Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Eskom National Transmission Company of South AfricaLocation
Gauteng
Closing Date
26 Aug 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Simmerpan - Germiston - Gauteng - 1401
Organization Type
GOVERNMENT
Published
04 Aug 2026
OCDS Reference
ocds-9t57fa-164494
This tender from ESKOM national transmission company of south africa (ntcsa) seeks a contractor for the space optimization of the 2nd floor engineering building in simmerpan, germiston, gauteng. The project involves demolishing existing layouts, creating focus booths and open workstations, installing new furniture, and redoing electrical works to accommodate 50 workstations. Bidders must comply with stringent she (safety, health, and environmental) requirements and be registered as electrical installation contractors.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 26 August 2026 - 11:00
Venue
Simmerpan Telecommunications Field and Ops Boardroom
Categories
Request for Bid(Open-Tender)
Simmerpan - Germiston - Gauteng - 1401
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: Engineering Building Final 02.pdf, 20250510_Method Statement_Cat 4 Tender Returnables.docx, Eng Building Space Optimisation - Env Requirements Proforma.docx. You don’t need to refresh — this page will pick up the updated review automatically.
04 Aug
2026
Tender Published
Tender was published
26 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Engineering Building Final 02.pdf
ENGINERRING BUILDING door (ESKOM HOLDINGS)-Model-CL0.pdf
This tender from Eskom National Transmission Company of South Africa (NTCSA) is for the optimization and refurbishment of the engineering building space at Simmerpan, Gauteng. The scope includes the supply and installation of various timber doors (types B02-B08), aluminum windows (VP01), and associated ironmongery, with detailed specifications for fire-rated doors, frames, and compliance with SANS 10400. The project also involves drainage and plumbing work, with all dimensions to be verified on site and discrepancies reported to the architect.
NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf
This tender is for the optimization of the Simmerpan engineering building space, issued by Eskom National Transmission Company of South Africa. The document provided is an acknowledgment form for e-tendering training, indicating that bidders must confirm they have completed self-training on the e-Tendering system before submitting a bid.
20260510_Space Optimization of List of Tender Returnables_Cat 4.pdf
Eskom National Transmission Company of South Africa invites tenders for the space optimization of the 2nd Floor Engineering Building at Simmerpan to accommodate 50 workstations. The tender focuses on quality management system compliance, requiring documented ISO 9001-aligned processes, quality deliverables, and proof of relevant experience.
NEC ECSC- Engineering Building Space Optimization .pdf
Analysis completed but response format was invalid
559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdf
This document is a post-contract award SHEQ (Safety, Health, Environment, and Quality) requirement checklist for the Simmerpan Engineering Building Space Optimization project by Eskom National Transmission Company of South Africa. It outlines the mandatory SHEQ documentation and compliance items that the contractor must submit for approval before commencing work, covering OHS, environmental, and quality management requirements.
PAYE Questionnaire for Service Contracts 2026_2027.doc
This document is a PAYE (Pay-As-You-Earn) questionnaire for service contracts with Eskom Group of Companies, specifically for the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION tender. It is used to determine the tax classification of contractors (whether they are independent contractors, personal service providers, labour brokers, or dependent contractors) for the 2026/2027 tax year. The questionnaire must be completed by companies, close corporations, trusts, or individuals providing services to Eskom, and includes various tests (residence, employee count, income concentration, place of control, and dominant impression) to establish the correct tax treatment.
Safety,_Health,_Environment_and_Quality_(SHEQ)_Policy.pdf
This tender is for the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION project, issued by Eskom National Transmission Company of South Africa (NTCSA) in Gauteng. The document provided is Eskom's Safety, Health, Environment and Quality (SHEQ) Policy (Revision 5), which outlines the mandatory safety, health, environmental, and quality standards that all contractors and suppliers must comply with when working for Eskom. The policy emphasizes zero harm, zero defects, adherence to ISO 9001, ISO 14001, and ISO 45001, and strict compliance with legal and other requirements.
Contract and Contractor OHS Management.pdf
This document is Eskom's Contract and Contractor OHS Management standard (32-726), which outlines the minimum Occupational Health and Safety (OHS) requirements that suppliers/contractors must comply with throughout the entire contract lifecycle, from project initiation and design through tender, site mobilisation, execution, and post-contract review. It applies to all Eskom divisions and subsidiaries and is relevant to the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION tender. The standard emphasises Eskom's 'Zero Harm' commitment and integrates OHS into procurement processes, requiring contractors to submit OHS documentation, comply with South African legislation, and undergo evaluations before and during contract execution.
AM OHS Contractor Baseline risk assessment.xlsx
This tender is for the optimization of space in the Simmerpan Engineering Building, issued by Eskom National Transmission Company of South Africa. The document primarily contains an Occupational Health and Safety (OHS) baseline risk assessment template, which is a mandatory part of the tender submission. It outlines a wide range of potential hazards and risks associated with the work, including driving, cleaning, working at heights, handling hazardous chemicals, electrical work, plumbing, and emergency preparedness. The tender requires contractors to acknowledge and comply with these risk assessments, implement controls, and adhere to all relevant South African legislation and Eskom procedures.
Engineering Building Space Optimization Project OHS Tender Evaluation.pdf
This tender from Eskom National Transmission Company of South Africa (NTCSA) is for the Simmerpan Engineering Building Space Optimization project. It is classified as high-risk work and requires a comprehensive Occupational Health and Safety (OHS) submission. The tender evaluation focuses on the tenderer's ability to manage safety, health, and environmental risks, with detailed documentation and costing required.
NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf
This document is a Non-Disclosure Agreement (NDA) template provided by the National Transmission Company South Africa (NTCSA) for vendors participating in a tender for the 'SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION' project. The NDA outlines the terms under which confidential information will be shared between NTCSA and the vendor, emphasizing confidentiality, non-disclosure, and the protection of proprietary information. The tender itself is for space optimization at the Simmerpan Engineering Building, with a closing date of August 26, 2026.
Scope of work Engineering Building - 25.03.26 M.N.pdf
Eskom National Transmission Company of South Africa seeks a contractor to optimize space on the 2nd floor of the Simmerpan Engineering Building in Germiston, Gauteng. The project involves renovating the PTM&C and Quality Management sections to create 50 non-dedicated workstations, focus booths, syndicate rooms, and support spaces. Works include demolition, drywalling, electrical rewiring (LED lighting, occupancy sensors, emergency lights, new DB with SPD), LAN point installation, air conditioning repositioning, full recarpeting, tiling of kitchen and bathrooms, and new furniture. The closing date is 26 August 2026 at 11:00 UTC.
20260510_Space Optimization of 2nd_Form A_Cat 4_ Rev 9.docx
This tender from Eskom National Transmission Company of South Africa seeks a contractor to optimize the 2nd floor of the Simmerpan Engineering Building to accommodate 50 workstations. The tenderer must acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 standards. The document includes a quality requirements checklist that the tenderer must complete, indicating applicability of various clauses.
Final SHEQ specification Engineering Space Optimization Rev 1.pdf
This tender is for the space optimization of the 2nd Floor Engineering Building at Simmerpan, Germiston, for Eskom National Transmission Company of South Africa (NTCSA). The project involves redesigning the floor to accommodate 50 workstations, including demolition of existing office/printing areas, installation of new workstations (Type H), focus booths, a kitchenette, and a syndicate room. It also includes electrical rewiring along skirting and upgrading ceiling lights to LEDs. The contractor must comply with extensive SHE (Safety, Health, and Environment) requirements, including developing a SHE Plan, conducting risk assessments, and adhering to OHS Act regulations.
Eskom Standard Conditions of Tender on e-tendering.pdf
This tender is for the optimization of space in the Simmerpan Engineering Building, issued by Eskom National Transmission Company of South Africa. The document outlines the standard conditions of tender, including submission requirements, evaluation criteria, and compliance obligations. Tenders must be submitted electronically via the Eskom Tender Bulletin site by the closing date. The process emphasizes ethical conduct, transparency, and cost-effectiveness.
Engineering Building Space Optimization Technical Evaluation Criteria.pdf
This tender from Eskom National Transmission Company of South Africa seeks a contractor for the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION project in Gauteng. The evaluation is two-stage: mandatory criteria (gatekeepers) and qualitative criteria (weighted). Bidders must meet all mandatory criteria to proceed, and must score at least 70% in the qualitative stage to be considered technically compliant.
240-77471499 Annexure B.pdf
This tender from Eskom National Transmission Company of South Africa is for the optimization of space in the Simmerpan Engineering Building. The document provided is primarily an acknowledgement form for Eskom's Occupational Health and Safety (OHS) legal and other requirements, which the supplier/contractor/tenderer must understand and comply with. The closing date is August 26, 2026.
Space opt Tender BOQ.xlsx
Eskom National Transmission Company of South Africa (NTCSA) is tendering for the space optimization of the 2nd floor Engineering Building at the Simmerpan Complex in Gauteng. The project aims to accommodate 50 workstations and includes alterations, building works, electrical works, and associated services. The contract is valued at R500,000 (excluding VAT) and is governed by the NEC Engineering Construction Short Contract. The scope includes removal of existing ceilings, partitioning, and floor coverings; installation of new doors, fire doors, ceilings, partitions, floor coverings, ironmongery, sanitary fittings, and electrical works; and compliance with SHEQ requirements.
240-105658000 Supplier Quality Management Specification (3).pdf
This tender is for the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION project by Eskom National Transmission Company of South Africa. The document provided is the Supplier Quality Management specification (240-105658000, QM 58) which outlines the minimum quality requirements for suppliers. It mandates that suppliers develop, implement, and maintain a Quality Management System (QMS) conforming to ISO 9001, and defines four categories of quality requirements (Category 1 to 4) with specific returnable documents. The specification covers pre-contract award requirements, including quality plans, contract quality plans, quality control plans/inspection and test plans, and supplier capability assessments. It also details post-contract award obligations such as audits, nonconformity management, and special processes.
Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdf
This tender from Eskom National Transmission Company of South Africa is for the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION project. The document provided is the 'Environmental Requirements for Contractors and/or Suppliers' standard, which outlines the environmental management obligations that contractors and suppliers must comply with when working for Eskom Transmission. It details a six-phase contractor environmental management model covering design, tender, registration, site mobilization, execution, and post-contract review, emphasizing the need for an Environmental Management System (EMS), compliance with South African environmental legislation, and adherence to Eskom's Zero Harm culture.
Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdf
This tender is for the optimization of space in the Simmerpan Engineering Building, issued by Eskom National Transmission Company of South Africa. The document provided is Eskom's SHEQ Policy, which outlines the safety, health, environment, and quality standards that all contractors and suppliers must adhere to when working with Eskom. The policy emphasizes compliance with ISO standards, zero harm, and continuous improvement.
Eng Building Space Optimisation - Env Management Tender Returnable Contractors or Service Providers (1).xls
This tender by Eskom National Transmission Company of South Africa seeks contractors for the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION project in Gauteng. The document primarily focuses on environmental management requirements, requiring bidders to demonstrate compliance with ISO 14001:2015 through either valid certification (Option 1) or documented EMS (Option 2). Bidders must submit various environmental documents including an EMS manual, environmental policy, waste management plan, aspect and impact register, and environmental management programme. The tender includes a weighted scoring system with a threshold of 80% for consideration.
32-95 rev 9.pdf
The document provided is not the actual tender specification for the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION project, but rather Eskom's Occupational Health and Safety (OHS) Incident Management Procedure (document 32-95, Rev 9). This procedure outlines the mandatory requirements for managing OHS incidents (including near-misses, injuries, fatalities, and occupational diseases) across all Eskom operations. For the tender, this means that any contractor or employee involved in the project must comply with this incident management procedure, including incident identification, emergency response, notification, prioritisation, classification, investigation, corrective actions, and close-out. The tender itself likely requires adherence to this OHS framework as part of the contractual obligations.
20250510_Method Statement_Cat 4 Tender Returnables.docx
This tender by Eskom National Transmission Company of South Africa seeks a contractor for the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION project in Gauteng. The document is a method statement template that requires bidders to detail their approach to scope, objectives, customer focus, competency, infrastructure, leadership, risk management, process improvement, data analysis, and stakeholder/supplier management. The closing date is August 26, 2026.
NTCSA_E-tendering Help Manual for supplier.pdf
The document is a user manual for Eskom's eTendering system, not the actual tender specification for the Simmerpan Engineering Building Space Optimization. It explains how suppliers can register, log in, upload tender documents, and finalize submissions electronically. The tender itself is for space optimization at the Simmerpan engineering building, with a closing date of August 26, 2026.
PAYE Questionnaire for Service Contracts - 2026_2027.xls
The tender document for the Simmerpan Engineering Building Space Optimization project by Eskom National Transmission Company of South Africa appears to be corrupted or improperly encoded, containing mostly binary or garbled data. The only readable metadata indicates the tender title, organization, province (Gauteng), and closing date (August 26, 2026). No substantive requirements, specifications, or evaluation criteria are discernible from the provided content.
Eng Building Space Optimisation - Env Requirements Proforma.docx
This tender from Eskom National Transmission Company of South Africa seeks contractors for the Simmerpan Engineering Building Space Optimization project in Gauteng. The document focuses heavily on environmental compliance, requiring contractors to adhere to Eskom's environmental management plans, standards, and legal requirements, and to maintain specific registers and documentation on site.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 1 983 750
Range
Based on 21 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: 240-105658000 Supplier Quality Management Specification (3).pdfImportant Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Methodology
Source: 240-105658000 Supplier Quality Management Specification (3).pdfExperience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdfQuality Management
Source: 240-105658000 Supplier Quality Management Specification (3).pdfPricing Schedule
Source: 240-105658000 Supplier Quality Management Specification (3).pdfFinancial Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Health & Safety
Source: 240-105658000 Supplier Quality Management Specification (3).pdfContractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdfSection
Source: 240-105658000 Supplier Quality Management Specification (3).pdfSubmission Guidelines
Source: Engineering Building Final 02.pdf (unknown)Returnable Documents: The tender document requires submission of returnable documents as specified in the document. Ensure all required forms and attachments are completed and submitted before the closing time. Late submissions will be disqualified.
Compliance Requirements
Source: Engineering Building Final 02.pdf (unknown)Insufficient searchable text - AI extraction recommended. The document text is not fully searchable; it is recommended to use AI extraction to identify compliance requirements such as CSD registration, tax clearance, B-BBEE, CIDB grading, and other mandatory documents.
Description
Source: Contract and Contractor OHS Management.pdfImportant Dates
Source: Contract and Contractor OHS Management.pdf (unknown)Contact Information
Source: Contract and Contractor OHS Management.pdf (unknown)Submission Guidelines
Source: Contract and Contractor OHS Management.pdf (unknown)Returnable Documents
Source: Contract and Contractor OHS Management.pdf (unknown)Evaluation Criteria
Source: Contract and Contractor OHS Management.pdf (unknown)Technical Specifications
Source: Contract and Contractor OHS Management.pdf (unknown)Methodology
Source: Contract and Contractor OHS Management.pdf (unknown)Experience & Qualifications
Source: Contract and Contractor OHS Management.pdfQuality Management
Source: Contract and Contractor OHS Management.pdfFinancial Requirements
Source: Contract and Contractor OHS Management.pdf (unknown)Compliance Requirements
Source: Contract and Contractor OHS Management.pdf (unknown)Health & Safety
Source: Contract and Contractor OHS Management.pdfEnvironmental
Source: Contract and Contractor OHS Management.pdfContractual Terms
Source: Contract and Contractor OHS Management.pdfSpecial Conditions
Source: Contract and Contractor OHS Management.pdf (unknown)Requirements
Source: Contract and Contractor OHS Management.pdf (unknown)Section
Source: Contract and Contractor OHS Management.pdfSubmission Guidelines
Source: 20250510_Method Statement_Cat 4 Tender Returnables.docx (unknown)Returnable documents: A completed Method Statement using the provided template is required. The template must include: title (as per tender/RFQ title), supplier representative details, originator, reviewer, approver, designation, contact number, date, client division/operating/business unit, tender/RFQ/contract number, activity, detailed description, reference document/procedure, area/dept/discipline, scope of work, objectives, and responses to quality management questions. Ensure all sections are filled in and signed where applicable.
Evaluation Criteria
Source: 20250510_Method Statement_Cat 4 Tender Returnables.docx (unknown)The document does not explicitly list scoring criteria, but bidders must demonstrate capability to deliver the scope of work as described in the NEC/RFQ. Evaluation will likely consider: relevant competencies and training, availability of required infrastructure (PPE, tools, equipment), quality management approach, risk management, and stakeholder/supplier management. Bidders should provide a detailed method statement addressing all template sections to show compliance with Eskom's quality and safety standards.
Technical Specifications
Source: 20250510_Method Statement_Cat 4 Tender Returnables.docx (unknown)Scope: Simmerpan engineering building space optimization. The method statement must outline: scope of work as per the contract document/order/tender, 2-3 SMART objectives related to outputs, customer needs identification and communication, required skills/competencies/training, PPE required, tools/equipment/infrastructure (including testing/measurements), organizational mission/vision/values, risk identification and mitigation, process improvement actions, data collection and analysis for future decisions, stakeholder management (including affected parties, impact level, actions), outsourcing details, and supplier selection/evaluation/monitoring.
Compliance Requirements
Source: 20250510_Method Statement_Cat 4 Tender Returnables.docx (unknown)No specific compliance requirements are stated in the document. However, bidders must comply with Eskom's quality management and safety standards as implied by the method statement template. Ensure CSD registration and other standard Eskom requirements are met, though not explicitly listed here.
Description
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdfThe document is a Non-Disclosure Agreement (NDA) template used by NTCSA for vendor engagements. It does not describe the Simmerpan engineering building space optimization project scope. The NDA is intended to protect confidential information shared between NTCSA and the vendor for the purpose of the Project.
Contact Information
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown)The NDA lists NTCSA's registered office: Megawatt Park, Maxwell Drive, Sunninghill ext.3, Sandton, Republic of South Africa. Postal address: P O Box 1091, Johannesburg, 2000. Telephone and fax numbers are partially redacted (+27 11 800 ....). No specific contact person or email is provided. For tender-specific contacts, refer to the main tender documentation.
Submission Guidelines
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown)The document provided is a Non-Disclosure Agreement (NDA) template, not the full tender submission guidelines. It does not specify how or where to submit the tender, the deadline, or required returnable forms beyond the NDA itself. The NDA must be signed by an authorized representative of the vendor. Ensure the NDA is completed and signed as part of the tender submission, but refer to the main tender documentation for full submission instructions.
Evaluation Criteria
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown)The document does not specify evaluation criteria for the tender. It only outlines the NDA terms. The vendor must be a legal entity capable of entering into a binding agreement, and the NDA must be signed by an authorized representative (for NTCSA, no lower than an E-Band Manager). No scoring method, preference points, or thresholds are provided.
Technical Specifications
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown)The document is an NDA and does not contain technical specifications for the Simmerpan engineering building space optimization project. It defines 'Confidential Information' broadly, including technical, commercial, financial, and marketing information, strategies, operations, know-how, trade secrets, processes, machinery, designs, drawings, formulae, test work data, equipment, notes, memoranda, methods, and other technical specifications and data relating to the Project. The NDA restricts the use of such information solely for the Project.
Compliance Requirements
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown)The NDA requires the vendor to be a legal entity capable of entering into a binding agreement. The vendor must sign the NDA, and for NTCSA, the signatory must be no lower than an E-Band Manager. The NDA includes confidentiality obligations, indemnification for unauthorized disclosure, and obligations to return or destroy confidential information upon request. No specific compliance requirements such as CSD, tax, B-BBEE, CIDB, or CIPC are mentioned in this document.
Contractual Terms
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdfThe NDA also includes standard boilerplate clauses:
Evaluation Criteria
Source: PAYE Questionnaire for Service Contracts - 2026_2027.xls (unknown)Not specified in the provided content. Typically, Eskom tenders require bidders to be registered on the Central Supplier Database (CSD), have relevant experience in similar projects, and comply with South African tax and BBBEE regulations, but this cannot be confirmed from the corrupted document.
Technical Specifications
Source: PAYE Questionnaire for Service Contracts - 2026_2027.xls (unknown)This will save your file. Please select the correct folderA@
Compliance Requirements
Source: PAYE Questionnaire for Service Contracts - 2026_2027.xls (unknown)No specific requirements found
Description
Source: 20260510_Space Optimization of 2nd_Form A_Cat 4_ Rev 9.docxThe tenderer must complete and sign the form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard. The project involves space optimization of the 2nd Floor Engineering Building, Simmerpan, to accommodate 50 workstations.
Submission Guidelines
Source: 20260510_Space Optimization of 2nd_Form A_Cat 4_ Rev 9.docx (unknown)Complete and sign the tenderer's quality representative section (Section E) of Form A. Acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 standard. Ensure the form is fully completed and submitted before the closing date.
Evaluation Criteria
Source: 20260510_Space Optimization of 2nd_Form A_Cat 4_ Rev 9.docx (unknown)Tenderer must meet Eskom's supplier quality requirements for Category 4 (as per clause 3.5.5 of 240-105658000). Must have a designated quality representative to sign the form. Compliance with ISO 9001 principles is implied. No other explicit eligibility criteria are provided in the document.
Technical Specifications
Source: 20260510_Space Optimization of 2nd_Form A_Cat 4_ Rev 9.docx (unknown)Scope: Space optimization of the 2nd Floor Engineering Building, Simmerpan, to accommodate 50 workstations. Tenderer must complete and sign the form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard. Quality requirements include pre-contract award quality requirements (Category 4), post-contract award contract execution, supplier quality performance monitoring, and standard conditions such as Eskom rights of access, rights to information, preservation, quality audits, management of nonconformities, and special processes.
Compliance Requirements
Source: 20260510_Space Optimization of 2nd_Form A_Cat 4_ Rev 9.docx (unknown)No specific compliance requirements found in the document. However, the tenderer must accept Eskom Supplier Quality Requirements and ISO 9001 standard.
Description
Source: Engineering Building Space Optimization Technical Evaluation Criteria.pdfThe tender is for engineering building space optimization. The technical evaluation focuses on company profile, track record, key personnel, and method statement.
Evaluation Criteria
Source: Engineering Building Space Optimization Technical Evaluation Criteria.pdf (unknown)Stage 1: Mandatory criteria (gatekeepers) are 'must meet' criteria. Assessed on a Yes/No basis. A 'No' against any criterion results in immediate technical disqualification and no further evaluation.
Stage 2: Qualitative evaluation criteria are weighted. Minimum weighted final score required is 70%.
Qualitative criteria weights and scoring:
Technical Specifications
Source: Engineering Building Space Optimization Technical Evaluation Criteria.pdf (unknown)Scope: Engineering building space optimization. The document focuses on technical evaluation criteria rather than detailed technical specifications. Bidders must demonstrate capability in electrical, plumbing, carpentry, and building works as per key personnel requirements.
Methodology
Source: Engineering Building Space Optimization Technical Evaluation Criteria.pdfMethod statement (15% weight): Provide a detailed initial method statement with projected timelines, potential risks, and mitigation. Scoring: 5 = detailed plan providing methodology, project timelines, resources, and hours for the project, risks; 4 = project method statement not fully articulated, missing some components; 2 = poorly documented method statement, missing 50% of components; 0 = more than 50% of components missing or not submitted.
Experience & Qualifications
Source: Engineering Building Space Optimization Technical Evaluation Criteria.pdfKey personnel requirements:
Company track record: Provide table listing similar projects/contracts completed within last five years, with reference letters, appointment letters, purchase/task orders with written confirmation of completion from client.
Compliance Requirements
Source: Engineering Building Space Optimization Technical Evaluation Criteria.pdf (unknown)Mandatory registrations:
If any part of the scope is subcontracted, a letter of intent between the parties must be provided.
Failure to meet any mandatory criterion results in immediate disqualification.
Requirements
Source: Engineering Building Space Optimization Technical Evaluation Criteria.pdf (unknown)Mandatory requirements:
Failure to meet any mandatory criterion results in immediate disqualification.
Section
Source: Engineering Building Space Optimization Technical Evaluation Criteria.pdfEvaluation is conducted in two stages:
Stage 1: Mandatory criteria (gatekeepers) assessed on Yes/No basis. A 'No' results in immediate disqualification.
Stage 2: Qualitative criteria weighted. Minimum weighted final score required is 70%.
Qualitative criteria weights:
Description
Source: 240-77471499 Annexure B.pdfThe document is an acknowledgement form for Eskom OHS legal and other requirements. It requires the supplier/contractor to confirm understanding and compliance with OHS requirements when working at or rendering a service to Eskom.
Submission Guidelines
Source: 240-77471499 Annexure B.pdf (unknown)Returnable documents: Annexure B – Acknowledgement Form for Eskom OHS legal and other requirements, completed and signed.
Returnable Documents
Source: 240-77471499 Annexure B.pdf (unknown)The returnable document is the completed and signed Annexure B – Acknowledgement Form for Eskom OHS legal and other requirements. It must include:
Evaluation Criteria
Source: 240-77471499 Annexure B.pdf (unknown)The document does not specify general eligibility criteria (e.g., financial, technical) but implies that the tenderer must be a company or supplier capable of complying with Eskom's OHS requirements. The acknowledgement form requires the company/supplier name and the signature of an authorised person, indicating that the tenderer must be a registered entity with authorised representatives.
Technical Specifications
Source: 240-77471499 Annexure B.pdf (unknown)The document focuses on OHS compliance rather than technical specifications. It requires the main contractor/supplier to demonstrate the process and selection criteria for appointing contractors and suppliers, and to provide notification to Eskom prior to appointment for commencement of work.
Compliance Requirements
Source: 240-77471499 Annexure B.pdf (unknown)The supplier/contractor/tenderer must understand and comply with the following OHS requirements when working at or rendering a service to Eskom (not limited to):
Description
Source: Space opt Tender BOQ.xlsxSubmission Guidelines
Source: Space opt Tender BOQ.xlsx (unknown)Evaluation Criteria
Source: Space opt Tender BOQ.xlsx (unknown)Technical Specifications
Source: Space opt Tender BOQ.xlsx (unknown)Financial Requirements
Source: Space opt Tender BOQ.xlsx (unknown)Compliance Requirements
Source: Space opt Tender BOQ.xlsx (unknown)Submission Guidelines
Source: Eng Building Space Optimisation - Env Requirements Proforma.docx (unknown)Returnable Documents: The document is an Environmental Management Declaration proforma. Bidders must complete and sign this declaration as part of their submission. The declaration requires the following details: Name of the Organisation, Vendor Number, Contract Number, Scope of Work, and the full name, designation, contact number, signature, and date of the contractor's authorised representative. The Eskom Project Manager will also sign the declaration. Ensure the declaration is fully completed and signed before submission.
Evaluation Criteria
Source: Eng Building Space Optimisation - Env Requirements Proforma.docx (unknown)The document does not specify formal evaluation criteria such as scoring methods or minimum thresholds. However, bidders must be able to commit to the environmental management declaration and demonstrate capacity to manage environmental compliance on site. The ability to provide the required contact details and sign the declaration is essential. No preference points or evaluation stages are stated.
Technical Specifications
Source: Eng Building Space Optimisation - Env Requirements Proforma.docx (unknown)Scope of Work: Simmerpan engineering building space optimization. The document is an Environmental Management Declaration proforma. Contractors must adhere to the project Environmental Management Plan/Programme and/or Environmental Authorisation, and comply with Eskom's Environmental Requirements for Organizations (240-18100134). Contractors must comply with all applicable environmental legal and other requirements, and Eskom's environmental standards, policies, and procedures. Contractors must inform all staff of their role in managing environmental impacts on site. Incidents must be reported within 24 hours of occurrence. Contractors must implement environmental best practice on site during the contract and address all non-conformances promptly. Where applicable, the following documentation/registers must be kept on site and submitted to the Eskom Project Manager on completion: Copy of the approved project-specific Environmental File, Incident/complaint register, Herbicide and pesticide register, Hazardous substance (including solvents) register.
Compliance Requirements
Source: Eng Building Space Optimisation - Env Requirements Proforma.docx (unknown)No specific compliance requirements beyond the environmental management declaration are stated. The declaration requires commitment to comply with the project Environmental Management Plan/Programme, Eskom's Environmental Requirements for Organizations (240-18100134), and all applicable environmental legal and other requirements. Contractors must also comply with Eskom's environmental standards, policies, and procedures, and the environmental transgressions fine system.
Description
Source: 32-95 rev 9.pdfEskom’s SHEQ Policy sets out principles and rules that underpin the way in which Eskom
approaches occupational health and safety, the environment and quality.
Incident management is an integral function of risk management. The aims and objectives of
incident management are as follows:
a) Reduce risk and prevent any recurrence of incidents.
b) Ensure that incidents are managed effectively.
c) Ensure that incidents are classified and recorded accurately.
d) Ensure prompt and appropriate investigation.
e) Promote the proactive use and value of near-miss incident reporting.
f) Improve the quality of occupational health and safety by learning from incidents, including
near-misses.
g) Share incident information.
h) Report to internal and external stakeholders, as required.
i) Promote the analysis of trends, and review practices accordingly.
j) Involve and communicate information to all stakeholders.
Incident management is not a mechanism for assigning blame or monitoring staff performance, but
rather a way of identifying and addressing areas for improvement in order to reduce future risks.
Eskom is committed to Zero Harm as a value, this value forms an integral part of Eskom’s
operations.
2.1 Scope
2.1.1 Purpose
This document describes the high-level intention and requirements for the effective management of
incidents that occur during the course of Eskom’s business that result in, or could result in, near
misses, property damage, injuries, occupational diseases/illnesses or fatalities.
2.1.2 Applicability
This document shall apply throughout Eskom Holdings SOC Ltd, its groups/ divisions, subsidiaries,
and entities in which Eskom has a controlling interest. Where Eskom does not have a controlling
interest, this procedure shall apply if no such similar document exists.
This document is applicable to Eskom employees, contractors (unless it is explicitly mentioned
otherwise in this document) and members of the public affected by activities of, or on behalf of,
Eskom.
For the purpose of Eskom benchmarking with other organisations, the applicable Responsible
Manager may use the relevant classification criteria required for such benchmarking process.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
In the case where a site consists of multiple employers, this procedure must be complied with for
Eskom reporting purposes.
For the interpretation of requirements related to occupational health and safety incidents, this
document will supersede any other procedures and instructions. This procedure is supported by
sup[ported by Standard – “Occupational Health and Safety Incident Management Definitions and
Classification Parameters: 240-131838225”.
2.1.3 Effective date
The document is applicable as of 1 April 2021.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] 240-62582234: OHS Roles and Responsibilities and Statutory Appointments Standard.
[2] 32-727: Eskom, Safety, Health, Environment, and Quality Policy.
[3] 32-123: Eskom Emergency Planning Procedure.
[4] 32-124: Eskom Fire Risk Management Standard.
[5] 32-256: Emergency Response Procedure – Communications.
[6] 240-51122806: Process Control Manual (PCM) for Incident Management.
[7] 240-49308149: Process Control Manual (PCM) for Occupational Health and Safety
Management.
[8] Aviation Act, No. .
[9] Occupational Health and Safety Act, No. .
[10] Labour Relations Act, No. .
[11] Medicine and Related Substance Control Act, No. .
[12] Mine Health and Safety Act, No. .
[13] Compensation for Occupational Injuries and Diseases Act, No. .
[14] Basic Conditions of Employment Act, No. .
[15] National Health Act, No. .
[16] 240-62946386: Vehicle and Driver Safety Procedure.
[17] 240-84733329: Medical Surveillance Procedure.
[18] 32-425: Hearing Conservation Procedure.
[19] COIDA Occupational Disease 2 Form – as per COIDA.
[20] 240-131838225: Occupational Health and Safety Incident Management Definitions and
Classification Parameters.
[21] 240-58554227: Health & Safety Agreement.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
2.2.2 Informative
[22] I240-47560170: Process Control Manual (PCM) for Quality Management.
[23] 240-51367318: Process Control Manual (PCM) for Assurance and Advisory Audits.
[24] 32-450: Safety and Occupational Hygiene Performance Management.
[25] ISO 9001 Quality Management Systems.
[26] ISO 45001 Occupational Health and Safety Management Systems.
[27] OHSAS 18001 Occupational Health and Safety Systems.
[28] EPM0060: Measurement Specification Document for Headcount.
[29] Criminal Procedures Act, No. .
[30] Electricity Act, No. .
[31] Explosives Act, No. .
[32] Inquest Act, No. .
[33] Law of Evidence Amendment Act, No. .
[34] National Road Traffic Act, No. .
[35] 240-75512977: Noise-Induced Hearing Loss Investigation Form.
[36] 240-75512947: Noise-Induced Hearing Loss Notification Form.
[37] 240-154786986: COVID-19 Investigation Form.
The list of legislation and documents for further information is not exhaustive and/or not limited to
the legislation and documents listed above.
2.3 Definitions
2.3.1 Accident: Any unplanned event, arising out of, and in the course of, an Eskom or
contractor employee’s employment and resulting in human injury, illness, or death of the
employee, as well as death of, or injury to, any member of the public or damage to property.
2.3.2 Fatality: an incident occurring at work, or arising out of, or in connection with, the activities
of persons at work, or in connection with the use of plant or machinery, o r direct or
indirect exposure to Eskom’s product or activities, in consequence of which, any person
(that is, employee, contractor, or member of the public) dies, regardless of the time
intervening between the injury and/or exposure to the date of death. The date of the
incident will reflect the date on which the incident occurred, irrespective of the date of
death.
Note: Incidents related to the death of a person (employee or contractor employee) while
at the workplace and on duty who dies as a consequence of any activity or cause not
directly related to the course and scope of the deceased’s employment (for example, death
from natural causes, etc.) will not be regarded as a work related incident.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
2.3.3 First-aid injury: An injury due to a work-related incident, where that injury requires first aid
treatment within the scope of a first aider and content of a first aid box and does not require
further treatment by a health professional. Therefore, the following injuries will be regarded
as first-aid injuries:
a) If there was no medication required.
b) No subsequent medical treatment is required.
c) Where an employee was involved in an OHS incident where there was contact with a
person’s body part, whether there was an injury or not, the involved employee shall at
least be assessed by a first aider/health professional, for the purpose of this document,
this assessment/examination will be regarded as First Aid. At the minimum, the incident
shall be classified at least as a first-aid injury.
d) First-aid treatment can also be offered by a medical professional as long as it is in the
scope of the first aider.
e) The affected employee is able to resume work after the injury has been treated.
Note 1: Classification is based on the level of treatment, not on the person
administering treatment. For example, health professionals or emergency teams can
provide first-aid treatment.
Note 2: This excludes Incidents which are not caused by OHS events that arise at
the workplace or not directly related to the course and scope employment.
2.3.4 Lost-time injury (LTI): A work injury, including impairment and a fatality that arises out of,
and in the course of, employment and that renders the employee or contractor to be booked
off work. A work injury, including impairment and a fatality, that arises out of, and in the
course of, employment and that renders the employee or contractor to be unable to perform
his/her regular/normal work longer than seven calendar days or shifts other than the day or
shift on which the injury occurred.
Note: Normal work refers to any work where a person can perform his/her normal duties,
as per job profile, without restriction. Lost-time injury will apply if a person is booked off
work by a medical practitioner due to an incident, including being booked off for acute
stress or post-traumatic stress disorder by a relevant medical practitioner after an OHS
incident.
A lost-time injury includes the following:
a) Where an employee/contractor is booked off, regardless of the number of days or
shifts.
b) Incident resulting to a person being booked on restricted/ light duty longer than seven
calendar days.
Note: This excludes incidents which are not caused by OHS events that arise at the
workplace or not directly related to the course and scope employment.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
2.3.5 Medical injury: an injury resulting from a work related incident where treatment was
rendered by a medical/health professional within a 24-hour period, and medication was
either prescribed, dispensed, and/or applied. The affected employee is able to resume
work after the injury has been treated.
Note 1: Treatment, for the purpose of this document, excludes any diagnostic or
examination procedure or method used in the establishment of the extent of injuries or
illnesses (for example, X-rays or scans).
Note 2: Where medication was prescribed and/or dispensed after an injury and it was not
obtained and/or used, the injury shall be classified as a medical injury.
Note 3: Where medication is prescribed, dispensed and/or applied, whether to treat an injury
or prevent an illness or medical condition after an incident, the incident must be regarded at
least as a medical injury.
Note 4: any work-related noise-induced hearing loss with a PLH shift between 3.2% and
9.9% will be regarded as a medical injury.
Note 5: This excludes Incidents which are not caused by OHS events that arise at the
workplace or not directly related to the course and scope employment.
2.3.6 OHS Event: any occurrence where humans were involved and this occurrence poses a risk
of injury or illness/disease to those involved humans.
2.3.7 Occupational health and safety incident (OHS incident): an unplanned OHS event that
could, or does, result in human injury or illness or property damage, excluding:
a) crime-related incidents where there was no potential for injuries; and
b) motor vehicle incidents where the vehicle was stationary and unoccupied, incidents
where there were scratches on the vehicle with no potential for injury, windscreen or
glass-related incidents with no potential for injury.
Note: For recording and performance purposes, when there is an incident where multiple
divisions/groups are involved, divisions/groups must capture the incident for their
involved/injured.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
2.3.8 Occupational safety near-miss incident: Any OHS event that did not result in human
injury or damage but had the potential, under different circumstances, to cause human
injury or property damage.
2.3.9 Occupational hygiene near-miss incident: An OHS event where a person is exposed to a
single or combination of occupational hygiene hazards, which occurred in the work
environment, due to failure/insufficient/absence of control measures for that hazard(s) that
could result in medical treatment, impairment or an occupational disease/illness.
2.3.10 Occupational impairment: Partial or total loss of bodily function or part of the body
attributed to exposure at the workplace.
2.3.11 Noise-induced hearing loss (NIHL) incident: Where an individual experiences a bilateral
sensorineural hearing loss with a confirmed percentage hearing loss of 10% or more
measured from the baseline, which must be based on two diagnostic audiograms, as per
Instruction 171 issued by the Compensation Commissioner.
2.3.12 Occupational disease/illness: Any confirmed disease/illness arising out of, and in the
course of, an employee’s employment and that is listed in Schedule 3 of the COID Act or
any other condition as determined by an occupational medicine practitioner. In the case of
employees placed through a labour broker, the onus is on the relevant OU/BU to ensure
that the pre-employment medical examinations are done.
2.3.13 Public fatality: The death of a member of the public.
2.3.14 Public incident: Direct or indirect exposure to Eskom’s product or activities caused by
substandard acts and/or conditions that result in, or have the potential to cause, physical
harm to members of the public, damage to property or interruption of business.
If an Eskom vehicle is used for commuting (the employee is not on standby, nor has he/she
been called out for work) and the employee is involved in an MVA resulting in injuries either
to himself/herself or a member of the public, this incident should be classified as non-work-
related. If there were injuries to the member of the public, the incident shall be captured on
SAP as a public incident and investigated but regarded as non-work related incident.
2.3.15 Public Recordable Fatality Incident (PRFI)
a) A PRFI is an incident resulting in the electrocution of a member of the public by coming
into contact with Eskom apparatus within the point of supply, but excluding
electrocution resulting from criminal activities. A minor being electrocuted as a result of
criminal activity will be regarded as a public recordable fatality incident.
b) Any work-related incident where an Eskom employee or contractor is responsible for
the death of a member of the public, excluding incidents where a member of the public
is solely at fault.
2.3.16 Serious incident:
a) Any incident that results in a person being admitted to ICU for four days or more.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
b) Any incident involving persons where there was electrical contact, uncontrolled release
of energy (for example steam release, electrical flashover, etc.).
Note: OU/BU must inform Sustainability Systems immediately regarding the incident, where
after a decision will be made regarding the activation of an independent Subject Matter
Expert.
2.4 Abbreviations
Abbreviation Explanation
A&F Audit and Forensic
CC Compensation Commissioner
DoE&L Department of Employment and Labour
Eskom Eskom Holdings SOC Limited
Exco Executive Committee
HR Human Resources
ICU Intensive Care Unit
INO Initial Notification of Occurrence
LTI Lost-Time Injury
LTIR Lost-Time Injury Rate
MHSA Mine Health and Safety Act
NIHL Noise-Induced Hearing Loss
NPA National Prosecuting Authority
OEL Occupational Exposure Limit
OHS Occupational Health and Safety
OHS Act Occupational Health and Safety Act, 1993 (Act No. )
OMP Occupational Medical Practitioner
OU/BU Operating Unit/Business Unit
PCM Process Control Manual
PLH Percentage Loss of Hearing
PPE Personal Protective Equipment
PRFI Public Recordable Fatality Incident
SAIOH Southern African Institute for Occupational Hygiene
SAP Systems, Applications and Products in Data Processing
SAP EH&S SAP Environmental Health and Safety (system)
SDIC Safety Data Integrity Committee
SHEQ Safety, Health, Environment and Quality
SOC State-Owned Company
SS OHS Sustainability Systems Occupational Health and Safety
TRIR Total Recordable Injury Rate
WCL Workman’s Compensation Letter
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
2.5 Roles and Responsibilities
Eskom Holdings SOC Ltd and its subsidiaries shall take all reasonably practicable steps to prevent
all incidents and harm to any person, including members of the public and damage to property.
The Responsible Managers shall be responsible for:
a) Implementing this procedure;
b) Communicating to all their employees, contractors and contractor employees the
importance of compliance with this procedure and the consequences of non-compliance.
This includes communicating duty of care and refusal to perform an unsafe task to all new
employees and new contractors;
c) Implementing a monitoring process for ensuring understanding of, and compliance with,
duty of care and refusal to perform an unsafe task; and
d) Ensuring understanding of, and compliance with, the requirements of this procedure.
Note: Joint ventures: There may be occasions when Eskom and other organisations combine
resources to carry out a joint venture. Unless otherwise stipulated, each company in the joint
venture is liable for its own contraventions and could, therefore, be prosecuted in its own name,
without reference to any of the other companies involved.
2.6 Process for Monitoring
Compliance with the requirements of this procedure shall be audited as per the first- to third-tier
audit process. The OU/BU is responsible for its own monitoring; all other assurance providers will
monitor compliance with this procedure.
2.7 Related/Supporting Documents
Parties using this document shall apply the most recent edition of the documents listed below:
[1] Annexure 1: as required by the OHS Act – document number 240-100003427.
[2] OHS Incident Investigation Report template – document number 240-77046688.
[3] WCL forms – as per the OHS Act.
[4] Preliminary Brief on OHS Incidents document – document number 240-99618317
[5] Process Flow on the process of Capturing, Verification and Validation of Occupational
Diseases – document number 240-134597296
The following steps describe the process of incident management and are described in detail in the
remainder of the document:
Incident identification.
Initiation and execution of emergency response.
Notification and reporting to relevant stakeholders.
Incident prioritisation.
Classification and recording of incidents.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
Incident investigation.
Management of corrective actions - implementation and monitoring of corrective actions of
incidents.
Incident close-out.
Incident communication – occurs throughout the incident management process and is not
necessarily a stand-alone step.
3.1 Incident Identification
Identify or recognise that an incident has occurred. There are two types of identification or
recognition, that is, direct observation and indirect observation.
To ensure identification of incidents, the Responsible Manager should provide employees with
knowledge and skills as well as create a culture and environment that motivate employees to
immediately identify incidents as they occur.
Direct observation includes seeing the incident happening or being involved in the incident. For
potential occupational disease incidents/impairments, direct observation includes assessment
results by any medical practitioner or medical surveillance conducted by an occupational health
practitioner.
Where in doubt whether the incident is an OHS incident or not, test the description of the incident
against a definition of an occupational health and safety incident.
Any medical practitioner who examines or treats a person for a disease described in schedule
three of the COIDA, or any other disease that he believes arose out of that person’s employment,
shall within the prescribed period and in the prescribed manner report the case to the person’s
employer and to the chief inspector and inform that person accordingly.
Identification of occupational hygiene-related near-miss incidents must be classified by the
occupational hygiene/safety practitioner.
Indirect observation includes learning of the incident through, for example, complaints, feedback,
or information provided by internal stakeholders (for example, Eskom employees or contractor
employees) or external stakeholders (for example, authorities, members of the public, etc.).
3.2 Initiation and Execution of Emergency Response
a) Emergency response includes, but is not limited to, the following:
i. Rescue operations.
ii. Ensuring that the scene is safe during and after the incident.
iii. Providing emergency care (that is, first-aid treatment) to the injured to stabilise him/her
and prevent further injury and obtaining medical assistance, where necessary and/or
applicable.
b) Activate the appropriate emergency response actions in terms of the site or area
emergency preparedness plan/procedure.
c) In order to prepare for proper emergency response, the Responsible Manager must assess
the potential risks and develop a suitable response plan to address the risks. In the event
of an incident, emergency care must be provided in accordance with the emergency
response plan for the area.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
d) The supervisor/manager must ensure that the injured person receives the best medical
care and, when required, is transported to the doctor/hospital and that the relevant
Employer’s Report (WCL 1 or 2) is duly completed.
e) The supervisor/manager must ensure that a copy of the person’s identity document is
available to the treating doctor/hospital, which will facilitate prompt treatment. The
Supervisor / Line Manager should ensure that the injured is accompanied for medical
treatment, for the purpose of ensuring that the injured person receives the best medical
care and that the relevant medical reports are completed correctly and appropriate
feedback is received from the treating doctor.
f) The OU/BU Responsible Manager is to ensure that specific work instructions relating to
emergency response are available on site and executed accordingly.
g) Emergency response includes collection of evidence, which will assist in establishing the
root cause. When collecting evidence, take cognisance of the 5 Ps (people, position, parts,
paper and process evidence).
h) Collection and preservation of evidence:
i. Immediate actions at the scene following an incident can disturb or potentially remove
vital physical items and information important for the investigation.
ii. The Responsible Manager is responsible for ensuring that complete and correct
evidence and records are identified, collected, recorded and obtained, archived, stored
and preserved to support the investigation of the incident.
iii. The Responsible Manager must take steps to preserve physical items, computer data
and other relevant information until the incident investigation begins.
iv. No person should be allowed to remove, disturb or tamper with any evidence until
authorised to do so by the Responsible Manager or regulatory authority.
3.3 Notification and Reporting
All occupational health and safety incidents must be reported to relevant stakeholders. If
information is not readily available, the available information must be used, an updated notification
must be distributed to all stakeholders as more information becomes available. The action and
responsibility requirements under the Incident Prioritisation section must be referenced to identify
who needs to be notified.
When: when did the incident occur (exact time and date)?
Who: who was involved in the incident?
Where: where did the incident occur?
What happened: what work was being done at the time, what materials, equipment or
substances were involved?
Note: In the case of incidents involving crime and firearm-related incidents, the relevant Security
Department shall be notified.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
3.3.1 Internal stakeholders to be notified for occupational health and safety-related
incidents include the following:
a) All incidents
i. Supervisor.
ii. Responsible Manager.
iii. Occupational health and safety representative.
iv. Safety Department.
v. Occupational Health Department (if applicable).
b) Specific incidents
i. In the case of a fatality or a serious incident, notify OU/BU Management and
Sustainability Systems Department immediately.
ii. In the case of receiving any notification in terms of the OHS Act, sections 31 or 32, or in
the case of a summons received from the NPA, or any incident where there is a
possibility of liability, immediately contact the Legal Department regarding the
appointment of the attorney. If there are reasons to believe that such an attorney is not
required, the OU/BU must provide, without delay, a detailed motivation which will be
assessed by Legal Department and thereafter a decision will be communicated to the
Ou/bu.
3.3.2 Eskom employees performing work temporarily at another Eskom OU/BU
a) The Responsible Manager at the OU/BU where the incident occurred shall report to the
relevant stakeholders.
b) The affected employee’s own OU/BU Responsible Manager is responsible for reporting the
incident to the Compensation Commissioner (CC).
3.3.3 Eskom employees performing work at another organisation
If an incident occurs during regular/normal work, the reporting to the CC must be done by the
original OU/BU, although the external organisation (where reasonably practicable) must assist with
completing the documentation for submission to the CC.
3.3.4 Notification requirements for employee and contractor fatalities
a) The OU/BU must provide to the Sustainability Systems Department, immediately, the
detailed information relating to the circumstances of the incident, including details of the
deceased’s next of kin, in order for the announcement to be compiled for communication to
Eskom’s Board, Exco and the rest of the organisation.
b) The fatality announcement to be sent throughout Eskom must be signed off by the Group
Executive.
c) Only the Eskom Communication Department and/or the Eskom spokesperson may disclose
information to the media and/or the public.
d) Information can only be released to any external party after verification by the Eskom Legal
Department.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
3.3.5 Notification requirements for potential occupational diseases
Any potential occupational disease/illness must be referred to an Eskom occupational medicine
practitioner (OMP) for confirmation. Once confirmed, the OMP shall inform the Responsible
Manager, who must ensure that the incident management process is followed after confirmation.
Feedback on confirmed occupational diseases:-
a) Incidents to be recorded on SAP EH&S.
b) Each case must be discussed at the OU/BU statutory committees as required by law.
3.3.6 Capture initial notification
3.3.6.1 Capture and communicate the initial notification
a) Initial reports are reports that are submitted by any individual who is reporting an incident to
the relevant OU/BU Occupational Health and Safety Department. They can be provided in
any form, for example, email, OU/BU internal flash report or INO.
b) Initial reports are brief and limited to an outline of the known facts (that is, date, time, place,
what happened, immediate actions taken and persons involved).
c) The Responsible Manager must ensure that the initial notification is communicated in
accordance with the time lines.
3.4 Incident Prioritisation
From the initial reports, the Responsible Manager, in conjunction with, and advised by, the
occupational health and safety practitioner, must use the matrixes provided to determine the
priority rating of an incident. The Responsible Manager is responsible for ensuring that all those
involved in the prioritisation of incidents are in a position to understand and use the relevant
matrixes.
3.4.1 The priority rating is utilised to:
a) Ensure that appropriate management of the incident takes place;
b) Determine the level of action following notification of the incident;
c) Assist Responsible Managers with prioritising and classifying incidents; and
d) Provide clear direction about the incident reporting and communication requirements.
3.4.2 Steps involved in incident prioritisation:
3.4.2.1 Step 1
Determine the actual or potential outcome, consequence and severity of the incident by using the
Consequence table. Note: Use the actual outcome for injuries and the potential outcome for
near-miss incidents.
3.4.2.2 Step 2
Determine the likelihood of a recurrence of this incident by using the Likelihood table.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
3.4.2.3 Step 3
Quantify the level of risk associated with the incident by assigning a priority rating to the incident.
Using the information obtained in Steps 1 and 2 of this process, use the priority matrix to determine
the priority rating.
3.4.2.4 Step 4
Determine the appropriate action to be taken, as described in the Action and Responsibility
Requirements Table.
3.4.2.5 Step 5
If the severity of the incident changes, e.g. medical injury to a lost-time injury, the priority rating of
the incident must be reviewed and amended where necessary, including updating relevant
information in SAP EH&S.
3.5 Classification and Recording of Incidents
All occupational health and safety incidents, regardless of their rating, must be classified,
prioritised and recorded on the SAP EH&S system according to the CARAT (complete, accurate,
relevant, accessible, timely) principles. Contractor employees working under the Mine Health and
Safety Act will be classified and recorded as contractor employees and not as Eskom employees
for the purposes of this document.
3.5.1 Classification
Classification of incidents is based on the consequence as a result of the incident.
Note: the onus is on the OU/BU to determine the work relatedness and classification of the
incident. Sustainability Systems will not classify incidents on behalf of the OU/BU, but will assist in
interpretation of the procedure, should the OU/BU be unable to classify the incident or if there is a
dispute regarding classification, that particular incident shall be referred to Safety Data Integrity
Committee (SDIC).
3.5.1.1 Involved person’s relationship with Eskom: The aim of classifying the type of
relationship with the person is to determine whether the person(s) involved in the incident
was/were an Eskom employee(s), contractor employee(s) or member(s) of the public.
3.5.1.2 Work-relatedness: In order to classify the work status and to determine whether the
incident arose out of, or in connection with, the person at work, one needs to consider the workrelatedness of an incident. Unless otherwise specified in this procedure or in Occupational Health
and Safety Incident Management Definitions and Classification Parameters standard, as a general
rule, an affirmative answer to all of the following questions is required:
a) Did the incident or exposure occur at any workplace or within workplace boundaries?
b) Did it arise out of, or in connection with, the activities of persons at work, or as a result of a
Hazard present in the workplace?
c) Did it occur in the course of a person’s employment?
d) Did it result, or could it have resulted, in personal injury or health impairment?
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
3.5.1.3 Responsible unit (OU/BU)
a) Eskom employees: An incident must be captured against the OU/BU/subsidiaries based
on the employee’s organisational structure at the time of the incident.
b) Contractor employees: An incident must be recorded against the OU/BU/subsidiary with
which the contractor has a contractual relationship and/or any other contractual agreement
(including hand-over documents). In the case of incidents involving a service provider
procured through a national contract, incidents shall be recorded against the
OU/BU/subsidiary or end-user that requested a service from the contractor/supplier, this
request may be in a form of releasing services from a contract, in writing or otherwise,
including emails, telephone, etc.
3.5.1.4 Classification of occupational diseases and occupational health impairment
Classification of occupational diseases and occupational health impairment incidents must be
undertaken by the occupational hygiene/safety practitioner based on the confirmation received
from the Eskom medical practitioner with the supporting documentation (refer to 240-134597296 –
Process Flow on the process of Capturing, Verification and Validation of Occupational Diseases).
The following will be excluded from the Eskom performance measure:
conditions.
exposed to any excessive noise at the workplace after 16 November 2003.
3.5.1.5 Reclassified incidents
Reclassified incidents must be communicated by means of an updated SAP EH&S flash report to
relevant internal stakeholders, together with an explanation of the reclassification. Supporting
documentation or proof must be made available for incident classification, verification and audit
purposes and electronically attached to the incident in SAP EH&S. Downgraded incidents affecting
performance indicators must be submitted to SDIC for ratification. Third Party at Fault incidents
affecting performance indicators must be submitted to SDIC for ratification.
3.5.1.6 Clarification regarding incident classification of occupational health and safety-
related incidents
Where clarification is required for the interpretation of rules and examples for the classification of
incidents or in order to resolve disputes with regard to occupational health and safety incidents, the
Responsible Manager must send all relevant information to the Safety Data Integrity Committee
(SDIC) for review, the committee will evaluate information and provide direction in accordance with
the Terms of Reference of the SDIC.
3.5.1.7 Classification dispute and appeal process
In order to deal with disputes or clarification, OHS incidents requiring clarification must be tabled at
the Safety Data Integrity Committee (SDIC). These incidents will be reviewed in terms of this
procedure and/or other relevant documentation. Should the OU/BU be not satisfied with the
findings/outcome of the SDIC, the OU/BU is entitled to appeal the decision at the Safety Data
Integrity Appeal Committee.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
3.5.2 Recording
3.5.2.1 General requirements
All work-related occupational health and safety incidents must be recorded on SAP EH&S.
All non-work-related occupational health and safety incidents that occur within workplace
boundaries must be recorded on SAP EH&S and it is not necessary to communicate the flash
report.
The following generally agreed principles must be followed with regard to which information is
recorded:
The date on which the incident occurred, as opposed to the date of subsequent
reclassification on severity, for example, deterioration of condition or death.
Any preceding incident, including an occupational disease/illness, that occurred as a result
of exposure to the same agent, impacting the same body part or target organ on a different
occasion and resulting in similar symptoms or health effects, must be reported and
recorded as a new/different incident.
3.5.2.2 Recording of occupational diseases or illnesses
The date of the incident for occupational diseases shall be the date of confirmation by the Eskom
Occupational Medicine Practitioner as reflected on the First Medical Report in respect of an
Occupational Disease (WCL22).
This incident must be captured on SAP EH&S as work-related within 48 hours as per information
provided on the First Medical Report. Once the outcome of the investigation proves that the
incident is not work related, SAP EH&S must be updated immediately to reflect changes on the
work relatedness. All Occupational Diseases where after the investigation, are regarded as not
work related, or where the OU/BU requires clarity/assistance, those Occupational Diseases must
be submitted to SDIC for final classification. An Occupational Disease involving a pensioner shall
be submitted to SDIC for final classification.
The date of an occupational health impairment incident shall be the date reflected on the NoiseInduced Hearing Loss Notification form (240-75512947). Occupational diseases/illnesses will be
recorded against the OU/BU to which the employee belongs at the date of confirmation by the
Eskom Medicine Practitioner, unless it can be proven that the occupational disease/illness was
caused by the activities of another OU/BU.
3.6 Incident investigation
3.6.1 General
a) All investigation reports must be considered controlled disclosure documents in accordance
with the Eskom document management process.
b) All health and safety incidents must be investigated, excluding non-work-related incidents
occurring outside workplace boundaries.
c) During the investigation of repeat incidents, ineffective corrective actions from previous
incidents must be considered.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
d) The chairperson of an incident investigation committee shall be at a level as per the “Action
and Responsibility Requirements” table contained in the Occupational Health and Safety
Incident Management Definitions and Classification Parameter Standard (240-131838225).
Where there is perceived conflict of interest (an interest which is likely to adversely affect
the investigation process), if the conflict is found to exist, the chairperson of an investigation
committee shall not be a direct manager/supervisor of the injured/involved person. It is the
responsibility of the Responsible Manager to ensure that incidents are not chaired by the
chairpersons who are conflicted in that particular incident.
e) In the case of incidents involving crime, the applicable Security Department must be
involved.
f) The employer’s investigation report (Annexure 1 in terms of the OHS Act) must be
completed by the OU/BU investigator and signed off by the applicable OU/BU Responsible
Manager as the representative of the employer/user. Annexure 1 for contractor incidents
must be signed off on a similar basis, unless the Contractor’s Policies and Procedures
stipulates otherwise.
g) All investigations shall be completed within 30 days of the occurrence of an incident, if the
investigation could not be completed within 30 days, the OU/BU manager shall write a
signed off letter indicating the reasons why the Internal OHS Investigation could not be
completed within 30 days. This letter shall be loaded on SAP EH&S.
h) The results of the OHS investigation must be captured on the Eskom Internal OHS
Investigation template: Form 240-77046688 and signed off by the chairperson within 20
calendar days after conclusion of the investigation.
i) All investigation results must be documented and captured on SAP EH&S, including root
cause analysis and identified corrective measures. The root cause analysis must be
electronically attached to the incident in SAP EH&S. Investigations by government
agencies could also trigger a review of the initial incident information captured.
j) Records must be kept by the OU/BU of all OHS Act section 24 incidents, lost-time injuries
and medical treatment cases on the Annexure 1 form (as required in the OHS Act –
General Administrative Regulations for Recording and Investigation of Incidents) for all
employees, contractors and members of the public. All investigation reports must be kept
and archived for at least 25 years, unless another period has been specified in legislation or
in any court proceedings that may ensue.
k) To determine the estimated cost of an incident, the Compensation Commissioner Cost
Calculations should be utilised.
l) The Eskom Internal Investigation Report’s disclosure is controlled, it is for internal use only.
It may only be disclosed to third parties with specific authorization or consent from Legal
and Compliance Department.
m) This information includes a wide spectrum of internal business data that can be used by all
employees and can be shared through authorized business process.
n) The completed Annexure 1 form, as required in terms of the OHS Act – General
Administrative Regulations for Recording and Investigation of Incidents, may be made
available to a third party on request.
o) Chapter 23 of the MHSA Regulations sets out the manner in which incidents are to be
reported to the Mine Health and Safety Inspectorate on the following forms: SAMRASS 1,
2, 4, and 9 in accordance with Chapter 21 of the MHSA Regulations, as may be required, in
consultation with the Eskom Legal Department.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
p) In the case of incidents involving contractor employees, the contractor must investigate
those incidents as an employer in his/her own right (employer’s investigation) and generate
a report. The report and Annexure 1 must be submitted to the applicable OU/BU or on
request to the Department of Employment and Labour by the contractor. Eskom may
participate during these investigations.
q) During Eskom’s investigation, a contractor/member of the public may be requested to
provide information/ evidence. The contractor/member of the public is entitled (at their own
cost) to be represented by a legal representative whilst giving information/evidence. The
contractor/member of the public legal representative’s attendance in the investigation
process is limited to the period within which they are providing information/evidence. While
the contractor is giving evidence, the contractor executive may sit-in in the investigation.
Once the contractor personnel have finalised giving information/evidence to the committee,
the contractor executive to be excused. They must not sit in for the duration of the
investigation or question Eskom witnesses/committee members or to seek evidence from
Eskom.
r) When the contractor conducts its own investigation, Eskom employees may participate in
such an investigation. If an Eskom employee is required in that investigation to be a
witness, formal request must be submitted to the manager of the required employee.
s) Should the contractor or any third party need information or evidence from Eskom, the
manager of the employee from whom such evidence is requested, shall evaluate this
request and if required, seek assistance from Legal and Compliance Department who will
give guidance or determine whether such information can be provided.
t) The investigation report must include the following information:
i. The details of the incident (type of incident, what occurred, sequence of events when
and where the incident occurred).
ii. Incident consequences and impacts.
iii. The risk of the incident reoccurring using a root causes analysis technique and the
likelihood and consequence table within this document.
iv. Direct or immediate cause(s).
v. Root causes, taking into consideration human, workplace and natural factors (who, what
and why).
vi. Identify system failures (procedure non-conformance, training, plant failure, etc.).
vii. Corrective actions to remedy and prevent a reoccurrence of the incident.
viii. Lessons learnt and recommendations.
3.6.2 Investigation requirements
a) All incidents occurring within workplace boundaries must be investigated regardless of work
relatedness. Such incidents must be investigated to identify any possible contributing
causes and to make recommendations on preventing any repeat incidents.
b) The investigation of non-work-related incidents that do not occur at the workplace, including
non-work-related commuting incidents is not required. In some cases an investigation can
be requested by the Responsible Manager where the Responsible Manager has a very
good reason to request such an investigation (where Eskom has an interest to understand
the reasons/root causes) with permission from an employee. These lessons could be
shared in the organisation to prevent repeat incidents.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
c) It must be noted that the employer does not have the mandate to investigate incidents that
occurred at an employee’s home, unless the person was performing work from home
(defined as telework) at the time of the incident, in which case the incident would be
regarded as work related.
d) Eskom investigations will consist of an OU/BU investigation, or depending on the severity of
the incident (as determined in the incident prioritisation section), a corporate investigation
will be held.
e) After every incident that requires an investigation, regardless of the seriousness of the
incident, the responsible manager shall ensure that preliminary evidence collection process
is conducted within 72 hours of occurrence.
f) In cases of incidents involving contractor employees, the contractor must investigate those
as an employer in his/her own right (employer’s investigation) and generate a report. The
report and Annexure 1 must be submitted to the applicable OU/BU or on request to the
Department of Labour by the contractor. Eskom may participate during these investigations
g) The employer’s investigation under the MHSA must be conducted as set out in section
11(5), as revised, of the MHSA.
h) Root cause analysis techniques.
A root cause analysis technique must be used for all employee and contractor OHS
investigations.
3.6.3 Eskom Internal OHS Investigation
3.6.3.1 OU/BU investigations (excluding serious and fatality investigations)
The Investigation Committee must consist of the following, given the nature of the incident:
a) A chairperson (appointed in writing by the employer) as the investigator of the incident. The
chairperson of an incident investigation committee who shall be at a level as per the
“Action and Responsibility Requirement” table contained in the Occupational Health and
Safety Incident Management Definitions and Classification Parameter Standard (240-
131838225),
b) Where there is perceived conflict of interest (an interest which is likely to adversely affect
the investigation process), if the interest is found to exist, the chairperson of an
investigation committee shall not be a direct manager/supervisor of the injured/involved
person. It is the responsibility of the Responsible Manager to ensure that incidents are not
chaired by the chairpersons who are conflicted in that particular incident.
c) Where applicable, a subject matter specialist(s) may be appointed by the OU/BU.
d) Representatives from all entities, where multiple organisations and/or Groups/Divisions are
involved in an incident.
e) The relevant supervisor/manager under whose supervision the incident occurred shall be
the first person to give evidence related to the incident and may be allowed to remain in
attendance at the investigation as an observer, provided there is no conflict of interest.
f) The applicable local workplace statutory health and safety representatives, as required by
the OHS Act.
g) The OU/BU shall invite the respective Division/Group’s Full Time Health and Safety
Representative (where applicable), as per Health and Safety Agreement.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
h) The relevant local union representative as per Eskom’s recognised trade unions may
participate during an employee employer’s investigation, including the process of evidence
collection, investigation, formulation of findings and corrective actions. The relevant union
representative must be from the union in which the involved person is affiliated to.
i) An applicable OU/BU OHS Department representative.
j) In case of an incident involving a person with disability, the investigation committee must
consist out of a representative from Human Resources (HR) and an Occupational Hygiene
Practitioner (where required). Depending on the complexity of the incident, the
Occupational Hygiene Practitioner in consultation with HR will recommend additional
specialist if and when required to assist with effective investigation of the incident.
k) Where relevant and applicable, the Construction Health and Safety Agent.
l) Where relevant and applicable, the OHS Act GMR 2(1) person appointed for plant-related
incidents or his/her assistant in terms of GMR 2(7).
Witnesses: Direct and indirect witnesses as determined by the investigation committee.
Note: A witness may be recalled to answer further questions by the committee, as determined by
the chairperson.
The Investigation Committee chairperson is responsible for the process of evidence collection,
investigation, formulation of findings, identification of root causes, formulation of corrective actions,
compilation of an investigation report.
Note 1: In the case of a committee member who needs to testify as a witness, such a member
needs to be excluded from the investigation sitting until such time as he/she has given his/her
testimony and thereafter the chairperson can exercise his/her prerogative to allow such a person to
become a member of the committee.
Note 2: The investigation may not continue if either the chairperson, the Responsible Manager or
his/her delegate (provided there is no conflict of interest), the statutory Health and Safety
Representative and the subject matter specialist(s) determined by the chairperson is not present
Note 3: The Sustainability Systems Department, as well as an identified subject matter
specialist(s), may attend on invitation.
Note 4: The initiation of the incident investigation must not be delayed due to the unavailability of
any witness.
Note 5: Sustainability Systems has the prerogative to participate as it may deem fit, after
consulting with the relevant OU/BU Responsible Manager, in any incident investigation
notwithstanding the priority rating or incident classification. Sustainability Systems may also
request, through the relevant management structures, any incident investigation report and enquire
on the contents of such a report. Sustainability Systems may lead any investigation at the request
of any relevant senior manager.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
3.6.3.2 Public Incidents
a) The OU/BU shall conduct an investigation for fatal and non-fatal public incidents.
b) The OU/BU shall immediately mobilise for a specialist to respond to the scene and collect
evidence.
c) In the case of electrical related incidents that occurred beyond the point of supply or
involving electrical related criminal activities (theft), the onus is on the OU/BU to conduct
its own investigation. If there is any reason to believe that there is a legal liability, the
OU/BU needs to provide a motivation accompanied by an investigation report and
supporting documentation/information to Sustainability Systems and Legal Departments
and seek a legal opinion from Legal Department.
3.6.3.3 Employee and contractor serious incidents (see definition of a serious incident)
a) OU/BU must inform Sustainability Systems immediately regarding the incident, whereafter
a decision will be made regarding the activation of an independent Subject Matter Expert.
b) Where required, Sustainability Systems Department will appoint and mobilise an
independent subject matter specialist/expert to facilitate and coordinate the collection of
evidence, statements and to support the OU/BU personnel
c) In the case of an extreme serious incident, the OU/BU must appoint an independent
chairperson (at least MPSG17) from another OU/BU to chair the investigation, where
required, the OU/BU to liaise with the Divisional/Group head office for assistant in the
appointment of the independent chairperson. Liaise with Sustainability Systems OHS
regarding attendance of the Sustainability Systems OHS representative.
d) The OU/BU’s Internal OHS investigation chairperson/investigator must provide the
investigation final report in accordance with the Internal OHS Investigation template (240-
Manager and Sustainability Systems Department. The independent subject matter
specialist(s) (referred to in a) above, may provide a separate technical report.
e) If there is potential liability, the Legal Department and Sustainability Systems Departments
must be provided with a motivation for such possible liability in order to advise the OU/BU
on the way forward.
f) The composition of the investigation committee for serious incident is similar to the OU/BU
investigation, with the exception of point a), b) and c) above.
g) The OU/BU where the incident occurred shall support the investigation by assisting with
logistical arrangements and providing a resource for the secretariat role, i.e. for taking
notes and assisting the chairperson with the draft report.
3.6.3.4 Corporate investigation (fatalities)
a) In the case of employee and contractor fatalities, the Sustainability Systems Department
will initiate a corporate investigation and immediately mobilise personnel, who will facilitate
and coordinate the collection of evidence.
b) The OU/BU must ensure that a preliminary investigation is conducted and a report is
generated before the corporate investigation.
Note: In cases where the MHSA applies, the investigation process set out in it will be followed.
Thereafter, a corporate investigation will continue, as required.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
c) The Corporate Investigation Committee must consist of the following members:
i. Chairperson – appointed by Sustainability Systems.
ii. OU/BU Responsible Manager, or his/her delegated person.
iii. Relevant and applicable departmental senior management representative(s) (provided
that he/she have no direct involvement in the particular incident and no conflict of
interest exist).
iv. Risk & Assurance/SHEQ Department representative.
v. Subject matter specialist/ expert.
vi. Sustainability Systems Department representative.
vii. The local statutory health and safety representative (for employee incidents). Where
relevant, the applicable Full Time Health and Safety Representative, as per Health and
Safety Agreement. The OU/BU shall extend the invitation to the applicable Full Time
Health and Safety Representative.
viii. The applicable local union representative as per Eskom’s recognised trade unions may
participate in employee investigations, including the process of evidence collection,
investigation, formulation of findings and corrective actions. The applicable union
representative must be from the union in which the involved person is affiliated to.
ix. Representatives from other divisions in cases involving multiple divisions.
x. In cases where the MHSA applies, the following members may be included as
committee members: 4(1) employer’s representative, 3(1) (a) mine manager, and
2.13.1 engineering manager (mining equipment)/mine engineer.
xi. Where relevant and applicable, the Construction Health and Safety Agent.
xii. Where relevant and applicable, the OHS Act GMR 2(1) person appointed for plant-
related incidents or his/her assistant in terms of GMR 2(7).
xiii. In case of the contractor employee incidents, contractor management representative(s)
are not part of the committee as they would have conducted their own investigation as
the employer. Should the contractor management representative(s) strongly feel that
they need to be part of Eskom’s investigation, the representative shall request (with
reasons) for such permission from the chairperson. Granting of this permission is at the
discretion of the chairperson.
xiv. In case of contractor fatalities, the contractor management representative may be
present while his or her employee is giving evidence. He or she can only seat-in when
their employees are being interviewed since this is an Eskom investigation and the
contractor would have done its own investigation as an employer.
Note: Should any person find it necessary to be an observer, such person shall request the
chairperson for an observer status.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
d) The investigation committee shall identify and confirm the required witnesses:
i. Direct and indirect witnesses as determined by the investigation committee.
ii. A witness may be recalled to answer further questions of the committee, as
determined by the chairperson.
e) The OU/BU where the incident occurred shall support the investigation by assisting with
logistical arrangements and providing a resource for the secretariat role, i.e. for taking
notes and assisting the chairperson with the draft report.
3.6.4 Inquiries, investigation and hearings initiated by government agencies
a) National, provincial, and regional government agencies have the legal authority to inquire
into, or investigate, certain OHS incidents.
b) Any inquiry or investigation by any of these agencies should be preceded by giving proper
notice to the organisation.
c) When any of the following notices are received:
Notifications issued by the DoE&L (in terms of the OHS Act sections 31 and 32
and section 56 of COID Act – Application for Increased Compensation).
Where the MHSA applies, the Mine Health and Safety Inspectorate may convene
an investigation in terms of section 60 of the MHSA and/or an inquiry in terms of
section 65 of the MHSA.
Summons/subpoena received from the NPA or any third party.
Any incident where there is a possibility of liability.
The OU/BU must immediately (not later than 24 hours of being notified) inform
Sustainability Systems and Legal Departments of such notice or requests received
by providing a copy of the notice, completed Annexure 1 form as required in terms
of the OHS Act (where applicable), the OU/BU’s relevant investigation report and
supporting documents and a completed Mandate of Instruction in order for Legal
and Compliance Department to appoint an external legal representative.
If there are reasons to believe that such an attorney is not required, the OU/BU
must provide, without delay, a detailed motivation to Sustainability Systems and
Legal Department, such motivation will be assessed where after a decision will be
communicated to the OU/BU.
d) Requests by government agencies for access to the site’s investigation reports and
related materials must be made in writing and where the OU/BU is unsure regarding the
submission of the requested documentation or information, the OU/BU shall request
advise from Legal Department and Sustainability Systems before they are granted.
e) Employees have the right not to incriminate Eskom or themselves.
f) In the case of incidents involving contractor employees, the investigation will require the
contractor’s involvement.
g) In the case where a contractor does not cooperate during any part of the Eskom
investigation, in terms of contractual and legal obligations, Eskom shall take further steps
to ensure that the immediate and root causes of the incident have been identified and to
ensure that workable corrective actions are identified and implemented and that actions
that will prevent the repeat of such an incident are implemented in order for Eskom to fulfil
its legal obligation.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
h) When required, all persons must be available and cooperate during any investigation by
the Department of Employment and Labour or NPA.
3.7 Management of Corrective Actions
3.7.1 Implementation and monitoring of corrective actions of incidents
a) There must be at least one corrective action for each root cause identified during the
investigation.
b) The Investigation Committee must consider the following hierarchy of control when
formulating corrective actions:
i. Engineering control for the purpose of designing/redesigning in order to eliminate
the risk.
ii. Barriers to isolate/insulate between the source and employees or animals.
iii. The provision of personal protective equipment should be the last resort.
c) Planned start and end dates for all corrective actions must be clearly defined and must be:
i. Specific;
ii. Measureable;
iii. Achievable;
iv. Realistic, with clearly allocated responsibilities; and
v. Timeous, with clear deadlines.
d) Corrective actions and restart criteria/conditions that have to be completed before
operations may resume must be clearly identified in the investigation report. Other
corrective actions (for example, longer-term system-related improvements or evaluations)
often have a completion date that extends beyond the start-up date.
e) Identify potential risks that can influence the achievement of the corrective actions, and
document in the investigation report how these risks should be mitigated.
f) All corrective actions must be verified by the person responsible in order to determine
effective implementation. Documentary evidence of the implemented corrective actions
must be available and attached electronically to the incident in SAP EH&S before the
corrective action is closed on SAP EH&S.
g) Where a corrective action that has been implemented is deemed ineffective and, therefore,
unsuccessful, the corrective action(s) must be revised by the Investigation Committee and
implemented. An alternative corrective action measure must be identified to address the
root cause(s).
h) The revised corrective actions must be approved by the chairperson of the Investigation
Committee, and the report must be revised accordingly. The chairperson must provide the
motivation and/or justification for the decision. The previous ineffective corrective actions
must be closed out on SAP EH&S and a new corrective action must be identified and
captured on SAP EH&S.
i) Risk assessment must be done to ensure that any corrective actions that constitute an
improvement does not create an additional risk or increase the existing risk.
j) To ensure the prompt follow-up and close-out of corrective actions from an incident
investigation report, periodic status reports must be provided from SAP EH&S to site
management until all recommendations have been acted on and closed out.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
k) The Statutory Occupational Health and Safety/SHEQ Committee meeting must also track
the corrective actions, target dates and responsible person(s) identified during
investigations and note, in the minutes, the discussion points on the progress made with
the implementation of corrective actions. The minutes must be kept for at least three
years.
l) The OU/BU manager, as the Responsible Manager, is responsible for reviewing/analysing
the recommendations made in the incident investigation report, assigning responsibilities
to the relevant applicable Responsible Managers and providing the necessary resources to
implement the recommendations made, within a reasonable time frame that does not
expose persons to risk for an unnecessarily long period and to prevent recurrence of the
incident.
3.8 Incident Close-Out
a) Close-out is the final step in the incident management process. The action of closing out
an incident signifies that all corrective actions have been effectively implemented and case
studies have been effectively communicated and all relevant documents have been
attached on SAP EH&S.
b) The incident must then be closed out in SAP EH&S as an action.
3.9 Incident Communication
3.9.1 The communication means for occupational health and safety incidents:
a) Initial incident notification reports must be submitted by any individual who is reporting an
incident to the relevant OU/BU Occupational Health and Safety Department. They can be
provided in any format, that is, email, OU/BU flash report, or INO.
b) The SAP EH&S flash report is the formal notification informing all relevant stakeholder/s
(specified in the Action and Responsibility Requirements Table) that an incident has
occurred.
c) Fatality announcement – Sustainability Systems Department will send out an SMS and an
announcement for employee and contractor work-related fatalities. This communication shall
be signed off by the applicable Group Executive.
d) Occupational health and safety preliminary brief – the preliminary brief report must state the
key learning points, which need to be shared in accordance with the Action and
Responsibility Requirements Table in order to create immediate awareness and to prevent
reoccurrence. The Responsible Manager where the incident occurred is responsible for
compiling an incident preliminary brief. Where required, the preliminary brief must be
communicated to the Sustainability Systems Department for further distribution to all
relevant stakeholders.
f) When compiling the preliminary brief, consider the following:
i. The key learning points should be those points that are obvious (not necessarily the
root causes, as they might not be available at the time of communication).
ii. They must only cover a few main points.
iii. Focus on positive points as well.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
iv. Protect individuals by excluding names and places or any other information that could
be sensitive. Where reasonably practicable, use photos that are relevant to the
incident. Be sensitive towards the reader. Do not include any sensitive photos or
information.
v. The OU/BU must ensure that this information is disseminated to all affected and
interested parties who could benefit from the feedback. The OU/BU Responsible
Manager must ensure that the effectiveness of shared key learning points is monitored.
vi. The communication of the preliminary brief should not be delayed by waiting for the
incident investigation outcome/report. Key learning points are, therefore, not findings or
recommendations.
3.9.2 Fatality Presentations to Executive committee
a) Presentations must be made to the applicable executive committee on all employee and
contractor fatalities by the relevant General Manager or delegated senior manager.
b) Any additional and/or amended information provided at the applicable executive committee
must be updated on SAP EH&S and a revised case study must be republished immediately
on the Eskom publication tool, e.g. Hyperwave.
3.9.3 Case studies must be published for the following incidents:
a) For all occupational health and safety incidents rated with a priority rating of moderate, high
and extreme. In the case of near-miss incidents, publish those rated as extreme.
b) Public fatalities and injuries (excluding public crime-related incidents and incidents that
occurred beyond point of supply) publish those with a priority rating of modetate high and
extreme.
c) The case study must be generated and formally communicated within the OU/BU within five
(5) working days after finalising the investigation report (5 days from date of signature).
d) For fatalities, the OU/BU must, within seven working days after the initial presentation of the
incident at the executive committee, compile and forward the case study to Sustainability
Systems, where after it will be communicated Eskom wide. The OU/BU must ensure that all
case studies are published on an Eskom publication site, for example, Hyperwave.
and safety incident management
In addition to the above outlined procedural requirements, non-compliance to any of the
following will be treated as violation of the procedure:
a) If misleading information is deliberately supplied or information is deliberately withheld.
b) If evidence is wilfully withheld, removed, disturbed, tampered with or distributed without the
relevant permission.
c) If a witness or any person involved in the incident investigation process is victimised or
intimidated.
d) If notification of the incident is not given within the specified time frames.
e) If prioritisation of the incident is deliberately or wilfully manipulated to indicate a lower
priority.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
f) If any incident is not fully investigated within the time frames specified.
g) If incidents are deliberately classified wrongfully.
h) If any incident is not recorded.
i) If corrective actions are not implemented within the time frames agreed and captured in
Sap eh&s.
j) If the effectiveness of corrective actions is not assessed within the required time frames.
Note 1: The collection of evidence for the purpose of the disciplinary process must be conducted
separately from the occupational health and safety incident investigation process.
Note 2: The disciplinary process must collect its own evidence.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
This document has been seen and accepted by:
OHS Steering Committee.
Risk and Sustainability Management Committee.
Date Rev. Compiler Remarks
Procedure reviewed due to
March 2021 9 M Zondi
request from business.
June 2018 8 M Zondi Inclusion of the Full Time Health
and Safety Representative in OHS
Investigation as committee
members.
October 2017 7 M Zondi Align to current business
requirements, e.g. Management of
Occupational Diseases, review
classification of incidents.
Exclusion of environmental
requirements from the document.
November 2015 6 SN Middel Clarification required as requested by
the Legal Department with regard to
the investigation process into cases of
serious incidents and fatalities in so
far as alignment with the employer
investigation and the corporate
investigation process. To clarify the
corporate investigation process for
incidents where no injuries occurred
or in the case of third party
investigations with serious
consequences for the business.
April 2015 5 SN Middel OHS Steering Committee raised a
concern regarding the practicality of
managing incidents at the operational
level as some of the processes are
complex. This initiated a procedure
review.
The following people were involved in the development of this document:
As per the list below.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
Group/division name group/division name
Human Resources Duke Lebethe
Group Capital Division Ndiaphe Maphanga Division
Group Capital Division Sheryl Isaacs Eskom Rotek Industries Thanduxolo Zulu
Group Capital Division Frans Durand Eskom Rotek Industries Eunice Hamilton
Group Capital Division Althea Stuart Eskom Rotek Industries James Lubisi
Group Capital Division Albert Mogapi Eskom Rotek Industries Joyce Leshiba
Group Capital Division Loraine Smit Assurance and
Forensics Lesley Motshelanoka
Generation Division Marc Lebea Finance Division Theresa Nuthall
Generation Division Bob Phahle Finance Division Sekete Pule
Generation Division Fundisa Dangazele Risk and Sustainability Brenda Njotini
Generation Division Nompilo Dlamini Risk and Sustainability Mara De Kock
Generation Division Tendani Mukhuba Risk and Sustainability Sivendri Govender
Generation Division Happy Sithole Risk and Sustainability Mpapadi Monyela
Generation Division Nkosinathi Makhanya Risk and Sustainability Ntokozo Ngubane
Generation Division Jcp Coetzee Risk and Sustainability Mike Townsend
Transmission Division Refilwe Maswanganyi Risk and Sustainability Miranda Moahlodi
Transmission Division Revive Mkansi Risk and Sustainability Sibongile Masipa
Transmission Division Petrus Motsumi Risk and Sustainability Refilwe Sebothoma
Transmission Division Sifiso Ndlovu Risk and Sustainability Amy Seherie
Transmission Division Pieter Human Risk and Sustainability Sivuyisiwe Mqanto
Distribution Division Paulene Pirthi Executive Support Wandile Katoo
Distribution Division Donald Kekana
Distribution Division Laetitia Smith
Distribution Division Lenny Babulall
Distribution Division Bertie De Jager
Distribution Division Nicholas Sibiya
Distribution Division Silindokuhle Sithebe
Group Commercial Mikateko Chauke
Group Commercial Meisie Sindane
Group IT Pumeza Mabunda
Human Resources Jan Olckers
Division
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Evaluation Criteria
Source: 32-95 rev 9.pdf (unknown)The document does not specify eligibility criteria for the tender. However, typical Eskom tenders require bidders to be registered on the Central Supplier Database (CSD), have relevant experience in building/engineering projects, and demonstrate compliance with OHS regulations. Bidders must also have the necessary financial and technical capacity to execute the project.
Technical Specifications
Source: 32-95 rev 9.pdf (unknown)Eskom’s SHEQ Policy sets out principles and rules that underpin the way in which Eskom approaches occupational health and safety, the environment and quality.
Incident management is an integral function of risk management. The aims and objectives of incident management are as follows:
Incident management is not a mechanism for assigning blame or monitoring staff performance, but rather a way of identifying and addressing areas for improvement in order to reduce future risks. Eskom is committed to Zero Harm as a value, this value forms an integral part of Eskom’s operations.
Scope:
Effective date: The document is applicable as of 1 April 2021.
Normative references include:
Informative references include:
Key definitions:
Roles and Responsibilities:
Process for Monitoring:
Incident Management Procedure steps:
Incident Identification:
Emergency Response:
Notification and Reporting:
Incident Prioritisation:
Classification and Recording:
Incident Investigation:
Corrective Actions:
Incident Close-Out:
Incident Communication:
Disciplinary hearings:
Compliance Requirements
Source: 32-95 rev 9.pdf (unknown)No specific requirements found in the document. However, the document references compliance with the Occupational Health and Safety Act, No. 85 of 1993, the Mine Health and Safety Act, No. 29 of 1996, and other relevant legislation. Contractors are expected to comply with Eskom's OHS procedures and the Health & Safety Agreement (240-58554227).
Health & Safety
Source: 32-95 rev 9.pdf (unknown)Revision: 9
Total Pages: 30
Next Review Date: March 2027
Senior Advisor OHS Senior Manager–OHS General Manager
rather a way of identifying and addressing areas for improvement in order to reduce future risks.
Eskom is committed to Zero Harm as a value, this value forms an integral part of Eskom’s
operations.
2.1 Scope
2.1.1 Purpose
incidents that occur during the course of Eskom’s business that result in, or could result in, near
misses, property damage, injuries, occupational diseases/illnesses or fatalities.
2.1.2 Applicability
and entities in which Eskom has a controlling interest. Where Eskom does not have a controlling
interest, this procedure shall apply if no such similar document exists.
This document is applicable to Eskom employees, contractors (unless it is explicitly mentioned
otherwise in this document) and members of the public affected by activities of, or on behalf of,
Eskom.
2.3 Definitions
2.3.1 Accident: Any unplanned event, arising out of, and in the course of, an Eskom or
contractor employee’s employment and resulting in human injury, illness, or death of the
employee, as well as death of, or injury to, any member of the public or damage to property.
2.3.2 Fatality: an incident occurring at work, or arising out of, or in connection with, the activities
of persons at work, or in connection with the use of plant or machinery, o r direct or
indirect exposure to Eskom’s product or activities, in consequence of which, any person
(that is, employee, contractor, or member of the public) dies, regardless of the time
intervening between the injury and/or exposure to the date of death. The date of the
incident will reflect the date on which the incident occurred, irrespective of the date of
death.
Note: Incidents related to the death of a person (employee or contractor employee) while
at the workplace and on duty who dies as a consequence of any activity or cause not
directly related to the course and scope of the deceased’s employment (for example, death
from natural causes, etc.) will not be regarded as a work related incident.
a) Where an employee/contractor is booked off, regardless of the number of days or
shifts.
b) Incident resulting to a person being booked on restricted/ light duty longer than seven
calendar days.
Note: This excludes incidents which are not caused by OHS events that arise at the
workplace or not directly related to the course and scope employment.
2.3.15 Public Recordable Fatality Incident (PRFI)
a) A PRFI is an incident resulting in the electrocution of a member of the public by coming
into contact with Eskom apparatus within the point of supply, but excluding
electrocution resulting from criminal activities. A minor being electrocuted as a result of
criminal activity will be regarded as a public recordable fatality incident.
b) Any work-related incident where an Eskom employee or contractor is responsible for
the death of a member of the public, excluding incidents where a member of the public
is solely at fault.
2.3.16 Serious incident:
a) Any incident that results in a person being admitted to ICU for four days or more.
WCL Workman’s Compensation Letter
all incidents and harm to any person, including members of the public and damage to property.
a) Implementing this procedure;
b) Communicating to all their employees, contractors and contractor employees the
importance of compliance with this procedure and the consequences of non-compliance.
employees and new contractors;
c) Implementing a monitoring process for ensuring understanding of, and compliance with,
duty of care and refusal to perform an unsafe task; and
d) Ensuring understanding of, and compliance with, the requirements of this procedure.
Note: Joint ventures: There may be occasions when Eskom and other organisations combine
resources to carry out a joint venture. Unless otherwise stipulated, each company in the joint
venture is liable for its own contraventions and could, therefore, be prosecuted in its own name,
without reference to any of the other companies involved.
2.6 Process for Monitoring
audit process. The OU/BU is responsible for its own monitoring; all other assurance providers will
monitor compliance with this procedure.
2.7 Related/Supporting Documents
[1] Annexure 1: as required by the OHS Act – document number 240-100003427.
[2] OHS Incident Investigation Report template – document number 240-77046688.
[3] WCL forms – as per the OHS Act.
[4] Preliminary Brief on OHS Incidents document – document number 240-99618317
[5] Process Flow on the process of Capturing, Verification and Validation of Occupational
Diseases – document number 240-134597296
remainder of the document:
necessarily a stand-alone step.
3.1 Incident Identification
recognition, that is, direct observation and indirect observation.
knowledge and skills as well as create a culture and environment that motivate employees to
immediately identify incidents as they occur.
three of the COIDA, or any other disease that he believes arose out of that person’s employment,
shall within the prescribed period and in the prescribed manner report the case to the person’s
employer and to the chief inspector and inform that person accordingly.
3.3.2 Eskom employees performing work temporarily at another Eskom OU/BU
a) The Responsible Manager at the OU/BU where the incident occurred shall report to the
relevant stakeholders.
b) The affected employee’s own OU/BU Responsible Manager is responsible for reporting the
incident to the Compensation Commissioner (CC).
3.3.3 Eskom employees performing work at another organisation
original OU/BU, although the external organisation (where reasonably practicable) must assist with
completing the documentation for submission to the CC.
3.3.4 Notification requirements for employee and contractor fatalities
a) The OU/BU must provide to the Sustainability Systems Department, immediately, the
detailed information relating to the circumstances of the incident, including details of the
deceased’s next of kin, in order for the announcement to be compiled for communication to
Eskom’s Board, Exco and the rest of the organisation.
b) The fatality announcement to be sent throughout Eskom must be signed off by the Group
c) Only the Eskom Communication Department and/or the Eskom spokesperson may disclose
information to the media and/or the public.
d) Information can only be released to any external party after verification by the Eskom Legal
practitioner (OMP) for confirmation. Once confirmed, the OMP shall inform the Responsible
Consequence table. Note: Use the actual outcome for injuries and the potential outcome for
near-miss incidents.
3.4.2.2 Step 2
Using the information obtained in Steps 1 and 2 of this process, use the priority matrix to determine
the priority rating.
3.4.2.4 Step 4
the incident must be reviewed and amended where necessary, including updating relevant
information in SAP EH&S.
3.5 Classification and Recording of Incidents
prioritised and recorded on the SAP EH&S system according to the CARAT (complete, accurate,
relevant, accessible, timely) principles. Contractor employees working under the Mine Health and
for the purposes of this document.
3.5.1 Classification
conditions.
exposed to any excessive noise at the workplace after 16 November 2003.
3.5.1.5 Reclassified incidents
boundaries must be recorded on SAP EH&S and it is not necessary to communicate the flash
report.
recorded:
The date on which the incident occurred, as opposed to the date of subsequent
reclassification on severity, for example, deterioration of condition or death.
Any preceding incident, including an occupational disease/illness, that occurred as a result
of exposure to the same agent, impacting the same body part or target organ on a different
occasion and resulting in similar symptoms or health effects, must be reported and
recorded as a new/different incident.
3.5.2.2 Recording of occupational diseases or illnesses
l) The Eskom Internal Investigation Report’s disclosure is controlled, it is for internal use only.
and Compliance Department.
m) This information includes a wide spectrum of internal business data that can be used by all
employees and can be shared through authorized business process.
n) The completed Annexure 1 form, as required in terms of the OHS Act – General
the contractor executive to be excused. They must not sit in for the duration of the
investigation or question Eskom witnesses/committee members or to seek evidence from
g) The employer’s investigation under the MHSA must be conducted as set out in section
11(5), as revised, of the MHSA.
h) Root cause analysis techniques.
investigations.
3.6.3 Eskom Internal OHS Investigation
3.6.3.1 OU/BU investigations (excluding serious and fatality investigations)
supporting documentation/information to Sustainability Systems and Legal Departments
and seek a legal opinion from Legal Department.
3.6.3.3 Employee and contractor serious incidents (see definition of a serious incident)
a) OU/BU must inform Sustainability Systems immediately regarding the incident, whereafter
a decision will be made regarding the activation of an independent Subject Matter Expert.
b) Where required, Sustainability Systems Department will appoint and mobilise an
independent subject matter specialist/expert to facilitate and coordinate the collection of
evidence, statements and to support the OU/BU personnel
c) In the case of an extreme serious incident, the OU/BU must appoint an independent
chairperson (at least MPSG17) from another OU/BU to chair the investigation, where
required, the OU/BU to liaise with the Divisional/Group head office for assistant in the
appointment of the independent chairperson. Liaise with Sustainability Systems OHS
regarding attendance of the Sustainability Systems OHS representative.
d) The OU/BU’s Internal OHS investigation chairperson/investigator must provide the
investigation final report in accordance with the Internal OHS Investigation template (240-
by providing a copy of the notice, completed Annexure 1 form as required in terms
of the OHS Act (where applicable), the OU/BU’s relevant investigation report and
supporting documents and a completed Mandate of Instruction in order for Legal
and Compliance Department to appoint an external legal representative.
If there are reasons to believe that such an attorney is not required, the OU/BU
must provide, without delay, a detailed motivation to Sustainability Systems and
reoccurrence. The Responsible Manager where the incident occurred is responsible for
compiling an incident preliminary brief. Where required, the preliminary brief must be
communicated to the Sustainability Systems Department for further distribution to all
relevant stakeholders.
f) When compiling the preliminary brief, consider the following:
i. The key learning points should be those points that are obvious (not necessarily the
root causes, as they might not be available at the time of communication).
ii. They must only cover a few main points.
iii. Focus on positive points as well.
following will be treated as violation of the procedure:
a) If misleading information is deliberately supplied or information is deliberately withheld.
b) If evidence is wilfully withheld, removed, disturbed, tampered with or distributed without the
relevant permission.
c) If a witness or any person involved in the incident investigation process is victimised or
intimidated.
d) If notification of the incident is not given within the specified time frames.
e) If prioritisation of the incident is deliberately or wilfully manipulated to indicate a lower
priority.
OHS Steering Committee.
Risk and Sustainability Management Committee.
members.
October 2017 7 M Zondi Align to current business
requirements, e.g. Management of
As per the list below.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Section
Source: 32-95 rev 9.pdfcorrective actions (for example, longer-term system-related improvements or evaluations)
approaches occupational health and safety, the environment and quality.
f) Improve the quality of occupational health and safety by learning from incidents, including
Description
Source: ENGINERRING BUILDING door (ESKOM HOLDINGS)-Model-CL0.pdfThe project involves the optimization and refurbishment of the 2nd floor engineering building offices at Simmerpan. Work includes supply and installation of doors, windows, and associated ironmongery, as well as plumbing and drainage works. The drawing set includes detailed door and window schedules, with door types B01-B08 and window type VP01. All dimensions must be checked on site, and discrepancies reported to the architect before work commences.
Important Dates
Source: ENGINERRING BUILDING door (ESKOM HOLDINGS)-Model-CL0.pdf (unknown)Closing date: 2026-08-26 at 11:00 (as per tender record). No other dates (briefings, site visits, clarification deadlines) are stated in the document.
Contact Information
Source: ENGINERRING BUILDING door (ESKOM HOLDINGS)-Model-CL0.pdf (unknown)Contact details found in the drawing: Cell: 079 546 2492, Email: [email protected]. Location: Megawatt Park, Maxwell Drive, Sunninghill, Sandton.
Submission Guidelines
Source: ENGINERRING BUILDING door (ESKOM HOLDINGS)-Model-CL0.pdf (unknown)Returnable documents are not specified in the available document. Bidders should refer to the full tender pack for the required forms and submission instructions.
Evaluation Criteria
Source: ENGINERRING BUILDING door (ESKOM HOLDINGS)-Model-CL0.pdf (unknown)The document does not explicitly state evaluation criteria, scoring method, or preference points. As an Eskom NTCSA tender, bidders are likely expected to be registered on the Central Supplier Database (CSD) and meet Eskom-specific supplier requirements. Contractors must demonstrate expertise in door and window installation, fire-rated assemblies, and plumbing/drainage work. They must also be able to provide samples and comply with all technical specifications.
Technical Specifications
Source: ENGINERRING BUILDING door (ESKOM HOLDINGS)-Model-CL0.pdf (unknown)Scope: Supply and installation of doors, windows, and associated ironmongery for the 2nd floor engineering building space optimization and refurbishment at Simmerpan.
Door types and quantities:
General requirements:
Door specifications:
Window specifications:
Plumbing and drainage notes:
Compliance Requirements
Source: ENGINERRING BUILDING door (ESKOM HOLDINGS)-Model-CL0.pdf (unknown)No specific compliance requirements (e.g., CSD, tax, B-BBEE, CIDB, CIPC) are stated in the document. As an Eskom NTCSA tender, bidders are likely expected to be registered on the Central Supplier Database (CSD) and meet any Eskom-specific supplier requirements.
Health & Safety
Source: ENGINERRING BUILDING door (ESKOM HOLDINGS)-Model-CL0.pdfThe document does not explicitly state health and safety requirements. However, as a construction tender, the contractor must comply with the Occupational Health and Safety Act and any Eskom site-specific safety regulations. Ensure a site safety file and method statements are prepared as per standard practice.
Contact Information
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Submission Guidelines
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Returnable Documents
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Evaluation Criteria
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Technical Specifications
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Compliance Requirements
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Description
Source: NTCSA_E-tendering Help Manual for supplier.pdfImportant Dates
Source: NTCSA_E-tendering Help Manual for supplier.pdf (TENDER)Submission Guidelines
Source: NTCSA_E-tendering Help Manual for supplier.pdf (TENDER)Evaluation Criteria
Source: NTCSA_E-tendering Help Manual for supplier.pdf (TENDER)Technical Specifications
Source: NTCSA_E-tendering Help Manual for supplier.pdf (TENDER)Compliance Requirements
Source: NTCSA_E-tendering Help Manual for supplier.pdf (TENDER)Section
Source: NTCSA_E-tendering Help Manual for supplier.pdfDescription
Source: Eng Building Space Optimisation - Env Management Tender Returnable Contractors or Service Providers (1).xlsThe tender is for the optimization of the Simmerpan engineering building space. The document is an environmental management tender returnable, requiring the contractor/service provider to submit environmental documentation as specified in the enquiry. The scope includes providing objective evidence of documented information for environmental management systems, waste management, environmental management programme, and other environmental aspects.
Submission Guidelines
Source: Eng Building Space Optimisation - Env Management Tender Returnable Contractors or Service Providers (1).xls (unknown)Returnable Documents: The tender requires submission of the completed EM Tender Returnables document (Excel file). Ensure all sections are completed and signed where required.
Evaluation Criteria
Source: Eng Building Space Optimisation - Env Management Tender Returnable Contractors or Service Providers (1).xls (unknown)Bidders must either hold a valid ISO 14001:2015 certification from an accredited body (Option 1) or provide objective evidence of a documented EMS that conforms to ISO 14001 (Option 2). The certification must be valid on the day of submission. Bidders must achieve a weighted average score of at least 80% across all sections to be considered. The scope of the ISO 14001 certificate must be relevant to the project.
Technical Specifications
Source: Eng Building Space Optimisation - Env Management Tender Returnable Contractors or Service Providers (1).xls (unknown)The tender is for the optimization of the Simmerpan engineering building space. The document is an environmental management tender returnable, requiring the contractor/service provider to submit environmental documentation as specified in the enquiry. The scope includes providing objective evidence of documented information for environmental management systems, waste management, environmental management programme, and other environmental aspects.
Description
Source: Scope of work Engineering Building - 25.03.26 M.N.pdfThe document is a Scope of Works for the space optimization of the 2nd Floor Engineering Building at Simmerpan, Germiston. It details the renovation of PTM&C and Quality Management spaces to accommodate 50 workstations, including specific finishes, electrical installations, LAN points, air conditioning, carpeting, and tiling. The document is classified as 'Controlled Disclosure' and includes roles, responsibilities, and monitoring processes.
Important Dates
Source: Scope of work Engineering Building - 25.03.26 M.N.pdf (unknown)The document mentions a closing date of 19 March 2025, but this appears to be the date of the scope document compilation, not the tender closing date. No other dates (e.g., briefings, site visits, clarification deadlines) are stated.
Contact Information
Source: Scope of work Engineering Building - 25.03.26 M.N.pdf (unknown)The document lists the following development team members (no direct contact details provided):
Evaluation Criteria
Source: Scope of work Engineering Building - 25.03.26 M.N.pdf (unknown)The document does not specify formal eligibility criteria (e.g., registration, financial, or technical qualifications). However, applicants are expected to be qualified contractors with experience in building renovations, electrical installations, and compliance with South African regulations (OHS Act, SANS10400, SANS10142). They must be able to work within Eskom's controlled disclosure and records management requirements.
Technical Specifications
Source: Scope of work Engineering Building - 25.03.26 M.N.pdf (unknown)Scope of Work – Space Optimization of 2nd Floor Engineering Building, Simmerpan, Germiston:
Finishes Specification (must adhere):
Electrical Installation:
LAN Points:
Air Conditioning:
Carpeting:
Tiles:
Applicability:
Normative References:
Informative Reference:
Roles and Responsibilities:
Monitoring:
Related/Supporting Documents:
Sheq:
Cost Benchmarking:
Records:
Compliance Requirements
Source: Scope of work Engineering Building - 25.03.26 M.N.pdf (unknown)No specific compliance requirements (e.g., CSD, tax, B-BBEE, CIDB, CIPC) are stated in the document. However, the following are referenced as normative requirements:
Health & Safety
Source: Scope of work Engineering Building - 25.03.26 M.N.pdfAll SHEQ (Safety, Health, Environment, Quality) requirements must be adhered to in all activities. Normative references include the Occupational Health and Safety Act and Regulations, National Building Regulations (SANS10400), and NTCSA Corporate Identity Guidelines. Electrical work must comply with SANS10142 and a new Certificate of Compliance (COC) must be issued.
Section
Source: Scope of work Engineering Building - 25.03.26 M.N.pdfThe document does not provide formal evaluation criteria. It only describes the scope of works and references that bidders must be qualified contractors with experience in building renovations, electrical installations, and compliance with South African regulations (OHS Act, SANS10400, SANS10142).
Description
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdfEskom Holdings SOC Ltd is South Africa's primary electricity supplier, wholly owned by the South African Government. Eskom's mandate is to efficiently ensure a stable electricity supply, contributing to lower business costs and enabling economic growth. Eskom has a considerable impact on the economy and everyday lives of South Africans and the region. Eskom's approach to occupational health, safety, the environment, and quality is entrenched in its values and living the purpose of 'powering growth sustainably' to achieve the vision of 'sustainable power for a better future'. Eskom is committed to upholding safety, health, environmental, and quality principles to ensure that no operating condition or service urgency justifies exposing anyone to risks that could lead to incidents. The Safety, Health, Environment & Quality (SHEQ) Policy governs principles and rules to fulfil Eskom's commitment to people, the environment, and quality. The policy applies throughout Eskom Holdings SOC Ltd divisions, subsidiaries, and entities in which Eskom has a controlling interest or influence. The policy addresses safety, health, environment, and quality across the organisation. The policy references normative documents including the Constitution of the Republic of South Africa Act, National Environmental Management Act, Occupational Health and Safety Act, Compensation for Occupational Injuries and Diseases Act, Climate Change Act, and various Eskom standards. Informative references include ISO 9000, ISO 9004, ISO 31000, Mines Health and Safety Act, and various Eskom policies and strategies.
Contact Information
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdf (unknown){"name":null,"email":null,"phone":null,"department":"ies. Eskom’s approach to occupational health, safety, the environment and quality is","address":"Environment, Unique Identifier: 32-727"}
Evaluation Criteria
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdf (unknown)Eligible applicants are external service providers (contractors/suppliers) who can demonstrate compliance with Eskom's SHEQ policy and relevant ISO standards. They must have the capacity to manage safety, health, environment, and quality risks, and be willing to align with Eskom's zero-harm and continuous improvement culture.
Technical Specifications
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdf (unknown)Eskom Holdings SOC Ltd is South Africa's primary electricity supplier, wholly owned by the South African Government. The SHEQ Policy applies to all Eskom divisions, subsidiaries, and entities where Eskom has controlling interest or influence. The policy addresses safety, health, environment, and quality across the organisation. Eskom is committed to upholding safety, health, environmental, and quality principles to ensure no operating condition or service urgency justifies exposing anyone to risks that could lead to incidents. The policy governs principles and rules to fulfil Eskom's commitment to people, the environment, and quality. Eskom's operations are underpinned by the organisation's mandate, vision, purpose, shareholder priorities, strategic objectives, and values.
Quality Management
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdfEskom will integrate and/or incorporate safety, health, environmental, and quality requirements into its operations through the Plan-Do-Check-Act (PDCA) quality cycle. This approach ensures decisions are made with consideration for economic development, environmental duty of care, social equity, continuous process performance improvement, and the achievement of key stakeholder requirements. Eskom will: 1. Fulfil compliance and conformity to legal and other requirements. 2. Establish, document, implement, and review management systems in accordance with ISO 9001, ISO 14001, and ISO 45001 requirements. 3. Set safety, health, environment, and quality objectives to achieve intended outcomes and measure performance against these to ensure continual improvement. 4. Take overall responsibility and drive accountability for ensuring safe and healthy workplaces and operations, with the aim of preventing work-related injuries and ill-health. 5. Consult and participate with workers and/or worker representatives on safety, health, environment, and quality management systems matters. 6. Engage interested parties and stakeholders by promoting open communication. 7. Conduct safety, health, environment, and quality training and create employee awareness. 8. Minimise the impact of business on the environment, encouraging environmentally friendly technologies. 9. Proactively manage Eskom's environmental footprint by minimising pollution and environmental degradation, pursuing a low-carbon future, and prioritising energy and water conservation. 10. Address climate change by reducing GHG emissions and protecting assets from adverse impacts. 11. Apply risk-based assessment methodologies for SHEQ management systems improvement. 12. Ensure external service providers establish, develop, and implement a relevant management system conforming to ISO 9001, ISO 14001, ISO 45001 or other applicable standards. 13. Support the establishment and functioning of safety, health, environment, and quality committees. 14. Develop skills and enhance employee competency through continuous training, education, and awareness. 15. Ensure adequate structures and resources are available for SHEQ management. 16. Manage SHEQ during procurement and supply chain of goods, services, and products sourced from external service providers. 17. Ensure continual improvement in SHEQ systems to enhance business performance.
Compliance Requirements
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdf (unknown)External service providers (contractors/suppliers) have a duty to fulfil all relevant safety, health, environmental, and quality compliance obligations, including conformity to standards and organisational requirements. They should establish, develop, and implement a relevant management system that conforms to, but is not limited to, ISO 9001, ISO 14001, ISO 45001 or other applicable standards. The policy references normative documents including the Constitution of the Republic of South Africa Act, National Environmental Management Act, Occupational Health and Safety Act, Compensation for Occupational Injuries and Diseases Act, Climate Change Act, and various Eskom standards. Informative references include ISO 9000, ISO 9004, ISO 31000, Mines Health and Safety Act, and various Eskom policies and strategies.
Health & Safety
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdfThe SHEQ Policy has undergone revisions. Revision 5 was coordinated by P Dondashe in May 2025, reviewed as per document review cycle to ensure alignment with the latest ISO 9001, ISO 14001 and ISO 45001 standards, including new business requirements practices for its operations and processes. Revision 4 was coordinated by K Modiole in October 2020, adding the word 'environment'. Revision 3 was coordinated by K Modiole in August 2020, aligning to the requirements of the latest ISO 9001, ISO 14001 and ISO 45001 standards and new business requirements. Revision 2 was coordinated by L Cloete in August 2016, updating policy based on revised ISO 9001 and 14001 standards, change in Eskom's registration name, changed to refer to other standards as may be applicable, aligned to Corporate Plan, and the appointment of a new Group Chief Executive. Revision 1 was coordinated by S Sambo in August 2013, updating policy based on revision date, while taking into account Eskom's strategic imperatives, changed structure and additional Eskom values. Revision 0 was coordinated by TL Ndlela in August 2010, superseding 32-94 and 32-7 SHE and Quality Policies, incorporating the contents of both policies into one policy, reallocated reference number 32-727 in accordance with the Eskom Documentation Centre (EDC) requirements. The policy was reviewed by the Risk and Sustainability Business Unit, incorporating inputs from the divisions/groups across Eskom Holdings SOC Ltd and its subsidiaries.
Environmental
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdfEskom strives to ensure Zero Harm befalls its employees, contractors, the public, and the environment by pursuing: 1. Open, isolate, test, earth, create an equipotential zone bond, and/or insulate before touch. 2. Zero fatalities. 3. Zero injuries, ill-health. 4. Zero environmental incidents. 5. Zero tolerance. 6. Zero defects. 7. Ensure safe live working. Eskom's Life-saving Rules apply to all employees, external service providers, and visitors: 1. Open, isolate, test, earth, create an equipotential zone bond, and/or insulate before touch. 2. Hook up at heights. 3. Buckle up. 4. Be sober. 5. Permit to work. 6. Ensure safe live working.
Description
Source: AM OHS Contractor Baseline risk assessment.xlsxSubmission Guidelines
Source: AM OHS Contractor Baseline risk assessment.xlsx (unknown)Evaluation Criteria
Source: AM OHS Contractor Baseline risk assessment.xlsx (unknown)Technical Specifications
Source: AM OHS Contractor Baseline risk assessment.xlsx (unknown)Compliance Requirements
Source: AM OHS Contractor Baseline risk assessment.xlsx (unknown)Description
Source: Engineering Building Space Optimization Project OHS Tender Evaluation.pdfImportant Dates
Source: Engineering Building Space Optimization Project OHS Tender Evaluation.pdf (unknown)Contact Information
Source: Engineering Building Space Optimization Project OHS Tender Evaluation.pdf (unknown)Submission Guidelines
Source: Engineering Building Space Optimization Project OHS Tender Evaluation.pdf (unknown)Returnable Documents
Source: Engineering Building Space Optimization Project OHS Tender Evaluation.pdf (unknown)Ref OHS Tender Returnable Y = Yes Comments
N= No
Evaluation Criteria
Source: Engineering Building Space Optimization Project OHS Tender Evaluation.pdf (unknown)Technical Specifications
Source: Engineering Building Space Optimization Project OHS Tender Evaluation.pdf (unknown)Financial Requirements
Source: Engineering Building Space Optimization Project OHS Tender Evaluation.pdf (unknown)Compliance Requirements
Source: Engineering Building Space Optimization Project OHS Tender Evaluation.pdf (unknown)Section
Source: Engineering Building Space Optimization Project OHS Tender Evaluation.pdfDescription
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdfImportant Dates
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdf (unknown)Contact Information
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdf (unknown)Submission Guidelines
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdf (unknown)Evaluation Criteria
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdf (unknown)Technical Specifications
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdf (unknown)Quality Management
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdfFinancial Requirements
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdf (unknown)Compliance Requirements
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdf (unknown)Health & Safety
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdfEnvironmental
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdfContractual Terms
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdfSection
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdfDescription
Source: 20260510_Space Optimization of List of Tender Returnables_Cat 4.pdfThe project involves space optimization of the 2nd Floor Engineering Building at Simmerpan to accommodate 50 workstations. Bidders must provide a quality method statement and proof of previous similar work.
Important Dates
Source: 20260510_Space Optimization of List of Tender Returnables_Cat 4.pdf (unknown)Contact Information
Source: 20260510_Space Optimization of List of Tender Returnables_Cat 4.pdf (unknown)Submission Guidelines
Source: 20260510_Space Optimization of List of Tender Returnables_Cat 4.pdf (unknown)Returnable Documents
Source: 20260510_Space Optimization of List of Tender Returnables_Cat 4.pdf (unknown)Required returnables include: completed and signed Form A, proof of previous work done as per scope, and all quality deliverables listed in Sections A, B, and E of the List of Tender Returnables (Category 4).
Evaluation Criteria
Source: 20260510_Space Optimization of List of Tender Returnables_Cat 4.pdf (unknown)Technical Specifications
Source: 20260510_Space Optimization of List of Tender Returnables_Cat 4.pdf (unknown)Compliance Requirements
Source: 20260510_Space Optimization of List of Tender Returnables_Cat 4.pdf (unknown)Section
Source: 20260510_Space Optimization of List of Tender Returnables_Cat 4.pdfEvaluation is based on Category 4 Quality Requirements. Section A (QMS): 3 points for documented QMS complying with ISO 9001 (method statement, quality policy, quality objectives). Section B (QMS in operation): 2 points for documented roles/responsibilities and control of external providers. Section E: 2 points for completed Form A and proof of previous work. Total 7 points.
Description
Source: Safety,_Health,_Environment_and_Quality_(SHEQ)_Policy.pdfThe document is Eskom's Safety, Health, Environment and Quality (SHEQ) Policy (Document Identifier 32-727, Revision 5). It applies to Eskom Holdings SOC Ltd and its subsidiaries. The policy affirms Eskom's commitment to excellence in SHEQ management, encompassing the ESG framework, and ensures uniformity and compliance with legal and other requirements. It is effective from the date of official authorisation and communication. The policy references normative standards including ISO 9001, ISO 14001, and ISO 45001, and various South African legislation. It defines key terms such as accident, incident, contractor/supplier, environment, quality, zero harm, and zero defects. The policy statement outlines Eskom's approach to integrating SHEQ into operations through the Plan-Do-Check-Act cycle, setting objectives, ensuring safe workplaces, consulting workers, engaging stakeholders, conducting training, minimising environmental impact, addressing climate change, and driving continuous improvement. Eskom's principles include Zero Harm, zero defects, and adherence to Life-saving Rules. The policy is monitored through audits and is authorised by various committees including OHS, Environmental Management, Eskom Quality Steering Committee, and NTCSA EXCO.
Contact Information
Source: Safety,_Health,_Environment_and_Quality_(SHEQ)_Policy.pdf (unknown)No specific contact details (name, email, phone, address) are provided in the document. The document is a policy document, not a tender-specific contact sheet.
Submission Guidelines
Source: Safety,_Health,_Environment_and_Quality_(SHEQ)_Policy.pdf (unknown)Returnable Documents: The document does not specify a list of returnable documents. Bidders should refer to the full tender documentation for the required forms and submission method.
Evaluation Criteria
Source: Safety,_Health,_Environment_and_Quality_(SHEQ)_Policy.pdf (unknown)The document does not specify explicit eligibility criteria (e.g., financial, technical, or legal requirements) for this tender. However, as a contractor/supplier to Eskom, applicants must be formally contracted and must demonstrate the ability to meet the SHEQ policy requirements, including having a relevant management system (ISO 9001, 14001, 45001) and a commitment to zero harm and zero defects.
Technical Specifications
Source: Safety,_Health,_Environment_and_Quality_(SHEQ)_Policy.pdf (unknown)The document is a Safety, Health, Environment and Quality (SHEQ) Policy, not a technical specification for the building space optimization project. It outlines Eskom's commitment to SHEQ principles and applies to all contractors/suppliers. Key points:
Quality Management
Source: Safety,_Health,_Environment_and_Quality_(SHEQ)_Policy.pdfQuality management requirements from the SHEQ policy:
Compliance Requirements
Source: Safety,_Health,_Environment_and_Quality_(SHEQ)_Policy.pdf (unknown)The document is a SHEQ policy, not a compliance checklist for tender submission. However, it sets out compliance expectations for contractors/suppliers:
Health & Safety
Source: Safety,_Health,_Environment_and_Quality_(SHEQ)_Policy.pdfHealth and safety requirements from the SHEQ policy:
Environmental
Source: Safety,_Health,_Environment_and_Quality_(SHEQ)_Policy.pdfEnvironmental requirements from the SHEQ policy:
Section
Source: Safety,_Health,_Environment_and_Quality_(SHEQ)_Policy.pdfThe document does not provide specific evaluation criteria for the tender. It is a policy document, not a tender evaluation framework. Bidders should refer to the tender-specific documentation for evaluation criteria.
Description
Source: PAYE Questionnaire for Service Contracts 2026_2027.docThis document is the PAYE Questionnaire for Service Contracts to Eskom Group of Companies, applicable from 1 March 2026 to 28 February 2027. It is used to determine the tax classification of contractors (individuals, companies, close corporations, trusts) providing services or labour to Eskom. The questionnaire includes evaluation packs for companies/CCs/trusts and individuals, with tests to classify the contractor as an Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor. It includes affidavits and declarations that must be signed based on responses.
Contact Information
Source: PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)Group Tax email: [email protected]. No other contact details are provided in the document.
Submission Guidelines
Source: PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)Complete the PAYE Questionnaire for Service Contracts 2026/2027 for the Eskom Group of Companies. The pack applies from 1 March 2026 to 28 February 2027. Return the completed pack, including the signed summary sheet and signed affidavits, to Eskom. Copy Group Tax on email: [email protected]. The contractor or authorised representative must declare that all questions have been answered truthfully. Fields marked with an asterisk (*) must be completed. Failure to sign required affidavits or declarations will result in PAYE being withheld from payments.
Evaluation Criteria
Source: PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)The questionnaire determines the contractor's tax classification (Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor) for PAYE purposes. It is not an evaluation of technical capability or eligibility. The classification is based on responses to a series of tests: Residence, Number of Employees Exclusion, Services Rendered by a Connected Person, More than 80% of Income Test, Place, Control and Supervision Test, and Dominant Impression Test. The outcome determines whether PAYE is withheld and the applicable IRP5/IT3(a) code.
Technical Specifications
Source: PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)The document is a PAYE questionnaire for service contracts to Eskom Group of Companies. It applies to contractors providing services or labour to Eskom Holdings SOC Ltd and its subsidiaries, including Eskom National Transmission Company SA. The pack is based on tax legislation for the 2026/2027 tax year and is subject to change.
Financial Requirements
Source: PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)The document does not specify pricing, bonds, guarantees, or payment terms. It focuses on tax classification and PAYE withholding. If classified as a Personal Service Provider or Dependent Contractor, PAYE will be withheld from payments at prevailing tax rates. If classified as an Independent Contractor, no PAYE is withheld and no IRP5/IT3(a) is issued.
Compliance Requirements
Source: PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)Complete the PAYE Questionnaire for Service Contracts 2026/2027. Provide all required information and sign all applicable affidavits and declarations as per the questionnaire flow. Provide a valid IRP30 exemption certificate if acting as a labour broker. Notify Eskom of any changes to the information provided. Eskom may withhold taxes, interest, and penalties if information is inaccurate.
Description
Source: NEC ECSC- Engineering Building Space Optimization .pdfImportant Dates
Source: NEC ECSC- Engineering Building Space Optimization .pdf (unknown)Briefing Session
Source: NEC ECSC- Engineering Building Space Optimization .pdf (unknown)Contact Information
Source: NEC ECSC- Engineering Building Space Optimization .pdf (unknown)Submission Guidelines
Source: NEC ECSC- Engineering Building Space Optimization .pdf (unknown)Returnable Documents
Source: NEC ECSC- Engineering Building Space Optimization .pdf (unknown)Evaluation Criteria
Source: NEC ECSC- Engineering Building Space Optimization .pdf (unknown)Technical Specifications
Source: NEC ECSC- Engineering Building Space Optimization .pdf (unknown)Methodology
Source: NEC ECSC- Engineering Building Space Optimization .pdf (unknown)Quality Management
Source: NEC ECSC- Engineering Building Space Optimization .pdfFinancial Requirements
Source: NEC ECSC- Engineering Building Space Optimization .pdf (unknown)Compliance Requirements
Source: NEC ECSC- Engineering Building Space Optimization .pdf (unknown)B-BBEE Requirements
Source: NEC ECSC- Engineering Building Space Optimization .pdf (unknown)Health & Safety
Source: NEC ECSC- Engineering Building Space Optimization .pdfEnvironmental
Source: NEC ECSC- Engineering Building Space Optimization .pdfContractual Terms
Source: NEC ECSC- Engineering Building Space Optimization .pdfSection
Source: NEC ECSC- Engineering Building Space Optimization .pdfDescription
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdfThis document is a post-contract award SHEQ requirement checklist for the Engineering Building Space Optimization Project at Simmerpan. It lists mandatory SHE file contents that the contractor must provide for approval before work commences. The checklist covers OHS, environmental, and quality management requirements.
Contact Information
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"n presented"}
Submission Guidelines
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdf (unknown)This document is a post-contract award SHEQ requirement checklist, not a tender submission guideline. It applies after the bid is awarded. The contractor must submit a SHE file/SHE Plan for approval by Eskom's SHEQ Officer before commencing work. The SHE file must include all items listed in the checklist (OHS, environmental, and quality requirements). Work may only start after the safety file is approved via a formal work authorisation letter.
Evaluation Criteria
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdf (unknown)The contractor must be the successful bidder for the Simmerpan Engineering Building Space Optimization project. They must be a registered company (with a company registration number) and comply with all South African OHS Act, environmental, and quality regulations. Specific competency requirements include: electrical contractor registered with the Department of Employment and Labour (DEL), safety officer with National Diploma in Safety Management or Advanced SAMTRAC and SACPCMP registration, and personnel with fall arrest and rescue unit standard certifications (229998, 229995, 229994).
Technical Specifications
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdf (unknown)The project involves engineering building space optimization at Simmerpan. The document is a SHEQ requirement checklist that must be complied with post-award. It lists mandatory SHE file contents including: OHS policy, tender SHE specification, Annexure B, letter of good standing, contract SHE plan, signed 37(2) agreement, notification of construction work (CR4), appointment letters for various roles, registers/checklists, head count, training matrix, OHS organogram, incident management procedure, method statements, risk assessments, fall protection plans, medical fitness certificates, emergency management plan, proof of competency, job descriptions, and COID documents. Environmental requirements include waste management plan, environmental management plan, aspect and impact register, environmental policy, training, environmental officer, waste transporter registration, hazardous chemical register and SDS, waste treatment licenses, waste manifest, incident and non-compliance procedures, and signed environmental proforma. Quality requirements include signed quality policy, quality method statement, quality objectives, control of documented information, roles and responsibilities, proof of previous work, quality plan, quality organogram, management review schedule, work instruction checklist, calibration schedule, and non-conformance procedure.
Methodology
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdfThe contractor must provide a signed quality policy, quality method statement, and quality objectives signed by top management. These form part of the quality management requirements.
Quality Management
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdfThe quality file must be approved by Eskom. The approval is indicated by a signed document with name, signature, designation, and date of approval.
Compliance Requirements
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdf (unknown)The contractor must be a registered company with a company registration number. Must comply with the Occupational Health and Safety Act and relevant regulations. Must have an electrical contractor registered with the Department of Employment and Labour (DEL). Must have a safety officer with National Diploma in Safety Management or Advanced SAMTRAC and SACPCMP registration. Must have personnel with fall arrest and rescue unit standard certifications (229998, 229995, 229994). Must have a signed 37(2) agreement. Must have a letter of good standing. Must have COID Act applicable documents. Must have a SHE file approved by Eskom before work commences. Must have a signed environmental requirements proforma form. Must have a signed quality policy and quality plan.
Health & Safety
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdfAppointment letters required include: appointment 16(2) with legal liability and incident management competency, principal contractor appointment, appointment of sub-contractor, site manager/responsible manager OHS Act Sec 8 with legal liability and incident investigation competency, assistant site manager/responsible manager with legal liability and incident investigation competency, electrical installation supervisor (Master Electrical Installation) with HIRA, supervisory training and incident investigation, legal liability, supervisor OHS Act Sec 8(2) with legal liability, supervisory training, incident investigation, HIRA, safety officer with National Diploma in Safety Management or Advanced SAMTRAC and HIRA including SACPCMP registration, risk assessor, and fall protection planner CR10.
Environmental
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdfThe contractor must have a non-compliance procedure and must sign the issued tender environmental requirements proforma form.
Contractual Terms
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdfThe document is a post-contract award requirement. The contractor must comply with all listed SHEQ requirements as part of the contract. The safety file must be approved by issuing a formal work authorisation letter before the contractor can commence work.
Section
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdfThe contractor must provide proof of competency for all personnel, including fall arrest system unit standard 229998, fall arrest system rescue unit standard 229995, and fall protection plan developer unit standard 229994. Must have an electrical contractor registered with DEL. Must have a SHE communication system, pre-start job assessment process, and COID Act documents. Environmental requirements include waste management plan, environmental management plan, aspect and impact register, environmental policy, environmental training, environmental officer, waste transporter registration, hazardous chemical register and SDS, waste treatment licenses, waste manifest, incident and non-compliance procedures, and signed environmental proforma. Quality requirements include signed quality policy, quality method statement, quality objectives signed by top management, control of documented information, signed roles and responsibilities, proof of previous work, quality plan, quality organogram signed by top management, management review schedule, work instruction checklist, calibration schedule, and non-conformance procedure.
Description
Source: Eskom Standard Conditions of Tender on e-tendering.pdfsupply identified in the specification and/or
works
Important Dates
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)Briefing Session
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)Site visit and / or 2.15 Tenderers must attend a site visit and/or clarification meeting that is cited as being
clarification compulsory in order to familiarise themselves with the proposed work, services or supply,
meeting location, etc. and raise questions. Details of the meeting(s) are stated in the Tender Data.
Failure to attend such compulsory meeting/site visit will result in the tender being
disqualified.
Contact Information
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)Submission Guidelines
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)Returnable Documents
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)Submitting a 2.7 Check the enquiry documents on receipt and notify the Eskom representative of any
tender discrepancy or omissions of documents. The Acknowledgement Form must be
completed as required and submitted with the tender and must clearly state if the tender
is for the whole or part of the works, services or supply identified in the specification and/or
works information by Eskom
2.8 Return the mandatory tender returnables to Eskom for evaluation purposes by tender
submission deadline, and other tender returnables that are required for contract award,
before contract award, completing without exception; all the forms, data and schedules
included therein. Where any certificate, document, proof of registration or the like is
required to be submitted as a mandatory or other tender returnable, the tenderer must
ensure that Eskom is in possession of a valid, current and where stipulated, an original
certificate/document for the duration of the tender validity period and, if the tender is
successful, up to contract award.
2.9 Submit the tender via Eskom Tender bulletin site on the Eskom E- tendering page. These
tenders must be submitted in English.
2.10 Sign the electronic tender. Eskom will hold the signatory named as the person duly
authorised to sign the tender on behalf of the tenderer, liable for the tender.
2.11 The Tender documents should be updated in the relevant folders, technical, Commercial
and financial as indicated on e-tendering page.
Evaluation Criteria
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)Technical Specifications
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)Quality Management
Source: Eskom Standard Conditions of Tender on e-tendering.pdfsubmission via the Eskom Tender bulletin site on the Eskom E- tendering page will be
accepted
Cost of 2.6 Accept that Eskom will not compensate the tenderer for any costs incurred in the
tendering preparation and submission of a tender, or the negotiation of any contract, including the
costs of any testing necessary to demonstrate that aspects of the tender satisfy the
evaluation criteria.
Submitting a 2.7 Check the enquiry documents on receipt and notify the Eskom representative of any
tender discrepancy or omissions of documents. The Acknowledgement Form must be
completed as required and submitted with the tender and must clearly state if the tender
is for the whole or part of the works, services or supply identified in the specification and/or
works information by Eskom
2.8 Return the mandatory tender returnables to Eskom for evaluation purposes by tender
submission deadline, and other tender returnables that are required for contract award,
before contract award, completing without exception; all the forms, data and schedules
included therein. Where any certificate, document, proof of registration or the like is
required to be submitted as a mandatory or other tender returnable, the tenderer must
ensure that Eskom is in possession of a valid, current and where stipulated, an original
certificate/document for the duration of the tender validity period and, if the tender is
successful, up to contract award.
Pricing Schedule
Source: Eskom Standard Conditions of Tender on e-tendering.pdfPricing the 2.19 Include in the rates, prices, and the tendered total of the Prices (if any) all duties, taxes
tender (including VAT), and other levies payable by the successful tenderer. Such duties, taxes
and levies are those applicable 14 (fourteen) days prior to the deadline for tender
submission.
2.20 Provide rates and Prices that are fixed for the duration of the contract and not subject to
contract price adjustment except as provided for in the Enquiry.
2.21 State the rates and Prices in South African Rand unless instructed otherwise in the
Conditions of Tender on Effective Date May 2022
e-tendering Review Date May 2027
Alterations to 2.22 Not make any alterations or additions to the tender documents, other than for purposes
documents of complying with instructions issued by the Eskom Representative or if necessary to
correct errors made by the tenderer. All such alterations shall be initialed by all
signatories to the tender. Corrections may not be made using correction fluid, correction
tape or the like.
Alternative 2.23 Submit alternative tenders only if a main tender is also submitted, and only if this is
tenders permitted in the Invitation to Tender. Accept that an alternative tender may be based only
on the criteria stated in the Tender Data and as acceptable to Eskom
Clarification and 2.24 Provide clarification and documents as required by the Eskom Representative during the
correction of evaluation of tenders, if not submitted. However, mandatory tender returnables (that
Prices after were required at tender submission deadline) will not be requested and may not be
tender submitted after tender submission deadline. Clarifications may include providing a
submission breakdown of rates or Prices and may not result in changes to prices or substance of
the tender submitted, except as required by the Eskom Representative to confirm the
correction of arithmetical errors discovered in the evaluation of tenders. The total of the
after the evaluation of tender offers with respect to the following errors/omissions: -
a) the gross misplacement of the decimal point in any unit rate; or
b) omissions made in completing the pricing schedule or bill of quantities, or
c) arithmetical errors due to line-item totals resulting from the product of a unit rate and
a quantity in a bill of quantities or schedule of prices; or
d) the summation of the prices
to either confirm the tender offer as tendered or to accept the corrected total of prices
Where the tenderer elects to confirm the tender offer as tendered; Eskom will correct the
error as follows: -
a) If a bill of quantities/pricing schedule applies and there is an error in the line-item
total resulting from the product of the unit rate and the quantity, the line-item total
shall govern, and the rate shall be corrected.
line-item total as quoted shall govern, and the unit rate shall be corrected.
b) Where there is an error in total of the prices either as a result of other corrections
the prices shall govern, and the tenderer shall be asked to revise the selected item
prices (and their rates if bill of quantities apply) to achieve the tendered total of the
prices.
Financial Requirements
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)Compliance Requirements
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)B-BBEE Requirements
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)2.32 Eskom may disqualify a tender if it is found that the tenderer has misrepresented or
falsified any information, certificate, affidavit or document. A fraudulent B-BBEE
-BBEE Commissioner and the
tenderer will be suspended from business with any State-Owned Company for up to
10 years and may even be sentenced to jail.
Health & Safety
Source: Eskom Standard Conditions of Tender on e-tendering.pdfProof of 2.26 Where an agent on behalf of a principal submits a tender, an authenticated copy of the
authority to act authority to act as an agent of the tenderer must be submitted as a tender returnable.
as agent
Compliance with 2.27 Comply with relevant legislation such as NT instructions (CSD, etc.), CIDB regulations for
relevant construction works; designated materials according to dti, PPPFA regulations; Amended B-
legislation (NT requirements for Safety, Health, Environment and
instructions, Quality (SHEQ) etc. and any other applicable legislation/regulations as may be set out in
etc)
2.28 Tenderers are required to provide reasonable proof to the satisfaction of Eskom, that
safety, health, environmental and quality (SHEQ) systems, policies and capabilities are
in place at the time of contract award. All costs and personnel associated with SHEQ
should be reflected in the tender for Eskom s assessment thereof.
2.29 Where CIDB is applicable; proof of registration on CIDB is mandatory at tender closing
deadline. Should this not be received as stipulated in the enquiry; the tender will be
disqualified. However, in the event that, at tender deadline submission, only proof of
application for registration on CIDB is available, then this must be submitted by tender
closing deadline, while the actual proof of CIDB registration (printout from CIDB
database) must be submitted by contract award.
Contract Skills 2.30 The Contractor shall achieve in the performance of the contract the CSDG established
Development in the CIDB Standard for Developing Skills through Infrastructure Contract (Published in
Goal (CSDG) GGN36760 of March 2020). CSDG is applicable to all classes of works exceeding R60
million and where the contract duration is 12 months or more or to Professional
services/service contract/order where the estimated contract exceed R5 million and
where the contract duration is 12 months or more.
Conditions of Tender on Effective Date May 2022
e-tendering Review Date May 2027
Contract 2.31 Contractor shall achieve in the performance of the contract the Contract Participation
Participation Goals (CPG) relating to the engagement of targeted enterprise as established in the
Goals (CPG) CIDB standard for Indirect targeting for enterprise development through Construction
works contracts (Published in GN No:36190 of the 25 February 2013)
Contract participation goals is only applicable in Grade 7-9 General Building (GB) and
Civil Engineering (CE) contract where the contract duration is 6 months or more.
Construction Works contracts in which at least 25% of the main contract could
reasonably be expected to be sub-contracted out in one or more of the following classes:
Civil Engineering (CE)
Electrical Engineering Work (EB)
General Building Works (GB)
Mechanical Engineering (ME)
right to reject the financial institution if found not to be suitable.
Respond to 3.1 Respond to a request for clarification received earlier than the closing time for clarification
clarification of queries. The responses will be published to all tenderers in the same manner the
enquiry documents were issued, and it is the tenderers responsibility to check the Eskom
Conditions of Tender on Effective Date May 2022
e-tendering Review Date May 2027
Tender opening 3.4 Open the tenders in the presence of the tenderers representatives who choose to attend
at the time and place stated in the Tender Data. Tenders for which an acceptable notice
of withdrawal has been submitted will not be opened.
3.5 At tender opening, Eskom will announce the names of the tenderers. Prices may be
announced if so stated in the Tender Data.
Non-disclosure 3.6 Unless required to do so by law, not disclose to tenderers, or to any other person not
officially concerned with such processes, information relating to the evaluation and
comparison of tenders and recommendations for the award of a contract, until after the
award of the contract to the successful tenderer.
Grounds for 3.7 Reject a tender after the Eskom Supplier Reconsideration Committee has established
rejection through the Eskom prescribed processes, that there is proof that the tenderer influenced
the processing of tenders or awarding of the contract; that colluding/ bid rigging or any
fraudulent activity has taken place in connection with the Invitation to Tender.
Clarification of a 3.8 Obtain from a tenderer clarification of any matter in the tender which may not be clear or
tender could give rise to ambiguity in a contract arising from this tender if the matter were not to
be clarified. Mandatory documents will not be requested but clarity on it may be required.
Basic 3.9 Determine before detailed evaluation, whether each tender received meets the basic
Contractual Terms
Source: Eskom Standard Conditions of Tender on e-tendering.pdf-written, type-written, printed or electronically
made, and resulting in a permanent record. Communication shall be in the English
language. Eskom takes no responsibility for non-receipt of communications from or by a
tenderer
Eskom's rights 1.6 Eskom may accept or reject any variation, deviation or alternative tender and reserves
to accept or the right to accept the whole or any part of the tender. Eskom may cancel the tender
reject any tender process at any time prior to the formation of a contract and will give written reasons for
the cancellation upon written request to do so. After the cancellation of the tender process
or the rejection of all tenders due to non-compliance with the thresholds, Eskom may
abandon the proposed work and services, have it performed in any other manner, or re-
issue a similar invitation to tender at any time. Eskom, its subsidiaries, shareholders,
advisors, directors, employees, representatives including the Eskom Representative shall
not be liable for any losses, claims or damages of whatsoever nature or howsoever arising
which may be sustained by a tenderer or any other person as a result of its participation
or any amendment, termination or suspension of the process set out in this Invitation to
1.7 Eskom reserves the right to enter into mandated negotiations with any one or more
negotiate
procedures.
Disclaimer 1.8 While Eskom takes all reasonable measures to ensure that all information contained in
regarding the tender documents is correct and complete, Eskom does not, however, make any
accuracy of representations or warranties, express or implied, as to the accuracy or completeness of
tender such information and Eskom expressly disclaims any and all liability for such
documents representations, warranties or statements.
Conditions of Tender on Effective Date May 2022
e-tendering Review Date May 2027
2.9 Submit the tender via Eskom Tender bulletin site on the Eskom E- tendering page. These
tenders must be submitted in English.
2.10 Sign the electronic tender. Eskom will hold the signatory named as the person duly
authorised to sign the tender on behalf of the tenderer, liable for the tender.
2.11 The Tender documents should be updated in the relevant folders, technical, Commercial
and financial as indicated on e-tendering page.
Tender validity 2.12 Hold the tender(s) valid for acceptance by Eskom at any time within the validity period
after the deadline for tender submission. Extend the validity period for a specified
additional period if Eskom requests the tenderer to do so. A tenderer agreeing to the
request will not be required or permitted to modify a tender. If contracts have not been
concluded and the tender validity has not been extended (as prescribed in the Eskom
PSCM 32-1034) and lapses; then the tenders are deemed to be invalid, and the
procurement process cannot continue. A new procurement process will have to be
initiated.
Confidentiality 2. 13 Treat as confidential all matters arising in connection with the tender. Use and copy the
and copyright of documents provided by Eskom only for the purpose of preparing and submitting a tender
documents in response to this Invitation to Tender.
Standardised 2.14 Obtain, if required, for the purposes of submitting a tender, copies of the latest revision of
specifications standardised specifications and/or other documents, which are not attached to the Invitation
and other to Tender, but which may be incorporated in the contents of the enquiry documents by
publications reference.
Site visit and / or 2.15 Tenderers must attend a site visit and/or clarification meeting that is cited as being
clarification compulsory in order to familiarise themselves with the proposed work, services or supply,
meeting location, etc. and raise questions. Details of the meeting(s) are stated in the Tender Data.
disqualified.
Seek 2.16 Request clarification of the enquiry documents, if necessary, by notifying the Eskom
clarification Representative earlier than the closing time for clarification of queries.
Insurance 2.17 Be informed that the extent (if any) of insurance provided by Eskom may not be for the
full cover required in terms of the relevant category listed in the conditions of contract.
not accept the correction of errors in the required manner.
Evaluation of 3.17 Score the B-BBEE level as stated on the CSD report or as per certificate/affidavit
B-BBEE provided. If the B-BBEE level is a pre-qualification criterion; then the proof of the B-BBEE
level (certificate/CSD number/CSD report) must be provided at tender submission
deadline; or the tender will be disqualified. If sub-contracting to designated groups pre-
qualification criteria are utilized (selected/mandatory) in terms of the PPPFA Regulation,
then Eskom will apply the PPPFA requirements for sub- -BBEE status and
the sub- -BBEE certificate/affidavit will need to be provided
at tender submission deadline. Should the information/documents provided indicate that
the level is in dispute (fraudulent/ expired) then the tender will be disqualified.
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
provided at Tender closing deadline, or the information/documents provided are
fraudulent or have expired; then the tenderer will not be disqualified (if otherwise deemed
to be responsive and acceptable in all other aspects) but will score zero under PPPFA
point allocation.
Ranking of 3.18 According to the PPPFA, Eskom will add the score for Pricing and the B-BBEE level
tenders together and rank the suppliers from the highest to the lowest.
Objective criteria 3.19 A contract may be awarded to a tenderer that did not score the highest points only in
accordance with Section 2(1) (f) of the PPPFA Act . If Eskom intends to apply
objective criteria in terms of Section 2 (1) (f), Eskom must stipulate the applicable
objective criteria in the tender documents. Functionality and any element of the B-BBEE
scorecard may not be used as objective criteria.
Special Conditions
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)Conditions of Tender on Effective Date May 2022
e-tendering Review Date May 2027
General 1.
Parties 1.1 The Employer, the Eskom Representative and each eligible tenderer submitting a tender
shall act timeously, ethically and in a manner which is fair, equitable, transparent,
competitive and cost-effective.
Interpretation 1.2 Terms shown in italics vary for each tender and the details of each term in italics are
identified in the Tender Data.
1.3 The Invitation to Tender documents issued by Eskom comprises of the enquiry
documents (including any annexures thereto) and/or any additional requirements as
stated in the Tender Data. Documents to be provided by the tenderer may form part of
any contract arising from this Invitation to Tender, if so, stated in the Tender Data,
however, these Standard Conditions of Tender and the Tender Data shall not form part
of any contract arising from this Invitation to Tender.
1.4 An open Invitation to Tender will be advertised on and National
Treasury (NT) e-Tender Portal and/or any other media if so required. A closed Invitation
to Tender will be sent directly to a limited number of known tenderers. A sole source is
regarded as a tenderer who meets the requirements as stated in the Eskom Procurement
and Supply Chain Management Procedure 32-1034. Any addenda to the Invitation to
Tender, will be published or issued in the same way as the Invitation to Tender was, and
will form part of the enquiry documents.
Communication 1.5 Each communication between Eskom and a tenderer shall be to or from the Eskom
Representative only, in writing, and in a format that can be read, copied and recorded.
-written, type-written, printed or electronically
made, and resulting in a permanent record. Communication shall be in the English
language. Eskom takes no responsibility for non-receipt of communications from or by a
tenderer
Requirements
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)Eligibility 2.1 Submit a tender only if the tenderer (whether a single company or a structure similar to a
Joint Venture) complies with the eligibility criteria stated in the Tender Data and the
tenderer, or any of his principals, is not under any restriction to do business with
Eskom/State Owned Companies.
Tenderers are not permitted to sub-contract 100% of the SOW. Any tender that is based
on 100% sub-contracting will be deemed ineligible and will be disqualified.
Section
Source: Eskom Standard Conditions of Tender on e-tendering.pdfevaluation criteria.
2.8 Return the mandatory tender returnables to Eskom for evaluation purposes by tender
materials and (gatekeeper for further evaluation) must be bought from local companies. A tenderer s
Functionality 3.13 If functionality is a criterion; tenderers are scored against the technical functionality
analysis financial risks to Eskom in the execution of the contract. During evaluation of the financial
Evaluation of 3.15 Evaluate the price according to the criteria/requirements set in the Tender Data. Factors
Check the highest ranked tender/tenderer with the highest number of evaluation points
after the evaluation of tender offers with respect to the following errors/omissions
relevant construction works; designated materials according to dti, PPPFA regulations; Amended B
instructions, Quality (SHEQ) etc. and any other applicable legislation/regulations as may be set out in
CIDB, PPPFA Invitation to Tender.
safety, health, environmental and quality (SHEQ) systems, policies and capabilities are
Description
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdfThis SHE specification is National Transmission Company of South Africa (NTCSA) Asset
Management Real Estate’s minimum requirements which are required to be met for the
specific contract and for the duration of the contract period by contractors and where required,
the delivery organisations.
National NTCSA Company of South Africa develop optimal plans and engineering solutions
for the expansion, maintenance and refurbishment of the power NTCSA network as well as
providing a technology and asset management service to ensure that the integrated power
system is reliable, adequate and secure.
The contractor is expected to develop a coherent SHE Plan in line with the issued scope
of work and this SHE Specification. National Transmission Company of South Africa
(NTCSA) AM Real Estate in no way assumes the contractor’s legal responsibilities. The
contractor is and remains accountable for the quality and the execution of his/her
health and safety programme for his/her employees and Appointed principal contractor
employees.
This SHE specification reflects minimum requirements and should not be construed as all
encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not
supersede or replace any organizational SHE requirements
2.1 Scope
This SHE specification lists the legislative and NTCSA AM Real Estate requirements and
where applicable, any requirements pertaining to Local Authorities/ Municipal by-laws/
Environmental legislation that must be met by the contractor.
2.1.1 Purpose
This specification sets out the minimum legislative and organisational requirements for the
specific scope of work.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
2.1.2 Applicability
This SHE specification is applicable to the contractor tendering for the issued scope of work
for space optimization of 2nd Floor Engineering Floor, Simmerpan, Germiston building,
including the purchasing of new furniture to occupy space as per design
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] Basic Conditions of Employment Act No .
[2] Occupational Health and Safety Act and Regulations No .
[3] National Environmental Management Act .
[4] National Environmental Management Waste Act 59 2008
[5] 32-37 Eskom Substance Abuse Procedure.
[6] 32-726 Contract and Contractor Occupational Health and Safety Management Standard
[7] 240-62196227 Life- saving Rules
[8] 32-95 Occupational Health and Safety Incident Management Procedure
[9] 32-727 SHEQ Policy
[10] 32- 418 Working at Heights Procedure
[11] 240-62946386 Vehicle and Driver Safety Management Procedure
[12] 32-520 Risk Assessment procedure
[13] Plant Safety Regulations.
[14] ISO 9001: 2015 Quality management system
[15] 39-71 Quality Control Plan and contact Quality Control Plan Approval Standard
[16] ISO 45001: 2018 Occupational health and safety management system
[17] Eskom program for Reintegration and return to work of employees, during the COVID
19 pandemic, Revision 30043030-V04
[18] ISO 14001:2015 Environmental Management System
[19] SANS 10400 The application of the National Building Regulations – All Parts.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
[20] SANS 17025:2017 Requirements for Testing and Calibration Laboratories
[21] SANS 204:2011 Energy efficiency in buildings.
[22] SANS 10400-XA:2011 Energy usage in buildings.
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] National Building Regulations and Building Standard Act No. Constitution
of the Republic of South Africa No
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
2.3 Definitions
Definition Explanation
Sub- contractor Means a contractor appointed by the Appointed principal contractor
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the
business
Employee (OHS Act) means, subject to the provisions of subsection (2), any
person who is employed by or works for an employer and who
receives or is entitled to receive any remuneration or who works
under the direction or supervision of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any
person who employs or provides work for any person and
remunerates that person or expressly or tacitly undertakes to
remunerate him/her, but excludes a TES (labour broker) as defined in
section 1(1) of the Labour Relations Act 1956 (Act No. )
Environment (32-94) means:
a. the land, water, and atmosphere of the earth;
b. micro-organisms and plant and animal life; and
c. any part or combination of (a) and (b) and the interrelationships
among and between them, and the physical, chemical, aesthetic,
and cultural properties and conditions of the foregoing that
influence human health and well-being
Environmental A detailed plan of action prepared to ensure that recommendations for
Management plan enhancing or ensuring positive impacts and limiting or preventing
negative environmental impacts are implemented during the life-cycle
of a project. This Environmental Management Plan should preferably
form part of Eskom’s Environmental Management System
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
2.3 Definitions
Definition Explanation
Fall protection plan (OHS Act) means a documented plan of all risks relating to working
from an elevated position, considering the nature of work undertaken,
and setting out the procedures and methods to be applied in order to
eliminate the risk
Health and safety (OHS Act) means a document specification of all health and safety
specification requirements pertaining to associated to a contract, so as to ensure
the health and safety of persons.
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to
cause serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an
fitness occupational health practitioner, issued in terms of the regulations,
whom shall be registered with the Health Professions Council of
South Africa
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the
hazards identified in any risk assessment
Appointed principal (In the text of this document) Means an employer, as defined in
contractor section 1 of the OHS Act, who intends to tender for or has signed a
contract with Eskom for services rendered.
Risk assessment (OHS Act) means a programme to determine any risk associated with
any hazard at a construction site in order to identify the steps needed
to be taken to remove, reduce, or control such hazard.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
2.4 Abbreviations
Abbreviation Description
AIA Approved Inspection Authority
AM Asset Management
BU Business Unit
CE Chief Executive
CNC (Eskom) Customer Network Centre
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DC Direct Current
DEL Department of Employment and Labour (Inspection and Enforcement
services – Provincial office)
EAP Employee Assistance Program
EP Emergency Preparedness
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GSR General Safety Regulations
HCA Hazardous Chemical Agent
LDV Light Delivery Vehicle
LoG (COID) Letter of Good Standing
SDS Safety Data Sheets
NEMA National Environmental Management Act
NTCSA National Transmission Company of South Africa
OHS Act Occupational Health and Safety Act and Regulations,
PPE Personal Protective Equipment
SABS South African Bureau Standard
SANS South African National Standard
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
2.5 Roles and Responsibilities
2.5.1 Appointed principal contractors and sub- contractors
Note 1: Most of the roles and responsibilities listed apply to both Appointed principal
contractors and sub- contractors. Where some of the listed do not apply to both, then the
specific responsibilities will be listed and titled. The contractors shall:
form part of the OHS Act.
their Appointed principal contractors within their working area, as contemplated by
section 37(2) of the OHS Act;
date of induction, relevant skills and licenses and be able to produce this list at the
request of the Project/Contract Manager.
responsibilities in terms of their appointment and that they advise and assist these
appointees in the execution of their duties.
requirements are complied with on all work sites.
their full participation and co-operation.
must be kept for each work site.
appointed sub-contractors’ files) health and safety file to the NTCSA AM Real Estate
project manager on completion of the project. This is to include all drawings, designs,
lists of materials used and other applicable information about the completed project,
as well as the list of sub- contractors, the agreement, and the type of work completed.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
copy of his/her Compensation Commissioner’s valid letter of good standing before the
commencement of work and any future renewal letters obtained during the project for
record-keeping purposes. The letter of good standing shall reflect the name of the
contractor’s company. Similarly, the Appointed principal contractor must provide the
Eskom project manager with all the valid letters of good standing from their sub-
contractors.
his/her Compensation Commissioner’s valid letter of good standing before the
commencement of work and any future renewal letters obtained during the project for
record-keeping purposes. The letter of good standing shall reflect the name of the
contractor’s company.
trained in the health and safety aspects relating to such work and that the employees
understand the hazards associated with all other work being carried out on the project.
they adhere to such procedures. Similarly (without removing the Appointed principal
contractors’ responsibilities), ensure that their sub-contractors and their employees are
conversant with all relevant work procedures and that they adhere to such procedures.
Co-ordinate the activities of all the sub-contractors in the interests of safety and health;
Ensure that potential contractors (whom they intend appointing) submitting tenders
have made detailed provision for the cost of safety and health measures throughout
the project.
in accordance with the health and safety plan or if such work poses a threat to the
health and safety of persons or a risk of degradation to the environment.
Take reasonable steps to ensure cooperation between all their sub-contractors.
Only appoint contractors to do work, if satisfied that the contractor has the necessary
competencies and resources to perform the work safely.
of all specified work throughout the contract period.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
Note 2: No work may commence and or continue without the presence of the appointed project
manager or project supervisor during performance of the contracted work.
the site for which such supervisor has been appointed for.
Note 3: In determining the number of appointed competent supervisors, the nature and scope of work
being performed, shall be taken into consideration.
Note 4: If a sufficient number of competent employee(s) have been appointed to assist the appointed
supervisor, the supervisor may supervise more than one site.
or dismiss employees, by virtue of the employee’s divulging health and safety
information or suspecting such information has been divulged, in the interests of health
and safety requirements;
contractor employees have transgressed any of the requirements of the health and
safety specification, safety and health plans, site rules or any other requirements.
of the public, and other contractors) present at work or in the vicinity of a construction
site against all risks that may arise from such site.
done by a competent person appointed in writing with a view to identify hazardous and
potentially hazardous work operations.
to the starting of any new task, irrespective of whether it is a repetitive task or not.
the project activity for which they are responsible.
NTCSA AM Real Estate’s behalf, with the relevant sections of the documented NTCSA
AM Real Estate’s SHE Specification.
plans if they meet all the requirements.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
the contract is in place and maintained.
conducted, person/man job specifications must be compiled and handed to the
occupational health practitioner.
employees. Medical assessments must be conducted by a registered Occupational
Health Practitioner or Occupational Doctor. During the pre-employment medical,
where employees will be required to work at heights, they will also be required to
undergo the required employee physical and psychological fitness examinations.
work, as well as the Appointed principal contractors, have received a health and safety
induction training session. Similarly, ensure that all visitors to site undergo the site’s
induction training.
their employees, inspect such equipment regularly and ensure recipients of PPE are
trained in the proper use, care and where necessary, the maintenance of PPE;
Note 5: should the Appointed principal contractor or his/her sub-contractors entertain visitors on site,
they will be held responsible for the provision and wearing PPE.
by law rehabilitate the environment.
the OHS Act.
on the work sites.
Note 6: Eskom will not tolerate the presence of anyone who is or who appears to be under the influence
of alcohol or any other intoxicating substance whilst performing work for them or on any work site.
respect to condition, use, care, storage, maintenance, and the management of these;
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
investigators.
Be involved in all of their contractor’s investigations.
When appointing contractors, advise the NTCSA’s Project Manager in writing
timeously and obtain his/her approval prior to them commencing work.
of induction, relevant skills and licenses and be able to produce this list at the request
of the NTCSA’s Project Manager.
Labour (DEL) as Electrical Installation Contractor and provide proof off.
2.5.2 Site/ Project Managers
Note 1: No work may commence and or continue without the appointed supervisor or site manager
during the performance of the contracted work.
new staff and site visitors;
Site Manager/ Project Manager shall be registered with SACPCMP
Communicate to all employees under their control on any hazardous and related work
procedures, before any work commences and thereafter, at such times as may be
determined by a risk assessment;
are complied with on all work sites;
poses a threat to the safety and health of persons or a risk of degradation to the
environment;
employees wear/use the PPE as instructed.
Inspect such PPE on a regular basis and record the inspections;
Ensure that all incidents are reported to the client and are investigated.
Be involved in all investigations that occur within their area of responsibility.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
contractor.
procedures and that they adhere to such procedures;
and prior to the starting of any new task, irrespective of whether it is a repetitive task.
Ensure that the team are involved in the abovementioned risk assessments;
well as confirming the requirements of the daily risk assessments;
of the public, and other contractors) present at work or in the vicinity of a construction
site against all risks that may arise from such site.
on, the premises / work sites and that no employee remains on site if he/she is under
the influence. Furthermore, report such instances to contract management;
with respect to condition, use, care, storage, maintenance, and the management of
these.
information or suspecting such information has been divulged, in the interests of health
and safety requirements (reference – section 26 of the OHS Act).
damage is done to the environment and that where an Environment Management Plan
is in place, then the plan adhere to the plan.
Stop any employee or contractor from performing work which is not in accordance with the
Appointed principal contractor’s and or contractors’ health and safety plan which poses a
threat to the health and safety of persons.
2.5.3 Contractor Site Supervisor or Contract Supervisor
Must:
Legal Liability, Hazard Identification and Risk Assessment and Incident Investigation
competent training and a 5 years supervision experience.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
NTCSA AM Real Estate requirements;
NTCSA AM Real Estate’s standards and specifications
action is in place.
for the elimination of unsafe acts by all people whilst on the project site.
in the first instance and thereafter the NTCSA AM Real Estate project manager in the
second instance relating to procedure requirements, non-conformances identified,
corrective actions, audits and inspection schedules.
AM Real Estate requirements;
employees.
procedures, work instructions and safety regulations issued by NTCSA AM Real
Estate:
relevant inspection reports.
Participate in all contractor incident investigations.
Participate in the Appointed principal contractor’s emergency preparedness planning.
Ensure that their own employees and those of any contractor are competent to perform
the tasks assigned.
the contractors deviate from safety requirements.
the SHE File and relevant documentation.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
2.5.4 Contractor Health and Safety Officer
ordinate the organisation’s safety effort on site.
Safety Management Diploma or an Environmental Health Diploma from recognised
institutions. Or a recognised safety certification (e.g., SAMTRAC – full course) with a
minimum of two years working experience.
The Safety Officer shall be registered with SACPCMP
Promote a SHE Culture within the organisations involved in the project / contract.
The contractor’s safety and health officer shall assist in the control of all health and
safety-related matters on the sites.
Be involved in the developing the project SHE Plan and SHE policy.
Be in constant liaison and cooperate with NTCSA AM Real Estate’s SHE professionals
responsible for providing them with a health and safety service.
contractor and is submitted to any contractors.
Conduct inspections of all work sites for the duration of the project.
Be involved in the organisations incident investigations when required.
Conduct organisational, site and visitor induction training.
Stop any employee or contractor from performing work which is not in accordance with
the Appointed principal contractor’s and or contractors’ health and safety plan which
poses a threat to the health and safety of persons.
as per the SHE Plan.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
3.1 Scope of work
The scope of work for this project entails:
PTM&C Section:
and replace with focus booths.
(straight desk) Open Area Currently space to also be fitted out with double door
credenzas / filling cupboards
Quality Management Section:
pause area create mall syndicate room to support Quality Management side of
building floor.
Electrical Installation:
ceiling lights to be LEDs. All the electrical work will follow design layout.
A Signed copy of the scope of works must be retained by the contractor.
Note: The contractor who will be awarded this contract will be known as the “Appointed principal
contractor” and any contractor appointed by the Appointed principal contractor will be known as the
“sub-contractor.
3.2 Legal Compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between NTCSA AM Real Estate and the
Appointed principal contractor at the time of awarding the contract. The Appointed principal
contractor must ensure that a section 37(2) agreement is compiled between the Appointed
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
principal contractor and all their contractors for the contract. This agreement must be
submitted as part of the safety file package.
The original copy of the section 37(2) Agreement must be retained by the Appointed principal
contractor and a copy retained by the responsible Eskom NTCSA AM Real Estate project
manager.
Copies of all the agreements must form part of the respective contractor’s SHE File.
3.2.2 Site Access requirements
The Safety file package must be submitted to the OHS department 2 weeks before the
agreed site establishment date.
Before the successful Contractor commences with any work, the NTCSA AM Real Estate
Project Manager/Contract Manager shall ensure that;
person of the contracting company as well as the NTCSA AM Real Estate baseline
risk assessment.
Estate project manager/contract manager have signed the NTCSA AM Real
Estate section 37 (2) agreement.
Contract/Project Manager
approved by the Appointed principal contractor Responsible Person
the SHE Plan and accompanied by a risk assessment procedure applied. A
monitoring and review plan must form part of the risk assessment procedure
Appointed principal contractor must supply the applicable NTCSA AM Real Estate
SHE specifications to the contractor(s).
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
Contract/Project Manager, where the file meets all the requirements an
authorisation letter shall be issued to the Appointed principal contractor
attendance register as proof of communication before Eskom NTCSA OHS
department can provide Eskom NTCSA contractor induction.
must be trained to level 2 from SAQA approved training provider.
Covid-19 management plan in line with the guidelines as issued by the
Department of Employment and Labour
Department of Employment and Labour
masks over and above other masks that may be required due to the risk of the
activities
to the employees
frequency
3.2.3 Hazardous work by children (Child Labour)
The constitution of the Republic of South Africa, in the “Bill of Rights” is clear on the rights of
children, especially when it comes to:
being protected from exploitative labour practices;
not to be required or permitted to perform work or provide services that
i. are inappropriate for a person of that child’s age; or
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
ii. place at risk the child’s well-being, education, physical or mental health or spiritual,
moral or social development; and the Basic Conditions of Employment Act, Chapter
six Section 43 “Prohibition of employment of children”.
Before resorting to the use of child labour, due consideration must be given to the rights of the
child in terms of the constitution. Where work is being performed which is not prohibited in
terms of the constitution, then such work must be conducted in terms of the OHS Act
“Regulations on Hazardous Work by Children in South Africa” with emphasis on paragraph 2
Purpose and Interpretation. Eskom does not condone the use of child labour and therefore all
effort must be exercised and child labour should not be used.
3.2.4 Legal Compliance
The Appointed principal contractor and contractors shall have an up-to-date copy of the OHS
Act and regulations which will be available to all employees. The Appointed principal
contractor and all sub- contractors will comply with all the legislation pertaining to the issued
scope of work. The Appointed principal contractor and contractors shall have an up-to-date
copy of the OHS Act and regulations which will be available to all employees
3.2.5 Requirements Specific to the issued Scope of Work
The Engineering Space Optimization at NTCSA AM Real Estate falls under High risk in
terms of supplier category as workers in the vicinity are at an increased risk of exposure of
Working at Heights, and Electrical Installation and etc. therefore:
competent.
use of tools and equipment during installations and maintenance thereof.
proceeding with planned activities.
A relevant risk assessment and method statement to be developed and applied.
Employees must be medical fit to work at fall risk position.
Before the commencement of the activities the Appointed principal contractor to
ensure that all Isolations are done and lock out system is adhered to
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
including identification documents of the employees and their competency
certificates.
issued per risk based.
in possession of a site-specific fall protection plan developed by a competent person.
site.
(SAQCC) training certificates for their respective field of work and per the scope of
work
The SHE Plan shall contain the following as a minimum:
Relevant applicable legal and other requirements as per issued scope of work
Roles and responsibilities
Process for hazard identification and risk assessment including monitoring and review
plans, a further identification of opportunities must be part of the process. Interested
and affected parties must be clearly outlined.
Process for change management
Process for employee training, competency, communication, awareness and
participation
Process for incident management and investigation
Process for setting objectives and programmes
Process in place to review the SHE Plan
Process for performance management and monitoring
Process for internal audits
Process for document and records management
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
and when required by the client) to ensure that it fully addresses all the issues and
complies with these requirements to the satisfaction of the client.
3.3 Coid
The Appointed principal contractor and all his/her sub-contractors shall be registered with an
appropriate employment compensation commissioner and have available a valid letter of good
standing (LoG) from such commissioner. The obligation lies with the contractors to ensure that
the LoG remain valid throughout the contract period. A copy of the LoG must be filed in the
contractor SHE files.
3.4 Costing for SHE within the Project
The SHE costing must be itemised and must take into consideration the scope of work. The
Appointed principal contractor must make sure that he/she made adequate provision for the
cost of health and safety measures during tendering process. The SHE cost must exclude
the tools of the trade and PPE.
3.5 Eskom Life-saving Rules
who performs work for Eskom in Eskom adopt the same view.
agents, consultants, and contractors. Failure to adhere to these rules by any Eskom
employee or employee of an Appointed principal contractor or contractor will be
considered a serious transgression. These rules are being implemented to prevent
serious injury or death of any employee, labour broker or contractor working in any
area within Eskom.
of any product), then the rules shall be obeyed by any contractor and their employees.
The rules are:
Rule description of rule
Open, isolate, test, earth and create an equipotential zone
Rule 1
Before touch
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
With the aim to ensure a safe electrical work environment, no person may work/operate
on, around or near any electrical network, line or apparatus, electrically connected to
the power system and/or electrically charged and/or not electrically charged.
Hook up at heights
Rule 2 Working at height is defined as any work performed above a stable work surface or
where a person puts himself/herself in a position where he/she exposes himself/herself
to a fall from or into.
Buckle up
Rule 3 No person may drive any vehicle on Eskom business and/or on Eskom premises:
Unless the driver and all passengers are wearing seat belts.
Be sober
Rule 4 No person is allowed to be under the influence of intoxicating liquor or drugs while on
duty
Permit to work
Rule 5 Where an authorisation limitation exists, no person shall work without the required
permit to work.
Ensure safe live working
To ensure safe live work, each live worker shall:
Rule 6
Ensure all live work basic principles are adhered to, as outlined (for the method being
used) in the High Voltage Live Working Standard for the respective division.
Eskom will take a stance of zero tolerance on these rules.
Non-compliance to a Life Saving rule will be considered serious misconduct and will lead to
serious disciplinary action, which may include dismissal.
This is to ensure that every person who works on or visits an Eskom returns home safely
to his or her family.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
3.6 Substance Abuse
industrial incidents and the driving of vehicles. Eskom is therefore, entitled to take
reasonable steps to ensure that intoxicated persons are identified and prevented from
entering Eskom.
General Safety Regulation 2A is clear on the legal stance regarding intoxication.
The alcohol and drug permissible level is 0%.
All contractors shall comply with Eskom’s procedure 32-37 (“Substance Abuse
Procedure”), taking in to account that this is an Eskom Life-saving Rule number 4: BE
SOBER”), this means anyone entering the Eskom will be subjected to ad hoc alcohol
testing.
alcohol testing of their own employees. The legislative alcohol level is deemed to be
zero.
file.
3.7 Risk assessment (refer sec 8 & 9 of the OHS Act)
The contract manager must prepare and provide a Baseline Risk Assessment for an intended
work as per the scope of work to the contractor as part of the contract package that gives an
overview of identified hazards and mitigation is the work area where this scope of work will be
executed.
The Appointed principal contractor shall develop a Risk Assessment in line with Section 8
(2)(d) of the OHS Act, in alignment to Eskom 32-520 procedure. Emerging risks and hazards
must be managed during the duration of the contract. This means that if there are significant
changes to a process or activity, or any new process, then these should also be subjected to
risk assessment. All risks must be rated. Activity based risk assessments shall be conducted
by a competent person of the Appointed principal contractor.
3.8 Fire Equipment and maintenance
a. Be clearly labelled
b. Conspicuously numbered
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
c. Entered in a register
d. Inspected monthly by a competent person
Tested and serviced at recommended intervals by an accredited supplier
Results entered in the register and signed by competent person.
3.9 First Aid and Equipment
The requirements of the OHS Act GSR 3 must be observed.
First aid appointments must be made to meet the requirements. Appointees must be
trained to level 2. It is good practice for all employees to be trained to at least level 1.
box(es) at or near the working area.
type of work performed, the distance teams are working apart and the terrain to be
covered if an emergency should arise.
accessible for all employees.
employees are familiar with the emergency numbers.
every 50 or team of workers on site or part thereof, taking into account the type of work
performed and the distance between teams.
must be available and accessible for the immediate treatment of injured persons at the
workplace.
name and contact details of the First Aider of such first aid box or boxes shall be
erected.
arrangements be made for incidents occurring after working hours
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
3.10 SHE Communication Systems
Appointed principal contractor/s and their contractors must develop a communication
procedure outlining how they intend to communicate SHE issues to their staff, the mediums
they will employ and how they will measure the effectiveness of there SHE communication.
Communications shall include:
were part of the talks.
completion of the task.
3.10.1 Tool box talks / Daily team talks / pre job meetings
personnel associated with the work task in attendance. The job, relevant procedures,
associated hazards, safety measures, i.e., the task risk assessments shall be
discussed. Each employee who attends the briefing shall sign an attendance list of that
pre-job brief form undertaking that they have an understanding of the tasks, risks and
control measures required.
3.11 SHE Training
indicating all met training requirements in relation to the scope of work
the SHE File.
3.11.1 Induction training
and their employees have undergone the NTCSA AM Real Estate Safety induction
training prior to commencing work on site.
indicate that they have received and understood the induction training.
employment medical examination and found fit for duty. A copy of the certificate of
fitness must be kept in the SHE File on site for the duration of the project.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
All employees and visitors on site shall carry the proof of induction training.
All contractor employees must attend the Appointed principal contractor induction
3.11.2 Site specific induction training
The Appointed principal contractor shall ensure that all his / her employees and contractor
employees undergo site specific work induction with regard to the approved project SHE Plan,
general hazards prevalent on site, risk assessment, rules and regulations, and other related
aspects. Records of site-specific induction must be kept in the safety file
The induction training should also include identification of sensitive features such as
wetlands/vlei areas, red data species, graves, etc.
3.11.3 Visitors to site induction
contractor’s site-specific safety induction prior to being allowed access to site.
properly inducted. No visitors are permitted to undertake any work onsite, of any
nature.
Visitors who have completed site induction must be provided with a record of proof of Induction
training.
3.11.4 Requirements for Drivers
access to laydown area/site.
condition and a vehicle license must be valid at all times.
Contractor vehicles can be subject to inspections by the contract/project manager
Vehicles which are not roadworthy will not be permitted to be used on site.
Precautions shall be taken to secure all loads properly. Loads projecting from vehicles
shall be securely loaded and in daytime a red flag and during darkness a red light or
red reflective material shall be attached to the extreme end of such projecting material.
All vehicles must be fitted with fire extinguisher and first aid kit
The driver must have a valid national licence for the type of vehicle used.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
The driver must have level 1 first aid training and basic fire extinguisher training
It is the responsibility of the driver to ensure:
Their passengers wear seat belts whilst the vehicle is in motion.
Comply with all traffic road rules, safety, direction and speed signs.
Ensure that vehicle loads are properly secured prior to moving off.
Ensure that vehicles are not overloaded.
No drivers or operators may text, talk on cell phones or two-way radios whilst driving,
unless a hands-free kit is used.
All drivers of such vehicles are to have valid medical fitness certificates.
Drivers of light vehicles must avoid stopping or parking in the vicinity of machines. At
least 30 (thirty) meters must be left clear between such a vehicle and such a machine
by them.
3.12 Housekeeping and Order
vehicles for the duration of the project.
Prompt disposal of waste materials, scrap and rubbish is essential.
Materials/objects shall not be left unsecured in elevated areas –falling objects may
cause serious injuries/fatalities.
Nails protruding through timber shall be bent over or removed so as not to cause injury.
All packaging material including boxes, pallets, crates, etc. to be removed from the
work area immediately.
area of all materials, scrap, temporary buildings and building bases to the satisfaction
of the client/agent.
compromising safety and cleanliness, anyone has the responsibility to bring it to the
attention of the Appointed principal contractor in the first instance and the Eskom
project/site manager in the second instance.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Important Dates
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdf (unknown)Contact Information
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdf (unknown)Submission Guidelines
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdf (unknown)Evaluation Criteria
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdf (unknown)Technical Specifications
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdf (unknown)Quality Management
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdfReview Date 16 April 2029
3.17 Smoking ........................................................................................................................... 38
3.18 Cellular Phones .............................................................................................................. 38
3.19 General Requirements as per the cellular phone usage generation directive ...... 38
3.20 Medicals .............................................................................................................................. 38
3.21 Personal Protective Equipment Requirements .......................................................... 42
3.22 Incident Investigation ..................................................................................................... 42
3.23 Emergency Management .............................................................................................. 43
3.24 Non-Conformance and Compliance ............................................................................ 43
3.25 Work Stoppage ............................................................................................................... 44
3.26 Hours of Work ................................................................................................................. 44
3.26.1 Normal work .................................................................................................................... 44
3.26.2 Night work ....................................................................................................................... 44
3.26.3 Overtime ...................................................................................................................... 45
3.29. Environmental Requirements ....................................................................................... 45
3.29.1 Environmental Rules ...................................................................................................... 45
3.29.2 Contract Award Documentation ................................................................................... 46
3.29.3 Records to be kept onsite ............................................................................................. 47
3.30. Quality Requirements .................................................................................................... 48
3 Acceptance .................................................................................................................................. 49
4 Revisions ..................................................................................................................................... 49
Review Date 16 April 2029
[20] SANS 17025:2017 Requirements for Testing and Calibration Laboratories
[21] SANS 204:2011 Energy efficiency in buildings.
[22] SANS 10400-XA:2011 Energy usage in buildings.
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] National Building Regulations and Building Standard Act No. Constitution
of the Republic of South Africa No
DEL Department of Employment and Labour (Inspection and Enforcement
services – Provincial office)
in the first instance and thereafter the NTCSA AM Real Estate project manager in the
second instance relating to procedure requirements, non-conformances identified,
corrective actions, audits and inspection schedules.
relevant inspection reports.
authorisation letter shall be issued to the Appointed principal contractor
attendance register as proof of communication before Eskom NTCSA OHS
department can provide Eskom NTCSA contractor induction.
must be trained to level 2 from SAQA approved training provider.
Covid-19 management plan in line with the guidelines as issued by the
industrial incidents and the driving of vehicles. Eskom is therefore, entitled to take
reasonable steps to ensure that intoxicated persons are identified and prevented from
entering Eskom.
General Safety Regulation 2A is clear on the legal stance regarding intoxication.
The alcohol and drug permissible level is 0%.
All contractors shall comply with Eskom’s procedure 32-37 (“Substance Abuse
Procedure”), taking in to account that this is an Eskom Life-saving Rule number 4: BE
SOBER”), this means anyone entering the Eskom will be subjected to ad hoc alcohol
testing.
alcohol testing of their own employees. The legislative alcohol level is deemed to be
zero.
file.
3.7 Risk assessment (refer sec 8 & 9 of the OHS Act)
Financial Requirements
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdf (unknown)Compliance Requirements
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdf (unknown)Health & Safety
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdfEskom NTCSA’s Project Manager Eskom NTCSA’s SHEQ Officer
Mangaka Magaoga Name: ____________________________Sakhi Nkebe Name: ________________________
Signature: ________________________ Signature: _____________________
Date: _____________________________23/04/2026 Date: ________________________24/04/2026
Eskom NTCSA’s Environmental Officer Eskom NTCSA’s Snr SHEQ Advisor
Name: __________________________Tshegofatso Nnene Name: Albert_______________________Shai
Signature: _______________________ Signature: ______________________
Date: ___________________________24 April 2026 Date: __________________________24/04/2026
Review Date 16 April 2029
Content . Introduction .................................................................................................................................... 5
2.1 Scope .......................................................................................................................................... 5
2.1.1 Purpose ................................................................................................................................ 5
2.1.2 Applicability ......................................................................................................................... 6
2.2 Normative/Informative References ......................................................................................... 6
2.2.1 Normative ............................................................................................................................ 6
2.2.2 Informative ........................................................................................................................... 7
2.3 Definitions ................................................................................................................................... 8
2.4 Abbreviations ............................................................................................................................ 10
2.5 Roles and Responsibilities ..................................................................................................... 11
2.5.1 Appointed principal contractors and sub- contractors ................................................ 11
2.5.2 Site/ Project Managers .................................................................................................... 15
2.5.3 Contractor Site Supervisor or Contract Supervisor ..................................................... 16
2.5.4 Contractor Health and Safety Officer ............................................................................ 18
3.1 Scope of work........................................................................................................................... 19
3.2 Legal Compliance .................................................................................................................... 19
3.2.1 Section 37(2) (Legal) Agreement ................................................................................... 19
3.2.2 Site Access requirements ............................................................................................... 20
3.2.3 Hazardous work by children (Child Labour) ................................................................. 21
3.2.4 Legal Compliance ............................................................................................................. 22
3.2.5 Requirements Specific to the issued Scope of Work .................................................. 22
3.3 Coid..................................................................................................................................... 24
Review Date 16 April 2029
3.4 Costing for SHE within the Project .................................................................................. 24
3.5 Eskom Life-saving Rules ................................................................................................... 24
3.6 Substance Abuse ............................................................................................................... 26
3.7 Risk assessment (refer sec 8 & 9 of the OHS Act) ....................................................... 26
3.8 Fire Equipment and maintenance .................................................................................... 26
3.9 First Aid and Equipment .................................................................................................... 27
3.10 SHE Communication Systems ..................................................................................... 28
3.12.1 Tool box talks / Daily team talks / pre job meetings ................................................. 28
3.11 SHE Training ................................................................................................................... 28
3.13.1 Induction training ............................................................................................................ 28
3.13.2 Site specific induction training ...................................................................................... 29
3.13.3 Visitors to site induction ................................................................................................ 29
3.13.4 Requirements for Drivers .............................................................................................. 29
3.12 Housekeeping and Order .............................................................................................. 30
3.14.1 Stacking ........................................................................................................................... 31
3.13 Workplace Signage and Colour Coding ...................................................................... 31
3.14 Tools and Equipment ..................................................................................................... 32
3.14.1 Hand tools ....................................................................................................................... 32
3.15 Ladders ............................................................................................................................ 33
3.15.1 Working at Heights ......................................................................................................... 34
3.15.2 Fall Protection Plan ........................................................................................................ 35
3.15.3 Safe Work Procedures / Method Statements ............................................................ 35
3.16 Auditing ............................................................................................................................ 37
3.16.1 Approval and compliance of Appointed principal contractor SHE Plan ................. 37
3.16.2 Eskom SHE audits ......................................................................................................... 37
3.16.3 Contractor audits ............................................................................................................ 37
Review Date 16 April 2029
This SHE specification is National Transmission Company of South Africa (NTCSA) Asset
Management Real Estate’s minimum requirements which are required to be met for the
specific contract and for the duration of the contract period by contractors and where required,
the delivery organisations.
of work and this SHE Specification. National Transmission Company of South Africa
(NTCSA) AM Real Estate in no way assumes the contractor’s legal responsibilities. The
contractor is and remains accountable for the quality and the execution of his/her
health and safety programme for his/her employees and Appointed principal contractor
employees.
encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not
supersede or replace any organizational SHE requirements
following paragraphs.
2.2.1 Normative
[1] Basic Conditions of Employment Act No .
[2] Occupational Health and Safety Act and Regulations No .
[3] National Environmental Management Act .
[4] National Environmental Management Waste Act 59 2008
[5] 32-37 Eskom Substance Abuse Procedure.
[6] 32-726 Contract and Contractor Occupational Health and Safety Management Standard
[7] 240-62196227 Life- saving Rules
[8] 32-95 Occupational Health and Safety Incident Management Procedure
[9] 32-727 SHEQ Policy
[10] 32- 418 Working at Heights Procedure
[11] 240-62946386 Vehicle and Driver Safety Management Procedure
[12] 32-520 Risk Assessment procedure
[13] Plant Safety Regulations.
[14] ISO 9001: 2015 Quality management system
[15] 39-71 Quality Control Plan and contact Quality Control Plan Approval Standard
[16] ISO 45001: 2018 Occupational health and safety management system
[17] Eskom program for Reintegration and return to work of employees, during the COVID
19 pandemic, Revision 30043030-V04
[18] ISO 14001:2015 Environmental Management System
[19] SANS 10400 The application of the National Building Regulations – All Parts.
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the
business
Employee (OHS Act) means, subject to the provisions of subsection (2), any
person who is employed by or works for an employer and who
receives or is entitled to receive any remuneration or who works
under the direction or supervision of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any
person who employs or provides work for any person and
remunerates that person or expressly or tacitly undertakes to
remunerate him/her, but excludes a TES (labour broker) as defined in
section 1(1) of the Labour Relations Act 1956 (Act No. )
Environment (32-94) means:
a. the land, water, and atmosphere of the earth;
b. micro-organisms and plant and animal life; and
c. any part or combination of (a) and (b) and the interrelationships
among and between them, and the physical, chemical, aesthetic,
and cultural properties and conditions of the foregoing that
influence human health and well-being
Fall protection plan (OHS Act) means a documented plan of all risks relating to working
from an elevated position, considering the nature of work undertaken,
and setting out the procedures and methods to be applied in order to
eliminate the risk
Health and safety (OHS Act) means a document specification of all health and safety
specification requirements pertaining to associated to a contract, so as to ensure
the health and safety of persons.
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to
cause serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an
fitness occupational health practitioner, issued in terms of the regulations,
whom shall be registered with the Health Professions Council of
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the
hazards identified in any risk assessment
Appointed principal (In the text of this document) Means an employer, as defined in
contractor section 1 of the OHS Act, who intends to tender for or has signed a
contract with Eskom for services rendered.
Risk assessment (OHS Act) means a programme to determine any risk associated with
any hazard at a construction site in order to identify the steps needed
to be taken to remove, reduce, or control such hazard.
their full participation and co-operation.
must be kept for each work site.
appointed sub-contractors’ files) health and safety file to the NTCSA AM Real Estate
project manager on completion of the project. This is to include all drawings, designs,
lists of materials used and other applicable information about the completed project,
as well as the list of sub- contractors, the agreement, and the type of work completed.
trained in the health and safety aspects relating to such work and that the employees
understand the hazards associated with all other work being carried out on the project.
they adhere to such procedures. Similarly (without removing the Appointed principal
contractors’ responsibilities), ensure that their sub-contractors and their employees are
conversant with all relevant work procedures and that they adhere to such procedures.
Co-ordinate the activities of all the sub-contractors in the interests of safety and health;
Ensure that potential contractors (whom they intend appointing) submitting tenders
have made detailed provision for the cost of safety and health measures throughout
the project.
in accordance with the health and safety plan or if such work poses a threat to the
health and safety of persons or a risk of degradation to the environment.
or dismiss employees, by virtue of the employee’s divulging health and safety
information or suspecting such information has been divulged, in the interests of health
and safety requirements;
contractor employees have transgressed any of the requirements of the health and
safety specification, safety and health plans, site rules or any other requirements.
of the public, and other contractors) present at work or in the vicinity of a construction
site against all risks that may arise from such site.
done by a competent person appointed in writing with a view to identify hazardous and
potentially hazardous work operations.
NTCSA AM Real Estate’s behalf, with the relevant sections of the documented NTCSA
AM Real Estate’s SHE Specification.
plans if they meet all the requirements.
conducted, person/man job specifications must be compiled and handed to the
occupational health practitioner.
work, as well as the Appointed principal contractors, have received a health and safety
induction training session. Similarly, ensure that all visitors to site undergo the site’s
induction training.
their employees, inspect such equipment regularly and ensure recipients of PPE are
trained in the proper use, care and where necessary, the maintenance of PPE;
Note 5: should the Appointed principal contractor or his/her sub-contractors entertain visitors on site,
they will be held responsible for the provision and wearing PPE.
on the work sites.
Note 6: Eskom will not tolerate the presence of anyone who is or who appears to be under the influence
of alcohol or any other intoxicating substance whilst performing work for them or on any work site.
procedures, before any work commences and thereafter, at such times as may be
determined by a risk assessment;
poses a threat to the safety and health of persons or a risk of degradation to the
environment;
employees wear/use the PPE as instructed.
and prior to the starting of any new task, irrespective of whether it is a repetitive task.
Ensure that the team are involved in the abovementioned risk assessments;
well as confirming the requirements of the daily risk assessments;
of the public, and other contractors) present at work or in the vicinity of a construction
site against all risks that may arise from such site.
on, the premises / work sites and that no employee remains on site if he/she is under
the influence. Furthermore, report such instances to contract management;
with respect to condition, use, care, storage, maintenance, and the management of
these.
information or suspecting such information has been divulged, in the interests of health
and safety requirements (reference – section 26 of the OHS Act).
Appointed principal contractor’s and or contractors’ health and safety plan which poses a
threat to the health and safety of persons.
2.5.3 Contractor Site Supervisor or Contract Supervisor
Must:
procedures, work instructions and safety regulations issued by NTCSA AM Real
the contractors deviate from safety requirements.
the SHE File and relevant documentation.
Review Date 16 April 2029
2.5.4 Contractor Health and Safety Officer
ordinate the organisation’s safety effort on site.
institutions. Or a recognised safety certification (e.g., SAMTRAC – full course) with a
minimum of two years working experience.
safety-related matters on the sites.
responsible for providing them with a health and safety service.
the Appointed principal contractor’s and or contractors’ health and safety plan which
poses a threat to the health and safety of persons.
as per the SHE Plan.
and replace with focus booths.
(straight desk) Open Area Currently space to also be fitted out with double door
credenzas / filling cupboards
Review Date 16 April 2029
principal contractor and all their contractors for the contract. This agreement must be
submitted as part of the safety file package.
The original copy of the section 37(2) Agreement must be retained by the Appointed principal
contractor and a copy retained by the responsible Eskom NTCSA AM Real Estate project
manager.
Copies of all the agreements must form part of the respective contractor’s SHE File.
3.2.2 Site Access requirements
The Safety file package must be submitted to the OHS department 2 weeks before the
agreed site establishment date.
Project Manager/Contract Manager shall ensure that;
person of the contracting company as well as the NTCSA AM Real Estate baseline
risk assessment.
The responsible person of the contracting company and the NTCSA AM Real
The SHE Plan must be discussed and accepted by the Contract Manager and
approved by the Appointed principal contractor Responsible Person
the SHE Plan and accompanied by a risk assessment procedure applied. A
monitoring and review plan must form part of the risk assessment procedure
SHE specifications to the contractor(s).
masks over and above other masks that may be required due to the risk of the
activities
to the employees
frequency
3.2.3 Hazardous work by children (Child Labour)
The constitution of the Republic of South Africa, in the “Bill of Rights” is clear on the rights of
children, especially when it comes to:
being protected from exploitative labour practices;
not to be required or permitted to perform work or provide services that
i. are inappropriate for a person of that child’s age; or
child in terms of the constitution. Where work is being performed which is not prohibited in
terms of the constitution, then such work must be conducted in terms of the OHS Act
“Regulations on Hazardous Work by Children in South Africa” with emphasis on paragraph 2
competent.
use of tools and equipment during installations and maintenance thereof.
proceeding with planned activities.
A relevant risk assessment and method statement to be developed and applied.
Employees must be medical fit to work at fall risk position.
Before the commencement of the activities the Appointed principal contractor to
ensure that all Isolations are done and lock out system is adhered to
Review Date 16 April 2029
including identification documents of the employees and their competency
certificates.
issued per risk based.
in possession of a site-specific fall protection plan developed by a competent person.
site.
(SAQCC) training certificates for their respective field of work and per the scope of
work
The contractor to provide first aider level 2 SAQA competent person.
Relevant applicable legal and other requirements as per issued scope of work
Roles and responsibilities
Process for hazard identification and risk assessment including monitoring and review
plans, a further identification of opportunities must be part of the process. Interested
and affected parties must be clearly outlined.
Process for change management
Process for employee training, competency, communication, awareness and
participation
Process for incident management and investigation
Process for setting objectives and programmes
Process in place to review the SHE Plan
Process for performance management and monitoring
Process for internal audits
Process for document and records management
Review Date 16 April 2029
and when required by the client) to ensure that it fully addresses all the issues and
complies with these requirements to the satisfaction of the client.
3.3 Coid
appropriate employment compensation commissioner and have available a valid letter of good
standing (LoG) from such commissioner. The obligation lies with the contractors to ensure that
the LoG remain valid throughout the contract period. A copy of the LoG must be filed in the
contractor SHE files.
3.4 Costing for SHE within the Project
cost of health and safety measures during tendering process. The SHE cost must exclude
the tools of the trade and PPE.
3.5 Eskom Life-saving Rules
Rule 2 Working at height is defined as any work performed above a stable work surface or
where a person puts himself/herself in a position where he/she exposes himself/herself
to a fall from or into.
work as per the scope of work to the contractor as part of the contract package that gives an
overview of identified hazards and mitigation is the work area where this scope of work will be
executed.
The Appointed principal contractor shall develop a Risk Assessment in line with Section 8
(2)(d) of the OHS Act, in alignment to Eskom 32-520 procedure. Emerging risks and hazards
must be managed during the duration of the contract. This means that if there are significant
changes to a process or activity, or any new process, then these should also be subjected to
risk assessment. All risks must be rated. Activity based risk assessments shall be conducted
by a competent person of the Appointed principal contractor.
3.8 Fire Equipment and maintenance
a. Be clearly labelled
b. Conspicuously numbered
type of work performed, the distance teams are working apart and the terrain to be
covered if an emergency should arise.
employees are familiar with the emergency numbers.
every 50 or team of workers on site or part thereof, taking into account the type of work
performed and the distance between teams.
Review Date 16 April 2029
3.10 SHE Communication Systems
procedure outlining how they intend to communicate SHE issues to their staff, the mediums
they will employ and how they will measure the effectiveness of there SHE communication.
were part of the talks.
completion of the task.
3.10.1 Tool box talks / Daily team talks / pre job meetings
personnel associated with the work task in attendance. The job, relevant procedures,
associated hazards, safety measures, i.e., the task risk assessments shall be
discussed. Each employee who attends the briefing shall sign an attendance list of that
pre-job brief form undertaking that they have an understanding of the tasks, risks and
control measures required.
3.11 SHE Training
the SHE File.
3.11.1 Induction training
and their employees have undergone the NTCSA AM Real Estate Safety induction
training prior to commencing work on site.
employment medical examination and found fit for duty. A copy of the certificate of
fitness must be kept in the SHE File on site for the duration of the project.
employees undergo site specific work induction with regard to the approved project SHE Plan,
general hazards prevalent on site, risk assessment, rules and regulations, and other related
aspects. Records of site-specific induction must be kept in the safety file
contractor’s site-specific safety induction prior to being allowed access to site.
properly inducted. No visitors are permitted to undertake any work onsite, of any
nature.
Review Date 16 April 2029
compromising safety and cleanliness, anyone has the responsibility to bring it to the
attention of the Appointed principal contractor in the first instance and the Eskom
project/site manager in the second instance.
Section
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdf3.30. Quality Requirements .................................................................................................... 48
contractor is and remains accountable for the quality and the execution of his/her
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Lake Street, Germiston, Johanessburg, 1401, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
28
Last checked
06 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
021-980-7509[email protected]www.eskom.co.za/Pages/Landing.aspxLake Street, Germiston, Johanessburg, 1401, South Africa
Key Personnel
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction of buildings. Unlock full pricing strategies, bid frequency, and historical win rates.