Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Matimba Power Station - Lephalale - Lephalale - 0556
Organization Type
GOVERNMENT
Published
25 Sept 2026
OCDS Reference
ocds-9t57fa-171692
ESKOM requires the supply and delivery of ssc spares to matimba power station in limpopo on an as-and-when-required basis for a period of 60 months (5 years). The contract is awarded under the PPPFA 90/10 or 80/20 preference point system, with b-bbee status level contributing up to 10 or 20 points. Bidders must meet designated local content thresholds for certain components and commit to sdl&i obligations, including a 2% retention on every invoice and a 2% penalty for non-compliance. The most consequential consideration is the mandatory b-bbee documentation and the local content thresholds, which are conditions for contract award.
Closing: 30 October 2026 at 10:00. Submission method and address not stated in the document.
B-BBEE evidence: Valid B-BBEE certificate (SANAS accredited), sworn affidavit (EME/QSE as applicable), or CIPS affidavit is a condition for contract award. Electronic signatures on affidavits are not accepted.
Local content thresholds (designated sectors): Fasteners (Bolts and Nuts) 100%, Valves and Actuators (Valves) 70%, Steel Products 100%, Pumps (Centrifugal Pumps) 70%, Steel conveyance pipes 100%. SBD 6.2 and Annex C are returnable if applicable.
SDL&I obligations: Submit B-BBEE improvement/retention plan within 30 days of contract signing; complete SDL&I Implementation Schedule within 28 days of contract award; skill one candidate per R30 million spend; 2% retention on every invoice (excl. VAT) and 2% penalty for non-compliance.
Evaluation: 90/10 or 80/20 preference point system. Price max 90 or 80 points; B-BBEE specific goals max 10 or 20 points. Contract awarded to highest total points.
B-BBEE improvement milestones: Level 4 must reach Level 3 by end of first year; Levels 5-8 or non-compliant must reach Level 4 by end of first year, then improve one level per year.
Returnable documents: SBD 6.2 (if designated sector), Annex C, B-BBEE preference point documentation (certificate/affidavit, proof of ownership, certified ID copies, proof of disability if applicable, consolidated certificate for trusts/consortia/JVs).
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 30 October 2026 - 10:00
Venue
Microsoft Teams
Request for Bid(Open-Tender)
Matimba Power Station - Lephalale - Lephalale - 0556
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Good Manufacturing Practice (GMP), SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
Source: 240-68099512 Form A_Cat 2_ Rev 9 17 - 04 - 2026.docx (unknown)25 Sept
2026
Tender Published
Tender was published
30 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-109253698 Template for a Typical Contract Quality Plan.docx
Supply and delivery of SSC (superheater/supercritical?) spares to Eskom's Matimba Power Station in Limpopo on an as-and-when-required basis for a period of five years. The contract requires the successful bidder to implement a Contract Quality Plan (CQP) covering quality management, inspection, documentation, and post-delivery support.
Invitation to Tender (ITT) SSC Spares.pdf
Supply and delivery of SSC Spares to Matimba Power Station for a period of five years, on an as-and-when-required basis. The contract is issued by Eskom Holdings SOC Ltd and is an open invitation to tender.
240-12248652_List of Tender Returnables_Cat 2_ Rev 7 17 - 04 - 2026.docx
Supply and delivery of SSC Spares to Matimba Power Station for a five-year period, on an as-and-when-required basis, for Eskom in Limpopo.
Tender Technical Evalauation Strategy - SSC Spares.pdf
Supply and delivery of Submerged Scraper Conveyor (SSC) spares to Matimba Power Station for a five-year period, on an as-and-when-required basis. The technical evaluation strategy defines the qualitative criteria and team responsibilities for assessing bidders.
NEC3 Supply Contract for SSC Spares.pdf
Supply and delivery of SSC Spares to Matimba Power Station, Lephalale, Limpopo, on an as-and-when-required basis for a period of five years. The contract is an NEC3 Supply Contract (SC3) between Eskom Holdings SOC Ltd and a supplier to be appointed at award stage.
Environmental Evaluation Report _Low Risk Activity.xlsx
Supply and delivery of SSC Spares to Matimba Power Station for a five-year period, on an as-and-when-required basis. The procurement is issued by Eskom and requires bidders to meet a low-risk environmental evaluation threshold.
240-68099512 Form A_Cat 2_ Rev 9 17 - 04 - 2026.docx
Supply and delivery of SSC Spares to Matimba Power Station for a five-year period on an as-and-when-required basis. The contract is issued by Eskom and requires the successful bidder to comply with Eskom's Supplier Quality Requirements as per specification 240-105658000 and ISO 9001.
Supplier Development Localisation Industrialisation (SDLI) Strategy SSC 1.pdf
Supply and delivery of SSC spares to Matimba Power Station on an as-and-when-required basis for a period of 60 months (5 years). The contract is issued by Eskom and includes specific goals for B-BBEE preference points, local content requirements, and SDL&I obligations.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 576 123
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The tenderer must complete and sign the Eskom Supplier Quality Requirements form to acknowledge and accept the quality requirements as per specification 240-105658000 and ISO 9001 Standard.
Submission Guidelines
Source: 240-68099512 Form A_Cat 2_ Rev 9 17 - 04 - 2026.docx (unknown)Returnable documents: The tenderer must complete and sign the Eskom Supplier Quality Requirements form (Form A, Category 2) to acknowledge and accept the quality requirements of specification 240-105658000 and ISO 9001. The form must indicate applicable clauses with an X and non-applicable clauses with a dash.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 2_ Rev 9 17 - 04 - 2026.docx (unknown)Bidders must accept and sign the Eskom Supplier Quality Requirements form. No other eligibility criteria are stated in the document.
Technical Specifications
Source: 240-68099512 Form A_Cat 2_ Rev 9 17 - 04 - 2026.docx (unknown)The tenderer must complete and sign the Eskom Supplier Quality Requirements form to acknowledge and accept the quality requirements as per specification 240-105658000 and ISO 9001 Standard. The form requires selection of a quality category (Category 2 is pre-selected) and confirmation of pre-contract award, post-contract award, and standard conditions.
Compliance Requirements
Source: 240-68099512 Form A_Cat 2_ Rev 9 17 - 04 - 2026.docx (unknown)No specific requirements found
Description
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC 1.pdf (unknown)Supply and delivery of SSC Spares to Matimba Power Station on an as and when required basis. Contract duration: 60 months (5 years). Market research indicates no current suppliers; potential suppliers are the open market.
Important Dates
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC 1.pdf (unknown)Closing date: 30 October 2026 at 10:00 (from tender record).
No briefing or site visit dates are stated in the document.
Contact Information
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC 1.pdf (unknown)Buyer: Sharlotte Masopoga
Department: Matimba Power Station
No email, telephone, or address provided in the document.
Submission Guidelines
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC 1.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC 1.pdf (unknown)Evaluation is based on the 90/10 or 80/20 preference point system (PPPFA).
Level 1: 10 (90/10) / 20 (80/20)
Level 2: 9 / 18
Level 3: 6 / 14
Level 4: 5 / 12
Level 5: 4 / 8
Level 6: 3 / 6
Level 7: 2 / 4
Level 8: 1 / 2
Non-compliant: 0 / 0
Technical Specifications
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC 1.pdf (unknown)Supply and delivery of SSC Spares to Matimba Power Station on an as and when required basis.
Contract duration: 60 months (5 years).
No quantities or specific spares list are provided in the document.
Financial Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC 1.pdf (unknown)Pricing must be separated into components as per the Price Schedule included with the tender documents.
Local procurement content is total spending minus the imported component.
SDL&I penalty: 2% of contract value for failure to meet SDL&I obligations.
SDL&I performance security: Eskom retains 2% of every invoice (excluding VAT) as security for fulfilment of SDL&I obligations; retained amounts released only upon full fulfilment.
Compliance Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC 1.pdf (unknown)B-BBEE requirements:
Local content (designated sectors) – minimum thresholds:
Sworn affidavit validity requirements:
B-BBEE Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC 1.pdf (unknown)B-BBEE status level determines specific goal points (10/20 max). Required documentation: valid B-BBEE certificate (SANAS accredited) or sworn affidavit/CIPS affidavit, proof of ownership/shareholding (preferably CIPC) with breakdown, certified ID copies of shareholders, proof of disability where applicable, consolidated B-BBEE certificate for trusts/consortia/JVs. Electronic signatures not accepted. Failure to provide documentation does not disqualify but limits price points to 90/80 and specific goal points to 0. Local content thresholds for designated sectors: Fasteners 100%, Valves 70%, Steel Products 100%, Pumps 70%, Pipes 100%. SBD 6.2 and Annex C returnable if applicable. B-BBEE improvement/retention plan required within 30 days of contract signing. Level 1 maintain; Levels 2-3 may improve/maintain; Level 4 achieve Level 3 by end of first year; Levels 5-8 or non-compliant achieve Level 4 by end of first year. EME (≤R10m) may submit sworn affidavit; QSE (≤R50m) must comply with QSE scorecard unless ≥51% black owned; above R50m requires valid certificate. Local procurement content target is 100%. Jobs: submit proposals for type and number of jobs created and retained. Skills development: one candidate for every R30 million cumulative spend, bursary minimum 24 months, candidates from previously disadvantaged groups. Sworn affidavit validity requirements as detailed.
Contractual Terms
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC 1.pdf (unknown)SDL&I obligations are contractual. Failure to meet them incurs a penalty of 2% of contract value. Eskom retains 2% of every invoice (excluding VAT) as security for SDL&I obligations; retained amounts are released only upon full fulfilment. Suppliers must submit quarterly SDL&I compliance reports per the Data Collection Template. Eskom reviews reports within 30 days and notifies in writing if obligations are not met. Suppliers must implement corrective measures before the next report, failing which retention clauses are invoked. The SDL&I Implementation Schedule must be completed and returned within 28 days of contract award.
Section
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy SSC 1.pdf (unknown)Specific goals (B-BBEE status level) points: maximum 10 (90/10 system) or 20 (80/20 system). Points added to price points, total rounded to two decimals. Contract awarded to highest scorer per PPPFA. B-BBEE status level points table for 90/10 and 80/20 systems. Failure to provide preference point documentation limits price points to 90/80 and specific goal points to 0.
Description
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)The document is a Contract Quality Plan (CQP) template for the supply and delivery of SSC spares to Matimba Power Station over five years, as and when required. The template guides the supplier in planning quality management for the contract.
Submission Guidelines
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)Returnable documents: the completed Contract Quality Plan (CQP) template, signed by the tenderer's organisation owner, must be submitted with the bid. No other returnable forms are specified in the provided content.
Evaluation Criteria
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)The document does not specify evaluation criteria, scoring split, minimum qualifying score, or preference point system. The CQP template must be completed and approved by the tenderer's organisation owner. No other pre-qualification requirements are stated.
Technical Specifications
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)The Contract Quality Plan (CQP) template is to be completed by the supplier to plan for meeting Eskom's quality management expectations for the contract. The CQP must address the following elements:
Compliance Requirements
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)No specific compliance requirements (e.g., CSD, tax, B-BBEE, CIDB) are stated in the provided content.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7 17 - 04 - 2026.docx (unknown)Returnable documents: Form A must be completed and signed. No other returnable forms are specified in the provided document.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7 17 - 04 - 2026.docx (unknown)Quality requirements are evaluated under Category 2. Bidders must satisfy either Option 1 or Option 2 for ISO 9001 compliance.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7 17 - 04 - 2026.docx (unknown)Supply and delivery of SSC spares to Matimba Power Station for a period of five years, on an as-and-when-required basis.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7 17 - 04 - 2026.docx (unknown)No specific compliance requirements (e.g., CSD, tax clearance, B-BBEE, CIDB) are stated in the provided document.
Description
Source: Environmental Evaluation Report _Low Risk Activity.xlsx (unknown)Environmental evaluation for low-risk activity. Bidders must achieve a minimum weighted final score of 90% on the environmental criteria. The assessment is reviewed by a Senior Advisor and approved by the Environmental Manager.
Evaluation Criteria
Source: Environmental Evaluation Report _Low Risk Activity.xlsx (unknown)Environmental evaluation for low-risk activity. Bidders must achieve a minimum weighted final score of 90% on the environmental criteria. The assessment is reviewed by a Senior Advisor and approved by the Environmental Manager.
Technical Specifications
Source: Environmental Evaluation Report _Low Risk Activity.xlsx (unknown)Environmental policy: signed policy statement committing to environmental compliance and duty of care (weight 10).
Aspects and Impacts Register: must identify, assess and provide controls/mitigations for environmental impacts as per scope of work (weight 70).
Method Statement: must fully demonstrate the scope of work to be executed (weight 20).
Important Dates
Source: Invitation to Tender (ITT) SSC Spares.pdf (RFP)Closing date: 30 October 2026 at 10:00 am
Clarification meeting (non-compulsory): 06 October 2026 at 13:30 via Microsoft Teams
Clarification queries deadline: 5 working days before the tender closing date.
Briefing Session
Source: Invitation to Tender (ITT) SSC Spares.pdf (RFP)Non-compulsory clarification meeting: 06 October 2026 at 13:30 via Microsoft Teams.
Contact Information
Source: Invitation to Tender (ITT) SSC Spares.pdf (RFP)Eskom Representative (SCM):
Fraud and corruption reporting:
All queries and clarifications must be addressed in writing to the Eskom Representative.
Submission Guidelines
Source: Invitation to Tender (ITT) SSC Spares.pdf (RFP)Submission method: electronic only via the Eskom E-Tendering site (Eskom Tender Bulletin). No hard copies accepted.
Returnable documents (mandatory at closing, disqualifiable if missing or unsigned):
Returnables required at closing but non-disqualifiable (5 working days to correct):
Returnables required for evaluation (score zero if missing):
Additional documents for JV/consortium: letter of intent or valid JV agreement stating joint and several liability, confirmation of single business entity, and single designated bank account.
Evaluation Criteria
Source: Invitation to Tender (ITT) SSC Spares.pdf (RFP)Evaluation stages:
Preference point system: 90/10 (for tenders above R50 million).
Technical Specifications
Source: Invitation to Tender (ITT) SSC Spares.pdf (RFP)Scope: Supply and delivery of SSC Spares to Matimba Power Station.
Methodology
Source: Invitation to Tender (ITT) SSC Spares.pdf (RFP)Method Statement (MS) is part of the environmental evaluation (20 points).
Quality Management
Source: Invitation to Tender (ITT) SSC Spares.pdf (RFP)Quality requirements are contractual, assessed after evaluation and ranking.
Pricing Schedule
Source: Invitation to Tender (ITT) SSC Spares.pdf (RFP)Pricing Schedule/BOQ is contained in the NEC contract, in PDF and Excel formats.
Financial Requirements
Source: Invitation to Tender (ITT) SSC Spares.pdf (RFP)Pricing format: Pricing Schedule/BOQ contained in the NEC contract, submitted in PDF and Excel formats.
Compliance Requirements
Source: Invitation to Tender (ITT) SSC Spares.pdf (RFP)Eligibility:
Tax compliance:
B-bbee:
Employment Equity:
Local content:
OHS (contractual, assessed after ranking):
Quality (contractual):
Environmental (evaluated, threshold 90%):
Health & Safety
Source: Invitation to Tender (ITT) SSC Spares.pdf (RFP)OHS returnables must be submitted at tender closing. OHS evaluates suppliers that pass functionality.
Environmental
Source: Invitation to Tender (ITT) SSC Spares.pdf (RFP)Environmental requirements are evaluated with a total weight of 100 and a minimum threshold of 90%.
Contractual Terms
Source: Invitation to Tender (ITT) SSC Spares.pdf (RFP)Contract duration: five years, as-and-when-required.
Requirements
Source: Invitation to Tender (ITT) SSC Spares.pdf (RFP)Eligibility criteria: no restriction to do business with Eskom or State-Owned Companies; no nationality of sanctioned countries; no multiple tenders (except e-tendering size limits); JV/consortium agreements must state joint and several liability; no conflicts of interest; tenders signed by authorised persons; not restricted by National Treasury or on Tender Defaulters list; no 100% subcontracting.
Section
Source: Invitation to Tender (ITT) SSC Spares.pdf (RFP)Functionality threshold: 80%.
Description
Source: Tender Technical Evalauation Strategy - SSC Spares.pdf (unknown)Matimba Power Station operates SSC plants under the boilers of all six units for boiler bottom ash cooling and removal, and furnace sealing. Each SSC cools and removes ash, discharging onto coarse ash conveyors via the grizzly assembly. The SSCs comprise chain, scraper bars, main drive, tensioning, reversing, idler wheels, immersion damper doors, degritting sump, water piping, ash box, and hydraulic system. The scope is supply and delivery of SSC spares as listed in section 3.1.1 of the scope of work.
Contact Information
Source: Tender Technical Evalauation Strategy - SSC Spares.pdf (unknown)Technical evaluation team:
Document authorisation:
No email addresses or telephone numbers are provided in this document.
Submission Guidelines
Source: Tender Technical Evalauation Strategy - SSC Spares.pdf (unknown)Returnable documents: none are listed in this technical evaluation strategy. The document is the evaluation strategy only; the full tender pack will specify returnable forms.
Submission method: not stated in this document.
Closing time: not stated in this document.
Evaluation Criteria
Source: Tender Technical Evalauation Strategy - SSC Spares.pdf (unknown)Technical evaluation threshold: minimum weighted final score of 80%.
Qualitative criteria (total 100 points):
No mandatory technical criteria are listed (Table 2 states 'Not Applicable').
Technical Specifications
Source: Tender Technical Evalauation Strategy - SSC Spares.pdf (unknown)Scope: supply and delivery of Submerged Scraper Conveyor (SSC) spares to Matimba Power Station, on an as-and-when-required basis for five years.
SSC plants are located under the boilers of all six units, used for boiler bottom ash (BBA) cooling and removal, and furnace sealing. Each SSC cools and removes ash, discharging onto coarse ash conveyors (CAC) via the grizzly assembly.
SSC components covered by the spares: chain, scraper bars (flights), main drive system, tensioning system, reversing system, idler wheels, immersion damper doors, degritting sump, water piping system, ash box, and hydraulic system (for lifting/lowering the SSC and operating immersion damper doors).
Spares are listed in section 3.1.1 of the scope of work (specific item numbers referenced in evaluation criteria).
Methodology
Source: Tender Technical Evalauation Strategy - SSC Spares.pdf (unknown)The Technical Evaluation Team (TET) will evaluate bids according to Eskom's Tender Evaluation Procedure. The TET sets the evaluation criteria and assesses submissions to appoint a competent contractor.
Experience & Qualifications
Source: Tender Technical Evalauation Strategy - SSC Spares.pdf (unknown)Bidders must submit proof of successful supply and delivery of SSC spares as listed in section 3.1.1, with orders and delivery notes stamped/signed by the client. Bidders must also provide proof of workshop ownership or a signed rental agreement, and the workshop must have minimum machinery (milling machine, lathe machine, boring mill, cylindrical grinder, roller machine, bending machine). Bidders must submit local OEM authorised distributor letters for spares in section 3.1.1 (1, 2 & 5), and material data sheets with technical specification and layout drawings for spares in section 3.1.1 (1, 2, 3, 5, 11 & 15).
Quality Management
Source: Tender Technical Evalauation Strategy - SSC Spares.pdf (unknown)ISO 9001 Quality Management Systems is listed as a normative reference. No specific quality management requirements are stated for bidders.
Compliance Requirements
Source: Tender Technical Evalauation Strategy - SSC Spares.pdf (unknown)No specific compliance requirements are stated in this document. The document references ISO 9001 (Quality Management Systems), the Occupational Health and Safety Act, and Eskom's Life Safety Rules as normative references, but does not state them as mandatory bidder requirements.
Health & Safety
Source: Tender Technical Evalauation Strategy - SSC Spares.pdf (unknown)The Occupational Health and Safety Act and Eskom's Life Safety Rules are listed as normative references. No specific health and safety requirements are stated for bidders.
Section
Source: Tender Technical Evalauation Strategy - SSC Spares.pdf (unknown)Technical evaluation threshold: minimum 80% weighted final score. Qualitative criteria total 100 points: SSC spares supply experience (50 points), spares lead times (10 points), workshop facility (20 points), local OEM authorisation (10 points), material data sheets (10 points). Scoring details as per the main evaluation criteria section.
Contact Information
Source: NEC3 Supply Contract for SSC Spares.pdf (unknown)Supply Manager:
Purchaser (Eskom Holdings SOC Ltd):
Engineering Contract Strategies (NEC3 documents):
Submission Guidelines
Source: NEC3 Supply Contract for SSC Spares.pdf (unknown)Returnable documents:
Submission method and address: not stated in the document.
Disqualification risks:
Evaluation Criteria
Source: NEC3 Supply Contract for SSC Spares.pdf (unknown)The document does not specify a scoring methodology, preference point system, or minimum qualifying score. Evaluation appears to be based on acceptance of the Offer and completion of the required contract data. The tenderer must submit a completed Form of Offer and Acceptance and Contract Data Part Two. The offered total of the Prices (exclusive and inclusive of VAT) must be stated. The tenderer must be able to provide securities, bonds, guarantees, proof of insurance and other documentation as required by the contract within two weeks of receiving the completed agreement.
Technical Specifications
Source: NEC3 Supply Contract for SSC Spares.pdf (unknown)Scope:
Delivery terms:
Supply requirements:
Quality Management
Source: NEC3 Supply Contract for SSC Spares.pdf (unknown)The document does not specify a separate quality management system, but the supplier must comply with the Goods Information and Supply Requirements, including providing test results and maintenance manuals. Asbestos-related quality requirements include compliance with the Asbestos Regulations and Eskom's Asbestos Standard 32-303, with measurements by a SANAS-accredited and Department of Employment and Labour approved inspection body.
Pricing Schedule
Source: NEC3 Supply Contract for SSC Spares.pdf (unknown)Pricing data is in Part C2: Pricing Data, including pricing assumptions and the price schedule. The tendered total of the Prices must be stated exclusive and inclusive of VAT. The percentage for overheads and profit added to the Defined Cost must be stated in Contract Data Part Two.
Financial Requirements
Source: NEC3 Supply Contract for SSC Spares.pdf (unknown)Pricing:
Payment terms:
Liability and insurance:
Price adjustment:
Compliance Requirements
Source: NEC3 Supply Contract for SSC Spares.pdf (unknown)B-bbee:
Health, safety and environment:
Tax:
General:
Health & Safety
Source: NEC3 Supply Contract for SSC Spares.pdf (unknown)Health and safety obligations as per Z6.1: supplier must take reasonable precautions, comply with all applicable health & safety laws, and ensure subcontractors and employees comply. Asbestos provisions as per Z15: compliance with Asbestos Regulations and Eskom's Asbestos Standard 32-303; OEL 0.2 fibres/ml (4-hour TWA) and short-term 0.6 fibres/ml (10-minute TWA); parallel measurements allowed at supplier's expense; risk assessment and control measures if asbestos identified; personnel may stop work until area declared safe; removal/disposal by registered asbestos contractor at Purchaser's expense.
Environmental
Source: NEC3 Supply Contract for SSC Spares.pdf (unknown)The supplier must comply with all applicable environmental laws and regulations, and ensure subcontractors, employees and others under their control comply.
Contractual Terms
Source: NEC3 Supply Contract for SSC Spares.pdf (unknown)Supply requirements (Annexure A): Incoterms 2010 DDP to Matimba Power Station, Lephalale. The supplier must comply with constraints on manufacturing, prototyping, testing and storage; transport requirements; delivery place; actions during supply (notice of delivery, checking packing, contracting transport, paying costs, arranging access, loading/unloading, export/import requirements for international procurement); and provide packing lists, invoice, delivery note, test results, maintenance manuals, and for international procurement: licences, Air Waybill or Bill of Lading, Bill of Entry, customs work sheets, and import clearing agent invoice.
Section
Source: NEC3 Supply Contract for SSC Spares.pdf (unknown)The document does not specify evaluation criteria beyond the requirement to submit a completed Form of Offer and Acceptance and Contract Data. Deviations from the tender documents are limited to those permitted in the Conditions of Tender and must be recorded in the Schedule of Deviations. A tenderer's covering letter must not be included in the final contract document.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Matimba Power Station - Lephalale - Lephalale - 0556
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
8
Last checked
25 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A strategic guide for medical equipment suppliers, maintenance companies, and healthcare technology providers bidding for tenders across South Africa's nine provincial health departments. Covers SAHPRA registration, OEM authorisation, service level agreements, and technical evaluation criteria.
A comprehensive guide to securing medical equipment maintenance tenders in South African public hospitals. Learn about SLA management, OEM certifications, and clinical engineering requirements.
Guide to sports tenders in South Africa. Covers SRSA-funded facility maintenance, sports equipment supply, surfacing contracts, and tournament management opportunities.
Supplying the labs of the NHLS, water boards, and universities. A niche market for high-precision scientific equipment and reagents.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Repair and installation of machinery and equipment. Unlock full pricing strategies, bid frequency, and historical win rates.