Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
01 IMPALA ROAD - PULLENSHOPE, HENDRINA POWER STATION - MIDDELBURG - 1096
Organization Type
GOVERNMENT
Published
26 Aug 2026
OCDS Reference
ocds-9t57fa-167003
De-silting and lining of the seven-year dam at eskom's hendrina power station in mpumalanga, for a 12-month period. Bidders must hold CIDB grade 6ce registration and pass a mandatory OHS compliance gate before their bid can be evaluated further.
CIDB Grade 6CE registration is mandatory.
Mandatory OHS returnables: Annexure B (acknowledgement of Eskom's OHS requirements), Health and Safety Plan, detailed OHS costing (broken down, not lump sum), Baseline OHS Risk Assessment (BRA) with methodology, valid COIDA Letter of Good Standing, CEO-signed OHS policy, and OHS competency evidence (CVs, qualifications, certificates).
All OHS returnables must be submitted and acceptable before the bid proceeds to further evaluation.
Valid CSD registration and SARS tax compliance (tax pin/TCS) are required.
Scope: de-silting and lining of the seven-year dam at Hendrina Power Station; duration 12 months.
Closing date: 16 September 2026 at 10:00.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 16 September 2026 - 10:00
Venue
MICROSOFT TEAMS
Submissions must be electronically via ESKOM e-tendering site
Categories
Request for Bid(Open-Tender)
01 IMPALA ROAD - PULLENSHOPE, HENDRINA POWER STATION - MIDDELBURG - 1096
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
26 Aug
2026
Tender Published
Tender was published
16 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NEC ECC.doc
Eskom Holdings SOC Ltd invites tenders for the de-silting and lining of the Seven Year Dam at Hendrina Power Station in Mpumalanga. The 12-month contract requires installation of a 2mm HDPE liner, construction of a leachate detection system, earthworks, and a diversion system to bring the dam into compliance with Water Use Licence No. 24046033 and DWS regulations. The contract will be based on the NEC3 Engineering and Construction Contract (Option B: Priced contract with Bill of Quantities).
240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf
Eskom requires a contractor to de-silt and line the Seven-Year Dam at Hendrina Power Station over a 12-month period. The contract is designated CIDB Grade 6CE.
E-tendering Help Manual for supplier - 27 January 2025.pdf
Eskom is procuring de-silting and lining services for the Seven-Year Dam at Hendrina Power Station over a 12-month period. The tender requires a CIDB Grade 6CE contractor and submissions must be made electronically via the Eskom eTendering portal.
(SDLI) Strategy .pdf
Eskom invites tenders for the de-silting and lining of the seven-year dam at Hendrina Power Station over a 12-month period. The contract is graded 6CE and includes mandatory Supplier Development, Localisation and Inclusion (SDL&I) obligations with financial penalties for non-compliance.
Seven Year Dam De-silting & Lining Scope of Work.pdf
Eskom requires a Grade 6CE contractor to de-silt and line the Seven-Year Dam at Hendrina Power Station in Mpumalanga over a 12-month period. The work involves constructing a temporary diversion system in two phases using GeoRevet bags, earthworks with specific compaction standards, a leak detection system with Pozidrain and Leakdrain, and installation of a 2 mm HDPE liner with non-destructive testing, all to achieve compliance with Water Use Licence 24046033 and regulations GN 704 and ZLED.
Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf
Eskom Holdings SOC Ltd invites tenders for the de-silting and lining of the Seven-Year Dam at Hendrina Power Station over a 12-month period. The contract is designated CIDB Grade 6CE and will be awarded under NEC3 Engineering and Construction Contract Option A with specific secondary options.
Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf
Eskom is procuring de-silting and lining of the seven-year dam at Hendrina Power Station for a 12-month period, under CIDB grade 6CE. The tender requires compliance with Eskom's OHS legal and other requirements, including acknowledgement via Annexure B.
OHS CHECKLIST (HIGH RISK).pdf
Eskom requires de-silting and lining of the Seven-Year Dam at Hendrina Power Station over a 12-month period. The contract is classified as Grade 6CE and carries a high OHS risk rating.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.pdf
De-silting and lining of the seven-year dam at Hendrina Power Station for a period of 12 months, issued by Eskom in Mpumalanga. Works are graded 6CE under the CIDB grading system.
Environmental Evaluation Checklist - template.pdf
Eskom requires a contractor to de-silt and line the Seven-Year Dam at Hendrina Power Station over a 12-month period. The work is classified as Grade 6CE and is subject to a detailed environmental evaluation based on ISO 14001:2015 requirements.
240-68099512 Form A Rev 10 - Cat 3.pdf
Eskom is procuring de-silting and lining services for the Seven-Year Dam at Hendrina Power Station over a 12-month period. The contract requires a CIDB Grade 6CE contractor and mandates compliance with Eskom's Supplier Quality Requirements (240-105658000) and ISO 9001:2015 standards.
240-109253698 CQP Template 2021.pdf
Eskom requires a Grade 6CE contractor to de-silt and line the Seven-Year Dam at Hendrina Power Station over a 12-month period. The successful bidder must submit a Contract Quality Plan aligned with SANS 466:2005 / ISO 10005:2005 covering all quality management aspects from supplier monitoring to commissioning.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025(2)(1)(2).pdf
Eskom is procuring de-silting and lining services for the Seven-Year Dam at Hendrina Power Station over a 12-month period. The contract requires a CIDB Grade 6CE registration.
TECHNICAL EVALUATION CRITERIA SEVEN YEAR DAM.pdf
Eskom requires a Grade 6CE contractor to de-silt and line the Seven-Year Dam at Hendrina Power Station in Mpumalanga over a 12-month period. The dam is an unlined earth embankment with a 3.6 m wall, 18,000 m³ capacity, and a concrete-lined spillway. The works involve HDPE lining, subgrade preparation, dewatering, and sectional construction in an operational power station environment.
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf
Eskom invites tenders for the de-silting and lining of the Seven-Year Dam at Hendrina Power Station over a 12-month period. The contract requires a CIDB Grade 6CE designation and will be evaluated under Eskom's Standard Conditions of Tender (Rev 12, effective 1 February 2025).
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 2 510 966
Range
Based on 16 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The document is a blank Eskom Quality Control Plan / Inspection and Test Plan (QCP/ITP) form (template 240-109253302 Rev 3). It is intended to be completed by the contractor for the de-silting and lining of the seven-year dam at Hendrina Power Station.
Evaluation Criteria
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.pdf (unknown)No eligibility criteria (CSD registration, tax clearance, B-BBEE level, CIDB grade, local content, or declarations) are stated in the document beyond the tender title’s implied grading.
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.pdf (unknown)The document is a blank Quality Control Plan / Inspection and Test Plan (QCP/ITP) form (Eskom template 240-109253302 Rev 3). It defines intervention points: Hold Point (requires approval before proceeding), Witness Point (requires witness), Document Review, Surveillance, and Verification. Inspection and test methods include Visual, Microscopy, NDT, Liquid/Dye Penetrant, Magnetic Particle, EDDY, etc. Acceptance criteria cover functionality, performance measures, regulatory compliance, and chemical tests. The form requires the contractor/supplier to complete activities, descriptions, dates, inspection methods, controlling documents, acceptance criteria, and records for supplier and Eskom inspections.
Compliance Requirements
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.pdf (unknown)No specific requirements found
Description
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)The tender is for de-silting and lining of the seven-year dam at Hendrina Power Station, with a contract period of 12 months. The required CIDB grading is 6CE. Submission is electronic via the Eskom eTendering portal.
Important Dates
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Closing date: 2026-09-16 at 10:00 (from tender record). No other dates (briefings, site visits, clarification deadlines) are stated in the provided document.
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)For system problems, contact the buyer responsible for the published tender. No specific contact name, phone, or department is provided in the document. Submission address: electronic only via eTendering portal.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Submit electronically via the Eskom eTendering portal at https://eTendering.eskom.co.za. Bidders must first register on the portal using a valid email address and cellphone number (with +27 prefix). An OTP will be sent for verification. After login, select the tender reference number, click "Create New Submission", upload documents under the correct category (Technical, Commercial, Finance), then click "Finalize Submission" and "Finalise and Close Submission". Individual file size limit is 50MB; total upload size must not exceed 900MB. A submission ID will be emailed upon finalisation. Returnable forms: all required Eskom tender forms and declarations as specified in the tender pack.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Bidders must hold a valid CIDB Grade 6CE registration. The tender is a Request for Bid (Open-Tender). Evaluation stages and scoring split are not stated in the provided document.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Scope: de-silting and lining of the seven-year dam at Hendrina Power Station. Duration: 12 months. Required CIDB grading: 6CE (Civil Engineering). No further technical details (quantities, standards, service levels) are stated in the provided document.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)CSD registration: mandatory to access the eTendering portal. CIDB Grade 6CE: mandatory. Tax compliance: a valid tax compliance status PIN is required (implied by CSD registration). B-BBEE: not mentioned in the provided document. CIPC registration: not mentioned.
Section
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Bidders must hold a valid CIDB Grade 6CE registration. No further evaluation criteria are stated in the provided document.
Important Dates
Source: (SDLI) Strategy .pdf (TENDER)Closing date: 16 September 2026 at 10:00 (from tender record). No briefing or site visit dates are stated in the document.
Contact Information
Source: (SDLI) Strategy .pdf (TENDER)Buyer: Musa Shikwambana. Business unit: Hendrina Power Station, Eskom. No email, phone, or submission address provided.
Submission Guidelines
Source: (SDLI) Strategy .pdf (TENDER)Bidders must submit a valid B-BBEE certificate or sworn affidavit (with supporting CIPC documentation, shareholding breakdown, certified ID copies of shareholders, and proof of disability if applicable). A consolidated B-BBEE certificate is required for trusts, consortia, or joint ventures. Failure to provide these documents does not disqualify the bid but results in 0 points for specific goals (only price points are scored). No other returnable forms are specified in the document.
Evaluation Criteria
Source: (SDLI) Strategy .pdf (TENDER)Evaluation uses a preference point system (either 90/10 or 80/20). Price points out of 90 or 80; specific goals (B-BBEE status level) out of 10 or 20. Bidders who do not submit B-BBEE documentation score 0 for specific goals. No functionality criteria are mentioned. CIDB skills development and designated sectors are not applicable. CIDB Grade 6CE registration is required (from tender title).
Financial Requirements
Source: (SDLI) Strategy .pdf (TENDER)Bidders must complete the Price Schedule included with the tender documents, separating local and imported components. Local procurement content is total spending minus imported component. Eskom will retain 1.5% of every invoice (excluding VAT) as security for SDL&I obligations. A penalty of 1.5% of the invoice amount or contract value applies for failure to meet SDL&I obligations.
Compliance Requirements
Source: (SDLI) Strategy .pdf (TENDER)CIDB Grade 6CE registration required. Valid B-BBEE certificate (SANAS accredited) or sworn affidavit (for EMEs/QSEs) is a condition for contract award. Bidders must commit to SDL&I contractual obligations: B-BBEE improvement plan within 30 days of contract, local procurement content target of 100%, creation and retention of jobs, and skills development (2 welders and 2 civil technicians).
Section
Source: (SDLI) Strategy .pdf (TENDER)Evaluation uses a preference point system (either 90/10 or 80/20). Price points out of 90 or 80; specific goals (B-BBEE status level) out of 10 or 20. Bidders failing to submit B-BBEE documentation score 0 for specific goals but are not disqualified. No functionality criteria. CIDB skills development and designated sectors not applicable.
Description
Source: Environmental Evaluation Checklist - template.pdf (unknown)The scope of work is de-silting and lining of the seven-year dam at Hendrina Power Station for a period of 12 months. The Environmental Evaluation Checklist (Document Reference F/ESK108 Rev 3) defines the environmental documentation and plans required for the contract. Key roles include Site Supervisor (Projects), Site Supervisor (Contractor), and Site Manager (Contractor).
Evaluation Criteria
Source: Environmental Evaluation Checklist - template.pdf (unknown)Bidders must achieve a minimum weighted average score of 80% on the Environmental Evaluation Checklist (Document Reference F/ESK108 Rev 3) to be considered. The checklist evaluates environmental management documentation and site-specific plans, each item carrying a maximum of 1 point. A valid ISO 14001:2015 EMS certificate (if the company is certified) or equivalent EMS documentation is required. Certified copies of all relevant environmental authorisations, permits, and licences (e.g., waste transporter, waste site licences) must be submitted. A detailed, signed, site-specific Environmental Management Plan (EMP) is mandatory. A signed Site Environmental Representative appointment letter must be provided. Method statements for specific activities as per the contract, copies of procedures and work instructions, and copies of approved NEC/PR/Order contract documents are required. Emergency preparedness plans for incidents such as oil/chemical spills must include protocols and contingencies. A register of all hazardous substances and corresponding Safety Data Sheets (SDS) per the scope of work must be submitted. A copy of the approved Environmental Management Programme, a waste register with a Waste Management Plan (method statement), and proof of training and skills for personnel performing significant activities (e.g., oil spill response, herbicide application) are required.
Technical Specifications
Source: Environmental Evaluation Checklist - template.pdf (unknown)The scope covers de-silting and lining of the seven-year dam at Hendrina Power Station over a 12-month period. The Environmental Evaluation Checklist (F/ESK108 Rev 3) defines the environmental documentation and plans required for the contract. Key roles include Site Supervisor (Projects), Site Supervisor (Contractor), and Site Manager (Contractor). The contractor must maintain an EMS file aligned with ISO 14001:2015 covering environmental policy, objectives and targets, roles and responsibilities, communication, internal audits, emergency preparedness, monitoring and evaluation of compliance, non-conformance/corrective/preventative action, and management review. An Environmental Aspects and Impacts Register is required. A detailed, signed, site-specific Environmental Management Plan (EMP) must be submitted. Certified copies of environmental authorisations, permits, and licences (e.g., waste transporter, waste site licences) are required. A signed Site Environmental Representative appointment letter is mandatory. Method statements for specific activities per the contract, procedures and work instructions, and approved NEC/PR/Order contract copies must be provided. Emergency preparedness plans for oil/chemical spills and disasters with protocols and contingencies are required. A register of all hazardous substances and Safety Data Sheets (SDS) per the scope of work must be maintained. A copy of the approved Environmental Management Programme is required. A waste register and Waste Management Plan (method statement) must be submitted. Proof of training and skills for personnel performing significant activities (e.g., oil spills, herbicide application) is required. The following Eskom procedures will be provided to the awarded contractor: Waste Management Procedure (ENV/GEN/WI/12), Oil-Spill Cleanup and Rehabilitation Procedure (RA/ENV/110) and Oil Spill Assessment Form, Hendrina Environmental Statement of Intent (ENV/STMT/01), Eskom SHEQ Policy (32-727), Environmental Incident Management Procedure (240-133087117).
Quality Management
Source: Environmental Evaluation Checklist - template.pdf (unknown)The contractor must maintain an EMS file aligned with ISO 14001:2015 covering: environmental policy, objectives and targets, roles and responsibilities, communication, internal audits, emergency preparedness (environmental related emergencies), monitoring, measurement and evaluation of compliance, non-conformance, corrective and preventative action, and management review. An Environmental Aspects and Impacts Register is required. A valid ISO 14001 EMS certificate (if the company is certified) must be provided. A detailed, signed, site-specific Environmental Management Plan (EMP) pertaining to site-specific activities is mandatory. Certified copies of relevant environmental authorisations, permits, and licences (e.g., waste transporter, waste site licences) are required. A detailed, signed Site Environmental Representative appointment letter must be submitted. Method statements for specific activities as per the contract are required. Copies of procedures and work instructions must be provided. Copies of approved NEC/PR/Order contract documents are required. Emergency preparedness plans (e.g., oil/chemical spill, disasters) with protocols and contingencies must be in place. A register of all hazardous substances as per the scope of work must be maintained. Safety Data Sheets (SDS) as per the scope of work must be available. A copy of the approved Environmental Management Programme is required. A register of waste that will be generated and a Waste Management Plan (method statement) must be submitted. Proof of training and skills of persons performing significant activities (e.g., oil spills, application of herbicides) is required.
Compliance Requirements
Source: Environmental Evaluation Checklist - template.pdf (unknown)CIDB Grade 6CE registration is required. Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax compliance status (SARS tax PIN). A valid ISO 14001:2015 EMS certificate (if certified) or equivalent EMS documentation must be provided. Certified copies of all required environmental authorisations, permits, and licences (e.g., waste transporter, waste site licences) are mandatory. A detailed, signed, site-specific Environmental Management Plan (EMP) must be submitted. A signed Site Environmental Representative appointment letter is required. Method statements for specific activities per the contract, copies of procedures and work instructions, and copies of approved NEC/PR/Order contract documents must be provided. Emergency preparedness plans for oil/chemical spills and disasters with protocols and contingencies are required. A register of all hazardous substances and Safety Data Sheets (SDS) per the scope of work must be submitted. A copy of the approved Environmental Management Programme is required. A waste register and Waste Management Plan (method statement) must be provided. Proof of training and skills for personnel performing significant activities (e.g., oil spill response, herbicide application) is required.
Health & Safety
Source: Environmental Evaluation Checklist - template.pdf (unknown)Method statements for specific activities as per the contract must be provided. Copies of procedures and work instructions are required. Copies of approved NEC/PR/Order contract documents must be submitted. Emergency preparedness plans for incidents such as oil/chemical spills and disasters must include protocols to be followed and contingencies to be put in place. A register of all hazardous substances as per the scope of work must be maintained. Safety Data Sheets (SDS) as per the scope of work must be available. A copy of the approved Environmental Management Programme is required.
Environmental
Source: Environmental Evaluation Checklist - template.pdf (unknown)Certified copies of relevant environmental authorisations, permits, and licences as required (e.g., waste transporter, waste site licences) must be provided. A detailed, signed Site Environmental Representative appointment letter is mandatory. A register of waste that will be generated and a Waste Management Plan (method statement) must be submitted. Proof of training and skills of persons performing significant activities (e.g., oil spills, application of herbicides) is required. The following Eskom procedures will be provided to the awarded contractor: Waste Management Procedure (ENV/GEN/WI/12), Oil-Spill Cleanup and Rehabilitation Procedure (RA/ENV/110) and Oil Spill Assessment Form, Hendrina Environmental Statement of Intent (ENV/STMT/01), Eskom SHEQ Policy (32-727), Environmental Incident Management Procedure (240-133087117). The minimum weighted average score on the Environmental Evaluation Checklist (F/ESK108 Rev 3) must be 80% or above for a tender to be considered.
Section
Source: Environmental Evaluation Checklist - template.pdf (unknown)The Environmental Evaluation Checklist (F/ESK108 Rev 3) is used to score tenders. Each checklist item carries a maximum of 1 point. The minimum weighted average score required for a tender to be considered is 80% or above. The checklist covers: EMS file (ISO 14001:2015) including policy, objectives, roles, communication, internal audits, emergency preparedness, monitoring and evaluation of compliance, non-conformance/corrective/preventative action, and management review; Environmental Aspects and Impacts Register; ISO 14001 EMS certificate (if certified); detailed signed site-specific Environmental Management Plan (EMP); certified copies of environmental authorisations, permits, and licences; signed Site Environmental Representative appointment letter; method statements for specific activities per contract; copies of procedures and work instructions; copies of approved NEC/PR/Order contract; emergency preparedness plans for oil/chemical spills and disasters with protocols and contingencies; register of hazardous substances; Safety Data Sheets (SDS); copy of approved Environmental Management Programme; waste register and Waste Management Plan (method statement); proof of training and skills for significant activities (e.g., oil spills, herbicide application).
Description
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)De-silting and lining of the seven-year dam at Hendrina Power Station for a period of 12 months. The work is classified as civil engineering (CIDB Grade 6CE).
Important Dates
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Closing date: 2026-09-16 at 10:00 SAST (GMT+2).
Site visit / clarification meeting: details stated in the Tender Data; if marked compulsory, attendance is mandatory — failure disqualifies the bidder.
Contact Information
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)All communication must be directed in writing to the Eskom Representative named in the Invitation to Tender.
No other Eskom official may be contacted.
Submission address: as specified in the Tender Data (hard-copy tender box or e-tendering portal).
Enquiries: written queries only; responses published on Eskom Tender Bulletin and NT e-Tender Portal.
Submission Guidelines
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Submission method: hard-copy original plus one copy in sealed packages marked "ORIGINAL" and "COPY", or via Eskom's e-tendering portal if permitted.
Outer package must be marked "Confidential", show the tender number, Eskom address, tenderer name and contact details.
Returnable forms (all must be completed and signed):
Disqualification risks:
Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Evaluation follows a multi-stage process:
B-BBEE level is scored from CSD report or certificate/affidavit; if not provided or expired, zero points for preference allocation (but bid not disqualified if otherwise responsive).
Financial analysis may be conducted to assess risk; insufficient mitigation may lead to exclusion.
Technical Specifications
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Scope: de-silting and lining of the seven-year dam at Hendrina Power Station.
Duration: 12 months.
CIDB grading required: 6CE (Civil Engineering).
The work involves civil engineering construction works at an Eskom power station site.
Bidders must familiarise themselves with the site via the compulsory site visit (if stipulated).
Pricing Schedule
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Rates and prices must be in South African Rand, fixed for the contract duration unless contract price adjustment is provided for. Prices include all duties, taxes (including VAT) and levies applicable 14 days before closing. No alterations to tender documents except to correct errors, initialled by all signatories. Alternative tenders only if a main tender is also submitted and permitted. Clarification and correction of prices after submission: mandatory returnables cannot be submitted after closing. Arithmetical errors: amounts in words prevail; errors corrected per Eskom procedures. Designated materials and thresholds information required by contract award. Financial analysis may be conducted; insufficient mitigation may lead to exclusion.
Financial Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Pricing format: rates and prices in South African Rand, fixed for the contract duration unless contract price adjustment is provided for.
Prices must include all duties, taxes (including VAT) and levies applicable 14 days before closing.
Tender validity: bid must be held valid for acceptance within the validity period stated in the Tender Data; Eskom may request an extension.
Security for performance: if required, bidder must name at least two financial institutions it will approach for the security.
Insurance: Eskom's cover may be insufficient; bidders should seek qualified advice.
Arithmetical errors: amounts in words prevail; errors corrected per Eskom's procedures; failure to accept corrections may lead to rejection.
No compensation for tendering costs.
Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)CSD registration: mandatory; must be registered and not restricted from doing business with Eskom or state-owned companies.
Tax compliance: valid SARS tax clearance PIN required.
CIDB Grade 6CE: mandatory at closing (or proof of application with registration by award).
B-BBEE: valid B-BBEE certificate/affidavit or CSD report required; if not provided or expired, zero points for preference (bid not disqualified if otherwise responsive).
SHEQ: proof of safety, health, environment and quality systems, policies and capabilities required at closing and/or award.
Local content: designated materials and thresholds information required by contract award.
SDL&I Undertaking: must be completed and submitted by contract award.
Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) apply if contract value or duration thresholds are met.
No 100% subcontracting permitted.
Misrepresentation or fraud leads to disqualification, reporting to B-BBEE Commission, and potential suspension from state business for up to 10 years.
Health & Safety
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Bidders must comply with the OHS Act and Eskom's SHEQ requirements. Proof of safety, health, environment and quality (SHEQ) systems, policies and capabilities must be provided at closing and/or award. All costs and personnel associated with SHEQ must be reflected in the tender. CIDB registration (Grade 6CE) is mandatory. Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) apply if thresholds are met. Eskom may reject a tender for collusion, fraud, or influencing the process.
Contractual Terms
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Eskom reserves the right to negotiate with any selected tenderer(s). Eskom disclaims liability for losses arising from participation in the tender process. Tender validity: bid must be held valid for acceptance within the validity period; Eskom may request extension. Confidentiality: all matters arising from the procurement must be treated as confidential. Standardised specifications and other documents incorporated by reference must be obtained by the bidder. Site visit/clarification meeting: if compulsory, attendance is mandatory; failure disqualifies. B-BBEE scoring: from CSD report or certificate/affidavit; if not provided or expired, zero points for preference. Specific Goals: scored; zero points if proof not submitted by closing.
Section
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Eskom will not measure a criterion twice in different evaluation phases (no double dipping). Functionality, if a criterion, will be scored against stated criteria and bidders must meet the minimum threshold to proceed. Price evaluation considers CPA, FOREX, commodity exposure, unconditional discounts, technical adjustment, PV and forecasted rates. B-BBEE level is scored from CSD report or certificate/affidavit; if not provided or expired, zero points for preference allocation. Specific Goals are scored; if proof not submitted by closing, zero points. Ranking follows PPPFA 80/20 or 90/10 system. Objective criteria under section 2(1)(f) may be applied if stated. Reverse e-auction may be used if indicated in the tender.
Description
Source: Seven Year Dam De-silting & Lining Scope of Work.pdf (unknown)Hendrina Power Station, Mpumalanga. The Seven Year Dam is an unlined earth embankment collecting runoff from the station and coal stockyard. Capacity 18,000 m³ (max 18,588 m³), wall height 3.6 m. Currently non-compliant with Water Use Licence 24046033 and regulations (DWS, GN 704, ZLED). The project aims to line the dam to meet compliance.
Important Dates
Source: Seven Year Dam De-silting & Lining Scope of Work.pdf (unknown)Closing: 16 September 2026 at 10:00. No mandatory briefing or site visit mentioned.
Contact Information
Source: Seven Year Dam De-silting & Lining Scope of Work.pdf (unknown)All correspondence to be directed to Eskom's project manager. No specific name, email, or phone provided in the scope document.
Evaluation Criteria
Source: Seven Year Dam De-silting & Lining Scope of Work.pdf (unknown)CIDB Grade 6CE registration required. Bidders must comply with OHS Act, NEMA, National Water Act, GN 704, ZLED, and SANS 1200. Must be able to source suitable clay fill off-site. Must perform HDPE liner welding and NDT per SANS standards. Geotechnical engineer involvement required for foundation assessment. No B-BBEE level, local content, or financial thresholds stated in the scope document.
Technical Specifications
Source: Seven Year Dam De-silting & Lining Scope of Work.pdf (unknown)The Seven Year Dam at Hendrina Power Station (Mpumalanga) is an unlined earth embankment collecting runoff from the station and coal stockyard. Capacity 18,000 m³ (max 18,588 m³), wall height 3.6 m. Currently non-compliant with Water Use Licence 24046033 and regulations (DWS, GN 704, ZLED). Scope includes: temporary diversion system in two phases using GeoRevet bags; earthworks (bottom-up, compaction to 95% Mod-AASHTO); leak detection system (Pozidrain, leakdrain, perforated pipes, concrete sump); installation of 2mm HDPE liner with wedge/fusion welds and NDT (air pressure, electric spark, vacuum box); site rehabilitation. Liner must be Waste Type 1 per Class A landfill assumption (Government Gazette 36784, 2013). Welding per SANS standards. Geotechnical engineer to inspect foundation.
Experience & Qualifications
Source: Seven Year Dam De-silting & Lining Scope of Work.pdf (unknown)A Geotechnical Engineer must inspect and assess the excavated surface to verify foundation conditions.
Quality Management
Source: Seven Year Dam De-silting & Lining Scope of Work.pdf (unknown)HDPE liner welding must comply with SANS specifications. Non-destructive tests (air pressure, electric spark, vacuum box) to be performed on site. Welding certificates required.
Compliance Requirements
Source: Seven Year Dam De-silting & Lining Scope of Work.pdf (unknown)CIDB Grade 6CE registration. Compliance with OHS Act, NEMA, National Water Act, GN 704, ZLED, and SANS 1200.
Health & Safety
Source: Seven Year Dam De-silting & Lining Scope of Work.pdf (unknown)Contractor must comply with the Occupational Health and Safety Act and its regulations, as well as Eskom SHE Policy, Standards, Procedures, Guidelines, Specifications and Regulations.
Environmental
Source: Seven Year Dam De-silting & Lining Scope of Work.pdf (unknown)The dam is non-compliant with Water Use Licence and regulations. Environmental investigation classified effluent as requiring a Waste Type 1 liner system based on Class A landfill assumption (Government Gazette 36784, 2013). Liner must prevent contamination of groundwater.
Contact Information
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025(2)(1)(2).pdf (unknown){"name":"Tel (landline)","email":null,"phone":null,"department":null,"address":"FORM – E-TENDERING TRAINING"}
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025(2)(1)(2).pdf (unknown)Bidders must hold a valid CIDB Grade 6CE registration. Registration on the National Treasury Central Supplier Database (CSD) and a valid SARS tax compliance status are mandatory. The E-Tendering Training Acknowledgement Form must be completed and signed by an authorised representative.
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025(2)(1)(2).pdf (unknown)CIDB Grade 6CE registration. CSD registration. Valid SARS tax compliance status. Completed E-Tendering Training Acknowledgement Form.
Contact Information
Source: OHS CHECKLIST (HIGH RISK).pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"owledgement of Eskom's OHS legal and"}
Submission Guidelines
Source: OHS CHECKLIST (HIGH RISK).pdf (unknown)Returnable documents must be completed, signed, and submitted with the bid. The following OHS returnables are mandatory: Annexure B (acknowledgement of Eskom's OHS legal and other requirements), Health and Safety Plan, detailed OHS costing (broken down, not lump sum), Baseline OHS Risk Assessment (BRA) with methodology, valid Letter of Good Standing (COIDA or equivalent), OHS policy signed by CEO complying with OHS Act Section 7, and OHS competency evidence (CVs, qualifications, certificates listing required competencies). Failure to provide any listed returnable will result in disqualification.
Returnable Documents
Source: OHS CHECKLIST (HIGH RISK).pdf (unknown)Mandatory OHS returnables: Annexure B (acknowledgement of Eskom's OHS legal and other requirements), Health and Safety Plan, detailed OHS costing, Baseline OHS Risk Assessment (BRA), valid Letter of Good Standing (COIDA or equivalent), OHS policy signed by CEO, and OHS competency evidence (CVs, qualifications, certificates). Additional OHS returnables may be specified.
Evaluation Criteria
Source: OHS CHECKLIST (HIGH RISK).pdf (unknown)CIDB Grade 6CE registration is required. Evaluation includes a mandatory OHS compliance gate: all OHS returnables must be submitted and acceptable before the bid can proceed to further evaluation. The OHS Tender Evaluation Template (Annexure C 1, High risk) is used to assess OHS submissions. Additional OHS returnables applicable to the scope may be evaluated prior to award.
Technical Specifications
Source: OHS CHECKLIST (HIGH RISK).pdf (unknown)Scope: de-silting and lining of the seven-year dam at Hendrina Power Station. Duration: 12 months. The work is classified as civil engineering (Grade 6CE).
Experience & Qualifications
Source: OHS CHECKLIST (HIGH RISK).pdf (unknown)Bidders must provide CVs, qualifications, and certificates demonstrating OHS competency relevant to the scope of work, risks, and OHS plan.
Compliance Requirements
Source: OHS CHECKLIST (HIGH RISK).pdf (unknown)CIDB Grade 6CE registration is required. Valid CSD registration and tax compliance (SARS tax pin/TCS) are required. OHS compliance: signed acknowledgement of Eskom OHS requirements (Annexure B), Health and Safety Plan, detailed OHS costing, Baseline OHS Risk Assessment (BRA), valid COIDA Letter of Good Standing, CEO-signed OHS policy, and OHS competency documents (CVs, qualifications, certificates).
Health & Safety
Source: OHS CHECKLIST (HIGH RISK).pdf (unknown)Bidders must submit: signed acknowledgement of Eskom's OHS legal and other requirements (Annexure B); a Health and Safety Plan addressing project OHS risks aligned with the health and safety specification; detailed OHS costing (broken down, not lump sum, based on overall scope and risk assessment); a Baseline OHS Risk Assessment (BRA) with methodology; a valid Letter of Good Standing (COIDA or equivalent); an OHS policy signed by CEO complying with OHS Act Section 7; and OHS competency evidence (CVs, qualifications, certificates listing required competencies). Additional OHS returnables applicable to the scope may be required.
Section
Source: OHS CHECKLIST (HIGH RISK).pdf (unknown)OHS submissions are evaluated using Annexure C 1 (OHS Tender Evaluation Template, High risk). All OHS returnables must be submitted and acceptable.
Contact Information
Source: NEC ECC.doc (unknown)Project Manager – Vusi Boya, Hendrina Power Station, Impala Road, P/Bag X1003, Pullenshope 1096; tel 799 3510; email [email protected].
Supervisor – Nqatyiswa Nkabinde, same address; tel 296 3695; email [email protected].
Eskom Supply Chain Operations (adjudicator panel enquiries) – Leighton Itholeng, tel +27 11 800 4031, fax +27 86 668 0419, email [email protected].
Evaluation Criteria
Source: NEC ECC.doc (unknown)CIDB Grade 6CE registration; valid CSD registration; tax compliance (SARS tax clearance certificate or tax pin); B-BBEE verification certificate; compliance with Construction Regulations 2014 and Occupational Health & Safety Act 85 of 1993; ability to provide required insurances per Insurance Table A; personnel must undergo Plant Safety Regulations (PSR) authorisation requiring 6 months on-site presence before approval; joint venture partners (if any) are jointly and severally liable and must notify key authorised person within 2 weeks of Contract Date; no alteration of JV composition without Employer's written consent.
Technical Specifications
Source: NEC ECC.doc (unknown)Scope: de-silting and lining of the Seven Year Dam (referred to in the Contract Data as the maturation pond) at Hendrina Power Station, lined with a 2 mm HDPE liner.
The dam is an unlined earth embankment collecting runoff from the eastern side of the power station and the coal stockyard; maximum storage capacity about 18,000 m³ (18,588 m³ including spillway), maximum wall height 3.6 m, and a concrete-lined spillway about 2 m long and 300 mm high.
The dam is non-compliant with Water Use Licence No. 24046033 and applicable regulatory requirements (DWS, GN 704, ZLED); lining is required to achieve compliance.
The works include a temporary diversion system in phases, earthworks, a leachate detection system, installation of the 2 mm HDPE liner, and maintenance items.
Bill of quantities highlights: site clearance 8,030; remove 700 mm unsuitable material 5,621; in-situ preparation layer 300 mm @95% Mod-Aashto 2,409; commercial clay layer 450 mm 2,409; borrow clay layer 450 mm 1,205; base preparation layer 150 mm 3,657; geosynthetic clay liner X1000 1,300; Leakdrain S5U 9,200; Pozidrain 4S250D/NW8 9,200; 2 mm HDPE liner supply and install 9,200; anchor trench 424 m x 0.6 m x 0.5 m (130.2); 15 MPa concrete backfill 130.2; river sand protection layer 100 mm (7,313); 80 mm petrol water pump; MEGAFLEX suction and delivery hose; yellow PVC lay-flat hoses.
Diversion works include GeoRevet S33, HDPE 450 mm pipe, sump brick wall, concrete slab, trench excavation and Bidim A5 geotextile. Leachate system includes trench excavation (560 m x 0.47 m x 0.15 m), 19 mm clean stone, perforated and non-perforated M100 geopipe, sump concrete 35 MPa (8.67) and a manhole cover.
Financial Requirements
Source: NEC ECC.doc (unknown)Pricing: the tender includes a Bill of Quantities with rates and lump sums; the contract data also refers to assessment per task order/activity schedule. Secondary options include price adjustment for inflation and changes in law.
Payment: assessed on completion of activities as agreed on the assessment date; payment within 30 days of submission of a correct tax invoice; interest on late payment at the publicly quoted prime rate (Standard Bank) for Rand amounts.
Tax invoicing: contractor must submit a tax invoice within one week of receiving a payment certificate; Employer's VAT number 4740101508 must appear on each invoice.
Delay damages: 35% of the total contract value for late completion of the whole of the works; if sectional completion applies, delay damages for sections are capped at 35% of total contract value.
Insurance: the Contractor must provide the insurances in Insurance Table A (replacement cost of works, Plant and Materials and Equipment; public liability; employer's liability as required by law). The Employer provides the insurances listed in Insurance Table B (Assets All Risk, Contract Works, Environmental Liability, General and Public Liability, Transportation, Motor Fleet, Terrorism, Cyber, Nuclear).
Securities/bonds: within two weeks of receiving the signed agreement, the Contractor must arrange delivery of any securities, bonds, guarantees and proof of insurance required by the contract; failure to do so is a repudiation.
Liability: the Contractor's total liability is limited to the total of the Prices, with certain excluded matters (design defects, off-site fabrication, property damage, injury/death, IP infringement) not limited; Employer's liability for indirect/consequential loss is limited to R0.00.
Compliance Requirements
Source: NEC ECC.doc (unknown)CIDB: Grade 6CE registration required; the Form of Offer asks for the tenderer's CIDB registration number.
CSD: valid Central Supplier Database registration required.
Tax: valid SARS tax clearance certificate or tax PIN required.
B-BBEE: valid B-BBEE verification certificate required; any change in B-BBEE status must be notified to the Employer within 7 days, with an updated certificate within 30 days; a decreased status may lead to renegotiation or termination.
Health and safety: compliance with the Construction Regulations 2014 and the Occupational Health & Safety Act 85 of 1993; the Employer may appoint the Contractor as Principal Contractor; the Prices must include sufficient allowance for H&S compliance.
Plant Safety Regulations: personnel must undergo PSR authorisation, which requires a person to be on site for 6 months before authorisation is approved.
Joint ventures: JV/consortium members are jointly and severally liable; the key authorised person must be notified to the Project Manager within two weeks of the Contract Date; JV composition may not be altered without the Employer's written consent.
Environmental: the Contractor must comply with all applicable environmental laws and regulations.
VAT: the Contractor must be VAT-registered and include the Employer's VAT number 4740101508 on invoices.
Description
Source: 240-68099512 Form A Rev 10 - Cat 3.pdf (unknown)The document is Form A (Template 240-43921804 Rev 3) for Tender & Contract Quality Requirements (240-68099512 Rev 10). It sets out Eskom's quality requirements for the tender, referencing specification 240-105658000 and ISO 9001. The bidder must select the applicable category and indicate whether a site assessment is needed. Category 3 is selected. Main Supplier and Sub-supplier Capability and Capacity Assessment is not applicable.
Evaluation Criteria
Source: 240-68099512 Form A Rev 10 - Cat 3.pdf (unknown)CIDB Grade 6CE registration is required.
The bidder must demonstrate capability and capacity under Category 3 pre-contract assessment per Eskom specification 240-105658000.
Compliance with Eskom Supplier Quality Requirements (240-105658000) and ISO 9001:2015 is mandatory.
The tenderer must complete and sign Form A (Template 240-43921804 Rev 3) accepting all quality requirements.
Technical Specifications
Source: 240-68099512 Form A Rev 10 - Cat 3.pdf (unknown)Scope: De-silting and lining of the seven-year dam at Hendrina Power Station.
Duration: 12 months.
Category 3 pre-contract award quality requirements apply (refer to clause 4.1 of 240-105658000).
Post-contract award requirements include contract execution, supplier quality performance monitoring, supplier quality audit, Eskom rights of access and information, preservation, quality audits, management of nonconformities, and special processes.
The bidder must acknowledge and accept Eskom Supplier Quality Requirements (240-105658000) and ISO 9001 Standard.
Methodology
Source: 240-68099512 Form A Rev 10 - Cat 3.pdf (unknown)The document references ISO 9001 clauses on context of the organisation, leadership, planning, support, operation, performance evaluation, and improvement. The bidder must align their quality management system with these principles, including customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making, and relationship management.
Quality Management
Source: 240-68099512 Form A Rev 10 - Cat 3.pdf (unknown)Pre-contract award quality requirements: Category 3 selected (refer to clause 4.1 of 240-105658000). Main Supplier and Sub-supplier Capability and Capacity Assessment is not applicable.
Compliance Requirements
Source: 240-68099512 Form A Rev 10 - Cat 3.pdf (unknown)CIDB Grade 6CE registration is required.
Form A (Template 240-43921804 Rev 3) must be completed and signed to accept Eskom Supplier Quality Requirements.
CSD registration, valid tax clearance, and B-BBEE certification are standard Eskom requirements but not explicitly stated in the provided document.
Section
Source: 240-68099512 Form A Rev 10 - Cat 3.pdf (unknown)Pre-contract award quality requirements apply (Category 3). Post-contract award requirements include supplier quality performance monitoring, supplier quality audit, and standard conditions such as Eskom rights of access, information, preservation, quality audits, management of nonconformities, and special processes. The bidder must complete and sign Form A to accept Eskom Supplier Quality Requirements as per 240-105658000 and ISO 9001.
Description
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)De-silting and lining of seven-year dam at Hendrina Power Station for a period of 12 months.
Scope includes all required activities for de-silting, subgrade preparation, and lining with water control.
Works to be executed in a live/operational power station environment.
Contract period: 12 months.
Important Dates
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Closing date: 16 September 2026 at 10:00.
Non-compulsory clarification meeting: 01 September 2026 at 13:00, via Microsoft Teams.
Meeting ID: 352 301 489 121 247, Passcode: eF3ST6Aq.
Tenderers must confirm attendance with the Eskom Representative in advance.
Clarification queries deadline: 5 working days before tender closing (09 September 2026 at 10:00).
Tender validity period: 90 days from closing date and time.
Briefing Session
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Non-compulsory clarification meeting:
Date: 01 September 2026
Time: 13h00
Venue: Microsoft Teams
Join link: https://teams.microsoft.com/meet/352301489121247?p=KO6DRJMm9YBP4cYlBa
Meeting ID: 352 301 489 121 247
Passcode: eF3ST6Aq
Tenderers must confirm intention to attend with the Eskom Representative, providing names, positions, and contact details of attendees.
If a briefing were mandatory, non-attendance would disqualify; this one is not mandatory but recommended.
Contact Information
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Eskom Representative: Musa Shikwambana
Tel: 013296 3896
Email: [email protected]
Fraud and corruption hotline: 0800 11 2722 / [email protected]
Electronic submission: Eskom Tender Bulletin site (E-tendering) at TenderBulletin (eskom.co.za)
All queries must be in writing to the Eskom Representative.
Submission Guidelines
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Submit via Eskom E-tendering site (TenderBulletin) by 16 September 2026 at 10:00.
Documents must be uploaded in PDF format; pricing schedule in PDF and Excel.
Upload under folders: Technical, Commercial, Financial, Other.
No zipped/condensed files; no hard copies accepted.
If resubmitted, the latest version is accepted; earlier versions become void.
Ensure submission status shows as 'complete'.
Eskom may negotiate with preferred bidders if prices not market related.
Main contractors discouraged from subcontracting with subsidiaries; if done, must be declared.
Tenderers must continuously check the Eskom Tender Bulletin for updates.
Cataloguing information may be required after award.
Mandatory returnable forms (disqualifiable if missing): Annexure A (Authorisation), B (Acknowledgement), C (Tenderer's Particulars), D (Integrity Declaration), E (CPA local), F (CPA foreign), G1-G4 (SBD 6.2 local content), H (SBD 1), I (SBD 6.1 Preference Points), J (SBD 4 Disclosure), K (Tax Evaluation Questionnaire), pricing schedule, NEC contract, CIDB grading proof, tax clearance, JV documents (if applicable), proof of CSD registration.
Non-disqualifiable returnables may be requested within 5 working days after closing.
Returnable Documents
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Annexures (marked as disqualifiable at closing unless noted):
Additional documents:
Evaluation Criteria
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Two-stage evaluation: functionality (technical) first, then price and specific goals.
Functionality criteria and weights:
Minimum threshold: 70% overall weighted score. If no tenderer achieves 70%, threshold may be reduced to 60%.
Price evaluation: Inclusive of VAT, corrected for arithmetic errors, excluding contingencies, adjusted for variations. Unconditional discounts considered; conditional discounts applied on payment. Prices scored out of 80 points.
Specific goals (B-BBEE, skills development, etc.) scored out of 20 points under PPPFA 80/20 system. Failure to submit proof yields 0 points (not disqualification).
Total score = price score + specific goals score. Ranking from highest to lowest.
Eligibility: No restriction to do business with Eskom/SOCs, not from sanctioned countries, no multiple tenders unless JV, JV agreement with joint/severe liability, no conflict of interest, tender signed by authorised person, not restricted by NT or on defaulters list, no 100% subcontracting.
Basic compliance: Meet eligibility, submit complete tender (commercial, financial, technical), all mandatory returnables, CSD number.
Technical Specifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Scope: De-silting and lining of seven-year dam at Hendrina Power Station for a period of 12 months.
Mandatory technical requirement: An ECSA Registered Civil Engineer must certify/interpret as-built drawings. Submit certified professional registration certificate.
Functionality evidence required:
Quality: Category 3 Quality Requirements – see Annexure R.
Environmental requirements: EMS File (ISO14001:2015), ISO 14001 certificate (if certified), signed Contractor's EMP, environmental authorisations/permits, site environmental representative appointment, method statements, emergency plans, hazardous substances register, SDS, waste register and management plan, proof of training (see Annexure S).
Safety requirements: COIDA certificate of good standing (SA tenderers), OHS plan, Baseline OHS Risk Assessment, OHS policy signed by CEO, OHS Competency (Annexure Q).
Methodology
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Detailed method statement required covering de-silting, subgrade preparation, and sectional lining with water control.
Must include:
Scored under functionality (30 points).
Experience & Qualifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Company experience: Proven track record in civil engineering construction in live/operational environments (e.g., power stations, mining). Scored (10 points) based on years of experience: >5 yrs (full marks), 3-5 yrs (80%), 1-3 yrs (40%), <1 yr (0%).
Completed similar projects: Number of dam lining/HDPE works projects with letters of appointment and completion certificates. Scored (30 points): 6+ similar (full), 4 (80%), 2 (40%), 0 (0%).
Construction Manager: Must hold certified bachelor's degree in civil engineering, construction management, or closely related discipline. Scored (15 points) based on years in construction management: >5 yrs (full), 3-5 (80%), 1-3 (40%), <1 (0%).
Welding Artisan: Experience in HDPE wedge and fusion welds with certified certification. Scored (15 points): >5 yrs (full), 3-5 (80%), 1-3 (40%), <1 (0%).
Quality Management
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Category 3 Quality Requirements apply. See Annexure R for full list of returnable documents.
Quality Control Plans (QCPs) for inspection and testing are part of the method statement and scored under functionality (5 points).
Pricing Schedule
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Pricing schedule/BOQ to be submitted in PDF and Excel format.
Pricing schedule is part of the contract (NEC3 ECC Option A with activity schedule).
Prices evaluated inclusive of VAT, corrected for arithmetic errors, excluding contingencies, and adjusted for variations.
Unconditional discounts considered for evaluation; conditional discounts applied on payment.
Prices scored out of 80 points.
Cataloguing line item may be included if required (Eskom pays).
Performance security required – select two Eskom-approved financial institutions.
Financial Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Pricing schedule / Bill of Quantities (BOQ): Submit in both PDF and Excel format.
Prices evaluated inclusive of VAT, corrected for arithmetic errors, excluding contingencies, adjusted for variations.
Unconditional discounts taken into account; conditional discounts applied on payment.
Prices scored out of 80 points.
Payment terms:
Performance security: Required; tenderer must select at least two Eskom-approved financial institutions from the provided list.
Cataloguing: If required, a line item for cataloguing must be included in the pricing schedule; Eskom will pay for cataloguing.
No reverse e-auction.
Compliance Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)CSD registration (CSD number) – mandatory.
Tax compliance: Provide SARS e-filing PIN for verification or certified tax clearance certificate; foreign suppliers without SA footprint complete SBD 1 but no proof required.
B-BBEE: Submit SBD 6.1 Preference Points Claim Form (Annexure I) and valid B-BBEE status level certificate, sworn affidavit, or other prescribed proof. Specific goals scored out of 20 points.
CIDB: Main contractor must hold a valid CIDB Grade 6CE grading (proof required at closing or within 21 working days if agreed).
ECSA: Registered Civil Engineer certification for mandatory technical requirement.
Safety: COIDA letter of good standing (original/proof of application) for SA tenderers; Annexure B, OHS plan, Baseline Risk Assessment, OHS policy signed by CEO, OHS Competency.
Environmental: EMS File (ISO14001:2015), ISO 14001 certificate if certified, signed Environmental Management Plan, relevant permits, emergency plans, hazardous substances register, Safety Data Sheets, waste management plan, proof of training.
Quality: Category 3 Quality Requirements per Annexure R.
Employment Equity: Designated employers must furnish proof of compliance (EE report submission) – SA tenderers only.
Tax Evaluation Questionnaire (Annexure K) to determine if the entity is a personal service provider.
All returnable forms (Annexures A, B, C, D, E, F, G1-G4, H, I, J, K) must be completed and signed where required; missing disqualifiable forms lead to disqualification.
Joint venture documents: JV/consortium agreement with joint and several liability, single bank account, details of partners.
Financial statements: Latest approved annual financial statements of the tendering entity (not parent), including all required components; public interest score if applicable.
B-BBEE Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Proof of B-BBEE status level: valid B-BBEE certificate issued by authorised body, sworn affidavit per B-BBEE Codes, or other prescribed requirement.
Specific goals scored out of 20 points under PPPFA 2022 regulations (80/20 system). Failure to submit evidence results in 0 points for that goal (not disqualification).
B-BBEE points claimed via SBD 6.1 Preference Points Claim Form (Annexure I).
Health & Safety
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Safety returnables (required at award, details in Annexure Q):
Also assessed as part of contractual requirements.
Environmental
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Environmental returnables (details in Annexure S):
Contractual Terms
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Contract: NEC3 Engineering and Construction Contract (ECC) with Option A (priced contract with activity schedule).
Dispute resolution: Option W1.
Secondary options: X1 (price adjustment for inflation), X2 (changes in law), X5 (sectional completion), X7 (delay damages), X15 (limitation of contractor's liability for design to reasonable skill and care), X16 (retention), X18 (limitation of liability), Z (additional conditions).
Performance security required; tenderer to select two Eskom-approved financial institutions.
Payment terms: 30 days for contracts < R50M; 60 days for contracts >= R50M.
Contractual requirements (assessed after ranking): CSD registration, NEC contract, Price Schedule, all annexures.
Failure to meet contractual requirements may result in non-responsiveness.
Eskom may negotiate with preferred bidders if prices not market related.
Main contractors discouraged from subcontracting with subsidiaries; must declare if done.
Tender validity: 90 days.
Special Conditions
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Eskom may negotiate with preferred bidders if tendered prices not market related.
Main contractors discouraged from subcontracting with subsidiaries; if done, must be declared in tender documents.
Tenderers must continuously check the Eskom Tender Bulletin for any updates or addenda.
Cataloguing information may be required after contract award.
No alternative tenders allowed.
Prices will not be read out.
Reverse e-auction not applicable.
No objective criteria.
Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Eligibility criteria: tenderers not under restriction to do business with Eskom or SOCs; not from sanctioned countries; not submitting multiple tenders unless as JV; JV/consortium agreement must state joint and several liability; no conflict of interest; tender signed by authorised person; not restricted by National Treasury or on Tender Defaulters list; no 100% subcontracting.
Basic compliance: meet eligibility, submit complete tender (commercial, financial, technical), mandatory returnables, CSD number.
Mandatory technical requirement: ECSA Registered Civil Engineer certificate for certifying as-built drawings.
Contractual requirements (assessed after award): CSD, NEC, Price Schedule, all annexures, SHEQ, financial viability, SDL&I targets (CSI=1% of contract value).
Section
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Seven Year Dam.pdf (RFP)Functionality criteria with weights and scoring (total 100 points):
Minimum threshold: 70% overall; may be reduced to 60% if no tenderer achieves 70%.
Price evaluation: inclusive of VAT, corrected for arithmetic errors, excludes contingencies, adjusted for variations; unconditional discounts considered; scored out of 80 points.
Specific goals: scored out of 20 points under PPPFA.
Ranking: 80/20 system (price 80, goals 20).
Eligibility and basic compliance are pass/fail.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Returnable documents — all must be completed, signed, and submitted:
Disqualification risks:
Returnable Documents
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Form A must be completed and signed.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)CIDB Grade 6CE registration is mandatory.
The bidder must be registered on the Central Supplier Database (CSD) and have a valid SARS tax compliance status.
B-BBEE level will be used for preference point claiming under the PPPFA 80/20 or 90/10 system (split not stated).
Quality requirements (Category 3) are evaluated with a score indicator of 1 for each deliverable — bidders must submit objective evidence of a documented QMS that complies with ISO 9001, including:
Total quality score possible: 13.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Scope: De-silting and lining of the seven-year dam at Hendrina Power Station.
Duration: 12 months.
Category: Civil engineering (Grade 6CE).
The work requires a Contract Quality Plan and Quality Control Plan specific to the scope, referencing Eskom specifications 240-105658000 and 240-109253698.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)CIDB Grade 6CE registration is required.
CSD registration is required.
Valid SARS tax compliance status PIN is required.
B-BBEE certificate or sworn affidavit is required for preference point claiming.
Quality management system compliant with ISO 9001 is required, with documented evidence as per the List of Tender Returnables (Category 3).
Form A must be completed and signed.
Section
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Quality requirements are evaluated as Category 3 deliverables with a score indicator of 1 per item. Bidders must submit:
Total quality score: 13.
Important Dates
Source: 240-109253698 CQP Template 2021.pdf (unknown){"closingDate":"01 April 2021"}
Contact Information
Source: 240-109253698 CQP Template 2021.pdf (unknown){"name":null,"email":null,"phone":null,"department":"ies.","address":null}
Evaluation Criteria
Source: 240-109253698 CQP Template 2021.pdf (unknown)CIDB Grade 6CE registration required.
Bidder must be registered on the Central Supplier Database (CSD) and have valid tax compliance status (SARS tax pin).
A completed Contract Quality Plan (Rev 0) must be submitted with the bid.
The bidder must demonstrate capacity to manage quality per ISO 9001 principles and SANS 466/ISO 10005, including sub-supplier evaluation, inspection planning, and document control.
Technical Specifications
Source: 240-109253698 CQP Template 2021.pdf (unknown)(Type in the Full description of the Works Information as described in the NEC or Fidic document)
Scope of work category ( Mark with X if Yes N/A Type in the scope of work in the appropriate
any activity below is included in SOW) column.
Design
Manufacturing
Supply and Delivery/ Transportation
Construction/ Installation/ Maintenance
Commissioning
Professional services
Other
Each person on site must know their own responsibilities as well as the responsibilities of others. Each party must keep the relevant
people informed. Indicate for this contract Communication regarding all quality related issues i.e. Documentation/ Supplier Representative
details and contacts - E-mails; Minutes of Meetings; Fixed Contract Meeting; /Weekly Progress Meetings & reporting;. All documentation
shall be submitted per the contract agreement).
(Include scope of work /contract related organogram showing designations with roles and responsibilities/ outputs, which shall include the
QA and QC functions with all personnel responsible for management of activities/processes during execution or delivery of product. Team
member’s responsibilities and qualifications necessary to fulfil stated duties Work verification (e.g., who is responsible for carrying out a
task, as well as who is responsible for checking the work)
Specifications)
List of Supplier’s core processes to be used for executing scope of work / List of Documents to be used on this contract - Work Instructions;
Processes; policies; procedures for the scope of work; Industry standards; specifications; drawings applicable to the scope of work.
Name of document Type Revision
(for sow specific raw material/ required components; list all possible services/material to be sourced or services to be outsourced)
Material components to be purchased
Possible suppliers to be used for sourcing Material /components to be purchased
A
B
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 7
Template Identifier 240-43921804 Rev 5
Template for a Typical Document Identifier 240-109253698 Rev 3
Contract Quality Plan Effective Date 01 April 2021
Next Review Date 01 April 2026
Scope of Work Sub-Suppliers or Sub-contractors- for specialised, complex SOW activities that will be
outsourced.
Outsourced Description of the activity Criteria for selection
Activity/Subcontractor
Eg - Drilling of holes in rocky areas Rock drilling when digging holes; Hiring additional ladders; Eg: Technical & Quality requirements
A
B
C
Note: Evaluation; selection and performance monitoring of suppliers shall be performed as defined in the supplier’s procedures for
managing externally supplied products and services.
(Description of how the tender’s Supplier and contractors indicated in Section 6 will be monitored post award, mark with X the applicable
box- if there are sub-suppliers/ sub-contractors)
Supplier/contractor performance monitoring activities as per scope of work Yes N/A
Supplier inspection report or
supplier surveillance/audit report or /and audit schedule
Generate supplier/contractor inspection plan
Purchased Material verification checklist or report
(Description of the interface of the Sub-Supplier and Suppliers QMS and applicable documents, procedures and work instructions)
Purchased
(Submit a list of SOW items/activities that will be manufactured/refurbished or purchased which will be used on this project/contract
including full descriptions; production schedule and if produced in-house or out-sourced)
Item manufactured refurbished purchased serial number
(Description of all production products/processes which will be monitored by an approved QCP process- compilation; review and implementation and
compliance monitoring Inspection Management)
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 7
Template Identifier 240-43921804 Rev 5
Template for a Typical Document Identifier 240-109253698 Rev 3
Contract Quality Plan Effective Date 01 April 2021
Next Review Date 01 April 2026
Governed by codes of manufacturing/fabrication standards
(Description of all products/processes/services which will require special controls, i.e. welding, NDT/NDE. For each of the deliverables
identified, describe the quality control activities you will execute to ensure the deliverable will meet quality expectations (QC). For example,
you could note that you will be completing a Quality Control Checklist for each major deliverable)
During project
All documents that will be submitted to Eskom - Technical records (Safe working procedure/ Method statements), Inspections reports, signed
off QCP’s, technical assurance report, warranty certificates, material certificates , dimension reports, tests reports etc) List of retained
information to be submitted as evidence - SOW has been executed, SOW outputs
(Example):
Title number
Submitted to Eskom prior to commencement /execution
QCP / ITP from Suppliers
Certificates of compliance
Index of ITP/QCP/PQP
Data book Index
Risk Register
offsite and offshore inspections
Submitted to Eskom during and at completion of the contract
Method statements/Safe Working Procedures/ PQRs; Repair Procedures)
Qcp / itp/pqp
Final DATA book
Captured in the QMS of the Supplier / Sub-Supplier
Quality Manual
Quality Policy
Risk Register
Audit findings report and Audit Findings Register / Action Register
Consolidated inspection register of all planned and completed inspections (Accepted,
Rejected, Postponed, Cancelled, Missed);
Monthly Inspection Analysis Report
Audit findings report and Audit Findings Register / Action Register – Analysis Report
Updated procedure registers (PQRs, Method Statements, Repair Procedures, etc.)
A register of NCs / Defects / Punch Items with all the necessary analysis – Analysis Report
Databook status registers – Monthly Analysis Report (Milestone Based)
Inspection rejection rate
(Some records submitted in Clause 12 of CQP- Description of how records shall be controlled (eg. identified, completed, retained and
disposition method - please do not attach procedure) A good retrievable filing system using an indexing and cross reference system should
be set up.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 7
Template Identifier 240-43921804 Rev 5
Template for a Typical Document Identifier 240-109253698 Rev 3
Contract Quality Plan Effective Date 01 April 2021
Next Review Date 01 April 2026
Record name Reference number Distributed to Retention period
(access):
(Share brief description (flowchart/process) of how the following processes will be implemented: Concession management process; Non-
Conformance (Defects; Repair & Rework) Management Process; Inspection Management Process.
Maintenance manual
If data book applicable to the scope of work, Submission of data books – reflect review; and acceptance; include list of purchase orders for
quality critical items.
Required to execute the contract scope of work.
(Provide a list of Tools & Equipment to be used for this contract; Provide a list of Calibration/ Maintenance or Test (for those applicable)
status of each of the tools and equipment to be used)
Provide a brief description or the process flow which details the manner in dealing with customer property as per latest ISO 9001
requirement.
Include a process flow which details the manner for the preservation, storage and handling of materials – identification; handling;
contamination control; packaging; storage; transmission or transportation, and protection
Indicate the identification and traceability methods to be used for SOW related activities affected by statutory and regulatory requirements
Indicate any post-delivery activities/support and how shall it be given to Eskom during commissioning and after SOW delivery - any
warranty period and conditions; customer satisfaction measurement; technical support; defect correction period/ retention funds. When
determining post-delivery activities consider statutory; regulatory and scope of work requirements
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 7
Methodology
Source: 240-109253698 CQP Template 2021.pdf (unknown)Method statements, safe working procedures, PQRs, and repair procedures must be submitted.
Audit findings, registers of non-conformances/defects/punch items, and databook status registers must be provided with monthly analysis reports.
Experience & Qualifications
Source: 240-109253698 CQP Template 2021.pdf (unknown)The bidder must provide an organogram showing designations with roles, responsibilities, and outputs, including QA and QC functions.
Team members' responsibilities and qualifications necessary to fulfil stated duties must be included.
Quality Management
Source: 240-109253698 CQP Template 2021.pdf (unknown)The bidder must submit a Contract Quality Plan (CQP) following the Eskom template (240-109253698 Rev 3).
The CQP must address: scope of work, communication channels, organogram with QA/QC roles, interfacing documents, list of suppliers and sub-suppliers, monitoring of suppliers, QCP/ITP for offsite and onsite activities, special controls (e.g., welding, NDT), documented information to be submitted to Eskom, records control and retention, concession and non-conformance management, databook management, management of tools and equipment, customer property, product preservation, identification and traceability, and commissioning/post-delivery activities.
Reference standards: SANS 466:2005 / ISO 10005:2005.
Compliance Requirements
Source: 240-109253698 CQP Template 2021.pdf (unknown)CIDB Grade 6CE registration required.
CSD registration required.
Valid tax compliance status (SARS tax pin) required.
Contract Quality Plan (Rev 0) must be submitted with the bid.
Health & Safety
Source: 240-109253698 CQP Template 2021.pdf (unknown)Method statements must describe in a logical sequence how a job is carried out safely, including all risks identified in the risk assessment and the measures needed to control those risks.
Contractual Terms
Source: 240-109253698 CQP Template 2021.pdf (unknown)Post-delivery activities must include warranty period and conditions, customer satisfaction measurement, technical support, defect correction period, and retention funds.
Description
Source: TECHNICAL EVALUATION CRITERIA SEVEN YEAR DAM.pdf (unknown)Hendrina Power Station is situated in Mpumalanga Province, approximately 30 km from both Hendrina
Township and Middelburg.
The Seven Year Dam is an unlined earth embankment constructed to collect runoff originating from the
eastern side of the power station and the adjacent coal stockyard.
Stormwater and station effluent are collected by a subsurface drainage system located east of the
chimneys and precipitator plant and are conveyed through a 1050 mm concrete pipe into an
underground culvert discharging into the dam.
Additional runoff from the stockpile area is directed via two channels into a concrete settling sump, with
overflow from the sump also feeding into the same 1050 mm pipeline.
Furthermore, a concrete pre-settling channel positioned along the security fence conveys runoff from the
southeastern section of the station to the dam inlet culvert.
The Seven Year Dam is designed to accommodate a 1:50-year flood event and has a maximum storage
capacity of approximately 18,000 m3, with a dam wall height of 3.6 m.
The structure comprises a sandy-clayey core embankment and incorporates a concrete-lined spillway,
approximately 2 m long and 300 mm high, to manage overflow during periods of high rainfall.
The spillway has an estimated maximum discharge capacity of 18,588 m3.
2.1 Scope
The document covers the tender technical returnable required for the technical evaluation purpose for
De-silting & Lining of the seven-year dam. The tender returnable comprises of mandatory and qualitative
requirements.
2.1.1 Purpose
The purpose of this tender technical evaluation strategy is to define the Mandatory Evaluation Criteria,
Qualitative Evaluation Criteria and TET member responsibilities for tender technical evaluation.
The technical evaluation strategy serves as basis for the tender technical evaluation process.
2.1.2 Applicability
This document is applicable to Hendrina Power Station.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the following
paragraphs.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation for the Seven-Year De-Silting & Unique Identifier:
Lining Project Revision: 0
Page:
2.2.1 Normative
[1] 240-168966153: Tender Technical Evaluation Procedure
[2] 32-1034 Eskom Procurement and Supply Chain Management Procedure
2.2.2 Informative
[3] None
2.3 Definitions
2.3.1 Classification
Controlled Disclosure: Controlled Disclosure to external parties (either enforced by law, or
discretionary).
2.4 Abbreviations
Abbreviation Description
7YD Seven Year Dam
TET Technical Evaluation Team
CIDB Construction Industry Development Board
ECSA Engineering council of south Africa
HDPE High-density polyethylene
SANS South African National Standards
TET Technical Evaluation Team
ZLED Zero Liquid Effluent Discharge
2.5 Roles and responsibilities
as per 240-168966153: Tender Technical Evaluation Procedure
2.6 Process for monitoring
N/a
2.7 Related/supporting documents
Seven-year De-Silting & Lining Project Scope of Work
3.1 Technical evaluation threshold
The minimum weighted final score (threshold) required for a tender to be considered from a technical
perspective is 70%.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation for the Seven-Year De-Silting & Unique Identifier:
Lining Project Revision: 0
Page:
Table 1: Qualitative Evaluation Criteria Scoring Table.
Score (%) Definition
Compliant
5 100 Meet technical requirement(s) AND.
No foreseen technical risk(s) in meeting technical requirements.
Compliant with associated qualifications
Meet technical requirement(s) with.
4 80 Acceptable technical risk(s) AND/OR.
Acceptable exceptions AND/OR.
Acceptable conditions.
Non-compliant
Does not meet technical requirement(s) AND/OR.
2 40
Unacceptable technical risk(s) AND/OR.
Unacceptable exceptions AND/OR.
Unacceptable conditions.
0 0 totally deficient or non-responsive
Note 1: The scoring table does not allow for scoring of 1 and 3.
Note 2: Foreseen acceptable and unacceptable risk(s), exceptions and conditions shall be unambiguously
defined in the relevant Tender Technical Evaluation Strategy.
3.2 Tet members
Table 2: TET Members
TET number TET Member Name Designation
TET 1 Civil Engineer
TET 2 Civil Engineer
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation for the Seven-Year De-Silting & Unique Identifier:
Lining Project Revision: 0
Page:
3.3 Manadatory technical evaluation criteria
Table 3: Mandatory Technical Evaluation Criteria
Mandatory Technical Criteria Description Reference to Technical Specification / Tender Motivation for use of Criteria
Contact Information
Source: TECHNICAL EVALUATION CRITERIA SEVEN YEAR DAM.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":null}
Submission Guidelines
Source: TECHNICAL EVALUATION CRITERIA SEVEN YEAR DAM.pdf (unknown)Returnable Documents: ECSA Registered Civil Engineer Certified Professional registration certificate Ability of the contractor to certify/interpret as built drawings. Tender Technical Evaluation for the Seven-Year De-Silting & Unique Identifier: Lining Project Revision: 0 Page: 3.4 QUALITATIVE TECHNICAL EVALUATION CRITERIA Table 4: Qualitative Technical Evaluation Criteria Reason for Category Points Sub Criteria Score Source Evidence
Evaluation Criteria
Source: TECHNICAL EVALUATION CRITERIA SEVEN YEAR DAM.pdf (unknown)Mandatory: Bidders must be registered with CIDB Grade 6CE and provide a certified ECSA Professional Registration certificate for a Civil Engineer to certify as-built drawings.
Qualitative evaluation (100 points total):
Minimum technical threshold: 70% weighted final score.
Scoring scale: 5 = 100% (compliant, no risks), 4 = 80% (compliant with acceptable qualifications), 2 = 40% (non-compliant), 0 = 0% (totally deficient). Scores 1 and 3 are not used.
Unacceptable technical risks (zero score): Inadequate subgrade preparation, liner installation on wet/unstable surface, failed/untested weld seams, absence of anchor trenches, uncontrolled water flow, lack of geotextile protection, non-compliance with environmental regulations, inadequate quality control/documentation, use of incorrect/substandard materials.
Acceptable technical risks (score 4): Controlled residual moisture, minor differential settlement, controlled seaming variability, temporary water ingress, surface imperfections within tolerance, environmental disturbance during de-silting.
Technical Specifications
Source: TECHNICAL EVALUATION CRITERIA SEVEN YEAR DAM.pdf (unknown)Site: Hendrina Power Station, Mpumalanga, approximately 30 km from Hendrina and Middelburg.
Seven Year Dam: Unlined earth embankment collecting runoff from the power station and coal stockyard. Stormwater and effluent are conveyed via a 1050 mm concrete pipe into an underground culvert discharging into the dam. Additional runoff from stockpile area goes through channels into a concrete settling sump, overflow feeds the same pipeline.
Dam capacity: 18,000 m³, wall height 3.6 m, designed for 1:50-year flood. Spillway: concrete-lined, 2 m long, 300 mm high, max discharge 18,588 m³.
Scope: De-silting and lining of the dam. Lining is HDPE (from references). Work includes subgrade preparation, sectional lining with water control, and associated civil works.
Methodology
Source: TECHNICAL EVALUATION CRITERIA SEVEN YEAR DAM.pdf (unknown)a Detailed method statement for: De-silting, Subgrade preparation & Sectional lining
with water control.
Submitted list of standards: (100% = 5
points).
Experience & Qualifications
Source: TECHNICAL EVALUATION CRITERIA SEVEN YEAR DAM.pdf (unknown). Introduction ...................................................................................................................................................... 3
2.1 Scope .............................................................................................................................................................. 3
2.1.1 Purpose ..................................................................................................................................................... 3
2.1.2 Applicability................................................................................................................................................ 3
2.2 Normative/informative references .................................................................................................. 3
2.2.1 Normative .................................................................................................................................................. 4
2.2.2 Informative ................................................................................................................................................. 4
2.3 Definitions .................................................................................................................................................... 4
2.3.1 Classification ............................................................................................................................................. 4
2.4 Abbreviations .............................................................................................................................................. 4
2.5 Roles and responsibilities .................................................................................................................... 4
2.6 Process for monitoring ........................................................................................................................ 4
2.7 Related/supporting documents ......................................................................................................... 4
3.1 Technical evaluation threshold ....................................................................................................... 4
3.2 Tet members ................................................................................................................................................. 5
3.3 Manadatory technical evaluation criteria .................................................................................. 6
3.4 Qualitative technical evaluation criteria .................................................................................... 7
3.5 Tet member responsibilities ............................................................................................................... 10
3.6 Foreseen acceptable / unacceptable qualifications............................................................. 11
3.6.1 Risks ........................................................................................................................................................ 11
3.6.2 Exceptions / Conditions ........................................................................................................................... 12
Authorisation .................................................................................................................................................. 13
Revisions ............................................................................................................................................................ 13
Development team ......................................................................................................................................... 13
Acknowledgements ...................................................................................................................................... 13
Construction projects with experience in live/operational environments (e.g., power
stations, mining).
with a track record Regulation 5 More than 5 years. (100% = 5 points). 10
Experience of of the works done (h); 10
similar work with Regulation 5
references/ (h);
6 or more similar projects successfully completed. (100% = 5 points). 30 Completed Completion
4 similar projects successfully completed. (80% = 4 points). 24
2 similar projects successfully completed. (40% = 2 points). 12
0 similar projects successfully completed. (0% = 0 points). 0
Civil Engineering, Construction Management, Project Management, or a closely related Construction Regulation 8 (1)
built environment discipline. Manager with a
proven track record
with certified
Experience certification. More than 5 years. (100% = 5 points). 15
Construction 15
5 years and less, but more than 3. (80% = 4 points). 12
3 years and less but more than 1. (40% = 2 points). 6
1 year and less. (0% = 0 points). 0
This sub criterion covers the experience of the proposed Welding Artisan (total
duration of professional activity as a Welding Artisan) in projects that entails HDPE
welds.
Lining Project Revision: 0
Page:
3.6 Foreseen acceptable / unacceptable qualifications
3.6.1 Risks
Table 6: Acceptable Technical Risks
Quality Management
Source: TECHNICAL EVALUATION CRITERIA SEVEN YEAR DAM.pdf (unknown)Method 30 chart. No submission: (0% = 0 points). inspection acceptable
Methods, level controls, etc.. No submission: (0% = 0 points).
Submitted inspection & testing QCP's: (100%
= 5 points).
Inspections and Testing / QCP No submission: (0% = 0 points).
Compliance Requirements
Source: TECHNICAL EVALUATION CRITERIA SEVEN YEAR DAM.pdf (unknown)CIDB registration: Grade 6CE (as per tender title).
Mandatory returnable: Certified ECSA Professional Registration certificate for a Civil Engineer.
Additional mandatory returnables may be listed in the full tender pack (not included in this document).
Health & Safety
Source: TECHNICAL EVALUATION CRITERIA SEVEN YEAR DAM.pdf (unknown)relevant standards, contractor to
Submitted Gantt chart with project timelines: programme, execute the
(100% = 5 points). equipment list, work safety and
Requirements
Source: TECHNICAL EVALUATION CRITERIA SEVEN YEAR DAM.pdf (unknown)Mandatory Technical Evaluation Criteria: 1. ECSA Registered Civil Engineer - Certified Professional registration certificate required for ability of the contractor to certify/interpret as built drawings.
Section
Source: TECHNICAL EVALUATION CRITERIA SEVEN YEAR DAM.pdf (unknown)Title: Tender Technical Evaluation Unique Identifier
Tender Technical Evaluation for the Seven-Year De-Silting & Unique Identifier
Description
Source: Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdfThe main contractor must notify Eskom before appointing any subcontractor or supplier, and before work commences.
Important Dates
Source: Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf (unknown)Closing date: 16 September 2026 at 10:00.
No other dates (briefing, site visit, clarification deadline) are stated in the document.
Submission Guidelines
Source: Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf (unknown)Returnable documents required:
Submission address and method are not stated in the provided document.
Evaluation Criteria
Source: Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf (unknown)Minimum qualification: CIDB contractor grading 6CE.
Bidders may be required to provide testimonials or references for similar projects.
Annexure B must be completed and signed as part of the bid.
Technical Specifications
Source: Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf (unknown)Scope: De-silting and lining of the seven-year dam at Hendrina Power Station.
Contract duration: 12 months.
Quality Management
Source: Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdfThe main contractor must:
Compliance Requirements
Source: Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdf (unknown)CIDB grade 6CE — contractor must hold this grading.
Occupational Health and Safety (OHS) compliance — must comply with the OHS Act, 1993, and its Regulations, as well as Compensation for Occupational Injuries and Diseases Act (COIDA).
After award, contractor must align its processes with Eskom's OHS policies, procedures, and standards.
Contractual penalties apply for non-compliance with OHS requirements.
Annexure B (Acknowledgment Form) must be signed and submitted with the bid.
Health & Safety
Source: Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.pdfContractor must comply with the Occupational Health and Safety Act, 1993 and its Regulations, and the Compensation for Occupational Injuries and Diseases Act (COIDA), as amended.
After contract award, the contractor must fully align its company processes with Eskom's OHS policies, procedures, and standards.
Contractual penalties apply for non-compliance with OHS or other statutory requirements.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
01 IMPALA ROAD - PULLENSHOPE, HENDRINA POWER STATION - MIDDELBURG - 1096
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
15
Last checked
26 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Civil engineering. Unlock full pricing strategies, bid frequency, and historical win rates.