ESKOM is establishing a panel of up to 8 contractors to provide low voltage (lv) breakdown, planned maintenance, and replacement services in the free state operating unit on an as-needed basis over 36 months. The tender is open to qualified contractors who can respond to breakdowns within 24 hours and maintenance within 5 working days. Bidders must submit electronically via eskom's etendering system by 27 july 2026.
Must have a valid CSD number and CIDB grading of Level 3EP or higher (or be capable of registering within 21 days).
Complete and submit all mandatory annexures, including the E-Tendering Training Acknowledgement Form, SBD 1, SBD 4, SBD 6.1, and Integrity Declaration.
Upload documents in PDF (price list also in Excel) under Technical, Commercial, Financial, and Other folders; max 50MB per file, 900MB total; no zip files.
Attend the non-compulsory clarification meeting on 09 July 2026 at 11:00 via MS Teams (Meeting ID: 377 917 469 637 216, Passcode: Pc6qv3fM).
Tender validity is 12 weeks; prices fixed for first 12 months, then adjusted annually using CPA and SEIFSA indices.
Must meet 90% functionality threshold to proceed to price evaluation; no subcontracting 100% of scope.
An enabling agreement for a panel of 08 contractors for the provision of services for: s1 low voltage (lv) breakdown, planned maintenance and replace function on an as and when required basis in the free state operating unit, for a period of thirty-six (36) months
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
DocumentCORRECT COMMERCIAL.zipReview complete
Description
Source: CORRECT COMMERCIAL.zip
Important Dates
30 Jun
2026
PUBLICATION
Tender Published
Tender was published
27 Jul
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Eskom seeks to establish a panel of 8 contractors for a 36-month enabling agreement to provide S1 low voltage (LV) breakdown, planned maintenance, and replacement services on an as-and-when-required basis in the Free State Operating Unit (FSOU). The contract will be based on the NEC3 Engineering & Construction Contract, Option B (Priced contract with bills of quantities).
Eskom is establishing a panel of 8 contractors for low voltage (LV) breakdown, planned maintenance, and replacement services in the Free State Operating Unit on an as-needed basis for 36 months. The tender involves medium-risk work and has strict environmental and safety (SHE) compliance requirements.
Eskom tender for an enabling agreement to establish a panel of 8 contractors for low voltage (LV) breakdown, planned maintenance, and replacement services in the Free State Operating Unit, for a 36-month period. Evaluation is two-phased, with strict mandatory and technical scoring criteria.
Eskom seeks a panel of 8 contractors for a 36-month enabling agreement to provide S1 low voltage (LV) breakdown, planned maintenance, and replacement services in the Free State Operating Unit on an as-and-when-required basis. The tender includes a comprehensive Bill of Quantities (BOQ) covering site establishment, health & safety, material supply, site personnel, LV structures, pole top boxes, meter installations, excavations, pole planting, conductor work, trenching, decommissioning, and transport.
Eskom seeks to establish a panel of 8 contractors for low voltage (LV) maintenance, breakdown, and replacement services in the Free State Operating Unit on an as-needed basis for 36 months. The tender focuses heavily on Supplier Development, Localization, and Industrialization (SDL&I) objectives, including B-BBEE transformation, local procurement, job creation, and skills development.
Eskom seeks to establish a 36-month enabling agreement with a panel of 8 contractors for Low Voltage (LV) breakdown, planned maintenance, and replacement services in the Free State Operating Unit. The tender is classified under Category 3 quality requirements, mandating a documented Quality Management System (QMS) compliant with ISO 9001:2015, alongside specific quality plans and control procedures.
Eskom seeks to establish a panel of 8 contractors for low voltage (LV) breakdown, planned maintenance, and replacement services in the Free State Operating Unit on an as-needed basis for 36 months. This document is an OHS (Occupational Health and Safety) acknowledgement form, indicating that compliance with stringent health and safety regulations is a critical component of the tender.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
This tender is for an enabling agreement to establish a panel of 8 contractors.
Services required: S1 low voltage (LV) breakdown, planned maintenance, and replacement functions in the Free State Operating Unit.
Contract period: 36 months on an 'as and when required' basis.
The eTendering system is mandatory for submission; suppliers must register and use the online portal.
Important Dates
Source: CORRECT COMMERCIAL.zip (unknown)
Closing date and time: 27 July 2026 at 10:00 South African Standard Time (SAST).
Clarification meeting (non-compulsory): 09 July 2026 at 11:00 via Microsoft Teams.
Meeting details: Join via Teams link or dial-in: +27 21 834 0825,,437276995#. Meeting ID: 377 917 469 637 216, Passcode: Pc6qv3fM.
Tender validity period: 12 weeks from the closing date.
Deadline for clarification queries: 5 working days before the tender submission deadline.
Contact Information
Source: CORRECT COMMERCIAL.zip (unknown)
Eskom Representative for this tender: Millicent Kraai.
Upload documents under specific folders: 'Technical', 'Commercial', 'Financial', and 'Other'.
All documents must be in PDF format, except the price list which requires both PDF and Excel formats.
File size limits: maximum 50MB per file, total submission not exceeding 900MB.
Do not upload zip/compressed files.
Ensure the submission status shows 'complete' before finalizing.
If resubmitting, only the latest version will be considered; previous submissions become invalid.
Mandatory returnable documents include: C1.1 Form of Offer and Acceptance, and other annexures listed in the tender data.
Complete and submit the E-Tendering Training Acknowledgement Form; failure to do so will result in disqualification.
Evaluation Criteria
Source: CORRECT COMMERCIAL.zip (unknown)
Tenderers must have a valid CIDB grading of Level 3EP or higher (or be capable of registering within 21 days).
Must not be under any restriction to do business with Eskom or the state, not be on international sanctions lists, and not have conflicts of interest.
Subcontracting 100% of the work is prohibited.
Joint ventures must provide an agreement showing joint and several liability.
Proof of Central Supplier Database (CSD) registration is mandatory.
Tenderers must meet the 90% functionality threshold to proceed to price evaluation.
Technical Specifications
Source: CORRECT COMMERCIAL.zip (unknown)
Scope: Establish a panel of 8 contractors for S1 low voltage (LV) breakdown, planned maintenance, and replacement services in the Free State Operating Unit.
Contract type: NEC3 Engineering and Construction Contract, Option B (Priced contract with bills of quantities).
Duration: 36 months on an 'as and when required' basis.
Key deliverables: Provide services for LV breakdowns, planned maintenance, and replacement functions.
Site boundaries: Free State Operating Unit.
Works Information is contained in Part C3: Scope of Work.
Response times: 24 hours for breakdowns; 5 working days for maintenance.
Financial Requirements
Source: CORRECT COMMERCIAL.zip (unknown)
Contract uses NEC3 Option B: Priced contract with bills of quantities.
Prices are fixed and firm for the first 12 months, then adjusted annually for inflation using CPA and SEIFSA tables.
Payment terms: Payments assessed after every completion, with a payment period of 4 weeks.
Currency: South African Rand.
Tax invoices must be provided within one week of receiving a payment certificate, including Eskom's VAT number 4740101508.
Delay damages: 2.5% for late completion.
Price adjustment factors: Labour rates (70% SEIFSA Table C-3), Transport rates (15% SEIFSA Table L-2).
Compliance Requirements
Source: CORRECT COMMERCIAL.zip (unknown)
A valid CSD number is required to access the eTendering system.
Submit mandatory annexures: Authorisation Form, Acknowledgement Form, Tenderer's Particulars, Integrity Declaration Form, SBD 1, SBD 4, SBD 6.1, and local content forms if applicable.
B-BBEE: Contractors must notify Eskom of any change in B-BBEE status within 7 days and submit an updated verification certificate.
Joint ventures must be jointly and severally liable; the agreement must be submitted.
Tax compliance: Provide detailed financial documents upon request during evaluation.
Local content requirements apply if designated materials are included; submit SBD 6.2 and supporting schedules.
Ensure no conflict of interest and eligibility criteria are met as per Tender Data.
Section
Source: CORRECT COMMERCIAL.zip
Specific evaluation criteria are not detailed in the extracted sections.
References to 'Quality assurance requirements' and 'Quality' suggest quality management will be part of the evaluation.
Bidders must consult the full tender documentation for comprehensive evaluation details.
DocumentSAFETY REQUIREMENTS.zipReview complete
Description
Source: SAFETY REQUIREMENTS.zip
The scope involves the appointment of contractors or suppliers for the commencement of work. The main contractor must manage subcontractors and ensure compliance with Eskom's OHS requirements.
Evaluation Criteria
Source: SAFETY REQUIREMENTS.zip (unknown)
The tender is open to contractors capable of providing LV electrical services. Key eligibility hinges on the ability to meet and demonstrate compliance with the listed OHS requirements and to manage subcontractors accordingly. The contractor must have an authorized signatory (CEO/Director/Managing Director) to acknowledge and commit to these OHS obligations.
Technical Specifications
Source: SAFETY REQUIREMENTS.zip (unknown)
The main contractor/supplier must:
Provide notification to Eskom prior to appointing contractors or suppliers for work commencement.
Ensure appointed contractors/suppliers have adequate resources and competencies.
Manage its contractors/suppliers to ensure compliance with applicable legal and Eskom requirements.
Monitor contractors/suppliers through OHS audits and assessments during work execution.
Provide grounds for termination of work done by contractors/suppliers.
Deal directly with non-conformances/non-compliance by contractors/suppliers through performance and penalty processes.
Be prepared for Eskom to verify capabilities; may be instructed to provide testimonials/references and client contact details for similar past work.
Compliance Requirements
Source: SAFETY REQUIREMENTS.zip (unknown)
You must comply with the following OHS requirements:
Eskom contractor Health and Safety requirements standards 32-136.
Provided OHS specifications/requirements.
Occupational Health and Safety Act.
Compensation for Occupational Diseases and Illnesses Act.
After contract award, fully align your company's processes to Eskom's OHS requirements (policies, procedures, standards).
Ensure all employees (contractors/suppliers) undergo relevant Eskom induction.
Penalties will be enforced for non-conformance to Eskom and/or statutory OHS requirements.
As main contractor/supplier, you must:
Demonstrate to Eskom your process and selection criteria for appointing contractors and suppliers.
Notify Eskom prior to appointing contractors or suppliers for work commencement.
Ensure contractors/suppliers have adequate resources and competencies.
Manage your contractors/suppliers to ensure legal and Eskom compliance.
Monitor contractors/suppliers through OHS audits and assessments.
Provide grounds for termination of work by contractors/suppliers.
Handle non-conformances by contractors/suppliers directly through performance and penalty processes.
Eskom reserves the right to verify compliance; you may be asked to provide testimonials/references and client contact details for similar past work.
You must sign an acknowledgement form confirming understanding and compliance.
DocumentSDL AND I.zipReview complete
Description
Source: SDL AND I.zip
Scope: An enabling agreement for a panel of 8 contractors to provide low voltage (LV) breakdown, planned maintenance, and replace functions on an as-and-when-required basis in the Free State Operating Unit.
Duration: 36 months.
Budget: R16,699,277.
Note: This is a general description; detailed specifications are not provided in the extracted text.
Important Dates
Source: SDL AND I.zip (unknown)
Closing date: 27 July 2026 at 10:00.
No other dates (e.g., briefings, site visits, clarification deadlines) are specified in the document.
Contact Information
Source: SDL AND I.zip (unknown)
Business Unit: Free State Operating Unit.
Buyer name: Tyra Ramdharee.
No email, phone, or physical address for submission is provided in the extracted text.
Submission Guidelines
Source: SDL AND I.zip (unknown)
Complete and submit the SDL&I Bidder’s Document.
Provide a valid B-BBEE certificate from a SANAS accredited verification agency, a valid sworn affidavit, or a valid B-BBEE Certificate issued by CIPC for EME companies.
Submit your CIPC Registration Document.
Include identity documents of shareholders/owners/members.
Provide share certificates where applicable.
Submit latest financial statements corresponding to the financial date on the sworn affidavit.
Note: SBD 6.2, Annexure C, Annexure D, Annexure E, proof of sub-contracting agreements, and sub-contractor B-BBEE certificates are marked as N/A for this tender.
Ensure all documents are correctly completed and signed to avoid disqualification.
Evaluation Criteria
Source: SDL AND I.zip (unknown)
Evaluation uses a preference points system based on price and B-BBEE status (specific goals).
Maximum points for specific goals: 10 points (90/10 system) or 20 points (80/20 system).
B-BBEE status level points are allocated as per the table in the document.
To claim preference points, submit valid B-BBEE documentation.
If documentation is not provided, you score only on price and 0 on specific goals.
Objective criteria (e.g., local content, CIDB skills development) are conditions for contract award but not mandatory for evaluation.
Companies must be legally registered in South Africa (CIPC).
B-BBEE compliance is a condition for award; level determines preference points.
Financial thresholds apply for B-BBEE documentation: ≤R10m revenue (Exempted Micro Enterprise) can submit sworn affidavit; ≤R50m (Qualifying Small Enterprise) specific rules; >R50m requires full B-BBEE certificate.
No mandatory subcontracting for this contract (value < R30m).
CIDB skills development is not applicable.
Technical Specifications
Source: SDL AND I.zip (unknown)
Scope: Low voltage (LV) maintenance, breakdown, planned maintenance, and replace functions on an as-and-when-required basis in the Free State Operating Unit.
Duration: 36 months.
The tender is for a panel of 8 contractors.
Note: Technical specifications beyond scope and duration are not detailed in the extracted text.
Financial Requirements
Source: SDL AND I.zip (unknown)
Budget: R16,699,277.
No other financial requirements (e.g., pricing format, bonds, guarantees, payment terms) are specified in the extracted text.
Compliance Requirements
Source: SDL AND I.zip (unknown)
B-BBEE compliance is mandatory for contract award.
Submit a valid B-BBEE certificate, sworn affidavit, or CIPC-issued B-BBEE certificate for EMEs.
B-BBEE status level determines preference points (see evaluation criteria).
For Exempted Micro Enterprises (annual total revenue ≤ R10 million): submit a sworn affidavit.
For Qualifying Small Enterprises (annual total revenue ≤ R50 million): comply with QSE scorecard elements or submit a sworn affidavit if at least 51% black owned.
For entities with annual total revenue > R50 million: submit a valid B-BBEE certificate.
Local content requirements: SBD 6.2 Declaration Form and Annexure C are tender returnables and a condition for contract award.
CIDB skills development: Failure to meet CIDB CSDG mandatory percentage will render the tender non-responsive.
Note: Tax clearance, CSD registration, and other standard compliance items are not mentioned.
DocumentPART FOUR - QUALITY REQUIREMENT.zipReview complete
Description
Source: PART FOUR - QUALITY REQUIREMENT.zip
This document is the Supplier Quality Management Specification (240-105658000), also referenced as QM 58. It applies to Eskom Holdings SOC Ltd and its suppliers/sub-suppliers.
Purpose: To specify minimum quality requirements for existing and potential Eskom suppliers, defining criteria for selection, evaluation, registration, management, monitoring, assessment, and auditing.
Scope: Requires suppliers to develop, implement, maintain, and continually improve a QMS based on ISO 9001 to ensure conformity with Eskom quality requirements throughout a contract.
Applicability: Applies to all Eskom divisions, subsidiaries, suppliers, and sub-suppliers, forming part of all RFI/RFQ/RFP and procurement contracts.
Key sections include supporting clauses (definitions, abbreviations, roles), pre-contract award quality requirements (QMS, quality plans, CQP, QCP, categories), post-contract award requirements (execution, monitoring, audits), and standard conditions (rights of access, information, preservation, audits, nonconformities, special processes).
Important Dates
Source: PART FOUR - QUALITY REQUIREMENT.zip (unknown)
Closing date: 2026-07-27 at 10:00. No other dates (e.g., briefings, site visits, clarification deadlines) are stated in the document.
Contact Information
Source: PART FOUR - QUALITY REQUIREMENT.zip (unknown)
No specific contact names, emails, phones, or submission addresses are provided in the document. Refer to the tender documentation for submission details.
Submission Guidelines
Source: PART FOUR - QUALITY REQUIREMENT.zip (unknown)
Returnable Documents (Category 3):
Complete and sign Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001).
Submit objective evidence of a developed QMS compliant with ISO 9001, including: a QMS manual or document defining the QMS scope, a signed quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, and nonconformity and corrective action procedure.
Submit a draft Contract Quality Plan specific to the scope of work, addressing minimum requirements per ISO 10005.
Submit an example Inspection and Test Plan (ITP) or Quality Control Plan (QCP) on similar or previous work.
Submit documented information for Control of Externally Provided Processes, Products and Services.
Submit documented information for roles, responsibilities, and authorities (e.g., organization charts, job descriptions).
Ensure all documents are signed/approved where required.
Evaluation Criteria
Source: PART FOUR - QUALITY REQUIREMENT.zip (unknown)
Evaluation is based on the Supplier Quality Management Specification (240-105658000).
Category 3 requires a developed QMS compliant with ISO 9001 (not necessarily certified).
The QMS must be evidenced by documented information as listed in the returnables.
A draft Contract Quality Plan (CQP) per ISO 10005 is required.
An example ITP/QCP for similar work is required.
The supplier must demonstrate capability to manage sub-suppliers and implement quality plans.
Post-award, the supplier will be monitored for quality performance and may be audited.
Technical Specifications
Source: PART FOUR - QUALITY REQUIREMENT.zip (unknown)
Scope: Low voltage (LV) breakdown, planned maintenance, and replace function services in the Free State Operating Unit on an as-and-when-required basis for 36 months.
Quality Requirements (Category 3):
Develop, implement, and maintain a QMS compliant with ISO 9001:2015.
Submit a draft Contract Quality Plan (CQP) specific to the scope, following ISO 10005.
Submit an example Inspection and Test Plan (ITP) or Quality Control Plan (QCP) for similar work.
Provide documented information for Control of Externally Provided Processes, Products and Services.
Provide documented information for roles, responsibilities, and authorities (e.g., organization charts).
The specification details requirements for quality plans, contract quality plans, quality control plans, and special processes.
Compliance Requirements
Source: PART FOUR - QUALITY REQUIREMENT.zip (unknown)
B-BBEE Minimum Level: 1. The document references the Preferential Procurement Policy Framework Act (PPPFA) and CIDB 1004 for evaluating quality in tender submissions. No specific tax, CSD, CIDB, CIPC, or professional registration requirements are stated. Suppliers must comply with Eskom's quality management specifications.
Section
Source: PART FOUR - QUALITY REQUIREMENT.zip
The evaluation is based on Supplier Quality Management Specification 240-105658000.
The specification sets minimum quality requirements for selecting and evaluating suppliers.
It references ISO 9001, ISO 10005, ISO 9000, Eskom's SHEQ Policy, ISO 10006, PPPFA, CIDB 1004, and the List of Tender Returnables (240-12248652).
Key definitions include Contract Quality Plan, Hold Points, Intervention Points, and Inspection Agency.
The criteria cover pre-contract award requirements (e.g., QMS compliance, quality plans) and post-contract award monitoring.
DocumentENVIRONMENTAL.zipReview complete
Description
Source: ENVIRONMENTAL.zip
The tender submission will be scored: 0 = Document not submitted OR submitted but does not satisfy the minimum requirements; 1 = Document submitted and the content satisfies the minimum requirements.
Submission Guidelines
Source: ENVIRONMENTAL.zip (unknown)
Submit the signed acknowledgement of Eskom's SHE rules and requirements form (Annexure B) with your tender submission.
Ensure all required environmental documents are attached as per the tender requirements.
Evaluation Criteria
Source: ENVIRONMENTAL.zip (unknown)
Scoring is based on submission of required documents: 0 = not submitted or does not meet minimum requirements; 1 = submitted and meets minimum requirements.
Pre-requisite: Signed Annexure B (acknowledgement of Eskom's SHE rules) must be included.
For medium risk work, provide an Environmental Management Plan covering waste management, environmental induction, incident management, and emergency planning.
For medium/high risk, provide identification of environmental aspects and impacts with methodology and controls.
Provide an Environmental (or SHE/SHEQ) policy signed by Company Owner/CEO/MD, committing to compliance and duty of care.
Alternatively, submit an ISO 14001 Environmental Management Standard certificate.
Technical Specifications
Source: ENVIRONMENTAL.zip (unknown)
The tender is for low voltage (LV) breakdown, planned maintenance, and replacement services in the Free State Operating Unit.
The agreement is for a panel of 08 contractors, on an as-and-when-required basis, for a period of 36 months.
Contractors must demonstrate capability in medium-risk electrical work and strong environmental management.
Compliance Requirements
Source: ENVIRONMENTAL.zip (unknown)
No specific compliance requirements found beyond the environmental and SHE documentation.
DocumentS1 TECHNICAL CRITERIA.zipReview complete
Description
Source: S1 TECHNICAL CRITERIA.zip
An enabling agreement for a panel of 08 contractors for the provision of services for S1 low voltage (LV) breakdown, planned maintenance and replace function on an as-and-when required basis in the Free State Operating Unit, for a period of thirty-six (36) months.
Contact Information
Source: S1 TECHNICAL CRITERIA.zip (unknown)
For the accredited service provider list, send an empty email to [email protected].
Submission Guidelines
Source: S1 TECHNICAL CRITERIA.zip (unknown)
Returnable documents must be submitted as hard copies, legible, and certified by legal authorities.
All documents must be valid at the time of submission and comply with South African Government requirements.
Failure to provide stipulated evidence will result in the submission being unsuccessful.
Mandatory criteria must achieve a 'Yes' to proceed to Phase 1 scoring; a 'No' on any mandatory criterion renders the submission non-responsive.
Evaluation Criteria
Source: S1 TECHNICAL CRITERIA.zip (unknown)
Evaluation is conducted in two phases: Phase 1 is a desktop paper evaluation; Phase 2 is a physical verification at the contractor's premises.
Mandatory criteria (Table 1) must be met with a 'Yes' to proceed; otherwise, the submission is non-responsive.
Phase 1 scoring is based on the following categories and weights:
Low Voltage Operator training: 40 points
Machine Operator: 5 points
Crane Operator: 5 points
Tools and Equipment: 20 points
Personal Protective Equipment: 10 points
Mobile and Trucks: 20 points
Scoring is full marks or zero; no partial marks.
The threshold is 90%, but Eskom reserves the right to lower it to 70% if there are inadequate qualifying submissions.
Technical Specifications
Source: S1 TECHNICAL CRITERIA.zip (unknown)
Scope: Provision of low voltage (LV) breakdown, planned maintenance, and replace function on an as-and-when required basis in the Free State Operating Unit.
Mandatory technical criteria:
Wireman's Licence or Installation Electrician registered with the Department of Labour, including proof of completed EWSETA unit standards.
Company organogram with signed employee appointment letters and proof of company induction.
Required tools and equipment (with asset register and clear pictures):
Electrician toolbox/insulated tools, hand drill, compactor, fibre glass step ladder, come along, lever hoist, sling, fire extinguisher, hydraulic crimping tool, work site cones (3), multimeter/line tester, tools carrying bag and handline, telescopic link stick, pick and shovel.
Required vehicles:
Truck with crane, owned and validly registered in the tendering company's name.
Vehicle to carry team, equipment, tools, and ladder (with rack).
Personal protective equipment (with asset register and photos):
FAS and rescue, face shield, 1000V rubber gloves.
Compliance Requirements
Source: S1 TECHNICAL CRITERIA.zip (unknown)
Mandatory: Valid Wireman's Licence or Installation Electrician registration with the Department of Labour.
All documents must be certified, valid, and comply with South African Government requirements.
B-BBEE minimum level: 2.
Section
Source: S1 TECHNICAL CRITERIA.zip
Evaluation is in two phases: Phase 1 is a desktop paper evaluation; Phase 2 is physical verification at the contractor's premises.
Mandatory criteria must achieve a 'Yes' to proceed to Phase 1 scoring; a 'No' on any criterion renders the submission non-responsive.
Scoring is full marks or zero, no partial marks.
Threshold is 90% (Eskom reserves the right to lower to 70% if inadequate submissions pass).
Phase 1 desktop evaluation covers:
Low Voltage Operator training (40 points)
Machine Operator (5 points)
Crane Operator (5 points)
Tools & Equipment (20 points)
Personal Protective Equipment (10 points)
Mobile & Trucks (20 points)
DocumentBOQ -.zipReview complete
Description
Source: BOQ -.zip
Provision of services for S1 Low Voltage (LV) breakdown, planned maintenance, and replacement functions in the Free State Operating Unit (FSOU).
Services are required on an as-and-when-required basis for a period of thirty-six (36) months.
Evaluation Criteria
Source: BOQ -.zip (unknown)
Multi-stage evaluation process indicated by 'ASSESSMENT STAGE 2' and 'ASSESSMENT STAGE 3' in the BOQ.
Contractors must demonstrate capability to perform LV electrical work, adhere to OHS Act No 85 of 1993 and Construction Regulations, comply with Eskom safety specifications, provide personnel with appropriate authorization levels, and have resources for transport and equipment as per BOQ.
Financial capacity to handle variable work orders is implied.
Technical Specifications
Source: BOQ -.zip (unknown)
Scope: Provision of services for S1 Low Voltage (LV) breakdown, planned maintenance, and replacement functions in the Free State Operating Unit (FSOU) on an as-and-when-required basis.
Key deliverables include:
Site establishment, health, safety, and environmental compliance.
Supply of site personnel (e.g., FULL AUTHORISED person, RESPONSIBLE PERSON, LV AUTHORISED person).
Installation and maintenance of LV structures, pole top boxes, pre-paid meters, split meters, and associated hardware.
Pegging, excavation, and planting of poles, stays, and struts.
Installation of rural metering kiosks (LPU/SPU).
Stringing of LV conductors and cable trenching/jointing.
Dismantling/decommissioning of networks.
Work must comply with Eskom distribution standards (parts 8 & 22), OHS Act No 85 of 1993, Construction Regulations, and Eskom Safety Specifications.
All cables must be tested in accordance with Technical Instruction 04TI-20 REVISION 0.
Items are re-measurable and require 'as-built' drawings.
Financial Requirements
Source: BOQ -.zip (unknown)
Pricing must be provided per line item in the Bill of Quantities (BOQ).
Labour rates are required per hour (/H) or per team (/Team) for various personnel categories.
Compensation clauses are specified for Eskom or contractor negligence related to outages or access delays.
Material supply claims require original invoices (or certified copies) and signed site instructions from Eskom.
A site establishment cost is set at 10% of labour and transport.
A health and safety cost is set at 5% of labour.
Compliance Requirements
Source: BOQ -.zip (unknown)
Contractor must maintain all health and safety measures as required by the OHS Act No 85 of 1993 and regulations.
Site establishment must comply with health, safety, environmental, and site establishment requirements in the NEC.
Completion and submission of an Expanded Public Works Report is required.
Section
Source: BOQ -.zip
The tender document references 'ASSESSMENT STAGE 2' and 'ASSESSMENT STAGE 3', indicating a multi-stage evaluation process.
Specific evaluation criteria details are not provided in the extracted text.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.