Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Corner Hunslet and Lower Germiston Road - Germiston - Gauteng - 2022
Organization Type
GOVERNMENT
Published
12 May 2026
OCDS Reference
ocds-9t57fa-155842
This tender invites suppliers to provide and deliver a three-phase transformer winding analyzer to ESKOM in gauteng. IT is an open bid targeting suppliers of electrical equipment, with strict occupational health and safety (OHS) compliance requirements.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Categories
Request for Bid(Open-Tender)
Corner Hunslet and Lower Germiston Road - Germiston - Gauteng - 2022
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: 32-136_Contractor Health and Safety Requirements.pdf, 240-68099512 Form A_Cat 4_ Rev 9.pdf, True Three-phase transformer winding analyzer AB Technical requirements.pdf and 10 more. You don’t need to refresh — this page will pick up the updated review automatically.
12 May
2026
Tender Published
Tender was published
02 Jun
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure B.pdf
240-106084675 Annexure C3 OHS Tender Evaluation Low risk.pdf
240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf
240-68099512 Form A_Cat 4_ Rev 9.pdf
240-77471969 Annexure C2 OHS Tender evaluation Medium risk.pdf
240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf
ITT SUPPLY AND DELIVERY OF THREE PHASE TRANDFORMER WINDING ANALYZER SIGNED.pdf
NEC SSC3 True Three-phase transformer winding analyzer test instrument CORRECTED.pdf
240-106084699 Annexure C4 OHS Tender evaluation Construction work_.pdf
True Three-phase transformer winding analyzer - SOW.pdf
240-143768931 Rev 2 - SHE Audit Check Sheet.pdf
True Three-phase transformer winding analyzer AB Technical requirements.pdf
32-136_Contractor Health and Safety Requirements.pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 407 611
Range
Based on 13 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Technical Specifications
Source: 32-136_Contractor Health and Safety Requirements.pdfScope: Supply and delivery of a three-phase transformer winding analyzer to Eskom.
Key Requirements:
Specialized Considerations:
Compliance Requirements
Source: 32-136_Contractor Health and Safety Requirements.pdfMandatory Compliance:
Occupational Health and Safety Act, 1993 (OHS Act) and its regulations (e.g., Construction Regulations, General Safety Regulations, Driven Machinery Regulations).
National Environmental Management Act, 1998 (NEMA).
National Environmental Management: Waste Act, 2008.
Mine Health and Safety Act, 1996 (if applicable to the work environment).
Basic Conditions of Employment Act, 1997.
Compensation for Occupational Injuries and Diseases Act, 1993 (COID Act).
National Road Traffic Act, 1996.
Eskom-Specific Requirements:
Eskom Safety, Health, Environment, and Quality Policy (32-727).
SHE Requirements for the Eskom Commercial Process (32-726).
Eskom Procurement and Supply Chain Management Procedure (32-1034).
Eskom Disciplinary Code (32-1112) and Disciplinary Procedure (32-1113).
Life-Saving Rules Standard (240-62196227).
Waste Management Procedure (32-245).
Emergency Planning (32-123) and Eskom Fire Risk Management (32-124).
Statutory Appointments and Registrations:
Documentation and Certification:
Health and safety plans (approved by Eskom prior to commencement).
Risk assessments and method statements.
Records of training, inductions, and toolbox talks.
Incident reports and investigation findings.
Audit and inspection records.
Medical surveillance records (if applicable).
Permits to Work (where required).
Local Content and Additional Requirements:
Contact Information
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdfAnnah Serite, Quality Officer, Eskom. Document signed on 05/05/2026.
Submission Guidelines
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdfSubmit the completed and signed Form A (Template Identifier 240-43921804 Rev 3) to acknowledge acceptance of Eskom Supplier Quality Requirements per 240-105658000 Specification and ISO 9001 Standard. Key points: Only one applicable category may be selected (Category 4 is pre-marked in this tender). Ensure the form is signed by the tenderer’s quality representative.
Technical Specifications
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdfSupply and delivery of 3 x True Three Phase Transformer Winding Analyser. Must comply with: Eskom Supplier Quality Requirements (240-105658000 Specification) and ISO 9001 Standard. Key clauses include: Pre-Contract Award Quality Requirements, Contract Execution, Supplier Quality Performance Monitoring, Eskom Rights of Access/Information, Preservation, Quality Audits, Management of Nonconformities, and Special Processes.
Compliance Requirements
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdfMust comply with Eskom Supplier Quality Requirements (240-105658000 Specification) and ISO 9001 Standard. Tenderer must complete and sign Form A to confirm adherence. ISO 9001 clauses 4-10 and principles 1-7 are applicable as per the document.
Important Dates
Source: True Three-phase transformer winding analyzer AB Technical requirements.pdfThe tender document does not specify any important dates such as briefing sessions or clarification deadlines.
Contact Information
Source: True Three-phase transformer winding analyzer AB Technical requirements.pdfTechnical Contact:
Note: No contact details (phone or email) are provided for Elliot Sithole.
Submission Guidelines
Source: True Three-phase transformer winding analyzer AB Technical requirements.pdfReturnable Documents:
Evaluation Criteria
Source: True Three-phase transformer winding analyzer AB Technical requirements.pdfThe tender document does not specify the evaluation criteria or scoring method.
Technical Specifications
Source: True Three-phase transformer winding analyzer AB Technical requirements.pdfThe tender requires the supply and delivery of a three-phase transformer winding analyzer with the following specifications:
General:
Testing Capabilities (must perform with one instrument):
Included Accessories & Cables:
Test Software:
User Interface:
Standards & Support:
Financial Requirements
Source: True Three-phase transformer winding analyzer AB Technical requirements.pdfThe tender document does not specify any financial requirements such as pricing format, bonds, guarantees, payment terms, or financial capacity.
Compliance Requirements
Source: True Three-phase transformer winding analyzer AB Technical requirements.pdfNo specific compliance requirements (e.g., CSD, tax, B-BBEE, CIDB, CIPC, local content) are detailed in the provided document excerpt.
Contact Information
Source: True Three-phase transformer winding analyzer - SOW.pdfElliot Sithole, Electrical Test Manager
Technical Specifications
Source: True Three-phase transformer winding analyzer - SOW.pdfSupply and deliver 3 x True Three-phase transformer winding analyzer test instruments with the following capabilities:
Important Dates
Source: NEC SSC3 True Three-phase transformer winding analyzer test instrument CORRECTED.pdfDelivery date: July 2024 (or as per Batch Order). Starting date: July 2026. Defects liability period: 12 weeks after delivery. Correction of defects period: 1 week after delivery. Assessment day: Last day of each month. Period for reply: 2 working days.
Submission Guidelines
Source: NEC SSC3 True Three-phase transformer winding analyzer test instrument CORRECTED.pdfSubmit the following returnable documents: signed Form of Offer and Acceptance, completed Contract Data (Part C1.2), Price Schedule (Part C2.2), and Schedule of Deviations (if applicable). Within one week of contract award, provide securities, bonds, guarantees, proof of insurance, and any other required documentation. Failure to submit these may result in disqualification. For alternative tender offers, use separate, endorsed copies of the Form of Offer and Acceptance marked ‘Alternative Tender No. _____’.
Technical Specifications
Source: NEC SSC3 True Three-phase transformer winding analyzer test instrument CORRECTED.pdfSupply and deliver 3 units of True Three-phase transformer winding analyzer test instruments with the following capabilities: turns ratio, excitation/magnetization (open circuit test), winding DC resistance, dynamic resistance measurement (DRM)/continuity test, heat run (internal temperature), dry out (internal temperature), contact resistance test, short circuit impedance (leakage reactance), frequency response of stray losses test, vector group verification, demagnetization, magnetic balance test, transformer losses/efficiency test. Must test all 3 phases simultaneously or individually without adjusting setup. Includes all test leads, accessories, and connections for primary and secondary testing. Must have emergency stop button, dead-man's switch, and warning lights. Includes test and system control software with customizable reports per IEC 60076-1 standards. Calibration frequency: 2-year intervals or longer. Deliver with current calibration certificates (issued within 3 months of tender closing or later). Local South African representation and support required with max 48-hour response time. Supplier must provide demonstration and training for up to 18 Eskom employees at Eskom premises after delivery. Compliance with Eskom Health & Safety requirements mandatory during delivery, demonstration, and training.
Financial Requirements
Source: NEC SSC3 True Three-phase transformer winding analyzer test instrument CORRECTED.pdfPricing must be fixed and free of escalation. Use NEC3 SSC Price Schedule format: enter rates and quantities for each item, or lump-sum prices. Total price must include all work and deliverables. Invoices payable within 30 days of receipt of tax-compliant invoice and supporting documentation. Supplier must include Purchaser’s VAT number (4740101508) on all invoices. Delay damages: 0.1% per week up to 10% of purchase order value. Interest on late payment: 0.75% per complete month of delay. Supplier’s liability for indirect/consequential loss is limited to R0.00.
Compliance Requirements
Source: NEC SSC3 True Three-phase transformer winding analyzer test instrument CORRECTED.pdfSupplier must be B-BBEE compliant. Must notify Eskom within 7 days of any change in B-BBEE status and submit updated verification certificate within 30 days. Failure to notify may result in termination. Supplier must comply with Value Added Tax Act and include VAT registration details on invoices. No cession, delegation, or assignment of rights/obligations without Eskom’s written consent. Supplier must cooperate with investigations into prohibited actions (corruption, fraud, collusion, coercion, or obstruction) and ensure subcontractors/agents do the same. Termination may occur if prohibited actions are taken.
Contact Information
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdfESKOM Representative: Annah Serite. Document issued on 5 May 2026.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdfSubmit the following returnable documents as part of your bid: Form A (completed and signed).
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdfEvaluation is based on quality requirements divided into sections with the following scoring: Section A (QMS Requirements ISO 9001) - Max 3 points: A.1 Quality Method Statement (use Template Ref 240-126469599), A.2 Quality Policy (approved by top management), A.3 Quality Objectives (approved by top management), A.4 Control of documented information (Clause 7.5 ISO 9001:2015), A.5 Control of nonconforming outputs (Clause 8.7 ISO 9001:2015), A.6 Nonconformity and Corrective Action (Clause 10.2 ISO 9001:2015), A.7 Internal Audit (Clause 9.2 ISO 9001:2015). Section B (Evidence of QMS in operation) - Max 2 points: B.1 Roles, responsibilities, and authorities (Organization chart and Responsibility matrix, Clause 5.3 ISO 9001:2015), B.2 Control of Externally Provided Processes (Clause 8.4 ISO 9001:2015). Section C (Contract Quality Plan) - 0 points: Draft Contract Quality Plan (Ref ISO 10005). Section D (Quality Control Plan) - 0 points: Draft/Example of Inspection and Test Plan (ITP) or Quality Control Plan (QCP). Section E (Additional Requirements) - 1 point: E.1 Form A completed and signed.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdfSupply and delivery of 3 x True three phase transformer winding analyzer. Quality requirements must comply with Specification 240-105658000 and Supplier Quality Management Revision 7.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdfQuality Management System (QMS) must comply with ISO 9001:2015. Objective evidence of documented QMS required, even if not certified. Specific clauses referenced: 5.3 (roles, responsibilities, and authorities), 7.5 (control of documented information), 8.4 (control of externally provided processes), 8.7 (control of nonconforming outputs), 9.2 (internal audit), 10.2 (nonconformity and corrective action).
Contact Information
Source: 240-106084675 Annexure C3 OHS Tender Evaluation Low risk.pdfEskom’s/Client’s OHS Representative (Designation, Signature, Date). Development Team: Diane Maunatlala.
Submission Guidelines
Source: 240-106084675 Annexure C3 OHS Tender Evaluation Low risk.pdfSubmit the following returnable documents: For all tenderers: 1) Signed acknowledgement of Eskom's OHS legal and other requirements (Annexure B). 2) OHS plan addressing project/scope OHS risks, aligned with Eskom's health and safety specifications. 3) Baseline OHS Risk Assessment (BRA) with methodology. 4) Valid Letter of Good Standing (COIDA or equivalent). 5) OHS policy signed by CEO, compliant with OHS Act Section 7. For suppliers with auditable OHS systems: 1) Signed Annexure B. 2) ISO 45001 certificate or equivalent. 3) Valid Letter of Good Standing (COIDA or equivalent).
Compliance Requirements
Source: 240-106084675 Annexure C3 OHS Tender Evaluation Low risk.pdfSubmission Guidelines
Source: 240-77471969 Annexure C2 OHS Tender evaluation Medium risk.pdfSubmit the following returnable documents: For all tenderers: 1. Signed Annexure B (acknowledgement of Eskom's OHS legal and other requirements). 2. OHS Plan addressing project/scope OHS risks, aligned with Eskom’s health and safety specifications. 3. Baseline OHS Risk Assessment (BRA) including methodology, identifying and managing Safety, Health, and Environmental risks. 4. Valid Letter of Good Standing (COIDA or equivalent). 5. OHS Policy signed by CEO, compliant with OHS Act Section 7. For suppliers with certified auditable OHS systems (Part B): 1. Signed Annexure B. 2. ISO 45001 certificate or equivalent. 3. Valid Letter of Good Standing (COIDA or equivalent).
Compliance Requirements
Source: 240-77471969 Annexure C2 OHS Tender evaluation Medium risk.pdfOHS Compliance: 1. Submission of signed OHS policy compliant with OHS Act Section 7. 2. Valid Letter of Good Standing (COIDA or equivalent). 3. For certified suppliers: ISO 45001 or equivalent certification required.
Submission Guidelines
Source: Annexure B.pdfReturnable Documents: Signed Acknowledgement Form (Annexure B) must be submitted, confirming understanding of Eskom OHS legal and other requirements. The form must include: Company/Supplier Name, Name of Authorised Person (CEO/Director/Managing Director), Signature, Date, and Witness Signatures (x2).
Compliance Requirements
Source: Annexure B.pdfMandatory OHS Compliance: Supplier must comply with: Eskom Contractor Health and Safety Requirements Standard 32-136, OHS specifications/requirements provided by Eskom, Occupational Health and Safety Act, Compensation for Occupational Diseases and Illnesses Act. Post-award, supplier must align company processes with Eskom’s OHS policies, procedures, and standards. Penalties apply for non-conformance by the supplier, its contractors, or sub-suppliers. All employees (including contractors/suppliers) must undergo Eskom induction. Main supplier responsibilities: Demonstrate selection criteria for appointing contractors/suppliers, Notify Eskom prior to appointing contractors/suppliers, Ensure contractors/suppliers have adequate resources and competencies, Manage contractors/suppliers to ensure compliance with legal and Eskom requirements, Monitor contractors/suppliers via audits/assessments for OHS compliance, Provide grounds for termination of contractor/supplier work, Address all non-conformances by contractors/suppliers directly. Eskom may verify compliance and request copies of testimonials/references and client contact details for similar past work.
Important Dates
Source: ITT SUPPLY AND DELIVERY OF THREE PHASE TRANDFORMER WINDING ANALYZER SIGNED.pdfClosing date: 02 June 2026 at 10:00. Non-compulsory clarification meeting: 19 May 2026 at 10:00 via MS Teams (Eskom Rotek Industries). Tender validity period: 120 days from closing. Clarification queries deadline: 10 working days before closing (21 May 2026).
Contact Information
Source: ITT SUPPLY AND DELIVERY OF THREE PHASE TRANDFORMER WINDING ANALYZER SIGNED.pdfEskom Representative: Nomasondo Mahlangu, Tel: 011 621-3069, Email: [email protected]. Fraud/corruption reporting: 0800 11 2722 or [email protected]. Submission portal: https://tenderbulletin.eskom.co.za.
Submission Guidelines
Source: ITT SUPPLY AND DELIVERY OF THREE PHASE TRANDFORMER WINDING ANALYZER SIGNED.pdfSubmit electronically via Eskom E-Tendering portal (https://tenderbulletin.eskom.co.za) by 02 June 2026 at 10:00. Late submissions are disqualified. Mandatory returnables at closing: Annexure A (Authorisation Form), B (Acknowledgement Form), C (Tenderer’s Particulars), D (Integrity Declaration), E (CPA for Local Goods/Services), F (CPA for Imported Goods/Services if applicable), G1-G4 (SBD 6.2 Local Content Declarations if applicable), H (SBD 1), I (SBD 6.1 Preference Points Claim), J (SBD 4 Bidders Disclosure), Tax Clearance Certificate, COIDA Certificate, Employment Equity Compliance (SA tenderers only), and completed pricing schedule (PDF + Excel). Joint ventures must submit a valid JV agreement and designated bank account details. Failure to submit mandatory documents by the deadline results in disqualification. Clarification queries must be submitted in writing to the Eskom Representative at least 10 working days before closing.
Evaluation Criteria
Source: ITT SUPPLY AND DELIVERY OF THREE PHASE TRANDFORMER WINDING ANALYZER SIGNED.pdfEvaluation follows a multi-stage process: Step 1: Basic Compliance (pass/fail) – checks submission of all mandatory returnables. Step 2: Functionality (pass/fail) – technical mandatory requirements (Yes/No criteria) as per A&B schedule. Step 3: Price and Preference (80/20) – Price scored out of 80 (inclusive of VAT, corrected for errors, excluding contingencies, adjusted for deviations, NPV considered). Preference points (20) awarded per B-BBEE level. Step 4: Objective Criteria – SHEQ evaluated per Annexure C2 and C5, Quality per QMS. Step 5: Financials – Audited financial statements for previous 18-36 months (or last year if unavailable). Tenders ranked by total points (Price + Preference). Negotiations held with highest-ranked supplier first. Failure to submit Specific Goals evidence scores 0 for that criterion but does not disqualify.
Technical Specifications
Source: ITT SUPPLY AND DELIVERY OF THREE PHASE TRANDFORMER WINDING ANALYZER SIGNED.pdfSupply and delivery of a True Three Phase Transformer Winding Analyzer Test Instrument. The instrument is an advanced version of existing Resistance Bridge equipment, with enhanced technology and additional diagnostic capabilities. Must comply with Eskom’s Supply Quality Management Specification (240-105658000) and ISO 9001 Standard (240-68099512). Cataloguing/codification not required as it falls under existing transformer testing category. Technical mandatory requirements are detailed in the accompanying A&B schedule (pass/fail criteria).
Financial Requirements
Source: ITT SUPPLY AND DELIVERY OF THREE PHASE TRANDFORMER WINDING ANALYZER SIGNED.pdfPricing must be inclusive of VAT, exclude contingencies, and be corrected for arithmetical errors. Unconditional discounts are considered for evaluation; conditional discounts are applied at payment. Prices scored out of 80 points. Payment terms: 30 days for contracts ≤ R50M, 60 days for contracts > R50M (from receipt of undisputed invoices). Audited financial statements for the previous 18-36 months (or last year if unavailable) required. For JVs/SPVs, each partner must submit financials. Start-ups (<12 months) exempt but must provide statements if awarded. No performance security required.
Compliance Requirements
Source: ITT SUPPLY AND DELIVERY OF THREE PHASE TRANDFORMER WINDING ANALYZER SIGNED.pdfMandatory: CSD registration (CSD number/report), Tax Clearance Certificate (or SBD1 for foreign suppliers with no SA footprint), COIDA Certificate (SA tenderers only), Employment Equity Compliance (SA designated employers only), Integrity Declaration (Supplier Integrity Pact), CIDB grading (if applicable, not required for this tender). B-BBEE status certificate or sworn affidavit required for preference points. SHEQ compliance: Valid Letter of Good Standing (Compensation Fund/insurer), documented SHE Plan, risk assessments, and signed Eskom rules acknowledgement. Quality: Compliance with Supply Quality Management Specification (240-105658000) and ISO 9001 (240-68099512). Local content: SBD 6.2 and Annexures G1-G4 if designated materials are included.
Submission Guidelines
Source: 240-143768931 Rev 2 - SHE Audit Check Sheet.pdfReturnable Documents: Submit signed copy of Contractor Environmental Compliance Proforma (TRMFM-0038). Include, if applicable: Copy of Bio-Remediates Register (TRM-FM-0067), Waste Disposal Control Register (TRM-FM-0086), Hazardous Waste SANS Classes (TRM-FM-0088), Environmental Incident Notification/Flash/Report (TRM-FM-0084), Soil Erosion Assessment Table (TRM-FM-0088), Chemical Spill Assessment Table. Ensure all documents are complete and submitted as per tender requirements.
Technical Specifications
Source: 240-143768931 Rev 2 - SHE Audit Check Sheet.pdfScope: Supply and delivery of a three-phase transformer winding analyzer. Critical tasks may involve working at heights or handling machinery/equipment. Audit and approval processes apply, including file approval and inspector sign-off. Document the number of employees and maintain an equipment inventory list for all items on the project site.
Compliance Requirements
Source: 240-143768931 Rev 2 - SHE Audit Check Sheet.pdfMandatory Compliance: Provide Letter of Good Standing with Registration Number and Expiry Date. Written contract between client and principal contractor (PO/5(1)K) required. SHE Plan must be reviewed and accepted by the client. Certifications: ISO 9001:2015, ISO 45001:2018, ISO 14001:2015. SHEQ Policy and proof of communication required. Legal Appointments: Designated employer (16.2 appointment), Responsible Supervisor, SHE Representative with formal training. Emergency Preparedness: Appoint fire equipment inspector (CR 29(h)) and competent first aider (GSR 3(1)). Provide emergency preparedness plan, fire equipment inspection checklist, first aid register, and inspection checklist. Operational Documents: Maintain tools/equipment inventory list, PPE register, PPE inspection records, housekeeping checklist, and planned job observation records. Incident Management: Appoint incident investigator (GAR 9(2)), provide incident management procedure, and maintain incident statistics. Risk Assessment: Ensure employees are trained to conduct HIRA. Provide baseline risk assessment from client, contractor risk assessment, monitoring/review plan, and risk matrix. Lifting Machinery: Provide LMO certificates, load test certificates, checklists for lifting machines and tackles, rigging procedure, and rigger training records. Working at Heights: Appoint competent fall protection implementer (CR 10(1)(a)), provide fall protection plan and rescue procedures, working at heights training certificates, ladder inspector appointment (GSR 13(a)), and procedures for inspection/testing/maintenance of fall protection equipment. Employee Competencies: Provide full names, surnames, ID numbers, home addresses, contract numbers, annual medical fitness certificates (with ORP), and proof of criminal record clearance. Grid HV Requirement: Provide ORHVS Certificate and authorization per grid. Induction: Provide training matrix, induction training syllabus, attendance register, life-saving rules acknowledgement, and ensure contractor induction is conducted by the client. Vehicle Management: Provide driver management plan, appoint vehicle inspector, ensure driver’s license and Eskom driver permit are valid, and maintain vehicle inspection checklist. Environmental: Appoint environmental representative with proof of training/skills. Provide waste management plan, relevant permits (waste generation, transportation, facility), SDS list, and environmental incident reporting forms.
Submission Guidelines
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdfSubmit a signed Acknowledgement Form (Annexure B) confirming understanding of Eskom SHE Rules and other requirements. The form must be: completed by an authorised person (CEO/Director/Managing Director), include signature, date, and witness details (two witnesses).
Compliance Requirements
Source: 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements.pdfMandatory compliance with: Eskom Contractor Health and Safety Requirements Standard 32-136, provided SHE specifications, Occupational Health and Safety Act, Mine Health and Safety Act (where applicable), Compensation for Occupational Diseases and Illnesses Act, National Environmental Management Act. Post-award: align company processes with Eskom’s SHE policies, procedures, and standards. Ensure all employees (including contractors/suppliers) undergo Eskom and company inductions. Main supplier must: demonstrate selection criteria for contractors/suppliers, notify Eskom prior to their appointment, ensure their competence and resources, manage their compliance with legal and Eskom requirements, monitor via audits/assessments, handle non-compliance penalties, and provide termination grounds for subcontractors. Eskom may request testimonials/references for similar past work.
Submission Guidelines
Source: 240-106084699 Annexure C4 OHS Tender evaluation Construction work_.pdfSubmit the following returnable documents as part of your tender: - Signed acknowledgement of Eskom's OHS legal and other requirements (Annexure B). - OHS plan addressing project/scope-specific OHS risks, aligned with Eskom’s health and safety specifications. - Detailed costing for SHE management, broken down by activity or component (not lump sum), based on the scope of work and risk assessment. - Baseline Risk Assessment (BRA) including methodology, risk matrix, and OHS risk management for the scope. - Valid Letter of Good Standing (COIDA or equivalent). - OHS policy signed by the CEO, compliant with OHS Act Section 7. - Proof of OHS competency: CVs, qualifications/certificates aligned with scope, risks, and SHE plan. Additional OHS returnables may apply—refer to Annexure A (240-77433139) for explanatory notes.
Financial Requirements
Source: 240-106084699 Annexure C4 OHS Tender evaluation Construction work_.pdfSubmit detailed costing for SHE management, broken down by activity or component (not lump sum). Costing must align with the overall scope of work and risk assessment.
Compliance Requirements
Source: 240-106084699 Annexure C4 OHS Tender evaluation Construction work_.pdfSets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Corner Hunslet and Lower Germiston Road - Germiston - Gauteng - 2022
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
13
Last checked
12 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: Electrical Equipment. Unlock full pricing strategies, bid frequency, and historical win rates.