
2.1 Scope
This document provides the Medupi Power Station Project with guidance on conforming to the
requirements of the Environmental Management Systems (EMS) during the construction of Medupi
Power Station project.
2.1.1 Purpose
The purpose of the document is to describe the complete system used to manage the construction
of Medupi Power Station project, to detail activities, responsibilities, requirements and controls to
manage the project’s environmental requirements.
2.1.2 Applicability
This document shall apply to Medupi Power Station Project.
2.1.3 Effective date
Authorization date will be the effective date.
2.2 Normative/Informative References
Parties using this document shall apply the most recent editions of the documents listed in the
following paragraphs.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
2.2.1 Normative
[1] ISO 9001 Quality Management Systems - Requirements
[2] 348-961711 Project Execution Plan
[3] 348-883902 Project Quality Plan
[4] 348-653867 Development and Change of Medupi QMS Documents
[5] 348-883808 Document and Record Management Procedure
[6] 348-639974 Unit Construction Work Instruction
[7] ISO 14001 Environmental Management Systems, Requirements with guidance for use
[8] 32-95 Eskom Environmental, Occupational Health and Safety Incident Management
[9] 348-681011 The Environmental Management Plan for the Medupi Coal-fired Power Station in
the Lephalale Area, Limpopo Province – The Construction Phase, Rev 2, 2010
[10] 348-860848 Medupi Environmental Policy
[11] 32-249 Environmental Liaison Committee Performance Indicators Reporting Procedure
[12] 240-91688868 Emergency Preparedness and Response Plan
[13] 348-693723 Environmental Incident Management Procedure
[14] 348-717685 Procedure for the handling of Environmental Non-conformities and Corrective
Actions
[15] 348-275284 Environmental Audit Work Instruction
[16] 348-275237 Environmental Communications Work Instruction
[17] 348-646829 Register of EMS Procedures, Operational Controls and Records Master List
[18] 348-614061 Risk Management Plan
2.2.2 Informative
[1] The Constitution of the Republic of South Africa Act
[2] National Environmental Management Act ()
[3] National Water Act
[4] National Environmental Management Act: Air Quality Act
2.3 Definitions
Term Explanation
An action either planned, actual (existing) or historical, that
Activity
occurs or is performed by employees on behalf of the company.
Actual completion date Real date when an action is completed.
Competence Ability to apply knowledge and skills to achieve intended results.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
Term Explanation
An employer who performs construction work and includes
Contractor principal contractors. Contracted companies are specifically
viewed as employers in their own right, as per the OHS Act.
Employee An individual in the full-time or part-time / occasional employ of
Medupi Power Station Project Team
Environment The surrounding in which humans exist that is made up of:
i. the earth’s land, water and atmosphere,
ii. micro-organisms, plant and animal life,
iii. any part or combination of (i) and (ii) and the interrelationship
among and between them and
iv. the physical, chemical, aesthetic and cultural properties and
conditions of the foregoing that influence human health and
well being
Environmental aspect An element of an organisation’s activity, product and service that
can have a beneficial or adverse impact on the environment.
Environmental Management A documented plan or programme which captures short-,
Plan/Programme medium- and long-term actions aimed at addressing
environmental management at the Station.
Environmental Practitioner Individual working in the Environmental Department, which
includes the trainees, officers, senior advisors and manager.
Interested and affected part Person or organisation that can affect, be affected by or perceive
itself
Kick-off meeting The initial gathering of the project team and contractor/service
provider at the start of the new project. Its purpose is to
communicate key project information, introducing project team
members, and establish a shared understanding of the project’s
goals, scopes and timelines.
Life cycle Consecutive and interlinked stages of a product or service, from
raw material acquisition or generation from natural resources to
final disposal.
Mobilisation The process of a contractor/service provider preparing to
commence work on a contract after it has been awarded. This
involves ensuring all resources, personal, and infrastructure are
in place before work begins.
Team Staff All employees under Medupi project.
Target completion date A specific date set for a specific action to be completed.
A functional responsibility allocated to an Environmental
Unit Area
practitioner based on plant area and responsible contractors.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
2.4 Abbreviations
Abbreviation Explanation
Doc. Centre Documentation Centre
EDMS Electronic Document Management System/s
EMC Environmental Monitoring Committee
EMP Environmental Management Plan
EMP/EMPr Environmental Management Plan/Programme
EMS Environmental Management System
HCS Hazardous Chemical Substances/Agents
RACI Responsible, Accountable, Consulted, Informed
SPO Smart Plant Operator
UNESCO The United Nations Educational, Scientific and Cultural Organization
2.5 Roles and Responsibilities
The Health, Safety and Environmental Manager will delegate a responsible person/s for each
Department who will:
Environmental management system roles, responsibilities and authorities have been identified as
per Table 1 below. Each EMS Procedure referenced from this Manual also provides for a RACI
Matrix defining roles and responsibilities particular to that Procedure.
The Management of the Team Medupi will jointly provide the resources essential to the
implementation and control of the EMS, including training, human resources, specialty services,
financial resources, technical and informational services.
The Health Safety and Environmental Manager is the EMS Management Representative and
oversees the establishment, operation and maintenance of the EMS. These responsibilities may
from time to time be delegated. The TM environmental department provide specific support. The
Project’s environmental organisational structure and line communication is depicted pictorially in
Figure 4. Each member of the TM is expected to comply with applicable elements/requirements of
the EMS.
Principal Contractors, and subcontractors, shall conform to requirements of the TM EMS were
indicated in specific procedures, but shall in all cases comply with the relevant Project Agreements
and applicable statutory and regulatory requirements. (Principal) Contractors are Employers in their
own right and therefore must ensure compliance to all Legal and Other Requirements. Environmental
roles and responsibilities of (Principal) Contractors are also expanded upon in the Medupi
Construction Environmental Management Plan Rev 2, 2010 (SPO No. 348-681011).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
Table 1:RACI Matrix Key
R - Responsible Those who do the work to achieve the task. There is at least one role with a
type of participation, although others can be delegated to assist in the work
required.
A – Accountable The one ultimately answerable for the correct and thorough completion of the
(also approver or deliverable or task, and the one who delegates the work to those responsible.
final approving In other words, an accountable must sign off (approve) work that responsible
authority) provides. There must be only one accountable specified for each task or
deliverable.
C - Consulted Those whose opinions are sought, typically subject matter experts; and with
(sometimes whom there is two-way communication.
counsel)
I - Informed Those who are kept up to date on progress, often only on completion of the
task or deliverable; and with whom there is just one-way communication.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
Table 2: RACI Matrix
General Team Medupi Team Departmen Contract Health, Safety and Environmental ECO Contractors
Process Step/Activity Manager Construction Medupi tal Managers Environmental Practitioners
Manager Staff Managers Manager
Context of the Organization
Understanding the A C I C R R R C I
organization and its context
Understanding the needs A C I C R R R C I
and expectations of
Interested parties
Determining the scope of the A C I R R R R I I
Ems
Leadership
Leadership and Commitment A R I R R R R I I
Environmental Policy C I
A c i c a r i
(compilation)
Environmental Policy A R R R R R R I R
(implementation and
operation)
Organizational Roles and A R R R R R R R R
Responsibilities
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
General Team Medupi Team Departmen Contract Health, Safety and Environmental ECO Contractors
Process Step/Activity Manager Construction Medupi tal Managers Environmental Practitioners
Manager Staff Managers Manager
Planning
Environmental Aspects I C C C R A R I R
Compliance Obligations A R R R R R R R R
Objectives & Targets A R R C R R R I R
Support
Resources A R C R R R R I R
Competence A R C R R R C I R
Awareness A R I R R R R I R
Internal Communication C R R R I A R I R
External Communication A C I C C R I R I
Documented Information A R R R R R R R R
Operation
Operational Planning and A R R R R R R I R
Control
Emergency Preparedness A R R R R R R I R
Performance Evaluation
Monitoring, measurement A C C C C R R I R
and analysis
Evaluation of compliance A C C C C R R R R
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
General Team Medupi Team Departmen Contract Health, Safety and Environmental ECO Contractors
Process Step/Activity Manager Construction Medupi tal Managers Environmental Practitioners
Manager Staff Managers Manager
Internal audit A C C C C R R R R
Management review A R R R R R R I I
Improvement
Nonconformity and A R R R R R R R R
corrective action
Incident management A R R R R R R R R
Continual Improvement A R R C R R R R R
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
2.6 Related/Supporting Documents
See section 2.2 of this manual.
3.1 Process map/Flow Chat
Not compiled.
3.2 Context of the Organisation (COTO)
Medupi Power Station project is committed to determining its position in the marketplace and
understanding how relevant factors arising from legal, political, economic, social and technological
issues influence its strategic direction and which define its organizational context.
Medupi Power Station project identifies, analyses, monitors and reviews factors that may affect its
ability to satisfy its customers and stakeholders, as well as; factors that may adversely affect the
stability and integrity of its processes and management system.
To ensure that our organizational context is aligned with our strategy, whilst taking account of
relevant, influential, internal and external factors; Medupi Power Station project collates and
analyses information pertinent to those influential factors to identify issues that have the potential to
be affected by our activities, products and services. Similarly, we identify internal and external issues
that could be capable of affecting our organization’s ability to deliver products, services or activities.
Medupi Power Station project collates, assesses and reviews information about these relevant
influential factors to ensure that a continual understanding of each factor and its effects is derived
and maintained to develop our contextual intelligence. To facilitate the understanding of our context,
our Top management team regularly consider these issues using SWOT and PESTLE analysis to
determine and plan for issues that may influence our business. These are reviewed during
management review meetings, the results of which are recorded and conveyed via meeting minutes,
revised objectives, policies, and business planning documents where appropriate.
The output from this activity is evident as an input to the consideration of risks and opportunities,
and the actions that we take to address them. For more information about our risk and opportunity
management framework, refer to Section 3.4.1.
The following lists will form part of the context of the organisation, the context will guide priorities for
the organisation, mitigation or corrective actions shall be addressed at different platforms including
management meetings, stakeholder meeting etc.:
3.2.1 Understanding the Organisation and its Context
The Medupi Power Station Project determined external and internal issues that are relevant to its
purpose and that affect its ability to achieve the intended outcomes of its environmental management
system. Such issues include environmental conditions being affected by or capable of affecting the
organisation. External and internal issues are captured in the external and internal register template
(348-10102307). See document number 348-10102500 for detailed Medupi Power Station Project
identified external and internal issues.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
3.2.2 Relevant Interested Party/ies
Medupi Power Station project recognizes that we have a unique set of interested parties whose
needs and expectations change and develop over time, and furthermore; that only a limited set of
their respective needs and expectations are applicable to our operations or to our EMS. Medupi
Power Station Project has determined the interested parties that are relevant to the environmental
management system; the relevant needs and expectations of these interested parties; and which of
these needs and expectations become its compliance obligations. Such needs and expectations are
identified and captured in register template (348-10102302) with unique identifier (348-1010249).
3.2.3 EMS Scope
The scope of the EMS covers all construction activities on the physical Medupi Power Station Project
Site property located within Lephalale local municipality, Limpopo province, as well as the footprint
of adjacent properties where related construction activities are conducted.
This manual applies to all existing or planned activities, products and services at the Medupi Power
Station Project (construction and commissioning stages), under normal, abnormal and emergency
conditions, as well as to employees and contractors.
Medupi power station project FGD and all areas that fall under Medupi Generation (Gx) are excluded
from the current scope of the EMS. FGD Plant shall only form part of the EMS scope upon the
commencement of the construction phase.
Medupi Flue Gas Desulfurization Plant (FGD)
The Medupi Power Station Flue Gas Desulfurization (FGD) Retrofit Project will consist of the addition
of FGD systems to six 800-megawatt (MW) coal fired steam electric generating units. The FGD
Project will result in the addition of wet limestone open spray tower FGD systems to each of the
operating units.
Each of the Medupi Power Station units has been designed and constructed with provisions
incorporated into the space and equipment design to accommodate the installation of FGD systems.
Each of the six FGD absorbers will treat the flue gas from one boiler; commercial-grade saleable
gypsum, chemical sludge and chemical solids will be produced as by-products. A cluster of three
absorbers will be located near each of the plant’s two chimneys. Systems for makeup water,
limestone preparation, FGD by-product (gypsum) dewatering, and storage/disposal and treatment
of the wastewater stream will be common to all FGD absorbers in the plant.
The FGD areas can be categorised into 2 areas, the limestone off-loading area and the main FGD
area. The limestone off-loading area for receipt of limestone via the new Rail Siding or trucked via a
new access road network. This area includes the limestone stockpile, pollution control dams and
other infrastructure to facilitate limestone offloading. The limestone off-loading area contains a
gypsum storage building for the off take of gypsum via rail in the future. The main FGD area is the
area on the western side of the existing Boilers, which comprises of the Process and proposed
Wastewater Treatment Plants (WWTP). The limestone and gypsum conveyor servitudes connect
the main FGD area and limestone off-loading area.
Program details:
a) A limestone off-loading facility.
b) A limestone stockyard and associated handling system.
c) A limestone slurry preparation system.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
d) The FGD absorber and common plant infrastructure.
e) A gypsum dewatering system.
f) New wastewater treatment facility independent of the power stations water treatment facility.
g) Gypsum off-take and disposal facility.
The geographical boundary of the property, over which Medupi Power Station Project exerts control,
is depicted in Figure 1 below.
Figure 1: Geographical boundaries of Medupi PS
Medupi Power Station Project may attempt to influence activities, products and services that do not
fall under their direct control/areas of jurisdiction where reasonably practicable (such as by querying
or commenting on environmental concerns, when required) but such activities, products and services
may fall under the environmental scope and control of other Eskom Business Units or Corporate
functions e.g. the coal supply agreement.
Since all actual site construction is undertaken by contactors, contracted companies are specifically
viewed as employers in their own right, as per the OHS Act. In this regard, operational
documentation for significant environmental aspects and impacts is controlled through the
requirements stipulated in the Medupi Construction EMP Rev 2, 2010 (348-681011) and may be
controlled further through contractor’s method statements and procedures, which is reviewed and
influenced by Medupi Power Station Project’s Site Environmental Department. Contractors are not
required to have EMS certification.
3.2.4 EMS Processes
Medupi Power Station project has implemented an EMS that exists as part of a larger strategy that
has established, documented and implemented our processes, policies and objectives, whilst
satisfying the requirements of ISO 9001:2015. To achieve this, Medupi Power Station project has
adopted the process approach advocated by the above management system standards.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
Top/senior management team has determined the processes required for achieving the intended
outputs. Medupi Power Station project ensures that system effectiveness is established and
maintained. These processes are described using tools such as procedures, process maps, activity
flow diagrams, matrices, schedules, and charts, etc.
It is recognized that defining, implementing and documenting the environmental management
system is only the first step towards fully implementing its requirements.
The effectiveness of each process and its subsequent output is measured and evaluated through
regular internal audits, inspections and data analysis. We use key performance indicators (KPIs) that
are linked to our objectives to monitor our processes, as well as assessments to determine the risks
and opportunities inherent to each process. We also use trends and indicators relating to nonconformities, objectives and corrective action, as well as; monitoring and measuring results,
customer satisfaction and process performance data.
348-882048 EMS Scope &
manual
348-860846 Environmental
policy
348-717685 Handling of 348-882048 EMS Scope &
HSE Nonconformities and manual
corrective actions work 348-883808 Document and
instruction Management work instruction
348-693723 Incident 240-91688868 Emergency
management work instruction preparedness and response
348-882048 EMS Scope & 240-139218662 Medupi Alien
manual and Invasive Plant Species
Management Plan
348-882177 Land and
Stockpile Management work
instruction
348-880696 Medupi Spill
Prevention Control and
Countermeasure Plan
348-882048 EMS Scope & 348-22367 Medupi Waste
manual Management Work Instruction
348-275284 Environmental 241-2022178 Integrated
audit work instruction Water and Waste
Management Plan (IWWMP)
348-22351Sewage
Management work instruction
Figure 2: EMS Overview
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
Figure 3: Key business processes
3.3 Leadership
3.3.1 Leadership and Commitment
Medupi Power Station project leadership is at the centre of the EMS. Top leadership ensures that
the system operates efficiently by ensuring that:
with the strategic direction and the context of the organization.
environmental budget in place where all EMS Objectives and Key Projects etc. are catered
for. Top management also demonstrate leadership by ensuring qualified staff are placed to
ensure environmental responsibilities are executed.
regular management meetings where environmental issues are discussed. The management
reviews are chaired by General Manager or delegation where applicable.
place to address the intended outcome of the system.
environmental management is part of top management meetings, inter-departmental teams
that addresses specific issue like water management, procurement, design and construction
meetings.
executed.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
environmental management system requirements are communicated. This is achieved
through various awarenesses onsite including induction.
management system through availing required resources, training and awareness.
of responsibility are supported.
3.3.2 Environmental Policy
The environmental policy is documented as per document 348-860846 and the following applies:
platforms.
environmental impacts of its activities, products and services.
other commitment(s) relevant to the context of project.
3.3.3 Organisational roles, responsibilities and authorities
Environmental roles and responsibilities are outlined in the EMS representative appointment letter
as delegated by the General Manager. Detailed description of the roles and responsibilities are
outlined in the EMS work instruction/procedures through the RACI matrix.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
Figure 4: TM Environmental Communication Overview
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
3.4 Planning
3.4.1 Actions to address risks and opportunities
3.4.1.1 General
Medupi Power Station Project developed, implement, and maintains the Environmental Risk
Register (348-1033378) with template (348-64756) which aim to address all relevant risks and
opportunities associated with the scope of the EMS. Risk and opportunities related to environmental
aspects, compliance obligations and other issues and requirements identified in the organisation and
its context, and in understanding the needs and expectations of interested parties that need to be
addressed are determined.
In providing assurance to the organisation on the actions to address risks and opportunities, the
Medupi Power Station project identifies the key focus areas, describe the risks and opportunities,
monitoring the progress of the identified risks and opportunities, and assign the responsibility with a
time frame to specific department or persons.
Risks and opportunities addressed and monitored in various platforms that includes regular Risk
meetings, environmental department meetings, business review meetings etc.
3.4.1.1.1 Techniques and Methods of Identifying Risks
One or more of the following techniques may be used in risk identification:
Table 3: Risk Identification Techniques
Technique Description
Brainstorming Involves a good range of stakeholders. The
forum shall allow open and honest discussions.
Interviewing Can be one-to-one with Project team members
and/or stakeholders. Consideration of obtaining
expert advice.
Learning from Experience Compare with similar projects or those at a
similar stage of the project lifecycle.
Prompt List Use of a generic list to generate initial thoughts
and to act as a stimulus for further identification
techniques.
Checklist Use of a specific checklist to ensure that all
possible sources of risks have been considered
Review of Project Data Use of project documentation to aid the
identification of environmental risks.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
When determining risks and opportunities, environmental aspects, compliance obligations and other
issues and requirements, identified in clause 4.1 and 4.2 of ISO14001:2015, that need to be
addressed are taken into consideration.
3.4.1.1.2 Analyse Risks
Risks analysis includes qualitative assessments of the consequences and likelihood /probability of
the identified risks occurring.
Qualitative Risk analysis involves consideration of the risks, their positive and negative
consequences, and the likelihood that those consequences may occur, considering the controls
already in place. Risk shall be analysed by examining consequences and their likelihood against
Eskom’s approved consequence criteria and likelihood scales (Table 4 & 5) The combination of
likelihood and consequence shall indicate the risk level. (Table 6).
3.4.1.1.3 Priority Attention
See table 7 for details.
3.4.1.2 Environmental Aspects
During the identification and assessments of environmental aspects, the life cycle approach will be
applied, taking into consideration the following:
Medupi project will apply the life cycle approach (cradle to grave) pertaining to the impact caused by
its suppliers, service providers etc. The approach described above is a continual improvement
process and must be assessed on an ongoing basis (at least annually) to verify whether the life cycle
approach is being applied for significant activities.
The life cycle approach will follow the following basic steps:
Pre-Use Phase (Cradle)
This phase will cover the risks associated with sourcing (supply chain) of raw materials,
manufacturing process and transportation to site where applicable.
Construction and commissioning phase
This phase will cover the risks associated with all stages of construction including but not limited to
site establishment, excavations, concrete pouring/steel fabrications, etc.
End of life of construction (Grave)
This phase will cover the risks associated with all stages of end-of-life phase including but not limited
Rehabilitation, demolition phase, landfilling or recycling.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
3.4.1.2.1 Identification of Environmental Aspects and Impacts
The responsible environmental practitioner shall identify, assess and capture environmental aspects
and impacts arising from activities, products, and services related to Medupi Power Station Project
activities on the Medupi Power Station Project (Construction Phase) Environmental Aspects and
Impacts Register template (348-10092514), unique identifier (348-646271). Once rated significant
impacts are captured on significant aspect register template (348-10102937), unique identifier (34810103921).
▪ a description of the activities that take place in the area.
▪ the known impacts of the activities.
▪ any changes in the Unit’s activities, products or services.
considered:
▪ potential and actual impacts.
▪ positive and negative impacts.
▪ direct and indirect impacts (the use of a resource such as electricity indirectly uses water
and fuels which are examples of indirect impacts).
▪ inputs and outputs associated with current, past and planned activities, products and
services.
▪ normal, abnormal and reasonably foreseeable emergency situations.
▪ life cycle approach is used and improved on an ongoing basis.
▪ legal database reference and changes to any legislations.
▪ potential secondary and cumulative impacts.
▪ the extent to which Medupi Power Station Project has control or influence over its
activities, products and services.
3.4.1.2.2 Rating of Environmental Aspects and Impacts
Table 4 and 5 shall be used to determine the significance relative to the likelihood and consequences
of an impact with the resultant Table 6 Impact Matrix.
Table 4:Consequence Criteria
Rating Environment
6 ▪ Irreversible long term environmental harm.
▪ Community outrange-potential large-scale class action.
▪ Public inquiry by government agency.
▪ Environmental licence revoked.
▪ Potential for significant legal sanctions against Eskom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
Rating Environment
5 ▪ Prolonged environmental impact.
▪ High profile community concerns raise requiring significant rectification measures.
▪ Government agency inquiry.
▪ Environmental licence revoked and directive issue.
4 ▪ Measurable environmental harm medium term recovery.
▪ High potential for complaints and from stakeholders and community.
▪ Environmental directives issued by authorities.
3 ▪ Medium term recovery, immediate effect on environmental/community.
▪ Required to inform government agency (e.g. noise and dust).
2 ▪ Short term transient environmental and community impact some clean-up cost.
1 ▪ Negative impact on the environment, little to no ecological effect and no measurable
impact on human health.
Table 5: Likelihood Criteria
Category Criteria
▪ 99% probability, or
E ▪ impact is occurring now, or
▪ could occur within “days to weeks”
▪ >70% probability, or
D ▪ balance of probability will occur, or
▪ could occur within “weeks to months”
▪ >20% probability, or
C ▪ may occur shortly but a distinct probability it won’t, or
▪ could occur within “months to years’”
▪ >5% probability, or
B ▪ may occur but not anticipated, or
▪ could occur in “years to decades”
▪ <5% probability A
▪ occurrence requires exceptional circumstances
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
Category Criteria
▪ exceptionally unlikely, even in the long-term future
▪ only occur as a “100 year event”
Table 6: Impact matrix
6 ii ii i i i
Unacceptable Risks
5 ii ii ii i i
4 iii iii ii i i
Iv
3 III II Tolerable Risks II I Consequence Acceptable Risks
2 iv iv iii ii ii
1 iv iv iii iii iii
A b c d e
Likelihood
Table 7: Priority Attention
Authority for continued toleration of
Priority Suggested timing of treatment
residual risk
I Short term. Normally within 1 month General Manager
General Manager, Line Managers (e.g. Unit
Medium term. Normally within 3
II Managers, Contract Managers, Construction
months
Managers)
General Manager, Line Managers (e.g. Unit
III Normally within 1 year Managers, Contract Managers, Construction
Managers)
On-going control as part of a
IV All Staff
management system
3.4.1.2.3 Methodology for rating of significance of impacts
a) Determine the likelihood of occurrence of an aspect and the consequence of an impact on
the environment. Correlate the row of consequence level (1-6) with the likelihood column (A-
E) and conclude on the significance.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
b) Formula used for obtaining significant impacts = likelihood score matched with consequence
score e.g. Score of A1= IV implies insignificant aspect rating (green) while E6= I implies
significant aspect rating (red). Negligible/very low, low, medium, high.
c) The significance of impacts is colour coded in register to indicate significance.
d) Significant impacts are listed and are given priority in management programmes.
e) A negligible, low, medium impact may escalate if not addressed and therefore shall be
appropriately managed as part of day-to-day operation of the site.
f) Significant impacts will be communicated to the relevant stakeholders. Monitoring
programmes will be tracked continuously and potential changes to significance will be
communicated immediately. Resultant changes due to the successful implementation of
controls will be reviewed and communicated during Management Reviews.
g) Significant impacts shall be used to formulate project’s environmental objective which will be
monitored, measured and reviewed during management reviews.
h) Aspects and Impacts register shall be reviewed annually and/or as when required. Changes
made after each review will be documented on the Aspect and Impact register.
3.4.1.2.4 Monitoring and Measurement
following instances:
▪ The occurrence of an Emergency Event.
▪ Any change in Legal and Other Requirements that has significant impact to the
Project.
▪ Aspects and/or Impacts brought to the attention of the Environmental Department
by Medupi personnel.
▪ When an applicable audit/self-assessment finding arises.
▪ When contracts come to an end.
▪ Changes in scopes of work/activities.
3.4.1.3 Compliance Obligations
information received from site’s Aspects & Impacts register as part of the inputs. The register
consists of all relevant environmental Legislation.
etc.) to which the Project subscribes are found on the Eskom Intranet Legal Database.
environmental permits, registrations, standards etc.
specific legal or other requirements, they should contact the TM Environmental Department
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
Environmental Practitioners as well as the Environmental Manager.
website and service provider’s website.
Authorizations and/or EMP’s) can also be found on Medupi’s electronic documentation
system (e.g. SPO or Opentext). Due to the changing nature of the site, availability at points
of use is limited to the Medupi Environmental Department or Principal contractors Contractor
Environmental Personnel.
captured in the Medupi Power Station project EA/ RoD, License, Permits, Certificates and
Servitudes Register template (348-10103381), unique identifier (348-678483).
subsequent ROD’s require that the Medupi Environmental Monitoring Committee (EMC), in
conjunction with the developer, to appoint a suitably qualified Environmental Control Officer
(ECO) who would on behalf of the EMC, on a daily basis monitor the project compliance with
conditions of the Record of Decision, environmental legislation and recommendations of the
Environmental Management Plan (EMP). The ECO will monitor compliance by conducting
regular inspections and audits onsite.
organization’s compliance with legal and other requirements that may be applicable.
Audit Management Standard, 39-33.
non-conformities and Corrective and Preventative Action (348-717865).
the relevant site meetings/forums.
3.4.2 Environmental objectives and planning to achieve them
Medupi Power Project has developed Environmental Objectives that are documented in the Register
template (348-717756), unique identifier (348-1033379). Environmental objectives are
communicated at various platforms including inductions, management reviews meetings, business
review and SHE meetings. Significant environmental aspects and associated compliance
obligations, and risks and opportunities are taken into consideration during the establishment of
environmental objects. Some of environmental objectives included in the programme are set out
from Eskom head office.
Achievement of environmental Objectives shall be reviewed at an annual EMS Management
Reviews Meetings or ad-hoc/interim EMS Management Review Meetings (Business Reviews) and
updated accordingly.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
3.4.2.1 Establishment of Objectives and planning to achieve them
levels, taking into account the organisation’s significant environmental aspects and
associated compliance obligations. Risks and opportunities are considered during the
establishment of environmental objectives.
contractors and Eskom employees through platforms such as Medupi Environment email,
Inductions and Medupi Communications email.
meetings or management meetings, at least, on a six-monthly basis. The progress will be
communicated to TM employees through Medupi Communications email or other appropriate
platforms when necessary.
achieving the objectives. This information is then used as input or considered when setting
objectives and targets for the succeeding year. It must be noted that some objectives and
targets will not be fully achieved as these may span over a number of years. However,
progress of such objectives and targets must be presented.
3.4.2.2 Monitoring and Measurement of the Management Programs
implementations required to the Medupi Power Station Project’s Site Management.
kept in the EMS system folders stored on an Eskom approved application. e.g. OpenText or
other platforms.
Meetings or ad-hoc/interim EMS Management Review Meetings (Business Reviews) and
updated accordingly.
Document 348-1033379 (Environmental Objectives and planning to achieve them
Programmes).
next financial year.
3.5 Support
3.5.1 Resources
Medupi Power Station project management is responsible for ensuring that the EMS is established,
implemented, maintained and continually improved. This is achieved by providing adequate
resources including people, infrastructure (Offices and furnisher), technology, equipment
(Computers, printers, vehicles), software tool (SAP EHS, SAP QIM, OpenText, legal Register),
finance (training and environmental budget), external consultants and training.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
3.5.2 Competence
mechanisms such as existing qualifications, Performance Appraisals, job observations, etc.
Environmental Manager using human resource policies and procedures.
the staff member and relevant manager as per human resource policies and procedures.
staff member may enrol for relevant environmental training.
discussed with the Environmental Manager in accordance with the Staff member’s IDP, and
if an agreement is reached, such training will follow the Zenzele and Eskom Training
Procedure protocol.
Department/HR.
according to the ESKOM/Zenzele protocol.
register (348-10103095), unique identifier (348-10103310) and Eskom “Minimum SHE
Training” 39-3.
will be in an appropriate format for the receiving audience. Where training has been done
verbally, persons having received training must indicate in writing that they have indeed
attended a training session. Where appropriate a regular form of written or verbal testing
will be used to test whether competency has been attained.
3.5.3 Awareness
regular basis.
on findings from site environmental observations and audits. The ECO may conduct
environmental awareness to site staff and contractors, where deemed necessary.
▪ A basic understanding of the key environmental features of the construction site and the
surrounding environment.
▪ The environmental policy.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
▪ The significant environmental aspects and related actual or potential environmental
impacts associated with their work.
▪ The employee’s contribution to the effectiveness of the environmental management
system including the benefits of enhanced environmental performance.
▪ The implications of not conforming with the environmental management system
requirements, including not fulfilling the organisation’s compliance obligations.
▪ The requirements of the Environmental Authorisations, EMP and the environmental
specifications as they apply to the construction of the power station.
▪ Interventions on any other environmental matters, which are deemed to be necessary
by TM.
means:
▪ Posters,
▪ Environmental Bulletins,
▪ Formalized PowerPoint Presentation Sessions, and
▪ Verbally at TM staff Meetings.
3.5.4 Communication
All environmental communications will be addressed under work instruction, Environment
Communications (348-275237).
Table 8 below provides a summary of the communication process.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
Table 8: Communication process
Content of the Internal/External
communication Frequency Audience Communication method communication Responsibility
Induction
Team Medupi Awareness Internal TM env dept
Annual Contractors Email Internal TM env dept
Upon
request or
Policy, Objectives, Significant as they visit External Induction TM env dept
Environmental Aspects site stakeholders Email/formal letter External
As and TM env dept Team Medupi Via email Internal
when there
are changes
effected on TM env dept
EMS processes/ Procedures procedures Contractors Via email Internal
TM TM env dept
Key Environmental Risks Monthly Management Business review meeting Internal
Mass Briefs & Email via Medupi TM env dept
Team Medupi Communication Internal
Email (ECO Report) TM env dept
Contractors SHE contractors meeting Internal
Team Medupi Mass briefs, Business Review,
TM env dept Management Weekly performance report Internal
Authorities,
Monthly community reps ECO report External ECO
Annual environmental & social
Environmental Performance Annually Funders performance report External TM env dept
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi EMS Scope and Manual Unique Identifier: 348-882048
Revision: 9
Page:
Content of the Internal/External
communication Frequency Audience Communication method communication Responsibility
Authorities &
community
Quarterly representatives EMC meetings External TM env dept
Team Medupi
Monthly Contractors ECO report Internal ECO
Authorities
Community
Quarterly Reps EMC Meeting External ECO
Authorities
Funders
Monitoring report (Air, water & Community
dust) Monthly Reps ECO report External ECO
Adhoc/ Emails, Business Review
when there Team Medupi meeting, Mass brief TM env dept
Legal updates are changes Contractors Awareness Internal
Emails/formal notification letter
EMC Meeting TM env dept
Authorities ECO monthly report External
TM env dept Emails/Massbrief/Awareness/SHE
Team Medupi meetings, progress meetings Internal
Emails
As and Contractors Awareness External ECO
when they Community EMC Meeting
Emergency incidents occur Reps ECO monthly report External ECO
EMC Meeting
Complaints Authorities ECO monthly report External TM env dept
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Methodology
Source: 348-882048 Medupi EMS Scope and Manual Rev 9_ Final.pdf (unknown)Environmental risks and opportunities are identified using techniques such as brainstorming, interviewing, learning from experience, prompt lists, checklists and review of project data. Risks are analysed qualitatively using consequence and likelihood criteria. The life cycle approach (cradle to grave) is applied to assess impacts from sourcing, construction and end-of-life phases. Significance of impacts is determined by correlating consequence level (1-6) with likelihood (A-E).
Experience & Qualifications
Source: 348-882048 Medupi EMS Scope and Manual Rev 9_ Final.pdf (unknown)Team Medupi management provides resources essential for EMS implementation, including training, human resources, specialty services, financial resources, and technical and informational services.
Quality Management
Source: 348-882048 Medupi EMS Scope and Manual Rev 9_ Final.pdf (unknown)The EMS is aligned with ISO 9001:2015 and ISO 14001:2015. System effectiveness is measured through regular internal audits, inspections and data analysis, using KPIs linked to objectives. Non-conformities and corrective actions are managed through documented procedures. Environmental training is provided to staff, with records kept in employee files.
Health & Safety
Source: 348-882048 Medupi EMS Scope and Manual Rev 9_ Final.pdf (unknown)The Health, Safety and Environmental Manager is the EMS Management Representative, overseeing the establishment, operation and maintenance of the EMS. Contractors are viewed as employers under the OHS Act and must ensure compliance with all legal and other requirements.
Environmental
Source: 348-882048 Medupi EMS Scope and Manual Rev 9_ Final.pdf (unknown)The EMS scope covers all construction activities on the Medupi Power Station site in Lephalale local municipality, Limpopo, including adjacent properties where related construction occurs. The FGD plant is excluded until construction commences. Contractors are not required to have EMS certification but must comply with the Medupi Construction EMP and applicable legal requirements. Environmental aspects and impacts are identified, rated for significance, and managed through registers and monitoring programmes.
Description
Source: Tech Evaluation Strategy Bus_Transportation Medupi .pdf (unknown)The service is the provision of staff bus transportation for Eskom Medupi Power Station Project. The required service is the daily home-to-work and work-to-home transportation of Eskom Medupi Power Station Project employees within the designated service areas of Onverwacht, Lephalale Town, Marapong and other areas within Lephalale, as per scope of work.
The evaluation seeks to identify one or multiple suppliers capable of delivering a safe, reliable, efficient and cost-effective transport solution that meets Eskom's operational requirements throughout the contract period.
Evaluation Criteria
Source: Tech Evaluation Strategy Bus_Transportation Medupi .pdf (unknown)Mandatory criteria — bidders failing any are disqualified from further evaluation:
Qualitative criteria — weighted score card, total 100 points. Minimum weighted final score required for technical consideration is 75%:
Technical Specifications
Source: Tech Evaluation Strategy Bus_Transportation Medupi .pdf (unknown)Scope of service — daily home-to-work and work-to-home transportation of Eskom Medupi Power Station Project employees within the designated service areas of Onverwacht, Lephalale Town, Marapong and other areas within Lephalale, as per scope of work.
Vehicle requirements — 22-seater buses, information to be provided for a minimum of 4 buses:
Driver requirements:
Physical vehicle inspection items:
Experience & Qualifications
Source: Tech Evaluation Strategy Bus_Transportation Medupi .pdf (unknown)Experience requirement — minimum five years' experience in providing staff/employee bus transportation services.
Reference letters — three reference letters for similar contracts successfully executed within the past three years. Each reference letter must include the client's contactable details, description of similar services provided, and the contract value.
Scoring based on number of reference letters:
Key personnel:
Quality Management
Source: Tech Evaluation Strategy Bus_Transportation Medupi .pdf (unknown)Quality standard referenced: ISO 9001 Quality Management Systems - Requirements (informative).
Compliance Requirements
Source: Tech Evaluation Strategy Bus_Transportation Medupi .pdf (unknown)Mandatory compliance — bidders failing any are disqualified:
Vehicle compliance:
Driver compliance:
Quality standard referenced: ISO 9001 Quality Management Systems - Requirements (informative).
Health & Safety
Source: Tech Evaluation Strategy Bus_Transportation Medupi .pdf (unknown)Safety and operational compliance is part of the technical evaluation.
Driver safety requirements:
Vehicle safety requirements:
Section
Source: Tech Evaluation Strategy Bus_Transportation Medupi .pdf (unknown)The technical evaluation consists of mandatory criteria and qualitative criteria. Results of mandatory evaluation will be 'Compliant' or 'Non-Compliant.' Bidders who fail to comply with any mandatory requirements will be disqualified. The qualitative evaluation uses a weighted score card approach. The minimum weighted final score (threshold) required for a tender to be considered from a technical perspective is 75%.
Mandatory criteria:
Qualitative criteria (total 100 points):
Description
Source: 348- 275284 Environmental Audit Work Instruction Rev 10- Final (003).pdf (unknown)This document is an internal Eskom work instruction for environmental audits at Medupi Power Station. It does not contain tender-specific scope, deliverables, or quantities for the advertised staff bus transportation service.
Contact Information
Source: 348- 275284 Environmental Audit Work Instruction Rev 10- Final (003).pdf (unknown){"name":null,"email":null,"phone":null,"department":"and the","address":"gal requirements as defined in the scope; and"}
Evaluation Criteria
Source: 348- 275284 Environmental Audit Work Instruction Rev 10- Final (003).pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and have a valid SARS Tax Clearance Certificate (or tax pin). Bidders must have a valid B-BBEE certificate or sworn affidavit. Bidders must have a valid operating license for passenger transport services (if applicable). Bidders must have a fleet of buses that meet South African roadworthiness standards. Bidders must have adequate insurance coverage for passenger liability.
Technical Specifications
Source: 348- 275284 Environmental Audit Work Instruction Rev 10- Final (003).pdf (unknown)This document outlines the process to be followed and the requirements for the Environmental Audits
conducted on the Medupi Power Station project.
2.1 Scope
This document describes the processes employed in planning, performing, and reporting of
Environmental Audits by the Team Medupi and the Environmental Control Officer (ECO) on the
Medupi Power Station project.
Environmental Audits covered within this are:
requirements.
This Work instruction is applied by the Team Medupi (TM) Environmental Department and the
Eco.
Principal Contractors, Suppliers or Consultants are not required to comply with the specific
requirements of this Work instruction. It is however, issued to Principal Contractors for Information
2.1.1 Purpose
The purpose of this work instruction is to describe the processes employed in planning, performing,
and reporting of Environmental Audits by the TM Environmental Department and ECO on the
Medupi Power Station project.
Environmental Audits undertaken on the Medupi Power Station project have the following
objectives:
legal and other requirements.
compliance to legal requirements as defined in the scope; and
such prior to incident, investigation, or litigation. In this sense it should be viewed as means
of implementation of Preventive Action.
2.1.2 Applicability
This document shall apply throughout Medupi Power Station Construction activities, excluding
activities handed over to the client, Generation.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Environmental Audit Work Instruction Unique Identifier: 348- 275284
Revision: 10
Page:
2.1.3 Effective date
Authorization date will be the effective date
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] 348-961711 Project Execution Plan
[2] 348-883902 Project Quality Plan
[3] 348-653867 Development and Change of Medupi QMS Documents
[4] 348-883808 Document and Record Management Work instruction.
[5] 348-868846 Medupi Environmental Policy
[6] 348- 882048 EMS Scope and Manual
[7] 348 – 681011 The Environmental Management Plan for the Medupi Coal-fired Power Station in
the Lephalale Area, Limpopo Province – The Construction Phase
[8] 348-63648 Project Environmental Audit Programme
[9] 348-10094354 PC Environmental Audit Programme
[10] 348-882478 HSE Audit Report (Template)
[11] 348-717685 Work instruction for the handling of Environmental Non-conformities and Corrective
and Action
[12] 348-10100726 Nonconformity and Corrective Action Form
2.2.2 Informative
ISO 9001: Quality Management System - Requirements
[13] ISO 14001: Environmental Management System
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Environmental Audit Work Instruction Unique Identifier: 348- 275284
Revision: 10
Page:
2.3 Definitions
Term Explanation
Audit Systematic, independent and documented process for obtaining audit
evidence and evaluating it objectively to determine the extent to which the
audit criteria are fulfilled.
Auditee Organization being audited
Auditor Person with the competence to conduct an audit
Audit Checklist A “questionnaire” indicating specific requirements and acts as record of
Audit. It ensures that an audit is conducted in a systematic and
comprehensive manner and that adequate evidence is obtained.
Audit Client Person/Organisation requesting the Audit, if such is not the Auditee
Audit Finding Results of the evaluation of the collected audit evidence against audit
criteria
Conformance Meeting of requirements.
Good Good practice involves a procedure, methodology, or arrangement that is
practice/Highlight considered best practice that can be disseminated to other parts of the
organisation. All such instances can be shared as organisational experience
for the continual improvement of the management system.
Lead Auditor Person responsible for successful completion of the Audit Process
Non-conformity Failure to comply with/and or deviate from any stipulated environmental
Methodology
Source: 348- 275284 Environmental Audit Work Instruction Rev 10- Final (003).pdf (unknown)The audit process includes scheduling, notification, preparation, conducting activities, reporting, and follow-up. Auditees are notified at least one week in advance. Opening and closing meetings are held, and fieldwork involves observations and interviews. Non-conformities are recorded on a Nonconformity and Corrective Action form. The draft report is submitted within 14 days, with 10 working days for comment, and the final report within 10 working days after that.
Quality Management
Source: 348- 275284 Environmental Audit Work Instruction Rev 10- Final (003).pdf (unknown)The work instruction includes key performance indicators for the audit process, such as conducting 75% of planned audits quarterly, clearing non-conformities within 60 days, and limiting major ISO 14001 external findings to no more than two per month. It also requires a six-monthly self-assessment of the process and a three-yearly compulsory revision of EMS documents.
Compliance Requirements
Source: 348- 275284 Environmental Audit Work Instruction Rev 10- Final (003).pdf (unknown)Opportunity for When the auditee is implementing measures to comply with environmental Improvement requirements or partially met the requirements. 2.4 Abbreviations Abbreviation Explanation ECO Environmental Control Officer EMP Environmental Management Plan EMS Environmental Management System GCD Group Capital Division ISO International Standards Organisation KPI/KPA Key Performance indicators/Key Performance areas MS- Teams Microsoft Teams PC Principle Contractor NCA Nonconformity and Corrective Action Form CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30. Medupi Environmental Audit Work Instruction Unique Identifier: 348- 275284 Revision: 10 Page: QMS Quality Management System SHEQ Safety, Health, Environment and Quality TM Team Medupi 2.5 Roles and Responsibilities
Responsible Those who do the work to achieve the task. There is at least one role with a participation type of responsible, although others can be delegated to assist in the work required.
Accountable (also approver or final approving authority) The one ultimately answerable for the correct and thorough completion of the deliverable or task, and the one who delegates the work to those responsible. In other words, an accountable must sign off (approve) work that responsible provides. There must be only one accountable specified for each task or deliverable.
Consulted (sometimes counsel) Those whose opinions are sought, typically subject matter experts; and with whom there is two-way communication.
Informed Those who are kept up to date on progress, often only on completion of the task or deliverable; and with whom there is just one-way communication. Table 1: RACI Matrix Process Step Construction Contracts SHE TM Manager TM Departmental Manager TM Manager TM Manager Environmental Practitioners Principal Contractors ECO Compile and distribute Audit Program R I I I A R I Maintain Audit Register R I I I A R I Notify Auditee R I I I A R I Undertake Document Review R I A R I Compile Audit Protocols (Checklists) R I A R I Undertake Audit fieldwork (including I I I A R I Opening and Closing Meetings) R Compile and distribute Audit Report (including PCA forms) I I R A R I R Audit finding follow-up R I I I A R I CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30. Medupi Environmental Audit Work Instruction Unique Identifier: 348- 275284 Revision: 10 Page: 2.6 Related/Supporting Documents The following quality records are utilised to record necessary process data required to verify process conformity/compliance
Environmental Audit Programme, Environmental Audit Plan and Notification
Audit Checklist
Audit attendance registers
Nonconformity and Corrective Action Forms or NCA Register
Environmental Audit Report
Document Content 3.1 Process Map/Flow Chat Not compiled. 3.2 Auditor Competence
The (Lead) Auditor should have knowledge and experience of ISO 14001 and ISO 19011.
Where knowledge and experience are lacking, training interventions shall be applied.
Environmental Practitioners and ECO’s, acting as Auditors, shall be competent in line with requirements of Section 4, Part 9 of the Employer Policies and Work instructions. 3.3 Environmental Auditor responsibilities
TM Environmental Department is responsible for auditing principal contractors against the Operational Controls whenever the need arises and in-line with the Audit programme.
The ECO is responsible for auditing principal contractors against the EMP as per audit programme/schedule.
The ECO also audit the project on legal requirements (e.g. Environmental Authorisations/Permits/Licences/EMP) on an annual basis or as required. 3.4 Process description 3.4.1 Audit Scheduling
TM Environmental Department and the ECO shall prepare an Audit Programme prior to the start of each financial year. This shows all the Environmental Audits planned for the project during the particular financial year. This Programme also includes all planned external audits which have an influence on the EMS.
Environmental audits on contractors by TM environmental department & ECO shall be documented on audit programme template (348-10065383) whereas environmental audits on TM shall be recorded on audit programme template (348-10061454).
The Audit Programme shall be updated as required and communicated to relevant contract managers to issue to their respective contractors. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30. Medupi Environmental Audit Work Instruction Unique Identifier: 348- 275284 Revision: 10 Page
The Programme shall be made available to the Medupi Risk and Assurance Manager. 3.4.2 Audit Notification and Preparation
The relevant Auditee shall be notified at least 1 (one) week in advance of the audit.
Formally distribute the specific Environmental Audit Plan/Schedule via relevant Contract Manager to the Auditee.
Obtain Auditee applicable work documents.
Perform Document Review to prepare audit activities and establish an overview of the extent of the documentation to detect possible gaps. Note: The ECO shall utilise their own templates (with their company logo) for Audit Notification, Environmental Audit Finding Sheet and Audit Report. 3.5 Conducting the Audit Activities
An Opening Meeting shall be held with the Auditee’s management and/or those responsible for the functions/processes to be audited.
The following are some, but not limited list of items discussed at the Opening Meeting, which is chaired by the (Lead) Auditor
Introduction of the Audit Team and their roles.
Confirmation of the audit type, objective, scope and criteria.
Confirmation of the Audit Plan and Schedule.
Environmental
Source: 348- 275284 Environmental Audit Work Instruction Rev 10- Final (003).pdf (unknown)The work instruction governs environmental audits on the Medupi project, covering audits of processes, work instructions, and environmental compliance of principal contractors. It is issued to principal contractors for information only; they are not required to comply with its specific requirements.
Description
Source: 348-275237 Environmental Communications Procedure Rev 09_signing.pdf (unknown)The document is an internal Eskom Work Instruction for environmental communications at the Medupi Power Station Project, not a tender specification. It defines processes for internal and external communications, including handling of complaints, queries, statutory/regulatory communications, and press/media interactions. It also covers environmental consultation and participation through meetings such as Contractors SHE Meetings and the Environmental Monitoring Committee (EMC).
Contact Information
Source: 348-275237 Environmental Communications Procedure Rev 09_signing.pdf (unknown)Environmental email: [email protected]
Evaluation Criteria
Source: 348-275237 Environmental Communications Procedure Rev 09_signing.pdf (unknown)Bidders must comply with the Medupi Environmental Communications Work Instruction (348-275237). They must use the communal environmental email address ([email protected]) for all electronic communications. Bidders must not interact directly with press/media and must direct such requests to the TM Communications and Stakeholder Management Department. They must also follow the complaint handling process, including providing updates to the Environmental Control Officer (ECO) and responding within stipulated timeframes.
Technical Specifications
Source: 348-275237 Environmental Communications Procedure Rev 09_signing.pdf (unknown)The document is an internal Eskom Work Instruction for environmental communications at the Medupi Power Station Project, not a tender specification. It applies to all construction activities on the Medupi site and adjacent properties, covering construction and commissioning stages under normal, abnormal and emergency conditions. It excludes activities handed over to the client, Generation, and those undertaken by the National Transmission Company of South Africa (NTCSA).
Methodology
Source: 348-275237 Environmental Communications Procedure Rev 09_signing.pdf (unknown)The procedure outlines communication protocols: all electronic communications from the TM Environmental Department are copied to [email protected]; formal project communications from contractors are issued through Document Control; responses to queries are formulated within 48 hours; complaints are handled with preventive and corrective measures; statutory/regulatory communications are forwarded to Assurance and Communications departments; environmental awareness topics are issued regularly; and consultation occurs through monthly Contractors SHE Meetings and quarterly EMC meetings.
Quality Management
Source: 348-275237 Environmental Communications Procedure Rev 09_signing.pdf (unknown)The document references ISO 14001:2015 and ISO 9001 as informative standards. It defines Key Performance Areas and Indicators (KPAs/KPIs) including registering communications from Interested and Affected Parties within 24 hours, clearing communications within 7 days, and tracking actions from meetings. A six-monthly self-assessment review of the process is required, and the document itself is subject to a three-yearly revision.
Compliance Requirements
Source: 348-275237 Environmental Communications Procedure Rev 09_signing.pdf (unknown)No specific requirements found
Health & Safety
Source: 348-275237 Environmental Communications Procedure Rev 09_signing.pdf (unknown)Contractors are viewed as employers in their own right under the Occupational Health and Safety Act, 1993 as amended. Monthly Contractors SHE Meetings are chaired by the SHE Manager/Senior Environmental Advisor and attended by TM and contractors' HSE/Environmental Practitioners to report and discuss environmental performance and compliance.
Environmental
Source: 348-275237 Environmental Communications Procedure Rev 09_signing.pdf (unknown)The document establishes processes for internal and external environmental communications at the Medupi Power Station Project. All electronic communications from the TM Environmental Department must copy the communal email [email protected]. Formal project communications from contractors are issued through Document Control functions. Responses to queries must be formulated within 48 hours of receipt. Complaints are handled with preventive and corrective measures, with updates provided to the Environmental Control Officer (ECO). No member of the TM Environmental Department may interact directly with press/media; such requests are directed to the TM Communications and Stakeholder Management Department. Statutory or regulatory communications are forwarded to the Medupi Assurance Department and the TM Communications and Stakeholder Management Department. All formal communications to external parties must be registered on the Environmental External Communication Register (348-362543). Environmental awareness topics are issued regularly, covering aspects, impacts, lessons learnt, operational controls, contractual obligations and trends. Consultation occurs through monthly Contractors SHE Meetings, regular Contractors Environmental Meetings, and quarterly Environmental Monitoring Committee (EMC) meetings.
Evaluation Criteria
Source: Medupi PS Project Aspect & Impact.pdf (unknown)Bidders must be registered on the CSD (Central Supplier Database) and hold a valid tax clearance (SARS TCS or tax PIN). B-BBEE requirements apply under the PPPFA preference points system. For construction-related activities, a valid CIDB grading may be required. Bidders must complete and submit all mandatory National Treasury standard forms, including SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 6.2 (Declaration for Local Production and Content), SBD 8 (Declaration of Bidder's Past SCM Practices), SBD 9 (Certificate of Independent Bid Determination), and an Authority to Sign / Board Resolution. Compliance with Eskom's environmental policies and procedures is mandatory.
Technical Specifications
Source: Medupi PS Project Aspect & Impact.pdf (unknown)The document is an Environmental Aspects and Impacts Register for the construction phase of the Medupi Power Station Project. It covers office activities (energy, water, waste, cleaning), procurement, engineering design, human resources, emergency preparedness, site support services, project management, top management, finance, IT disposal, waste management, project execution (BOP/units), commissioning, demobilisation, disestablishment, rehabilitation, and heritage management. Each aspect lists pre- and post-mitigation risk ratings, controls referencing the Medupi EMP, legal register, ISO 14001:2015, and monitoring via inspections, audits, and meetings.
Compliance Requirements
Source: Medupi PS Project Aspect & Impact.pdf (unknown)Compliance with Eskom's environmental policies and procedures is mandatory. Bidders must be registered on the CSD and hold a valid tax clearance. B-BBEE requirements apply under the PPPFA preference points system. For construction-related activities, a valid CIDB grading may be required. Bidders must complete and submit all mandatory National Treasury standard forms, including SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 6.2 (Declaration for Local Production and Content), SBD 8 (Declaration of Bidder's Past SCM Practices), SBD 9 (Certificate of Independent Bid Determination), and an Authority to Sign / Board Resolution.
Environmental
Source: Medupi PS Project Aspect & Impact.pdf (unknown)The register also addresses waste classification and disposal, requiring waste to be taken to a central waste area within 30 days for general waste and 180 days for concrete and rubble during planned unit shutdowns. It includes controls for hydrocarbon spillage prevention via SPCC plans, sourcing river sand only from licensed suppliers, managing flammable/HCS storage with proper licensing, and adhering to commissioning procedures. Demobilisation and rehabilitation activities must follow the Medupi PS Construction Environmental Management Plan and Rehabilitation Strategy, with method statements for removal of contaminated slabs and hazardous waste. Alien and invasive species must be monitored, controlled, and eradicated per the relevant procedure. Heritage management requires handling of unidentified graves and archaeological features per the Environmental Incident Management Procedure and Heritage Management Plan.
Contact Information
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown){"name":"__________________________________________________________","email":null,"phone":null,"department":null,"address":null}
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Submission of the fully completed E-Tendering Training Acknowledgement Form is mandatory. Failure to submit it within the prescribed period will render the tenderer non-responsive and disqualified from the procurement process.
Description
Source: NEC - Document.pdf (unknown)The service is the provision of staff bus transportation for Eskom Medupi Power Station Project employees (GCD) for home-to-work-to-home transport. Areas serviced: Onverwacht, Lephalale Town and Marapong. Initially approximately 80 employees; numbers may vary. All transport using 22-seater buses. Ad hoc weekend transport for overtime workers, and ad hoc transport for representatives of traditional councils of Shongoane, Abbotspoort and Seleka and other stakeholders within a 90 km radius to and from the project site for meetings or stakeholder engagements.
Contact Information
Source: NEC - Document.pdf (unknown)Service Manager: Julius Manyathela, Medupi Power Station, Maxwell Drive, Sandton, Johannesburg. Tel +27 14 762 2248. Email [email protected].
Employer (Eskom Holdings SOC Ltd): Megawatt Park, Maxwell Drive, Sunninghill, Johannesburg, Gauteng, South Africa, 2000.
No separate SCM or technical enquiry contacts are stated.
Submission Guidelines
Source: NEC - Document.pdf (unknown)Returnable documents:
Submission method and address are not stated in the document provided. The closing date and time are in the tender record (2026-08-28T10:00:00Z).
Disqualification risks:
Evaluation Criteria
Source: NEC - Document.pdf (unknown)The document does not state the evaluation methodology, scoring split, preference point system (80/20 or 90/10), or any minimum qualifying thresholds. No functionality or price-weighting details are provided.
Technical Specifications
Source: NEC - Document.pdf (unknown)Scope: provision of staff bus transportation (home-to-work-to-home) for Eskom Medupi Power Station Project employees (GCD). Areas serviced: Onverwacht, Lephalale Town and Marapong. Initially approximately 80 employees; numbers may vary. All transport using 22-seater buses.
Ad hoc services: weekend home-to-work-to-home transport including overtime workers; transport for representatives of traditional councils of Shongoane, Abbotspoort and Seleka and other stakeholders within a 90 km radius to and from the project site for meetings or stakeholder engagements.
Working times:
Contractor responsibilities:
Employer responsibilities:
Vehicle and driver requirements:
Vehicle specifications (minimum):
Hygiene requirements:
Records (not limited to):
Contract sign-off:
Labour requirements:
Methodology
Source: NEC - Document.pdf (unknown)Working times:
Bus schedules must take into consideration travel times and pick-up point times; this information must be stated by the Contractor. Any changes or further information can be obtained from Fleet Management.
Contractor's plan: the Contractor must submit a first plan for acceptance within seven weeks of the Contract Date. The plan must show how each item description on the Price List relates to the operations on each plan submitted for acceptance.
Management meetings: weekly risk register meeting (Clause 16.2) may be held to discuss safety, compensation events, subcontracting, overall co-ordination and other matters. Records of meetings to be submitted to the Service Manager within five days of the meeting.
Task Order programme: the Contractor submits a Task Order programme to the Service Manager within five days of receiving a Task Order.
Forecasts: the Contractor prepares forecasts of the final total of the Prices for the whole of the service at intervals no longer than four weeks.
Quality Management
Source: NEC - Document.pdf (unknown)Maintenance programme: the supplier must submit a maintenance programme for all buses and allow an Eskom Medupi Power Station site representative to visit and evaluate the workshop where maintenance will be done.
Servicing: all vehicles must undergo scheduled servicing within a reasonable timeframe upon reaching their service due date.
Seatbelts: all buses must be equipped with SABS-approved seatbelts.
Inspections: Eskom will carry out monthly inspections on each bus in conjunction with the bus driver and give a detailed report to the contractor.
Vehicle standards: all buses must comply with South African Road Traffic Regulations for transportation of people and meet or exceed Eskom's vehicle safety standard 32-345.
Records: list of defects and corrections (defect notification report); daily, weekly and weekend attendance registers; safety and environmental reports/records per SHEQ Department requirements.
Contract sign-off: no project signed off before assurance that no environmental liabilities exist; physical inspection by responsible person, project leader or environmental advisor before acceptance. No invoice processed before work accepted.
Pricing Schedule
Source: NEC - Document.pdf (unknown)Pricing form: NEC3 Term Service Contract (TSC3) Option A — priced contract with a price list. Items may be priced as lump sums or as expected quantities multiplied by rates, or a mix.
Price list items to be priced:
Pricing assumptions:
Payment:
Financial Requirements
Source: NEC - Document.pdf (unknown)Pricing format: NEC3 Term Service Contract (TSC3) Option A — priced contract with a price list. Prices are derived from a list of items priced as lump sums or as expected quantities multiplied by rates, or a mix.
Price list items (to be priced by bidder):
Payment terms:
Price adjustment:
Bonds and guarantees:
Liability:
Insurance (Contractor to provide per Insurance Table A):
Employer provides insurances per Insurance Table B (Assets All Risk, Contract Works, Environmental Liability, General and Public Liability, Transportation (Marine), Motor Fleet and Mobile Plant, Terrorism, Cyber Liability, Nuclear Material Damage and Business Interruption, Nuclear Material Damage Terrorism) — cover per the insurance policy documents.
Compliance Requirements
Source: NEC - Document.pdf (unknown)B-bbee:
Joint ventures:
Cession, delegation and assignment:
Confidentiality:
Ethics:
Health, safety and environment:
Compensation for Occupational Injuries and Diseases Act (COID):
Other:
Health & Safety
Source: NEC - Document.pdf (unknown)Health and safety compliance: the Contractor must take all reasonable precautions to maintain the health and safety of persons in and about the execution of the service.
Principal Contractor: the Employer may appoint the Contractor as Principal Contractor under the Construction Regulations 2014 (promulgated under the Occupational Health & Safety Act). The Contractor warrants that the total of the Prices includes sufficient amount for proper compliance with the Construction Regulations and all applicable health and safety laws.
Compliance: the Contractor must comply with the Construction Regulations, all applicable health and safety laws, regulations, rules, guidelines and procedures provided for in the contract, and ensure that subcontractors, employees and others under the Contractor's direction and control do likewise.
Risk Register: matters to be included in the Risk Register as per Eskom SHEQ requirements, Section 3.1.11 Risk register table A and B, under Part 3.
Safety officer: the appointed safety officer/consultant should have at least a National Diploma (as a minimum) and be available when required for inspections, audits and incident investigations.
Safety procedures: the Contractor must be conversant with Employer safety procedures prior to commencing any work on site. Failure to comply may result in the Employer suspending execution of services and removing personnel.
Safety standards: the Contractor must comply with Eskom's safety policy and value of Zero Harm, and with Lephalale Local Municipality By-Laws in accordance with the scope of the project.
Driver requirements: drivers must have vehicle safety training or advanced driving certificates; all drivers must have a Public Driving Permit (PDP) and EC1/04 or EC licence certificate.
Vehicle safety equipment: warning sign, 2 triangles, fire extinguisher, spare wheel, wheel spanner, vehicle jack, spill kit, SABS-approved three-point safety belts for every seat, at least two emergency exits for every 12 passengers, yellow reflective tape, speed warning sign (100km/h).
Hygiene: daily clean and disinfect the bus; frequent cleaning and disinfection of touched surfaces; hand-washing before and after bus use; non-contact greeting; cough into tissue or elbow; posters reminding staff to wash hands; staff not to travel to work if unwell.
Environmental
Source: NEC - Document.pdf (unknown)Environmental compliance: the Contractor must comply with all applicable environmental laws and regulations and rules, guidelines and procedures provided for in the contract, and ensure that subcontractors, employees and others under the Contractor's direction and control do likewise.
Contract sign-off: no project shall be signed off before the Business Unit or Department has given assurance that no environmental liabilities exist. The responsible person, project leader or environmental advisor shall carry out a physical inspection before acceptance of work done.
Spill control: vehicles must have a spill kit to contain any fuel or hydraulic oil spills/leaks should they occur.
Asbestos: the Employer manages asbestos and ACM according to Eskom's Asbestos Standard 32-303. If asbestos is identified while providing the service, a risk assessment is conducted; if exposure above the action level is possible, immediate control measures are implemented and air monitoring conducted to declare the area safe. Contractor's personnel may stop working and leave the contaminated area until declared safe. Asbestos removal and disposal done by a registered asbestos contractor at the Employer's expense.
Contractual Terms
Source: NEC - Document.pdf (unknown)Contract form: NEC3 Term Service Contract (TSC3), April 2013 edition, with main Option A (priced contract with price list), dispute resolution Option W1, and secondary Options X1 (price adjustment for inflation), X2 (changes in the law), X18 (limitation of liability), X19 (Task Order), and Z (additional conditions Z1 to Z14).
Duration: service period of fourteen months; starting date to be confirmed.
Law and language: law of the Republic of South Africa; English.
Period for reply: seven days.
Contractor's plan: first plan for acceptance within seven weeks of the Contract Date.
Task Orders: Contractor submits a Task Order programme within five days of receiving a Task Order.
Key Performance Indicators: incentive schedule in Annexure to Contract Data; report of performance provided at three-month intervals.
Price adjustment: prices fixed and firm for the first 12 months from the base date (month before tender close), thereafter CPA adjustment using SEIFSA indices (labour 0.35, transport 0.50, non-adjustable 0.15).
Limitation of liability: Contractor's liability for indirect or consequential loss limited to R0.00; total liability limited to the total of the Prices (other than for additional excluded matters). Employer's liability for Contractor's indirect or consequential loss limited to R0.00.
Termination: Employer may terminate for prohibited actions (coercive, collusive, corrupt, fraudulent, obstructive) without a court finding; also for business rescue order granted against the Contractor.
Cession, delegation and assignment: not permitted without the Employer's written consent.
Joint ventures: members jointly and severally liable; key person to be notified within two weeks of Contract Date; composition may not be altered without consent.
Confidentiality: no disclosure of contract information; images of the Affected Property require prior written consent; rights vest in the Employer.
Waiver and estoppel: any extension, concession, waiver or relaxation does not constitute a waiver of rights unless confirmed in writing.
Compensation events: if the Contractor does not notify a compensation event within eight weeks of becoming aware, he is not entitled to a change in the Prices.
Tax invoice: within one week of receiving a payment certificate, the Contractor must provide a tax invoice per Employer's procedures; failure extends the payment period by the delay. Invoices must include Eskom's VAT number 4740101508.
Insurance: Contractor provides insurances per Insurance Table A (replacement cost or amounts required by law for property damage, bodily injury, death). Employer provides insurances per Insurance Table B (Assets All Risk, Contract Works, Environmental Liability, General and Public Liability, Transportation (Marine), Motor Fleet and Mobile Plant, Terrorism, Cyber Liability, Nuclear Material Damage and Business Interruption, Nuclear Material Damage Terrorism) — cover per policy documents.
Nuclear liability: Employer indemnifies the Contractor against nuclear damage liabilities (except for unlawful intent or unauthorised presence at Koeberg Nuclear Power Station).
Asbestos: Employer ensures ambient air conforms to South African asbestos standards (OEL 0.2 fibres/ml as 4-hour TWA; short-term 0.6 fibres/ml as 10-minute TWA). Contractor may stop work and leave contaminated area until declared safe. Asbestos removal/disposal by registered asbestos contractor at Employer's expense.
COID: before commencing work on site, Contractor must furnish proof of valid registration through a certificate of good standing in terms of the Compensation for Occupational Injuries and Diseases Act, and that all payments due to the commissioner are discharged. This cover must remain in force during the contract.
Requirements
Source: NEC - Document.pdf (unknown)Contractor responsibilities:
Employer responsibilities:
Evaluation Criteria
Source: 240-68099512 Form A Rev 9.pdf (unknown)Bidders must accept and comply with Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard. The tenderer must complete and sign the quality requirements form to acknowledge acceptance. No other eligibility criteria are stated in the document.
Technical Specifications
Source: 240-68099512 Form A Rev 9.pdf (unknown)The document is a standard Eskom quality requirements form (Form A, document identifier 240-68099512 Rev 9). It requires the tenderer to indicate applicability of pre-contract award quality requirements, selecting only one category (Category 1 to 4) and indicating whether a site assessment is applicable. Main Supplier and Sub-supplier Capability and Capacity Assessment is marked as applicable. Post-contract award requirements include contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, management of nonconformities and nonconforming outputs, and special processes. The form also covers clauses of ISO 9001 standard and quality principles.
Methodology
Source: 240-68099512 Form A Rev 9.pdf (unknown)The form references clauses of ISO 9001 standard (Context of the Organisation, Leadership, Planning, Support, Operation, Performance Evaluations, Improvement) and quality principles (Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence based decision making, Relationship Management).
Quality Management
Source: 240-68099512 Form A Rev 9.pdf (unknown)The tenderer must complete and sign the form to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard. The form includes pre-contract award quality requirements (selecting applicable category, indicating whether site assessment is applicable, and main supplier/sub-supplier capability and capacity assessment), post-contract award requirements (contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, management of nonconformities, special processes), and clauses of ISO 9001 standard and quality principles.
Compliance Requirements
Source: 240-68099512 Form A Rev 9.pdf (unknown)Bidders must complete and sign the quality requirements form to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard. No other compliance requirements are stated in the document.
Section
Source: 240-68099512 Form A Rev 9.pdf (unknown)The form requires the tenderer to accept and comply with Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard. It includes pre-contract award quality requirements and post-contract award requirements such as contract execution, supplier quality performance monitoring, and quality audits.
Description
Source: Blank Pricelist New Bus Contract - 17032026.xlsx (unknown)The tender is for the provision of staff bus transportation services for the Medupi Power Station project, covering scheduled trips from Marapong, Onverwacht, and Lephalale to the Medupi site, plus ad hoc services and daily hire of a 22-seater bus.
Evaluation Criteria
Source: Blank Pricelist New Bus Contract - 17032026.xlsx (unknown)No eligibility criteria specified
Technical Specifications
Source: Blank Pricelist New Bus Contract - 17032026.xlsx (unknown)The tender covers staff bus transportation for the Medupi Power Station project. The pricing schedule lists the following service items:
Financial Requirements
Source: Blank Pricelist New Bus Contract - 17032026.xlsx (unknown)Bidders must complete the pricing schedule (Blank Pricelist New Bus Contract) with rates for each item listed. The schedule includes quantities and units as specified; rates are to be filled in by the bidder.
Important Dates
Source: 348-631731 Medupi RoD all conditions.pdf (unknown){"closingDate":"10 May 1982","closingTime":"04:16","briefingSession":"{"date":null,"time":null,"venue":"abaneand Mr NdhivhuwoNetshilaphalafrom the","is_compulsory":false}"}
Contact Information
Source: 348-631731 Medupi RoD all conditions.pdf (unknown){"name":"Mr VincentMatabaneandMr","email":null,"phone":"0123204431","department":"of EnvironmentalAffairs and","address":"ublictransport)."}
Evaluation Criteria
Source: 348-631731 Medupi RoD all conditions.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance certificate. Bidders must have the necessary permits and licenses to operate bus transportation services in South Africa. Bidders must comply with the requirements of the tender document, including any returnable forms such as SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), and SBD 9 (Certificate of Independent Bid Determination).
Technical Specifications
Source: 348-631731 Medupi RoD all conditions.pdf (unknown)supplythis additional capacityin such a
way that it improvessecurity of supplyto the nationalgrid systemand South Africa in its entirety,
Basgdon the informationconsidered,the Department'sconclusionsarethat:
(a.)the proposedactivitiesmayleadto substantialdetrimentalimpacton the environment;
(b.)theneedfor the project
Description
Source: Blank Pricelist New Bus Contract - 17032026.pdf (unknown)The tender is for the provision of staff bus transportation services for the Medupi Power Station project, covering scheduled routes from Marapong, Onverwacht, and Lephalale to the Medupi site, as well as ad hoc bus services and daily hire of a 22-seater bus.
Contact Information
Source: Blank Pricelist New Bus Contract - 17032026.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Qty Rate","address":null}
Technical Specifications
Source: Blank Pricelist New Bus Contract - 17032026.pdf (unknown)The tender covers the provision of staff bus transportation services for the Medupi Power Station project.
Pricing Schedule
Source: Blank Pricelist New Bus Contract - 17032026.pdf (unknown)Pricing must be provided for: trips from Marapong to Medupi site and back, trips from Onverwacht to Medupi site and back, trips from Lephalale to Medupi site and back, ad hoc bus services per kilometre, and daily hire of a 22-seater bus.
Financial Requirements
Source: Blank Pricelist New Bus Contract - 17032026.pdf (unknown)Pricing must be submitted on the provided price list (C2.2 Price List) under enquiry number PS(M)2012/PVDW/02.
Compliance Requirements
Source: Blank Pricelist New Bus Contract - 17032026.pdf (unknown)SHE requirements are included in the pricing schedule, indicating bidders must cost for medicals, PPE, a safety file, a safety officer, and police clearance for personnel.
Evaluation Criteria
Source: 348-10082055 Environmental File for contractors Rev 0 - Final.pdf (unknown)The document is an evaluation checklist for the environmental file that contractors must submit when working at Medupi Power Station. It lists required environmental documents and plans, including: Declaration Letter of Compliance to Eskom Environmental Requirements; Environmental Approvals provided by Eskom or applied for by the contractor (e.g., permits from local municipality for waste and emergency bylaws); appointment letters for HSE Practitioner/Environmental Officer and HCS Storeman with CVs and qualifications; communication procedure and organogram; SHE Induction; method statements with risk assessments; environmental management plan addressing potential risks per aspect and impact register; signed environmental/SHEQ policy; environmental legal register; risk-ranked environmental impact and aspects register with methodology; company risk assessments; schedule of activities linked to resources; signed objectives and targets; emergency preparedness plan; audit procedure and schedule; waste management plan with waste stream analysis and inventory; environmental incident management plan with register and reporting template; non-conformance control procedure with NCR register and template; hazardous chemical substance plan/SPCC plan with associated checklists and registers; water management plan; sewage management plan; monthly and inspection report templates; site shutdown and start-up checklist; complaints register; traffic management plan; training and awareness procedure and matrix; protocol for sourcing materials especially from mining activities; alien invasive plant species eradication plan; and ozone depleting substances management plan (if applicable).
Technical Specifications
Source: 348-10082055 Environmental File for contractors Rev 0 - Final.pdf (unknown)The environmental file must include the following documents and plans:
Compliance Requirements
Source: 348-10082055 Environmental File for contractors Rev 0 - Final.pdf (unknown)The environmental file must include:
Health & Safety
Source: 348-10082055 Environmental File for contractors Rev 0 - Final.pdf (unknown)The environmental file must include:
Description
Source: Eskom - Standard Conditions of Tender (May 2022 update).pdf (TENDER)The tender is for the provision of staff bus transportation services for the Medupi Power Station project. No further scope details are available in the source.
Important Dates
Source: Eskom - Standard Conditions of Tender (May 2022 update).pdf (TENDER)Closing date and time: 2026-08-28 at 10:00 (SAST, Telkom time signal).
Site visit / clarification meeting:
Clarification of queries:
Contact Information
Source: Eskom - Standard Conditions of Tender (May 2022 update).pdf (TENDER)All communication must be directed to the Eskom Representative only, in writing, in English, in a format that can be read, copied and recorded.
No specific contact names, emails, phone numbers, or submission address are stated in the available source. These are to be found in the Tender Data.
Submission Guidelines
Source: Eskom - Standard Conditions of Tender (May 2022 update).pdf (TENDER)Submission format and packaging:
Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender (May 2022 update).pdf (TENDER)Evaluation stages:
Technical Specifications
Source: Eskom - Standard Conditions of Tender (May 2022 update).pdf (TENDER)The tender is for the provision of staff bus transportation services for the Medupi Power Station project.
No detailed technical specifications (routes, fleet size, service levels, passenger numbers, or operating hours) are stated in the available source. These are to be found in the Tender Data and the specification/works information.
Quality Management
Source: Eskom - Standard Conditions of Tender (May 2022 update).pdf (TENDER)No tender-specific quality management requirements are stated in the available source. Bidders must provide reasonable proof of quality systems, policies and capabilities at contract award, with associated costs reflected in the tender.
Pricing Schedule
Source: Eskom - Standard Conditions of Tender (May 2022 update).pdf (TENDER)Pricing requirements:
Arithmetical error correction:
Insurance:
Security for performance:
Financial Requirements
Source: Eskom - Standard Conditions of Tender (May 2022 update).pdf (TENDER)Pricing format:
Insurance:
Security for performance:
Arithmetical corrections:
Costs:
Compliance Requirements
Source: Eskom - Standard Conditions of Tender (May 2022 update).pdf (TENDER)Eligibility:
Legislative compliance:
CSD registration:
Tax compliance:
B-bbee:
CIDB grading:
Sheq:
Misrepresentation:
Collusion and fraud:
Health & Safety
Source: Eskom - Standard Conditions of Tender (May 2022 update).pdf (TENDER)Compliance with the OHS Act and Eskom's SHEQ requirements is mandatory.
Contract Skills Development Goal (CSDG):
Contract Participation Goals (CPG):
Contractual Terms
Source: Eskom - Standard Conditions of Tender (May 2022 update).pdf (TENDER)Eskom's rights:
Tender validity:
Confidentiality:
Contract formation:
Section
Source: Eskom - Standard Conditions of Tender (May 2022 update).pdf (TENDER)Evaluation follows the standard Eskom process: basic compliance, mandatory returnables, pre-qualification criteria, designated material thresholds, functionality (if applicable), financial risk analysis, price evaluation, and B-BBEE scoring. Bidders must meet any minimum functionality threshold stated in the Tender Data. Price and B-BBEE scores are added and ranked. Arithmetical errors are corrected per Eskom's rules, with amounts in words governing.
Important Dates
Source: 240-109253698 Template for a Typical Contract Quality Plan.pdf (unknown){"closingDate":"01 April 2021"}
Contact Information
Source: 240-109253698 Template for a Typical Contract Quality Plan.pdf (unknown){"name":null,"email":null,"phone":null,"department":"ies.","address":null}
Evaluation Criteria
Source: 240-109253698 Template for a Typical Contract Quality Plan.pdf (unknown)Engineer; QC
Accepted by ( Contract Leave it blank-
completed afterManager/ End User/
Project Manager)
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 7
Template Identifier 240-43921804 Rev 5
Template for a Typical Document Identifier 240-109253698 Rev 3
Contract Quality Plan Effective Date 01 April 2021
Next Review Date 01 April 2026
Contract quality plan sample
Index
. Definitions .................................................................................................................................... 3
Scope of work ............................................................................................................................. 4
Communication channels between supplier & ESKOM ...................................................... 4
Organogram ............................................................................................................................... 4
Index of interfacing documents (processes; standards; codes & specifications) ..... 4
A list of suppliers & sub-suppliers .......................................................................................... 4
Monitoring of suppliers & contractors /sub-suppliers .................................................. 5
Interface of sub-suppliers with the qms of supplier ........................................................ 5
Index of items to be manufactured, refurbished and newly purchased .................... 5
Related items/activities that need qcp/itp (offsite and onsite) ................................. 5
Scope of work areas and processes requiring special controls governed by
Codes of manufacturing/fabrication standards ..................................................................... 6
Project .................................................................................................................................................. 6
How records will be controlled and retained .............................................................. 6
Concession and non-conformance management ......................................................... 7
Databook management process - databook index and operating & maintenance
Manual .................................................................................................................................................. 7
Execute the contract scope of work. ........................................................................................... 7
Dealing with customer property ....................................................................................... 7
Product preservation ........................................................................................................... 7
Identification and traceability .......................................................................................... 7
Commissioning and post delivery activities .................................................................... 7
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 7
Template Identifier 240-43921804 Rev 5
Template for a Typical Document Identifier 240-109253698 Rev 3
Contract Quality Plan Effective Date 01 April 2021
Next Review Date 01 April 2026
a) Quality Management System - defined as a formalized system that documents processes, procedures,
and responsibilities for achieving quality policies and objectives.
b) Quality Plan - specification of the procedures and associated resources to be applied when and by whom
to a specific object. “A document or set of documents that describe the standards, quality practices,
resources and processes pertinent to a specific product, service or project.”
c) Quality Assurance - "part of quality management focused on providing confidence that quality
requirements will be fulfilled." The confidence provided by quality assurance is twofold—internally to
management and externally to customers, government agencies, regulators, certifiers, and third parties.
The planned and systematic activities implemented within the quality system that can be demonstrated to
provide confidence that a product or service will fulfil requirements for quality."
d) Quality Control - part of quality management focused on fulfilling quality requirements." While quality
assurance relates to how a process is performed or how a product is made, quality control is more the
inspection aspect of quality management. An alternate definition is "the operational techniques and
activities used to fulfil requirements for quality."
e) Supplier – supplier - organization that provides a product or a service. A supplier is an individual or
organization who provides businesses with either products, services, or both. A provider can be internal
or external to the organization.
f) Sub-suppliers - suppliers that will be utilised by tenderer to execute the scope of work deliverables. Sub-
Supplier means any supplier who contracts with the Supplier for performance of the services for which
the Supplier has contracted with the Service Provider.
g) A subcontractor (or sub-contractor) is a company or person whom a general contractor, prime
contractor or main contractor hires to perform a specific task as part of an overall project and normally
pays for services provided to the project.
h) Quality objectives: This term represents the plan laid out to ensure that quality results are achieved
properly. They are measurable goals relevant to enhancing customer satisfaction and are consistent with
the quality policy. The quality goals are specific, measurable (using key figures), and time-bound (SMART)
intermediate steps to fulfil the quality policy.
i) Quality policy: Overall intentions and directions of an organization with regard to quality concerns, as
formally expressed by the top management.
j) Risk management: The identification, evaluation and prioritization of risks to eliminate or mitigate their
probability or severity or to leverage opportunities.
k) Documented information: information that must be controlled and maintained. A process for identifying,
reviewing and approving documents as well as using an appropriate format and media for the contents of
the documented information is required in any organisation. Documented information must be available
for those that need to access it, protected, version controlled and inactive/old versions (obsolete) disposed
of properly.
l) Method statements: It describes in a logical sequence exactly how a job is to be carried out in a safe
manner and without risks to health/safety. It includes all the risks identified in the risk assessment and the
measures needed to control those risks. This allows the job to be properly planned and resourced.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 7
Template Identifier 240-43921804 Rev 5
Template for a Typical Document Identifier 240-109253698 Rev 3
Contract Quality Plan Effective Date 01 April 2021
Next Review Date 01 April 2026
Technical Specifications
Source: 240-109253698 Template for a Typical Contract Quality Plan.pdf (unknown)(Type in the Full description of the Works Information as described in the NEC or Fidic document)
Scope of work category ( Mark with X if Yes N/A Type in the scope of work in the appropriate
any activity below is included in SOW) column.
Design
Manufacturing
Supply and Delivery/ Transportation
Construction/ Installation/ Maintenance
Commissioning
Professional services
Other
Each person on site must know their own responsibilities as well as the responsibilities of others. Each party must keep the relevant
people informed. Indicate for this contract Communication regarding all quality related issues i.e. Documentation/ Supplier Representative
details and contacts - E-mails; Minutes of Meetings; Fixed Contract Meeting; /Weekly Progress Meetings & reporting;. All documentation
shall be submitted per the contract agreement).
(Include scope of work /contract related organogram showing designations with roles and responsibilities/ outputs, which shall include the
QA and QC functions with all personnel responsible for management of activities/processes during execution or delivery of product. Team
member’s responsibilities and qualifications necessary to fulfil stated duties Work verification (e.g., who is responsible for carrying out a
task, as well as who is responsible for checking the work)
Specifications)
List of Supplier’s core processes to be used for executing scope of work / List of Documents to be used on this contract - Work Instructions;
Processes; policies; procedures for the scope of work; Industry standards; specifications; drawings applicable to the scope of work.
Name of document Type Revision
(for sow specific raw material/ required components; list all possible services/material to be sourced or services to be outsourced)
Material components to be purchased
Possible suppliers to be used for sourcing Material /components to be purchased
A
B
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 7
Template Identifier 240-43921804 Rev 5
Template for a Typical Document Identifier 240-109253698 Rev 3
Contract Quality Plan Effective Date 01 April 2021
Next Review Date 01 April 2026
Scope of Work Sub-Suppliers or Sub-contractors- for specialised, complex SOW activities that will be
outsourced.
Outsourced Description of the activity Criteria for selection
Activity/Subcontractor
Eg - Drilling of holes in rocky areas Rock drilling when digging holes; Hiring additional ladders; Eg: Technical & Quality requirements
A
B
C
Note: Evaluation; selection and performance monitoring of suppliers shall be performed as defined in the supplier’s procedures for
managing externally supplied products and services.
(Description of how the tender’s Supplier and contractors indicated in Section 6 will be monitored post award, mark with X the applicable
box- if there are sub-suppliers/ sub-contractors)
Supplier/contractor performance monitoring activities as per scope of work Yes N/A
Supplier inspection report or
supplier surveillance/audit report or /and audit schedule
Generate supplier/contractor inspection plan
Purchased Material verification checklist or report
(Description of the interface of the Sub-Supplier and Suppliers QMS and applicable documents, procedures and work instructions)
Purchased
(Submit a list of SOW items/activities that will be manufactured/refurbished or purchased which will be used on this project/contract
including full descriptions; production schedule and if produced in-house or out-sourced)
Item manufactured refurbished purchased serial number
(Description of all production products/processes which will be monitored by an approved QCP process- compilation; review and implementation and
compliance monitoring Inspection Management)
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 7
Template Identifier 240-43921804 Rev 5
Template for a Typical Document Identifier 240-109253698 Rev 3
Contract Quality Plan Effective Date 01 April 2021
Next Review Date 01 April 2026
Governed by codes of manufacturing/fabrication standards
(Description of all products/processes/services which will require special controls, i.e. welding, NDT/NDE. For each of the deliverables
identified, describe the quality control activities you will execute to ensure the deliverable will meet quality expectations (QC). For example,
you could note that you will be completing a Quality Control Checklist for each major deliverable)
During project
All documents that will be submitted to Eskom - Technical records (Safe working procedure/ Method statements), Inspections reports, signed
off QCP’s, technical assurance report, warranty certificates, material certificates , dimension reports, tests reports etc) List of retained
information to be submitted as evidence - SOW has been executed, SOW outputs
(Example):
Title number
Submitted to Eskom prior to commencement /execution
QCP / ITP from Suppliers
Certificates of compliance
Index of ITP/QCP/PQP
Data book Index
Risk Register
offsite and offshore inspections
Submitted to Eskom during and at completion of the contract
Method statements/Safe Working Procedures/ PQRs; Repair Procedures)
Qcp / itp/pqp
Final DATA book
Captured in the QMS of the Supplier / Sub-Supplier
Quality Manual
Quality Policy
Risk Register
Audit findings report and Audit Findings Register / Action Register
Consolidated inspection register of all planned and completed inspections (Accepted,
Rejected, Postponed, Cancelled, Missed);
Monthly Inspection Analysis Report
Audit findings report and Audit Findings Register / Action Register – Analysis Report
Updated procedure registers (PQRs, Method Statements, Repair Procedures, etc.)
A register of NCs / Defects / Punch Items with all the necessary analysis – Analysis Report
Databook status registers – Monthly Analysis Report (Milestone Based)
Inspection rejection rate
(Some records submitted in Clause 12 of CQP- Description of how records shall be controlled (eg. identified, completed, retained and
disposition method - please do not attach procedure) A good retrievable filing system using an indexing and cross reference system should
be set up.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 7
Template Identifier 240-43921804 Rev 5
Template for a Typical Document Identifier 240-109253698 Rev 3
Contract Quality Plan Effective Date 01 April 2021
Next Review Date 01 April 2026
Record name Reference number Distributed to Retention period
(access):
(Share brief description (flowchart/process) of how the following processes will be implemented: Concession management process; Non-
Conformance (Defects; Repair & Rework) Management Process; Inspection Management Process.
Maintenance manual
If data book applicable to the scope of work, Submission of data books – reflect review; and acceptance; include list of purchase orders for
quality critical items.
Required to execute the contract scope of work.
(Provide a list of Tools & Equipment to be used for this contract; Provide a list of Calibration/ Maintenance or Test (for those applicable)
status of each of the tools and equipment to be used)
Provide a brief description or the process flow which details the manner in dealing with customer property as per latest ISO 9001
requirement.
Include a process flow which details the manner for the preservation, storage and handling of materials – identification; handling;
contamination control; packaging; storage; transmission or transportation, and protection
Indicate the identification and traceability methods to be used for SOW related activities affected by statutory and regulatory requirements
Indicate any post-delivery activities/support and how shall it be given to Eskom during commissioning and after SOW delivery - any
warranty period and conditions; customer satisfaction measurement; technical support; defect correction period/ retention funds. When
determining post-delivery activities consider statutory; regulatory and scope of work requirements
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 7
Methodology
Source: 240-109253698 Template for a Typical Contract Quality Plan.pdf (unknown)The supplier must submit method statements and safe working procedures, including PQRs and repair procedures, as part of documented information to Eskom. The supplier must also maintain registers for audit findings, updated procedures, non-conformances/defects/punch items, and databook status, with monthly analysis reports.
Experience & Qualifications
Source: 240-109253698 Template for a Typical Contract Quality Plan.pdf (unknown)The supplier must provide an organogram showing designations with roles, responsibilities and outputs, including QA and QC functions. Team members' responsibilities and qualifications necessary to fulfil stated duties must be shown, including who carries out tasks and who checks the work.
Quality Management
Source: 240-109253698 Template for a Typical Contract Quality Plan.pdf (unknown)The supplier must prepare a Contract Quality Plan (CQP) to identify and plan for meeting Eskom's quality management expectations. The CQP references SANS 466:2005 and ISO 10005:2005. It must cover scope of work, communication channels, an organogram with QA/QC roles, interfacing documents, supplier and sub-supplier management, monitoring, special controls, documented information submission, records control, concession and non-conformance management, databook management, tool and equipment management, customer property, product preservation, identification and traceability, and commissioning and post-delivery activities. The CQP is compiled by the tenderer at revision 0 during tender evaluation and changes to revision 1 after contract signing; it is approved by the owner of the organisation and accepted by Eskom after award.
Contractual Terms
Source: 240-109253698 Template for a Typical Contract Quality Plan.pdf (unknown)The contract requires the supplier to address post-delivery activities, including warranty period and conditions, customer satisfaction measurement, technical support, and defect correction period or retention funds, considering statutory, regulatory and scope of work requirements.
Evaluation Criteria
Source: 348-22367 Medupi Waste Management Work Instruction Rev 8.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid SARS Tax Clearance Certificate (or tax pin). Bidders must have the necessary operating licences for passenger transport, including a valid operating licence issued by the relevant provincial authority. Bidders must comply with the National Road Traffic Act and all relevant regulations regarding vehicle fitness and driver qualifications. Bidders must meet Eskom's supplier evaluation criteria, which may include financial stability, safety record, and past performance. Bidders must complete all mandatory returnable forms as specified in the tender document, including the SBD forms (e.g., SBD 4 Declaration of Interest, SBD 9 Certificate of Independent Bid Determination) and any Eskom-specific declarations.
Technical Specifications
Source: 348-22367 Medupi Waste Management Work Instruction Rev 8.pdf (unknown)This document describes the approach in which waste both general and hazardous will be managed
on the Medupi construction site. This requires active involvement of both the Team Medupi and its
contractors. It does not relieve any employee or contractors from fulfilling requirements set in the
environmental legislations.
2.1 Scope
2.1.1 Purpose
The purpose of the Medupi Waste Management Work Instruction is to outline critical elements of
managing waste at Medupi Construction Project. The Project aims to avoid, minimise and dispose
of waste in an environmentally sound manner and in compliance to the applicable legislative
requirements.
2.1.2 Applicability
This document shall apply to Medupi Power Station.
2.1.3 Effective date
This work instruction shall be effective as from the authorisation date.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems – Requirements
[2] Environmental Conservation Act (Act ) External
[3] National Water Act (Act No. ) External
[4] National Environmental Management Act (Act No. ) External
[5] National Environmental Management: Waste Act (Act No. ) External
[6] Occupational Health and Safety Act (Act No. ) and Construction Regulations
External
[7] National Norms and Standards For the Remediation of Contaminated Land and Soil Quality,
GN 331, 2 Shall 2014 External
[8] Waste Classification and Management Regulations, GN 634, 23 August 2013 External
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Waste Management Work Instruction Unique Identifier: 348-22367
Revision: 8
Page:
[9] National Norms and Standards for the Assessment of Waste for Landfill Disposal, GN 635, 23
August 2013 External
[10] National Norms and Standard for Disposal of Waste to Landfill, GN 636, 23 August 2013
External
[11] Hazardous Chemical Substance Act (Act No. ) External
[12] National Health Act (Act ) as amended External
[13] National Road Traffic Act (Act No. ) External
[14] National Waste Information Regulations, GN 625, 13 December 2012 External
[15] Waste Tyre Regulation, GN 1064, 29 September 2017 External
[16] National Norms and Standards for the Sorting, Shredding, Grinding, Crushing, Screening,
Chipping or Bailing of General Waste, GN 1096, 11 November 2017, GN 926, External
[17] List of waste management activities that have, or are likely to have, a detrimental effect on the
environment, GN 921, 29 November 2013 and its amendments External
[18] Regulations regarding the control of the import of waste, GN 22, 21 January 2019 External
[19] Basel Convention on the trans-boundary movement of hazardous waste and their disposal
External
[20] Stockholm Convention on the identification and removal of persistent organic pollutants
External
[21] Rotterdam convention on the banning of hazardous substances External
[22] Montreal Convention, the phase-out of ozone depleting substance External
[23] Kyoto Protocol on the removal of greenhouse gases External
[24] Bamako Convention on the Ban of the Import into Africa and the control of Transboundary
movement of Hazardous Waste within Africa External
[25] National Environmental Management Laws Amendment Act External
2.2.2 Informative
[26] 348-961711 Project Execution Plan
[27] 348-883902 Project Quality Plan
[28] 348-653867 Development and Change of Medupi QMS Documents
[29] 348-883808 Document and Record Management Procedure
[30] 348-681011 The Environmental Management Plan for the Medupi Coal-fired Power Station in
the Lephalale Area, Limpopo Province – The Construction Phase
[31] 12/12/20/695 Record of Decision for the Medupi Project
[32] 348-31313 Medupi Power Station Water Use Licence 01/A1042/ABCEFGI/5213, Version: 01-
2020
[33] 348-859607 Medupi Power Station Water Use Licence 07/A42H/IIG/6425, Version: 01-2020
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Waste Management Work Instruction Unique Identifier: 348-22367
Revision: 8
Page:
[34] 348-859607 Medupi Power Station Water Use Licence 01/A1042/ABCEFGI/5213 &
07/A42H/IIG/6425
[35] 348-9936873 Registration approval for waste sorting, crushing and bailing facilities 12-9-11-
SSGCSB08-5
[36] 348-9936868 Registration approval for waste storage facilities 12-9-11-ST195-5
[37] 348-630732 Medupi Ash Disposal Facilities Waste Management Licence
12/9/11/L210323092918/5/R
[38] 348-860846 Medupi Environmental Policy
[39] 32-245 Eskom Waste Management Standard
[40] 348-717685 Procedure for the handling of HSE Non-conformities and Corrective and
Preventive Action
[41] 348-693723 Medupi Environmental Incident Management Procedure
2.3 Definitions
Term Explanation
Best Practical Means the option that provides the most benefit or causes the least damage to the
Environmental environment as a whole, at a cost acceptable to society, in the long term as well as in
Option (BPEO) the short term.
Best practice Means to perform or exercise a particular activity or activities in the most suitable,
appropriate, advantageous or best advised manner in order to achieve the highest
standards while performing or excising such activity or activities.
Building and Means waste, excluding hazardous waste, produced during the construction, alteration,
demolition waste repair or demolition of any structure, and includes rubble, earth, rock and wood
displaced during that construction, alteration, repair or demolition.
Business waste Means waste that emanates from premises that are used wholly or mainly for
commercial, retail, wholesale, entertainment or government administration purposes.
Colour coding Means the use of colour on a container or bag or the label attached to such that
serves to identify the category of waste it contains.
Contaminant Means any substance present in an environmental medium at concentrations in
excess of natural background concentrations that has a potential to cause harm to
human health or the environment.
Contractor An employer who performs construction work and includes principal contractors.
Contracted companies are specifically viewed as employers in their own right, as per
the OHS Act.
Cradle to grave A policy of controlling a waste from its inception to its ultimate disposal.
principle
Disposal Means the burial, deposit, discharge, abandoning, dumping, placing or release of any
waste into, or onto, any land.
Domestic waste Means waste, excluding hazardous waste, that emanates from premises that are
used wholly or mainly for residential, educational, health care, sport or recreation
purposes.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Waste Management Work Instruction Unique Identifier: 348-22367
Revision: 8
Page:
Term Explanation
Duty of care Every person who causes, has caused or shall cause significant pollution or
degradation of the environment shall take reasonable measures to prevent such
pollution or degradation from occurring, continuing or recurring, or, in so far as such
harm to the environment is authorised by law or cannot reasonably be avoided or
stopped, to minimise and rectify such pollution or degradation of the environment.
Environment The surrounding in which humans exist that is made up of:
i. the earth’s land, water and atmosphere;
ii. micro-organisms, plant and animal life;
iii. any part or combination of (i) and (ii) and the interrelationship among and between
them; and
the physical, chemical, aesthetic and cultural properties and conditions of the
foregoing that influence human health and well-being.
Extended Means measures that extend a person’s financial or physical responsibility for a
Producer product to the post-consumer stage of the product.
Responsibility
Measures
General waste Means waste that does not pose an immediate hazard or threat to health or to the
environment, and includes—
a) domestic waste;
b) building and demolition waste;
c) business waste;
d) inert waste; or
any waste classified as non-hazardous waste in terms of the regulations made under
section 69 of the NEMWA.
General Waste Means a storage facility that has a capacity to store in excess of 100m3of general
Storage Facility continuously.
Health care risk Means the hazardous portion of the waste generated at the heath care facility. This is
waste any waste that poses a hazard to human health or the environment.
Hazardous waste Means any waste that contains organic or inorganic elements or compounds that
shall, owing to the inherent physical, chemical or toxicological characteristics of that
waste, have a detrimental impact on health and the environment
Hazardous Means a storage facility that has a capacity to store in excess of 80m3 of hazardous
Waste Storage continuously.
Facility
Inert Waste Means waste that—
a) does not undergo any significant physical, chemical or biological transformation
after disposal;
b) does not burn, react physically or chemically biodegrade or otherwise adversely
affect any other matter or environment with which it shall come into contact; and
c) does not impact negatively on the environment, because of its pollutant content and
because the toxicity of its leachate is insignificant.
Integrated Is a holistic and integrated system and process of management, aimed at pollution
pollution and prevention and minimisation at source, managing the impact of pollution and waste on
waste the receiving environment and remediating damaged environments.
management
Life-cycle Means a process where the potential environmental effects or an impact of a product
assessment or service throughout the life of that product or service is being evaluated.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Waste Management Work Instruction Unique Identifier: 348-22367
Revision: 8
Page:
Term Explanation
Litter Means any object or matter which is left behind or discarded by a person in any place
except in an approved receptacle provided for that purpose or at a waste handling
facility.
Precautionary Where a risk is unknown; the assumption of the worst case situation and the making
principle of provision for such a situation.
Preventive Reduce risk by ensuring that collection, treatment, and disposal take place as close as
principle possible to the point of generation as is technically and environmentally feasible.
Proximity Treatment and disposal of general and hazardous waste shall take place as close as
principle possible to the point of production to minimise transportation and environmental risks.
Waste shall be managed and disposed of as close to the point of generation as
possible. The objective is to minimise transport distances and cost, exposure, and risk
associated with waste.
Pollution Any change in the environment caused by substances, radioactive or other waves,
noise, odours, dust or heat emitted from any activity, including the storage or
treatment of waste or substances, construction and the provisions or services,
whether engaged in by any person or an organ of state, where that change has an
adverse effect on human health or well-being or on the composition, resilience and
productivity of natural or managed ecosystems, or on materials useful to people, or
will have such effect in the future.
Polluter pays The costs of remedying pollution, environmental degradation and consequent adverse
principle. health effects and of preventing, controlling or minimising further pollution,
environmental damage or adverse health effects shall be paid for by those responsible
for harming the environment.
Recycle Means a process where waste is reclaimed for further use, which process involves the
separation of waste from a waste stream for further use and the processing of that
separated material as a product or raw material.
Recovery Means the controlled extraction or retrieval of [any substance,] energy, or material [or
object] from waste
Remediation Means the management of a contaminated site to prevent, minimise, or mitigate harm
to human health or the environment.
Re-use Means to utilise the whole, a portion of or a specific part of any substance, material or
object from the waste stream for a similar or different purpose without changing the
form or properties of such substance, material or object.
SANS 10234 Means the latest edition of the South African National Standard Globally Harmonised
System of Classification and Labelling of Chemicals.
Temporary Means a once off storage of waste for a period not exceeding 90 days.
storage
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Waste Management Work Instruction Unique Identifier: 348-22367
Revision: 8
Page:
Term Explanation
Waste Means:
(a) any substance, material, or object—
(i) that the generator of that substance, material or object has no further use for
within its own processes, whether or not it has any commercial value for the
generator, but which can be re-used, recycled, recovered or traded in by any
person; or
(ii) that is rejected, abandoned, discarded, or disposed of, either temporary or
permanently, or is intended to be discarded or disposed of by the generator of
that substance, material or object, regardless of whether or not that substance,
material or object has any commercial value for the generator or can be re-used,
recycled, recovered or traded in by any person; or
(b) any other substance, material or object that shall be defined as a waste by the
Minister by notice in the Gazette; but any waste or portion of waste, referred to in
paragraphs (a) and (b), ceases to be a waste—
(aa) once it is re-used, recycled, or recovered or traded in by the holder of that waste
or portion of waste in accordance with a condition stipulated in a valid waste
management licence, where applicable, or in accordance with an applicable
norm or standard made in terms of this Act; or
(bb) where the Minister has, in the prescribed manner, excluded the holder of any
waste stream or a portion of a waste stream from the definition of waste, enabling the
holder thereof to trade in the excluded waste stream or portion of the excluded waste
stream, provided that the holder has satisfied the requirements of proving the
environmentally safe use of the waste stream or portion of waste stream by it or any
other person and committed to provide the Minister with annual reports of the use
thereof.
Waste Means establishing, in terms of SANS 10234
classification a) whether a waste is hazardous based on the nature of its physical, health and
environmental hazardous properties (hazard classes), and
the degree or severity of hazard posed (hazard categories).
Waste disposal Means any site or premise used for the accumulation of waste with the purpose of
facility disposing of that waste at that site or on that premise.
Waste Means a place, infrastructure, structure, or containment of any kind, wherein, upon or
management at, a waste management activity takes place and includes a waste transfer station,
facility container yard, landfill site, incinerator, a lagoon, recycling or a composting facility.
Waste handling Means a facility that is used to accumulate and temporarily store waste before it is
facility/Temporar transported to a recycling, treatment, or waste disposal facility.
y Waste Storage
Facility
Waste generator Means any person whose actions, production processes or activities, including waste
management activities, results in generation of waste.
Waste manager Means any person that re-uses, recycles, recovers, treats, or disposes of waste.
Waste Means any person who conveys or transfers waste (a) between the waste generator
transporter and a waste management facility; or (b) between waste management facilities.
Waste manifest Means a system of control documentation, which accompanies a load of hazardous
system waste transported from the point of generation to the waste management facility.
Waste stream Means a type of waste, including building waste; business waste; bulky waste; dailies;
domestic waste; garden waste; hazardous waste; health care risk waste; industrial
waste; recyclable waste and special industrial waste.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Waste Management Work Instruction Unique Identifier: 348-22367
Revision: 8
Page:
Term Explanation
Waste Means any activity listed in Schedule 1 or published by notice in the Gazette under
management section 19 of the NEMWA, 2008 as amended
activity
Waste Means a programme that is intended to promote the reduced generation and disposal
minimisation of waste.
programme
2.4 Abbreviations
Abbreviation Explanation
DWS Department of Water and Sanitation
DFFE Department of Forestry, Fisheries and the Environment
EA Environmental Authorisation
ECO Environmental Control Officer
EMP Environmental Management Plan
GWIS Gauteng Waste Information System
GN Government Notice
HCRW Health Care Risk Waste
NEMWA National Environmental Management: Waste Act
ODS Ozone-Depleting Substances
PCB’s Polychlorinated biphenyl
SANS South African National Standards
SABS South African Bureau of Standards
SAWIS South African Waste Information System
SP Stockpile
TM Team Medupi
WML Waste Management Licence
WUL Water Use License
2.5 Roles and Responsibilities
a) Responsible
Those who do the work to achieve the task. There is at least one role with a participation type of
responsible, although others can be delegated to assist in the work required.
b) Accountable (also approver or final approving authority)
The one ultimately answerable for the correct and thorough completion of the deliverable or task,
and the one who delegates the work to those responsible. In other words, an accountable shall sign
off (approve) work that responsible provides. There shall be only one accountable specified for each
task or deliverable.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Waste Management Work Instruction Unique Identifier: 348-22367
Revision: 8
Page:
c) Consulted (sometimes counsel)
Those whose opinions are sought, typically subject matter experts; and with whom there is two-way
communication.
d) Informed
Those who are kept up-to-date on progress, often only on completion of the task or deliverable; and
with whom there is just one-way communication.
Table 1: RACI Matrix
Site Manager
Process Step Director Contractors Manager Project Construction Unit Contracts Construction Environmental ECO TM TM Manager TM TM TM Support TM Manager Environmental Practitioners Principal
Ensure that the requirements of this Waste
I I C,I R,I C,I A R RManagement Procedure are implemented I
Responsibilities:
TM and contractors shall, within their powers, take all reasonable measures to:
toxicity and amount of waste that is generated.
environmentally sound manner.
a nuisance through noise, odour or visual impacts.
managers of the impact of that waste on health and the environment. Waste generated at the
project shall be disposed of in an environmentally sound manner and life-cycle approach and/or
cradle to crave principle shall be implemented for all waste stream generated.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Waste Management Work Instruction Unique Identifier: 348-22367
Revision: 8
Page:
facilities used complies with the conditions of the permits/licenses issued as well as all applicable
legislations, but the ultimate legal responsibility lies with the waste generators to ensure that the
waste is treated, recycled and disposed of correctly. It is required that service providers and
waste disposal facilities be inspected/audited by the Contractors, TM Environmental Department
and the ECO’s in order to fulfil the duty of care, the life-cycle approach to waste management
and cradle to grave responsibilities with regard to waste management.
2.6 Related/Supporting Documents
[1] 348-885591 Anti-Litter Policy Statement
[2] 348-613250 Eskom WIS Registration Certificate for hazardous waste generator
[3] 348 – 669234 Waste Removal Checklist
[4] 348-665979 Medupi Waste Inventory Template
[5] 348-665980 Medupi Waste Hierarchy Implementation Template
[6] 240 – 47176064 Eskom Waste Reporting Template
[7] 348-611308 Eskom WIS Registration Certificate for Ash Disposal Facility
[8] 348-655890 Appendix A-Document Self-Assessment Checklist
3.1 Waste Management Strategy
In order to ensure that waste management activities within Medupi Power Station Project (the
Project) are undertaken in an environmentally sound manner, contractors are required to develop a
strategic planning tool (waste management plan/procedure) that serves as a first step towards
informed planning and accountability for waste management within their areas of responsibility.
Waste management plans shall be developed and implemented to meet the requirements stipulated
in Part 5 of the National Environmental Management Waste Act, 2008 (herein referred to as
NEMWA). The plan/procedure shall amongst others include:
Waste minimisation programme which sets out actions and target dates to minimise waste and
improve resource efficiency and meet the objectives of the waste management procedure/plan. The
programme
recycling and responsible disposal. The programme shall also look at actions for education and
awareness;
from contravening applicable environmental legislation, as well as consequences of non-
conformances to applicable standard or procedures (internal and external) are in place.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Waste Management Work Instruction Unique Identifier: 348-22367
Revision: 8
Page:
3.2 Environmental Management Principles
The NEMWA, 2008 introduced a number of guiding principles into South African environmental
legislation including the life-cycle approach to waste management, producer responsibility, the
precautionary principle and the polluter pays principle. Chapter 5 of the National Environmental
Management Act, 1998 (herein referred to as NEMA) provides instruments for integrated waste
management. NEMWA also places a duty of care on any person who shall cause significant pollution
or degradation of the environment, requiring them to institute measures to either prevent pollution
from occurring, or to minimise and rectify the pollution or degradation where it cannot be avoided.
The NEMWA echoes the duty of care provision by obliging holders of waste to take reasonable
measures to implement the waste management hierarchy.
3.3 Waste avoidance, waste generation and waste minimisation
The Project focus shall no longer be looking at how to handle and dispose of waste once it is
generated (End of Pipe), but rather at how to avoid waste generation. This is the first step in a list of
actions that relate to managing waste in a sustainable way called the “waste management hierarchy”
– trying at first to avoid creating waste, then minimising what is produced by re-using, recycling,
recovering and treating where necessary and disposal as a last resort.
Figure 1: Waste Management Hierarchy
Waste is an inevitable consequence of any development and hence it shall be managed in an
integrated and sustainable manner. The National Waste Management Strategy defines a waste
management hierarchy, which is based on the above-mentioned principles (see Figure 1). One of
the mechanisms to resolve this problem is to identify what portions of the waste stream can most
readily be avoided, minimised and/or recycled. To do this effectively, quantitative understanding of
the total waste stream is necessary.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Waste Management Work Instruction Unique Identifier: 348-22367
Revision: 8
Page:
Figure 2: Generic process flow waste management with recycling option
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Waste Management Work Instruction Unique Identifier: 348-22367
Revision: 8
Page:
3.4 Waste classification
Waste Classification and Management Regulations, GN 634 (the Regulations) came into effect on
the 23 August 2014. All waste generated at the project shall be classified in accordance with SANS
10234 within one hundred and eighty (180) days of generation with the exception of the waste stream
mentioned below:
3.4.1 General waste
3.4.2 Hazardous waste
Waste that is classified in terms of the Minimum Requirements for the Handling, Classification and
Disposal of Hazardous Waste (2nd Edition, 1998; Department of Water Affairs and Forestry), or
waste for which an alternative classification was approved by the Department of Water Affairs or
Department of Environmental Affairs, prior to the Regulations taking effect, shall be re-classified in
terms of Regulation 4(2) within three (3) years from the date of commencement of these Regulations.
Waste shall be separated at source and shall not be mixed or diluted solely to reduce the
concentration of its constituents prior to classification. Waste shall be re-classified every five (5)
years, or within 30 days of modification to the process or activity that generated the waste, changes
in raw materials or other inputs, or any other variation of relevant factors. Waste that has been
subjected to any form of treatment shall be reclassified, including any waste from the treatment
process.
Generators of hazardous waste shall ensure that a safety data sheet for the hazardous waste is
prepared in accordance with SANS 10234 as stipulated in the Regulations.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Waste Management Work Instruction Unique Identifier: 348-22367
Revision: 8
Page:
3.5 Safety Data Sheets
As from the 24 August 2016 all hazardous waste generators, except HCRW shall ensure that safety
data sheet/s prepared in accordance with SANS 10234 are kept.
Safety data sheets for asbestos waste, PCB waste or PCB containing waste (> 50 mg/kg or 50 ppm)
and expired, spoilt or unusable hazardous products shall be prepared in accordance with SANS
10234 for the product the waste originates from.
Safety data sheets for mixed waste (general waste, excluding domestic waste, which contains
hazardous waste or hazardous chemicals; and mixed, hazardous chemical wastes from analytical
laboratories and laboratories from academic institutions in containers less than 100 litres) shall be
prepared in accordance with SANS 10234 reflecting details of the specific hazardous waste/s or
hazardous chemical/s in the waste.
3.6 Waste Collection Services
TM and Contractors shall develop a waste collection programme which shall amongst others include:
Network of collection points;
Provision of clearly labelled waste receptacles and a system for the safe collection and
transportation of waste;
Sufficient suitably capacitated staff (employed or contracted);
Cleaning services this shall include provision and servicing of street litter bins, street sweeping,
litter picking, clearing of illegal dumping and animal carcasses.
Collection vehicles (bakkie, tractor trailers and open trucks) are used to transport waste from the
working areas/collections point to temporary waste storage facility/ies. At temporary storage facilities
general waste is placed into waste skips which are emptied using compactors trucks whereas
hazardous waste is placed inside the 6m3 and 28m3 skips, 210L drums and removed by the
accredited service providers.
3.7 Minimum requirements for management of waste storage facilities
Waste storage facility means any facility on or in which waste is accepted, accumulated, handled,
recycled, sorted, stored or treated prior to its transfer for treatment by way of incineration or for final
disposal.
National Norms and Standards for the Storage of Waste, GN 926 of November 2013 provide
minimum standards for the design and operation of new and existing waste storage facilities and
shall be read in conjunction with requirements stipulated below.
3.7.1 Location and Construction
Waste storage areas shall be located in such a manner that it can provide optimum handling and
transportation of waste material. Location of handling areas shall also take into consideration the
hazards associated with flammability and toxicity of the waste stored and applicable codes and
standards.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Waste Management Work Instruction Unique Identifier: 348-22367
Revision: 8
Page:
The foundations of waste storage containers shall be protected from, or resistant to all, forms of
internal and external wear, vibration, shock, corrosion, fire, heat, vacuum and pressure which might
cause the storage tank foundation to fail.
The liquid waste storage area shall have a firm, impermeable, chemical resistant floors and a roof
or a container that is coated to prevent direct sunlight and rainwater from getting in contact with the
waste. The facility shall be surrounded by an interception trench with a sump for intercepting and
recovering potential spills.
The liquid waste storage area shall have a secondary containment system (e.g. bund, drip tray) of
sufficient capacity to contain at least 110% of the maximum contents of the storage facility. Where
more than one container/tank is stored, the bund shall be capable of storing at least 110% of the
largest tank or 25% of the total storage capacity, whichever is greater (in the case of drums the
tray/bund size shall be at least 25% of total storage capacity).
3.7.2 Access Control and Notices
Access to waste storage facility shall be limited to employees who have been trained with respect to
the operation of the waste storage facility and emergency response procedures and any other person
authorized by the owner of the storage facility.
Notices prohibiting unauthorized persons from entering the waste storage facility, as well as a SABS
acceptable sign indicating the risks involved in unauthorized entry, shall be displayed at the entrance.
Notice stating the hours of operation, the name, address and telephone numbers of the person
responsible for the management of the waste storage facility shall be displayed at the entrance.
3.7.3 Operation
The waste storage facility shall be free from odour or emissions at levels likely to cause annoyance.
Waste shall be sorted into various categories (recyclables and non-recyclables). A procedure or
protocols shall be developed and implemented to prevent any mixing of hazardous and nonhazardous waste.
The waste storage facility shall be operated within its design capacity.
When the waste storage facility is no longer in use method statement for decommissioning and
rehabilitation of the facility shall be submitted to the TM Environmental Department and ECO’s for
approval prior commencement with disestablishment activities.
Routine inspections which include a review of the adequacy, amount and type waste, secondary
containment principle and accessibility of spill response equipment shall be conducted on regular
basis.
3.7.4 Waste Storage Containers
A waste container shall be of sufficient strength and structural integrity to ensure that it is unlikely to
burst or leak in its ordinary use. Containers shall be handled in accordance with appropriate safety
requirements and any waste lost during opening, handling or storage shall be contained.
Waste receptacles (e.g. skips, bins, 210L drums with closing mechanism) shall be closed to prevent
the waste from being blown away or rain entering and increasing volume of waste. Waste
receptacles containing hazardous waste shall be kept closed unless waste is added or emptied.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Waste Management Work Instruction Unique Identifier: 348-22367
Revision: 8
Page:
Any container or storage impoundment holding waste shall be labelled, or where labelling is not
possible, records shall be kept, reflecting the following:
Date on which waste was first placed in the container;
Date on which waste was placed in the container for the last time when the container was filled,
closed, sealed or covered;
impoundments, if relevant;
in terms of the National Waste Information Regulations, GN August 2012; and
3.8 Waste Treatment
Unless otherwise approved by authorities, TM and Contractors when planning to undertake
treatment of hazardous waste (e.g. crushing of fluorescent tubes, bioremediation) onsite shall first
check if the activity will triggers a listed activity or not. Contractors shall consult with TM
Environmental Department prior executing such activity.
Waste shall not be mixed or treated where this would reduce the potential for re-use, recycling or
recovery; and/or result in treatment that is not controlled and not permanent.
3.9 Waste Transportation
Only an accredited service provider shall transport hazardous waste from site and they shall do so
in accordance with the conditions of permit/s issued to them as well as the requirements of any
relevant SANS codes, in respect of the type of vehicle, the markings and manner of construction of
such vehicle, procedures for safety and cleanliness, and documentation relating to the source,
transportation and disposal of such waste, and subject to the requirements of any other legislation.
Contractors shall seek approval from TM Environmental Department prior to removal and disposal
of waste. This is done through submission of Waste Removal Checklist (348 - 669234). The checklist
shall be submitted 5 days prior removal of waste from site. Gate release permit shall be signed and
issued to the applicant/requestor who has waste removal checklist approved by TM Environmental
Department
At minimum, waste transporters shall be in possession of the following permits/registration
Compliance Requirements
Source: 348-22367 Medupi Waste Management Work Instruction Rev 8.pdf (unknown)Waste handling permit issued by local authority (e.g. Lephalale Local Municipality, City of Tshwane);
Waste Information Registration Certificate issued by either provincial or national where applicable; and
Transportation Permit issued in terms of the emergency services By-Laws (any municipality within South Africa) when transporting hazardous waste.
Approval granted by the provincial department responsible for environmental matters (e.g. Limpopo Economic Development Environment and Tourism) if applicable or required by law. . CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30. Medupi Waste Management Work Instruction Unique Identifier: 348-22367 Revision: 8 Page: Transporters of waste classified as hazardous shall
Complete a waste manifest, at minimum containing the information stipulated on Annexure 2: Waste Manifest System Requirements of the Waste Classification and Management Regulations GN August 2013;
Provide the information to the generator before the waste is transported from the premises of the generator; and
Provide the information to the waste manager at the time of delivery of the waste to the facility for a waste management activity. Any person engaged in the transportation of waste shall take all reasonable steps to prevent any spillage of waste or littering from a vehicle used to transport waste. Where waste is transported for the purposes of disposal, a person transporting the waste shall, before offloading the waste from the vehicle, ensure that the facility or place, to which the waste is transported, is authorised to accept such waste and shall obtain written confirmation that the waste has been accepted. Waste transporters shall have emergency response plans. Any environmental incidents that occur whilst transporting waste on the public road shall be managed in accordance with the applicable environmental legislation or municipal bylaws. Such incidents shall also be reported to TM Environmental Department as per Medupi Environmental Incident Management Procedure, SPO. No. 348 - 693723. 3.10 Waste Disposal No person shall dispose of waste, or knowingly or negligently cause or permit waste to be dispose of, in or on any land, water body or at any facility unless the disposal of that waste is authorised by law or dispose of waste in a manner that is likely to cause pollution of the environment or harm to health and well-being. Waste managers shall not store waste for more than eighteen (18) months from the date of receipt from the waste generator. Waste generators shall ensure that the disposal of their waste to landfill is done in accordance with the Norms and Standards for Disposal of Waste to Landfill, GN August 2013. 3.11 Land Contamination and Rehabilitation Contaminated in relation to Part 8 of Chapter 4 of the NEMWA, means the presence in or under any land, site, buildings or structures of a substance or micro-organism above the concentration that is normally present in or under that land, which substance or micro-organism directly or indirectly affects or shall affect the quality of soil or the environment adversely. The land contamination provisions provide for ‘high risk activities’ which are activities of an organisation which could potentially lead to land contamination. If high risk activities are undertaken or are taking place, the site is likely to have contamination. In order to avoid confusion disestablishment, Contractors shall inspect the areas allocated to them and document the outcome. The inspection report shall be used tool that provide guidance during development of disestablishment and/rehabilitation plan. The report shall clearly indicate the conditions, potential liabilities and highlight possible future obligations. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30. Medupi Waste Management Work Instruction Unique Identifier: 348-22367 Revision: 8 Page: Contractors who suspect that they operate on a land which is contaminated (with respect to different receptors and land use scenarios) or a person who undertakes an activity that caused the land to be contaminated shall notify TM Environmental Department of the contamination as soon as that person becomes aware of that contamination. No person shall transfer contaminated land without informing the person to whom that land is to be transferred to that the land is contaminated. Requirements stipulated in the National Norms and Standards for the Remediation of Contaminated Land and Soil Quality, GN Shall 2014 shall be adhered to. 3.12 Management of General Waste General waste means waste that does not pose an immediate hazard or threat to health or to the environment, and includes domestic waste, building and demolition waste, business waste and inert waste. 3.12.1 Scrap Metals Metals can be divided into two broad categories: ferrous- and non-ferrous metals. Ferrous metals are iron and surface-treated iron, while non-ferrous metals include copper and copper alloys, zinc, lead, aluminium, tin and precious metals such as gold and silver. Metal equipment shall be coated with paints (paint shall be lead-based) or PCB-containing oil, which shall have separate environmental hazards of their own. In line with the principles of waste minimisation, scrap metal shall first be minimised, reused and/or recycled. Contractors are responsible for ensuring that the facilities used to reuse/recycle scrap metal have the necessary operational permits such as waste management licence, WIS registration certificates, municipal waste handling permits, atmospheric emission licences. 3.12.2 Waste tyres Contractors shall manage waste tyres in their possession, control, or causes such tyres to be managed in accordance with the Waste Tyre Regulations GN September 2017 as amended. Contractors shall before remove waste tyres from site ensure that the end of life cycle is clearly understood and all required permits/licences/registration certificates are in place. Records of waste tyres (in categories) removed from site shall be submitted to the TM Environmental Department as part of the Contractors Monthly Environmental Compliance Reports. No person shall dispose of wholly waste tyres at a waste disposal facility or recycle, recover or knowingly or negligently cause or permit tyres to be recycled or recovered at any site, unless the recycling or recovery of those waste tyres is authorised by law. 3.12.3 Building Rubble/Spoil Material/Concrete Waste Arising from construction activities, large quantities of different soil types, rocks, spoil materials and building rubble/concrete waste is generated. Recycling is considered the best option to manage this waste stream. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30. Medupi Waste Management Work Instruction Unique Identifier: 348-22367 Revision: 8 Page: Building Rubble/Spoil Material/Concrete Waste shall be disposed of at the demarcated stockpile areas and processed for reuse within the project. Contractors shall ensure that the rubble brought to the stockpile areas is clean and free from other waste materials such scrap metal, paper, plastic and wood etc. 3.12.4 Incompactable Waste This includes any general waste that cannot be loaded into a compactor truck but not limited to PVC pipes, redundant office furniture and wood waste. All types of uncompactable waste generated on site except wood waste are disposed of inside the 28m3 skips. Wood waste is placed on the ground and then loaded onto the truck or 28m3 metres skips and disposed of at the licenced facility. Wood waste can be re-used by the local communities for different purposes. Burning of waste or use of wood waste for fire purposes is discouraged because some might have chemicals coating that could be unsafe or harmful to human-beings and environment. 3.12.5 Compactable Waste This include any waste that can be reduced in volume by compressing or applying pressure to it (compacting) with the intention to minimise transportation cost. It includes items such as cardboard boxes, paper and plastic bottles etc. Compacted waste is collected using waste receptacles such as 240L wheelie bins, 6 m3cubic skips or in some instances refuse bags. Contractors collect waste contained in 210L wheelie bins and refuse bags to the central waste areas where waste is disposed of into the 6m3 skips. At the central waste areas, Eskom Rotek Industries uses Rear End loader (REL) Compactor Truck to collect waste contained in the 6 cubic metres skip for final disposal at the licenced waste disposal facility. 3.13 Management of Hazardous Waste Hazardous waste means any waste that contains organic or inorganic elements or compounds that shall, owing to the inherent physical, chemical or toxicological characteristics of that waste, have a detrimental impact on health and the environment PCB’s and Asbestos are not used onsite and will therefore not be addressed in this work instruction. In case of suspicion material shall be assessed/investigated as per applicable legal requirements. Waste prohibitions and restrictions on the disposal of waste to landfill stipulated under section 5 (1) and 5 (2) of the National Norms and Standards for Disposal of waste to Landfill, GN August 2013 shall be adhered to. 3.13.1 Sewage Related Waste Management of sewage related waste is detailed in the Sewage Management Plan (348-22351). Sewage sludge, soil contaminated with sewage and screenings/rags are disposed of as hazardous waste at the licenced facility (e.g. Holfontein, Rietfontein). CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30. Medupi Waste Management Work Instruction Unique Identifier: 348-22367 Revision: 8 Page: Recycling of sewage (composting) shall be an option but the sludge needs to meet the requirements as stipulated in the Guidelines for Utilisation and Disposal of Wastewater Sludge - WRC Report No. TT261/06. 3.13.2 Health Care Risk Waste (HCRW) HCRW is waste capable of producing an infectious disease. It includes the following: sanitary waste, infectious waste, sharps and vails and expired medicines. HCRW shall be managed in accordance to SANS 10248 (1, 2, and 3) which gives details on storage, collection, transportation, treatment and disposal. HCRW generated onsite is collected by waste service providers and disposed of at the licensed hazardous waste facility. 3.13.3 Electronic Waste E-waste is the term used to describe discarded appliances that use electricity. It includes computers, printers, cell phones, iPods, iPads and other tablets, gaming consoles, air conditioners, fridges and other household appliances, batteries (wet and dry) and fluorescent light bulbs. E-waste contains valuable materials – such as gold, silver, copper and platinum – and harmful materials, such as lead, arsenic, mercury and brominated flame retardant (BFR) plastics, which require special handling and recycling methods. The recycling processes and disposal of these components, while being a lucrative business proposition for some, pose serious health risks and environmental dangers. The formation or discharge of hazardous emissions during the recycling of electrical and electronic equipment depends heavily on the handling of electronic waste. Hence hazardous substances contained in computers and televisions do not automatically pose a risk to the environment and human health. Some recycling processes applied in transition and developing countries can cause serious health problems and contaminate air, water and soil. Electronic waste can be disposed of as solid waste after having completed its life cycle but otherwise shall be refurbished or reused or recycled (remanufactured, restored, renovated, repaired, or recharged). Hazardous materials shall be disposed as per national requirement. Wet cell batteries or lead acid batteries are used in cars, trucks and dry cell batteries are used in general household appliances (clocks, torches, cameras, remote controls and some hand held equipment’s). Wet cell batteries are changed directly at the suppliers or returned to suppliers for recycling. Dry cell batteries (AA Batteries) are to be recycled or disposed at the hazardous waste licensed facility. 3.13.4 Ozone-depleting substances (ODSs) Ozone-depleting substances (ODSs) are compounds that contribute to the depletion of stratospheric ozone. ODSs are generally very stable in the troposphere and degrade under ultraviolet light in the stratosphere, releasing chlorine or bromine atoms, which deplete ozone. ODSs are categorised into two groups such as chlorofluorocarbons (CFCs), and Hydrochlorofluorocarbons (HCFCs). The most common HCFC in use today is HCFC-22 or R-22. Disposal of defected or unwanted equipment’s (e.g. air conditioners, refrigeration equipment) shall be done in an environmentally safe manner by either returning them to service provider or recycling. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30. Medupi Waste Management Work Instruction Unique Identifier: 348-22367 Revision: 8 Page: TM and contractors shall implement measures that will ensure proper and effective control of ODSs and compliance to the Regulations Regarding the Phasing-out and Management of Ozone Depleting Substances, GN 351 of Shall 2014 as amended. TM and contractors shall develop ODSs Phase-out Program which shall amongst others include an ODS inventory indicating types and quantities of ODSs used, their location and application as well as quantities stored on site. 3.13.5 Compact Fluorescent Lamps (CFLs) and Mercury-Containing Devices As from the 23 August 2016 (three years after the inception of the National Norms and Standard for disposal of waste to landfill, GN August 2013) disposal of Hazardous Waste Electronic Equipment (WEEE) Lamps at the landfill site is prohibited or restricted. Based on the above, TM and Contractors are encouraged recycle all their lighting lamps such as fluorescent tube, HID Lamps, and other associated lamp products such as fittings, ballast etc. A preferred method by the recycling facilities is that generators shall not crush the lamps but rather safely store the lamps in a clearly labelled designated waste receptacle for recycling purpose. Based on the above crushing of CFL’s on site is prohibited. 3.13.6 Empty printing cartridges The ink in the cartridge has certain health effects. The potential routes of over-exposure are the skin and the eyes. Inhalation of vapour and ingestion are not considered to be significant routes of exposure under normal use conditions. Ingestion of the ink will pose acute health hazards. Toner dust contains hazardous materials whereas inkjet inks can also contain a range of chemicals that are harmful to the environment. These materials pose no threat while they are contained within the cartridge. However, these pollutants can escape when cartridges are pulled apart during poorly managed refilling or recycling operations or when dumped cartridges start to deteriorate in landfill. Hazardous Waste Electric and Electronic Equipment (WEEE): other has been prohibited or restricted in terms of disposal. TM and Contractors shall explore recycling options and ensure that this waste stream is diverted to recycling facilities. 3.13.7 Used Oil or Waste Oil Waste oil generated from plant maintenance/services and incidents shall be recycled by the ROSE Foundation accredited service providers. Used oil shall be stored in a sealed container placed in secondary containment. When required the service provider will be contacted for removal or emptying. Used or contaminated oil that cannot be recycled shall be disposed of as hazardous waste at the licenced facility. 3.13.8 Empty Cylinders (B49 SABS 0140) SF6 cylinders are classified as Class 1 - Seamless steel containers. The re-use of cylinders for any gas other than SF6 or any other purpose, is subject to the prior approval of the Department of Labour and compliance with the requirements of SABS 019. Cylinders shall be returned to the supplier when empty or leaking. Cylinders contaminated with by-products shall be decontaminated by a licensed facility before re-use. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30. Medupi Waste Management Work Instruction Unique Identifier: 348-22367 Revision: 8 Page: 3.13.9 Solvents e.g. used thinners Used thinners generated from the painting activities shall be disposed at hazardous waste landfill site and recycled through refining processes. Upon arrival at the refinery the contaminated solvent is put through a series of refining processes which ensure the separation of impurities without any loss of the solvency power of the end product. Once the end product has been thoroughly tested, it is resold into the market as thinners for cleaning purposes only. As from the 24 September 2018 (five years after the inception of the National Norms and Standard for disposal of waste to landfill, GN August 2013) disposal of re-usable, recoverable or recyclable used or spent solvents at the landfill site is prohibited or restricted. 3.13.10 Pesticides Pesticides is a term that includes insecticides (for insect control), herbicides (for weed control) rodenticides (for rodent control), fungicides (for control of plant disease fungi) and miticides (for mite control). Pesticides can contain harmful compounds that can bio accumulate in body fats and move up the food chain as well as pollute soil and water. Pesticides products and containers shall be disposed at a licenced hazardous waste facility. 3.13.11 Ash Fly ash material solidifies while suspended in the exhaust gases and is collected by electrostatic precipitators or filter bags. They consist mostly of silicon dioxide (SiO2), which is present in two forms: amorphous, which is rounded and smooth, and crystalline, which is sharp, pointed and hazardous; aluminium oxide (Al2O3) and iron oxide (Fe2O3). Fly ash contains trace concentrations of many heavy metals that are known to be detrimental to health in sufficient quantities. These can leach into the ground or surface water and cause contamination. These elements are however, found in extremely low concentrations in fly ash. Fabric filter bags generated during commissioning are disposed at a hazardous waste landfill site. Fly ash and bottom ash generated during commissioning activities shall be disposed of at Medupi Ash Dump. Records of Ash disposed of at the facility are filed. 3.14 Waste Recycling TM Management Team is committed to reduce the amount of waste sent to landfill sites by ensuring that where possible waste is minimised (reduced, reused, recycled and recovered) and waste landfilling is considered as last option in order to protect the environment and reduce projects carbon footprint. Contractors are required to develop waste inventory to assess disposal options considering the waste hierarchal approach and ensure that disposal of waste at the landfill sites is the last resort. Examples of waste that can be recycled include but not limited to paper, cardboard, tins, glass, plastic, scrap metal, electronic waste, waste tyres, cartridge, batteries, oil rags, used thinners, used oil and fluorescent tubes. TM and contractors shall ensure that only permitted/licenced waste recycling facilities are used. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30. Medupi Waste Management Work Instruction Unique Identifier: 348-22367 Revision: 8 Page: Records of waste recycled; this include removal slips shall be submitted to the project as part of the Contractor’s Monthly Environmental Compliance Report (348-9987623) which is submitted on monthly basis. 3.15 Prevention and Management of Litter (Anti-Litter Policy) TM and Contractors shall take pride in maintaining the cleanliness onsite. No person onsite shall throw, drop, deposit, spill or in any other way discard any litter into or onto any place, land, open space, drainage system, storm water channels, street or road except in a container or a place specifically provided for that purpose. TM and its contractors shall ensure that sufficient waste containers are provided to contain litter that is discarded or left unattended by the employees and that litter is disposed of before it becomes a nuisance, a ground for a complaint or causes a negative impact on the environment. TM and its contractors shall ensure waste receptacles are provided with external closing mechanism which is scavenger, water and wind proof. TM and its contractors shall ensure waste receptacles are emptied on a regular basis and removed to the construction camp or Central Waste Facility. Litter management is governed by Medupi Project’s Anti-Litter Policy attached (348-883128). TM and Contractors are required to abide by the principles set in the policy. 3.16 Records and Reporting Medupi Power Station has been registered on the National Waste Information System established in terms of section 60 of the National Environmental Management Waste Act, 2008 as hazardous waste generator (excess of 20kg per day). The waste information registration number is D01651-01 (348-613250). This shall be provided to all waste transporters and ensure that is reflected on the waste manifest for removal of hazardous waste. Waste generators shall keep accurate and up to date records of the management of waste they generate. Records shall reflect
Classification of the waste;
Waste manifest, safe disposal certificate and waste disposal notes/slips;
Quantity/ies of each waste that has either been re-used, recycled, recovered, treated or disposed of expressed in tons or cubic metres per month; and
Waste handler or manager (transporter and disposal facility). Contractors shall submit records contemplated above to TM Environmental Department on a monthly basis as part of the Contractor’s Monthly Environmental Compliance Report . Waste manifest and/or safe disposal certificate shall be submitted to the TM on monthly basis as an attachment to the Contractor’s Monthly Environmental Compliance Report. It shall be noted that nonconformance with be raised against a contractor that fails to submit safe disposal certificate or waste manifest signed by all parties accompanied by weighbridge slip within 60 days of removal of waste from site. TM Environmental Department shall compile a monthly waste report and biannual waste report for submission to relevant stakeholders. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30. Medupi Waste Management Work Instruction Unique Identifier: 348-22367 Revision: 8 Page: 3.17 Reporting on South African Waste Information System (SAWIS) and/or Provincial Waste Information System Eskom Waste Centre of Excellence is responsible for reporting volumes of ash treated and/or disposed of within Eskom’s owned waste disposal facilities. Medupi Ash Dump Facility is operated by Eskom Medupi Generation, the facility is registered on the National Waste Information System for disposal of hazardous waste to land (Eskom WIS Registration Certificate for Ash Disposal Facility is D D06761-01(348-611308). Submission of records of waste handled and/or landfilled at the facility is managed by Eskom Medupi Generation Business Unit. Contractors shall ensure that waste managers for external facilities used to treat, recover, and dispose waste is registered and records are submitted SAWIS and/or provincial waste information system (GWIS) as required. Proof showing that waste records handled were reported to SAWIS or provincial WIS shall be updated on the Contractors Waste Inventory and submitted to the TM upon request. Any waste related incidents shall be dealt with and be reported in accordance with the Environmental Incident Management Procedure (348 - 693723).
Process for Monitoring 4.1 Key Performance Areas and Indicators The following Key Performance Areas / Indicators (KPAs / KPIs) shall be measured, analysed and reported. The Process Owner shall be accountable, and assign the responsibility at the frequency as indicated below, documented as part of the QMS measurement, analysis and improvement initiative. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30. Medupi Waste Management Work Instruction Unique Identifier: 348-22367 Revision: 8 Page: Table 2: KPAs/KPIs Key Key Performance Target Measure Responsibility Records Performance Indicator Frequency Area Implementation Provision of clearly Maintain Good Daily TM Contractors of the waste labelled waste waste collection or Environmental waste collection receptacles and management when required Department procedure services servicing/emptying standards /Contractors of the receptacles across site Proper Proper disposal of Conformance Monthly TM Waste management of waste to waste removal of Environmental records waste management waste from Department work site /Contractors instruction and attain legal Implementation Improved Quarterly TM Waste and maintenance waste basis Environmental Inventory of waste inventory recovery and Department reduction in /Contractors waste disposed to Landfill sites Proper Inspections of the Maintain good Daily basis TM Inspection management of temporary storage housekeeping Environmental records Storage facilities and Department/ Facilities and collection points Contractors Collection Points Implementation Records of waste Waste Monthly basis TM Waste of waste recycled accounting Environmental collection minimisation and reducition Department/Co notes/slips programmes ntractors (alternatives to avoid, reduce, reuse, and recycle and implement measures that will lead to effective waste management) Revision of Revision Conformance Annually or as Mumsy Revised Document requirements in line to document required Boshomane procedure with Medupi control Procedures 348- standards and 653867 procedures/w “Development and ork Change of Medupi instructions QMS Documents” and 348-883808 “Document and Record Management Procedure” CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30. Medupi Waste Management Work Instruction Unique Identifier: 348-22367 Revision: 8 Page: 4.2 Document Review and Self-Assessment 4.2.1 Document Self-Assessment The “Process Owner” identified on the front page of this document along with departmental personnel and the project QMS Engineer shall undertake a “self-check” review of the process defined in this document at six monthly intervals, commencing from the effective date of this document, to check
the process / procedure operational integrity
process efficiency
the level of stakeholder knowledge and implementation. Participants and results of the “self-check” review shall be documented by the Process Owner in the “Self-Assessment Checklist” (Template No. 348-655890) included as an Appendix to this work instruction which shall be submitted via SharePoint to Medupi Documentation Department Help Desk by the Process Owner once completed. Process Owner shall proceed with any revision requirements in line with Medupi Procedures, 348653867 “Development and Change of Medupi QMS Documents” and 348-883808 “Document and Record Management”. 4.2.2 Revision Period All QMS documents shall undergo a 3-yearly compulsory revision. 4.3 Training Requirements Induction training and onsite awareness through toolbox talks serve as training awareness in terms of waste management and recycling onsite. Contractors shall continuously provide awareness to all employees working with waste and all contract workers that might be exposed to waste. The training/ awareness programme shall amongst others include the following
Precautionary measures that need to be taken;
Procedures that they need to apply to their particular type of work;
Procedures for dealing with spillages and accidents;
Appropriate use of protective clothing; and
The risks of the hazardous substances to their health which they are likely to be exposed to. Sufficient number of employees shall receive training to cover for leave periods, absences due to illness and public holidays. Training records (signed attendance register and material shared) shall be submitted to TM Environmental Department as part of the Contractors Monthly Environmental Compliance Report Only trained persons shall be allowed to handle hazardous waste. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30. Medupi Waste Management Work Instruction Unique Identifier: 348-22367 Revision: 8 Page
Acceptance This document has been seen and accepted by: Name Designation Thabisile Biyela Senior Manager Portfolio Delivery Ntahli Molapo Safety, Health, and Environmental Manager Brenda Mgidlana Project Quality Manager
Revisions Date Rev. Compiler Remarks Three yearly revision and alignment to Eskom Waste Management Standards, 32 – 245 and National Environmental February 2023 8 Sakutanya Mamabolo Management Laws Amendment Act . Work instruction change to Template Rev.05 as well as the removal of the Waste expenditure. Revision following External ISO 14001 Audit and aligning to July 2019 7 Sakutanya Mamabolo revised Eskom Waste Management Standard (32 – 245) February 2018 6 Emile Marell New Licence requirements and amend waste removal checklist
Development Team The following people were involved in the development of this document
Sakutanya Mamabolo
Dovhani Mudzielwana
Mumsy Boshomane CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30. Medupi Waste Management Work Instruction Unique Identifier: 348-22367 Revision: 8 Page: Appendix A – Process Self-Assessment Checklist Template Identifier 348-655890 Rev 2 MEDUPI POWER STATION PROJECT DocumentIdentifier 348-10034274XXXXXXX Rev XX0 Effective Date January 2022 Next Review January 2025 Date TITLE: Document Self-Assessment Checklist for Medupi Waste Management Work Instruction Self-Assessment Date: Discipline: Environmental Applicable Document No.: 348-22367 XX / XX /XXXX Item Ref Compliant Self-Assessment Question Comment No Section Yes Part No 1 Has site specific waste management Procedure been developed? Does the content of the Waste Management Procedure contain waste minimisation programme? Is the waste management hierarchy implemented for all waste stream generated Are the portions of the waste stream that can be readily avoided, minimised and/or recycled Is the waste stream analysis conducted and waste inventory developed? 6 Is waste separated as near to the source as possible? Are the service providers and waste disposal facilities inspected/audited? Are there any control measures to prevent/minimise waste mixing implemented? CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30. Medupi Waste Management Work Instruction Unique Identifier: 348-22367 Revision: 8 Page: Is the waste collection programme developed, implemented and maintained? 11 Are the waste storage areas accessible? Is hazardous waste stored at the designated area with secondary containment? Is the access control maintained (recording vehicles entering waste area)? Notices prohibiting unauthorised entry, stating hours of operation and contact person in case of emergency displayed? 15 Does the contractor have waste receptacles? 16 Does the waste receptacle/s have closing mechanism? 17 Are the waste receptacles labelled? Is there any waste stream treated onsite? If was the project 18 informed? What type of treatment is undertaken and which waste is treated? 19 Are the waste service provider used accredited? Is prior approval sought from TM Environmental Department prior waste removal from site? Does the service provider used have all permit/licences/certificates required to transport waste? 22 Is waste generated disposed of the licenced/permitted facility? Is the contaminated land identified if yes was TM Environmental department informed? Are waste tyres managed in accordance to the Waste Tyre Regulation? 25 Does the contractor have waste receptacles? CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document shall be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30.
Description
Source: 348-693723 Environmental Incident Management Procedure Rev 9.pdf (unknown)The process applies to all environmental incidents on the Medupi construction site and activities under relevant contractual arrangements. Principal contractors must notify and report incidents, investigate using their own systems, submit reports in line with NEMA Section 30 or NWA Section 20, and record and undertake corrective actions. The purpose is to ensure compliance with legislation, client and ISO 14001:2015 requirements, and to provide for effective and efficient incident management.
Important Dates
Source: 348-693723 Environmental Incident Management Procedure Rev 9.pdf (unknown){"briefingSession":"{"date":"12 April 2013","time":null,"venue":"ions-dated","is_compulsory":false}"}
Contact Information
Source: 348-693723 Environmental Incident Management Procedure Rev 9.pdf (unknown){"name":null,"email":null,"phone":null,"department":"............................................................................. 14","address":"nvironmental Liaison Committee Performance Indicator Reporting Procedure."}
Evaluation Criteria
Source: 348-693723 Environmental Incident Management Procedure Rev 9.pdf (unknown)Bidders must be principal contractors or subcontractors operating under Team Medupi contractual arrangements. They must comply with the Medupi Environmental Incident Management Work Instruction and relevant Eskom procedures, including the Eskom Procedure for Environmental, Occupational Health and Safety Incident Management (32-95) and the Environmental Liaison Committee Performance Indicator Reporting Procedure (32-249). Bidders must report all environmental incidents and ensure compliance with NEMA Section 30 and NWA Section 20 reporting requirements. No specific eligibility thresholds (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the provided document.
Technical Specifications
Source: 348-693723 Environmental Incident Management Procedure Rev 9.pdf (unknown)The process applies to all environmental incidents on the Medupi construction site and activities under relevant contractual arrangements. Principal contractors must notify and report incidents, investigate using their own systems, submit reports in line with NEMA Section 30 or NWA Section 20, and record and undertake corrective actions. Incidents are classified by consequence (Low/Minimum, Minor, Moderate, Major, Critical) and priority (Low, Moderate, High, Extreme). Reporting timeframes: all incidents reported on SAP within 24 hours; NEMA Section 30/NWA Section 20 incidents reported to DFFE, DWS, and LLM within 24 hours. Investigations are initiated based on priority: Low within 7 working days, Moderate within 7 working days, High within 48 hours, Extreme within 24 hours, with completion within 30-45 days. Corrective actions must be SMART, captured on SAP EH&S, and verified. Incident close-out requires all corrective actions effectively implemented, lessons learnt communicated, and closure certificates for legal contraventions. Key performance indicators include 100% incident notification, reporting on SAP within 24 hours, and corrective actions closed within stipulated timeframes.
Quality Management
Source: 348-693723 Environmental Incident Management Procedure Rev 9.pdf (unknown)Bidders must record and undertake corrective actions to address root causes of incidents. Corrective actions must be SMART, captured on SAP EH&S, and verified. All investigation reports should be finalised and signed within 14 calendar days of completing the investigation. Corrective actions must be captured on SAP EH&S within seven calendar days of signing the investigation report.
Compliance Requirements
Source: 348-693723 Environmental Incident Management Procedure Rev 9.pdf (unknown)Bidders must comply with the Medupi Environmental Incident Management Work Instruction, the Eskom Procedure for Environmental, Occupational Health and Safety Incident Management (32-95), and the Environmental Liaison Committee Performance Indicator Reporting Procedure (32-249). They must report all environmental incidents and ensure compliance with NEMA Section 30 and NWA Section 20 reporting requirements. No specific eligibility thresholds (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the provided document.
Health & Safety
Source: 348-693723 Environmental Incident Management Procedure Rev 9.pdf (unknown)Bidders must comply with the Medupi Power Station Employer Policy and Procedures Part 9 (Safety, Health and Environmental Requirements Schedule), the Eskom Procedure for Environmental, Occupational Health and Safety Incident Management, and the Environmental Liaison Committee Performance Indicator Reporting Procedure. Incidents are classified by consequence (Low/Minimum, Minor, Moderate, Major, Critical) and priority (Low, Moderate, High, Extreme).
Contractual Terms
Source: 348-693723 Environmental Incident Management Procedure Rev 9.pdf (unknown)Bidders must comply with environmental legislation, authorisations, permits and licenses. Breaches include noncompliance with environmental legislation and administrative non-compliances.
Compliance Requirements
Source: 348-860846 Environmental Policy Rev 08.pdf (unknown)Insufficient searchable text - AI extraction recommended
Important Dates
Source: 348-717685 Handling of Environmental Nonconformances Rev 9- Final.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ion of previous observations","is_compulsory":false}"}
Evaluation Criteria
Source: 348-717685 Handling of Environmental Nonconformances Rev 9- Final.pdf (unknown)Bidders must be registered on the CSD (Central Supplier Database) and have a valid tax clearance (SARS TCS or tax pin). They must comply with B-BBEE requirements as per the PPPFA. Bidders must complete and submit all required SBD forms, including SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), and SBD 9 (Certificate of Independent Bid Determination). Bidders must also comply with Eskom's HSE requirements and environmental management standards.
Technical Specifications
Source: 348-717685 Handling of Environmental Nonconformances Rev 9- Final.pdf (unknown)This process applies to all Environmental non-conformities that are/or may be detected on the
Medupi construction site, as well as areas and activities deemed to form part of such, under relevant
Contractual arrangements.
This Procedure shall be implemented by the Medupi Project Team, the ECO and supported by
Principal Contractors.
Principal Contractors shall undertake the following activities in support of this Procedure:
stipulated format within the confines of the relevant contract.
prevent occurrence or recurrence of the identified non-conformity.
2.1 Scope
2.1.1 Purpose
The objective of this procedure is to define the handling of actual or potential Environmental nonconformities and subsequent Corrective Action, so as to ensure compliance with applicable
Statutory, conformance to Client (Generations) requirements, international standard requirements
as well as conformance to the relevant Eskom procedures and standards.
2.1.2 Applicability
This document shall apply throughout Medupi Power Station Construction and Commissioning
activities, excluding activities handed over to the client, Generation.
2.1.3 Effective date
The effective date shall be the date of authorisation of this document.
2.2 Normative/Informative References
2.2.1 Normative
[1] 348-961711 Project Execution Plan
[2] 348-883902 Project Quality Plan
[3] 348-653867 Development and Change of Medupi QMS Documents
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Handling of HSE Non-conformities and Unique Identifier: 348-717685
Corrective Action
Revision: 9
Page:
[4] 348-883808 Document and Record Management Work Instruction
[5] 348-860846 Medupi Environmental Policy
[6] 348-882048 EMS Manual and scope
[7] 348-860848 Environmental Audit Work instruction
[8] 32-95 ESKOM Procedure for the Effective Management of Safety, Health and Environmental
related Incidents
[9] 32-727 Safety, Health, Environment and Quality (SHEQ) Policy
[10] National Environmental Management Act No.
[11] 32-172 Procedure for Audit Reporting and Categorization of Control, Audit Findings and Audit
Report Ratings
[12] 348-10100726 Preventive and Corrective Action Request (Template)
2.2.2 Informative
[13] ISO 9001:2015 Quality Management Systems
[14] ISO 14001:2015 Environmental Management System
[15] ISO 45001:2018 Occupational Health and Safety Management System
2.3 Definitions
Term Explanation
Adhoc/surprise An unannounced evaluation exercise to determine whether the activities and/or
Inspections facilities conform to environmental requirements and standards, this will
typically be conducted by the ECO’s to enhance external confidence in the
inspection process.
Contractor An employer who performs construction work and includes principal
(Principal contractors. Contracted companies are specifically viewed as employers in
Contractor) their own right, as per the OHSAct.
Corrective Action to eliminate the cause of a detected nonconformity or other undesirable
Action situation.
Long term Correction actions with target dates which requires longer than 60 days
actions implementation
Observation Site evaluation of compliance or non-compliance to environmental
requirement(s).
Originator Person initiating a formal Preventive and/or Corrective Action process.
Planned/Form A formalised evaluation exercise to determine whether the activities and/or
al Inspection facilities conform to environmental requirements and standards as agreed
between the Contractors Environmental practitioner and TM environment/ECO.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Handling of HSE Non-conformities and Unique Identifier: 348-717685
Corrective Action
Revision: 9
Page:
Term Explanation
(Potential) Failure to comply with/and or deviation from any stipulated environmental
Non- requirement(s). Non-conformities can be identified through the following
conformity means:
i) Any Audit finding whether Internal or External that relates to
Environmental,
ii) Non-conformities identified through inspections,
iii) Any non-compliance to HSE Employer Policies and Procedures
referred to in the contract,
i) Root causes identified through Incident Investigations,
ii) Trends identified through Visible Felt Leadership,
iii) Any Legal non-compliance,
iv) Results from Analysis of Data,
v) Non-conformities identified through any other Monitoring and
Measurement activity (i.e. deviations from applicable standards),
vi) Any complaint/feedback from an external Interested and Affected Party,
Results from Management Review Meetings where applicable
Preventive Action to eliminate the cause of a potential nonconformity or other undesirable
Action potential situation.
Preventive action is taken to prevent occurrence whereas Corrective Action is
taken to prevent recurrence.
Respondent Person responsible to undertake root cause identification and actions to
eliminate root cases. A Respondent may be representative of TM or
Contractor.
2.4 Abbreviations
Abbreviation/
Explanation
Acronym
HSE Health, Safety and Environment
OHSAct Occupational Health and Safety Act, No.
EMS Environmental Management System
TM Team Medupi
I&AP(s) Interested and Affected Party(ies)
NCA Nonconformity and Corrective Action
VFL Visible Felt Leadership
RCAT Root Cause Analysis Technique
ECO Environmental Control Officer
WMCO Waste Management Control Officer
EM Environmental Manager
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Handling of HSE Non-conformities and Unique Identifier: 348-717685
Corrective Action
Revision: 9
Page:
2.5 Roles and Responsibilities
a) Responsible
Those who do the work to achieve the task. There is at least one role with a participation type of
responsible, although others can be delegated to assist in the work required.
b) Accountable (also approver or final approving authority)
The one ultimately answerable for the correct and thorough completion of the deliverable or task,
and the one who delegates the work to those responsible. In other words, an accountable must sign
off (approve) work that responsible provides. There must be only one accountable specified for each
task or deliverable.
c) Consulted (sometimes counsel)
Those whose opinions are sought, typically subject matter experts; and with whom there is two-way
communication.
d) Informed
Those who are kept up-to-date on progress, often only on completion of the task or deliverable; and
with whom there is just one-way communication.
Table 1: RACI Matrix
She
Process Step/Activity TM Manager Environmental Practitioners HSE Administrator(s ) Project Contracts Manager Respondents ECO
Compile NCA Requests A,I R I I R,I
Complete and Maintain NCA Register A R R I I
Issue NCA Requests to Contractors R,C,
I.A R,C,I A,R (where applicable) I
Issue NCA Requests internally (within TM) R,C,
A,i r
I
Review identified Root Causes of non- A,R,I
C,i,a r,i i
conformities
Review whether Corrective Actions have
A r c,i i
been undertaken and are effective. R,I
Respond to Corrective Actions within the
stipulated timeframe and in the stipulated I I,C C,I R,A I,C
format
Complete thorough identifications of root
C i c r,a
causes of non-conformities I
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Handling of HSE Non-conformities and Unique Identifier: 348-717685
Corrective Action
Revision: 9
Page:
She
Process Step/Activity TM Manager Environmental Practitioners HSE Administrator(s ) Project Contracts Manager Respondents ECO
Verify closure of all NCAs I,A C,I,R I C,I A,R
Keep records of evidence of applicable
Corrective Actions I,A C,I,R I R,A I
Make resources available for physical or
administrative review of actions taken, so I I,C R,A
as to prevent occurrence or recurrence
I
Records to be utilised as Input to
A R C C Management Review
2.6 Related/Supporting Documents
The following quality records are utilised to record necessary process data required to verify process
conformity:
i) Nonconformity and Corrective Action Register (348-10052686)
ii) Completed Nonconformity and Corrective Action Request Forms (348-10100726)
iii) GCD Breaches Register (240-84458888)
Documented information generated as a result of this document shall follow the process defined in
the 348-883808” Document and Record Management”
3.1 Process Map/ Flowchart
Not compiled.
3.2 Inspections
3.2.1 Contractor inspections
to ensure that the system for implementation of the Environmental Specification is operating
effectively. It is the Principal Contractors responsibility to ensure that all sub-contractors conform
to the environmental requirements and standards.
Compliance Reports.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Handling of HSE Non-conformities and Unique Identifier: 348-717685
Corrective Action
Revision: 9
Page:
3.2.2 TM Environment Inspections
site and surrounding areas in order to monitor compliance with Construction Environmental
Management Plan (348-681011) and other applicable environmental requirements.
by TM Environmental Practitioners. The ECO’s shall use their own template to record
observations made during the site inspection.
raised.
timeframes shall be raised as NCA.
3.3 Recording and Registration
10100726). Detailed information must be provided to enable effective analysis and action by the
Respondent.
Respondent within five (5) days. Where such Respondent is a Contractor, such issuance shall
be done through the relevant Contracts Manager.
to the Team Medupi Health, Safety and Environmental Manager.
3.4 Identification of Root Cause and appropriate Action
NCA form.
Note: Where the respondent is internal to Team Medupi, 5Whys or RCAT shall be used for the root cause identification process.
Where the respondent is within a Contractor organisation, a recognised root cause analysis process shall be used for the root
cause identification process.
impact/risk effect.
cause(s) to prevent re-occurrence or occurrence, as per the identified actual or potential non-
conformance. Such Actions shall be recorded on the NCA form including which items of evidence
shall be available and a completion date.
working days of receipt and following the applicable Document Control process.
the Originator shall escalate such to the TM Environmental Manager.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Handling of HSE Non-conformities and Unique Identifier: 348-717685
Corrective Action
Revision: 9
Page:
o Appropriate root cause analysis process was used in the root cause identification.
o The identified Root Cause(s) are accurate in relation to the stated non-conformity.
o The identified Actions would address the identified root causes effectively and efficiently.
o A Risk Assessment has been undertaken, covering the proposed Corrective Actions.
o Appropriateness of the completion dates.
o Such review shall take place within five (5) days of return by the Respondent.
application of Corrective and/or Preventive Action.
such will be returned to the Respondent to update within five (5) days.
3.5 Action and Review
Environmental Department.
o Whether Actions have been taken
o Whether the Actions have been successful in addressing the initial root causes.
o Outcomes of this review shall be captured on the applicable NCA form.
3.6 Overdue and Escalations
below. Once the initiator/originator becomes aware that one of the scenarios depicted on the
figure below has not been met, he/she should escalate the matter to the General Manager and/or
the Contracts Manager (in the case of Contractors) within ten (10) days.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Handling of HSE Non-conformities and Unique Identifier: 348-717685
Corrective Action
Revision: 9
Page:
If the Respondent
fail to respond to
the NCA Form
within five (5)
working days of
receipt
Overdue
If the Respondent
fails to implement If some work was
the corrective performed
actions within the however not as
agreed agreed
timeframes.
Figure 1-Overdue Findings Process
corrective actions are handled within the stipulated timeframes to prevent delays.
the matter will be escalated to the General Manager/Contract Manager.
3.7 Process for requesting Extension
actions will not be met, and that extension or change of dates will be unavoidable, the respondent
should request an extension of due dates through a motivation letter submitted to TM
Environment through the Contracts Manager at least 14 days prior to the due date. The
motivation letter requesting for an extension of the completion dates must be signed off by the
highest level of authority from the Contractors side and accepted by the Environmental Manager
and/or Contracts Manager.
motivation must be submitted to their office as per GCD reporting requirements outlined in
procedure 32-172.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Handling of HSE Non-conformities and Unique Identifier: 348-717685
Corrective Action
Revision: 9
Page:
3.8 Closure of NCA
actions where these have been agreed between the respondent and the environmental
practitioner.
NCA form shall be completed by signature and/or closes the NCA form.
Administrator so that the NCA Register may be updated to reflect status “Closed”.
3.9 Reporting on the status of Audit Findings
on a monthly basis.
on a monthly basis.
the Breaches register.
extension of dates to be signed by the General Manager Projects and further approved by GCD
SHEQ and Sustainability.
meetings as well as the Management Review meeting discussions
register to also align with the monthly OMAC report to ensure the latest version of dates and
progress.
of findings (Assurance Report).
and results from follow-up must be reported to the Audit and Risk Committee by the Assurance
department.
3.10 Nonconformity raised by external auditors, Eskom GC-GSHEQ, or any other
stakeholder
A nonconformity raised by an external auditor, GC-GSHEQ or any other stakeholder shall be
recorded on either the relevant Auditor’s NCR Forms or an action plan or an internal NC form.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Handling of HSE Non-conformities and Unique Identifier: 348-717685
Corrective Action
Revision: 9
Page:
4.1 Key Performance Areas and Indicators
The following Key Performance Areas / Indicators (KPAs / KPIs) shall be measured, analysed and
reported. The Process Owner shall be accountable and assign the responsibility at the frequency
as indicated below, documented as part of the QMS measurement, analysis and improvement
initiative.
Table 2: KPAs/KPIs
Key Key Target Measure
Performance Performance Frequency Responsible Record
Area Indicator
10% In line with Environmental NCAs
Reduction in
Management Practitioners/ raised and recurrence of
Review NCA
non-conformity ECO’s Register
10% In line with Environmental NCAs
Effective Reduction in
management Practitioners/ECO’s raised and Corrective occurrence of
Review NCA
Action non-conformity
Register
Corrective 80% Monthly Environmental NCAs
Action Practitioners/ECO’s raised and
undertaken by NCA
due date Register
The number of No more As per audit Environmental NCAs
major internal than 2 schedule Practitioners raised and
or external major NC NCA
findings in Register
relation to this
Iso 14001
Procedure as
conformity
stipulated in
the Group
GCD KPI’s for
each financial
year
Retain and 100% Annually or Environmental
store records storage of as required Practitioners
generated as a maintained
result of this and As
Document document as retained generated
control defined in the documented by the
Procedure information procedure
348-883808
“Control of
Records”.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Handling of HSE Non-conformities and Unique Identifier: 348-717685
Corrective Action
Revision: 9
Page:
Revision 100% Annually or Environmental
requirements review of as required Manager
in line with documents
Medupi due for
Procedures review.
348-653867 Three (3)
New
Revision of “Development yearly
revised
Document and Change of review
document
Medupi QMS
Documents”
and 348-
883808
“Document
Control”
4.2 Document Review and Self-Assessment
4.2.1 Document Self-Assessment
The “Process Owner” identified on the front page of this document along with departmental
personnel and the project QMS Engineer shall undertake a “self-check” review of the process defined
in this document at six monthly intervals, commencing from the effective date of this document, to
check:
a) the process / procedure operational integrity
b) process efficiency
c) the level of stakeholder knowledge and implementation.
Participants and results of the “self-check” review shall be documented by the Process Owner in the
“Self-Assessment Checklist” (Template No. 348-655890) included as an Appendix to this procedure
which shall be submitted via SharePoint to Medupi Documentation Department Help Desk by the
Process Owner once completed.
Process Owner shall proceed with any revision requirements in line with Medupi Procedures 348653867 “Development and Change of Medupi QMS Documents” and 348-883808 “Document and
Record Management”.
4.2.2 Revision Period
All QMS documents shall undergo a 3-yearly compulsory revision.
4.3 Training Requirements
No project specific training required to implement the process documented in this document beyond
normal job function.
This document has been seen and accepted by:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Handling of HSE Non-conformities and Unique Identifier: 348-717685
Corrective Action
Revision: 9
Page:
Name Designation
Z.Shange General Manager
L. Ndlovu Quality Assurance Manager
N. Khuzwayo Project Health, Safety and Environmental Manager
Date Rev. Compiler Remarks
July 2025 09 N Nengobela Three yearly review. New
document template. Included
recording and reporting (NCA)
process flow. Replace PCAR
with NCA. Remove ECO as the
verifier of closure of NCA.
Included NCs raised by external
auditor, GC-GSHEQ or any
other stakeholder.
March 2022 08 M.Boshomane Three Yearly review including
minor administrative changes
as well as addressing TN 06
and TN07 of ISO14001:2015
conducted 14-15 September
2021.New Document template
Rev.05 effected
January 2018 07 M Boshomane Annual Review
The following people were involved in the development of this document:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg. No 2002/015527/30.
Medupi Handling of HSE Non-conformities and Corrective and Preventive Unique Identifier: 348-717685
Action
Revision: 9
Page:
Appendix A – Process Self-Assessment Checklist
Template Identifier 348-655890 Rev 3
Document Identifier xxxx Rev xx
Medupi power station project
Effective Date February 2025
Next Review Date February 2030
TITLE: Document Self-Assessment Checklist Handling of Environmental Nonconformity and corrective action
Self-Assessment Date:
Discipline: Applicable Document No.: 348-717685
Dd / mm /yyyy
Item Ref Compliant
Self-Assessment Question Comment
No Section Yes Part No
Do Principal Contractors conduct monthly environmental
1 3.1.1 inspections to ensure that the system for implementation of the
Environmental Specification is operating effectively?
3.1.1 Do Principal Contractors submit all completed inspection
2 reports together with the Monthly Environmental Compliance
Reports as per the annual environmental calendar?
3.1.2 Are inspections recorded on an Environmental Inspection
3 Form (348-611838) or via email by TM Environmental
Department?
3.1.2 Is TM Environmental Department’s inspection report detailing
4 the observations made during the inspections issued
within 24hrs?
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized
version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30.
Medupi Handling of HSE Non-conformities and Corrective and Preventive Unique Identifier: 348-717685
Action
Revision: 9
Page:
3.1.2 Are observations raised during the inspections that have not
5 been addressed within the required timeframes being
raised as a NCA?
3.1.2 Are details of the relevant Non-conformity recorded on the
NCA Form?
3.1.2 Is relevant information on the NCA form provided to the
7 HSE/System Administrator so that such non-conformity
may be captured on the NCA Register?
3.1.2 Is the NCA form issued to the identified Respondent, formally
8 through the relevant Project Contracts Manager and
Document Controller?
3.1.2 Is Root Cause identification activities been undertaken and
9 have these root causes been completed on the NCA
form?
3.1.2 Have the Respondent returned the completed NCA form to
10 the Originator within 5 Days of receipt and following the
applicable Document Control process?
Have the Originator reviewed the completed NCA form(Within
11 3.2
5(five) days of return by the Respondent):
3.2 The identified Root Cause(s) are accurate in relation to the
stated non-conformity
3.2 The identified Actions would address the identified root
causes effectively and efficiently.
3.2 A Risk Assessment has been undertaken, covering the
proposed Corrective/Preventive Actions.
3.2 Have the Originator reviewed the Actions undertaken, within 5
days of the last target date?
16 3.2 Whether Actions have been taken
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized
version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30.
Medupi Handling of HSE Non-conformities and Corrective and Preventive Unique Identifier: 348-717685
Action
Revision: 9
Page:
3.2 Whether the Actions have been successful in addressing the
initial root causes.
3.5 Where found that Actions have not been undertaken or are
ineffectual, has:
3.5 This been escalated to the respective TM Environmental
19 Manager and the Contracts Manager (in the case of
Contractors) who will institute contractual measures?
3.5 Should the Principal Contractor fail to implement corrective
20 actions, it will be escalated to the TM Construction
Manager?
3.5 In the case of Internal (i.e. TM) Non-conformities, does this
21 get escalated to the respective TM Environmental
Manager and the Managing Director?
3.7 Does the ECO verify closure of all NCA’s by accepting or
rejecting such? Once NCA adequately address the non-
conformity does he/she close it and communicate with
Originator?
3.7 Has the completion of the NCA form been communicated to
22 the relevant HSE/System Administrator so that the NCA
Register may be updated to reflect status “Closed”?
Comments:
Self-Assessment by: Name: Position: Revision Required? Planned Revision Date:
(Yes / No)
Attendees:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized
version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No 2002/015527/30.
Description
Source: 348-880696 SPCC Work Instruction Rev 4 - Final.pdf (unknown)The document is the Medupi Spill Prevention, Control and Countermeasures (SPCC) Management Plan, applicable to the Medupi Power Station Project. It requires all Principal Contractors to develop their own site-specific SPCC Plan to prevent, mitigate and respond to land-based spills of hazardous chemical substances, including hydrocarbons, lubricants, solvents, paints and hazardous liquid wastes. The SPCC Plan must be accepted by the TM Environmental Department and forms part of the Project's Environmental Management System as an Operational Control Plan.
Important Dates
Source: 348-880696 SPCC Work Instruction Rev 4 - Final.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ors of hazardous conditions","is_compulsory":false}"}
Contact Information
Source: 348-880696 SPCC Work Instruction Rev 4 - Final.pdf (unknown){"name":null,"email":null,"phone":null,"department":". This document forms part of the Project’s","address":"r on the Medupi construction site, and areas and activities deemed to form"}
Evaluation Criteria
Source: 348-880696 SPCC Work Instruction Rev 4 - Final.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance certificate. Bidders must have the fleet and capacity to deliver the service and must comply with Eskom's environmental and safety standards, including the SPCC Plan requirements. Returnable forms include SBD 4 (Declaration of Interest) and SBD 9 (Certificate of Independent Bid Determination), plus any other forms specified in the tender pack.
Technical Specifications
Source: 348-880696 SPCC Work Instruction Rev 4 - Final.pdf (unknown)The tender is for staff bus transportation services at the Medupi Power Station project. The document provided is the Medupi Spill Prevention, Control and Countermeasures (SPCC) Management Plan, which applies to all Principal Contractors on the project. Bidders must develop a site-specific SPCC Plan using the SPCC-Plan Template (348-101224) and have it accepted by the TM Environmental Department. The SPCC Plan must cover spill prevention, control and response for hazardous chemical substances including hydrocarbons, lubricants, solvents, paints and hazardous liquid wastes. Bidders must conduct a Spill Impacts Assessment and complete a Spill Assessment Register covering all hazardous chemical substances used or stored, their quantities, locations, potential impacts and receptors. The SPCC Plan must include a site map showing boundaries, access roads, parking, HCS stores, refuelling and maintenance areas, drainage pathways, nearby waterways and sensitive areas, and locations of spill response equipment. Bidders must implement spill prevention measures including regular plant and machinery inspections, maintenance schedules, refuelling procedures, and proper storage with bunded areas capable of containing 110% of the total volume of hazardous chemicals stored. Vehicles and equipment must be parked at least 35 metres from rivers, streams, wetlands and other sensitive areas. Spill response equipment must be located at lay-down areas, construction areas, fuel and chemical storage facilities, and refuelling points. Spill kits must be fully stocked and regularly inspected. Bidders are responsible for responding to and cleaning up any spills in their allocated areas, including disposal of hazardous waste and restoration of contaminated areas. Waste from spill clean-up must be disposed as hazardous waste, with a Waste Removal Checklist (SPO No. 348-669234) approved by the TM Environmental Department. Waste manifests must be submitted within 24 hours and safe disposal certificates within 60 days of waste removal. Bidders must provide spill awareness and training to all staff, with records of attendance archived and available on request. The SPCC Plan must be reviewed and updated at least annually.
Quality Management
Source: 348-880696 SPCC Work Instruction Rev 4 - Final.pdf (unknown)Bidders must apply the most recent editions of referenced documents, including the Project Execution Plan (348-961711), Project Quality Plan (348-883902), Medupi Environmental Policy (348-860846), EMS Manual and scope (348-882048), and the Procedure for the Identification and Assessment of Environmental Aspects and Impacts (348-860847). Informative references include ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018. Bidders must conduct regular inspections of plant and machinery, preferably daily, to identify hazardous conditions that could lead to spills. Site inspection procedures and frequencies must be described in the SPCC Plan, and all inspection records must be archived and available on request. Bidders must establish maintenance schedules for all plant and equipment that uses hazardous chemical substances.
Compliance Requirements
Source: 348-880696 SPCC Work Instruction Rev 4 - Final.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance certificate. Bidders must comply with the Medupi Environmental Management Plan, environmental authorisations, applicable legislation and SANS standards. Bidders must submit a completed SBD 4 (Declaration of Interest) and SBD 9 (Certificate of Independent Bid Determination). Bidders must develop and submit a site-specific SPCC Plan and Spill Assessment Register to the TM Environmental Department for acceptance. Bidders must complete a register of all HCS Storage Facilities and submit it with the SPCC Plan. Bidders must comply with the National Environmental Management Act, National Water Act, and the Waste Classification and Management Regulations, 2013. Bidders must follow the Medupi Environmental Incident Procedure (348-693723) for reporting all HCS spillages.
Health & Safety
Source: 348-880696 SPCC Work Instruction Rev 4 - Final.pdf (unknown)Bidders must comply with the Occupational Health and Safety Act, as Principal Contractors are viewed as employers in their own right. Bidders must ensure all personnel involved in hazardous chemical substance management are aware of the SPCC Plan and their own site-specific SPCC Plan. Spill awareness and training sessions must be conducted with all staff, covering the location and use of drip trays and spill response kits, reporting procedures, handling of hazardous chemical substances, use of MSDS, hazardous waste disposal, incident management, refuelling procedures and use of spill clean-up kits. Emergency response team members must be trained to deal with emergency spill conditions. All training records must be archived and available on request.
Environmental
Source: 348-880696 SPCC Work Instruction Rev 4 - Final.pdf (unknown)The document is a Spill Prevention, Control, and Countermeasures (SPCC) Management Plan for the Medupi Power Station Project. It requires Principal Contractors to develop site-specific SPCC Plans to prevent, mitigate, and respond to land-based spills of hazardous chemical substances, including hydrocarbons, lubricants, solvents, paints, and hazardous liquid wastes. The plan outlines spill prevention measures, spill response strategies, waste disposal requirements, and monitoring through KPAs/KPIs.
Description
Source: Invitation to Tender (ITT).pdf (RFP)Eskom Holdings SOC Ltd invites tenders for the provision of staff bus transportation services for Medupi Power Station Project. Tender number E2684GCDLPMEDR, issue date 12/08/2026, closing date 28/08/2026 at 10h00am, validity period 90 days. Tenders submitted electronically via Eskom e-tendering site.
Important Dates
Source: Invitation to Tender (ITT).pdf (RFP)Closing date and time: 28 August 2026 at 10h00am.
Clarification meeting (non-compulsory): 20 August 2026 at 10h00am, held via MS Teams (link provided in the tender). Tenderers must confirm attendance with the Eskom Representative, stating name, position and contact details of each attendee. If a meeting is made mandatory, non-attendance leads to disqualification.
Clarification queries: must be submitted at least 3 working days before the tender submission deadline.
Briefing Session
Source: Invitation to Tender (ITT).pdf (RFP)A non-compulsory clarification meeting will be held on 20 August 2026 at 10h00am via MS Teams (link provided in the tender). Tenderers must confirm attendance with the Eskom Representative, stating name, position and contact details of each attendee. If the meeting is made mandatory, non-attendance leads to disqualification.
Contact Information
Source: Invitation to Tender (ITT).pdf (RFP)Eskom Representative: Namudi Phasha, Tel: 014 762 2493, E-mail: [email protected].
Procurement Manager: M. Charles Mkumbeni.
Fraud and corruption reporting: 0800 11 2722 / [email protected].
Submission Guidelines
Source: Invitation to Tender (ITT).pdf (RFP)Submission is electronic only via the Eskom e-tendering site (https://etendering.eskom.co.za). No hard copies accepted. Upload documents under the folders Technical, Commercial, Financial, and other. All documents in PDF format; the price list must be in PDF and a copy in Excel. No zip/condensed files. Upload size per document is 500 MB, total submission restricted to 4 GB. If resubmitting, the latest version is accepted and previous submissions become null and void. Ensure the submission status is indicated as complete. Late tenders are not accepted. Tender validity period is 90 days from closing date.
Mandatory returnables (disqualifiable if omitted):
Other returnables: Annexure G1-G4 (SBD 6.2 Local Production and Content declarations, only if designated materials apply), Tax Evaluation questionnaire, E-tendering Help Manual acknowledgement, Scope of Work, NEC or other Contract, Pricing Schedule/BOQ in PDF and Excel.
Disqualification risks: failure to meet eligibility criteria, incomplete tender, missing mandatory returnables, submitting more than one tender, conflict of interest, tender signed by non-authorised person, being restricted by National Treasury or on the Tender Defaulters list, subcontracting 100% of the scope, or submitting after the closing time.
Returnable Documents
Source: Invitation to Tender (ITT).pdf (RFP)Mandatory returnables at tender closing (disqualifiable): Annexure A Authorisation Form, Annexure B Acknowledgement Form, Annexure C Tenderer's Particulars, Annexure D Integrity Pact Declaration, Annexure E CPA for local goods/services, Annexure G1-G4 SBD 6.2 Local Production and Content (if applicable), Annexure H SBD 1, Annexure I SBD 6.1 Preference Points Claim, Annexure J SBD 4 Bidders Disclosure.
Non-disqualifiable returnables: Tax Evaluation questionnaire, E-tendering Help Manual acknowledgement, NEC or other Contract, Pricing Schedule in PDF and Excel, Scope of Work.
Supporting evidence: CSD registration, annual financial statements, public interest score, ITA34C, functionality/technical returnables including permit to operate within Lephalale area, COIDA letter of good standing.
Evaluation Criteria
Source: Invitation to Tender (ITT).pdf (RFP)Evaluation stages: basic compliance, functionality, then price and specific goals.
Basic compliance: meet eligibility criteria, submit a complete tender with commercial, financial and technical information, and submit mandatory commercial returnables by the deadline.
Functionality (100 points total) — tenderers who do not meet the threshold are disqualified:
Price evaluation: prices inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, compared on Net Present Value basis. Unconditional discounts considered; conditional discounts applied at payment. Prices scored out of 80 or 90 points.
Specific goals: scored out of 10 or 20 points per PPPFA. Failure to submit evidence results in 0 points for that goal but not disqualification.
Ranking: 90/10 for tenders above R50 million; 80/20 for R50 million or below. Eskom adds price and specific goals scores and ranks highest to lowest.
Objective criteria (mandatory compliance, non-compliance renders tender non-responsive):
Technical Specifications
Source: Invitation to Tender (ITT).pdf (RFP)Scope: provision of staff bus transportation services for Medupi Power Station Project.
Vehicle requirements:
Driver requirements:
Contract manager: CV required.
Permits: permit to operate within Lephalale area; passenger (workers) permits from Provincial Department of Transport (workers permits issued post contract award).
Methodology
Source: Invitation to Tender (ITT).pdf (RFP)Quality Method Statement based on the scope, addressing all supplier's business management processes to ensure Eskom's requirements are met consistently.
Safe Work Procedure (SWP)/Safe Operating Procedure (SOP)/Method statements with emergency processes for the works.
Skills development approach: tenderers to propose development of 3 male and 3 female drivers from Lephalale Municipality area, with N2/Grade 12 or equivalent and driver's licence (Code 08). Participation directly and through supply network; SETA accredited training providers may be approached. Tenderers bear full cost; Eskom makes no financial contribution. Tenderers advised to approach SETAs for grants and SARS for tax rebates.
Experience & Qualifications
Source: Invitation to Tender (ITT).pdf (RFP)Company experience: minimum 5 years' experience in providing staff/employee bus transportation services. Submit 3 reference letters for similar contracts successfully executed within the past 3 years. Each reference letter must include client's contactable details, description of similar services, and contract value.
Scoring: 0 letters = 0 points; 1 letter = 5; 2 letters = 10; 3 letters = 15.
Driver qualifications: all drivers must have PDP, EC1/04 or EC licence; advanced driving certificates; health examination certificates. Submit CVs and proof of qualifications.
Contract manager: CV required.
SHE competency: Safety Officer with National Diploma in Safety/Environmental related courses and 2 years' experience.
Quality Management
Source: Invitation to Tender (ITT).pdf (RFP)Quality requirements:
Returnables (as part of tender):
Pricing Schedule
Source: Invitation to Tender (ITT).pdf (RFP)Pricing Schedule/BOQ to be submitted in PDF and Excel format. Upload size per document 500 MB, total submission 4 GB.
Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, compared on Net Present Value basis. Unconditional discounts considered; conditional discounts applied at payment. Prices scored out of 80 or 90 points.
If cataloguing is a requirement, the Pricing Schedule must include a line item for cataloguing, which tenderers must quote for; Eskom will pay for cataloguing.
Financial Requirements
Source: Invitation to Tender (ITT).pdf (RFP)Pricing Schedule/BOQ to be submitted in PDF and Excel format. Upload size per document 500 MB, total submission 4 GB.
Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, compared on Net Present Value basis. Unconditional discounts considered; conditional discounts applied at payment. Prices scored out of 80 or 90 points.
Payment terms: for contracts valued below R50 million (including VAT), Eskom pays within 30 days of receipt of undisputed invoices. For contracts valued above R50 million (including VAT), Eskom pays within 60 days of receipt of undisputed invoices.
Security for performance: if a performance bond or demand guarantee is required, the tenderer must select at least two financial institutions from the list of Eskom-approved financial institutions.
Financial viability: submission of annual financial statements (latest, approved, no draft) including statement of financial position, comprehensive income, changes in equity, cash flows, and notes; signed auditor's/reviewer's/compiler's/accounting officer's report; signed director's report; public interest score (for non-audited entities); ITA34C for current and previous years (for non-audited entities). Financial statements must not be more than 18 months after financial year end. For unincorporated JV or SPV, each partner must submit its own financial statements.
Compliance Requirements
Source: Invitation to Tender (ITT).pdf (RFP)Mandatory:
Eligibility: no restriction to do business with Eskom or State-Owned Companies; not on international sanctions lists; no conflict of interest; not restricted by National Treasury; not on Tender Defaulters list; must not subcontract 100% of the scope.
Local content: designated materials and thresholds not applicable. NIPP not applicable. CIDB CPG and CSDG not applicable.
COIDA: valid letter of good standing (original certificate or proof of application) from the Compensation Fund or licensed compensation insurer (South African tenderers only).
Permits: permit to operate within Lephalale area; passenger (workers) permits from Provincial Department of Transport.
Health & Safety
Source: Invitation to Tender (ITT).pdf (RFP)SHEQ requirements (scored):
Environmental
Source: Invitation to Tender (ITT).pdf (RFP)Environmental requirements (scored):
Contractual Terms
Source: Invitation to Tender (ITT).pdf (RFP)Conditions of contract will be the NEC3 Term Services Contract.
Contractual requirements (assessed after evaluation and ranking, must be met before award): proof of CSD registration; financial viability (submission of financial statements); SHEQ requirements.
Security for performance: if a performance bond or demand guarantee is required, tenderer must select at least two financial institutions from the list of Eskom-approved financial institutions.
Skills development obligations: Eskom retains 2.5% of every invoice (excluding VAT) as security for SDL&I obligations, released upon receipt of progress reports and fulfilment of obligations. Penalty of 2.5% of contract value for failure to meet SDL&I obligations.
Payment terms: 30 days for contracts below R50 million (incl. VAT); 60 days for contracts above R50 million (incl. VAT).
Special Conditions
Source: Invitation to Tender (ITT).pdf (RFP)Skills development obligations: Tenderers must propose development of 3 male and 3 female drivers from Lephalale Municipality area, with N2/Grade 12 or equivalent and driver's licence. Eskom will retain 2.5% of every invoice (excluding VAT) as security for SDL&I obligations, released upon fulfilment. Penalty of 2.5% of contract value for failure to meet obligations.
Objective criteria: Local-to-Site preference for members of recognised Local Taxi Associations (ELTA, Kudu, ELDTA), with proof of association letter not older than 12 months.
Alternative tenders are not allowed.
Reverse e-auction is not applicable.
No public opening of tenders; prices will not be read out.
Requirements
Source: Invitation to Tender (ITT).pdf (RFP)Eligibility criteria: tenderers must not be under restriction to do business with Eskom or State-Owned Companies, must not have nationality of a sanctioned country, must not submit more than one tender, JV/consortium must be jointly and severally liable, no conflict of interest, tender signed by authorised person, not restricted by National Treasury, not on Tender Defaulters list, and must not subcontract 100% of scope.
Basic compliance: meet eligibility, submit a complete tender with commercial, financial and technical information, and submit mandatory commercial returnables by the deadline.
Permits: permit to operate within Lephalale area; passenger (workers) permits from Provincial Department of Transport.
Section
Source: Invitation to Tender (ITT).pdf (RFP)Functionality requirements: Company experience (15 points) - minimum 5 years' experience and 3 reference letters for similar contracts within past 3 years; Bus specification compliance (45 points) - wheelchair-accessible bus, Euro 3 compliance, OEM-approved chassis, road site assistance, roadworthy certificate, comprehensive insurance, service history; Driver safety compliance (17 points) - PDP, EC1/04 or EC licence, advanced driving certificates, health certificates, contract manager CV; Physical vehicle inspection (23 points) - various safety and equipment requirements. Tenderers not meeting functionality threshold are disqualified.
Price evaluation: prices inclusive of VAT, corrected for errors, scored out of 80 or 90 points. Specific goals scored out of 10 or 20 points per PPPFA. Ranking: 90/10 for tenders above R50 million, 80/20 for R50 million or below.
Objective criteria: Local-to-Site (Lephalale) - award to members of recognised Local Taxi Associations (ELTA, Kudu, ELDTA) with proof of association letter not older than 12 months; Skills Development targets - 3 male and 3 female drivers from Lephalale Municipality area, with penalty of 2.5% of contract value for failure to meet SDL&I obligations.
Description
Source: 240-105658000 Supplier Quality Management Specification Rev. 3.pdf (unknown)This specification defines the minimum quality requirements for all existing and potential Eskom suppliers, covering selection, evaluation, vendor registration, management, monitoring, assessment and auditing. It requires suppliers to develop, implement, maintain and continually improve a quality management system (QMS) conforming to ISO 9001. It applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFIs, RFQs, RFPs and contracts for procurement of products and services.
Important Dates
Source: 240-105658000 Supplier Quality Management Specification Rev. 3.pdf (unknown)No tender-specific dates are stated in the supplied document. The specification's authorisation date is 17 October 2021, but this is not a closing date for this tender.
Contact Information
Source: 240-105658000 Supplier Quality Management Specification Rev. 3.pdf (unknown)No contact details are stated in the supplied document.
Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification Rev. 3.pdf (unknown)Returnable documents: Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and Quality Requirements for ISO 9001 Standard) must be completed and signed. The applicable quality category (1-4) is indicated in Form A, and the required quality documentation must be submitted per the List of Tender Returnables (240-12248652).
Disqualification risks: Failure to submit the required quality documentation for the applicable category, or submitting unsigned or incomplete Form A, may result in disqualification.
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification Rev. 3.pdf (unknown)Quality requirements are classified into four categories (1, 2, 3, 4). Only one category applies per procurement process, as indicated in Form A. The supplier must prepare and submit quality documentation per the selected category.
Category 1: Valid ISO 9001 certificate, internal and external audit reports, draft contract quality plan, example ITP/QCP, documented information for control of externally provided processes, roles/responsibilities/authorities, and management review records.
Category 2: Objective evidence of a developed, implemented and maintained QMS complying with ISO 9001, including QMS manual, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, nonconformity and corrective action procedure, plus audit reports, draft CQP, example ITP/QCP, and other documented information.
Category 3: Objective evidence of a developed QMS with similar documentation, plus draft CQP, example ITP/QCP, and other documented information.
Category 4: Quality method statement based on ISO 9001, signed quality policy, quality objectives, documented information for control of externally provided processes, and roles/responsibilities/authorities specific to the project.
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification Rev. 3.pdf (unknown)This document is a general Eskom Supplier Quality Management specification (240-105658000, Rev 3), not the tender-specific scope for staff bus transportation. It sets minimum quality requirements for all Eskom suppliers, including a QMS conforming to ISO 9001, quality plans, quality control plans, and compliance with Eskom's quality requirements throughout the contract.
Methodology
Source: 240-105658000 Supplier Quality Management Specification Rev. 3.pdf (unknown)The supplier must develop and implement processes and procedures to monitor, verify and document the quality of the scope of work for deliverables. This includes preparing QCP/ITPs at a level of detail sufficient to address all quality-control-related activities in chronological order, from contract review through materials verification, manufacturing, fabrication, assembly, final testing, commissioning, hand-over documentation, and certification. The supplier must ensure compliance with requirements for clear description of equipment and locations, identification of quality verification activity and stage, reference documents, procedures, method statements, acceptance criteria, and certifying documents. The supplier must also establish processes for formal assessment of sub-supplier inspection and testing programmes, including review of sub-supplier inspection reports and other quality control documentation.
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification Rev. 3.pdf (unknown)Quality audits and related quality performance reviews shall be carried out by trained, accredited, and experienced personnel in accordance with procedures documented in the specification. Personnel performing special processes (e.g., NDE, welding, coating, heat treatment) must be suitably qualified and, where applicable, registered with statutory bodies as legally required. Personnel required to perform special processes must be certified competent through a certificate of competency in accordance with the company's internal training management and competency control procedures or an external certification body (e.g., NDT) through an accredited service provider as per SETA requirements. All personnel who perform activities that affect quality must have their training needs identified and documented, and training certificates must meet SETA requirements.
Quality Management
Source: 240-105658000 Supplier Quality Management Specification Rev. 3.pdf (unknown)Suppliers and sub-suppliers must develop, implement, maintain and improve a formal QMS conforming to the latest ISO 9001 standard, including documented information such as quality manual, quality plans, work procedures, work instructions, method statements, and workflow documentation. Unless excluded, the QMS must carry a valid ISO 9001 certificate from an accredited certification body. The main supplier is responsible for defining and managing quality assurance and control elements for sub-suppliers, and must inform Eskom of any proposed changes to the QMS or staff affecting the quality system. The main supplier must develop and implement a performance management programme for sub-suppliers, including verification of QMS, audits, surveillance, assessment of CQPs, review of QCPs, nonconformity and defect management, inspection and test plans, and risk management.
Quality plans: Where specified, all individual products, services and processes must have a documented, implemented, reviewed and maintained contract quality plan (CQP) and/or quality control plan (QCP)/inspection and test plan (ITP). The CQP must address quality assurance elements related to the scope of work, while the QCP/ITP must address quality control elements. The CQP must comply with ISO 10005 and include management of records, access for inspection, final documentation submission, special processes (welding, installation, fabrication), personnel qualification, training, equipment and materials storage/preservation, quality monitoring activities, resources, communication channels, management authority and responsibility, list of documents and records, and monitoring & measurement procedures. CQPs must be submitted prior to the initial scope of work kick-off or pre-fabrication meeting and prior to commencement of manufacturing. The Eskom template for CQP may be used as a guideline.
Quality Control Plans (QCP/ITP): The supplier must develop and implement processes to monitor, verify and document quality of deliverables. QCP/ITPs must cover all stages from contract review through materials verification, manufacturing, fabrication, assembly, final testing, commissioning, hand-over documentation and certification. They must be reviewed and accepted by Eskom or its inspection authority, and allow for insertion of hold and witness points. Changes require Eskom agreement. QCP/ITPs must include contract number, order number, description of work, sequence of operations, acceptance criteria, intervention points, inspection and test records, and sign-off provisions. Sub-supplier QCP/ITPs must be prepared and submitted for review. Quality kick-off meetings and pre-inspection meetings are required. Eskom may appoint resident quality inspectors and any inspection agency it prefers.
Supplier capability and capacity assessments shall be performed prior to contract award for potential suppliers providing products and services with high risk to operational sustainability, working on critical plant and equipment, supplying critical plant items or components, or providing special processes. Assessments apply to suppliers of Generation Level 1 & 2 plant, Transmission and Distribution Power Plant & Control Plant, and Mega Projects.
Post-contract award: Supplier quality performance monitoring phase includes monitoring of quality-related aspects. The supplier must submit documented processes for conducting project scope of work quality audits and related quality performance reviews, designed to evaluate progress towards completion of project functional area deliverables and final deliverable quality. A schedule of anticipated quality audits covering all functional areas must be provided at the time of first post-contract award CQP submission.
Pricing Schedule
Source: 240-105658000 Supplier Quality Management Specification Rev. 3.pdf (unknown)No pricing schedule requirements are stated in the supplied document.
Financial Requirements
Source: 240-105658000 Supplier Quality Management Specification Rev. 3.pdf (unknown)No financial requirements are stated in the supplied document.
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification Rev. 3.pdf (unknown)Suppliers must develop, implement, maintain and improve a formal QMS conforming to the latest ISO 9001 standard. Unless excluded per the quality category, the QMS must carry a valid ISO 9001 certificate from an accredited certification body. This applies to both the supplier and any sub-suppliers.
Form A must be completed and signed to acknowledge and accept Eskom Supplier Quality requirements.
Suppliers must submit quality documentation per the applicable category (1-4) as listed in the List of Tender Returnables (240-12248652).
Health & Safety
Source: 240-105658000 Supplier Quality Management Specification Rev. 3.pdf (unknown)The specification references Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) as an informative reference. No specific health and safety requirements are stated in the supplied document.
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification Rev. 3.pdf (unknown)Eskom has rights of access to supplier facilities and information as determined by applicable legislation. Eskom reserves the right to oversee supplier audit programmes by participating in selected audits as an observer and assessing the supplier during key work stages. The supplier must ensure preservation of equipment and materials, including clear communication of preservation requirements to sub-suppliers, documented processes for monitoring compliance, and a preservation programme addressing temporary, long-term and in-transit preservation, including protection against environmental conditions, coatings, grounding, inert gas charging, vibration protection, and structural integrity. Nonconformities must be managed: if the supplier fails to respond and rectify nonconforming products within contractual conditions, contractual remedies may be applied in accordance with FIDIC/NEC contract. Repeated nonconformities within 6 months must be escalated to management review committees and, if unresolved, to the supplier review committee. Special processes: all operators must be suitably qualified in accordance with procedures, processes and applicable standards/codes. Records of qualification of procedures, processes and operators must be maintained and made available to Eskom at all times.
Requirements
Source: 240-105658000 Supplier Quality Management Specification Rev. 3.pdf (unknown)Pre-contract award quality requirements are classified into four categories (1, 2, 3, 4). Suppliers must prepare and submit quality documentation as per the tender selected category, using the List of Tender Returnables document. Only one category applies per procurement process. Category 1 requires completion and signing of Form A, a valid ISO 9001 certificate, internal and external audit reports, a draft contract quality plan, an example ITP/QCP, documented information for control of externally provided processes, roles/responsibilities/authorities, and management review records. Category 2 requires objective evidence of a developed, implemented and maintained QMS complying with ISO 9001, including QMS manual, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, and nonconformity and corrective action procedure, plus audit reports, draft CQP, example ITP/QCP, and other documented information. Category 3 requires objective evidence of a developed QMS with similar documentation, plus draft CQP, example ITP/QCP, and other documented information. Category 4 requires completion of Form A, a quality method statement based on ISO 9001, signed quality policy, quality objectives, documented information for control of externally provided processes, and roles/responsibilities/authorities specific to the project.
Section
Source: 240-105658000 Supplier Quality Management Specification Rev. 3.pdf (unknown)Quality requirements are classified into four categories (1, 2, 3, 4). Only one category applies per procurement process, as indicated in Form A. The supplier must prepare and submit quality documentation per the selected category, using the List of Tender Returnables document. Category 1 requires a valid ISO 9001 certificate, audit reports, draft CQP, example ITP/QCP, and other documented information. Category 2 requires objective evidence of a developed, implemented and maintained QMS complying with ISO 9001, including QMS manual, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, nonconformity and corrective action procedure, plus audit reports, draft CQP, example ITP/QCP, and other documented information. Category 3 requires objective evidence of a developed QMS with similar documentation, plus draft CQP, example ITP/QCP, and other documented information. Category 4 requires a quality method statement based on ISO 9001, signed quality policy, quality objectives, documented information for control of externally provided processes, and roles/responsibilities/authorities specific to the project.
Submission Guidelines
Source: 348-31313 Medupi Amended Water Use License Rev 1 December 2020 (Station).pdf (unknown)Returnable documents: SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim for B-BBEE), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination), and an Authority to Sign / Board Resolution. All must be completed, signed, and submitted with the bid.
Evaluation Criteria
Source: 348-31313 Medupi Amended Water Use License Rev 1 December 2020 (Station).pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid SARS tax clearance (tax pin). Preference points will be allocated under the 80/20 or 90/10 system as per the PPPFA.
Compliance Requirements
Source: 348-31313 Medupi Amended Water Use License Rev 1 December 2020 (Station).pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid SARS tax clearance (tax pin). B-BBEE requirements apply as per the 80/20 or 90/10 preference point system.
Important Dates
Source: Enviromental objectives - 2025 &2026 FY.pdf (unknown)Target date for achieving environmental objectives: 31 March 2026.
Contact Information
Source: Enviromental objectives - 2025 &2026 FY.pdf (unknown){"name":null,"email":null,"phone":null,"department":"ies for than 2 major NC are dashboard.","address":null}
Technical Specifications
Source: Enviromental objectives - 2025 &2026 FY.pdf (unknown)Environmental objectives for the 2025/26 financial year at Medupi Power Station:
Quality Management
Source: Enviromental objectives - 2025 &2026 FY.pdf (unknown)Environmental objectives for the 2025/26 financial year at Medupi Power Station include:
Health & Safety
Source: Enviromental objectives - 2025 &2026 FY.pdf (unknown)Reduce total environmental incidents by 10% towards zero harm on the Medupi construction site (floor 13, kick-in 12, target 11, stretch 10, ceiling 9) by implementing the Incident Management Procedure and raising awareness on pollution prevention.
Description
Source: SOW Bus Transport Contract (003)-348-10125421.pdf (unknown)The service is the provision of staff bus transportation for Eskom Medupi Power Station Project employees (Group Capital Division) for home-to-work-to-home transport. Areas serviced: Onverwacht, Lephalale Town and Marapong. Initially approximately 80 employees, using 22-seater buses. Ad hoc weekend transport for overtime workers and for traditional council representatives and stakeholders within a 90 km radius. Working times: Mon–Thu 07h00–16h30, Fri finish 13h30; pay weekends Thu knock-off 14h30, Fri off.
Important Dates
Source: SOW Bus Transport Contract (003)-348-10125421.pdf (unknown)Closing date: 28 August 2026 at 10:00 (from tender record).
Service commencement: 1 August 2026.
Contract duration: 17 months.
No briefing or site visit dates are stated in the document.
Contact Information
Source: SOW Bus Transport Contract (003)-348-10125421.pdf (unknown)No specific contact details are stated in the document. Enquiries may be directed to Eskom's Fleet Management department for bus schedule information.
Submission Guidelines
Source: SOW Bus Transport Contract (003)-348-10125421.pdf (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Disqualification risks:
Evaluation Criteria
Source: SOW Bus Transport Contract (003)-348-10125421.pdf (unknown)Evaluation stages:
Technical Specifications
Source: SOW Bus Transport Contract (003)-348-10125421.pdf (unknown)Scope:
Working times:
Vehicle specifications:
Contractor responsibilities:
Records:
Methodology
Source: SOW Bus Transport Contract (003)-348-10125421.pdf (unknown)No specific methodology or execution plan is required beyond the operational requirements stated in the scope of work. The Contractor must submit a maintenance programme and allow Eskom to inspect the workshop. Bus schedules must account for travel times and pick-up points.
Quality Management
Source: SOW Bus Transport Contract (003)-348-10125421.pdf (unknown)Quality standards:
Financial Requirements
Source: SOW Bus Transport Contract (003)-348-10125421.pdf (unknown)Pricing format: not explicitly stated in the document; likely a schedule of rates or fixed price per the pricing schedule (SBD 3.1).
Compliance Requirements
Source: SOW Bus Transport Contract (003)-348-10125421.pdf (unknown)Mandatory registrations and permits:
Health & Safety
Source: SOW Bus Transport Contract (003)-348-10125421.pdf (unknown)Health and safety obligations:
Environmental
Source: SOW Bus Transport Contract (003)-348-10125421.pdf (unknown)Environmental management:
Contractual Terms
Source: SOW Bus Transport Contract (003)-348-10125421.pdf (unknown)Contract form: NEC3 (TSC) Terms Service Contract.
Requirements
Source: SOW Bus Transport Contract (003)-348-10125421.pdf (unknown)General requirements:
Section
Source: SOW Bus Transport Contract (003)-348-10125421.pdf (unknown)Additional evaluation criteria:
Important Dates
Source: 348 - 681011 Medupi EMP Revision 2 - September 2010.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ion.","is_compulsory":false}"}
Contact Information
Source: 348 - 681011 Medupi EMP Revision 2 - September 2010.pdf (unknown)Eskom Generation Division: Deidre Herbst (Generation Environmental Manager, Tel: (011) 800 3501 / (083) 660 1147). Eskom Enterprises Division / Medupi Execution Team: Roman Crookes (Executive Project Manager: New Coal, Tel: (011) 800 3861 / (082) 775 4678), Hank Vaughn (Site Director: Medupi Power Station, Tel: (014) 762 2401 / (082) 372 1854), Neil Bower (Environmental Manager: Medupi Power Station, Tel: (014) 762 2460 / (082) 446 1269), Emile Marell (Lead Environmental Control Officer: Medupi Power Station, Tel: (014) 762 2458 / (071) 685 8791). Environmental Consultant: Mrs Ashlea Strong (Bohlweki Environmental (Pty) Ltd, Tel: (011) 798 6001). National Department of Environmental Affairs: Ms Mosili Ntene (Deputy Director: Environmental Impact Evaluation, Tel: (012) 310 3031). Limpopo Department of Economic Development, Environment and Tourism: Ms Grace Rasesepe (Environmental Officer, Tel: (015) 295 5171). CAPCO: Mr Peter Lukey (National CAPCO, Tel: (012) 949 7887).
Evaluation Criteria
Source: 348 - 681011 Medupi EMP Revision 2 - September 2010.pdf (unknown)Bidders must comply with the Environmental Management Plan (EMP) for the Medupi Power Station construction phase, including all environmental specifications and legal requirements. Contractors must provide method statements for approval and appoint environmental officers. Compliance with the Health, Safety and Environmental Specification for Medupi Power Station (Appendix D) is required. No specific eligibility criteria such as CSD registration, tax clearance, or B-BBEE level are stated in the provided document.
Technical Specifications
Source: 348 - 681011 Medupi EMP Revision 2 - September 2010.pdf (unknown)The project involves the construction of the Medupi Power Station, a 4800 MW coal-fired power station in the Lephalale area, Limpopo Province, on the farm Naauwontkomen 509 LQ. The power station will use super-critical pulverised fuel technology with direct dry-cooled technology, electrostatic bagfilters, low NOx burners, and be FGD-ready. Coal will be supplied from Exxaro's Grootegeluk Colliery via conveyor belts. Construction will be phased, with 6 units of 750 MW each. The first unit will take approximately 48 months to construct, with subsequent units at nine-month intervals. At peak, approximately 7400 people will be on-site. Construction activities include terracing, roads, stormwater drainage, sewerage, and other enabling works. Terracing involves clearing and grubbing 1 million m2, removing and stockpiling topsoil, removing and stockpiling approximately 800,000 m3 amandelklip gravel, cut to fill of approximately 500,000 m3 hard rock, importing and processing approximately 1 million m3 fill material, and constructing terrace subgrade and layers. Terrace and contractor's yards roads and lay-down areas involve clearing and grubbing approximately 1.5 million m2, preparing lay down areas, constructing gravel wearing course, and constructing approximately 14 km of terrace roads and 5 km of contractor's yards roads.
Quality Management
Source: 348 - 681011 Medupi EMP Revision 2 - September 2010.pdf (unknown)The Contractor must implement monitoring programmes for water quality, noise, and dust in accordance with relevant permits and standards. The ECO will provide inputs on variables and frequency. Monitoring records must be available for inspection by relevant authorities. The Contractor must maintain records of spills, pollution incidents, spot fines, and training details, and copy them to the ECO.
Health & Safety
Source: 348 - 681011 Medupi EMP Revision 2 - September 2010.pdf (unknown)The EMP includes environmental specifications for construction activities, including site establishment, site clearing, plant repair and maintenance, noise control, dust control, water management, soil management, waste management, hazardous substances handling, and site clean-up and rehabilitation. Contractors must comply with the Health, Safety and Environmental Specification for Medupi Power Station (Appendix D).
Environmental
Source: 348 - 681011 Medupi EMP Revision 2 - September 2010.pdf (unknown)The EMP provides mitigation and management measures for the construction phase, including environmental specifications for site clearing, vegetation, fauna, heritage, air pollution, water management, soil management, waste management, hazardous substances, and site clean-up and rehabilitation. The Contractor must comply with all relevant environmental legislation and the Record of Decision conditions. The ECO must be appointed one month before construction start and must maintain daily site register, non-compliance register, public complaint register, and register of audits. The ECO must submit an environmental compliance report every two months to the Director-General of the DEA.
Contractual Terms
Source: 348 - 681011 Medupi EMP Revision 2 - September 2010.pdf (unknown)The EMP will be available on-site at all times. All employees on-site must abide by the EMP requirements. Any construction workforce member found in breach of the EMP specifications may be ordered by the Site Director to leave the site, orally or in writing. The Contractor must not direct any person to undertake an activity that would contravene the EMP. If the Contractor breaches the EMP, the Site Director may take action.
Section
Source: 348 - 681011 Medupi EMP Revision 2 - September 2010.pdf (unknown)Bidders must be able to comply with the Environmental Management Plan (EMP) for the Medupi Power Station construction phase, including all environmental specifications and legal requirements. The EMP requires contractors to provide method statements for approval and to appoint environmental officers. Bidders must also comply with the Health, Safety and Environmental Specification for Medupi Power Station (Appendix D of the EMP). No specific eligibility criteria such as CSD registration, tax clearance, or B-BBEE level are stated in the provided document.
Description
Source: 348-389557 Medupi-Matimba Contractor Quality Specification Rev 5 ._.pdf (unknown)This is the Medupi/Matimba Contractor Quality Specification (document 348-389557, alternative reference 200-1689), Revision 5, effective from the last authorisation date (8 March 2022). It applies to all contractors working at the Medupi/Matimba Power Station Projects. The specification sets out the Employer's quality requirements that must be adhered to, with the goal of satisfying safety, environmental, performance, technical integrity, maintainability, reliability, lifecycle cost, schedule, constructability, automation and commonality requirements.
Important Dates
Source: 348-389557 Medupi-Matimba Contractor Quality Specification Rev 5 ._.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ever access is needed to audit all","is_compulsory":false}"}
Contact Information
Source: 348-389557 Medupi-Matimba Contractor Quality Specification Rev 5 ._.pdf (unknown){"name":null,"email":null,"phone":null,"department":"ies......................................................... 16","address":"............................................................................................................... 16"}
Evaluation Criteria
Source: 348-389557 Medupi-Matimba Contractor Quality Specification Rev 5 ._.pdf (unknown)Bidders must comply with the Employer's quality specification 348-389557 and the Eskom Corporate Sustainability Supplier Quality Management Specification (QM 58). Where the two conflict, the project specification takes precedence.
The Contractor must implement a Quality Management System (QMS) certified to ISO 9001:2015 and provide evidence of conformance through independent audits by an ISO 9001 Certification Body (approved by the FIDIC Engineer/Project Manager) during design and construction phases. Audits must be completed before 50% completion of each phase, with the audit report issued to the FIDIC Engineer/Project Manager.
The Contractor must grant the FIDIC Engineer/Project Manager access to audit all quality system and technical documents and work faces during normal working hours, and must provide access within 10 days of receipt of an Audit Notification.
The Contractor must comply with all relevant statutory requirements, including the Occupational Health and Safety Act and the Mines Health and Safety Act where applicable.
Technical Specifications
Source: 348-389557 Medupi-Matimba Contractor Quality Specification Rev 5 ._.pdf (unknown)Scope: The specification applies to all contractors doing work at the Medupi/Matimba Power Station Projects in Lephalale, Limpopo. It defines the Employer's quality requirements for design, manufacture, installation/construction, commissioning, and takeover/handover of a coal-fired power station and related projects.
Quality Management System: The Contractor must implement a project-specific QMS conformant to ISO 9001:2015, summarized in a Project Quality Management Plan and detailed in Project Quality Assurance Plans, Quality Management Procedures, Inspection and Test Plans, Method Statements, Work Procedures and Work Instructions.
Criticality Assessment: The Contractor must implement a risk-based criticality assessment program (per Appendix 1) to rate equipment, materials and processes on criteria including safety, fluid characteristics, operational significance, availability for repair, design maturity, complexity, economics and environmental impact, and use the ratings to set inspection levels.
Inspection and Test Plans (ITPs): The Contractor must compile an ITP for each unique activity (temporary or permanent works) before activity commencement, for approval by the FIDIC Engineer/Project Manager. ITPs define hold, witness, actual inspection and review points.
Inspection and Test Notifications: The Contractor must issue notifications to the FIDIC Engineer/Project Manager for all inspections and tests requiring attendance, as defined in the ITPs.
Inspection Schedule: The Contractor must issue a monthly inspection schedule (one week before month end) identifying inspections and tests to be performed at manufacturers' premises and on site.
Quality Verification Records: The Contractor must maintain records demonstrating that the Permanent Works or Goods comply with the Contract. Paper hard copies must be scanned and stored on CD ROM with a guaranteed data storage life of at least ten years, with backup of electronic documentation.
Documentation Control: Document deliverables must be classified (Class 1 for approval, etc.) per Appendix 09. The Contractor may not proceed with works subject to a Class 1 document until it is approved by the FIDIC Engineer/Project Manager.
Hazardous Locations (HAZLOC): The Contractor must comply with OHSA certified equipment requirements and submit a Product Verification Plan for approval.
Permits and Licenses: The Contractor must comply with all permits, licenses and statutory provisions, including the Occupational Health and Safety Act and the Mines Health and Safety Act.
Methodology
Source: 348-389557 Medupi-Matimba Contractor Quality Specification Rev 5 ._.pdf (unknown)The Contractor must implement a risk-based criticality assessment program (per Appendix 1) to rate equipment, materials and processes on criteria including safety, fluid characteristics, operational significance, availability for repair, design maturity, complexity, economics and environmental impact, scoring per Appendix 2. The resulting criticality ratings determine inspection levels.
Quality management principles include customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making, and relationship management.
Experience & Qualifications
Source: 348-389557 Medupi-Matimba Contractor Quality Specification Rev 5 ._.pdf (unknown)Personnel performing work affecting quality must be competent based on education, training, skills and experience. For all personnel assigned to the Quality Department or responsible for verifying quality, the Contractor must maintain a Competency File containing a resume identifying qualifications and past experience, a job description, an interview questionnaire, and a competency assessment interview checklist.
Quality Management
Source: 348-389557 Medupi-Matimba Contractor Quality Specification Rev 5 ._.pdf (unknown)The Contractor shall manage interfaces, customer-related processes, permits and licenses, and statutory provisions. For hazardous locations, the Contractor must comply with OHSA certified equipment requirements and submit a Product Verification Plan for approval. Design and development processes must be controlled, including inputs, outputs, and change control.
Compliance Requirements
Source: 348-389557 Medupi-Matimba Contractor Quality Specification Rev 5 ._.pdf (unknown)Quality Management System: Must be certified to ISO 9001:2015, with independent audits by an approved ISO 9001 Certification Body.
Statutory Compliance: Must comply with the Occupational Health and Safety Act and the Mines Health and Safety Act (where applicable).
Personnel Competency: All personnel performing work affecting quality must be competent based on education, training, skills and experience. Quality control and verification staff must be independent from construction and commissioning activities and report to the Site Quality Department Manager.
Key Personnel: The Contractor must appoint a Project Quality Manager who reports to the Contractor's Project Representative. If the FIDIC Engineer/Project Manager withdraws consent to the Quality Manager, the Contractor must promptly nominate a replacement.
Organisational Charts: The Contractor must submit an overall Project Organisation Chart and a Quality Department Organisation Chart for approval, showing key personnel and reporting relationships.
Project Job Descriptions: Must be provided to the FIDIC Engineer/Project Manager for all Contractor personnel.
B-BBEE: Minimum Level 2 required.
Health & Safety
Source: 348-389557 Medupi-Matimba Contractor Quality Specification Rev 5 ._.pdf (unknown)The Contractor must comply with the Occupational Health and Safety Act (OHSA) and associated regulations, including Construction Regulations (latest issue), and the Mines Health and Safety Act where applicable. For hazardous locations, OHSA certified equipment and a Product Verification Plan are required. Monthly records index must be submitted to the Engineer/Project Manager.
Contractual Terms
Source: 348-389557 Medupi-Matimba Contractor Quality Specification Rev 5 ._.pdf (unknown)The Contractor must satisfy safety, environmental, performance, technical integrity, maintainability and interchangeability requirements, and achieve high reliability/operability, low lifecycle cost, overall project schedule, low investment cost, good constructability, high automation, and high commonality of components.
Documentation: All paper hard copies must be scanned and stored on CD ROM with a guaranteed data storage life of not less than ten years. Backup of electronic documentation must be in place.
Section
Source: 348-389557 Medupi-Matimba Contractor Quality Specification Rev 5 ._.pdf (unknown)The specification does not set out commercial evaluation criteria. It defines quality requirements the Contractor must meet, including ISO 9001:2015 conformance, independent audits, and compliance with the Employer's quality specification and QM 58.
Evaluation Criteria
Source: 240-77037682 - Occupational Health and Safety Act Section 37(20 Agreement Form - Rev 7.pdf (unknown)The contractor must be an employer in its own right and accept duties under the Occupational Health and Safety Act. The contractor must sign the Section 37(2) agreement and comply with the SHE specifications. No other eligibility criteria are stated in the provided document.
Technical Specifications
Source: 240-77037682 - Occupational Health and Safety Act Section 37(20 Agreement Form - Rev 7.pdf (unknown)The contractor must comply with the SHE specifications provided for the project/service, which constitute arrangements and procedures between the contractor and Eskom Holdings SOC Limited to ensure compliance with the Occupational Health and Safety Act.
Compliance Requirements
Source: 240-77037682 - Occupational Health and Safety Act Section 37(20 Agreement Form - Rev 7.pdf (unknown)The contractor must sign the Section 37(2) agreement, acknowledging that it is an employer in its own right with duties under the Occupational Health and Safety Act, 1993, and must ensure its employees adhere to the Act's provisions. The contractor must also comply with the SHE specifications provided for the project/service.
Health & Safety
Source: 240-77037682 - Occupational Health and Safety Act Section 37(20 Agreement Form - Rev 7.pdf (unknown)The contractor must acknowledge that it is an employer in its own right with duties under the Occupational Health and Safety Act, 1993, and must ensure that all work is performed and machinery or plant used in accordance with the Act. The contractor must strictly adhere to the Act and ensure its employees do the same. The contractor must comply with the SHE specifications provided for the project/service, which constitute arrangements and procedures between the contractor and Eskom Holdings SOC Limited to ensure compliance with the Act as contemplated in section 37(2).
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Steenbokpan Road - Onverwacht - Lephalale - 0555
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
28
Last checked
13 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Other service activities. Unlock full pricing strategies, bid frequency, and historical win rates.