Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Megawatt Park - Sunninghill - Johannesburg - 2157
Organization Type
GOVERNMENT
Published
15 May 2026
OCDS Reference
ocds-9t57fa-156269
This tender seeks consultancy services to conduct a comprehensive study on grid forming technology, including assessments, modelling, and recommendations for optimal high voltage technology to integrate renewable energy into eskom's transmission network. The project is managed by ntcsa under eskom’s grid modernisation initiative.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Categories
Request for Bid(Open-Tender)
Megawatt Park - Sunninghill - Johannesburg - 2157
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: NTCSA OHS Specification for grid forming technology_.pdf, 1.01_NTCSA Invitation to Tender_(ITT)_ E2795NTCSAMWP.pdf, NEC (PSC3)_Grid Forming Technology.pdf and 16 more. You don’t need to refresh — this page will pick up the updated review automatically.
15 May
2026
Tender Published
Tender was published
08 Jun
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
32-136 Contractor Health and Safety Requirement.pdf
NTCSA Non-Disclosure Agreement (NDA) Vendors_E2795NTCSAMWP.pdf
20251110_Method Statement_Cat 4 Tender Returnables.docx
Comprehensive Study on Grid Forming-List of Tender Returnables_Cat 4.pdf
240-105658000 Supplier Quality Management Specification (3).pdf
Post contract award OHS & Quality Requirements for Grid forming Technology.pdf
SDL&I- Comprehensive Study on Grid Forming Technology.pdf
NEC (PSC3)_Grid Forming Technology.pdf
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf
1.01_NTCSA Invitation to Tender_(ITT)_ E2795NTCSAMWP.pdf
PAYE Questionnaire for Service Contracts - 2026_2027.xls
Technial Evaluation Criteria _Optimal High Voltage Technology for Renewable Energy Integration_GFM.pdf
Scope of Work - Optimal High Voltage Technology for Renewable Energy Integration.pdf
NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf
Confirmation of Employment Equity.pdf
Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf
Declaration of Undertaking_Grid Forming Technology.pdf
Pricing Schedule for Grid Forming Technology.xlsx
NTCSA_E-tendering Help Manual for supplier.pdf
Annexure T3-Transmission OHS Tender Evaluation Template (Low Risk Activities).pdf
Comprehensive Study on Grid Forming Technology_Form A_Cat 4.pdf
NTCSA OHS Specification for grid forming technology_.pdf
Tender clarification meeting MS Teams link- E2795NTCSAMWP.docx
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Contact Information
Source: NTCSA OHS Specification for grid forming technology_.pdfProject Address: NTCSA: AM: Grid Modernisation, Eskom Megawatt Park, 2 Maxwell Drive, Sunninghill, Sandton, 1091. Contacts: Chief Engineer (Support: SHEQ Snr Advisor - Phumudzo Mathivha, Albert Shai), Safety Officer - Ramogolo Kekana.
Evaluation Criteria
Source: NTCSA OHS Specification for grid forming technology_.pdfEvaluation is a three-stage process: 1. Identification of all hazards. 2. Evaluation of the risks. 3. Implementation of measures to control the risks. Risk assessments must be maintained and updated for significant changes or new processes.
Technical Specifications
Source: NTCSA OHS Specification for grid forming technology_.pdfScope of work: 1. Assessment of existing infrastructure and gaps. 2. Definition of grid forming technology. 3. Development of technical specifications and grid code integration. 4. Testing and modelling framework. 5. GFM placement. 6. GFM implementation roadmap. Focus: Optimal high voltage technology for renewable energy integration. NTCSA mandates planning, operating, and maintaining transmission assets to ensure a reliable, adequate, and secure integrated power system.
Compliance Requirements
Source: NTCSA OHS Specification for grid forming technology_.pdfMandatory compliance: 1. Section 37(2) Legal Agreement between NTCSA and the principal contractor (and all sub-contractors), signed at contract award. 2. Up-to-date OHS Act and regulations available to all employees. Legislative compliance: Constitution of South Africa (Section 24), Occupational Health and Safety Act 1993, Compensation for Occupational Injuries and Diseases Act, National Environmental Management Act, National Road Traffic Act. COID: Registration required; maintain valid Letter of Good Standing (LoG). Substance abuse: 0% alcohol/drug tolerance; comply with Eskom Procedure 32-37 and Life-Saving Rule 4 (BE SOBER). Occupational Health: Medical surveillance program (entry, periodic, exit) for all employees, conducted by qualified Occupational Health Practitioners. Appointments: Competent employees for OHS Act roles (e.g., Fire Fighter, First Aider, SHE Representative, 16(2) appointments). Working at Height: Fall protection plan, risk assessments, safe work procedures, and PPE. Risk Assessments: Legal requirement per OHS Act Section 8(2)(d); must identify hazards, evaluate risks, and implement controls. PPE: Must comply with SANS standards; risk-based PPE matrix required. Incident Investigation: Follow OHS Act GAR 8 and 9, using Eskom Procedure 32-95; report injuries to Department of Labour. Emergency Management: Periodic drills required; non-compliance subject to disciplinary action per Eskom Procurement and Supply Management Procedure. Child Labour: Prohibited per Constitution and Basic Conditions of Employment Act; comply with OHS Act Regulations on Hazardous Work by Children.
Important Dates
Source: 1.01_NTCSA Invitation to Tender_(ITT)_ E2795NTCSAMWP.pdfContact Information
Source: 1.01_NTCSA Invitation to Tender_(ITT)_ E2795NTCSAMWP.pdfSubmission Guidelines
Source: 1.01_NTCSA Invitation to Tender_(ITT)_ E2795NTCSAMWP.pdfSubmit electronically via Eskom E-tendering portal by 08 June 2026 at 10h00 AM. Late submissions will not be accepted.
Evaluation Criteria
Source: 1.01_NTCSA Invitation to Tender_(ITT)_ E2795NTCSAMWP.pdfEvaluation follows a multi-stage process:
Note: Failure to submit evidence for Specific Goals results in 0 points for that section but does not disqualify the tender.
Technical Specifications
Source: 1.01_NTCSA Invitation to Tender_(ITT)_ E2795NTCSAMWP.pdfFinancial Requirements
Source: 1.01_NTCSA Invitation to Tender_(ITT)_ E2795NTCSAMWP.pdfCompliance Requirements
Source: 1.01_NTCSA Invitation to Tender_(ITT)_ E2795NTCSAMWP.pdfImportant Dates
Source: NEC (PSC3)_Grid Forming Technology.pdfContract completion date: 12 months from contract start date. Consultant must submit a first programme for acceptance within 2 weeks of the Contract Date. Revised programmes must be submitted at intervals no longer than 4 weeks. Defects date: 4 weeks after Completion of the whole of the services. Period for reply: 1 week. Period for retention: 24 months following Completion or earlier termination.
Contact Information
Source: NEC (PSC3)_Grid Forming Technology.pdfEngineering Contract Strategies contact: Phone 011 803 3008, Fax 011 803 3009, Website www.ecs.co.za. Employer’s registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg.
Submission Guidelines
Source: NEC (PSC3)_Grid Forming Technology.pdfSubmit the following returnable documents: C1.1 Form of Offer & Acceptance (3 pages). The tenderer’s duly authorised representative must sign the Offer section. Acceptance by the Employer requires signing the Acceptance section and returning one copy to the tenderer. Alternative tenders require a separate Form of Offer and Acceptance. Ensure compliance with all Conditions of Tender by submitting the Offer.
Evaluation Criteria
Source: NEC (PSC3)_Grid Forming Technology.pdfQuality requirements: The Consultant must submit a quality policy statement and quality plan within 3 weeks of the Contract Date. Evaluation will consider the outcome of the assessment of these documents.
Technical Specifications
Source: NEC (PSC3)_Grid Forming Technology.pdfScope: Provision of consultancy services to conduct a comprehensive study including assessments, modelling, and recommendations for Grid Forming Technology. Services include: Consulting Services for the Optimal High Voltage Technology for Renewable Energy Integration. Risk Register includes: PMU (Phasor Measurement Unit) and load data may be incomplete, noisy, or unavailable for certain grid areas; Cost overruns or timeline delays. Consultant must prepare forecasts of total expenses at intervals no longer than 4 weeks.
Financial Requirements
Source: NEC (PSC3)_Grid Forming Technology.pdfPricing format: Rate Based (exclusive and inclusive of VAT @ 15%). Payment terms: Assessment interval is the 25th day of each successive month. Payments made within 30 days. Currency: South African Rand. Interest rate: Publicly quoted prime rate of Standard Bank of South Africa for SA Rand amounts; LIBOR rate for foreign currencies. Performance bond: Amount to be determined (R[●]). Consultant’s total liability for all matters is limited to the total of the Prices. Liability for indirect or consequential loss is limited to R0.00. Consultant must submit a Tax Invoice compliant with the Value Added Tax Act, including Employer’s VAT number (4710303126).
Compliance Requirements
Source: NEC (PSC3)_Grid Forming Technology.pdfB-BBEE: Consultant must notify Employer within 7 days of any change in B-BBEE status. Updated verification certificate and supporting documentation must be submitted within 30 days of notification. Employer may re-negotiate or terminate if B-BBEE status decreases. Failure to notify may result in termination. Joint ventures/consortia: All members are jointly and severally liable. Key person with authority to bind the Consultant must be notified to Employer within 2 weeks of Contract Date. Composition changes require Employer’s written consent. Cession/assignment: Consultant may not cede, delegate, or assign rights or obligations without Employer’s written consent. Confidentiality: Consultant must not disclose contract-related information without Employer’s consent. Tax compliance: Consultant must comply with VAT Act requirements.
Contact Information
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_E2795NTCSAMWP.pdfNTCSA physical address: Megawatt Park, Maxwell Drive, Sunninghill, Sandton. Postal address: P O Box 1091, Johannesburg, 2000. Phone: +27 11 800 .... Fax: +27 11 800 ....
Technical Specifications
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_E2795NTCSAMWP.pdfScope: Provision of consultancy services for a comprehensive study, including: assessments, modelling, and recommendations for Grid Forming Technology.
Important Dates
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfClosing date and time: Strictly as per Tender Data (SAST, GMT+2). Compulsory site visit/clarification meeting: Details in Tender Data; failure to attend disqualifies. Monitor Eskom Tender Bulletin/NT e-Tender Portal for extensions or addenda.
Contact Information
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfAll communications must be in writing to the Eskom Representative only (name/email/phone specified in Tender Data). Submission address: As per Tender Data. Department: Supply Chain Management.
Submission Guidelines
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfSubmit a complete original tender in paper form plus one (1) complete hard copy by the closing date and time. For e-tendering, upload and finalize via the Eskom Tender Bulletin site (no physical submission). Ensure documents are accessible, uncorrupt, and in English. Mark packages as 'ORIGINAL', 'COPY', or 'ELECTRONIC COPY' with Eskom’s address, tender number, and your contact details. Seal outer package as 'Confidential'. Late submissions, incomplete packages, or 100% sub-contracting will disqualify. Eskom accepts no liability for postal/courier delays or network issues. Proof of posting is not proof of delivery.
Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfEvaluation includes Price (scored per Tender Data), Functionality (if applicable), and Specific Goals (PPPFA). Tenders scoring zero for Specific Goals (e.g., missing B-BBEE proof) will score zero under PPPFA point allocation. Price evaluation considers financial risk to Eskom. Ranking combines Price and Specific Goals scores (90/10 or 80/20 system). Objective Criteria (if used) must be stipulated in the Invitation to Tender. Reverse e-Auction may apply for competitive pricing.
Technical Specifications
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfScope: Consultancy services for a comprehensive study including assessments, modelling, and recommendations for grid-forming technology. Refer to Tender Data for full specifications, annexures, and additional requirements. Tenderers must attend compulsory site visits/clarification meetings if stipulated.
Financial Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfPricing must be in South African Rand (unless otherwise instructed), fixed for the contract duration, and include all duties, taxes (VAT), and levies applicable 14 days prior to closing. Rates must be submitted in the required format (PDF/Excel) and reflect SHEQ costs. No contract price adjustments unless provided for in the Invitation to Tender.
Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfMandatory: Valid B-BBEE certificate/affidavit (or CSD report/number) at closing. CIDB registration (if applicable) must be submitted at closing or within 21 working days (proof of application acceptable at closing, full registration required by contract award). Comply with: National Treasury Instructions, CIDB Regulations, PPPFA Regulations, Amended B-BBEE Codes, COIDA, OHS Act, dtic local content requirements, and Eskom’s SHEQ policies. Proof of SHEQ systems required at closing/contract award. Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) apply if contract duration ≥12 months or value ≥R5M (professional services) or CIDB grade ≥7 (construction).
Important Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdfClosing date for submissions in the document: 17 October 2021. Note: This date conflicts with the tender record's closing date (2026-06-08). Verify the correct deadline in the official tender listing.
Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdfDepartment: Supply Chain Management (Quality Management). For specific contacts, refer to the tender document or Eskom’s official procurement portal, as no direct names, emails, or phone numbers are provided in the extracted text.
Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification (3).pdfSubmit the following returnable documents as per the tender category (1-4) specified in Form A (240-68099512):
Category 1: Valid ISO 9001 certificate, latest internal/external audit reports, draft Contract Quality Plan (CQP), example Inspection and Test Plan (ITP)/Quality Control Plan (QCP), documented evidence of Control of Externally Provided Processes, roles/responsibilities, and management review records.
Category 2: Objective evidence of QMS compliance (manual, policy, objectives, documented procedures), latest internal audit reports, draft CQP, example ITP/QCP, documented evidence of Control of Externally Provided Processes, roles/responsibilities, and management review records.
Category 3: Objective evidence of QMS compliance (manual, policy, objectives, documented procedures), draft CQP, example ITP/QCP, documented evidence of Control of Externally Provided Processes, roles/responsibilities.
Category 4: Quality method statement (ISO 9001-based), signed quality policy, quality objectives, documented evidence of Control of Externally Provided Processes, roles/responsibilities.
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdfEvaluation is based on compliance with Eskom’s Supplier Quality Management Specification (240-105658000) and ISO 9001 standards. Key criteria include:
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdfMandatory Compliance:
Submission Guidelines
Source: Post contract award OHS & Quality Requirements for Grid forming Technology.pdfSubmit the following returnable documents as part of your bid: SHE file/SHE Plan, OHS policy signed by CEO/Director, issued tender SHE Specification, issued tender Annexure B, Copy Letter of Good Standing, SHE Plan signed by CEO/Director (covering site access, measurement procedures, protection testing, data security, and emergency contacts), signed 37(2) Agreement, CVs and competency records for key personnel, Risk Assessment Monitoring and Review Plan, Baseline Risk Assessment (covering HV/EHV substation access, Live yard exposure, Interface with inverter-based resources, HVDC and BESS hazards, Travel and remote site access), appointment letters for all required roles (16(2), Principal Contractor, Site Manager, Supervisor, Risk Assessor, Incident Investigator, First Aider), registers/checklists (Safety induction, PPE issue, PPE Matrix, PPE Awareness, Toolbox talk, First aid, Vehicle checklist), head count/total manpower, Training Matrix, OHS Site Specific organogram, Incident Management Procedure, Method Statements for site inspections/data collection, OHN Medical Fitness for Duty Certificate and Annexure 3, Emergency Management Plan, Job descriptions/proof of communication, SHE Communication System, Pre-start job assessment/talk process, Permit-to-Work (PTW) for HV/EHV substation activities, Quality Method Statement, Quality Policy, Quality Objectives, documented roles/responsibilities/authorities (ISO 9001:2015 Clause 5.3), Control of Externally Provided Processes (ISO 9001:2015 Clause 8.4), Form A (completed and signed), proof of previous work done. All safety and quality files must be approved via a formal work authorisation letter before work commencement.
Evaluation Criteria
Source: Post contract award OHS & Quality Requirements for Grid forming Technology.pdfEvaluation includes: quality evaluation of SHE and Quality files, selection and monitoring of performance, re-evaluation of external providers, and compliance with ISO 9001:2015 standards. Approval of Safety and Quality files is mandatory (Y/N).
Technical Specifications
Source: Post contract award OHS & Quality Requirements for Grid forming Technology.pdfScope: Conduct a comprehensive study including assessments, modelling, and recommendations for Grid Forming Technology to support optimal high voltage technology for renewable energy integration. Key technical requirements: HV/EHV substation access, Live yard exposure, Interface with inverter-based resources, HVDC and BESS hazards, Travel and remote site access. Required deliverables: Method Statements for site inspections, data collection at substations, and interface with testing/commissioning teams. Permit-to-Work (PTW) is mandatory for any activity inside HV/EHV substations, coordinated through Eskom Responsible Person or Control Room/System Operator.
Compliance Requirements
Source: Post contract award OHS & Quality Requirements for Grid forming Technology.pdfMandatory compliance: OHS policy signed by CEO/Director, Letter of Good Standing, SHE Plan signed by CEO/Director, signed 37(2) Agreement, appointment letters for all OHS Act roles (16(2), Site Manager, Supervisor, Risk Assessor, Incident Investigator, First Aider), CVs and competency records for key personnel, Risk Assessment and Baseline Risk Assessment, registers/checklists (Safety induction, PPE, Toolbox talk, First aid, Vehicle), Training Matrix, OHS organogram, Incident Management Procedure, Emergency Management Plan, OHN Medical Fitness Certificate, Quality Policy and Objectives, ISO 9001:2015 documented roles and Control of Externally Provided Processes, Form A, proof of previous work. B-BBEE Minimum Level: 2.
Submission Guidelines
Source: Declaration of Undertaking_Grid Forming Technology.pdfRequired returnable documents: Signed Declaration of Undertaking. For contractors based in Annex 1 countries (EU list of non-cooperative jurisdictions), a fully completed and legally countersigned Declaration of Tax Conformity (Appendix 1) must also be submitted at the time of award or contract review. Failure to submit may result in exclusion from the awarding procedure.
Technical Specifications
Source: Declaration of Undertaking_Grid Forming Technology.pdfScope: Provision of consultancy services to conduct a comprehensive study, including assessments, modelling, and recommendations for Grid Forming Technology. Project is executed under the Project Executing Agency (PEA) with financing conditions set by KfW. No legal relationship exists between KfW and the bidder; PEA retains full responsibility for tender process and contract performance.
Compliance Requirements
Source: Declaration of Undertaking_Grid Forming Technology.pdfMandatory compliance: Signed Declaration of Undertaking certifying no bankruptcy, winding-up, or cessation of activities; no criminal convictions (e.g., money laundering, terrorism, child labour, human trafficking); no sanctions/embargoes (UN, EU, Germany); no prior contract terminations for non-compliance (unless disputed). Conflict of interest declarations required if applicable (e.g., affiliation with PEA, business/family ties with PEA staff, shared control with other bidders, or prior involvement in contract specifications). For state-owned entities: proof of legal and financial autonomy under commercial laws. Additional requirements: Commitment to comply with international environmental and labour standards (ILO conventions), environmental treaties, and mitigation measures as specified by PEA. Records must be preserved for at least six years post-contract. Power of attorney required if signing on behalf of a Joint Venture (JV).
Important Dates
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdfContact Information
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdfSubmission Guidelines
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdfTechnical Specifications
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdfSubmission Guidelines
Source: Confirmation of Employment Equity.pdfSubmit proof of compliance with the Employment Equity Act if applicable. South African tenderers only: If employing more than 50 employees, attach proof of submission of the Employment Equity report to the Department of Labour. Indicate employment size (Yes/No) on the form and sign/date the declaration.
Compliance Requirements
Source: Confirmation of Employment Equity.pdfDesignated Employers (as defined in the Employment Equity Act) must provide proof of compliance with the Act. South African tenderers employing more than 50 employees must submit proof of Employment Equity report submission to the Department of Labour.
Important Dates
Source: Comprehensive Study on Grid Forming-List of Tender Returnables_Cat 4.pdfContact Information
Source: Comprehensive Study on Grid Forming-List of Tender Returnables_Cat 4.pdfSubmission Guidelines
Source: Comprehensive Study on Grid Forming-List of Tender Returnables_Cat 4.pdfEvaluation Criteria
Source: Comprehensive Study on Grid Forming-List of Tender Returnables_Cat 4.pdfTechnical Specifications
Source: Comprehensive Study on Grid Forming-List of Tender Returnables_Cat 4.pdfCompliance Requirements
Source: Comprehensive Study on Grid Forming-List of Tender Returnables_Cat 4.pdfTechnical Specifications
Source: 32-136 Contractor Health and Safety Requirement.pdfScope: Conduct a comprehensive study including assessments, modelling, and recommendations for grid-forming technology for Eskom.
Key Requirements:
Deliverables:
Compliance Requirements
Source: 32-136 Contractor Health and Safety Requirement.pdfMandatory Compliance:
32-727: Safety, Health, Environment, and Quality Policy.
32-726: SHE Requirements for the Eskom Commercial Process.
32-296: Integrated SHE Organisation, Roles and Responsibilities, and Statutory Appointments.
32-524: Developing Health & Safety Specifications.
32-529: Occupational Health and Safety Risk Management Process.
240-62196227: Life-Saving Rules Standard.
32-418: Working at Heights Standard.
32-123: Emergency Planning.
32-95: Environmental, Occupational Health and Safety Incident Management Procedure.
Statutory Appointments:
Documentation and Certifications:
Additional Notes:
Submission Guidelines
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements.pdfSubmit the signed Acknowledgement Form for Eskom OHS legal and other requirements (Annexure B, Rev 5, Identifier 240-77471499 Rev 3). Ensure all employees, contractors, and suppliers undergo Eskom induction. Main contractor/supplier must notify Eskom prior to appointing subcontractors or suppliers. Non-compliance may result in penalties.
Technical Specifications
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements.pdfProvide consultancy services for a comprehensive study, including assessments, modelling, and recommendations for grid-forming technology. Main contractor/supplier must: demonstrate processes for selecting subcontractors/suppliers; ensure subcontractors/suppliers have adequate resources and competencies; manage subcontractors/suppliers to comply with Eskom and legal requirements; monitor subcontractors/suppliers via audits/assessments for OHS compliance; provide grounds for termination of subcontractor/supplier work if required.
Compliance Requirements
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements.pdfMandatory compliance with: Eskom Contractor Health and Safety Requirements Standard 32-136; OHS specifications/requirements provided by Eskom; Occupational Health and Safety Act; Compensation for Occupational Diseases and Illnesses Act. Post-award, align company processes with Eskom’s OHS policies, procedures, and standards. Penalties apply for non-conformance by the main supplier or its subcontractors/suppliers. Eskom may request testimonials/references and client contact details (including Eskom) for similar past work. Main supplier is accountable for subcontractor/supplier compliance and must handle non-conformances directly.
Important Dates
Source: Annexure T3-Transmission OHS Tender Evaluation Template (Low Risk Activities).pdfEffective Date: 23 November 2020. Review Date: November 2023.
Submission Guidelines
Source: Annexure T3-Transmission OHS Tender Evaluation Template (Low Risk Activities).pdfSubmit the following returnable documents: For all tenderers: 1) Signed acknowledgement of Eskom's OHS legal and other requirements (Annexure B). 2) OHS Plan addressing project/scope-specific OHS risks, aligned with Eskom's health and safety specifications. 3) Baseline OHS Risk Assessment (BRA) with methodology. 4) Valid Letter of Good Standing (COIDA or equivalent). 5) OHS policy signed by CEO, compliant with OHS Act Section 7. For suppliers with certified auditable OHS systems: 1) Annexure B. 2) BRA, Method Statement, or OHS Plan. 3) Valid Letter of Good Standing (COIDA or equivalent).
Evaluation Criteria
Source: Annexure T3-Transmission OHS Tender Evaluation Template (Low Risk Activities).pdfEvaluation based on OHS compliance: - Verification of submitted returnable documents (Annexure B, OHS Plan, BRA, COIDA Letter of Good Standing, OHS Policy). - Recommendation: 'Recommended' or 'Not Recommended' based on completeness and compliance with Eskom's OHS requirements.
Technical Specifications
Source: Annexure T3-Transmission OHS Tender Evaluation Template (Low Risk Activities).pdfScope: Provision of consultancy services for a comprehensive study on Grid Forming Technology, including: - Assessments. - Modelling. - Recommendations for optimal high voltage technology for renewable energy integration.
Compliance Requirements
Source: Annexure T3-Transmission OHS Tender Evaluation Template (Low Risk Activities).pdfMandatory OHS compliance: - Signed acknowledgement of Eskom's OHS legal and other requirements (Annexure B). - OHS Plan aligned with Eskom's health and safety specifications. - Baseline OHS Risk Assessment (BRA) with methodology. - Valid Letter of Good Standing (COIDA or equivalent). - OHS Policy signed by CEO, compliant with OHS Act Section 7.
Submission Guidelines
Source: SDL&I- Comprehensive Study on Grid Forming Technology.pdfSubmit returnable documents: Valid B-BBEE certificate (SANAS-accredited) or sworn affidavit (CIPC or per B-BBEE Codes of Good Practice). Affidavits must include: deponent’s full name and ID, designation (director/owner/member), enterprise name and address (per CIPC), black/black female/designated group ownership percentages, total annual revenue (audited or management accounts), financial year-end, B-BBEE status level, empowering supplier status. Both deponent and Commissioner of Oath must sign and stamp on the same date, in person. Commissioner cannot be an employee or ex-officio of the enterprise.
Evaluation Criteria
Source: SDL&I- Comprehensive Study on Grid Forming Technology.pdfScoring: Preference points allocated for B-BBEE status via a preference point system. Objective criteria (if included) must align with PPPFA [clause 2(1)(f)]; non-compliance may disqualify the tenderer, defaulting to the second-ranked bidder. SDL&I objectives (e.g., B-BBEE improvement, skills development) do not affect scoring but are contractual obligations. Commitments must be fulfilled post-award.
Technical Specifications
Source: SDL&I- Comprehensive Study on Grid Forming Technology.pdfScope: Consultancy services for a comprehensive study, including assessments, modelling, and recommendations for grid-forming technology. Project duration: 18 months. Deliverables: Study outputs as per the scope of work.
Financial Requirements
Source: SDL&I- Comprehensive Study on Grid Forming Technology.pdfPayment terms: NTCSA retains 2.5% of every invoice (excluding VAT) as performance security for SDL&I obligations. Penalties: 2.5% of invoice amount for non-compliance with SDL&I obligations. Retained amounts are released only upon: submission of SDL&I progress reports, fulfilment of all SDL&I obligations, and submission of an approved compliance report by the SDL&I Department.
Compliance Requirements
Source: SDL&I- Comprehensive Study on Grid Forming Technology.pdfMandatory: Valid B-BBEE certificate or sworn affidavit. Requirements by revenue: EMEs (≤R10M): sworn affidavit; QSEs (≤R50M): sworn affidavit if ≥51% Black-owned, else full QSE scorecard compliance; >R50M: SANAS-accredited certificate. B-BBEE improvement/retention plan: Must be submitted within 30 days of contract signing. B-BBEE targets: Level 1-3: maintain/improve status; Level 4: reach Level 3 by end of Year 1; Levels 5-8: reach Level 4 by end of Year 1 and improve annually thereafter. Skills development: Propose training for 2 candidates in renewable energy skills and capacity building (unemployed graduates/TVET/Matriculates, demographically representative). Local content: Not applicable (not a designated sector). CIDB compulsory training: Not applicable. Subcontracting: Not mandatory.
Submission Guidelines
Source: Technial Evaluation Criteria _Optimal High Voltage Technology for Renewable Energy Integration_GFM.pdfSubmit a detailed company profile, including functional structure, services provided, and lead team experience. Include a comprehensive Project Plan with key milestones, timelines, and resource allocation. Attach at least two (2) written testimonials or reference letters (not older than three years) demonstrating prior experience in Grid Forming Technology (GFM) or similar renewable energy grid integration projects.
Evaluation Criteria
Source: Technial Evaluation Criteria _Optimal High Voltage Technology for Renewable Energy Integration_GFM.pdfEvaluation is based on a 100-point system with a minimum threshold of 75 points to proceed to price evaluation. Criteria and weightings: 1) Company Experience (30 points): Demonstrate experience in GFM design, application, research, grid integration, stability analysis, control strategies, power system modeling, simulation, grid code compliance, and renewable energy project integration. 2) Company Profile (20 points): Functional structure of the company/group and years of experience of the lead team (0=none, 5=<1 year, 10=1-3 years, 15=3-5 years, 20=>5 years). 3) References/Testimonials (30 points): Number of valid testimonials/reference letters (0=none, 10=one, 20=two, 30=three). 4) Approach and Capability (40 points): Understanding of assignment requirements, tailored methodology, technical analysis, modeling, simulation techniques for GFM, and detailed Project Plan with milestones, timelines, and resource allocation (0=no response, 10=poor, 20=satisfactory, 30=good, 40=very good).
Technical Specifications
Source: Technial Evaluation Criteria _Optimal High Voltage Technology for Renewable Energy Integration_GFM.pdfConduct a comprehensive study on Grid Forming Technology (GFM), including: assessments, modeling, and recommendations. Scope requires: demonstration of GFM expertise, grid integration and stability analysis, control strategies, power system modeling and simulation, grid code compliance, and renewable energy project integration. Deliverables must include a detailed Project Plan outlining technical analysis, modeling, simulation techniques, and implementation planning for GFM assessment.
Financial Requirements
Source: Technial Evaluation Criteria _Optimal High Voltage Technology for Renewable Energy Integration_GFM.pdfBids must achieve a minimum total score of 75 points in the technical evaluation to be considered for price evaluation. Pricing details are evaluated only after passing the technical threshold.
Important Dates
Source: NTCSA_E-tendering Help Manual for supplier.pdfClosing date: 2026-06-08 at 10:00. No other dates (briefings, site visits, clarifications) provided in document.
Contact Information
Source: NTCSA_E-tendering Help Manual for supplier.pdfFor system issues: Contact the buyer responsible for the published tender. Automated submission confirmation email: [email protected]. No direct SCM/technical contact details provided.
Submission Guidelines
Source: NTCSA_E-tendering Help Manual for supplier.pdfSubmit via Eskom eTendering portal (https://eTendering.eskom.co.za). Steps: 1) Register with CSD number, verify email and OTP (sent to cellphone and email). 2) Log in, select tender reference E2795NTCSAMWP. 3) Upload documents under correct categories (Technical, Commercial, Finance). 4) File size limits: 50MB per file, 900MB total. 5) Finalize submission before closing date (2026-06-08 10:00). 6) Save submission confirmation email with ID for records. Disqualification risks: Incomplete submissions, late submissions, or incorrect document categorization.
Evaluation Criteria
Source: NTCSA_E-tendering Help Manual for supplier.pdfSelection based on meeting evaluation criteria for closed tenders. Suppliers who qualify are invited via email to bid privately. Criteria details not specified in document.
Technical Specifications
Source: NTCSA_E-tendering Help Manual for supplier.pdfScope: Conduct a comprehensive study including assessments, modelling, and recommendations for grid-forming technology. Deliverables: Consultancy services as per study requirements. No further technical details (standards, capacity, service levels) provided in document.
Compliance Requirements
Source: NTCSA_E-tendering Help Manual for supplier.pdfCSD registration number required to access eTendering system. No other compliance (B-BBEE, CIDB, tax, CIPC) explicitly stated in document.
Contact Information
Source: Comprehensive Study on Grid Forming Technology_Form A_Cat 4.pdfEskom Quality Representative: Albert Shai, SNR Advisor SHEQ (document signed on 10/11/2025).
Submission Guidelines
Source: Comprehensive Study on Grid Forming Technology_Form A_Cat 4.pdfSubmit the completed and signed Form A (Template Identifier 240-43921804 Rev 3) to acknowledge acceptance of Eskom Supplier Quality Requirements as per Specification 240-105658000 and ISO 9001 Standard. The form must include: tenderer’s quality representative’s name, designation, date, and signature. Failure to fully complete and sign the form may result in disqualification.
Evaluation Criteria
Source: Comprehensive Study on Grid Forming Technology_Form A_Cat 4.pdfEvaluation is based on compliance with Eskom’s Pre-Contract Award Quality Requirements (Clause 3.5-105658000, Category 4 selected). Post-contract award evaluation includes: Contract Execution (Clause 3.7-105658000), Supplier Quality Performance Monitoring Phase (Clause 3.7-105658000), Eskom Rights of Access and Information (Clause 3.8-105658000), Preservation, Quality Audits, and Management of Nonconformities. ISO 9001 principles applied: Customer Focus, Leadership, Engagement of People, Process Approach, Improvement, Evidence-Based Decision Making, and Relationship Management.
Technical Specifications
Source: Comprehensive Study on Grid Forming Technology_Form A_Cat 4.pdfProvide consultancy services for a comprehensive study on Grid Forming Technology, including: assessments, modelling, and recommendations. Category 4 of Eskom’s quality requirements applies. Indicate whether site assessment is applicable if relevant to the study.
Compliance Requirements
Source: Comprehensive Study on Grid Forming Technology_Form A_Cat 4.pdfMandatory compliance with Eskom Supplier Quality Requirements (Specification 240-105658000) and ISO 9001 Standard. Tenderer must complete and sign Form A to confirm adherence to these requirements.
Evaluation Criteria
Source: Scope of Work - Optimal High Voltage Technology for Renewable Energy Integration.pdfScoring will focus on the following key areas:
Technical Specifications
Source: Scope of Work - Optimal High Voltage Technology for Renewable Energy Integration.pdfThe study requires the following technical deliverables:
Financial Requirements
Source: Scope of Work - Optimal High Voltage Technology for Renewable Energy Integration.pdfFinancial considerations include:
Compliance Requirements
Source: Scope of Work - Optimal High Voltage Technology for Renewable Energy Integration.pdfCompliance requirements include:
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the type of public body issuing this tender.
Act 71 of 2008
Relevant to governance and reporting obligations for state-owned companies and public entities.
Relevant because this tender appears to involve professional consulting, advisory, research, feasibility, or management services.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2001
Relevant to financial services, audit, accounting, KYC and anti-money-laundering obligations.
Relevant because this tender appears to involve professional consulting, advisory, research, feasibility, or management services.
Address
Megawatt Park - Sunninghill - Johannesburg - 2157
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
23
Last checked
12 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
In the high-stakes arena of South African procurement, winning isn't just about what you bid, but where you bid. Discover how provincial tender data is leveling the playing field for SMMEs and driving localized economic transformation.
As a procurement specialist for Tenders SA, I am excited to share insights on the critical aspects of software development government contracts, specifically focusing on Service Level Agreements (SLAs), Source Code Escrow, and Intellectual Property (IP) clauses. In the current regulatory environment of 2026, security contractors in Gauteng must navigate a complex landscape of compliance requirements to successfully secure and execute government contracts. Understanding these elements is crucial for ensuring that contracts are not only awarded but also executed efficiently, meeting the needs of both the government and the service providers.
Access North West education infrastructure development tenders for 2026. A practical guide to school construction, sanitation, and maintenance procurement for CIDB-registered contractors in the province.
From lodge concessions to conservation supplies, SANParks offers a wide range of procurement opportunities. Learn how to navigate the unique tender landscape of South Africa's national parks in 2026.
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 1 314 689
Range
Based on 23 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Scientific research and development. Unlock full pricing strategies, bid frequency, and historical win rates.