The scope covers leasing three (3) x 18-ton and three (3) x 32-ton forklifts, excluding operators, for twelve (12) months on a dry rate, including a comprehensive maintenance plan. The equipment supports cargo handling at Saldanha Multi-Purpose Terminal (SLD-MPT). The service provider must be available 24/7, responsible for all maintenance and repairs, and provide valid load test certificates for each forklift at delivery. Equipment must be in excellent condition, capable of operating in harsh environments. Routine maintenance per OEM recommendations, on-site repair support, replacement equipment for extended breakdowns, and a dedicated service team are required. Delivery and commissioning at TPT premises; decommissioning and removal at contract end at no extra cost. Equipment specifications: 18-ton forklift – basic type SCP180C2, max lifting height 4 m, engine QSB6.7, 164 kW, dimensions 8552x3100x3850 mm, load capacity 18000 kg, min turning radius 5.75 m, gross mass 33100 kg; 32-ton forklift – basic type SCP320C1, max lifting height 4 m, engine TAD851VE, 185 kW, dimensions 9535x3580x4380 mm, load capacity 32000 kg, min turning radius 6.65 m, gross mass 45200 kg. Enclosed steel cabin with tempered glass windows all round. Safety devices must be in place. Response time for technical onsite support: 2 hours from call logging. Lead time: deliver all forklifts within agreed timelines (kick-off meeting). Mandatory: valid load test certificates issued by certified Lifting Machinery Inspector from accredited independent institution per OHSA. Safety: comply with OHSA, submit valid letter of good standing from Department of Labor, adhere to SHEQ SOPs and TIMS SHEQ contractor specifications, implement dust control, provide PPE, no substance abuse. Business continuity plan required with defined team, critical services identification, risk mitigations, testing, crisis communication, backup contracts with alternative suppliers (response time defined). Contractor Execution Plan (CEP) required per TRN-IMS-GRP-GDL 014.5; Employee Personal Profile Dossier per TRN-IMS-GRP-TMP 014.3; Contractor Compliance SHE File per TPT-IMS-SLDT-CL-014-001.1; Mandatary Agreement per section 37(2) of OHS Act; subcontracting requires written permission; SHE File electronic submission; induction training per TRN-IMS-GRP-GDL 014.6; legal permits per TRN-IMS-GRP-TMP 014.7; contractor appointment per TRN-IMS-GRP-TMP-001.1.