Published
11 May 2026
OCDS Reference
ocds-9t57fa-155657
This tender involves the replacement of existing dip proof inverters (dpi) with uninterruptable power supply (UPS) systems for eskom's kriel power station, covering 6 units over a 2-year period. IT targets suppliers capable of providing compliant standby battery solutions, including flooded lead acid or nickel cadmium batteries, with strict technical, local content, and support requirements.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Categories
Request for Bid(Open-Tender)
Bethal, Ogies road - Kriel - Kriel - 2271
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: 240-70413291 Specification for Electrical Terminal Blocks.pdf, Commercial Supplier Integrity Pact 240-113650212 June 2016.pdf, PAYE Questionnaire for Service Contracts.pdf and 13 more. You don’t need to refresh — this page will pick up the updated review automatically.
11 May
2026
Tender Published
Tender was published
03 Jun
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Commercial Supplier Integrity Pact 240-113650212 June 2016.pdf
240-56176097_Cable schedule_.xlsm
Commercial Code of Ethics 32-527 Rev 0.pdf
Eskom is seeking a contractor to replace six existing 'dip proof inverters' (DPI) with control uninterruptable power supplies (UPSs) at the Kriel Power Station. The contract duration is for a period of two years.
Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 07 April 2026.pdf
Eskom invites tenders for the replacement of 6 existing Dip Proof Inverters (DPI) with Uninterruptable Power Supplies (UPSs) at the Kriel Power Station over a 2-year period.
Commercial Non-Disclosure Agreement (NDA) Vendors MPKRI10838GX.pdf
Eskom is seeking a service provider to replace 6 existing dip proof inverters (DPI) with control uninterruptable power supplies (UPS) at the Kriel Power Station. The contract duration for these services is 2 years.
NEC_ECC3 DPI Replacement.pdf
Eskom Holdings SOC Ltd is inviting tenders for the replacement of existing Dip Proof Inverters (DPI) with Uninterruptible Power Supplies (UPS) across units 3, 4, 5, and 6 at the Kriel Power Station. The contract is for a 2-year period and follows the NEC3 Engineering and Construction Contract (ECC3) Option A framework.
240-95240645 Technical Evaluation Criteria for Standby Batteries.pdf
Eskom is seeking a contractor for the replacement of existing DPI (dip proof inverters) with control uninterruptable power supplies (UPSs) at the Kriel Power Station, involving 6 units over a 2-year period. The tender evaluation is governed by technical criteria for standby batteries and associated ancillary equipment.
240-137465740 - Standby Battery Storage and Commissioning In Eskom.pdf
Eskom is seeking a contractor for the replacement of 6 existing Dip Proof Inverters (DPI) with Control Uninterruptible Power Supplies (UPS) at the Kriel Power Station. The contract duration is 2 years, and the work must adhere to strict Eskom standards regarding battery storage, installation, and commissioning.
377-KRL-AABB-D00139-86 Kriel DPI Replacement with UPS Basic Design Report Rev 1.pdf
Eskom is seeking a contractor to replace existing Dip Proofing Inverters (DPIs) with more reliable modular Control Uninterruptible Power Supplies (UPSs) at the Kriel Power Station. The project covers 6 units over a 2-year period to mitigate production losses caused by DPI design deficiencies and voltage dip sensitivity.
240-56360086 NiCd Batteries spec.pdf
Eskom is inviting tenders for the replacement of 6 existing 'dip proof inverters' (DPI) with control Uninterruptible Power Supplies (UPS) at the Kriel Power Station, covering a 2-year period. The project includes the supply, installation, commissioning, and decommissioning of associated battery systems.
RP_240-90489606 Rev 3 24 May 2022_Final-signed.pdf
Eskom is seeking a contractor to replace existing dip proof inverters (DPI) with control uninterruptible power supplies (UPS) at the Kriel Power Station. The project involves the supply, installation, commissioning, and maintenance of 6 units over a 2-year period.
240-53114248 Thyristor and switchmode chargers, ACDC to DCAC converters and inverter uninterruptible power supplies standard.pdf
Eskom is inviting tenders for the replacement of existing Dip Proof Inverters (DPI) with Control Uninterruptible Power Supplies (UPS) at the Kriel Power Station. The project involves the supply and installation of 6 units over a 2-year period, adhering to strict technical standards for power electronics.
240-170000055 Installation and Commissioning of Power Electronics Equipment.pdf
Eskom is seeking a contractor to replace six existing Dip Proof Inverters (DPI) with control Uninterruptible Power Supplies (UPS) at the Kriel Power Station. The contract duration is for a period of 2 years.
PAYE Questionnaire for Service Contracts.pdf
Eskom is seeking a contractor to replace existing Dip Proof Inverters (DPI) with Control Uninterruptible Power Supplies (UPS) at the Kriel Power Station. The project involves the replacement of 6 units over a 2-year duration.
240-56227443 Generation Requirements for Control and Power Cables for Power Stations Standard (Rev 2).pdf
Eskom is inviting tenders for the replacement of six existing 'dip proof inverters' (DPI) with control uninterruptable power supplies (UPSs) at the Kriel Power Station. The contract duration is for a period of two years.
240-70413291 Specification for Electrical Terminal Blocks.pdf
This tender is for the replacement of existing Dip Proof Inverters (DPI) with Control Uninterruptable Power Supplies (UPSs) at the Kriel Power Station, involving 6 units over a 2-year period. The provided document specifically outlines the mandatory technical standards for electrical terminal blocks used in the associated control and power plant equipment.
C3 1 ECC3 Employers Works Information_DPI replacement with UPS project_rev 2.pdf
Eskom is inviting tenders for the replacement of existing Dip Proofing Inverters (DPIs) with control uninterruptible power supplies (UPSs) at the Kriel Power Station. The project covers six units over a two-year period, involving full engineering, design, manufacturing, installation, testing, commissioning, and staff training.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 4 125 000
Range
Based on CIDB grading. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Evaluation Criteria
Source: 240-70413291 Specification for Electrical Terminal Blocks.pdfEvaluation is based on compliance with technical standards and successful completion of performance tests:
Technical Specifications
Source: 240-70413291 Specification for Electrical Terminal Blocks.pdfScope: Supply electrical terminal blocks for control panels, junction boxes and power‑plant wiring interfaces as defined in Eskom Specification 240‑70413291.
Key requirements:
Compliance Requirements
Source: 240-70413291 Specification for Electrical Terminal Blocks.pdfMandatory compliance:
Submission Guidelines
Source: Commercial Supplier Integrity Pact 240-113650212 June 2016.pdfThe tender refers to required returnable documents, but the specific list and submission instructions are not provided in the extracted text.
Compliance Requirements
Source: Commercial Supplier Integrity Pact 240-113650212 June 2016.pdfThe extracted text does not contain searchable compliance information; further AI extraction is recommended.
Important Dates
Source: PAYE Questionnaire for Service Contracts.pdfContact Information
Source: PAYE Questionnaire for Service Contracts.pdfSubmission Guidelines
Source: PAYE Questionnaire for Service Contracts.pdfEvaluation Criteria
Source: PAYE Questionnaire for Service Contracts.pdfCompliance Requirements
Source: PAYE Questionnaire for Service Contracts.pdfContact Information
Source: 240-137465740 - Standby Battery Storage and Commissioning In Eskom.pdfDr. Titus Mathe (Chief Engineer: DC & Auxiliary Supplies). Additional contacts may include: Christo van Zyl (Battery Care Group Convenor), Thomas Jacobs (Chief Engineer: DC & Auxiliary Supplies), Kashveer Jagdaw (DC & Auxiliary Supplies SC Chairperson).
Submission Guidelines
Source: 240-137465740 - Standby Battery Storage and Commissioning In Eskom.pdfNo submission portal, deadline, or formal bid return process is specified in the document. However, during project execution, the following must be submitted: 1) Completed commissioning checklists (Annexes A-N) for battery room, stands, cubicles, and batteries. 2) All commissioning documents or certificates must be forwarded to the Eskom-appointed DC person for approval. 3) Battery replacement record form (Annex N) must be completed for record-keeping.
Evaluation Criteria
Source: 240-137465740 - Standby Battery Storage and Commissioning In Eskom.pdfCompliance will be evaluated against: 1) ISO 9001 Quality Management Systems. 2) Eskom standard 240-56227923 (Battery Quality Requirements). 3) All commissioning work must be approved by an Eskom-appointed DC person. 4) Non-compliance with storage, installation, or commissioning instructions may lead to disqualification, warranty cancellation, or reduced operational lifetime.
Technical Specifications
Source: 240-137465740 - Standby Battery Storage and Commissioning In Eskom.pdfScope: Replacement of existing DPI (Dip Proof Inverters) with UPS (Uninterruptible Power Supplies) for Kriel Power Station (6 units) over 2 years. Technical requirements include: 1) Storage: Nickel Cadmium (max 24 months, 0°C–30°C, no direct sunlight), Flooded Lead Acid (max 24 months, refreshing charge every 3 months), VRLA (max 24 months, refreshing charge every 3 months). 2) Installation: Battery cubicles/stands must be level, securely mounted, and earthed. Inter-cell connectors must be torque-tightened, colour-coded (red=positive, blue=negative, white=inter-row), and coated with petroleum jelly/no-oxide grease. 3) Commissioning: Calibrated measurement equipment (class 0.5% accuracy) required for voltage, current, temperature, specific gravity, and discharge tests. Mandatory checklists (Annexes A-N) must be completed. 4) Safety: PPE per Eskom standard 240-44175132, no naked flames in battery rooms, adequate ventilation, and insulated tools. 5) Discharge tests: Must meet OEM-specified capacity and voltage thresholds.
Compliance Requirements
Source: 240-137465740 - Standby Battery Storage and Commissioning In Eskom.pdfImportant Dates
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 07 April 2026.pdfClarification meeting (non-compulsory): 14 May 2026 at 11:00 via Microsoft Teams. Clarification query deadline: 5 working days before tender closing. Tender closing date: 03 June 2026 at 10:00.
Contact Information
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 07 April 2026.pdfEskom Representative: Lesiba Mokhonoana. Email: [email protected]. Tel: 017 615 2327.
Submission Guidelines
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 07 April 2026.pdfSubmit tenders electronically via the Eskom E-tendering site. No hard copies will be accepted. Ensure all documents are in PDF format (total size limit 4GB, individual file limit 500MB). Pricing schedules must be submitted in both PDF and Excel formats. Ensure submission status is marked as 'complete' before the deadline. Late tenders will not be accepted.
Evaluation Criteria
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 07 April 2026.pdfEvaluation follows an 80/20 preference point system. Stage 1: Functionality evaluation (100% total, 80% minimum threshold for qualification). Stage 2: Price (80 points) and Specific Goals (20 points).
Technical Specifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 07 April 2026.pdfReplacement of 6 existing Dip Proof Inverters (DPI) with control Uninterruptable Power Supplies (UPSs) at Kriel Power Station for a 2-year period.
Financial Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 07 April 2026.pdfPricing must be inclusive of VAT and exclude contingencies. Unconditional discounts will be considered in evaluation; conditional discounts will be applied only at payment stage. Payment terms for contracts under R50 million are within 30 days of receipt of an undisputed invoice.
Compliance Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 28 - 07 April 2026.pdfMandatory returnables include SBD 1, SBD 4 (Bidders Disclosure), SBD 6.1 (Preference Points), SBD 6.2 (Local Content, if applicable), Authorisation Form, Acknowledgement Form, Tenderer’s particulars, and Integrity Declaration Form. Tenderers must not be restricted by National Treasury or Eskom and must not have a conflict of interest.
Technical Specifications
Source: 240-170000055 Installation and Commissioning of Power Electronics Equipment.pdfScope: Replacement of existing Dip Proof Inverters (DPIs) with Uninterruptible Power Supplies (UPSs) for Kriel Power Station (6 units) over 2 years.
Key Technical Requirements:
Compliance Requirements
Source: 240-170000055 Installation and Commissioning of Power Electronics Equipment.pdfMandatory Compliance:
Documentation and Certification:
Contact Information
Source: Commercial Code of Ethics 32-527 Rev 0.pdfEthics Office advice line: +27 11 800 3187/3189. Email: [email protected]. Fax: 086 663 4120. Whistle-blowing hotline: 0800 11 27 22.
Compliance Requirements
Source: Commercial Code of Ethics 32-527 Rev 0.pdfSuppliers must adhere to Eskom’s Code of Ethics, including: fair, equitable, transparent, competitive, and cost-effective procurement practices; high ethical standards in business dealings; no favouritism or nepotism; compliance with safety, health, and environmental legislation; and protection of confidential information. Suppliers must also comply with Eskom’s Conflict of Interest Policy, Protected Disclosures Policy, and relevant South African legislation (e.g., Labour Relations Act, Employment Equity Act, Basic Conditions of Employment Act).
Submission Guidelines
Source: 377-KRL-AABB-D00139-86 Kriel DPI Replacement with UPS Basic Design Report Rev 1.pdfOpen tender process. Bidders must specialize in the major scope (control supply UPSs) and will be responsible for appointing subcontractors for: cabling, batteries, civil/structural work, and SCADA modifications. Lead contractor must meet criteria outlined in the tender evaluation strategy (to be developed).
Evaluation Criteria
Source: 377-KRL-AABB-D00139-86 Kriel DPI Replacement with UPS Basic Design Report Rev 1.pdfContract awarded to a lead contractor specializing in the major scope (control supply UPSs). Bidders must meet the criteria set out in the tender evaluation strategy (to be developed).
Technical Specifications
Source: 377-KRL-AABB-D00139-86 Kriel DPI Replacement with UPS Basic Design Report Rev 1.pdfScope: Decommission existing Dip Proofing Inverters (DPIs) and supply, install, FAT, SAT, commission, and handover control supply modular UPSs at Kriel Power Station for 380V Unit Boards A-D. Key technical requirements: (n+1) modular redundancy for rectifiers and inverters; hot-swappable modules; NiCd battery backup; bypass line for continuous supply; sustain control supply voltage for 1 second during voltage dips (0.75 Vn); interface with existing 380V Unit Boards A-D; mains recorder for voltage monitoring; alarm integration with EOD SCADA. Structural: Floor slab assessment required for UPS and battery cabinet placement (existing slab may not support load without reinforcement). Equipment ratings: UPSs to match existing DPI ratings (5.75kVA). Standards: Must comply with Eskom and SANS electrical, structural, and safety standards.
Financial Requirements
Source: 377-KRL-AABB-D00139-86 Kriel DPI Replacement with UPS Basic Design Report Rev 1.pdfContract type: NEC3. Estimated capital cost: R23.2M. Pricing format and payment terms to be specified in the tender evaluation strategy.
Compliance Requirements
Source: 377-KRL-AABB-D00139-86 Kriel DPI Replacement with UPS Basic Design Report Rev 1.pdfMandatory compliance with Eskom standards: 240-56227443 (Control and Power Cables), 240-56360086 (Stationary Vented Nickel Cadmium Batteries), 240-137465740 (Standby Battery Storage and Commissioning), 240-53114248 (Thyristor and Switch Mode Chargers/UPS), 240-56356396 (Earthing and Lightning Protection), 240-56364545 (Structural Design), 240-83539994 (NDT Personnel Approval), 240-83540088 (NDT Requirements). Additional compliance: SANS 10142-1 (Low-voltage installations), SANS 10162-1 (Structural use of steel), SANS 10160-1 (Basis of structural design), SANS 10100-1 (Structural use of concrete).
Submission Guidelines
Source: 240-56360086 NiCd Batteries spec.pdfSubmit the following with your bid: 1) OEM letter of certification/accreditation (must include distribution agreement, technical support offered, and warranties); 2) Full equipment track record (years in service, customer references with contact details, environmental conditions, known problems/exceptional performance); 3) Completed Technical Schedules A and B; 4) Certificates proving compliance with environmentally sound disposal of used cells and electrolyte; 5) If deviating from Eskom standards: commissioning and maintenance instructions with differences clearly indicated; 6) Training proposal (course structure, duration, price per course for max 15 people, including venue, equipment, and presenters); 7) Priced spares list (individual pricing, descriptions, reference numbers, 5-year storage guarantee).
Evaluation Criteria
Source: 240-56360086 NiCd Batteries spec.pdfEvaluation is based on: 1) Compliance with SANS 62259:2005 or IEC 62259:2003 for recombination technology; 2) Meeting electrical performance (rated capacity, discharge curves, endurance, charge retention, temperature effects); 3) Quality assurance (ISO 9001 certification); 4) Local support capability (24-hour response during commissioning, trained staff nationally); 5) Prototype inspection and testing by Eskom; 6) Verification of test certificates, drawings, and instruction manuals; 7) Warranty terms (1-year full + 4-year prorated).
Technical Specifications
Source: 240-56360086 NiCd Batteries spec.pdfScope: Manufacture, delivery to site, off-loading, erection, commissioning, and de-commissioning of vented nickel cadmium cells (1.2V nominal) with partial gas recombination for Kriel Power Station. Key requirements: 1) Cells must be wet, charged, and pre-tested (capacity test reports per cell required); 2) Expected life: 17 years with end-of-life capacity ≥80% of C5 (5-hour rated capacity); 3) Must include all inter-cell connectors, nuts, bolts, washers, anti-corrosion lubricant, and cell numbering; 4) Battery cabinets: IP31 rating, ventilation holes, no internal isolation points, sharp edges removed (top drawer or standalone types); 5) Environmental suitability: altitude ≤2200m, humidity 10-85% non-condensing, outdoor temps -10°C to +40°C, room temps -5°C to +50°C; 6) Must provide maintenance equipment (jug, funnel, top-up bottle, lubricant), safety signs, and logbooks (A4, specific covers, NCR paper); 7) Spares: 85-170 cells stocked locally, 24-hour delivery, 10-year availability; 8) Disposal: Environmentally sound processes for cells and electrolyte, with compliance certificates; 9) Training: Optional (if specified), covering installation, commissioning, and maintenance; 10) Warranty: 1-year full + 4-year prorated (proportional to achieved life vs. design life).
Compliance Requirements
Source: 240-56360086 NiCd Batteries spec.pdfSubmission Guidelines
Source: 240-95240645 Technical Evaluation Criteria for Standby Batteries.pdfSubmit all tender information in English. Use the provided electronic MS Excel spreadsheets for Technical Schedules A&B. All supporting documents, including drawings, must be submitted in electronic (e.g., PDF) format. Clearly reference all supporting documents in the relevant columns of the Technical Schedules. Non-compliance with submission format may result in disqualification.
Evaluation Criteria
Source: 240-95240645 Technical Evaluation Criteria for Standby Batteries.pdfTechnical evaluation follows a two-level process with an 80% minimum threshold for acceptability. Level 1: Mandatory Gatekeepers (must pass all to proceed; failure results in 0% technical score). Level 2: Scored evaluation (100% total) with three sub-categories: 1) Product A&B Schedules (50% weight) – scored per item (5 = fully compliant, 2 = partially compliant, 0 = non-compliant), multiplied by item weight. 2) Supplier support, facilities & services (20% weight) – assessed via site visit to OEM/local agent. 3) Risk (30% weight) – split into Product Risk (60% of sub-category, scored 100%, 80%, 40%, or 0%) and Performance Questions (40% of sub-category, covering track record, expertise, and OEM support).
Technical Specifications
Source: 240-95240645 Technical Evaluation Criteria for Standby Batteries.pdfScope: Technical evaluation, testing, and acceptance of Flooded Lead Acid and Nickel Cadmium standby batteries, accessories, and ancillary equipment for Eskom. Standards: Must comply with ISO 9001 (Quality Management), ISO 14001 (Environmental Management), and Eskom-specific standards (240-56360034 for Vented Lead Acid Batteries, 240-56360086 for Nickel Cadmium Cells). Local Content: All battery cabinets and stands must be locally manufactured. Additional: Only single-cell batteries (not blocks) will be accepted. Suppliers must demonstrate capabilities for design, manufacture, testing, delivery, installation, commissioning, de-commissioning, and disposal.
Financial Requirements
Source: 240-95240645 Technical Evaluation Criteria for Standby Batteries.pdfPricing must cover: supply, transportation, de-commissioning, disposal, formation, installation, and commissioning of batteries. Clarify whether guarantees and/or warranties are included in the offered price. Subcontracting (if any) must be disclosed and evaluated as part of the supplier’s facilities assessment.
Compliance Requirements
Source: 240-95240645 Technical Evaluation Criteria for Standby Batteries.pdfMandatory: 1) All tender information in English on provided MS Excel Technical Schedules A&B. 2) All supporting documentation (certificates, type tests, ISO certifications, drawings) must be available. 3) Formal OEM-agent agreement detailing distribution, technical support, and warranties for this tender. 4) Detailed track records (companies, contact details, sites) for all offered equipment. 5) Permanent South African office for supply and support, with advanced-level support available for the contract duration. 6) Local manufacture of battery cabinets and stands. 7) Valid certificates for hazardous substance transport (vehicle and Hazmat agreement). Unacceptable risks: No local/regional track record, non-compliance with type tests, missing OEM support/agent agreement, use of non-Eskom-approved subcontractors, or lack of technical support facilities for commissioning.
Important Dates
Source: NEC_ECC3 DPI Replacement.pdfContact Information
Source: NEC_ECC3 DPI Replacement.pdfProject Manager: Kgomotso Ngweye – Tel: 017 615 2450 – Email: [email protected] – Address: Kriel Power Station, Private Bag x5009, Kriel, 2271. Supervisor: Ted Magwaza – Tel: 017 615 2972 – Email: [email protected] – Address: Kriel Power Station, Private Bag x5009, Kriel, 2271.
Submission Guidelines
Source: NEC_ECC3 DPI Replacement.pdfTechnical Specifications
Source: NEC_ECC3 DPI Replacement.pdfFinancial Requirements
Source: NEC_ECC3 DPI Replacement.pdfCompliance Requirements
Source: NEC_ECC3 DPI Replacement.pdfImportant Dates
Source: RP_240-90489606 Rev 3 24 May 2022_Final-signed.pdfClosing date: 2026-06-03 at 10:00. Document compilation/authorization dates (2022-06-01 to 2022-06-06) are historical and not bid-relevant.
Submission Guidelines
Source: RP_240-90489606 Rev 3 24 May 2022_Final-signed.pdfSubmit all information in English. Provide an OEM letter confirming you are a local agent authorized to: test, commission, maintain, modify, and conduct operating/maintenance training. Submit completed Technical Schedules A&B separately for each offered product (e.g., UPS, chargers, inverters). Include compliance to Referenced Technical Standards (Annex D) with a signed declaration for any deviations. Submit CVs for key personnel involved in development. Failure to meet any mandatory requirement results in automatic disqualification.
Evaluation Criteria
Source: RP_240-90489606 Rev 3 24 May 2022_Final-signed.pdfEvaluation has four stages, each with an 80% minimum threshold to proceed: 1) Mandatory Requirements (pass/fail on submission completeness). 2) Technical Qualitative Requirements (scored sub-categories: Schedules A&B, OEM type testing, manuals/drawings/training, life cycle costing, deemed technical risk, practical evaluation). 3) Factory Evaluation (desktop + site visit, scored via checklist). 4) Deemed Offer Risk (narrative on technical, field failure, pricing, deviations, CVs). Scoring: Fully compliant = 3, Partially compliant = 1, Non-compliant = 0. Critical items weighted 2x or 3x. Claims of compliance are verified; unclaimed compliance is scored as non-compliant.
Technical Specifications
Source: RP_240-90489606 Rev 3 24 May 2022_Final-signed.pdfScope: Design, manufacture, testing, QA, delivery, off-loading, erection, commissioning, decommissioning, installation, and disposal of UPS, phase-controlled/switch-mode chargers, converters, inverters, and Siemens charger retrofits for Eskom’s Generation/Transmission/Distribution. Standards: Eskom 240-53114248 (power electronics) and 240-87040106 (Siemens retrofit). Type testing: SANS 62040-1/2/3, SANS 1652, IEC 60146. OEM/agent must perform FATs and type tests (EMC/RFI via accredited lab). Manuals: Comprehensive OEM manuals required; similar equipment manuals acceptable with compliance commitment. Training: SETA-accredited, 10-year availability, OEM-authorized, includes parameter adjustments/firmware upgrades. Equipment must support local capacity for type testing >16A.
Financial Requirements
Source: RP_240-90489606 Rev 3 24 May 2022_Final-signed.pdfLife Cycle Costing (LCC) is evaluated as part of technical criteria. LCC includes: Total Cost of Ownership (capital cost + energy cost + reliability cost), Mean Time Between Failure (MTBF) data, spares/repair costs, and field failure reports. Pricing anomalies may impact Deemed Offer Risk Evaluation. Submit detailed cost breakdowns for LCC calculations.
Compliance Requirements
Source: RP_240-90489606 Rev 3 24 May 2022_Final-signed.pdfMandatory: All submissions in English; OEM-authorized local agent status; completed Technical Schedules A&B; signed compliance declaration for standards (with deviations); CVs for key personnel. Normative references: ISO 9001, Eskom standards 240-53114248 and 240-87040106. No explicit mention of CSD, tax, B-BBEE, CIDB, CIPC, professional registrations, or local content in the provided document.
Important Dates
Source: 240-53114248 Thyristor and switchmode chargers, ACDC to DCAC converters and inverter uninterruptible power supplies standard.pdfNext review date for the standard: June 2026.
Contact Information
Source: 240-53114248 Thyristor and switchmode chargers, ACDC to DCAC converters and inverter uninterruptible power supplies standard.pdfCompiled by: Yuvir Gokul (Senior Engineer, Transmission). Approved by: Prince Moyo (General Manager: Engineering). Authorized by: Dr. Titus Mathe (General Manager: Technology).
Evaluation Criteria
Source: 240-53114248 Thyristor and switchmode chargers, ACDC to DCAC converters and inverter uninterruptible power supplies standard.pdfEvaluation is based on compliance with Eskom Standard 240-53114248 (Revision 3). Key points:
Technical Specifications
Source: 240-53114248 Thyristor and switchmode chargers, ACDC to DCAC converters and inverter uninterruptible power supplies standard.pdfScope: Replacement of existing dip-proof inverters with control UPS for Kriel Power Station (6 units, 2-year period).
Key requirements:
Compliance Requirements
Source: 240-53114248 Thyristor and switchmode chargers, ACDC to DCAC converters and inverter uninterruptible power supplies standard.pdfMandatory compliance with:
Contact Information
Source: Commercial Non-Disclosure Agreement (NDA) Vendors MPKRI10838GX.pdfEskom Holdings SOC Ltd, Kriel Power Station, Bethal-Ogies Road, Kriel, Mpumalanga, 2271. Postal: Private Bag X5009, Kriel, 2271. Phone: +27 17 615 2653. Contact Person: A Botha.
Technical Specifications
Source: Commercial Non-Disclosure Agreement (NDA) Vendors MPKRI10838GX.pdfScope: Replacement of existing DPI (dip proof inverters) with control uninterruptable power supplies (UPSs) for Kriel Power Station. Quantity: 6 units. Duration: 2 years.
Important Dates
Source: C3 1 ECC3 Employers Works Information_DPI replacement with UPS project_rev 2.pdfFAT notice periods: At least 2 months' notice required if testing is in South Africa. At least 4 months' notice required if testing is outside South Africa.
Evaluation Criteria
Source: C3 1 ECC3 Employers Works Information_DPI replacement with UPS project_rev 2.pdfEvaluation includes: Factory Acceptance Test (FAT) must be conducted by the Contractor at a properly equipped facility in South Africa. System functionality must be demonstrated to the Project Manager/Supervisor. Non-critical defects must be rectified before commissioning.
Technical Specifications
Source: C3 1 ECC3 Employers Works Information_DPI replacement with UPS project_rev 2.pdfScope of work: Decommission and remove existing DPIs (Dip Proof Inverters) and associated feeder circuits. Design, manufacture, supply, install, test, and commission 5kVA control supply UPS units (125% overload capacity for 10 minutes) for 6 units at Kriel Power Station. Supply and install Nicad batteries with 30-minute standby time, hydrogen recombination technology, and compliance with 240-56360086 (Stationary Vented Nickel Cadmium Battery Standard). Design and install earthing/bonding systems per 240-56356396 standard. Modify SCADA for alarming and interface with existing systems. Provide training to Eskom staff, handover software/firmware, and update documentation (e.g., as-built drawings, cable schedules). Compliance with Eskom standards: 240-53114248 (UPS), 240-5622744 (cabling), and 240-56176097 (cable schedule template).
Financial Requirements
Source: C3 1 ECC3 Employers Works Information_DPI replacement with UPS project_rev 2.pdfPayment terms: Based on payment certificates issued by the Project Manager. Contractor must submit tax invoices to Eskom Holdings SOC Ltd matching the certified amount. Bonds and guarantees may be required as per contract terms.
Compliance Requirements
Source: C3 1 ECC3 Employers Works Information_DPI replacement with UPS project_rev 2.pdfMandatory compliance: B-BBEE and preferencing schemes as per tender returnables. ASGI-SA (Accelerated Shared Growth Initiative – South Africa) obligations where applicable. Adherence to Eskom site entry, security, and health and safety regulations. Contractor must appoint a Principal Contractor if required under Construction Regulations 2003. All designs must be signed off by an ECSA-registered engineer. Structural assessments and designs must comply with governing standards.
Submission Guidelines
Source: 240-56227443 Generation Requirements for Control and Power Cables for Power Stations Standard (Rev 2).pdfSubmit all required tender returnable documentation at the time of tender enquiry submission. This includes: - Valid product type test reports for all cables offered, in accordance with the relevant SANS standards. - SANAS accredited product certification body mark scheme documentation, where applicable.
Evaluation Criteria
Source: 240-56227443 Generation Requirements for Control and Power Cables for Power Stations Standard (Rev 2).pdfEvaluation will include: - Compliance with ISO 9001 Quality Management Systems. - Verification of valid product type tests for all cables offered, as per SANS standards (e.g., SANS 97, 1339, 1507, 1574).
Technical Specifications
Source: 240-56227443 Generation Requirements for Control and Power Cables for Power Stations Standard (Rev 2).pdfScope: Replacement of existing dip proof inverters (DPI) with control uninterruptable power supplies (UPS) at Kriel Power Station for 6 units over 2 years.
Cable Requirements: - Must adhere to Eskom standard 240-56227443 for power and control cables. - Cable types: Medium Voltage (MV) XLPE, Low Voltage (LV) power cables, control/protection/instrumentation cables (e.g., BVXnnCM, BVSnnCM, UVGnnACM multicore). - Voltage ratings: MV (3.3kV to 22kV), LV (600/1000V), instrumentation (300/500V). - Conductors: Copper or aluminium (Class 2 per SANS 1411-1), with options for CCA or aluminium alloy for pilot projects. - Insulation: XLPE for MV, PVC for LV, flame-retardant and reduced halogen emission properties required. - Armouring: Galvanized steel wire or aluminium wire, as specified in schedules. - Colour coding: Per SANS 1507-3 (2020) for LV, and specific schemes for instrumentation cables.
Installation: - Must comply with SANS 10198-1 to 13, SANS 10142-1, and Occupational Health and Safety Act. - Cable racking: Horizontal support every 375mm, vertical every 750mm. Trefoil configurations require non-magnetic cleats tested to SANS 61914. - Terminations: Use SANS 1213 mechanical glands. Torque wrenches mandatory; values per standard tables. - Fire performance: Low halogen emission (blue stripe) for tunnels/buildings, flame retardant (red stripe) for buried cables. - Testing: Type tests, sample tests, and routine tests required per SANS standards.
Documentation: - Cable dimensional data and rating information must be provided. - Marking: Outer sheath must include voltage level, cross-sectional area, and trade mark.
Compliance Requirements
Source: 240-56227443 Generation Requirements for Control and Power Cables for Power Stations Standard (Rev 2).pdfSets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Bethal, Ogies road - Kriel - Kriel - 2271
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
17
Last checked
12 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.